October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly...

42
1 N October 2019 Monthly Report Administrative Oversight Committee Citizens Oversight Advisory Committee Richard J. Llewellyn Jr., CAO Chair Adi Liberman, Chair Teresa Villegas, Board of Public Works Francine Diamond Sharon Tso, Chief Legislative Analyst Alina Bokde David Wright, Department of Water & Power Miguel Luna Elizabeth Crosson, Office of the Mayor Cynthia McClain-Hill Craig A. Perkins (Argo Drain Sub-Basin Facility) Proposition O – Clean Water Bond Program PREPARED BY BUREAU OF ENGINEERING PROP O CLEAN WATER BOND DIVISION

Transcript of October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly...

Page 1: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

1

N

October 2019 Monthly Report

Administrative Oversight Committee Citizens Oversight Advisory Committee Richard J. Llewellyn Jr., CAO Chair Adi Liberman, Chair Teresa Villegas, Board of Public Works Francine Diamond Sharon Tso, Chief Legislative Analyst Alina Bokde David Wright, Department of Water & Power Miguel Luna Elizabeth Crosson, Office of the Mayor Cynthia McClain-Hill

Craig A. Perkins

(Argo Drain Sub-Basin Facility)

Proposition O – Clean Water Bond Program

PREPARED BY BUREAU OF ENGINEERING

PROP O CLEAN WATER BOND DIVISION

Page 2: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean
Page 3: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Proposition O – Clean Water Bond Monthly Progress Report – October 2019

- Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 2

Distribution List Richard J. Llewellyn Jr., CAO Office of the City Administrative Officer (CAO) Kevin James, President Board of Public Works Sharon Tso, Chief Legislative Analyst Office of the Chief Legislative Analyst (CLA) Martin L Adams, General Manager Department of Water and Power (DWP) Barbara Romero, Deputy Mayor Mayor’s Office Elizabeth Crosson Mayor’s Office Adi Liberman, Chair Citizens Oversight Advisory Committee Francine Diamond Citizens Oversight Advisory Committee Alina Bokde Citizens Oversight Advisory Committee Miguel Luna Citizens Oversight Advisory Committee Cynthia McClain-Hill Citizens Oversight Advisory Committee Craig A. Perkins Citizens Oversight Advisory Committee Aura Garcia, Vice-President Board of Public Works Michael R. Davis, President Pro-Tempore Board of Public Works Jessica M. Caloza, Commissioner Board of Public Works Teresa Villegas, Commissioner Board of Public Works Gary Lee Moore, City Engineer Bureau of Engineering (BOE) John L. Reamer, Jr., Director Bureau of Contract Administration (BCA) Enrique C. Zaldivar, Director Bureau of Sanitation (BOS) Victoria Santiago, Director Board of Public Works, Office of Accounting Michael A. Shull, General Manager Department of Recreation & Parks (RAP) Kenneth R. Redd, Deputy City Engineer BOE Brian McCormick, Manager III BOS Edward Jordan, Assistant City Attorney City Attorney’s Office Laurie Rittenberg City Attorney’s Office David H. Hirano CAO Roy Cervantes CAO Salyna Cun CAO Rafael E. Prieto CLA David Pettijohn DWP Shahram Kharaghani BOS Christopher F. Johnson BOE Comments or suggestions regarding the Proposition O Monthly Report may be directed to Christopher F. Johnson, BOE Proposition O Implementation Program Manager, at 213-485-1165 or email at [email protected] This report is available for viewing online at: http://www.lacitypropo.org/

TABLE OF CONTENTS

Page 4: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Proposition O – Clean Water Bond Monthly Progress Report – October 2019

- Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 3

Section Page 1.0 Executive Summary 1.1 Program Summary 4 1.1.1 COAC, AOC, and Other

4

1.1.2 Key Issues 5 1.1.3 Proposition O Awards 5 1.1.4 Project Community Meetings Schedule 7 1.2 Bond Sales 8 1.3 Project Status Summary 9 1.3.1 Projects in Planning 9 1.3.2 COAC & AOC Project Funding Recommendations 10 1.3.2.1 COAC & AOC Project Recommendations 10 1.3.3 Total Project Budget Summary 11 1.3.4 Program Budget Summary 12 1.3.5 Projects in Implementation Funding Detail 13 2.0 Schedule 2.1 Project Schedules 15 2.2 Program Master Schedule 17 3.0 Budget 3.1 Budget vs. Actual Expenditure 18 4.0 Project Status 4.1 Project Status Reports 23 5.0 Appendix 5.1 Table of Catch Basin Retrofits Screen Covers and Inserts by Council Districts 37 5.2 Council District Map 38 5.3 Map of Proposition O Projects Approved for Implementation 39

1.0 EXECUTIVE SUMMARY

Page 5: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Proposition O – Clean Water Bond Monthly Progress Report – October 2019

- Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 4

1.1 Program Summary

In November 2004, voters of the City of Los Angeles passed the Proposition O – Clean Water Bond, authorizing $500 million of general obligation bonds for projects to protect public health by cleaning up pollution in the City’s rivers, lakes, and beaches. The projects are intended to assist the City of Los Angeles in meeting Federal Clean Water Act requirements. Proposition O – Clean Water Bond will also fund improvements to protect water quality, provide flood protection, increase water conservation, provide habitat protection, and create open space.

This monthly progress report summarizes the status of activities and progress of the Proposition O – Clean Water Bond program for October 2019.

1.1.1 Citizens Oversight Advisory Committee (COAC), Administrative Oversight Committee (AOC), and Other highlights

• City of Los Angeles Administrative Oversight Committee (AOC) approved the

following on January 31, 2019 and March 28, 2019 respectively:

• City of Los Angeles Administrative Oversight Committee (AOC) approved the following on May 30, 2019:

Recommendations for AOC action, SUBJECT TO THE APPROVAL OF THE CITY COUNCIL: PROPOSITION O CLEAN WATER GENERAL OBLIGATION BOND - BUDGET ADJUSTMENTS 1. Approve the modified Master Schedule in Attachment A for 10 projects and the addition of three projects 2. Authorize an increase in the Aliso Creek Limekiln Creek Restoration Project of $5,200,000, from $10,940,089 to $16,140,089.

3. Approve the Sun Valley/North Hollywood Greenway project in the amount of $849,030.0 PROPOSITION O STAFFING APPROPRIATION FOR FISCAL YEAR 2018-2019 1. Approve the appropriation of up to $7,140,579 for Proposition O staffing costs for the Bureaus Contract Administration (BCA), Engineering (BOE), and Sanitation (BOS) to continue and sustain project implementation. 2. Authorize the City Administrative Officer, in conjunction with BOE, to review proposed staffing cost and to make technical corrections as needed to the recommendations in this correspondence.

Page 6: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Proposition O – Clean Water Bond Monthly Progress Report – October 2019

- Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 5

1.1.2 Key Issues

• None 1.1.3 Prop O Awards

• Elmer Avenue Green Street Project National Association of Clean Water Agencies 2011 Operations and Environmental Performance Award Institute for Sustainable Infrastructure Envision Platinum Award

• South Los Angeles Wetlands Park

Construction Management Association of America – Southern California Chapter 2013 Project Achievement Award – Parks less than $10M Institute for Sustainable Infrastructure Envision Platinum Award American Council of Engineering Companies 2014 Engineering Excellence Awards Competition National Recognition Award

American Academy of Environmental Engineers and Scientists (AAEES) 2014 Superior Achievement Award

• Echo Park Lake Rehabilitation Project

Engineering News Record - California 2013 California Best Projects (Southern California) – Water/Environment American Public Works Association – Southern California Chapter 2013 BEST Project Award - Drainage, Water and Wastewater American Society of Civil Engineers – Metro Los Angeles Branch 2013 Outstanding Public Civil Engineering Project – (Water) over $10M American Society of Civil Engineers – Los Angeles Section 2013 Outstanding Government Civil Engineering Project

California Water Environment Association - Los Angeles Basin Section 2013 Engineering Achievement Award

Southern California Development Forum 2013 Urban Design and Planning Award

National Association of Clean Water Agencies 2014 Operations and Environmental Performance Award

Page 7: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Proposition O – Clean Water Bond Monthly Progress Report – October 2019

- Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 6

Prop O Awards cont’d

American Society of Civil Engineers - Region 9 2013 Outstanding Parks & Recreation Project American Academy of Environmental Engineers and Scientists 2014 Grand Prize for Environmental Sustainability Construction Management Association of America – Southern California Chapter 2014 Project Achievement Award – Public Works Project California Preservation Foundation 2014 California Preservation Design Award - Rehabilitation Category American Society of Civil Engineers - National 2015 Outstanding Civil Engineering Achievement Award Finalist California Stormwater Quality Association (CASQA) 2014 Outstanding Sustainable Stormwater BMP Project American Society of Landscape Architects - Southern California Chapter 2014 Quality of Life Design Award - Honor Award, Recreation and Parks

American Society of Landscape Architects - Southern California Chapter 2014 Quality of Life Design Award - Award of Excellence

• Harbor City Greenway/Machado Lake Phase 1 American Society of Civil Engineers – Metropolitan Los Angeles Branch 2015 Outstanding Environmental Engineering Project American Public Works Association - Southern California Chapter 2015 APWA BEST Project Award - Storm Water Quality

• Rory M. Shaw Wetlands Park

Institute for Sustainable Infrastructure Envision Platinum Award

• Santa Monica Bay Low Flow Diversion Upgrades American Public Works Association – Southern California Chapter 2013 BEST Project Award – Storm Water Quality

• Temescal Canyon Stormwater BMP Phase 1 American Society of Civil Engineers – Metropolitan Los Angeles Branch 2015 Outstanding Small Project

• Broadway Neighborhood Stormwater Greenway Project American Public Works Association – Southern California Chapter 2016 BEST Project Award - Storm Water Quality

Page 8: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Proposition O – Clean Water Bond Monthly Progress Report – October 2019

- Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 7

Prop O Awards cont’d

• Machado Lake Ecosystem Rehabilitation Project American Public Works Association – Southern California Chapter 2018 BEST Project Award – Storm Water Quality Engineering News Record (ENR) California Region 2018 Best Projects Award (Southern California) - Water/Environment

Construction Management Association of America – Southern California Chapter 2018 Project Achievement Award – Public Works American Society of Civil Engineers – Metropolitan Los Angeles Branch 2017 Outstanding Environmental Engineering Project

• Albion Riverside Park Engineering News Record (ENR) California Region 2019 Best Projects Award (Southern California) – Landscape/Urban Developement American Society of Civil Engineers – Metropolitan Los Angeles Branch 2019 Outstanding Parks and Recreation Project

• Argo Drain Sub-Basin Facility Institute for Sustainable Infrastructure

Envision Silver Award

1.1.4 Project Community Meetings Schedule

The following is a list of Proposition O project meetings with the public that occurred in October 2019 and are planned through the month of November 2019.

• Westwood Garden Civic Association: Saturday October 26, 2019, 3:30 – 6:00 pm at St. John’s Presbyterian Church located at 11000 National Blvd., Los Angeles, CA 90064, annual meeting

Page 9: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Proposition O – Clean Water Bond Monthly Progress Report – October 2019

- Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 8

1.2 Bond Sales The following table is a summary of the bond sales that fund Proposition O.

PROPOSITION O BOND SALE SUMMARY

General Obligation Bonds Approved by Voters $500,000,000

$439,500,000 Fund 16F July 13, 2005

City Council Approved Bond Sale $37,000,000 (Ord. 176839 CF 05-1408) Bond Interest Earnings (As of September 30, 2019) $3,093,480.53 Fund 16M July 21, 2006 $8,000,000

City Council Approved Bond Sale (Ord. 177733 CF 06-0600-S37) Bond Interest Earnings (As of September 30, 2019) $908,547.45 Fund 16Q July 22, 2008 $101,000,000

City Council Approved Bond Sale (Ord. 180090 CF 08-1706) Bond Interest Earnings (As of September 30, 2019) $6,610,264.12 Fund 16T July 21, 2009 $176,500,000 City Council Approved Bond Sale (Ord. 180808 CF 09-1674) Bond Interest Earnings (As of September 30, 2019) $12,947,430.38 Fund 16V July 28, 2011 $117,000,000

City Council Approved Bond Sale (Ord. 181755 CF 11-0841) Bond Interest Earnings (As of September 30, 2019) $8,759,539.15

Bond Interest Earnings (As of September 30, 2019) $32,319,261.64

General Obligation Bonds Remaining to be Sold $60,500,000

Page 10: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

1.3.1 Projects in Planning

* except as noted pending further scope & concept development

COAC AOC

Taylor Yard G2 BOS TBD $12,400,000 TBD TBD TBD *

Hollenbeck Lake BOS $5,000,000 $0 $23,000,000 11/20/2017 1/25/2018

Fernangeles Park BOS $2,235,000 $0 $15,000,000 11/20/2017 1/25/2018

Big Tujunga Canyon Via

Verde-RevisedBOS TBD $0 $0 11/20/2017 TBD *

Public Right-of-Way Low Impact

Development

BOS $1,108,750 $0 $399,300 11/20/2017 1/25/2018

Rosa Parks Learning Center

Stormwater Capture

BOS TBD $0 TBD 11/20/2017 1/25/2018

Sepulveda Median Island BOS TBD $0 TBD TBD TBD

$8,343,750 $12,400,000 $38,399,300

Proposition O - Clean Water Bond Monthly Progress Report - October 2019

The following table summarizes the projects that are approved in concept. The projects were presented and approved by the COAC and the AOC on 1/25/2018 and the City Council on 04/10/2018 (CF 13-1526) .

1.3 Project Status Summary

TOTALS

$1,508,050

PROJECTS

Project Title

$2,503,175

ApplicantProp O Funding

Request

Date presented to the COAC & AOC

Total Project Funding Needed

Prop O Pending Future

Allocation

$0

TBD

Funds From Other

Sources (if applicable)

$49,246,225

$28,000,000

$17,235,000

$397,000

Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 9

Page 11: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Sun Valley-North Hollywood Greenway

Project Area 6BOS $849,030 $0 $1,627,370 $2,486,400 $849,030 $849,030 3/18/2019 3/28/2019

1.3.2.1 COAC & AOC Project Recommendations (Pending Funding Approval)

Boyle Heights Joint Use Community Center

City of LA, Council District 14 $2,291,000 $0 $528,000 $2,819,000

$2,291,000 $0 $528,000 $2,819,000

TOTALS

AOC

Prop O Set Aside Funds

Funds From Other Sources

Total Project Funding

Month/Year Recommended by COAC & AOC

TOTALS

July 2007

PROJECTS RECOMMENDED BY COAC AND AOC

Project Title Applicant

Prop O Funding

The following table summarizes the projects approved by COAC and AOC, without funding authority.

Proposition O - Clean Water Bond Monthly Progress Report - October 2019

The following table summarizes the projects approved and recommended by COAC and AOC for funding. The projects were approved by the City Council (10/31/2017) and Mayor (CF 13-1526).

Total Project Funding Needed

1.3.2 COAC & AOC Funding Recommendations (Council & Mayor approved)

Prop O Funding Recommendations

Project Title COAC AOC COAC

Date Recommended by COAC & AOC

PROJECTS RECOMMENDED FOR FUNDING BY COAC AND AOC

Prop O Set Aside Funds

RequestApplicant

Funds From Other Sources (if applicable)

Prop O Funding Request

Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 10

Page 12: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Description Prop O Funding

Pending Future Funding

Allocation

Potential Funds From Other

Sources*Total Project

Budget

Proposition O - Clean Water Bond Monthly Progress Report - October 2019

1.3.3 Project Budget Summary

The following table is a summary of the Proposition O project funding.

$126,474,571

Projects Recommended by AOC

$567,243,794

PROJECT BUDGET SUMMARY

$8,343,750 $12,400,000 $40,902,475 $61,646,225 Projects In Planning– Prop O Funding Request

$0 $0 $0

Projects In Implementation $451,219,782 $0

$0

*Estimated direct funding and potential reimbursements

$12,400,000 $167,377,046

$471,963,532

$628,890,019

TOTALS

Prop O Total Project Obligation

$459,563,532

Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 11

Page 13: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

1.3.4 Prop O - Program Budget Summary October 2019 Monthly Report

Original BudgetApproved Planned Future Allocation

Albion Dairy Park - Demolition & Remediation - COMPLETED 3,956,400$ 3,000,000$ 6,956,400$ Albion Dairy Park - Land Acquisition - COMPLETED 17,560,000$ (3,000,000)$ 14,560,000$ Albion Riverside Park 11,455,000$ 6,900,000$ 18,355,000$ Argo Drain Sub-basin Facility 30,122,000$ 7,965,269$ 38,087,269$ Avalon Green Alley South - COMPLETED 1,602,642$ (108,418)$ 1,494,224$ Aliso Wash - Limekiln Creek Confluence Restoration 1,595,089$ 9,345,000$ 10,940,089$ Boyle Heights Joint Use Community Center Improvements -$ -$ Broadway Neighborhood Stormwater Greenway - COMPLETED 4,626,502$ 4,626,502$ Catch Basin Inserts and Coverings Phase I - COMPLETED 17,000,000$ (2,297,114)$ 14,702,886$ Catch Basin Opening Screen Covers Phase II - COMPLETED 10,000,000$ (369,212)$ 9,630,788$ Catch Basin Opening Screen Covers Phase III - COMPLETED 44,500,000$ 44,500,000$ Catch Basin Inserts & Opening Screen Covers Phase IV 6,160,000$ 6,160,000$ Cesar Chavez Ground Water Improvement - COMPLETED 3,040,000$ (512,127)$ 2,527,873$ Echo Park Lake Rehabilitation - COMPLETED 84,263,313$ (47,637,298)$ 36,626,015$ Elmer Avenue Phase II: Elmer Paseo - COMPLETED $ 829,000 (76,240)$ 752,760$ Glenoaks/Sunland Stormwater Capture - COMPLETED $ 508,696 508,696$ Grand Blvd. Tree Wells - COMPLETED 1,075,927$ (362,888)$ 713,039$ Hansen Dam Wetlands Restoration - COMPLETED 2,220,702$ 2,220,702$ Imperial Highway Sunken Median Stormwater BMP - COMPLETED 2,723,403$ (1,421,679)$ 1,301,724$ Inner Cabrillo Beach Bacterial Water Quality Improvement - COMPLETED 8,000,000$ (1,078,994)$ 6,921,006$ La Cienega/Fairfax Stormwater BMP - CANCELED 7,667,888$ (6,999,728)$ 668,160$ Los Angeles Zoo Parking Lot - COMPLETED 13,904,243$ (7,663,788)$ 6,240,455$ Machado Lake-Phase I (Wilmington Drain) - COMPLETED 21,049,911$ 4,043,800$ 25,093,711$ Machado Lake Ecosystem Rehabilitation 110,457,563$ (11,000,000)$ 99,457,563$ Mar Vista Recreation Center Stormwater BMP - COMPLETED 4,556,186$ 4,556,186$ Oros Green Street - COMPLETED 386,000$ (187,076)$ 198,924$ Peck Park Canyon Enhancement - COMPLETED 6,190,000$ (718,322)$ 5,471,678$ Penmar Water Quality Improvement Phase I - COMPLETED 17,754,800$ 17,754,800$ Penmar Water Quality Improvement Phase II 5,830,200$ 5,830,200$ Rory M. Shaw Wetlands Park 7,800,000$ 7,800,000$ Rosecrans Recreation Center Stormwater Enhancements - COMPLETED 4,829,119$ (1,850,884)$ 2,978,235$ Santa Monica Bay Low Flow Diversion Upgrades, Pkg. 1 - COMPLETED 6,814,377$ (2,201,290)$ 4,613,087$ Santa Monica Bay Low Flow Diversion Upgrades, Pkg. 2 - COMPLETED 3,380,111$ (1,347,770)$ 2,032,341$ Santa Monica Bay Low Flow Diversion Upgrades, Pkg. 3 - COMPLETED 20,634,036$ (6,554,928)$ 14,079,108$ Santa Monica Bay Low Flow Diversion Upgrades, Pkg. 3 Ph II - COMPLETED 14,194,469$ (654,063)$ 13,540,406$ Santa Monica Bay Low Flow Diversion Upgrades, Pkg. 4 - COMPLETED 6,290,504$ (2,399,442)$ 3,891,062$ South Los Angeles Wetlands Park (includes Site Readiness) - COMPLETED 16,678,202$ (6,848,828)$ 9,829,374$ Strathern Pit Multiuse - Land Acquisition - COMPLETED 10,000,000$ 10,000,000$ Sun Valley-North Hollywood Greenway Project Area 6 2,486,400$ 2,486,400$ Taylor Yard River Park - Parcel G2 Land Acquisition - COMPLETED (Non-Prop O) -$ Taylor Yard River Park - Parcel G2 Pending Planned for Future Fund Allocation 12,400,000$ 12,400,000$ Temescal Canyon Park Stormwater Phase I - COMPLETED 14,247,435$ 14,247,435$ Temescal Canyon Park Stormwater Phase II 4,398,565$ 658,000$ 5,056,565$ Vermont Ave Sormwater Capture & Green St. 3,700,000$ 3,700,000$ Westchester Stormwater BMP - RENAMED "ARGO" 32,722,000$ (30,147,213)$ 2,574,787$ Westminster Dog Park Stormwater BMP - COMPLETED 1,438,755$ (750,867)$ 687,888$ Westside Park Rainwater Irrigation - COMPLETED 6,904,589$ (2,348,085)$ 4,556,504$ Westwood Neighborhood Greenway 5,460,000$ 5,460,000$

