![Page 1: October 2015 1 Mary Louise Hendrickson Solid Waste Section – Technical Lead mhendrickson@mt.gov 406-444-1808.](https://reader035.fdocuments.us/reader035/viewer/2022062517/56649efa5503460f94c0c5b0/html5/thumbnails/1.jpg)
1
October 2015
Proposed Soil Treatment Facility Rules
Mary Louise HendricksonSolid Waste Section – Technical [email protected]
![Page 2: October 2015 1 Mary Louise Hendrickson Solid Waste Section – Technical Lead mhendrickson@mt.gov 406-444-1808.](https://reader035.fdocuments.us/reader035/viewer/2022062517/56649efa5503460f94c0c5b0/html5/thumbnails/2.jpg)
2
Purpose of the Rules
• Coordination among existing solid waste management ARMs to ensure definitions and other operational requirements are consistent.
• Part of a larger effort to customize Solid Waste Administrative Rules.
• Establish the regulatory framework according to potential impact to human health and the environment.
• Consistent and equitable application of requirements.
![Page 3: October 2015 1 Mary Louise Hendrickson Solid Waste Section – Technical Lead mhendrickson@mt.gov 406-444-1808.](https://reader035.fdocuments.us/reader035/viewer/2022062517/56649efa5503460f94c0c5b0/html5/thumbnails/3.jpg)
3
Facilities/operations exempt from Solid Waste licensure
• Landfarms at CECRA remediation sites.
• Landfarms located within the licensed area of a licensed Class II facility.
![Page 4: October 2015 1 Mary Louise Hendrickson Solid Waste Section – Technical Lead mhendrickson@mt.gov 406-444-1808.](https://reader035.fdocuments.us/reader035/viewer/2022062517/56649efa5503460f94c0c5b0/html5/thumbnails/4.jpg)
4
Before landfarming, consider…
• Landfill disposal costs vs. site development, long-term operation and management, post-closure, and liability.
• Upfront costs of landfilling vs. landfarming.
• Is landfarming still the best decision?
![Page 5: October 2015 1 Mary Louise Hendrickson Solid Waste Section – Technical Lead mhendrickson@mt.gov 406-444-1808.](https://reader035.fdocuments.us/reader035/viewer/2022062517/56649efa5503460f94c0c5b0/html5/thumbnails/5.jpg)
5
New Definition
One-time Landfarm – means a landfarm facility for remediation of less than 2,400 cubic yards of non-hazardous contaminated soil generated from a single site, regardless of the source, and will not be used to treat contaminated soil on an on-going basis.
Note: Contaminated soil does not include concrete, wood, metal, or any other non-soil material.
![Page 6: October 2015 1 Mary Louise Hendrickson Solid Waste Section – Technical Lead mhendrickson@mt.gov 406-444-1808.](https://reader035.fdocuments.us/reader035/viewer/2022062517/56649efa5503460f94c0c5b0/html5/thumbnails/6.jpg)
6
Landfarm Categories
One-time Landfarm <2,400 yds3 (single-site)
Minor Landfarm <3,200 yds3
Intermediate Landfarm <8,000 yds3
Major Landfarm >8,000 yds3
![Page 7: October 2015 1 Mary Louise Hendrickson Solid Waste Section – Technical Lead mhendrickson@mt.gov 406-444-1808.](https://reader035.fdocuments.us/reader035/viewer/2022062517/56649efa5503460f94c0c5b0/html5/thumbnails/7.jpg)
7
Landfarm Fee Structure
License Application Fee
Annual License Fee
One-time Landfarm $500 None
Minor Landfarm $1,200 $600
Intermediate Landfarm $2,400 $1,200
Major Landfarm $3,600 $1,800
![Page 8: October 2015 1 Mary Louise Hendrickson Solid Waste Section – Technical Lead mhendrickson@mt.gov 406-444-1808.](https://reader035.fdocuments.us/reader035/viewer/2022062517/56649efa5503460f94c0c5b0/html5/thumbnails/8.jpg)
8
General License Applications Requirements:
OT and MIM Landfarms:• Facility Contact and Applicant Information• Facility Location (legal and directional)• Background Sample Results• Contaminated Soil Analytical Results• Landowner Approval (consider an access agreement)• Local City/County Planning/Zoning Approval• Volume of contaminated soil proposed for remediation at the site• Operation and Maintenance Plan• Site Closure Plan• Groundwater Monitoring Plan (if dtw >25’ but <50’ bls for MIM)• Site Maps (location and site specific)
MIM Landfarms:• Information useful for the completion of an EA• Financial Assurance• General Liability Insurance Policy
![Page 9: October 2015 1 Mary Louise Hendrickson Solid Waste Section – Technical Lead mhendrickson@mt.gov 406-444-1808.](https://reader035.fdocuments.us/reader035/viewer/2022062517/56649efa5503460f94c0c5b0/html5/thumbnails/9.jpg)
9
General Rule Requirements
• Facility Design Criteria• Groundwater Protection• Surface Water Control• Siting and Setback Requirements• Operation and Maintenance Requirements• Sampling and Analysis• Recordkeeping and Annual Reporting• Closure and Post-Closure Monitoring Requirements
![Page 10: October 2015 1 Mary Louise Hendrickson Solid Waste Section – Technical Lead mhendrickson@mt.gov 406-444-1808.](https://reader035.fdocuments.us/reader035/viewer/2022062517/56649efa5503460f94c0c5b0/html5/thumbnails/10.jpg)
10
Operation and Maintenance Requirements
• Control storm water run-on and prevent storm water run-off
• Leachate management
• Controlling the site
• Description of personnel and equipment
• Description of landfarming methods
• Site management (who, when, how)
• Maximum 12-inch lift
![Page 11: October 2015 1 Mary Louise Hendrickson Solid Waste Section – Technical Lead mhendrickson@mt.gov 406-444-1808.](https://reader035.fdocuments.us/reader035/viewer/2022062517/56649efa5503460f94c0c5b0/html5/thumbnails/11.jpg)
11
Landfarm Sampling and Analysis Requirements
• Each MIM facility is required to sample and report findings to DEQ Solid Waste Program 3x a year.
