October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT...
-
date post
22-Dec-2015 -
Category
Documents
-
view
222 -
download
2
Transcript of October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT...
![Page 1: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/1.jpg)
October 20, 2004Mike J. Ressler, Deputy CIO
& Director of Operations
Presentation to theIT Directional
Meeting
![Page 2: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/2.jpg)
2
1. ITD Annual Report – Mike Ressler2. ITD Customer Service Division – Mike Ressler3. IT Planning Activities – Nancy Walz4. Enterprise Architecture Activities – Nancy Walz5. Project Management Activities – Nancy Walz6. Testing Tools – Selected Segue – Marlys Jangula7. Functional Consolidation Recap – Dean Glatt
8. Mainframe Migration Update – Cost Savings – Jeff Carr
9. Instant Messaging – Gary Vetter10. Standard Intervals for Telecommunication Services –
Jerry Fossum11. Customer Survey – Dan Sipes12. Password Resets – Dan Sipes
![Page 3: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/3.jpg)
3
![Page 4: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/4.jpg)
4
![Page 5: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/5.jpg)
5
Nancy Walz, Director
IT Policy & Planning
IT Planning ActivitiesEnterprise Architecture Activities
Project Management Activities
![Page 6: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/6.jpg)
6
IT Committee – Bill Drafts
• 50129.0200 – “Clean-up” language
• 50130.0200 – Revolving Fund
• 50131.0200 – SITAC role, standards
governance
• 50132.0200 – Administrative Rules
• Next meeting – November 3
![Page 7: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/7.jpg)
7
EA Activities
• Updating Standards
• Time and Labor – next step proposed
• Instant Messaging – solution proposed
• Testing Tools – solution proposed
• Platform Future State – next step proposed
• Desktop Support – on hold
• Potential Activities– Enterprise Spyware Removal
– Pre-approved IT Contractors
![Page 8: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/8.jpg)
EA ActivitiesPC / Laptop RFP – intent to award
Specification and Quantity
Typical WSCA Price
RFP Price Potential Cost Avoidance over 4 years
Office Automation PC w/ 17” CRT (~5000)
$1,073 $665 $2,040,000
Mainstream Laptop (~1000)
$1886 $1334 $552,000
![Page 9: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/9.jpg)
9
IT Planning Activities
• Agency IT plan review
• Incorporating PC replacement costs
• Statewide IT plan
• SITAC Project Ranking
![Page 10: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/10.jpg)
10
SITAC Project Ranking
• Projects over $250,000 requesting
general funds
• Relative rank provides an additional
piece of information for the Governor
and Legislature
![Page 11: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/11.jpg)
SITAC Project Ranking1 ND Public Safety Mobile Communications2 MMIS Rewrite 3 CJIS - Establish services to support deployment
4 Integrated Tax System 5 CAD - Computer Aided Dispatch 6 ITAG** 7 Mainframe Migration 8 AS/400 Migration 9 Time and Labor10 Enhanced Support Center11 GIS12 HIPAA
![Page 12: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/12.jpg)
12
PM Activities
• Guidebook
• Standard – Large IT Projects
• Training
![Page 13: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/13.jpg)
13
Large Projects
• Currently 22 projects
• Last year:
– Eight Projects Completed
– Seven Under Budget - $3,138,511
![Page 14: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/14.jpg)
14
Project Management Training
• Issues:
– More needed! Of 22 large projects, 11 w/ ND
certified managers, 2 managed by ITD, 2 managed
by vendor, 7 others.
– Need to be up-to-speed quickly
• Strategy:
– Identify early
– Mentoring / Apprenticeship / Certification
– Additional training options
![Page 15: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/15.jpg)
15
![Page 16: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/16.jpg)
16
Marlys Jangula, Manager
Software Development
Testing Tools – Selected Segue
![Page 17: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/17.jpg)
17
Functional Testing Tools
• Enterprise Architecture initiative
• RFP • Evaluated products through
– Vendor Demonstrations
– Proof of Concepts on ConnectND and
BND applications
• Segue Software’s tool was selected
![Page 18: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/18.jpg)
18
Functional Testing Tools Cont.