Total - Project Budget 601,014,027$ 12,400,000$ -$ (106,624,185)$ 506,789,842$

Office of Accounting 1,906,709$ 1,906,709$ Bureau of Contract Administration -$ -$ Bureau of Engineering 7,490,358$ 7,490,358$ Bureau of Sanitation 16,087,893$ 16,087,893$ Related Costs 8,077,839$ 8,077,839$

Subtotal 33,562,799$ -$ -$ -$ 33,562,799$

Program Development/Implementation 600,000$ (136)$ 599,864$ Full Proposal Development 360,000$ 360,000$

Subtotal 960,000$ -$ -$ (136)$ 959,864$

Optimization 1,616,524$ 5,382,000$ 6,998,524$ Arbitrage 2,000,000$ Controller-ITA 2,700$ 2,700$

Subtotal 1,619,224$ 2,000,000$ -$ 5,382,000$ 7,001,224$ Total - Prop O Budget 637,156,050$ 14,400,000$ -$ (101,242,321)$ 548,313,729$

Bond Proceeds - First Sale 37,000,000$ 37,000,000$ Bond Proceeds - First Sale Interest 3,093,192$ 289$ 3,093,481$ Bond Proceeds - Second Sale 8,000,000$ 8,000,000$ Bond Proceeds - Second Sale Interest 908,251$ 296$ 908,547$ Bond Proceeds - Third Sale 101,000,000$ 101,000,000$ Bond Proceeds - Third Sale Interest 6,593,941$ 16,323$ 6,610,264$ Bond Proceeds - Fourth Sale 176,500,000$ 176,500,000$ Bond Proceeds - Fourth Sale Interest 12,847,099$ 100,331$ 12,947,430$ Bond Proceeds - Fifth Sale 117,000,000$ 117,000,000$ Bond Proceeds - Fifth Sale Interest 8,589,535$ 170,004$ 8,759,539$ Bond Proceeds - Future Sales 60,500,000$ 60,500,000$ Secured Grants Received 18,270,046$ 18,270,046$ Sewer Construction and Maintenance (SCM) 6,826,018$ 20,952$ 6,846,970$

Total - Funding Sources $ 496,628,082 $ - $ 60,500,000 $ 308,196 $ 557,436,278 (548,313,729)$

9,122,548$ Bond Proceeds - Secured Grants Anticipated 36,437,505$ 36,437,505$

Project Title

Council / Mayor Approved

Future NeedsBudget

Adjustments

Current Council/Mayor

Approved Budget

PROP O PROGRAM BUDGET CONTINGENCY*

City Staff - Program Related Budget (as of Fiscal Year 16)

Consultants - Program Related Budget (as of October 2015)

General Costs (as of October 2015)

POTENTIAL FUNDING SOURCESFunding Sources (as of October 2015)

Total - Prop O Budget

12

Page 14: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Proj

ect T

itle

Bud

get

Orig

inal

Pro

p O

Fun

ding

(w

ith s

et a

side

s) O

ther

Dire

ct

Fund

ing

Pot

entia

l R

eim

burs

emen

ts

Sou

rce

Sta

tus

Sun

Valle

y-N

orth

Hol

lyw

ood

Gre

enw

ay P

roje

ct A

rea

62,

486,

400

$

$

849

,030

1,

627,

370

$

D

WP

Secu

red

Alis

o C

reek

-Lim

ekiln

Cre

ek R

esto

ratio

n10

,940

,089

$

$

1

4,56

0,00

0 -

$

-$

N/A

Mac

hado

Lak

e Ec

osys

tem

Reh

abili

tatio

n (H

RM

MP)

$

-

$

- -

$

-$

Ror

y M

. Sha

w W

etla

nds

Park

$

22,0

00,0

00

$

7,8

00,0

00

14,2

00,0

00$

-

$

LA

Cnt

y Fl

ood

Con

trol D

istri

ctSe

cure

d

Verm

ont A

ve. S

torm

wat

er C

aptu

re &

Gre

en S

t. Ph

II $

2

,749

,478

$

3

,700

,000

1,

145,

400

$

-

$

M

TA G

rant

Se

cure

d

Argo

Dra

in S

ub-b

asin

Fac

ility

$

52

,865

,131

$

38,

087,

269

14,7

77,8

62$

$

-

LAW

AFu

ndin

g C

onfir

med

Cat

ch B

asin

Inse

rts &

Ope

ning

Scr

een

Cov

ers

Phas

e IV

$

6,1

60,0

00

$

6,1

60,0

00

-$

-

$

N

/AN

/AW

estw

ood

Nei

ghbo

rhoo

d G

reen

way

$

5,4

60,0

00

$

3,2

60,0

00

2,20

0,00

0$

-$

Prop

84

Secu

red

5,00

0,00

0$

-$

Prop

84

Fund

ing

Con

firm

ed1,

644,

500

$

-

$

R

AP F

undi

ngFu

ndin

g C

onfir

med

684,

355

$

-$

Prop

ositi

on K

Fund

ing

Con

firm

ed-

$

-$

750,

000

$

-$

CD

BGFu

ndin

g C

onfir

med

-$

-

$

10

0,00

0$

-

$

M

ayor

's B

udge

tFu

ndin

g C

onfir

med

-$

-

$

20

7,87

5$

-

$

Si

te &

Fac

ility

Fund

ing

Con

firm

ed78

0,00

0$

-

$

Pr

op K

Fund

ing

of $

780,

000

paid

and

com

plet

ed29

6,99

7$

-

$

C

oast

al C

onse

rvan

cy$2

96,9

97 re

ceiv

ed35

2,00

0$

-

$

Q

uim

bySe

cure

d-

$

-$

-$

-

$

-

$

-$

-$

-

$

-

$

-$

-$

-

$

Pe

nmar

Wat

er Q

ualit

y Im

prov

emen

t (P

hase

II)

$

5,8

30,2

00

$

5,8

30,2

00

-$

2,

112,

985

$

Prop

84

$1,9

57,1

52 re

ceiv

ed, 1

0% re

tent

ion

with

held

Tem

esca

l Can

yon

Park

Sto

rmw

ater

BM

P (P

hase

II)

$

5,0

56,5

65

$

4,3

98,5

65

-$

-

$

N

/AN

/AVe

rmon

t Ave

. Sto

rmw

ater

Cap

ture

& G

reen

St.

Ph I

$

9

50,5

22

$

-

604,

500

$

-$

IRW

MP

Secu

red

$

-

$

5

00,0

00

Brow

nsfie

ld$5

00,0

00 re

imbu

rsed

-$

3,

000,

000

$

Dem

oliti

on e

scro

w a

ccou

nt$3

,000

,000

rece

ived

642,

761

$

-$

Sprin

t/Sw

iss

II le

ase

paym

ents

Leas

e pa

ymen

t of $

642,

761

rece

ived

-$

37

,569

$

C

ity C

lerk

Leas

e pa

ymen

t of $

37,5

69 re

ceiv

edAv

alon

Gre

en A

lley

Sout

h $

1

,602

,642

$

1

,494

,224

-

$

891,

344

$

Pr

op 8

4$8

02,2

09 re

ceiv

edAl

bion

Dai

ry P

ark

- Lan

d Ac

quis

ition

$

14,5

60,0

00

$

1

4,56

0,00

0 -

$

-$

N/A

N/A

Broa

dway

Nei

ghbo

rhoo

d St

orm

wat

er G

reen

way

$

4,6

26,5

02

$

4,6

26,5

02

-$

2,

939,

361

$

Prop

84

$2,6

45,4

24.9

0 re

imbu

rsed

Cat

ch B

asin

Inse

rts a

nd C

over

ings

Pha

se I

$

14,7

02,8

86

$

1

4,70

2,88

6 -

$

600,

000

$

Pr

op 4

0G

rant

com

plet

edC

atch

Bas

in O

peni

ng S

cree

n C

over

s Ph

ase

II $

9

,630

,788

$

9

,630

,788

-

$

-$

N/A

N/A

Cat

ch B

asin

Ope

ning

Scr

een

Cov

ers

Phas

e III

$

44

,500

,000

$

44,

500,

000

-$

-

$

N

/AN

/A5,

250,

000

$

-

$

D

WP

Secu

red

750,

000

$

-$

CIW

MB

Secu

red

387,

230

$

-$

UD

AG

Secu

red

414,

000

$

-$

CIE

P Se

cure

d

Albi

on R

iver

side

Par

k

$

10,9

14,6

03

$

2,5

27,8

73

Ces

ar C

have

z G

roun

d W

ater

Impr

ovem

ent

$

9,8

41,2

30

$

2,5

27,8

73

$

1

00,8

86,5

60

$

9

9,45

7,56

3

Proj

ects

Com

plet

ed

Albi

on D

airy

Par

k - D

emol

ition

& R

emed

iatio

n $

6

,956

,400

6,

956,

400

$

Mac

hado

Lak

e Ec

osys

tem

Reh

abili

tatio

n

Proj

ects

in P

ost-C

onst

ruct

ion

Prop

ositi

on O

– C

lean

Wat

er B

ond

M

onth

ly P

rogr

ess

Rep

ort -

Oct

ober

201

9

1.3.

5

Proj

ects

in Im

plem

enta

tion

(App

rove

d by

City

Cou

ncil

& M

ayor

)PR

OJE

CT

FUN

DIN

G D

ETAI

L

Proj

ects

in P

re-D

esig

n

Land

Acq

uisi

tion

/ Rig

ht o

f Way

/App

rova

ls

Proj

ects

in D

esig

n

Proj

ects

in B

id &

Aw

ard

Proj

ects

in C

onst

ruct

ion

13

Page 15: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Proj

ect T

itle

Bud

get

Orig

inal

Pro

p O

Fun

ding

(w

ith s

et a

side

s) O

ther

Dire

ct

Fund

ing

Pot

entia

l R

eim

burs

emen

ts

Sou

rce

Sta

tus

Prop

ositi

on O

– C

lean

Wat

er B

ond

M

onth

ly P

rogr

ess

Rep

ort -

Oct

ober

201

9

1.3.

5

Proj

ects

in Im

plem

enta

tion

(App

rove

d by

City

Cou

ncil

& M

ayor

)PR

OJE

CT

FUN

DIN

G D

ETAI

L

Echo

Par

k La

ke R

ehab

ilita

tion

$

37,2

25,8

90

$

3

6,62

6,01

5 59

9,87

5$

-

$

Pr

op K

Dire

ct fu

ndin

g of

$59

9,87

5 pa

id a

nd c

ompl

eted

Elm

er A

venu

e Ph

ase

II: E

lmer

Pas

eo

$

1,2

75,0

00

$

75

2,76

0 44

6,00

0$

-

$

C

ounc

il fo

r Wat

ersh

ed H

ealth

Secu

red

Gle

noak

s/Su

nlan

d St

orm

wat

er C

aptu

re

$

5

08,6

96

$

50

8,69

6 -

$

-$

N/A

N/A

Gra

nd B

lvd.

Tre

e W

ells

$

713

,039

$

713

,039

-

$

350,

000

$

Pr

op 5

0-SM

BRP

Gra

nt re

imbu

rsem

ent o

f $35

0,00

0 re

ceiv

edH

anse

n D

am W

etla

nds

Res

tora

tion

$

2,5

17,7

02

$

2,2

20,7

02

297,

000

$

-$

Cal

trans

- FT

IPSe

cure

d by

MR

CA

for D

esig

nIm

peria

l Hig

hway

Sun

ken

Med

ian

Stor

mw

ater

BM

P $

1

,301

,724

$

1

,301

,724

-

$

-$

N/A

N/A

Inne

r Cab

rillo

Bea

ch B

acte

rial W

ater

Qua

lity

Impr

ovem

ent

$

16,0

00,0

00

$

6,9

21,0

06

$

8,0

00,0

00

-$

Port

of L

os A

ngel

esSe

cure

dLo

s An

gele

s Zo

o Pa

rkin

g Lo

t $

6

,240

,455

$

6

,240

,455

-

$

-$

N/A

N/A

-$

4,

942,

134

$

Prop

50-

IRW

MP

4,94

2,13

4.46

rece

ived

and

gra

nt c

ompl

eted

8,16

6,47

4$

-$

LA C

nty

Floo

d C

ontro

l Dis

trict

Secu

red

10,0

00$

-$

Law

suit

Settl

emen

tD

irect

fund

ing

of $

10,0

00 p

aid

and

com

plet

ed-

$

1,77

7,83

8$

Am

er R

ecov

&Rei

nves

t Act

(AR

RA)

$1,7

77,8

38 re

ceiv

ed a

nd g

rant

com

plet

ed-

$

300,

000

$

Pr

op 5

0-SM

BRP

$300

,000

rece

ived

and

gra

nt c

ompl

eted

Mar

Vis

ta R

ecre

atio

n C

ente

r Sto

rmw

ater

BM

P (P

hase

II)

$

4

60,0

25

$

4

60,0

25

-$

-

$

N

/AN

/AO

ros

Gre

en S

treet

$

784

,251

$

198

,924

58

6,65

1$

-

$

Pr

op 1

3 &

CW

A 31

9th

Secu

red

1,58

6,19

3$

-$

Prop

50

$1

,586

,193

pai

d12

0,00

0$

-

$

R

ec &

Tra

ils G

rant

co

mpl

eted

14,9

25$

LAC

DPW

com

plet

ed1,

957,

152

$

Dep

t. of

Wat

er R

esou

rces

A re

tent

ion

of $

105,

649.

25 is

bei

ng h

eld

568,

690

$

-$

Prop

KFu

ndin

g se

cure

d 1,

356,

224

$

-

$

TB

DPr

op O

/K to

find

fund

ing

or d

own

scop

e pr

oj-

$

4,36

1,10

6$

(A

RR

A)Pk

g 2

ARR

A fu

ndin

g is

bun

dled

with

Pkg

1-

$

767,

077

$

Pr

op 5

0-C

BI$7

67,0

77 re

ceiv

ed a

nd g

rant

com

plet

edSa

nta

Mon

ica

Bay

Low

Flo

w D

iver

sion

Upg

rade

s, P

kg. 2

2,03

2,34

1$

2,03

2,34

1$

-$

-

$

(A

RR

A)Pk

g 2

ARR

A fu

ndin

g is

bun

dled

with

Pkg

1Sa

nta

Mon

ica

Bay

Low

Flo

w D

iver

sion

Upg

rade

s, P

kg. 3

14

,079

,108

$

14,0

79,1

08$

-

$

-$

N/A

N/A

Sant

a M

onic

a Ba

y Lo

w F

low

Div

ersi

on U

pgra

des,

Pkg

. 3 P

h 2

14,1

94,4

69$

-

$

17

3,98

1$

6,

826,

018

$

SCM

Fun

d$1

73,9

81 p

aid

& $6

,826

,018

reim

burs

edSa

nta

Mon

ica

Bay

Low

Flo

w D

iver

sion

Upg

rade

s, P

kg. 4

3,89

1,06

2$

3,89

1,06

2$

-$

-

$

Pr

op 5

0-C

BIPk

g. 4

is b

undl

ed w

ith P

kg. 1

-$

3,

713,

368

$

Prop

50-

IRW

MP

$3,7

13,3

68.4

3 re

ceiv

ed a

nd g

rant

com

plet

ed2,

011,

937

$

-

$

Pr

op 1

2 (R

ZH) -

for L

and

Dire

ct fu

ndin

g of

$2,

011,

937

paid

and

com

pl1,

282,

721

$

-

$

Pr

op 4

0 (R

ZH)

Dire

ct fu

ndin

g of

$1,

282,

721

paid

and

com

pl3,

277,

193

$

-

$

Su

pple

men

tal E

nv. P

roje

ctFu

ndin

g of

$3,

277,

193

paid

1,00

0,00

0$

-$

Prop

K -

for L

and

Acqu

isiti

onD

irect

fund

ing

of $

1,00

0,00

0 pa

id a

nd c

ompl

500,

000

$

-$

Prop

KD

irect

fund

ing

of $

500,

000

paid

and

com

pl-

$

858,

525

$

M

TA fo

r rem

edia

tion

$858

,525

rece

ived

-

$

67,5

01$

MTA

- le

ase

paym

ent

Leas

e pa

ymen

t of $

67,5

01 re

ceiv

ed

-$

19

9,97

7$

EPA

- Bro

wnf

ield

s gr

ant

$199

,977

rece

ived

and

gra

nt c

ompl

eted

Stra

ther

n Pi

t Mul

tiuse

- La

nd A

cqui

sitio

n $

28

,000

,000

$

10,

000,

000

18,0

00,0

00$

-

$

LA

Cnt

y Fl

ood

Con

trol D

istri

ctSe

cure

d

Tayl

or Y

ard

Riv

er P

ark

- Pa

rcel

G2

(Pen

ding

Fut

ure

Allo

catio

n) $

12

,400

,000

$

- $

-

$

- N

/A

Land

Acq

uisi

tion

non-

Prop

O is

com

plet

e. P

rop

O s

cope

for p

oten

tial p

lann

ed p

roje

ct is

pe

ndin

g fu

ture

fund

ing

allo

catio

nTe

mes

cal C

anyo

n Pa

rk S

torm

wat

er B

MP

(Pha

se I)

$

14,2

47,4

35

$

1

4,24

7,43

5 $

-

$

- N

/AN

/AW

estm

inst

er D

og P

ark

Stor

mw

ater

BM

P $

687

,888

$

687

,888

-

$

-$

N/A

N/A

-$

2,

000,

000

$

Prop

50-

SMBR

PG

rant

com

plet

ed90

0,00

0$

-

$

Q

uim

bySe

cure

d29

0,03

8$

-

$

Pr

op K

Secu

red

Mac

hado

Lak

e Ph

ase

I (W

ilmin

gton

Dra

in) H

RM

MP

-$

$

- -

$

-$

Proj

ect

La C

iene

ga F

airfa

x St

orm

wat

er B

MP

- CAN

CEL

ED $

668

,159

$

668

,159

-

$

-$

N/A

Proj

ect c

ance

led

Wes

tche

ster

Sto

rmw

ater

BM

P - R

ENAM

ED "

ARG

O"

$

2,5

74,7

87

$

2,5

74,7

87

-$

-

$

N

/AN

/A

$

5

66,3

82,0

84

$

46

3,29

7,81

9 99

,360

,457

$

38,2

16,8

81$

137,

577,

338

$

Wes

tsid

e Pa

rk R

ainw

ater

Irrig

atio

n5,

746,

542

$

4,

556,

504

$

Penm

ar W

ater

Qua

lity

Impr

ovem

ent

(Pha

se I)

$

17,7

54,8

00

$

1

7,75

4,80

0

Proj

ects

Com

plet

ed

Mac

hado

Lak

e-Ph

ase

I (W

ilmin

gton

Dra

in)

$

25,0

93,7

11

$

2

5,09

3,71

1

Proj

ects

Can

cele

d/R

enam

ed

TOTA

LS

Sant

a M

onic

a Ba

y Lo

w F

low

Div

ersi

on U

pgra

des,

Pkg

. 14,

613,

087

$

4,

613,

087

$

Sout

h Lo

s An

gele

s W

etla

nds

Park

(inc

lude

s Si

te R

eadi

ness

) $

17

,901

,225

$

9

,829

,374

-$

Ros

ecra

ns R

ecre

atio

n C

ente

r Sto

rmw

ater

Enh

ance

men

ts $

4

,903

,149

$

2

,978

,235

Mar

Vis

ta R

ecre

atio

n C

ente

r Sto

rmw

ater

BM

P $

4

,096

,161

$

4

,096

,161

Peck

Par

k C

anyo

n En

hanc

emen

t $

7

,177

,871

$

5

,471

,678

14

Page 16: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Proposition O – Clean Water Bond Monthly Progress Report – October 2019

- Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 15

2.1 Project Schedules The following table summarizes the schedule status for projects based on the new master schedule update effective July 2, 2019, pending approval.

