October 20 1999
SACTA/FOCUCS SACTA/FOCUCS MTCD EXPERIENCE IN AENAMTCD EXPERIENCE IN AENA
Memphis FAA/EUROCONTROL R&DMemphis FAA/EUROCONTROL R&DIgnacio NúñezIgnacio Núñez
October 20 1999
Background
SACTA/FOCUCS Project
Contents
Project Methodology & organisation
Results
Conclusions
October 20 1999
BACKGROUND
• SPANISH AUTOMATED ATC SYSTEM SACTA• DEFINITION&DEVELOPMENT : 1985-89
• SACTA I: 1989-91
– IMPLEMENTATION AT MADRID AND PALMA ACCs.
• SACTA II: 1992-94
– INTEROPERABILITY BETWEEN ACCs.
• SACTA III:1995 -2002
– EATCHIP III Requirements
– OPEN ARCHITECTURE.
– SPANISH ODS INTEGRATION
October 20 1999
BACKGROUND
Implementation orientedMore D than R
Assigned on organisational structureBenefit from previous work..Following EATCHIP/EATMP program
AENA’s RESEARCH & DEVELOPMENT APPROACH
October 20 1999
BACKGROUND
• ON GOING SACTAIII PROJECTS• OPEN ARCHITECTURE
• ATC Tools
• FOCUCS: 2K OCWP
• PLATON: Integrated SDP
• VICTOR : Integrated TWR
• Gate to Gate Real Time SIMULATION
October 20 1999
SACTA/FOCUCS Project
• SACTA/FOCUCS project, in the context of SACTA III
Strategy Plan .
• FOCUCS GOAL
– Development of functionalities to support new
operational procedures and advanced HMI
capabilities, for the Controller Working Positions
October 20 1999
SACTA/FOCUCS Project
• SACTAII EVOLUTION Supporting:
• New procedures
• New technologies and concepts
• Allows to configure conventional & FOCUCS CWPs
• Comparative evaluation
• Soft transition.
• Three releases (V1, V2, and V3),
– spiral and incremental model.
CRITERIA
October 20 1999
SACTA/FOCUCS Project
• Improve HMI
• Controller planing tools
• Ocwp harmonization
• Stripless
• Silence coordination
OPERATIONAL OBJECTIVES
October 20 1999
SACTA/FOCUCS Project
• Obtain a OCWP integrated in SACTA
• Integrate EATMP ATC tools (MONA , MTCD ...)
• Include ADS/AGDL functionality.
• Capacity evaluation through real-time simulation.
TECHNICAL OBJECTIVES
October 20 1999
SACTA/FOCUCS Project
• SEI:
• Normal Mode
• Autonomous Mode
• RADU
• UPC
MODES OF OPERATION• GENERATOR OF INTERFACE ADAPTATION
• DATA MANAGEMENT OF UCS ADAPTATION
•CONTROLLER INTERFACE, WITH/WITHOUT PAPER STRIPS
•INTEGRATION AS SACTA UCS
•SUPERVISION AND CONTROL
•RECORDING AND REPLAY
UCS WITHOUT SACTA CONEXIÓN
NO PAPER STRIP
RECORDING AND REPLAY
SIMULATION MULTIPLE UCS`s OF AN ACC
October 20 1999
SACTA/FOCUCS Project
- VERSION 1: STRIPLESS OPERATIONAL CONTROL TEST
• UCS INTEGRATED IN SACTA: RADAR, FP, MET/AIS• PLANNING SUPPORT AT BASIC LEVEL (Dinamic Future SITUATION preview )
• SILENT COORDINATION AND TRANSFERS
- VERSION 2: REVISION OF PLANNING CONTROL FUNCTIONS
• ADVANCED LEVEL OF PLANING SUPPORT
- MEDIUM TERM CONFLICT DETECTION (MTCD)
• CHANGES DERIVED FROM V1 OPERATIONAL EVALUATION
- VERSION 3: EVALUATION OF DEGRADATION MODES AND INCIDENT ANALYSIS
• AUTONOMOUS OPERATION OF THE UCS (By-Pass: RDP + FDP)
RECORD AND REPLAY
• CHANGES DERIVED AFTER V2 OPERATIONAL EVALUATION
October 20 1999
PROJECT METHODOLOGY& ORGANIZATION
RequirementsSpecification
DevelopmentV2
SATV2
RequirementsSpecification
DevelopmentV3
SATV3
Simulation
Evaluation Changes of
the SEI
V1
DevelopmentV1
SATV1
RequirementsSpecification
ENGINEERING GROUP
Training
USERS' GROUP
Changes Requirements
OperationalTransition
V1 V2 V3
V2
October 20 1999
SACTA/FOCUCS Project
October 20 1999