• Next Steps– Determine Licensing Needs
• Concurrent licensing model
– Training• Administration• Verification testing• Quick start for IssueManager and TestManager• Advanced verification
– Design Implementation Architecture• Servers for IssueManger and TestManager
• Testing lab
– Determine billing structure• Product includes usage reports
![Page 19: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/19.jpg)
19
Functional Testing Tools Cont.
• Service Delivery– ITD will host servers– ITD will host client license – ITD will offer service of setting up and
running
• Usage– ITD
• System testing applications
– Departments• System testing • Acceptance testing
![Page 20: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/20.jpg)
20
Functional Testing Tools
• Benefits– More complete tests – Elimination of human error– Consistency in testing – Shorter testing phases – Less impact as a result of software/tool
upgrades – Overall increase in software quality
• ITD contact– Kyle Forster [email protected] or
328-4323
![Page 21: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/21.jpg)
21
Biennium Planning
• Only 8 months of the biennium left
• We expect the last 4-6 months to be
hectic as usual
• Please request projects to be
started/completed this biennium
early
![Page 22: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/22.jpg)
22
![Page 23: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/23.jpg)
23
Dean Glatt, Director
Computer Systems Division
Functional Consolidation Recap
![Page 24: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/24.jpg)
24
Consolidated Services
Service# of Agencies
Fully Consolidated
# of Agencies Partially
Consolidated
Electronic Mail 5 0
File and Print 25 0
Database 5 1
Storage 3 0
Application Server 10 3
Web Hosting Services
11 0
![Page 25: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/25.jpg)
25
Benefits of Consolidation
• Original Analysis– State Government could potentially eliminate 100 or
more application, database or file and print servers.– In actuality,102 were eliminated, with the potential
of further reduction.
• State Government had over 100 servers providing file and print services– Typically one or more per agency– Utilizing the state network and consolidating onto a
single, clustered, environment for state government eliminated several application, database or file and print servers.
![Page 26: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/26.jpg)
26
Acknowledgement
• Many people took part in making this project a success, ITD and OMB would like to take the time to acknowledge and thank those involved in the IT Functional Consolidation Project– Technical teams in ITD and the agencies who
worked together for countless hours to accomplish the goals of this project
– Project team members who helped build the foundation to move forward
– Project Executive and Steering Committees for their support and guidance throughout the process
![Page 27: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/27.jpg)
27
Final Post Project Review Report
• The Final Post Project Review
Report can be found at the
following location:
– www.discovernd.com\ITD
(Under Consolidation News)
![Page 28: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/28.jpg)
28
![Page 29: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/29.jpg)
29
Jeff Carr
Systems Architect
Mainframe Migration Update
![Page 30: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/30.jpg)
30
Platforms & Operating Systems Future State
• The current server and operating system
infrastructure presents the state with
challenges that must be addressed.
• What are these challenges? How can
they be addressed?
![Page 31: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/31.jpg)
31
Business Critical applications are deployed on a variety of platforms
• Windows – ConnectND, JSND, Law Enforcement
• iSeries – DHS, BND• AIX – DHS, WSI• Solaris – OMB, DOT, Tax, JSND, others• Linux – G&F, ITD, Health, others• Mainframe – DHS, BND, ITD, OMB,
DOT, Tax, others• HP/UX – BND (Cash Management)• Apple OS/X – Water Commission
Note: This list contains every major operating system currently available.
![Page 32: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/32.jpg)
32
Reducing the variety of business critical platforms can reduce TCO
• Supporting a wide variety of platforms requires a wide variety of skill sets and so implies a larger staff.
• The effects of a wide skill set requirement are seen within ITD:– Some 40% of ITD's Computer Services Staff are
devoted to the mainframe; the remainder focuses on other platforms.
– Little cross over between these groups is possible due to the different technical skill sets.
– Service could be improved, and staff potentially decreased, by removing this division.
Implication: Business critical applications should be deployed on a limited set of platforms.
![Page 33: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/33.jpg)
33
Many business critical applications currently require staff with mainframe skill sets
• Numerous critical applications run on the state’s mainframe:– These applications include the tax system, several
DHS systems (MMIS, VISION, FASCES, etc.), Driver’s License, BND’s core banking.