Description Ahead On Behind Projects in Pre-Design Land Acquisition / Right of Way Projects Aliso Creek-Limekiln Creek Restoration Machado Lake Ecosystem Rehabilitation HRMMP

Projects in Design Rory M. Shaw Wetlands Park* Projects in Bid & Award Vermont Ave. Stormwater Capture & Green St. Ph II Projects in Construction Argo Drain Sub-basin Facility Catch Basin Inserts & Opening Screen Covers Phase IV* Machado Lake Pipeline – Eastern Reach** Westwood Neighborhood Greenway Projects in Post Construction Albion Riverside Park Machado Lake Ecosystem Rehabilitation Machado Lake Pipeline** Mar Vista Recreation Center Stormwater BMP Phase II Penmar Water Quality Improvement Phase II Temescal Canyon Park Stormwater BMP Phase II Vermont Ave. Stormwater Capture & Green St. Phase 1 Projects Completed Albion Dairy Park – Demolition & Remediation Albion Dairy Park – Land Acquisition* Avalon Green Alley South Broadway Neighborhood Stormwater Greenway Catch Basin Inserts and Coverings Phase I Catch Basin Opening Screen Covers Phase II Catch Basin Inserts & Opening Screen Covers Phase III* Cesar Chavez Ground Water Improvement* (a.k.a. Sheldon Arleta) Echo Park Lake Rehabilitation Elmer Avenue Phase II: Elmer Paseo Glenoaks/Sunland Stormwater Capture Grand Blvd. Tree Wells Hansen Dam Wetlands Restoration Imperial Highway Sunken Median Stormwater BMP Inner Cabrillo Beach Bacterial Water Quality Improvement* Los Angeles Zoo Parking Lot Machado Lake Phase I (Wilmington Drain) Mar Vista Recreation Center Stormwater BMP Oros Green Street Peck Park Canyon Enhancement Penmar Water Quality Improvement Phase I Rosecrans Recreation Center Stormwater Enhancements* Santa Monica Bay Low Flow Diversion Upgrades Pkg. 1 Santa Monica Bay Low Flow Diversion Upgrades Pkg. 2 Santa Monica Bay Low Flow Diversion Upgrades Pkg. 3 Santa Monica Bay Low Flow Diversion Upgrades Pkg. 3 Phase II Santa Monica Bay Low Flow Diversion Upgrades Pkg. 4

2.0 SCHEDULE

Page 17: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Proposition O – Clean Water Bond Monthly Progress Report – October 2019

- Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 16

Prop O Schedule Cont’d Projects Completed South Los Angeles Wetlands Park Strathern Pit Multiuse – Land Acquisition* Taylor Yard River Park-Parcel G2 Land Acquisition* Temescal Canyon Park Stormwater BMP Phase I Westminster Dog Park Stormwater BMP Westside Park Rainwater Irrigation Machado Lake Phase I (Wilmington Drain) HRMMP Projects Canceled Cabrito Paseo Walkway/Bike Path (CANCELED) La Cienega/Fairfax Stormwater BMP (CANCELED) Westchester Stormwater BMP (RENAMED ARGO) *Schedule not controlled by Prop O **Non Prop O Funded

Page 18: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

2.2

Proj

ect M

aste

r Sch

edul

e

Page 19: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Project Original Prop O Budget

Current Prop O Budget

September Expenditures

Prop O Expenditures as of

September 31, 2019Albion Dairy Park Demolition & Remediation

Funding Category 3Pre-Design/Design/ Construction Mgmt/Inspection

$816,400 $816,400 $0 $2,258,768

Construction Cost $3,140,000 $6,140,000 $0 $4,093,136$3,956,400 $6,956,400 $0 $6,351,904

Albion Dairy Park Land Acquisition Land Acquisition $17,560,000 $14,560,000 $0 $14,471,528Funding Category 2

*$3 million in escrow reimbursement provided to Albion Dairy Park Demolition & Remediation

Pre-Design/Design/ Construction Mgmt/Inspection

$0 $0 $0 $63,412

Construction Cost $0 $0 $0 $0 Sub-total $17,560,000 $14,560,000 $0 $14,534,940

Land Acquisition

Funding Category 2

Pre-Design/Design/ Construction Mgmt/Inspection

$2,907,000 $2,907,000 $1,623 $2,563,685

Construction Cost $8,548,000 $15,448,000 $277,261 $15,272,824Sub-total $11,455,000 $18,355,000 $278,884 $17,836,509

Land Acquisition

Funding Category 2

Pre-Design/Design/ Construction Mgmt/Inspection

$1,595,089 $1,595,089 $173 $1,118,253

Construction Cost $0 $9,345,000 $0 $0Sub-total $1,595,089 $10,940,089 $173 $1,118,253

Land Acquisition

Funding Category 1, 2, & 4

Pre-Design/Design/ Construction Mgmt/Inspection

$3,622,200 $3,622,000 $126,964 $1,848,733

Construction Cost $26,500,000 $34,465,269 $1,588,314 $6,300,607Sub-total $30,122,200 $38,087,269 $1,715,278 $8,149,340

Land Acquisition

Funding Category 2 and 4

Pre-Design/Design/ Construction Mgmt/Inspection

$481,913 $481,913 $0 $45,455

Construction Cost $1,120,729 $1,120,729 $0 $1,424,130 Sub-total $1,602,642 $1,602,642 $0 $1,469,585

Land Acquisition

Funding Category 2 and 4

Pre-Design/Design/ Construction Mgmt/Inspection

$1,331,046 $1,331,046 $0 1,684,108

Construction Cost $3,095,456 $3,095,456 $0 2,367,481 Sub-total $4,626,502 $4,626,502 $0 $4,525,819

Land Acquisition

Funding Category 1

Pre-Design/Design/ Construction Mgmt/Inspection

$2,100,000 $560,017 $0 $560,017

Construction Cost $14,900,000 $14,142,869 $0 $14,142,869 Sub-total $17,000,000 $14,702,886 $0 $14,702,886

$0

$0

$474,230

$0

$0

COUNCIL/MAYOR APPROVED CLOSE-OUT

$0

Argo Drain Sub-basin Facility

Avalon Green Alley South$0 $0 $0

Catch Basin Inserts and Coverings Ph I $0 $0

Broadway Neighborhood Stormwater Greenway $200,000 $200,000 $0

$0 $0

Aliso Creek-Limekiln Creek Restoration$0 $0

Proposition O - Clean Water Bond

3.1 Budget vs. Actual Expenditure

$0 $0 $0

$0Albion Riverside Park Improvements

CLOSEOUT NEED COUNCIL/MAYOR APPROVAL

$0$0

$0

$0

$0

3.0 PROP O PROGRAM BUDGET

18

Page 20: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Proposition O - Clean Water Bond

Project Original Prop O Budget

Current Prop O Budget

September Expenditures

Prop O Expenditures as of

September 31, 2019

Land Acquisition

Funding Category 1 Pre-Design/Design/ Construction Mgmt/Inspection

$0 $383,822 $0 $383,822

Construction Cost $10,000,000 $9,246,965 $0 $9,246,965 Sub-total $10,000,000 $9,630,787 $0 $9,630,787

Land Acquisition

Funding Category 1 & 4

Pre-Design/Design/ Construction Mgmt/Inspection

$2,475,000 $2,475,000 $0 $7,028,411

Construction Cost $42,025,000 $42,025,000 $0 $36,449,516 Sub-total $44,500,000 $44,500,000 $0 $43,477,927

Land Acquisition

Funding Category 1 & 4

Pre-Design/Design/ Construction Mgmt/Inspection

$0 $3,400,000 $0 $3,615,121

Construction Cost $0 $2,760,000 $14,219 $1,168,160Sub-total $0 $6,160,000 $14,219 $4,783,281

Land Acquisition

Funding Category 2Pre-Design/Design/ Construction Mgmt/Inspection

$1,234,950 $712,248 $0 $712,248

Construction Cost $1,805,050 $1,815,625 $0 $1,815,625Sub-total $3,040,000 $2,527,873 $0 $2,527,873

Echo Park Lake Rehabilitation Land Acquisition $0 $0 $0 $0

Funding Category 1, 2, 3, & 4

Pre-Design/Design/ Construction Mgmt/Inspection

$19,569,791 $10,653,574 $0 $10,653,574

Construction Cost $64,693,522 $25,972,441 $0 $25,972,441 Sub-total $84,263,313 $36,626,015 $0 $36,626,015

Land Acquisition

Funding Category 3

Pre-Design/Design/ Construction Mgmt/Inspection

$318,900 $318,900 $0 $283,699

Construction Cost $510,100 $510,100 $0 $469,042 Sub-total $829,000 $829,000 $0 $752,741

Land Acquisition

Funding Category 3

Pre-Design/Design/ Construction Mgmt/Inspection

$168,696 $168,696 $0 $35,757

Construction Cost $340,000 $340,000 $0 $340,748 Sub-total $508,696 $508,696 $0 $376,505

Grand Blvd. Tree Wells Land Acquisition $0 $0 $0 $0

Funding Category 1

Pre-Design/Design/ Construction Mgmt/Inspection

$248,927 $330,595 $0 $330,595

Construction Cost $827,000 $382,444 $0 $382,444COUNCIL/MAYOR APPROVED CLOSE-OUT Sub-total $1,075,927 $713,039 $0 $713,039Hansen Dam Wetland Restoration Land Acquisition $0 $0 $0 $0

Funding Category 3

Pre-Design/Design/ Construction Mgmt/Inspection

$637,302 $637,302 $0 $467,303

Construction Cost $1,583,400 $1,583,400 $0 $1,345,488 Sub-total $2,220,702 $2,220,702 $0 $1,812,791

$0

$0

$0

$0 $0

$0

$0

COUNCIL/MAYOR APPROVED CLOSE-OUT

PRE-CLOSE-OUT

$0 $0

PRE-CLOSE-OUT

Elmer Avenue Phase II: Elmer Paseo$0 $0 $0

Glenoak/Sunland Stormwater Capture

PRE-CLOSE-OUT

Cesar Chavez Ground Water Improvement $0 $0 $0

COUNCIL/MAYOR APPROVED CLOSE-OUT

Catch Basin Opening Screen Covers Ph IV $0 $0 $0

COUNCIL/MAYOR APPROVED CLOSE-OUT

Catch Basin Opening Screen Covers Ph II $0 $0 $0

Catch Basin Opening Screen Covers Ph III $0 $0 $0

19

Page 21: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Proposition O - Clean Water Bond

Project Original Prop O Budget

Current Prop O Budget

September Expenditures

Prop O Expenditures as of

September 31, 2019

Land Acquisition

Funding Category 1

Pre-Design/Design/ Construction Mgmt/Inspection

$505,700 $537,188 $0 $537,188

Construction Cost $2,217,703 $764,536 $0 $764,536 Sub-total $2,723,403 $1,301,724 $0 $1,301,724

Land Acquisition

Funding Category 1

Pre-Design/Design/ Construction Mgmt/Inspection

$1,043,478 $1,043,478 $0 $14,455

Construction Cost $6,956,522 $6,956,522 $0 $6,906,550 Sub-total $8,000,000 $8,000,000 $0 $6,921,005

Land Acquisition

Funding Category 1 Pre-Design/Design/ Construction Mgmt/Inspection

$2,050,388 $668,159 $0 $0

Construction Cost $5,617,500 $0 $0 $0 Sub-total $7,667,888 $668,159 $0 $0

LA Zoo Parking Lot Land Acquisition $0 $0 $0 $0

Funding Category 1 & 3Pre-Design/Design/ Construction Mgmt/Inspection

$2,774,743 $1,726,283 $0 $1,726,283

Construction Cost $11,129,500 $4,514,172 $0 $4,514,172 Sub-total $13,904,243 $6,240,455 $0 $6,240,455

Land Acquisition(Includes Habitat Restoration Mitigation & Monitoring Plan)

Pre-Design/Design/ Construction Mgmt/Inspection

$5,298,626 $5,298,626 $743 $8,550,117

Construction Cost $15,751,285 $19,795,085 $0 $16,117,358 Sub-total $21,049,911 $25,093,711 $743 $24,667,475

Land Acquisition(Includes Habitat Restoration Mitigation & Monitoring Plan)

Pre-Design/Design/ Construction Mgmt/Inspection

$23,113,996 $20,369,499 $408 $17,518,880

Construction Cost $65,409,901 $79,088,064 $0 $73,169,622 Sub-total $88,523,897 $99,457,563 $408 $90,688,502

Land Acquisition

Funding Category 1

Pre-Design/Design/ Construction Mgmt/Inspection

$1,130,482 $1,130,482 $0 $1,660,090

Construction Cost $3,425,704 $3,425,704 $0 $2,703,861 Sub-total $4,556,186 $4,556,186 $0 $4,363,951

Oros Green Street Land Acquisition $0 $0 $0 $0

Funding Category 4Pre-Design/Design/ Construction Mgmt/Inspection

$300,000 $1,325 $0 $1,325

Construction Cost $86,000 $197,600 $0 $197,600 Sub-total $386,000 $198,925 $0 $198,925

Land Acquisition

Funding Category 3

Pre-Design/Design/ Construction Mgmt/Inspection

$714,662 $2,978,961 $0 $2,978,961

Construction Cost $5,475,338 $2,578,129 $0 $2,578,129 Sub-total $6,190,000 $5,557,090 $0 $5,557,090

$0

$0

$0

$0

$0

N/A

$0

COUNCIL/MAYOR APPROVED CLOSE-OUT

Peck Park Canyon Enhancement$0 $0 $0

Mar Vista Recreation Center Stormwater BMP (Phases I & II) $0 $0 $0

Funding Category 1 & 3

Machado Lake Ecosystem Rehabilitation $0 $0 $0

Funding Category 1 & 3

Machado Lake - Phase I (Wilmington Drain) $0 $0 $0

La Cienega/Fairfax Stormwater BMP (Canceled) $0 $0 $0

COUNCIL/MAYOR APPROVED CLOSE-OUT

CANCELED

Inner Cabrillo Beach Bacterial Water Quality Improvement N/A N/A N/A

COUNCIL/MAYOR APPROVED CLOSE-OUT

Imperial Hwy Sunken Median Stormwater BMP $0 $0 $0

20

Page 22: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Proposition O - Clean Water Bond

Project Original Prop O Budget

Current Prop O Budget

September Expenditures

Prop O Expenditures as of

September 31, 2019

Land Acquisition

Funding Category 2 & 4

Pre-Design/Design/ Construction Mgmt/Inspection

$3,946,800 $4,600,000 $0 $5,039,805

Construction Cost $16,808,000 $13,154,800 $0 $12,363,592 Sub-total $20,754,800 $17,754,800 $0 $17,403,397

Land Acquisition

Funding Category 4

Pre-Design/Design/ Construction Mgmt/Inspection

$538,200 $1,582,000 $637 $1,588,517

Construction Cost $2,292,000 $4,248,200 $0 $3,222,457 Sub-total $2,830,200 $5,830,200 $637 $4,810,974

Rory M. Shaw Wetlands ParkLand Acquisition $0 $0 $0 $0

Funding Category 2

Pre-Design/Design/ Construction Mgmt/Inspection

$0 $0 $0 $9,455

Construction Cost $7,800,000 $7,800,000 $0 $0 Sub-total $7,800,000 $7,800,000 $0 $9,455

$0Land Acquisition

Funding Category 3 & 4

Pre-Design/Design/ Construction Mgmt/Inspection

$1,106,427 $144,737 $0 $144,737

Construction Cost $3,722,692 $2,833,498 $0 $2,833,498 Sub-total $4,829,119 $2,978,235 $0 $2,978,235

Land Acquisition

Funding Category 1

Pre-Design/Design/ Construction Mgmt/Inspection

$1,864,976 $1,413,342 $0 $1,409,649

Construction Cost $4,949,401 $3,199,746 $0 $3,143,463 Sub-total $6,814,377 $4,613,088 $0 $4,553,112

Land Acquisition

Funding Category 1

Pre-Design/Design/ Construction Mgmt/Inspection

$925,077 $858,394 $0 $852,465

Construction Cost $2,455,034 $1,173,948 $0 $1,173,948 Sub-total $3,380,111 $2,032,342 $0 $2,026,413

Right of Way

Funding Category 1

Pre-Design/Design/ Construction Mgmt/Inspection

$5,378,778 $3,627,036 $0 $3,640,026

Construction Cost $13,255,258 $8,452,072 $0 $8,446,053 Sub-total $20,634,036 $14,079,108 $0 $12,604,684

Right of Way

Funding Category 1

Pre-Design/Design/ Construction Mgmt/Inspection

$0 $1,790,120 $0 $2,154,199

Construction Cost $0 $12,153,554 $0 $11,245,535 Sub-total $0 $14,194,469 $0 $13,399,734

Land Acquisition

Funding Category 1

Pre-Design/Design/ Construction Mgmt/Inspection

$1,721,601 $1,434,020 $0 $1,391,303

Construction Cost $4,568,903 $2,457,042 $0 $2,457,042 Sub-total $6,290,504 $3,891,062 $0 $3,848,345

$0

$518,605

$0

$0

$0

$0

$0

$0

$0

Santa Monica Bay Low Flow Diversion Upgrades P 4 $0 $0 $0

PRE-CLOSEOUT

Santa Monica Bay Low Flow Diversion Upgrades P 3 Phase 2 $0 $250,795 $0

PRE-CLOSE-OUT

PRE-CLOSE-OUTSanta Monica Bay Low Flow Diversion Upgrades P 3 $2,000,000 $2,000,000 $0

Penmar Water Quality Improvement Phase II $0 $0 $0

PRE-CLOSE-OUT

Santa Monica Bay Low Flow Diversion Upgrades P 2 $0 $0 $0

PRE-CLOSE-OUT

Santa Monica Bay Low Flow Diversion Upgrades P 1 $0 $0 $0

Rosecrans Recreation Center Stormwater Enhancements $0 $0

PRE-CLOSEOUT

Penmar Water Quality Improvement Phase I $0 $0

21

Page 23: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Proposition O - Clean Water Bond

Project Original Prop O Budget

Current Prop O Budget

September Expenditures

Prop O Expenditures as of

September 31, 2019

Funding Category 3Pre-Design/Design/ Construction Mgmt/Inspection

$4,466,265 $5,973,306 $0 $5,973,306

Construction Cost $10,200,000 $3,856,068 $0 $3,856,068 Sub-total $16,678,202 $9,829,374 $0 $9,829,374