• All facilities must sample TZ and BTZ
• All facilities (OT and MIM) must use Test Methods for Evaluating Solid Waste Physical/Chemical Methods (SW-846)
• RCRA 8 Metals • BTEX • TPH/VPH/EPH• Paint filter liquids test (liquids prohibited at OT only)
![Page 12: October 2015 1 Mary Louise Hendrickson Solid Waste Section – Technical Lead mhendrickson@mt.gov 406-444-1808.](https://reader035.fdocuments.us/reader035/viewer/2022062517/56649efa5503460f94c0c5b0/html5/thumbnails/12.jpg)
12
Remediation Standards and Post-Remediation Use
• TPH/EPH concentrations below 100 parts per million (ppm) and BTEX concentrations less than 10 ppm, of which benzene must not be greater than one ppm.
• No use of remediated soils in any location that threatens human health and the environment, for residential topsoil, or for any purpose in school playgrounds or day care centers.
![Page 13: October 2015 1 Mary Louise Hendrickson Solid Waste Section – Technical Lead mhendrickson@mt.gov 406-444-1808.](https://reader035.fdocuments.us/reader035/viewer/2022062517/56649efa5503460f94c0c5b0/html5/thumbnails/13.jpg)
13
Remediation standards and post-remediation use continued–
• "Level 1" -- any use not prohibited by the ARM (daycares, topsoil, residential);
• "Level 2" -- use as backfill at a cleanup site, fill in industrial areas, daily cover or fill at licensed landfills, or road sub-grade or construction fill;
• "Level 3" -- use as daily cover or disposal in a licensed class II landfill facility, road sub-grade that will be completely covered with impermeable road surface material, or re-treatment at a licensed landfarm; and
• "Level 4" -- re-treatment in a landfarm or disposal in a licensed class II landfill facility.
![Page 14: October 2015 1 Mary Louise Hendrickson Solid Waste Section – Technical Lead mhendrickson@mt.gov 406-444-1808.](https://reader035.fdocuments.us/reader035/viewer/2022062517/56649efa5503460f94c0c5b0/html5/thumbnails/14.jpg)
14
Financial Assurance
• MIM Landfarm facilities required to provide financial assurance for closure and post-closure maintenance.
• Mechanisms must comply with the provisions in ARM 17.50.540.• surety bond, trust fund, letter of credit, insurance policy,
etc.
![Page 15: October 2015 1 Mary Louise Hendrickson Solid Waste Section – Technical Lead mhendrickson@mt.gov 406-444-1808.](https://reader035.fdocuments.us/reader035/viewer/2022062517/56649efa5503460f94c0c5b0/html5/thumbnails/15.jpg)
15
Closure and Post-Closure Requirements
• Soils remediated to target goals may be left in place, site regraded and seeded.
• Soils not reaching target goals may:• continue to be treated;• sent off for landfill disposal; or,• depending upon analytical results, covered with 2-feet of approved
cover soil, graded and seeded. (may require deed notation)
• Restoration of site to acceptable conditions
• 2-year post closure monitoring period• Vegetative growth• Surface water runoff
• Recordkeeping and reporting requirements – final report summarizing analyses, methods, and request for closure approval
![Page 16: October 2015 1 Mary Louise Hendrickson Solid Waste Section – Technical Lead mhendrickson@mt.gov 406-444-1808.](https://reader035.fdocuments.us/reader035/viewer/2022062517/56649efa5503460f94c0c5b0/html5/thumbnails/16.jpg)
16
Notice and Adoption Timeframe
Target Final Rule Adoption Date: January 23, 2016
Interested Persons Database Project
• Electronic notification• Website updates with links• Cleaning up IP lists
Emily Ewart – WUTMB Rule [email protected]