• The operation and maintenance of these systems requires staff with mainframe skill sets.
• As of 2002 some 60% of the people with these mainframe skill sets were age 50 or older. Implication: This impending skill set shortage
must be addressed.
![Page 34: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/34.jpg)
34
Current and Future State
• At present state government:– Provides critical business applications on a wide variety of
platforms.– Requires staff with a wide variety of skill sets, including
mainframe skill sets, to support these applications.
• In the future state government:
– Will provide critical business applications on a limited set of platforms
– Staff skill sets will be focused on this limited set of platforms.
• These goals need further definition to become actionable.
• Long term trends that drive Information Technology permit a more precise, or actionable, statement of goals.
![Page 35: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/35.jpg)
35
Information Technology Trends
• Intel based servers are becoming a commodity– There is little difference between different vendors Intel
Server Platforms.– The Price/Performance of Intel based hardware is driving
Enterprise server platforms towards Intel.
• The push towards Intel hardware implies that Windows and Linux will come to dominate the data center.
– Windows and Linux are the only Intel capable Operating Systems with large scale vendor support.
– All major software vendors, be they ERP vendors (eg. PeopleSoft, SAP), database vendors (eg. Oracle, IBM, SoftwareAG), offer some or all of their product line on Windows and/or Linux.
Implication: Over the next 10 years the Enterprise data center will become dominated by Intel capable operating systems, meaning Microsoft Windows and Linux.
![Page 36: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/36.jpg)
36
These trends are visible within the state’s IT environment
• No new mainframe application has been deployed since 1997.– The state's IT infrastructure is no different than
any other: new applications are deployed on Windows and Linux.
• Support for the state's IT infrastructure is under stress– The majority of the state's core business
processes are dependent on the mainframe.
– All new applications are deployed elsewhere.Question: Do we focus on the new, or the old? If the
new, how do we assure continuity of critical business functions? If the old, how do we prepare for the future? What does the future look like?
![Page 37: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/37.jpg)
37
Future State Datacenter
• Business Critical Applications will be hosted on Windows or Linux on Intel Compatible hardware.
– This is simply an acknowledgement of market direction: Windows/Linux on Intel.
• End-of-life, or outsourcing, dates must be established for legacy platforms such as the Mainframe.
– Without these sunset dates it becomes almost impossible to provide adequately trained staff or plan IT investments.
Implication: It is time to assess the future of the mainframe. At present a gradual, evolutionary process is leading away from the mainframe. Is it time to be more proactive?
![Page 38: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/38.jpg)
38
Moving towards the future
• The critical business functions currently supported by the mainframe require a stable and reliable technology infrastructure.
• This environment can be provided in one of four ways:– Maintain the current mainframe environment– Outsource the Mainframe environment.– Rewrite current applications.– Migrate current applications to another platform.
• Today, in the interests of time, we will focus on the cost of the current mainframe environment and the possibility of migrating current applications.
![Page 39: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/39.jpg)
39
Current Mainframe Environment Cont.
Annual Hardware Costs: $450,000(12%)
Annual Software Costs: $2,450,000(65%)
Annual Labor Costs: $890,000(23%)
Total Annual Cost: $3,790,000
(Hardware/Software $2,900,000)
Software maintenance and licensing fees are the largest single component of the annual cost of the current mainframe environment.
![Page 40: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/40.jpg)
40
Mainframe Migration
• Migration involves taking the existing applications and porting them to a different operating environment.– The existing mainframe applications would be
modified to run on a UNIX or Windows platform– This is not an application rewrite: little if any
change in functionality will result.– Aging applications that need replacement will
remain aging applications that need replacement.
• Migration can offer dramatically lower operating expenses.
• Migration will move the state's IT infrastructure towards the desired Future State.
![Page 41: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/41.jpg)
41
Option 4: Estimated Migration Costs Cont.
The estimated one time costs of the migration are:
Development Cost $4,000,000
Project Management $200,000
Software Acquisition $1,300,000
Hardware Acquisition $300,000
Testing/Training Costs $500,000
Total One Time Costs $6,300,000
Note: Testing will require significant agency resources; the cost of these resources is not included.