Funding Category 2

Pre-Design/Design/ Construction Mgmt/Inspection

$0 $0 $0 $2,729

Construction Cost $0 $0 $0 $0 Sub-total $10,000,000 $10,000,000 $0 $2,729

Land Acquisition $12,440,000 $12,400,000 $0 $0Pre-Design/Design/ Construction Mgmt/Inspection

$0 $0 $0 $0

Construction Cost $0 $0 $0 $0 Sub-total $12,440,000 $12,400,000 $0 $0

Land Acquisition $0 $0 $0 $0Pre-Design/Design/ Construction Mgmt/Inspection

$2,842,626 $5,122,699 $0 $5,043,983

Funding Category 3 & 4 Construction Cost $12,104,809 $9,124,736 $0 $9,111,923

PRE-CLOSE-OUT Sub-total $14,947,435 $14,247,435 $0 $14,155,906Temescal Canyon Park Stormwater BMP Phase II

Land Acquisition$0 $0 $0 $0

Funding Category 3 & 4

Pre-Design/Design/ Construction Mgmt/Inspection

$1,361,374 $1,461,374 $527 $1,414,309

Construction Cost $2,995,191 $3,595,191 $0 $2,681,829 Sub-total $4,356,565 $5,056,565 $527 $4,096,138

Vermont Avenue Stormwater Capture & Green Street Land Acquisition

$0 $0 $0 $0

Funding Category 3 & 4

Pre-Design/Design/ Construction Mgmt/Inspection $1,014,820 $1,014,820 $938 $414,839Construction Cost $2,685,180 $2,685,180 $30,757 $673,601 Sub-total $3,700,000 $3,700,000 $31,695 $1,088,440

Westchester Stormwater BMP (Renamed Argo) Land Acquisition

$0 $0 $0 $0

Funding Category 1, 2, & 4

Pre-Design/Design/ Construction Mgmt/Inspection

$2,574,787 $2,574,787 $0$2,657,762

Construction Cost $0 $0 $0 $0 Sub-total $2,574,787 $2,574,787 $0 $2,657,762

Land Acquisition

Funding Category 4

Pre-Design/Design/ Construction Mgmt/Inspection

$279,755 $432,928 $0 $432,928

Construction Cost $1,159,000 $254,960 $0 $254,960 Sub-total $1,438,755 $687,888 $0 $687,888

Westside Park Rainwater Irrigation Land Acquisition $0 $0 $0 $0

Funding Category 1 Pre-Design/Design/ Construction Mgmt/Inspection

$1,147,945 $1,572,362 $0 $1,569,812

Construction Cost $5,756,644 $2,984,142 $0 $2,986,141 Sub-total $6,904,589 $4,556,504 $0 $4,555,953

Westwood Neighborhood Greenway Land Acquisition $0 $0 $0 $0

Funding Category 1 Pre-Design/Design/ Construction Mgmt/Inspection

$1,413,000 $1,413,000 $21,418 $669,817

Construction Cost $4,047,000 $4,047,000 $0 $0

Sub-total $5,460,000 $5,460,000 $21,418 $669,817

$0

$0

$0

PRE-CLOSEOUTWestminster Dog Park Stormwater BMP

$0 $0 $0

COUNCIL/MAYOR APPROVED CLOSE-OUT

PRE-CLOSEOUT

$0

Funding Category 3 & 4

Temescal Canyon Park Stormwater BMP Phase I

Taylor Yard River Park Pending Planned for Future Funding Allocation

Strathern Pit Multiuse -Land Acquisition

Land Acquisition$10,000,000 $10,000,000

COUNCIL/MAYOR APPROVED CLOSE-OUT

South Los Angeles Wetlands Park (includes Site Readiness)

$2,011,937 $0 $0Land Acquisition

22

Page 24: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Proposition O - Clean Water Bond

PROJECTS SUBTOTAL 539,190,479$ $506,306,570 $2,063,981 $408,707,677

Project Optimization $6,198,524 $0 $2,207,106 Program Development $599,864 $0 $599,684 Full Proposal Development $360,000 $0 $360,000

Office of Accounting $1,906,709 $0 $1,611,318 Bureau of Engineering $7,490,358 $34,328 $5,883,485 Bureau of Sanitation $16,087,893 $52,100 $15,791,463 Related Costs $8,077,839 ** Arbitrage $2,000,000 $0 $7,340 Controller $2,700 $0 $2,700PROGRAM TOTAL $549,030,457 $2,150,409 $435,170,773*Expenditures are estimates, and will be adjusted to conform with approved modified indirect labor rated. Estimated expenditures are shown to assist in monitoring of expenses, and are not intended to be financial statements. **Included in Bureau staff costs

Consultant Cost – Program Related Budget

City Staff - Program Related Budget

23

Page 25: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Proposition O – Clean Water Bond Monthly Progress Report – October 2019

- Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 24

4.1 Project Status Report

A brief status report for each project is provided on the following pages. The report identifies key project information, the planned scope of work, progress date, updated construction costs and percentage complete for all Proposition O projects. The Percentage Complete at the far right hand column of the diagram uses a color-coding system to designate the current phase of each project.

Turquoise Pre-Design Yellow Right of Way Acquisition/ Land Acquisition Red Design Violet Bid and Award Green Construction Blue Post Construction

Progress for each project is tracked by a color-coded pie chart. The color-coding system shows work completed in the darker shade of each color and the lighter shade denotes work to be completed. For example, if a project is in design the pie chart begins as light red. As progress is made, a darker red will indicate the approximate percentage of design work completed to date.

4.0 PROJECT STATUS REPORT

Page 26: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Pro

posi

tion

O -

Cle

an W

ater

Bon

d Pr

ogra

mPR

OJE

CT

STAT

US

REP

OR

T

M

onth

ly P

rogr

ess

Rep

ort -

Oct

ober

201

9

PRO

JEC

TC

ON

TAC

TSPL

ANN

ED S

CO

PEM

ON

THLY

UPD

ATE

CO

NST

RU

CTI

ON

CO

STN

otic

e to

Pro

ceed

:07

/11/

11

CD

1 -

Gilb

erto

Ced

illoC

ontra

ct D

urat

ion:

661

days

1739

N. A

lbio

n St

reet

Des

igne

r:M

alco

lm P

irnie

City

Eng

inee

r's E

st.

(Cla

ss A

):2,

468,

100

$

C

ontra

ctor

:N

atio

nal D

emol

ition

Con

tract

Aw

ard

Amou

nt:

1,26

9,55

5$

Proj

. Mgr

.:N

aush

in K

amal

Con

tract

Aw

ard

+ C

ontin

genc

y:4,

469,

555

$

Con

tact

#:

213-

847-

0342

CO

's to

dat

e

(2

3, 2

23%

):2,

827,

281

$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

4,09

6,83

6$

100%

Fund

ing:

Pro

p O

& B

row

nsfie

ld

14-A

ug-1

7St

atem

ent o

f C

ompl

etio

nO

CT

2013

Pre

Des

ign

Land

Acc

. / R

ight

of

Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Prop

O A

cqui

sitio

n C

ost:

CD

1 -

Gilb

erto

Ced

illo17

,474

,154

1739

N. A

lbio

n St

reet

Des

igne

r:N

/A

Con

tract

or:

N/A

Proj

. Mgr

.:C

hris

toph

er F

. Joh

nson

Con

tact

#:

213-

485-

1165

Boa

rd A

ccep

tanc

e R

epor

t D

ate

100%

Fund

ing:

Pro

p O

N/A

Acqu

isiti

on D

ate:

Pre

Des

ign

Land

Acc

. / R

ight

of

Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

03/2

9/20

17

CD

1 -

Gilb

erto

Ced

illoC

ontra

ct D

urat

ion:

876

1739

Alb

ion

Stre

etD

esig

ner:

Tetra

Tec

hC

ity E

ngin

eer's

Est

. (C

lass

A):

12,5

00,0

00$

C

ontra

ctor

:Su

lly-M

iller

Con

tract

Aw

ard

Amou

nt:

16,6

25,0

00$

Proj

. Mgr

.:Jo

hn S

aldi

nC

ontra

ct A

war

d +

Con

tinge

ncy:

22,2

08,4

06$

Con

tact

#:

213-

485-

1411

CO

's to

dat

e

(3

1%):

5,12

2,04

0$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

21,7

47,0

40$

70

%

Fund

ing:

Pro

p O

, Pro

p. 8

4, &

Pr

op. K

TBD

Stat

emen

t of

Com

plet

ion

Dat

e:AU

G 2

019

Pre

Des

ign

Land

Acc

. / R

ight

of

Way

Des

ign

Bid

& Aw

ard

Post

Con

st

Not

ice

to P

roce

ed:

TBD

CD

- 12

John

Lee

Con

tract

Dur

atio

n:TB

D

Des

igne

r:Te

tra T

ech,

Inc.

City

Eng

inee

r's E

st.

(Cla

ss A

):-

$

Con

tract

or:

N/A

Con

tract

Aw

ard

Amou

nt:

-$

Proj

. Mgr

.:An

dy F

lore

sC

ontra

ct A

war

d +

Con

tinge

ncy:

-$

Con

tact

#:

213-

485-

4496

CO

's to

dat

e(#,

%):

-$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

-$

90

%93

%

Fund

ing:

Pro

p O

TBD

Mas

ter S

ch.

Com

plet

ion

Dat

e:JU

L 20

22

Pre

Des

ign

Land

Acc

. / R

ight

of

Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

This

pro

ject

is c

ompl

ete

The

Purc

hase

and

Sal

e Ag

reem

ent w

as e

xecu

ted

on

10/2

/09.

Esc

row

clo

sed

on

10/2

3/09

. Par

k la

nd a

cqui

sitio

n is

co

mpl

ete.

The

proj

ect c

ontin

ues

in th

e Po

st-

Con

stru

ctio

n ph

ase.

The

proj

ect c

ontin

ues

in th

e D

esig

n ph

ase.

Albi

on D

airy

Par

k - D

emo

& R

emed

iatio

nD

emol

ition

of t

he b

uild

ings

and

im

prov

emen

ts o

f an

indu

stria

l fa

cilit

y, re

med

iatio

n an

d ab

atem

ent

of a

ll ha

zard

ous

mat

eria

ls a

nd s

oils

on

site

, and

the

impo

rtatio

n of

cle

an

soil

to le

ave

the

prop

erty

in a

leve

l, gr

aded

con

ditio

n.

Con

stru

ctio

n of

BM

P’s

to re

duce

co

ntam

inan

ts to

Alis

o/ L

imek

iln

Cre

eks,

and

the

Los

Ange

les

Riv

er

to a

ssis

t the

City

in m

eetin

g TM

DL

requ

irem

ents

. BM

Ps in

clud

e bi

osw

ales

, veg

etat

ed b

asin

, ope

n an

d sp

ace

rest

orat

ion.

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Ja

n 20

09

Albi

on D

airy

Par

k - L

and

Acqu

isiti

on

Phot

o of

pro

ject

site

Albi

on R

iver

side

Par

k

Ren

derin

g of

pro

ject

site

PER

CEN

T C

OM

PLET

E

Acqu

ire a

par

cel o

f lan

d ad

jace

nt

to th

e LA

Riv

er a

s pa

rt of

LA

Riv

er

Rev

italiz

atio

n M

aste

r Pla

n.

Alis

o C

reek

-Lim

ekiln

Cre

ek

Res

tora

tion

No

Con

cept

Rep

ort p

repa

red

This

pro

ject

will

inst

all a

ser

ies

of

stor

m w

ater

bes

t man

agem

ent

prac

tices

. Sto

rm w

ater

will

be

dive

rted

from

nea

rby

stor

m d

rain

s an

d ut

ilized

/trea

ted

with

bio

swal

es,

bior

eten

tion

basi

ns, a

n in

filtra

tion

tank

, and

a s

tora

ge ta

nk.

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

N

ov 2

013

Phot

o of

pro

ject

site

afte

r re

med

iatio

n

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

O

ct 2

012

Phot

o of

pro

ject

site

100

25

Page 27: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Pro

posi

tion

O -

Cle

an W

ater

Bon

d Pr

ogra

mPR

OJE

CT

STAT

US

REP

OR

T

M

onth

ly P

rogr

ess

Rep

ort -

Oct

ober

201

9

PRO

JEC

TC

ON

TAC

TSPL

ANN

ED S

CO

PEM

ON

THLY

UPD

ATE

CO

NST

RU

CTI

ON

CO

STPE

RC

ENT

CO

MPL

ETE

Not

ice

to P

roce

ed:

09/1

0/18

CD

11

- Mik

e Bo

nin

Con

tract

Dur

atio

n:75

8 da

ys

Los

Ange

les

Wor

ld A

irpor

tD

esig

ner:

AEC

OM

City

Eng

inee

r's E

st.

(Cla

ss A

):23

,435

,933

$

Con

tract

or:

OH

L U

SAC

ontra

ct A

war

d Am

ount

:35

,810

,500

$

Proj

. Mgr

.:Jo

hn S

aldi

nC

ontra

ct A

war

d +

Con

tinge

ncy:

39,3

91,5

50$

Con

tact

#:

213-

485-

1411

CO

's to

dat

e

(0

%):

1,31

1$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

35,8

11,8

11$

54

%

Fund

ing:

Pro

p O

& L

AWA

TBD

Mas

ter S

ch.

Com

plet

ion

Dat

e:N

OV

2020

Pre

Des

ign

Land

Acc

. / R

ight

of

Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

04/2

0/15

CD

9 -

Cur

ren

Pric

e, J

r.C

ontra

ct D

urat

ion:

112

days

Alle

y nw

of 5

4th

and

San

Pedr

o.D

esig

ner:

The

Trus

t for

Pub

lic L

and

City

Eng

inee

r's E

st.

(Cla

ss A

):-

$

Con

tract

or:

Los

Ange

les

Engi

neer

ing

Con

tract

Aw

ard

Amou

nt:

959,

001

$

Proj

. Mgr

.:N

aush

in K

amal

Con

tract

Aw

ard

+ C

ontin

genc

y:-

$

Con

tact

#:

213-

847-

0342

CO

's to

dat

e(#,

%):

-$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

-$

10

0%

Fund

ing:

Pro

p O

& P

rop

84

TBD

Stat

emen

t of

Com

plet

ion

Dat

eFE

B 20

16

Pre

Des

ign

Land

Acc

. / R

ight

of

Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

05/1

9/15

CD

9 -

Cur

ren

Pric

e, J

r.C

ontra

ct D

urat

ion:

240

days

Vici

nity

of 4

8th

St &

Bro

adw

ayD

esig

ner:

Car

ollo

City

Eng

inee

r's E

st.

(Cla

ss A

):2,

302,

300

$

C

ontra

ctor

:M

ike

Prlic

h &

Sons

, Inc

.C

ontra

ct A

war

d Am

ount

:2,

339,

600

$

Proj

. Mgr

.:Jo

hn S

aldi

nC

ontra

ct A

war

d +

Con

tinge

ncy:

2,43

9,60

0$

Con

tact

#:

213-

485-

1411

CO

's to

dat

e(15

, 2.

76%

):64

,544

$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

2,40

4,14

4$

100%

Fund

ing:

Pro

p O

& P

rop

84

TBD

Stat

emen

t of

Com

plet

ion

Dat

eJU

L 20

16

Pre

Des

ign

Land

Acc

. / R

ight

of

Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

CD

6 -

Nur

y M

artin

ezC

ontra

ct D

urat

ion:

btw

n M

arso

n St

. and

Ray

mer

St.

Des

igne

r:TB

DC

ity E

ngin

eer's

Est

. (C

lass

A):

3,09

5,45

6$

Con

tract

or:

TBD

Con

tract

Aw

ard

Amou

nt:

-$

Proj

. Mgr

.:N

aush

in K

amal

Con

tract

Aw

ard

+ C

ontin

genc

y:-

$

Con

tact

#:

213-

847-

0342

CO

's to

dat

e(#,

%):

-$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

-$

Fund

ing:

N/A

Stat

emen

t of

Com

plet

ion

Dat

eD

EC 2

014

Pre

Des

ign

Land

Acc

. / R

ight

of

Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Proj

ect i

s on

hol

d du

e to

fund

ing

issu

es.

The

Los

Ange

les

Nei

ghbo

rhoo

d La

nd T

rust

(LAN

LT)

is u

nabl

e to

sec

ure

addi

tiona

l $3

milli

on in

fund

s ne

eded

to

com

plet

e th

e pr

ojec

t. LA

NLT

re

ques

ted

to w

ithdr

aw th

eir

Prop

osed

pro

ject

site

pla

n

This

pro

ject

is c

ompl

ete

The

proj

ect c

ontin

ues

in th

e C

onst

ruct

ion

phas

e.

Proj

ect i

s in

the

post

con

stru

ctio

n ph

ase.

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

M

ay 2

013

Con

stru

ctio

n of

sto

rmw

ater

BM

Ps

in a

n al

ley

loca

ted

in th

e So

uth

Los

Ange

les

area

to c

aptu

re, i

nfilt

rate

, an

d re

tain

sto

rmw

ater

runo

ff fro

m

the

tribu

tary

are

a: p

erm

eabl

e pa

vers

, dry

wel

ls, a

nd ra

inw

ater

ha

rves

ting

for p

lant

irrig

atio

n.

Cab

rito

Pase

o W

alkw

ay/B

ike

Path

Aval

on G

reen

Alle

y So

uth

Argo

Dra

in S

ub-b

asin

Fa

cilit

y D

iver

ts &

cap

ture

s S

torm

wat

er

flow

s fro

m 2

exi

stin

g st

orm

drai

ns.

Div

erte

d flo

ws

will

be tr

eate

d th

roug

h th

e im

plem

enta

tion

of

stor

mw

ater

BM

P el

emen

ts,

incl

udin

g cl

arifi

er fo

r ini

tial

treat

men

t & U

nder

grou

nd

Infil

tratio

n G

alle

ry. T

he tr

eate

d st

orm

wat

er w

ill ev

entu

ally

infil

trate

in

to th

e gr

ound

.

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

M

ay 2

013

Con

stru

ctio

n of

sto

rmw

ater

BM

Ps

of re

side

ntia

l BM

Ps: d

ry w

ells

, rai

n ga

rden

s, &

infil

tratio

n tre

nche

s;

neig

hbor

hood

BM

Ps: s

ub-s

urfa

ce

infil

tratio

n ba

sins

& d

ry w

ells

; & a

su

b-re

gion

al fa

cilit

y co

nsis

ting

of a

in

filtra

tion

galle

ry.

Estim

ated

co

nstru

ctio

n co

st is

$2.

6 m

il.

Prop

osed

pro

ject

layo

ut

Broa

dway

Nei

ghbo

rhoo

d St

orm

wat

er G

reen

way

Phot

o of

pro

pose

d ra

in g

arde

n

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Fe

b 20

11

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

M

ar 2

007

Impl

emen

t sto

rmw

ater

bes

t m

anag

emen

t pra

ctic

es in

clud

ing:

in

stal

latio

n of

bio

swal

es, t

rash

ca

ptur

e de

vice

s, tr

ee w

ells

to a

id

in fi

ltrat

ion,

and

a "S

MAR

T"

irrig

atio

n sy

stem

.

Ren

derin

g of

alle

y im

prov

emen

ts

26

Page 28: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Pro

posi

tion

O -

Cle

an W

ater

Bon

d Pr

ogra

mPR

OJE

CT

STAT

US

REP

OR

T

M

onth

ly P

rogr

ess

Rep

ort -

Oct

ober

201

9

PRO

JEC

TC

ON

TAC

TSPL

ANN

ED S

CO

PEM

ON

THLY

UPD

ATE

CO

NST

RU

CTI

ON

CO

STPE

RC

ENT

CO

MPL

ETE

Not

ice

to P

roce

ed:

CD

: All

Con

tract

Dur

atio

n:

City

wid

eD

esig

ner:

Bure

au o

f San

itatio

nC

ity E

ngin

eer's

Est

. (C

lass

A):

14,9

00,0

00$

C

ontra

ctor

:Va

rious

Con

tract

Aw

ard

Amou

nt:

-$

Proj

. Mgr

.:Al

fredo

Mag

alla

nes

Con

tract

Aw

ard

+ C

ontin

genc

y:-

$

Con

tact

#:

213-

485-

3958

CO

's to

dat

e(#,

%):

-$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

-$

10

0%

Fund

ing:

Pro

p O

& P

rop

40

N/A

Mas

ter S

ch.

