1/42
Capital Improvement
Plan
McAlester Public Schools2011/2012
-
8/4/2019 October 11th Bond Issue-1
2/42
Part I:
These are our schools today
-
8/4/2019 October 11th Bond Issue-1
3/42
EARLY CHILDHOOD
CENTERS
-
8/4/2019 October 11th Bond Issue-1
4/42
Currentbathrooms are not age appropriate for Early Childhood Centers
Washington ECC
1963
-
8/4/2019 October 11th Bond Issue-1
5/42
Washington ECC1963
Storage is really limited in our buildings.
Washington ECCs stage is used as a
the teachers & volunteers workroom,conference room, & teachers break room.Their boiler room is also used forstorage. This is not unique to Washington,all of our ECCs have the same problem.
-
8/4/2019 October 11th Bond Issue-1
6/42
Flooring damage is shownin this picture of WashingtonECC. Water damage fromleaks are evident in all ofour buildings across thedistrict.
Washington ECC
-
8/4/2019 October 11th Bond Issue-1
7/42
ELEMENTARY SCHOOLS
-
8/4/2019 October 11th Bond Issue-1
8/42
Elementary bathrooms needremodeling at all sites. Ageand condition of fixtureshamper sanitation.
Will Rogers Elementary1954
-
8/4/2019 October 11th Bond Issue-1
9/42
Water damage from leaksat Emerson Elementary (1955)
-
8/4/2019 October 11th Bond Issue-1
10/42
Window units, outdated andinefficient, are still in use atEmerson and several other buildings.
-
8/4/2019 October 11th Bond Issue-1
11/42
Multiple portable buildings, like the one shown here atWill Rogers Elementary, are also used at Washington,Parker, and Puterbaugh.
-
8/4/2019 October 11th Bond Issue-1
12/42
Parker Intermediate Center
-
8/4/2019 October 11th Bond Issue-1
13/42
ParkerIntermediateCenter1973
Due to lack of space,the kitchen appliancesmust be placed in theeating area. Performanceareas also serve askitchen storage.
-
8/4/2019 October 11th Bond Issue-1
14/42
Puterbaugh Middle School
-
8/4/2019 October 11th Bond Issue-1
15/42
A re-roof will be required atPuterbaugh, original MHSbuilding, and roof repair for
the Fine Arts Building.
Puterbaugh MiddleSchool
1968
-
8/4/2019 October 11th Bond Issue-1
16/42
McAlester High School
-
8/4/2019 October 11th Bond Issue-1
17/42
McAlester High School
1979
Water leaks causedamages to the ceilingsand floors.
-
8/4/2019 October 11th Bond Issue-1
18/42
-
8/4/2019 October 11th Bond Issue-1
19/42
The seating atHook Eales Stadium
is UNSAFE!
-
8/4/2019 October 11th Bond Issue-1
20/42
Hook EalesStadium
1957
Visitor bleachers
Home bleachers
-
8/4/2019 October 11th Bond Issue-1
21/42
Home bleachers are deterioratingand becoming unsafe.
Chips of concrete fall onspectators below.
-
8/4/2019 October 11th Bond Issue-1
22/42
Part II:
Here is what our schools
could be
-
8/4/2019 October 11th Bond Issue-1
23/42
McAlester Early Childhood CenterEmerson
Renovation Of Existing Building: Restrooms,Ceilings, Walls, Floors, Windows/Doors,HVAC, Electrical, Plumbing, Full ADA
Compliance Interior And Exterior Security Surveillance
System
Playground Renovation And Upgrade Expand Parking and Access Roads
Improve Drainage
M Al t El t
-
8/4/2019 October 11th Bond Issue-1
24/42
McAlester ElementaryGrades 2-5
Will Rogers/Puterbaugh
Renovation Of Existing Buildings: Restrooms,
Ceilings, Floors, Walls, Window/Doors, HVAC,Electrical, Plumbing, Full ADA Compliance
Interior And Exterior Security Surveillance System
Playground Renovation And Upgrade
Parking and Access Road New Roof On Puterbaugh
Improve Drainage
-
8/4/2019 October 11th Bond Issue-1
25/42
-
8/4/2019 October 11th Bond Issue-1
26/42
-
8/4/2019 October 11th Bond Issue-1
27/42
Parker Middle SchoolGrades 6-8
12/14 New Classrooms (Safe Rooms)
Minor Renovations On ExistingBuilding, Full ADA Compliance
Add Interior And Exterior SecuritySurveillance System
Expand Parking And Access Road
-
8/4/2019 October 11th Bond Issue-1
28/42
-
8/4/2019 October 11th Bond Issue-1
29/42
-
8/4/2019 October 11th Bond Issue-1
30/42
-
8/4/2019 October 11th Bond Issue-1
31/42
-
8/4/2019 October 11th Bond Issue-1
32/42
Other Facility Improvements
Comprehensive Technology Upgrades
Transportation Upgrades Improved Parking
Apply For FEMA Safe Room Funding
For All Sites
-
8/4/2019 October 11th Bond Issue-1
33/42
Transportation
Three activity busses - $400K
Video cameras & recorders all busses
$15K A/C all busses $70K
Current communication devices all
busses $15K Total $500K
-
8/4/2019 October 11th Bond Issue-1
34/42
-
8/4/2019 October 11th Bond Issue-1
35/42
Part III:
These are reasons to make a
difference
-
8/4/2019 October 11th Bond Issue-1
36/42
Cost Savings of Master Project
Utilities
Travel
Maintenance Technology
Administrative Costs
-
8/4/2019 October 11th Bond Issue-1
37/42
Other Benefits ofMaster Plan
Safe, Secure, & Sanitary Campuses for all Students All sites to meet ADA Compliance Equity in Class Size, Curriculum Resources, &
Student Activities
All Classrooms, Media Centers, & Computer Labs21st Century Equipped A Gym @ all sites, provides indoor activities during
inclement weather More parental options
Students are with the same peer group throughoutschool years Greater Ownership Eliminate unhealthy competition & comparisons
-
8/4/2019 October 11th Bond Issue-1
38/42
Capital Improvement
Projects1979-Present
-
8/4/2019 October 11th Bond Issue-1
39/42
-
8/4/2019 October 11th Bond Issue-1
40/42
2012-2013IMPACTTO
TAXPAYER
-
8/4/2019 October 11th Bond Issue-1
41/42
2012-2013 IMPACT TO TAXPAYER
ESTIMATED OVERALL TAX INCREASE
TAXING ENTITY 2011-12 MILLAGE 2012-13 MILLAGE MILLAGE CHANGE % INCREASE
PITTS CO. 21.11 21.11 0.00
VO-TECH 12.40 12.40 0.00
MCA SCHOOLS 42.00 52.50 10.50__________________________________________________________________________________
75.51 86.01 10.50 13.91%
-
8/4/2019 October 11th Bond Issue-1
42/42
Voter Registration Dates
September 16, 2011 This is the last daythat anyone can register in order to vote inthe October 11, 2011, Bond Election
Until October 5th Time frame forrequesting an Absentee Ballot
Friday, October 7th Monday, October
10th Early voting days