![Page 42: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/42.jpg)
42
Ongoing cost consist of Hardware, Software, and Labor costs.
Annual Hardware Costs: $275,000 (15%)Annual Software Costs: $700,000 (37%)Annual Labor Costs: $890,000 (48%)Total Annual Cost: $1,865,000(Hardware/Software $1,075,000)• The number of FTEs is kept constant in the new
environment. This will assure consistency of service levels.
• Note the major reduction in Annual Software costs as compared to the mainframe: $2,450,000 for the mainframe vs. $700,000 for the new environment.
Option 4: Estimated Migration Costs Cont.
![Page 43: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/43.jpg)
43
Comparing Ongoing Annual Costs
Current Mainframe Cost $3,790,000Future Mainframe Cost $4,030,000Outsourcing Cost $5,100,000Migrated Environment Cost $1,865,000
• Outsourcing increases annual operating costs by more than $1,000,000 and will not be considered further.
• Migration offers a reduction of $1,925,000 in operating costs from current levels, and a reduction of $2,165,000 in when compared to future mainframe cost.
• With a project cost of $6,300,000 this reduction translates to payback within 2 biennia.
![Page 44: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/44.jpg)
44
Putting it all together
• Migrating from the mainframe positions the state's IT infrastructure for the future.
• Migrating applications provides no change in functionality: aging applications that need replacement remain aging applications that need replacement.
• Migrating from the mainframe can reduce annual operating expenses by as much as $2,000,000
• With a project cost of $6,300,000 this reduction offers payback within 2 biennia.
![Page 45: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/45.jpg)
45
![Page 46: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/46.jpg)
46
Gary J. VetterGroupware/EDMS Supervisor
Instant Messaging
![Page 47: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/47.jpg)
47
![Page 48: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/48.jpg)
48
![Page 49: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/49.jpg)
49
Jerry Fossum, DirectorTelecommunications
Standard Intervals for Telecommunications Services
![Page 50: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/50.jpg)
50
Service Standard IntervalService Standard Interval
Telephone Moves, Adds and Changes 5 Business Days Disconnect 2 Business Days Voice Menu and ACD Changes 2 Weeks Installation of New Wall Jack 7 Business Days
Network Network Port 3 Business Days Wide Area Network Connection
T1 DSL Cable
4 Weeks
IP Admin Request IP DNS
2 Business Days
Network Disconnect Port Circuit
Next Business Day
Installation of New Wall Jack 7 Business Days
Non-Standard Services OC3 DS3 Fiber Installation of More Than 1 Wall Jack
Custom Per Project
Wireless WAN Connection(s)
Standard Intervals
![Page 51: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/51.jpg)
51
![Page 52: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/52.jpg)
52
Dan Sipes, DirectorAdministrative Services
Customer SurveyPassword Resets
![Page 53: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/53.jpg)
ITD Overall Performance Measures
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
Professionalism &Courtesy
Know ledge Timeliness Quality Value
Very Satisf ied
Satisf ied
Dissastisf ied
Very Dissastisf ied
![Page 54: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/54.jpg)
54
Password Resets
• Please have users populate security
database for password resets
– Increasing issue due to consolidation and Peoplesoft deployment
– Application can be found under the Security Section of ITD web site
– Contact Al Veit for more specific details
328-3173 [email protected]
![Page 55: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/55.jpg)
55
Virus Update
• Variation of W32.SPYBOT.WORM– Basically a DOS attack against authentication servers
– Most local administrator accounts on workstations are locked
– Protection measures• Update to latest version of virus definitions
• Force a system scan to remove the virus
• Apply Windows patches
• Utilize ITD’s Windows SUS Server to keep current on Windows workstation patches
– Contact Sean Wiese for more details
328-1985 [email protected]
![Page 56: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/56.jpg)
56
![Page 57: October 20, 2004 Mike J. Ressler, Deputy CIO & Director of Operations Presentation to the IT Directional Meeting.](https://reader035.fdocuments.us/reader035/viewer/2022062304/56649d7d5503460f94a60135/html5/thumbnails/57.jpg)
57