Com

plet

ion

Dat

e:SE

P 20

07

Pre

Des

ign

Land

Acc

. / R

ight

of

Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

CD

: All

Con

tract

Dur

atio

n:

City

wid

eD

esig

ner:

Bure

au o

f San

itatio

nC

ity E

ngin

eer's

Est

. (C

lass

A):

9,40

0,00

0$

Con

tract

or:

Vario

usC

ontra

ct A

war

d Am

ount

:-

$

Proj

. Mgr

.:Al

fredo

Mag

alla

nes

Con

tract

Aw

ard

+ C

ontin

genc

y (%

)-

$

Con

tact

#:

213-

485-

3958

CO

's to

dat

e(#

%):

-$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

-$

10

0%

Fund

ing:

Pro

p O

N/A

Mas

ter S

ch.

Com

plet

ion

Dat

e:O

CT

2007

Pre

Des

ign

Land

Acc

. / R

ight

of

Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

06/0

1/08

CD

: All

Con

tract

Dur

atio

n:73

0

City

wid

eD

esig

ner:

Bure

au o

f San

itatio

nC

ity E

ngin

eer's

Est

. (C

lass

A):

42,0

25,0

00$

C

ontra

ctor

:TB

DC

ontra

ct A

war

d Am

ount

:-

$

Proj

. Mgr

.:Al

fredo

Mag

alla

nes

Con

tract

Aw

ard

+ C

ontin

genc

y:-

$

Con

tact

#:

213-

485-

3958

CO

's to

dat

e(#,

%):

-$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

-$

10

0%

Fund

ing:

Pro

p O

N/A

Mas

ter S

ch.

Com

plet

ion

Dat

e:D

EC 2

016

Pre

Des

ign

Land

Acc

. / R

ight

of

Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

03/2

9/16

CD

: All

Con

tract

Dur

atio

n:21

12 d

ays

City

wid

eD

esig

ner:

Bure

au o

f San

itatio

nC

ity E

ngin

eer's

Est

. (C

lass

A):

2,76

0,00

0$

Con

tract

or:

Ecol

ogy

Con

trol I

ndus

tries

Con

tract

Aw

ard

Amou

nt:

2,30

0,00

0$

Proj

. Mgr

.:N

aush

in K

amal

Con

tract

Aw

ard

+ C

ontin

genc

y:2,

530,

000

$

Con

tact

#:

213-

847-

0342

CO

's to

dat

e(#,

%):

-$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

-$

82

%

Fund

ing:

Pro

p O

N/A

Mas

ter S

ch.

Com

plet

ion

Dat

e:O

CT

2020

Pre

Des

ign

Land

Acc

. / R

ight

of

Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Phot

o of

cat

ch b

asin

inse

rt

The

proj

ect i

s in

the

post

-co

nstru

ctio

n ph

ase.

The

Con

stru

ctio

n ph

ase

cont

inue

s fo

r the

CB

IV.

Cat

ch B

asin

Ope

ning

Sc

reen

Cov

ers

Phas

e IV

Ret

rofit

of c

atch

bas

ins

with

op

enin

g sc

reen

cov

ers

and

inse

rts.

Incl

udes

City

-ow

ned

catc

h ba

sins

no

t cov

ered

in P

hase

s I,

II, &

III a

s w

ell a

s al

l Sta

te a

nd C

ount

y ca

tch

basi

ns w

ithin

the

City

.

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

N

ov 2

013

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Fe

b 20

07

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Ju

n 20

05

This

pro

ject

is c

ompl

ete.

This

pro

ject

is c

ompl

ete.

Cat

ch B

asin

Inse

rts a

nd

Cov

ers

Phas

e I

Ret

rofit

of a

ppro

xim

atel

y 24

,219

ca

tch

basi

ns w

ith o

peni

ng s

cree

n co

vers

and

2,6

00 in

serts

. In

clud

es

City

-ow

ned

catc

h ba

sins

not

co

vere

d in

Pha

ses

I & II

, as

wel

l as

all

Stat

e an

d C

ount

y ca

tch

basi

ns w

ithin

the

City

.

Inst

all a

ppro

xim

atel

y 6,

400

scre

ens

in m

ediu

m tr

ash

gene

ratio

n ar

eas,

in th

e C

ity, t

o in

crea

se tr

ash

redu

ctio

n fro

m 2

0%

(acc

ompl

ishe

d in

Pha

se 1

) to

30%

tra

sh re

duct

ion

in B

allo

na C

reek

an

d LA

Riv

er W

ater

shed

s.

Cat

ch B

asin

Ope

ning

Sc

reen

Cov

ers

Phas

e III

Cat

ch B

asin

Ope

ning

Sc

reen

Cov

ers

Phas

e II

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Au

g 20

06

Phot

o of

cat

ch b

asin

scr

een

cove

r

Phot

o of

cat

ch b

asin

scr

een

cove

r

Phot

o of

cat

ch b

asin

scr

een

cove

r

Inst

all 8

,000

inse

rts a

nd 6

,000

sc

reen

s in

the

high

tras

h ge

nera

tion

area

s, in

the

City

, to

achi

eve

20%

tras

h re

duct

ion

in th

e Ba

llona

Cre

ek a

nd L

os A

ngel

es

Riv

er W

ater

shed

s.

27

Page 29: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Pro

posi

tion

O -

Cle

an W

ater

Bon

d Pr

ogra

mPR

OJE

CT

STAT

US

REP

OR

T

M

onth

ly P

rogr

ess

Rep

ort -

Oct

ober

201

9

PRO

JEC

TC

ON

TAC

TSPL

ANN

ED S

CO

PEM

ON

THLY

UPD

ATE

CO

NST

RU

CTI

ON

CO

STPE

RC

ENT

CO

MPL

ETE

Not

ice

to P

roce

ed:

CD

6 -

Nur

y M

artin

ezC

ontra

ct D

urat

ion:

1245

5 W

icks

Stre

etD

esig

ner:

Klei

nfel

der/G

eosy

ntec

City

Eng

inee

r's E

st.

(Cla

ss A

):C

ontra

ctor

:En

viro

nmen

tal C

onst

ruct

ion

Con

tract

Aw

ard

Amou

nt:

Proj

. Mgr

.:Fa

ng C

hang

Con

tract

Aw

ard

+ C

ontin

genc

y:

Con

tact

#:

213-

978-

1896

CO

's to

dat

e(#,

%):

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

100%

12-D

ec-1

1M

aste

r Sch

. C

ompl

etio

n D

ate:

OC

T 20

09

Pre

Des

ign

Land

Acc

. / R

ight

of

Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

07/1

1/11

CD

13

- Mitc

h O

'Far

rell

Con

tract

Dur

atio

n:60

0 D

ays

751

Echo

Par

k Av

enue

Des

igne

r:Bl

ack

& Ve

atch

City

Eng

inee

r's E

st.

(Cla

ss A

):49

,580

,000

$

Con

tract

or:

Ford

E.C

.C

ontra

ct A

war

d Am

ount

:24

,485

,000

$

Proj

. Mgr

.:Ju

lie A

llen

Con

tract

Aw

ard

+ C

ontin

genc

y:26

,933

,500

$

Con

tact

#:

213-

485-

1454

CO

's to

dat

e

(9

3, 8

%):

1,88

2,09

3$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

26,3

67,0

93$

10

0%

Fund

ing:

Pro

p O

& P

rop

K

4-Ju

n-14

Stat

emen

t of

Com

plet

ion

Dat

eN

OV

2013

Pre

Des

ign

Land

Acc

. / R

ight

of

Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

12/1

0/12

CD

6 -

Nur

y M

artin

ezC

ontra

ct D

urat

ion:

180

days

7702

Nor

th E

lmer

Ave

nue

Des

igne

r:Te

tra T

ech

City

Eng

inee

r's E

st.

(Cla

ss A

)30

6,37

5$

C

ontra

ctor

:Ad

jul C

orpo

ratio

nC

ontra

ct A

war

d Am

ount

358,

256

$

Proj

. Mgr

.:Ift

ekha

r Ahm

ed/

N

aush

in K

Con

tract

Aw

ard

+ C

ontin

genc

y:42

9,90

6$

Con

tact

#:

213-

485-

5875

CO

's to

dat

e (7

,-4.

2%):

(15,

131)

$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

343,

125

$

100%

Fund

ing:

Pro

p O

& C

ounc

il fo

r W

ater

shed

Hea

lth

19-O

ct-1

5St

atem

ent o

f C

ompl

etio

n D

ate

OC

T 20

13

Pre

Des

ign

Land

Acc

. / R

ight

of

Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

12/0

9/11

CD

6 -

Nur

y M

artin

ezC

ontra

ct D

urat

ion:

197

days

Inte

rsec

tion

of S

unla

nd &

Gle

noak

sD

esig

ner:

Bure

au o

f San

itatio

nC

ity E

ngin

eer's

Est

. (C

lass

A)

508,

696

$

Con

tract

or:

Hol

lyw

ood

Beau

tific

atio

n Te

amC

ontra

ct A

war

d Am

ount

508,

696

$

Proj

. Mgr

.:N

aush

in K

amal

Con

tract

Aw

ard

+ C

ontin

genc

y:50

8,69

6$

Con

tact

#:

213-

847-

0342

CO

's to

dat

e (#

,%):

-$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

-$

10

0%

Fund

ing:

Pro

p O

N/A

Stat

emen

t of

Com

plet

ion

Dat

eFE

B 20

14

Pre

Des

ign

Land

Acc

. / R

ight

of

Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Ret

rofit

exi

stin

g ga

s co

llect

ion

syst

em, i

nsta

ll ne

w fl

are

& re

stor

e ca

paci

ty in

adj

acen

t Tuj

unga

Sp

read

ing

Gro

unds

thro

ugh

reno

vatio

n of

clo

sed

colle

ctio

n sy

stem

.

Phot

o of

pro

ject

site

Phot

o of

exi

stin

g la

ke

This

pro

ject

is c

ompl

ete.

Gra

nd O

peni

ng e

vent

occ

urre

d on

Ju

ne 1

5, 2

013.

The

par

k is

ope

n to

th

e pu

blic

.

Proj

ect i

s co

mpl

eted

.

Wor

k or

der c

lose

-out

in p

rogr

ess.

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Ja

n 20

07

Phot

o of

bio

swal

e co

nstru

ctio

n

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Fe

b 20

11

Con

vert

a pa

ved

20' x

270

' alle

y in

to a

poc

ket p

ark

with

wat

er

qual

ity im

prov

emen

ts, i

nclu

ding

a

perv

ious

ped

estri

an p

athw

ay a

nd a

ve

geta

ted

swal

e. S

edim

enta

tion

rem

oval

dev

ices

will

also

be

inst

alle

d.

Echo

Par

k La

ke

Reh

abilit

atio

n

Phot

o of

con

stru

cted

pas

eo w

ith

impr

ovem

ents

Gle

noak

s-Su

nlan

d St

orm

wat

er C

aptu

reTh

is p

roje

ct w

ill in

stal

l inf

iltra

tion

wel

ls a

nd o

ther

sto

rm w

ater

Bes

t M

anag

emen

t Pra

ctic

es (B

MPs

) to

help

alle

viat

e flo

odin

g at

the

subj

ect i

nter

sect

ion

durin

g st

orm

ev

ents

.

In-la

ke im

prov

emen

ts, i

n-la

ke

vege

tatio

n (w

etla

nds)

and

hab

itat

impr

ovem

ents

, and

par

klan

d st

ruct

ural

bes

t man

agem

ent

prac

tices

(sw

ales

), la

ke re

-ci

rcul

atio

n sy

stem

, lak

e ae

ratio

n sy

stem

, rel

ocat

e fo

unta

in p

ump

hous

e.

Elm

er A

venu

e Ph

ase

II:

Elm

er P

aseo

Ces

ar C

have

z G

roun

d W

ater

Impr

ovem

ent

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Au

g 20

06

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Fe

b 20

11

28

Page 30: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Pro

posi

tion

O -

Cle

an W

ater

Bon

d Pr

ogra

mPR

OJE

CT

STAT

US

REP

OR

T

M

onth

ly P

rogr

ess

Rep

ort -

Oct

ober

201

9

PRO

JEC

TC

ON

TAC

TSPL

ANN

ED S

CO

PEM

ON

THLY

UPD

ATE

CO

NST

RU

CTI

ON

CO

STPE

RC

ENT

CO

MPL

ETE

Not

ice

to P

roce

ed:

07/0

7/08

CD

11

- Mik

e Bo

nin

Con

tract

Dur

atio

n:10

0 da

ys

Inte

rsec

tion

Gra

nd &

Riv

iera

Des

igne

r:PS

OM

ASC

ity E

ngin

eer's

Est

. (C

lass

A):

428,

900

$

Con

tract

or:

Andr

ew P

apac

& S

ons

Con

tract

Aw

ard

Amou

nt:

401,

797

$

Proj

. Mgr

.:An

dy F

lore

sC

ontra

ct A

war

d +

Con

tinge

ncy:

501,

797

$

Con

tact

#:

213-

485-

4496

CO

's to

dat

e

(5

, -15

%):

(19,

353)

$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

382,

444

$

100%

Fund

ing:

Pro

p O

& P

rop

50

7-D

ec-0

9St

atem

ent o

f C

ompl

etio

n D

ate

JUL

2009

Pre

Des

ign

Land

Acc

. / R

ight

of

Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

02/0

3/11

CD

7 -

Vaca

ntC

ontra

ct D

urat

ion:

240

days

Osb

orne

Stre

et @

Foo

thill

Blvd

.D

esig

ner:

MR

CA

City

Eng

inee

r's E

st.

(Cla

ss A

):1,

159,

000

$

C

ontra

ctor

:Le

e C

onst

ruct

ion

Con

tract

Aw

ard

Amou

nt:

955,

257

$

Proj

. Mgr

.:N

aush

in K

amal

Con

tract

Aw

ard

+ C

ontin

genc

y:1,

050,

257

$

Con

tact

#:

213-

847-

0342

CO

's to

dat

e

(3

2, 4

1%):

394,

150

$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

1,33

4,49

6$

100%

Fund

ing:

Pro

p O

& C

altra

ns-F

TIP

24-F

eb-1

4St

atem

ent o

f C

ompl

etio

n D

ate

JUN

201

2

Pre

Des

ign

Land

Acc

. / R

ight

of

Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

05/0

4/09

CD

11

- Mik

e Bo

nin

Con

tract

Dur

atio

n:27

0 da

ys

Pers

hing

Driv

e to

Cal

iforn

ia S

treet

Des

igne

r:PS

OM

ASC

ity E

ngin

eer's

Est

. (C

lass

A):

512,

864

$

Con

tract

or:

Park

Wes

t Lan

dsca

pe In

c.C

ontra

ct A

war

d Am

ount

:51

2,86

4$

Proj

. Mgr

.:N

aush

in K

amal

Con

tract

Aw

ard

+ C

ontin

genc

y:-

$

Con

tact

#:

213-

847-

0342

CO

's to

dat

e

(3

, 2%

):72

8,76

5$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

626,

781

$

100%

Fund

ing:

Pro

p O

17-A

ug-1

1St

atem

ent o

f C

ompl

etio

n D

ate

MAR

201

1

Pre

Des

ign

Land

Acc

. / R

ight

of

Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

CD

15

- Joe

Bus

cain

oC

ontra

ct D

urat

ion:

San

Pedr

o Sh

ore/

W. H

arbo

rD

esig

ner:

DM

JM (P

ort o

f Los

Ang

eles

)C

ity E

ngin

eer's

Est

. (C

lass

A):

Con

tract

or:

L.A.

Dee

peni

ng C

onst

ruct

ors

Con

tract

Aw

ard

Amou

nt:

Proj

. Mgr

.:Jo

hn S

aldi

nC

ontra

ct A

war

d +

Con

tinge

ncy:

Con

tact

#:

213-

485-

1411

CO

's to

dat

e

(#

,%):

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

100%

Fund

ing:

Pro

p O

& P

ort o

f LA

TBD

Mas

ter S

ch.

Com

plet

ion

Dat

e:JU

N 2

009

Pre

Des

ign

Land

Acc

. / R

ight

of

Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Con

cept

ual d

raw

ing

of tr

ee w

ell

Phot

o of

com

plet

ed p

roje

ct

Phot

o of

exi

stin

g m

edia

n

Phot

o of

new

san

d pl

acem

ent

Proj

ect i

s co

mpl

eted

.

Proj

ect c

ompl

eted

. Site

is n

ow

open

for p

ublic

use

.

Proj

ect i

s co

mpl

eted

.

The

sand

-repl

acem

ent p

roje

ct is

co

mpl

ete.

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Rec

onto

ur re

crea

tiona

l bea

ch a

nd

repl

ace

beac

h sa

nd to

pre

vent

flo

odin

g, p

rom

ote

drai

nage

and

sa

nd fl

ushi

ng to

impr

ove

wat

er

qual

ity. P

roje

ct is

bei

ng

cons

truct

ed b

y th

e H

arbo

r Dep

t. Pr

op O

is fu

ndin

g up

to $

8.0

M.

Stor

mw

ater

runo

ff fro

m th

ree

exis

ting

park

ing

lots

will

be s

ent

thro

ugh

new

ly co

nstru

cted

se

dim

ent f

oreb

ays

for r

emov

al o

f tra

sh &

sed

imen

ts p

rior t

o w

etla

nds

disc

harg

e.

Inst

all s

even

sto

rmw

ater

bi

oret

entio

n fil

ters

in a

hig

h-de

nsity

re

side

ntia

l and

com

mer

cial

cor

ridor

in

the

Veni

ce a

rea

to tr

eat r

unof

f fro

m 6

.8 a

cres

.

Inne

r Cab

rillo

Bea

ch

Bact

eria

l WQ

I

Gra

nd B

lvd.

Tre

e W

ells

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Au

g 20

06

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Se

p 20

06

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Fe

b 20

07

Incl

udes

one

200

-feet

long

gra

ss

swal

e, o

ne 2

50-fe

et lo

ng in

filtra

tion

trenc

h (7

‘D x

10’

W) w

ith n

ativ

e ve

geta

tion

alon

g th

e fu

ll le

ngth

of

the

med

ian,

& lo

cal r

egra

ding

to

redu

ce p

ondi

ng in

the

med

ian

at

Mai

n St

.

Impe

rial H

wy

Sunk

en

Med

ian

Stor

mw

ater

BM

P

Han

sen

Dam

Wet

land

s R

esto

ratio

n

100

0

29

Page 31: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Pro

posi

tion

O -

Cle

an W

ater

Bon

d Pr

ogra

mPR

OJE

CT

STAT

US

REP

OR

T

M

onth

ly P

rogr

ess

Rep

ort -

Oct

ober

201

9

PRO

JEC

TC

ON

TAC

TSPL

ANN

ED S

CO

PEM

ON

THLY

UPD

ATE

CO

NST

RU

CTI

ON

CO

STN

otic

e to

Pro

ceed

:N

/A

CD

10

- Her

b J.

Wes

son,

Jr.