SACTA/FOCUCS Project
SalidaFichas
RelojUltimosRecursos
Altavoces
PantallasAuxiliares
Bahías
SCV
CeniceroPorta-Latas
October 20 1999
Aena
SACTA/FOCUCS Organisation
Steering Group
PROJECT COORDINATOR
DEVELOPMENT GROUP USERS GROUP
AUTOMATIZATION
DIVISION
INDUSTRY
TECHNICAL/OPERATIONAL
EXPERTS
ACC´s
CED SIM-DIN ACC BARCELONA
HU
MA
NR
ES
OU
RC
ES
TE
CH
NIC
AL
RE
SO
UR
CE
SA
CTI
VIT
IES TECHNICAL SPECIFICATIONS
PROJECT MANAGEMENT
TECHNICAL VALIDATION OPERATIONAL EVALUATION
USERS REQUIREMENTS
October 20 1999
PROJECT METHODOLOGY& ORGANIZATION
LIFE CYCLE ACCORDING MIL-STD 498
USERS INVOLVED IN WHOLE LIFE CYCLE
TWO INTEGRATION MILESTONE
THREE SYSTEM ACCEPTANCE TEST
THREE OPERATIONAL EVALUATION PERIODS
October 20 1999
RESULTS
• Project began in 1995
• 2000 coded requirements.
• HMI configuration and adaptation tool (SEI) allows to
configure more than 1000 elements for display
• Focucs V1 evaluation concluded
– 4 weeks training of 20 controllers evaluation group
– 2 weeks real time simulations.
– Analysis of results in V1 simulation produced 15% of
changes for initial requirements.
October 20 1999
RESULTS
• Successfull integration in SACTA – Comparative analysis between convenitonal and Focucs
performance
– Transition strategy
• Dynamic future situation display DFSD
• Silent transfer ; Label dialogue between OCWP`s
• 24 hours on line record&replay
• Off line HMI use analysis ; PRAD GRAPH
October 20 1999
RESULTS
• DFSD
• Extrapolate Air Traffic Situation
• RDP & FDP data
• Window display of predicted situation– Horizontal ( Radar display window)
– Vertical
• Allows forward & Backward (selectable t steps)
• FL Selection
October 20 1999
RESULTS
• Operational transitions FOCUCS V1
• Madrid TMA June 98, • 8 FOCUCS OCWP´s +3 SIM-DIN
• BarcelonaTMA July 99,
• 6 FOCUCS OCWP´s +4 SIM-DIN
• Las Palmas TMA July 99,
• 2 OCWP´s +2 SIM-DIN
• Valencia TMA OCTOBER 99
• 4 FOCUCS OCWP´s
October 20 1999
October 20 1999
RESULTS
• Operational Transitions NEXT:
• Palma de Mallorca TMA
• 6 FOCUCS OCWP´s +2 SIM-DIN
• En route Systems Installation, Second semester of year
2000
October 20 1999
RESULTS
• V 2 content : Advanced level of planing support
• Planning Conflict detection (PCD) • Medium term conflict detection (MTCD) • Changes derived from v1 operational evaluation
October 20 1999
RESULTS
• MTCD• EATCHIP OPR ET1.ST04.DEL1.5 Vol 5
• Flight conflict list
• Graphic Display
• Conflit symbol & conflict time;– Prediction
– Violation
October 20 1999
RESULTS
• Evaluation of FOCUCS V2 2nd semester 2000
• First implementation FOCUCS V2– Valencia TMA 1st semester 2001
October 20 1999
CONCLUSIONS
• OPERATIONAL FINDINGS
• Stripless conditions:
• Silent authomatic coordination
• Information accesability
• DFSD very usefull towards MTCD
• MTCD no vertical and horizontal windows
• MTCD time configurable with SECTOR characteristics
October 20 1999
CONCLUSIONS
• FOCUCS V1 Evaluation key issues :
• Step by step concept ;– accepted
– evaluated
• Reporting and training eg: pilot on 8.33
• Package implementation
• Intuitive and coherent HMI eg : No editing need
October 20 1999
CONCLUSIONS
• Key issues for Operational Evaluation Sessions
• Clear & concise Objectives for each session
• Design scenarios tofulfill the objectives
• Define espected results
• Analyze real versus espected results