October 28, 2014
Update to RMS
1
*Reviewed and Discussed: *ERCOT Protocols and Retail Market Guide Requirements
*TDSPs’ Data Processes for IDR vs. AMS Metered Premises
* IDR Data Flow Overview
*AMS Data Flow Overview
*ERCOT provided a report of the number of ESI IDs currently meeting IDR Threshold Requirements
2
*Pull a list of all competitive BUSIDRRQ ESI IDs where:*esh.stoptime is null (ESI ID record is active)
*losscode <> “T” (ESI ID is connected at a distribution voltage)
*mrecode <> “65” (ESI ID is read by a TDSP)
*status <> “I” (ESI ID is active or de-energized)
*Pull all interval data for identified ESI IDs from 1/1/2002 to present
*Calculate monthly max kW values
*Determine if ESI ID monthly max values exceed a specified threshold by occurring twice in a twelve month period
3
4
39.1%70.8%
57.2%
98.4%
0.0%10.0%20.0%30.0%40.0%50.0%60.0%70.0%80.0%90.0%
100.0%
Oct-2
009
Nov-2
009
Dec-2
009Jan
-2010
Feb-20
10Ma
r-2010
Apr-2
010Ma
y-2010
Jun-20
10Jul
-2010
Aug-2
010Sep
-2010
Oct-2
010
Nov-2
010
Dec-2
010Jan
-2011
Feb-20
11Ma
r-2011
Apr-2
011Ma
y-2011
Jun-20
11Jul
-2011
Aug-2
011Sep
-2011
Oct-2
011
Nov-2
011
Dec-2
011Jan
-2012
Feb-20
12Ma
r-2012
Apr-2
012Ma
y-2012
Jun-20
12Jul
-2012
Aug-2
012Sep
-2012
Oct-2
012
Nov-2
012
Dec-2
012Jan
-2013
Feb-20
13Ma
r-2013
Apr-2
013Ma
y-2013
Jun-20
13Jul
-2013
Aug-2
013Sep
-2013
Oct-2
013
Nov-2
013
Dec-2
013Jan
-2014
Feb-20
14Ma
r-2014
Apr-2
014Ma
y-2014
Jun-20
14Jul
-2014
Aug-2
014Sep
-2014
Percent Actual/Percent Interval Data Recorder (IDR)
Actual Data Used in Initial Settlement (all meter types) Total AMS and IDR Load (actual & estimated)
Oct 2009 - OD+8 Sep 2014 - OD+4
5
42.8%
1.6%0.0%
44.5%
25.8% 26.1%
31.4%27.8%
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
40.0%
45.0%
50.0%
Oct-2
009
Nov-2
009
Dec-2
009
Jan-20
10Feb
-2010
Mar-2
010
Apr-2
010
May-2
010
Jun-20
10Jul
-2010
Aug-2
010
Sep-20
10Oc
t-201
0No
v-201
0De
c-201
0Jan
-2011
Feb-20
11Ma
r-201
1Ap
r-201
1Ma
y-201
1Jun
-2011
Jul-20
11Au
g-201
1Sep
-2011
Oct-2
011
Nov-2
011
Dec-2
011
Jan-20
12Feb
-2012
Mar-2
012
Apr-2
012
May-2
012
Jun-20
12Jul
-2012
Aug-2
012
Sep-20
12Oc
t-201
2No
v-201
2De
c-201
2Jan
-2013
Feb-20
13Ma
r-201
3Ap
r-201
3Ma
y-201
3Jun
-2013
Jul-20
13Au
g-201
3Sep
-2013
Oct-2
013
Nov-2
013
Dec-2
013
Jan-20
14Feb
-2014
Mar-2
014
Apr-2
014
May-2
014
Jun-20
14Jul
-2014
Aug-2
014
Sep-20
14
Percent of Load by Meter Type
Non-Interval Data Recorder (NIDR) Advanced Metering System (AMS) Non Opt-In Entity (NOIE) Competitive Interval DataRecorder (COMP_IDR)
6
*Should the IDR Mandatory Installation Threshold Be Increased, Eliminated or Continue as shown in Protocols Section 18.6?
*Installation and Use of Interval Data Recorder Meters: *18.6.1 Interval Data Recorder Meter Mandatory
Installation Requirements(1) Interval Data Recorder (IDR) Meters are required and shall be installed and utilized for Settlement of Premises having
either:(a) A peak Demand greater than 700 kW (or 700 kVA in CenterPoint
Energy’s service territory); or
(b) Service provided at transmission voltage (above 60 kV).
7
*http://www.ercot.com/calendar/2014/10/20141020-IDRWORKSHOP
Microsoft Word Document
Responses due to [email protected] NLT Wednesday, November 12, 2014 at 5:00 PM
8
*RMS/COPS Workshop II - IDR Meter Protocol Requirement Threshold
*December 2nd, 1:30 - 4:00 pm, following the RMS meeting
*http://ercot.webex.com
*Meeting Number: 654 980 612
*Meeting Password: Workshop2 Audio Dial-In: 1.877.668.4493
*http://www.ercot.com/calendar/2014/12/20141202-IDRWORKSHOP
9
10