Con

tract

Dur

atio

n:N

/A

2800

S. F

airfa

x Av

enue

Des

igne

r:PS

OM

ASC

ity E

ngin

eer's

Est

. (C

lass

A):

5,61

7,50

0$

Con

tract

or:

TBD

Con

tract

Awa

rd

Amou

nt:

-$

Proj

. Mgr

.:Ift

ekha

r Ahm

ed/

Nau

shin

Kam

alC

ontra

ct A

ward

+

Con

tinge

ncy:

-$

Con

tact

#:

213-

485-

5875

CO

's to

dat

e

(#,%

):-

$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

-$

Prop

osed

pro

ject

layo

utFu

ndin

g: P

rop

ON

/AM

aste

r Sch

. C

ompl

etio

n D

ate:

N/A

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

02/1

0/10

CD

4 -

Tom

LaB

onge

Con

tract

Dur

atio

n:30

7 da

ys

5333

Zoo

Driv

eD

esig

ner:

Tetra

Tec

hC

ity E

ngin

eer's

Est

. (C

lass

A):

7,97

9,50

0$

Con

tract

or:

Pim

a C

o.C

ontra

ct A

ward

Am

ount

:4,

227,

360

$

Proj

. Mgr

.:Ift

ekha

r Ahm

ed/

Nau

shin

Kam

alC

ontra

ct A

ward

+

Con

tinge

ncy:

4,65

0,09

6$

Con

tact

#:

213-

485-

5875

CO

's to

dat

e

(4

0, 6

%):

251,

853

$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

4,47

9,21

3$

100%

Phot

o of

com

plet

ed p

roje

ctFu

ndin

g: P

rop

O

2-Ju

l-12

Stat

emen

t of

Com

plet

ion

Dat

eJU

L 20

11

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

05/1

3/13

CD

15

- Joe

Bus

cain

oC

ontra

ct D

urat

ion:

830

days

PCH

& V

erm

ont A

venu

eD

esig

ner:

CD

M S

mith

/Par

sons

City

Eng

inee

r's E

st.

(Cla

ss A

)15

,910

,250

$

Con

tract

or:

Ford

E.C

.C

ontra

ct A

ward

Am

ount

:14

,940

,264

$

Proj

. Mgr

.:Al

len

Wan

gC

ontra

ct A

ward

+

Con

tinge

ncy:

16,4

34,2

90$

Con

tact

#:

(213

) 485

-141

1C

O's

to d

ate

(84,

8%

)1,

153,

527

$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

16,0

93,7

91$

10

0%

Phot

o of

pro

ject

site

afte

r rem

oval

of i

nv

Fund

ing:

Pro

p O

, LA

Cou

nty,

&

Prop

50

17-A

pr-1

7St

atem

ent o

f C

ompl

etio

n D

ate

AUG

201

5

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

10/1

6/15

CD

15

- Joe

Bus

cain

oC

ontra

ct D

urat

ion:

N/A

PCH

& V

erm

ont A

venu

eD

esig

ner:

N/A

City

Eng

inee

r's E

st.

(Cla

ss A

)-

$

Con

tract

or:

Arca

dis

Con

tract

Awa

rd

Amou

nt:

-$

Proj

. Mgr

.:Al

len

Wan

gC

ontra

ct A

ward

+

Con

tinge

ncy:

-$

Con

tact

#:

(213

) 485

-141

1C

O's

to d

ate

(0, 0

%)

-$

Boa

rd A

ccep

tanc

e R

epor

t Dat

eAw

ard

Amou

nt +

C

O's

Issu

ed-

$

100%

Fund

ing:

Pro

p O

N/A

Stat

emen

t of

Com

plet

ion

Dat

e:AU

G 2

019

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

La C

iene

ga/F

airfa

x St

orm

wat

er B

MP

LA Z

oo P

arki

ng L

ot

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Au

g 20

06

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Fe

b 20

07

Mac

hado

Lak

e-Ph

ase

l (W

ilmin

gton

Dra

in)

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Ja

n 20

07

PER

CEN

T C

OM

PLET

E

Con

stru

ct fl

ow d

iver

sion

, lift

-st

atio

n, h

ydro

dyna

mic

sep

arat

or,

unde

rgro

und

tank

, bio

-rete

ntio

n ar

ea, s

tora

ge ta

nk, e

fflue

nt p

ump

stat

ion,

reci

rcul

atio

n pu

mp

syst

em

and

an o

verfl

ow s

yste

m.

Inst

all t

rash

net

ting

syst

ems,

in

stal

l sm

art i

rriga

tion

in

land

scap

ed a

reas

, use

bio

filte

rs

or s

imila

r veg

etat

ed B

MPs

, and

re

cont

our a

nd a

lign

the

chan

nel.

Con

stru

ct s

torm

wat

er b

est

man

agem

ent p

ract

ices

incl

udin

g tra

sh c

aptu

re d

evic

es, p

orou

s pa

vem

ent a

nd b

iosw

ales

at t

he

Zoo

Park

ing

Lot.

On

4/1/

09, C

ity C

ounc

il ca

ncel

ed

this

pro

ject

. The

Wes

tsid

e Pa

rk

Rai

nwat

er Ir

rigat

ion

proj

ect w

as

appr

oved

to re

plac

e it.

Proj

ect c

ompl

eted

. Site

is n

ow

open

for p

ublic

use

.

This

pro

ject

is c

ompl

ete

Tran

sfer

of W

ilmin

gton

Dra

in

mai

nten

ance

resp

onsi

bliti

y ba

ck to

LAC

FCD

was

co

mpl

eted

on

Sept

embe

r 16,

20

19. T

his

conc

lude

s th

e co

mpl

etio

n of

the

Post

-C

onst

ruct

ion

phas

e.

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Ja

n 20

07

Post

con

stru

ctio

n 5-

year

hab

itat

miti

gatio

n an

d m

onito

ring

perio

d fo

r the

Mac

hado

Lak

e-Ph

ase

I (W

ilmin

gton

Dra

in)

Proj

ect,

requ

ired

by th

e C

alifo

rnia

D

epar

tmen

t of F

ish

and

Wild

life

Perm

it an

d H

abita

t Res

tora

tion

Miti

gatio

n an

d M

onito

ring

Plan

(H

RM

MP)

.

Mac

hado

Lak

e-Ph

ase

l (W

ilmin

gton

Dra

in) H

RM

MP

Phot

o of

pro

ject

site

afte

r rem

oval

of

inva

sive

pla

nts

100

0

30

Page 32: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Pro

posi

tion

O -

Cle

an W

ater

Bon

d Pr

ogra

mPR

OJE

CT

STAT

US

REP

OR

T

M

onth

ly P

rogr

ess

Rep

ort -

Oct

ober

201

9

PRO

JEC

TC

ON

TAC

TSPL

ANN

ED S

CO

PEM

ON

THLY

UPD

ATE

CO

NST

RU

CTI

ON

CO

STPE

RC

ENT

CO

MPL

ETE

Not

ice

to P

roce

ed:

03/0

3/14

CD

15

- Joe

Bus

cain

o

Con

tract

Dur

atio

n:10

40 d

ays

PCH

& V

erm

ont A

venu

eD

esig

ner:

CD

M S

mith

City

Eng

inee

r's E

st.

(Cla

ss A

)79

,000

,000

$

Con

tract

or:

OH

L U

SAC

ontra

ct A

ward

Am

ount

:74

,841

,795

$

Proj

. Mgr

.:An

dy F

lore

sC

ontra

ct A

ward

+

Con

tinge

ncy

:82

,341

,795

$

Con

tact

#:

(213

) 485

-449

6C

O's

to d

ate

(.7

4%)

(551

,348

)$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

:74

,290

,447

$

59

%

Phot

o of

exi

stin

g la

keFu

ndin

g: P

rop

O, C

oast

al

Con

serv

ancy

, Qui

mby

& P

rop

K

TBD

Stat

emen

t of

Com

plet

ion

Dat

e:FE

B 20

18

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

05/0

3/17

CD

15

- Joe

Bus

cain

o

Con

tract

Dur

atio

n:N

/A

PCH

& V

erm

ont A

venu

eD

esig

ner:

N/A

City

Eng

inee

r's E

st.

(Cla

ss A

)-

$

Con

tract

or:

Arca

dis

Con

tract

Awa

rd

Amou

nt:

-$

Proj

. Mgr

.:Ka

tie D

oher

tyC

ontra

ct A

ward

+

Con

tinge

ncy

:-

$

Con

tact

#:

(213

) 847

-039

5C

O's

to d

ate

(0

, 0%

)-

$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

:-

$

48%

Phot

o of

hab

itat

Fund

ing:

Pro

p O

N/A

Mas

ter S

ch.

Com

plet

ion

Dat

e:JU

N 2

022

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

05/0

4/09

CD

11

- Mik

e Bo

nin

Con

tract

Dur

atio

n:36

5 da

ys

1143

0 W

. Woo

dbin

eD

esig

ner:

PSO

MAS

City

Eng

inee

r's E

st.

(Cla

ss A

):2,

979,

900

$

Con

tract

or:

LA E

ngin

eerin

g In

c.C

ontra

ct A

ward

Am

ount

:2,

340,

120

$

Proj

. Mgr

.:An

dy F

lore

sC

ontra

ct A

ward

+

Con

tinge

ncy:

2,

790,

120

$

Con

tact

#:

213-

485-

4496

CO

's to

dat

e

(1

8, 3

%):

65,7

02$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

2,40

5,82

2$

100%

Phot

o of

con

stru

ctio

n si

teFu

ndin

g: P

rop

O, P

rop

50 &

AR

RA

12-D

ec-1

1St

atem

ent o

f C

ompl

etio

n D

ate

JAN

201

1

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

02/2

8/18

CD

11

- Mik

e Bo

nin

Con

tract

Dur

atio

n:33

2 da

ys

1143

0 W

. Woo

dbin

eD

esig

ner:

Lee

& R

o, In

c.C

ity E

ngin

eer's

Est

. (C

lass

A):

Con

tract

or:

Mur

ray

Con

tract

Awa

rd

Amou

nt:

369,

613

$

Proj

. Mgr

.:An

dy F

lore

sC

ontra

ct A

ward

+

Con

tinge

ncy:

40

7,00

0$

Con

tact

#:

213-

485-

4496

CO

's to

dat

e

(0

, 0%

):

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

369,

613

$

59%

Phot

o of

con

stru

ctio

n si

teFu

ndin

g: P

rop

O

TBD

Stat

emen

t of

Com

plet

ion

Dat

e:JU

N 2

018

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Mar

Vis

ta R

ecre

atio

n C

ente

r St

orm

wat

er B

MP

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Au

g 20

06

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Au

g 20

06

Con

stru

ctio

n of

a s

torm

wat

er li

ft st

atio

n, h

ydro

dyna

mic

sep

arat

or,

unde

rgro

und

dete

ntio

n ta

nk,

chlo

rinat

ion

faci

lity,

fina

l effl

uent

pu

mp

stat

ion,

reci

rcul

atio

n pu

mp,

an

d ov

erflo

w p

ipin

g at

Mar

Vis

ta

Park

.

This

pro

ject

is c

ompl

ete.

The

proj

ect c

ontin

ues

in th

e Po

st-

Con

stru

ctio

n ph

ase.

The

proj

ect i

s in

the

Post

-C

onst

ruct

ion

phas

e.

The

Post

-Con

sruc

tion

habi

tat

rest

orat

ion

miti

gatio

n an

d m

onito

ring

is o

ngoi

ng.

Mar

Vis

ta R

ecre

atio

n C

ente

r St

orm

wat

er B

MP

Ph II

Mac

hado

Lak

e Ec

osys

tem

R

ehab

ilitat

ion

HR

MM

PPo

st c

onst

ruct

ion

5-ye

ar h

abita

t m

itiga

tion

and

mon

itorin

g pe

riod

for t

he M

acha

do L

ake

Ecos

yste

m

Reh

abili

tatio

n Pr

ojec

t, re

quire

d by

th

e C

alifo

rnia

Dep

artm

ent o

f Fis

h an

d W

ildlif

e Pe

rmit

and

Hab

itat

Res

tora

tion

Miti

gatio

n an

d M

onito

ring

Plan

(HR

MM

P).

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Ja

n 20

07

Mac

hado

Lak

e Ec

osys

tem

R

ehab

ilitat

ion

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Ja

n 20

07

In-la

ke re

habi

litat

ion

tech

niqu

es,

ripar

ian

syst

em e

nhan

cem

ents

, an

d tre

atm

ent b

est m

anag

emen

t pr

actic

es.

Phas

e II

will

inst

all a

n irr

igat

ion

syst

em w

hich

will

use

sto

rmw

ater

w

ater

from

the

an e

xist

ing

260,

000

gallo

n un

derg

roun

d ci

ster

n, to

irrig

ate

turf

on th

e no

rther

ly s

ide

of th

e pa

rk n

ear

Saw

telle

Bou

leva

rd a

nd th

e ex

istin

g pl

ante

r box

es a

long

the

perim

eter

of t

he te

nnis

cou

rts. T

he

scop

e w

ill a

lso

incl

ude

the

inst

alla

tion

of a

des

ert g

arde

n.

31

Page 33: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Pro

posi

tion

O -

Cle

an W

ater

Bon

d Pr

ogra

mPR

OJE

CT

STAT

US

REP

OR

T

M

onth

ly P

rogr

ess

Rep

ort -

Oct

ober

201

9

PRO

JEC

TC

ON

TAC

TSPL

ANN

ED S

CO

PEM

ON

THLY

UPD

ATE

CO

NST

RU

CTI

ON

CO

STPE

RC

ENT

CO

MPL

ETE

Not

ice

to P

roce

ed:

CD

13

- Mitc

h O

'Far

rell

Con

tract

Dur

atio

n:

betw

een

Blak

e Av

enue

& L

A R

iver

Des

igne

r:N

orth

Eas

t Tre

es (N

ET)

City

Eng

inee

r's E

st.

(Cla

ss A

):-

$

Con

tract

or:

Stre

et S

ervi

ces

Con

tract

Awa

rd

Amou

nt:

-$

Proj

. Mgr

.:D

ean

Har

ding

Con

tract

Awa

rd +

C

ontin

genc

y (#

,%)

-$

Con

tact

#:

213-

473-

4242

CO

's to

dat

e

(#

, %):

-$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

-$

100%

Phot

o of

new

sid

ewal

k an

d st

orm

wat

er F

undi

ng: P

rop

O, P

rop

13 &

CW

A

N/A

Mas

ter S

ch.

Com

plet

ion

Dat

e:JU

L 20

07

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

02/2

2/10

CD

15

- Joe

Bus

cain

oC

ontra

ct D

urat

ion:

593

days

560

N. W

este

rn A

venu

eD

esig

ner:

Tetra

Tec

hC

ity E

ngin

eer's

Est

. (C

lass

A):

4,00

0,64

1$

Con

tract

or:

C.S

. Leg

acy

Con

stru

ctio

n, In

cC

ontra

ct A

ward

Am

ount

:3,

636,

946

$

Proj

. Mgr

.:Jo

hn S

aldi

nC

ontra

ct A

ward

+

Con

tinge

ncy

(10%

)4,

000,

640

$

Con

tact

#:

213-

485-

1411

CO

's to

dat

e

(3

0, 8

%):

301,

760

$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

3,93

8,70

6$

100%

Prop

osed

pro

ject

layo

utFu

ndin

g: P

rop

O, P

rop

50 &

Rec

an

d Tr

ails

Gra

nt

23-J

ul-1

2St

atem

ent o

f C

ompl

etio

n D

ate

OC

T 20

11

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

12/1

2/10

CD

11

- Mik

e Bo

nin

Con

tract

Dur

atio

n:60

0 da

ys

1216

E. R

ose

Ave

Des

igne

r:Br

own

& C

aldw

ell

City

Eng

inee

r's E

st.

(Cla

ss A

):13

,878

,500

$

Con

tract

or:

Paci

fic H

ydro

tech

Con

tract

Awa

rd

Amou

nt:

11,3

60,7

00$

Proj

. Mgr

.:An

dy F

lore

sC

ontra

ct A

ward

+

Con

tinge

ncy

(10%

)12

,500

,700

$

Con

tact

#:

213-

485-

4496

CO

's to

dat

e

(6

9, 8

%):

881,

734

$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

12,2

42,4

34$

10

0%

Phot

o of

con

stru

ctio

n si

teFu

ndin

g: P

rop

O, D

ept.

Wat

er

Res

ourc

es &

LAC

DPW

17-O

ct-1

4St

atem

ent o

f C

ompl

etio

n D

ate

FEB

2014

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

05/1

6/16

CD

11

- Mik

e Bo

nin

Con

tract

Dur

atio

n:46

0 da

ys

1216

E. R

ose

Ave

Des

igne

r:C

arol

lo E

ngin

eers

City

Eng

inee

r's E

st.

(Cla

ss A

):2,

275,

000

$

Con

tract

or:

Gre

en B

uild

ing

Cor

p.C

ontra

ct A

ward

Am

ount

:3,

037,

000

$

Proj

. Mgr

.:Ka

tie D

oher

tyC

ontra

ct A

ward

+

Con

tinge

ncy

(10%

)3,

341,

000

$

Con

tact

#:

213-

847-

0395

CO

's to

dat

e

(4

.18%

):12

6,88

4$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

3,16

3,88

4$

63%

Prop

osed

pro

ject

layo

ut.

Fund

ing:

Pro

p O

& P

rop

84

TBD

Stat

emen

t of

Com

plet

ion

Dat

e:AU

G 2

018

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Oro

s G

reen

Stre

et

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Au

g 20

06

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

M

ar 2

007

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

N

ov 2

006

Penm

ar W

ater

Qua

lity

Impr

ovem

ent P

hase

I

Peck

Par

k C

anyo

n En

hanc

emen

t

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

M

ar 2

007

Con

duct

ing

Miti

gatio

n M

easu

res

esta

blis

hmen

t and

Bes

t M

anag

emen

t Pra

ctic

es (B

MP)

op

timiz

atio

n.

Con

stru

ct fi

ve c

urb

side

"s

torm

wat

er g

arde

ns" i

n st

reet

pa

rkw

ay a

nd a

larg

e in

filtra

tion

galle

ry b

enea

th S

teel

head

Par

k.

Phas

e II

of th

e Pe

nmar

Wat

er

Qua

lity

Impr

ovem

ent P

roje

ct

prop

oses

the

cons

truct

ion

of a

n on

site

sto

rmw

ater

trea

tmen

t /

disi

nfec

tion

syst

em. T

he tr

eate

d st

orm

wat

er is

to b

e us

ed fo

r la

ndsc

ape

irrig

atio

n.

Penm

ar W

ater

Qua

lity

Impr

ovem

ent P

hase

II

Inst

all v

eget

ated

bio

-sw

ales

, in

filtra

tion

strip

s, s

torm

wat

er c

atch

ba

sins

, arm

orin

g an

d re

-ve

geta

tion

for b

ank

stab

iliza

tion,

an

d a

step

poo

l cha

nnel

in P

eck

Park

.

Cap

ture

& tr

eat d

ry/w

et w

eath

er

runo

ff. D

ry w

eath

er ru

noff

to b

e di

verte

d to

san

itary

sew

er fo

r tre

atm

ent.

Wet

wea

ther

runo

ff to

be

div

erte

d to

the

unde

rgro

und

stor

age

tank

for d

isch

arge

to

sani

tary

sew

er.

This

pro

ject

is c

ompl

eted

.

The

proj

ect c

ontin

ues

in P

ost-

Con

stru

ctio

n.

This

pro

ject

is c

ompl

ete.

100

0

32

Page 34: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Pro

posi

tion

O -

Cle

an W

ater

Bon

d Pr

ogra

mPR

OJE

CT

STAT

US

REP

OR

T

M

onth

ly P

rogr

ess

Rep

ort -

Oct

ober

201

9

PRO

JEC

TC

ON

TAC

TSPL

ANN

ED S

CO

PEM

ON

THLY

UPD

ATE

CO

NST

RU

CTI

ON

CO

STPE

RC

ENT

CO

MPL

ETE

Not

ice

to P

roce

ed:

TBD

CD

6 -

Nur

y M

artin

ezC

ontra

ct D

urat

ion:

TBD

8175

& 8

216

Fair

Aven

ueD

esig

ner:

LA C

ount

yC

ity E

ngin

eer's

Est

. (C

lass

A):

-$

Con

tract

or:

N/A

Con

tract

Awa

rd

Amou

nt:

-$

Proj

. Mgr

.:An

dy F

lore

sC

ontra

ct A

ward

+

Con

tinge

ncy:

-$

Con

tact

#:

213-

485-

4496

CO

's to

dat

e

(#

,%):

-$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

-$

93

%

Prop

osed

pro

ject

site

pla

nFu

ndin

g: P

rop

O &

L.A

. Cou

nty

TBD

Mas

ter S

ch.

Com

plet

ion

Dat

e:O

CT

2025

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

01/1

7/11

CD

15

- Joe

Bus

cain

oC

ontra

ct D

urat

ion:

640

days

1500

0 S.

Ver

mon

t Ave

nue

Des

igne

r:W

ither

s &

Sand

gren

City

Eng

inee

r's E

st.

(Cla

ss A

):3,

500,

000

$

Con

tract

or:

Hor

izon

Con

stru

ctio

n In

tl.C

ontra

ct A

ward

Am

ount

:3,

195,

540

$

Proj

. Mgr

.:R

ay A

rauj

oC

ontra

ct A

ward

+

Con

tinge

ncy:

3,51

5,09

4$

Con

tact

#:

213-

473-

9717

CO

's to

dat

e

(4

, 2%

):32

,151

$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

3,23

7,94

0$

100%

Phot

o of

com

plet

ed c

onst

ruct

ion

site

Fund

ing:

Pro

p O

& P

rop

K

TBD

Stat

emen

t of

Com

plet

ion

Dat

eFE

B 20

14

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

07/0

6/09

CD

11

- Mik

e Bo

nin

Con

tract

Dur

atio

n:36

6 da

ys

PCH

Sev

eral

Loc

atio

nsD

esig

ner:

PSO

MAS

City

Eng

inee

r's E

st.

(Cla

ss A

):3,

714,

300

$

Con

tract

or:

LA E

ngin

eerin

g, In

c.C

ontra

ct A

ward

Am

ount

:3,

024,

545

$

Proj

. Mgr

.:An

dy F

lore

sC

ontra

ct A

ward

+

Con

tinge

ncy:

3,32

7,00

0$

Con

tact

#:

213-

485-

4496

CO

's to

dat

e

(2

6, 6

%):

121,

970

$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

3,14

6,51

5$

100%

Phot

o of

Mar

quez

Ave

. LFD

Fund

ing:

Pro

p O

, Pro

p 50

&

ARR

A

30-A

pr-1

2St

atem

ent o

f C

ompl

etio

n D

ate

JAN

201

1

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

07/2

7/09

CD

11

- Mik

e Bo

nin

Con

tract

Dur

atio

n:TB

D

At T

emes

cal C

anyo

n Pa

rkD

esig

ner:

PSO

MAS

City

Eng

inee

r's E

st.

(Cla

ss A

):1,

807,

900

$

Con

tract

or:

LA E

ngin

eerin

g, In

c.C

ontra

ct A

ward

Am

ount

:1,

207,

440

$

Proj

. Mgr

.:An

dy F

lore

sC

ontra

ct A

ward

+

Con

tinge

ncy

(9.9

%)

1,32

7,44

0$

Con

tact

#:

213-

485-

4496

CO

's to

dat

e

(1

1, 3

%):

42,0

74$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

1,24

9,51

4$

100%

Phot

o of

Tem

esca

l Cyn

LFD

Fund

ing:

Pro

p O

& A

RR

A

19-D

ec-1

1St

atem

ent o

f C

ompl

etio

n D

ate

JAN

201

1

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

The

proj

ect c

ontin

ues

in D

esig

n ph

ase.

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Au

g 20

06

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Au

g 20

06

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

O

ct 2

006

Upg

rade

the

exis

ting

Tem

esca

l C

anyo

n Lo

w F

low

Div

ersi

on

Syst

em to

com

ply

with

the

bact

eria

TM

DL

win

ter d

ry w

eath

er

regu

latio

ns.

Ror

y M

. Sha

w W

etla

nds

Park

SMBL

FD U

pgra

des

Pkg

2

Proj

ect i

s co

mpl

ete.

Proj

ect i

s co

mpl

ete.

Proj

ect c

ontin

ues

in th

e po

st

cons

truct

ion

phas

e. B

urea

u of

Sa

nita

tion

and

the

Bure

au o

f En

gine

erin

g co

ntin

ue im

plem

ent

optim

izat

ion

of th

e sy

stem

.

Inst

all "

SMAR

T" ir

rigat

ion

syst

em,

bios

wal

es, v

eget

ated

rete

ntio

n ba

sins

, inf

iltra

tion

basi

ns,

synt

hetic

soc

cer f

ield

, de

com

pose

d gr

anite

pat

hway

, and

la

ndsc

apin

g.

Upg

rade

Mar

quez

, Bay

Clu

b,

Thor

nton

, Ven

ice

Pavi

lion,

and

Im

peria

l Low

Flo

w D

iver

sion

sy

stem

s to

div

ert b

oth

sum

mer

an

d w

inte

r dry

-wea

ther

flow

s, in

or

der t

o co

mpl

y w

ith th

e ba

cter

ia

TMD

L w

inte

r dry

-wea

ther

re

gula

tions

.

Ros

ecra

ns R

ec. C

ente

r St

orm

wat

er E

nhan

cem

ents

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

N

ov 2

006

SMBL

FD U

pgra

des

Pkg

1

The

proj

ect w

ill c

onve

rt a

30-a

cre

land

fill t

o a

wet

land

s pa

rk fa

cilit

y

to p

rovi

de e

nhan

ced

wat

er q

ualit

y,

flood

pro

tect

ion,

hab

itat c

reat

ion,

gr

ound

wat

er re

char

ge,

recr

eatio

nal a

nd w

ater

reus

e. (

fo

rmer

ly th

e St

rath

ern

Pit M

ultiu

se

Proj

ect )

33

Page 35: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Pro

posi

tion

O -

Cle

an W

ater

Bon

d Pr

ogra

mPR

OJE

CT

STAT

US

REP

OR

T

M

onth

ly P

rogr

ess

Rep

ort -

Oct

ober

201

9

PRO

JEC

TC

ON

TAC

TSPL

ANN

ED S

CO

PEM

ON

THLY

UPD

ATE

CO

NST

RU

CTI

ON

CO

STPE

RC

ENT

CO

MPL

ETE

Not

ice

to P

roce

ed:

10/2

0/10

CD

11

- Mik

e Bo

nin

Con

tract

Dur

atio

n:66

0 da

ys

Alon

g PC

HD

esig

ner:

PSO

MAS

City

Eng

inee

r's E

st.

(Cla

ss A

):8,

684,

000

$

Con

tract

or:

Bloi

s C

onst

ruct

ion

Con

tract

Awa

rd

Amou

nt:

8,46

8,45

1$

Proj

. Mgr

.:An

dy F

lore

sC

ontra

ct A

ward

+

Con

tinge

ncy:

9,31

5,45

1$

Con

tact

#:

213-

485-

4496

CO

's to

dat

e

(4

5, -.

24%

):(1

9,92

9)$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

8,44

8,52

2$

100%

Phot

o of

relie

f sew

er lo

catio

nFu

ndin

g: P

rop

O

2-Ju

n-14

Stat

emen

t of

Com

plet

ion

Dat

eAP

R 2

013

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

02/0

5/14

CD

11

- Mik

e Bo

nin

Con

tract

Dur

atio

n:36

0 da

ys

Alon

g PC

HD

esig

ner:

PSO

MAS

City

Eng

inee

r's E

st.

(Cla

ss A

):8,

261,

000

$

Con

tract

or:

Ford

E.C

.C

ontra

ct A

ward

Am

ount

:8,

784,

278

$

Proj

. Mgr

.:An

dy F

lore

sC

ontra

ct A

ward

+

Con

tinge

ncy:

10,7

74,2

93$

Con

tact

#:

213-

485-

4496

CO

's to

dat

e

(7

5, 2

8%):

2,46

1,25

7$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

11,2

45,5

35$

10

0%

Phot

o of

pro

ject

loca

tion

Fund

ing:

Pro

p O

& S

CM

12-F

eb-1

8St

atem

ent o

f C

ompl

etio

n D

ate

OC

T 20

15

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

09/2

3/09

CD

11

- Mik

e Bo

nin

Con

tract

Dur

atio

n:36

5 D

AYS

Will

Rog

ers

Beac

h Pa

rkin

g Lo

tD

esig

ner:

PSO

MAS

City

Eng

inee

r's E

st.

(Cla

ss A

):3,

798,

800

$

Con

tract

or:

Grif

fith

Com

pany

Con

tract

Awa

rd

Amou

nt:

2,27

9,00

0$

Proj

. Mgr

.:An

dy F

lore

sC

ontra

ct A

ward

+

Con

tinge

ncy:

2,50

7,00

0$

Con

tact

#:

213-

485-

4496

CO

's to

dat

e

(1

0, 8

%):

178,

640

$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

2,45

7,64

0$

100%

Phot

o of

cha

nnel

at d

iver

sion

site

Fund

ing:

Pro

p O

& P

rop

50

24-O

ct-1

1St

atem

ent o

f C

ompl

etio

n D

ate

JUL

2011

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

04/0

9/10

CD

9 -

Cur

ren

D. P

rice,

Jr.

Con

tract

Dur

atio

n:68

3 da

ys

54th

St &

Ava

lon

Boul

evar

dD

esig

ner:

PSO

MAS

City

Eng

inee

r's E

st.

(Cla

ss A

):10

,354

,300

$

Con

tract

or:

Ford

E.C

.C

ontra

ct A

ward

Am

ount

:6,

370,

000

$

Proj

. Mgr

.:Jo

hn S

aldi

nC

ontra

ct A

ward

+

Con

tinge

ncy:

7,29

7,00

0$

Con

tact

#:

213-

485-

1411

CO

's to

dat

e

(6

7, 1

1%):

713,

375

$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

7,02

9,37

9$

100%

Ren

derin

g of

pro

pose

d pr

ojec

t

24-M

ay-1

3St

atem

ent o

f C

ompl

etio

n D

ate

JUL

2012

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Con

stru

ctio

n w

ork

has

been

co

mpl

eted

.

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Au

g 20

06

SMBL

FD U

pgra

des

Pkg

3 Ph

ase

2

Con

stru

ct a

relie

f sew

er (C

IRS)

to

the

Coa

stal

Inte

rcep

tor S

ewer

in

orde

r to

com

ply

with

the

bact

eria

TM

DL

win

ter d

ry-w

eath

er

regu

latio

ns.

Sout

h Lo

s An

gele

s W

etla

nds

Park

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Au

g 20

06

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Au

g 20

06

SMBL

FD U

pgra

des

Pkg

4Th

is p

roje

ct w

ill u

pgra

de th

e ex

istin

g Lo

w F

low

Div

ersi

on

Syst

em a

t San

ta M

onic

a C

anyo

n an

d Pa

lisad

es P

ark

Low

Flo

w

Div

ersi

on S

yste

m. U

pgra

des

incl

ude

pum

p an

d el

ectri

cal

upgr

ades

and

aut

omat

ic c

ontro

l fro

m V

enic

e Pu

mp

Plan

t.

SMBL

FD U

pgra

des

Pkg

3

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Au

g 20

06

Con

stru

ct a

relie

f sew

er (C

IRS)

to

the

Coa

stal

Inte

rcep

tor S

ewer

in

orde

r to

com

ply

with

the

bact

eria

TM

DL

win

ter d

ry-w

eath

er

regu

latio

ns.

The

wet

land

s ce

lls a

re in

the

optim

izat

ion

phas

e.C

onst

ruct

a w

etla

nds

park

at 5

4th

St. a

nd A

valo

n Bl

vd to

impr

ove

area

sto

rmw

ater

qua

lity,

and

pr

ovid

e re

crea

tiona

l spa

ce fo

r the

su

rroun

ding

com

mun

ity.

Proj

ect i

s co

mpl

ete.

Proj

ect i

s co

mpl

ete.

34

Page 36: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Pro

posi

tion

O -

Cle

an W

ater

Bon

d Pr

ogra

mPR

OJE

CT

STAT

US

REP

OR

T

M

onth

ly P

rogr

ess

Rep

ort -

Oct

ober

201

9

PRO

JEC

TC

ON

TAC

TSPL

ANN

ED S

CO

PEM

ON

THLY

UPD

ATE

CO

NST

RU

CTI

ON

CO

STPE

RC

ENT

CO

MPL

ETE

CD

6 -

Nur

y M

artin

ez

p

Acqu

isiti

on C

ost:

$10,

000,

000

8175

& 8

216

Fair

Aven

ueD

esig

ner:

LA C

ount

y

Con

tract

or:

N/A

Proj

. Mgr

.:An

dy F

lore

s

Con

tact

#:

213-

485-

4496

Boa

rd A

ccep

tanc

e R

epor

t D

ate

100%

Prop

osed

pro

ject

site

pla

nFu

ndin

g: P

rop

O &

LA

Cou

nty

N/A

Expe

cted

Acq

uisi

tion

Dat

e:TB

D

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

08/1

7/11

CD

11

- Mik

e Bo

nin

Con

tract

Dur

atio

n:61

6 da

ys

200

N. T

emes

cal C

anyo

n R

d.

Des

igne

r:AE

CO

MC

ity E

ngin

eer's

Est

. (C

lass

A):

8,00

8,80

0$

Con

tract

or:

LA E

ngin

eerin

g, In

c.C

ontra

ct A

ward

Am

ount

:7,

019,

800

$

Proj

. Mgr

.:N

aush

in K

amal

Con

tract

Awa

rd +

C

ontin

genc

y:8,

701,

780

$

Con

tact

#:

213-

847-

0342

CO

's to

dat

e

(6

2, 2

7%):

1,90

0,09

5$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

8,91

9,89

5$

100%

Phot

o of

pla

ygro

und

and

new

rest

room

sFun

ding

: Pro

p O

30-J

an-1

7St

atem

ent o

f C

ompl

etio

n D

ate

APR

201

5

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

05/1

6/16

CD

11

- Mik

e Bo

nin

Con

tract

Dur

atio

n:42

0 da

ys

362

N. T

emes

cal C

anyo

n R

d.D

esig

ner:

Car

ollo

Eng

inee

rsC

ity E

ngin

eer's

Est

. (C

lass

A):

2,46

7,00

0$

Con

tract

or:

Gre

en B

uild

ing

Cor

p.C

ontra

ct A

ward

Am

ount

:2,

817,

500

$

Proj

. Mgr

.:Ka

tie D

oher

tyC

ontra

ct A

ward

+

Con

tinge

ncy

(%)

3,09

9,25

0$

Con

tact

#:

213-

847-

0395

CO

's to

dat

e

(6

.77%

):19

0,82

9$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

3,00

8,32

9$

73%

Prop

osed

pro

ject

layo

utFu

ndin

g: P

rop

O

TBD

Stat

emen

t of

Com

plet

ion

Dat

e:AU

G 2

018

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

CD

8 -

Mar

quee

ce H

arris

-Daw

son

Con

tract

Dur

atio

n:10

4 da

ys

Verm

ont A

ve.

Des

igne

r:Ar

cadi

s/Te

tra T

ech

City

Eng

inee

r's E

st.

(Cla

ss A

):54

7,50

0$

Con

tract

or:

Cla

rke

Con

tract

ing

Cor

p.C

ontra

ct A

ward

Am

ount

: 62

4,00

0$

Proj

. Mgr

.:An

dy F

lore

sC

ontra

ct A

ward

+

Con

tinge

ncy

(%)

686,

400

$

Con

tact

#:

213-

485-

4496

CO

's to

dat

e

(6

.56%

):40

,958

$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

664,

958

$

26%

Prop

osed

pro

ject

layo

utFu

ndin

g: P

rop

O &

IRW

MP

TBD

Stat

emen

t of

Com

plet

ion

Dat

e:JU

L 20

19

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Verm

ont A

ve. S

torm

wat

er

Cap

ture

- Ph

ase

1

Stra

ther

n Pi

t Mul

tiuse

- La

nd

Acqu

isiti

on

Tem

esca

l Can

yon

Park

St

orm

wat

er B

MP

Ph I

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

&

AOC

Sep

t 201

7

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

M

ar 2

007

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

M

ar 2

007

Tem

esca

l Can

yon

Park

St

orm

wat

er B

MP

Ph II

Phas

e II

of th

e Te

mes

cal C

anyo

n Pa

rk S

torm

wat

er B

MP

Proj

ect

prop

oses

the

cons

truct

ion

of a

n on

site

sto

rmw

ater

trea

tmen

t /

disi

nfec

tion

syst

em. T

he tr

eate

d st

orm

wat

er is

to b

e us

ed fo

r la

ndsc

ape

irrig

atio

n.

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

O

ct 2

006

Acqu

ire th

e la

nd n

eces

sary

to

conv

ert a

30-

acre

gra

vel p

it si

te

into

a m

ultip

urpo

se fa

cilit

y de

dica

ted

to s

torm

wat

er re

tent

ion

and

reus

e.

Proj

ect i

s co

mpl

ete.

Proj

ect i

s co

mpl

ete.

The

proj

ect c

ontin

ues

in P

ost-

Con

stru

ctio

n.

Phas

e I i

nclu

des

inst

alla

tion

of

BMPs

in th

e pu

blic

righ

t-of-w

ay in

or

aro

und

an e

xist

ing

med

ian

to

colle

ct a

nd tr

eat t

he 8

5th

perc

entil

e st

orm

wat

er ru

noff

from

a

4.7

acre

are

a th

at d

rain

s w

est

tow

ard

the

sout

heas

t cor

ner o

f G

age

Aven

ue a

nd V

erm

ont

Aven

ue.

The

Proj

ect c

ontin

ues

to b

e in

the

Post

-Con

stru

ctio

n ph

ase.

Div

ert s

torm

wat

er fr

om a

n ex

istin

g st

orm

dra

in to

Tem

esca

l Can

yon

Park

for t

reat

men

t by

a hy

drod

ynam

ic s

epar

ator

, un

derg

roun

d de

tent

ion

tank

and

di

vers

ion

to a

san

itary

sew

er fo

r tre

atm

ent a

t tre

atm

ent p

lant

.

35

Page 37: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Pro

posi

tion

O -

Cle

an W

ater

Bon

d Pr

ogra

mPR

OJE

CT

STAT

US

REP

OR

T

M

onth

ly P

rogr

ess

Rep

ort -

Oct

ober

201

9

PRO

JEC

TC

ON

TAC

TSPL

ANN

ED S

CO

PEM

ON

THLY

UPD

ATE

CO

NST

RU

CTI

ON

CO

STPE

RC

ENT

CO

MPL

ETE

Not

ice

to P

roce

ed:

CD

8 -

Mar

quee

ce H

arris

-Daw

son

Con

tract

Dur

atio

n:

Verm

ont A

ve.

Des

igne

r:Ar

cadi

s/Te

tra T

ech

City

Eng

inee

r's E

st.

(Cla

ss A

):

Con

tract

or:

Con

tract

Awa

rd

Amou

nt:

Proj

. Mgr

.:An

dy F

lore

sC

ontra

ct A

ward

+

Con

tinge

ncy

(%)

Con

tact

#:

213-

485-

4496

CO

's to

dat

e

(1

, 0.0

6%):

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

-$

77

%

Prop

osed

pro

ject

layo

utFu

ndin

g: P

rop

O &

MTA

Gra

nt

TBD

Mas

ter S

ch.

Com

plet

ion

Dat

e:FE

B 20

21

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

CD

11

- Mik

e Bo

nin

Con

tract

Dur

atio

n:

Los

Ange

les

Wor

ld A

irpor

tD

esig

ner:

AEC

OM

City

Eng

inee

r's E

st.

(Cla

ss A

):26

,500

,000

$

Con

tract

or:

TBD

Con

tract

Awa

rd

Amou

nt:

-$

Proj

. Mgr

.:Sa

lem

Gar

awi

Con

tract

Awa

rd +

C

ontin

genc

y:-

$

Con

tact

#:

213-

847-

0345

CO

's to

dat

e

(#

,%):

-$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

-$

Prop

osed

pro

ject

layo

utFu

ndin

g: P

rop

O

N/A

Mas

ter S

ch.

Com

plet

ion

Dat

e:TB

D

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

03/0

4/09

CD

11

- Mik

e Bo

nin

Con

tract

Dur

atio

n:16

0 da

ys

1203

Sou

th M

ain

Stre

etD

esig

ner:

PSO

MAS

City

Eng

inee

r's E

st.

(Cla

ss A

):37

3,00

0$

Con

tract

or:

Flem

ing

Envi

ronm

enta

l, In

c.C

ontra

ct A

ward

Am

ount

:28

5,33

0$

Proj

. Mgr

.:Sa

lem

Gar

awi

Con

tract

Awa

rd +

C

ontin

genc

y:38

5,33

0$

Con

tact

#:

213-

847-

0345

CO

's to

dat

e

(3

, -11

%):

(30,

370)

$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

254,

585

$

100%

Phot

o of

exi

stin

g do

g pa

rkFu

ndin

g: P

rop

O

7-Se

p-11

Stat

emen

t of

Com

plet

ion

Dat

eM

AR 2

010

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

06/0

3/10

CD

10

- Her

b J.

Wes

son,

Jr.

Con

tract

Dur

atio

n:27

0 da

ys

2785

Cly

de A

venu

eD

esig

ner:

PSO

MAS

City

Eng

inee

r's E

st.

(Cla

ss A

):2,

766,

900

$

Con

tract

or:

PPC

Con

stru

ctio

n, In

c.C

ontra

ct A

ward

Am

ount

:2,

675,

963

$

Proj

. Mgr

.:Ift

ekha

r Ahm

ed/

Nau

shin

Kam

alC

ontra

ct A

ward

+

Con

tinge

ncy:

2,94

3,55

9$

Con

tact

#:

213-

485-

5875

CO

's to

dat

e

(3

7, 2

2%):

600,

216

$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

3,27

6,17

9$

100%

Phot

o of

com

plet

ed p

ark

Fund

ing:

Pro

p O

, Pro

p 50

, Pro

p K,

Q

uim

by

6-Au

g-12

Stat

emen

t of

Com

plet

ion

Dat

eO

CT

2011

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

Se

p 20

06

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

M

ar 2

007

Verm

ont A

venu

e St

orm

wat

er

Cap

ture

Ph

II

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

&

AOC

Sep

t 201

7

Wes

tsid

e Pa

rk R

ainw

ater

Irr

igat

ion

Trea

t pol

luta

nts

from

on-

site

and

of

f-site

sto

rmw

ater

by

inst

allin

g a

stor

mw

ater

lift

stat

ion,

a

subs

urfa

ce ir

rigat

ion

syst

em, a

nd

a dr

y cr

eek

with

a p

erfo

rate

d pi

pe

for c

olle

ctin

g an

d re

turn

ing

exce

ss

irrig

atio

n w

ater

to th

e ex

istin

g st

orm

dra

in.

Cap

ture

and

trea

t sto

rmw

ater

ru

noff

from

thre

e ex

istin

g st

orm

dr

ains

thro

ugh

the

proj

ect B

MP

elem

ents

, inc

ludi

ng T

rash

Net

Sy

stem

, Und

ergr

ound

Det

entio

n Ta

nk a

nd U

nder

grou

nd In

filtra

tion

Faci

lity.

Wes

tmin

ster

Dog

Par

k St

orm

wat

er B

MP

Proj

ect i

s in

bid

& a

war

d

Proj

ect i

s co

mpl

ete.

Proj

ect c

ompl

eted

. Sev

ente

en

(17)

sol

ar li

ghts

inst

alle

d by

R

ecre

atio

n &

Park

s.

The

proj

ect i

s cu

rrent

ly in

the

Bid

& Aw

ard

phas

e.

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

M

ar 2

009

Phas

e II

will

prov

ide

stor

mw

ater

and

ur

ban

runo

ff tre

atm

ent,

infil

tratio

n an

d ca

ptur

e an

d us

e fo

r ev

apot

rans

pira

tion

by v

eget

atio

n in

st

orm

wat

er B

MPs

; gre

en s

pace

on

side

wal

ks a

nd m

edia

ns; a

nd a

re

duct

ion

of lo

cal f

lood

ing

durin

g st

orm

eve

nts.

Thi

s pr

ojec

t is

loca

ted

alon

g Ve

rmon

t Ave

nue,

bet

wee

n G

age

Aven

ue a

nd F

lore

nce

Aven

ue,

wes

t of H

oove

r Stre

et.

Incl

udes

inst

alla

tion

of a

mod

ular

co

nstru

cted

wet

land

(b

iore

med

iatio

n fil

ter),

so

that

on-

site

runo

ff w

ill b

e ca

ptur

ed a

nd

treat

ed p

rior t

o di

scha

rgin

g in

to

the

stor

m d

rain

sys

tem

.

Wes

tche

ster

Sto

rmw

ater

BM

P

36

Page 38: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Pro

posi

tion

O -

Cle

an W

ater

Bon

d Pr

ogra

mPR

OJE

CT

STAT

US

REP

OR

T

M

onth

ly P

rogr

ess

Rep

ort -

Oct

ober

201

9

PRO

JEC

TC

ON

TAC

TSPL

ANN

ED S

CO

PEM

ON

THLY

UPD

ATE

CO

NST

RU

CTI

ON

CO

STPE

RC

ENT

CO

MPL

ETE

Not

ice

to P

roce

ed:

CD

5 -

Paul

Kor

etz

Con

tract

Dur

atio

n:

Des

igne

r:Ar

cadi

s/At

kins

City

Eng

inee

r's E

st.

(Cla

ss A

):

Con

tract

or:

Con

tract

Awa

rd

Amou

nt:

Proj

. Mgr

.:An

dy F

lore

sC

ontra

ct A

ward

+

Con

tinge

ncy

(%)

Con

tact

#:

213-

485-

4496

CO

's to

dat

e

(1

, 0.0

6%):

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

-$

16

%

Fund

ing:

Pro

p O

& P

rop

84

TBD

Mas

ter S

ch.

Com

plet

ion

Dat

e:AU

G 2

020

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

01/0

9/17

CD

15

- Joe

Bus

cain

o

Con

tract

Dur

atio

n:45

0 da

ys

Des

igne

r:LA

DW

PC

ity E

ngin

eer's

Est

. (C

lass

A)

3,69

0,00

0$

Con

tract

or:

Mik

e Bu

balo

Con

stru

ctio

nC

ontra

ct A

ward

Am

ount

:4,

255,

100

$

Proj

. Mgr

.:Ka

tie D

oher

tyC

ontra

ct A

ward

+

Con

tinge

ncy:

5,10

6,12

0$

Con

tact

#:

213-

847-

0395

CO

's to

dat

e

(200

,410

)$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

4,05

4,69

0$

85%

Prop

osed

Alig

nmen

t Fu

ndin

g: L

A D

WP

N/A

Stat

emen

t of

Com

plet

ion

Dat

e:AP

R 2

019

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

Not

ice

to P

roce

ed:

07/0

9/18

CD

15

- Joe

Bus

cain

o

Con

tract

Dur

atio

n:95

4 da

ys

Des

igne

r:LA

DW

PC

ity E

ngin

eer's

Est

. (C

lass

A)

15,5

00,0

00$

Con

tract

or:

Gro

up O

HL

USA

C

ontra

ct A

ward

Am

ount

:15

,921

,294

$

Proj

. Mgr

.:M

oham

mad

Al-J

amal

Con

tract

Awa

rd +

C

ontin

genc

y:19

,105

,553

$

Con

tact

#:

213-

847-

0322

CO

's to

dat

e

107,

666

$

Boa

rd A

ccep

tanc

e R

epor

t D

ate

Awar

d Am

ount

+

CO

's Is

sued

15,9

99,5

61$

41

%

Prop

osed

Alig

nmen

t Fu

ndin

g: L

A D

WP

N/A

Mas

ter S

ch.

Com

plet

ion

Dat

e:N

OV

2021

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

CD

1 -

Gilb

ert C

edillo

Prop

O A

cqui

sitio

n C

ost:

$0

2850

Ker

r Stre

etD

esig

ner:

N/A

Con

tract

or:

N/A

Proj

. Mgr

.:C

hris

toph

er F

. Joh

nson

Con

tact

#:

213-

485-

1165

Boa

rd A

ccep

tanc

e R

epor

t D

ate

100%

Phot

o of

G2

parc

el &

LA

Riv

erFu

ndin

g: M

ICLA

N/A

Expe

cted

Acq

uisi

tion

Dat

e:TB

D

Pre

Des

ign

Land

Acc

. /

Rig

ht o

f Way

Des

ign

Bid

& Aw

ard

Con

stPo

st C

onst

The

proj

ect i

s cu

rrent

ly in

the

Con

stru

ctio

n ph

ase.

Acqu

ire a

par

cel o

f lan

d ad

jace

nt

to th

e LA

Riv

er a

s pa

rt of

R

evita

lizat

ion

Mas

ter P

lan.

Escr

ow c

lose

d on

3/1

/17.

Con

cept

Rep

ort a

ppro

ved

by th

e C

OAC

M

ar 2

007

Mac

hado

Lak

e Pi

pelin

e -

East

ern

Rea

ch(N

on-P

rop

O

Fund

ed P

roje

ct)

Inst

alla

tion

of 6

,500

line

ar fe

et o

f re

clai

med

wat

er p

ipel

ine

in th

e H

arbo

r are

a to

pro

vide

a b

ack-

up

to th

e La

ke m

ake-

up w

ater

sup

ply

to M

acha

do L

ake

from

the

Term

inal

Isla

nd W

ater

R

ecla

mat

ion

Plan

t.

The

proj

ect i

s cu

rrent

ly in

the

Con

stru

ctio

n ph

ase.

Tayl

or Y

ard

Riv

er P

ark

- Pa

rcel

G2

Land

Acq

uisi

tion

(Non

-Pro

p O

Fun

ded)

Mac

hado

Lak

e Pi

pelin

e

(Non

-Pro

p O

Fun

ded

Proj

ect)

Inst

alla

tion

of 3

,300

line

ar fe

et o

f re

clai

med

wat

er p

ipel

ine

in th

e H

arbo

r are

a to

pro

vide

a la

ke

mak

e-up

wat

er s

uppl

y to

Mac

hado

La

ke fr

om th

e Te

rmin

al Is

land

W

ater

Rec

lam

atio

n Pl

ant.

The

proj

ect c

ontin

ues

in th

e Po

st-

Con

stru

ctio

n ph

ase.

Wes

twoo

d N

eigh

borh

ood

Gre

enw

ay -

Prop

OTh

is p

roje

ct w

ill p

rovi

de u

rban

ru

noff

treat

men

t, gr

een

spac

e,

acce

ss to

pub

lic tr

ansi

t, a

nd

educ

atio

nal &

recr

eatio

nal

oppo

rtuni

ties.

The

sys

tem

will

ca

ptur

e ur

ban

runo

ff fro

m

Ove

rland

dra

in a

nd W

estw

ood

Blvd

and

div

ert i

t to

a co

nstru

cted

bi

o-sw

ale

stre

am o

n th

e no

rth s

ide

of th

e M

TA s

tatio

n.C

once

pt R

epor

t app

rove

d by

the

CO

AC

& AO

C S

ept 2

017

37

Page 39: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Proposition O – Clean Water Bond Monthly Progress Report – October 2019

- Prepared by the Bureau of Engineering Prop O - Clean Water Bond Division 38

5.2 Council District Map

See attached 5.3 Map of Proposition O Projects Approved for Implementation See attached

PROJECT PHASE STATUS

Phase I Complete

7,620 catch basin inserts 7,900 catch basin curb opening screens covers • Installations coverage addressed the City’s high trash generation areas.

Phase II

Complete 6,400 catch basin curb opening screen covers

• Installation coverage addressed only a portion of the City’s medium trash generation area.

Phase III

Complete 24,187 catch basin curb opening screen covers

• Installation coverage addressed the low and medium trash generation areas in the Los Angeles and Ballona Creek watersheds.

• Completed a special study, The Quantification of the City of LA’s Institutional Measures for Trash TMDL Compliance. The study resulted in demonstrating the City’s institutional measures having a 13.5% effectiveness in the prevention of trash discharges into the storm drain system.

Phase IV

In Progress

1,600 catch basin inserts (PLANNED) 1,000 catch basin curb opening screen covers (PLANNED)

• Ecology Control Industries selected as contractor and negotiations have begun.

• Completed the field evaluation of 250 catch basins in the Machado Lake watershed for feasibility of curb opening screen covers or insert installation.

• Completed the field evaluation of 1,150 catch basins in the Dominguez Channel watershed for feasibility of curb opening screen covers or insert installation.

• Completed the field evaluation of 1,200 catch basins in the Santa Monica Bay watershed for feasibility of curb opening screen covers or insert installation.

• Completed 68 inserts in the Civic Center high trash area.

• Catch basin retrofits in the Machado Lake watershed and Trash TMDL Receiving Water Monitoring Protocol: Notice to Proceed was given on March 29, 2016 to TRC Solutions and G2. Construction for the amount of $300,000. Catch Basin retrofits to commence on May 2, 2016.

• A Request for Proposals to establish a contract for the fabrication and installation of curb opening screen covers was advertise on December 2015, 2 proposals were received January 2016, and currently being reviewed by the Bureau of Contract Administration for BIP adherence. Anticipate contract start date late Summer or early Fall 2016.

5.0 APPENDIX

Page 40: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

4

4

5

11

14

5

10

P A C I F I C

O C E A N

712

6

3 2

5

4

1311

1

10

9

8

15

101

101

5

210

605

5

10

105

710

110

405

14

90

22

1

47

103

91

170

110

60

2

134

118

ARTESIA BLVD

LVEDA B

W JEFFERSON BLVD

ALONDRA BLVD

W WILLOW ST

W IMPERIAL HWY

W VERNON AV

BLVD

E 223RD ST

W ARTESIA BLVD

IMPERIAL HWY

E AV

W DEL AMO BLVD

CARSON ST

W CENTURY BLVD

W SLAUSON AV

RINALDI ST

B RLY BLVD

E FIRESTONE BLVD

VICTORY BLVD

SOST

ROSECRANS AV

190TH ST

E ARTESIA BLVD

IN ST

E MANCHESTER AV

VANOWEN S

E

E SPRING ST

MOORPARK ST

SAN FERNANDO MISSION B

WASHINGTON BLVD

DEVONSHIRE ST

W 3RD S

L AMO BLVD DEL AMO BLVD

W ROSECRANS AV

25TH ST

W FLORENCE AV

E CALIFORNIA BLVD

MAGNOLIA BLVD

NORDHOFF ST

PLUMMER ST

GARVEY AV

TIN LUTHER KING JR BLVD

D

ROSCOE BL

B

ON ST

BURBANK BLVD

W

B

W LOMITA BLVD

E 7TH ST

MANHATTAN BEACH BLVD

FRANKLIN AV

E ORANGE GROVE BLVD

OOD BLVD

R

E COLORADO BLVD

E 3RD ST

E ANAHEIM ST

E WILLOW ST

E CARSON ST

SATICOY ST

E FLORENCE

E ROSECRANS AV

EXPOSITION BLVD

E 103RD ST

E COMPTON BLVD

W ANAHEIM ST

U

RODEO RD

MISSION ST

SHEPARD ST

MANCHESTER AV

E COLORADO ST

SHERMAN WY

W MANCHESTER BLVD

S

E 7TH ST

SANTA MONICA BLVD

E PACIFIC COAST HWYW PACIFI

0 4.50.9 1.8 2.7 3.6

Miles

Copyright © 2019 City of Los AngelesPrepared by BOE\GIS\Mapping Division: 9/2019

This map shall not be copied or reproduced, all or anypart thereof, whether for distribution or resale, withoutthe prior written permission of the CITY ENGINEER.

L E G E N D

City of Los Angeles Council Districts

Street Data Copyright © 2014 Rand McNally and Company

Council District

GARY LEE MOORE, P.E.CITY ENGINEER

ERIC GARCETTIMAYOR

1. Gilbert Cedillo (15.8 Sq Mi)

2. Paul Krekorian (25.0 Sq Mi)

3. Bob Blumenfield (36.6 Sq Mi)

4. David Ryu (41.0 Sq Mi)

5. Paul Koretz (37.5 Sq Mi)

6. Nury Martinez (27.2 Sq Mi)

7. Monica Rodriguez (54.1 Sq Mi)

8. Marqueece Harris-Dawson (16.0 Sq Mi)

9. Curren D. Price, Jr. (13.0 Sq Mi)

10. Herb J. Wesson, Jr. (14.5 sq Mi)

11. Mike Bonin (63.8 Sq Mi)

12. John Lee (58.7 Sq Mi)

13. Mitch O'Farrell (13.6 Sq Mi)

14. Jose Huizar (24.2 Sq Mi)

15. Joe Buscaino (32.1 Sq Mi)

Page 41: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

45

5

11

14

14

15

4

7

11

3

12

6

2

15

8

1

14

9

10

13

Strathern Wetlands Park(CD 6)

Cesar Chavez GroundWater Quality Improvement

(CD 6)

Mar Vista RecreationCenter Stormwater BMP

(CD 11)

Westside Park RainwaterIrrigation Project

(CD 10)

Echo Park LakeRehabilitation

(CD 13)

Oros Green Street(CD 13)

Rosecrans Rec. CenterStormwater Enhancements

(CD 15)

South Los AngelesWetlands Park

(CD 9)

Machado Lake EcosystemRehabilitation

(CD 15)

Peck Park CanyonEnhancement

(CD 15)

Westminster Dog ParkStormwater BMP

(CD 11)

Grand Blvd.Tree Wells

(CD 11)

Imperial Highway SunkenMedian Stormwater BMP

(CD 11)

Inner Cabrillo Beach BacterialWater Quality Improvement

(CD 15)

Machado LakePhase I(CD 15)

NOT TO SCALE

Proposition O Projects Approved for Implementation

Taylor Yard RiverPark (G2 Parcel)

(CD 1)

LA Zoo Parking Lot(CD 4)

Hansen DamWetlands Restoration

(CD 7)

Temescal Canyon ParkStormwater BMP

(CD 11)

Argo Drain(CD 11)

Penmar Water QualityImprovement

(CD 11)

Albion Dairy Park(CD 1)

Catch Basin Inserts andCovers Ph I

Catch Basin OpeningScreen Covers Ph II

Projects Not Shown:

Catch Basin Opening ScreenCovers and Inserts Ph III

Project SitesSanta Monica Bay Low Flow Diversion Upgrades Pkg. 1-4Council District

Santa Monica LFDUpgrades Pkg. 1

(CD 11)

Santa Monica LFDUpgrades Pkg. 3 & 4

(CD 11)Santa Monica LFDUpgrades Pkg. 2

(CD 11)

Santa Monica LFDUpgrades Pkg. 1

(CD 11)

Santa Monica LFDUpgrades Pkg. 1

(CD 11)

Copyright ©2019 City of Los AngelesPrepared by :\BOE\GIS MAPPING DIVISION : 06/2019

This shall not be copied or reproduced, all or anypart thereof, whether for distribution or resale, withoutthe prior written permission of the CITY ENGINEER.

Elmer Avenue Phase II:Elmer Paseo

(CD 6)

Glenoaks-Sunland Stormwater Capture(CD 2 & CD 6)

WatershedSanta Monica BayDominguez ChannelLos Angeles River Malibu Creek San Gabriel RiverSanta Clara River Marina Del ReyBallona Creek

Avalon GreenAlley South

(CD 9)

Broadway NeighborhoodStormwater Greenway

(CD 9)

Streets Copyright © 2010 Rand McNally & Co.

Gary Lee Moore P.E.City Engineer

Eric GarcettiMayor

Aliso-Limekiln CreekRestoration

(CD 12)

Vermont AveStormwater Capture

Phase I(CD 8)

Vermont AveStormwater Capture

Phase II(CD 8)

Prop O - WestwoodNeighborhood Greenway

(CD 11)

Page 42: October 2019 Monthly Report - lacitypropo.org · Proposition O – Clean Water Bond Monthly Progress Report – October 2019 - Prepared by the Bureau of Engineering Prop O - Clean

Prepared by theProject Management Team