    Capital Improvement

    Plan

    McAlester Public Schools2011/2012

  • 8/4/2019 October 11th Bond Issue-1

    2/42

    Part I:

    These are our schools today

  • 8/4/2019 October 11th Bond Issue-1

    3/42

    EARLY CHILDHOOD

    CENTERS

  • 8/4/2019 October 11th Bond Issue-1

    4/42

    Currentbathrooms are not age appropriate for Early Childhood Centers

    Washington ECC

    1963

  • 8/4/2019 October 11th Bond Issue-1

    5/42

    Washington ECC1963

    Storage is really limited in our buildings.

    Washington ECCs stage is used as a

    the teachers & volunteers workroom,conference room, & teachers break room.Their boiler room is also used forstorage. This is not unique to Washington,all of our ECCs have the same problem.

  • 8/4/2019 October 11th Bond Issue-1

    6/42

    Flooring damage is shownin this picture of WashingtonECC. Water damage fromleaks are evident in all ofour buildings across thedistrict.

    Washington ECC

  • 8/4/2019 October 11th Bond Issue-1

    7/42

    ELEMENTARY SCHOOLS

  • 8/4/2019 October 11th Bond Issue-1

    8/42

    Elementary bathrooms needremodeling at all sites. Ageand condition of fixtureshamper sanitation.

    Will Rogers Elementary1954

  • 8/4/2019 October 11th Bond Issue-1

    9/42

    Water damage from leaksat Emerson Elementary (1955)

  • 8/4/2019 October 11th Bond Issue-1

    10/42

    Window units, outdated andinefficient, are still in use atEmerson and several other buildings.

  • 8/4/2019 October 11th Bond Issue-1

    11/42

    Multiple portable buildings, like the one shown here atWill Rogers Elementary, are also used at Washington,Parker, and Puterbaugh.

  • 8/4/2019 October 11th Bond Issue-1

    12/42

    Parker Intermediate Center

  • 8/4/2019 October 11th Bond Issue-1

    13/42

    ParkerIntermediateCenter1973

    Due to lack of space,the kitchen appliancesmust be placed in theeating area. Performanceareas also serve askitchen storage.

  • 8/4/2019 October 11th Bond Issue-1

    14/42

    Puterbaugh Middle School

  • 8/4/2019 October 11th Bond Issue-1

    15/42

    A re-roof will be required atPuterbaugh, original MHSbuilding, and roof repair for

    the Fine Arts Building.

    Puterbaugh MiddleSchool

    1968

  • 8/4/2019 October 11th Bond Issue-1

    16/42

    McAlester High School

  • 8/4/2019 October 11th Bond Issue-1

    17/42

    McAlester High School

    1979

    Water leaks causedamages to the ceilingsand floors.

  • 8/4/2019 October 11th Bond Issue-1

    18/42

  • 8/4/2019 October 11th Bond Issue-1

    19/42

    The seating atHook Eales Stadium

    is UNSAFE!

  • 8/4/2019 October 11th Bond Issue-1

    20/42

    Hook EalesStadium

    1957

    Visitor bleachers

    Home bleachers

  • 8/4/2019 October 11th Bond Issue-1

    21/42

    Home bleachers are deterioratingand becoming unsafe.

    Chips of concrete fall onspectators below.

  • 8/4/2019 October 11th Bond Issue-1

    22/42

    Part II:

    Here is what our schools

    could be

  • 8/4/2019 October 11th Bond Issue-1

    23/42

    McAlester Early Childhood CenterEmerson

    Renovation Of Existing Building: Restrooms,Ceilings, Walls, Floors, Windows/Doors,HVAC, Electrical, Plumbing, Full ADA

    Compliance Interior And Exterior Security Surveillance

    System

    Playground Renovation And Upgrade Expand Parking and Access Roads

    Improve Drainage

    M Al t El t

  • 8/4/2019 October 11th Bond Issue-1

    24/42

    McAlester ElementaryGrades 2-5

    Will Rogers/Puterbaugh

    Renovation Of Existing Buildings: Restrooms,

    Ceilings, Floors, Walls, Window/Doors, HVAC,Electrical, Plumbing, Full ADA Compliance

    Interior And Exterior Security Surveillance System

    Playground Renovation And Upgrade

    Parking and Access Road New Roof On Puterbaugh

    Improve Drainage

  • 8/4/2019 October 11th Bond Issue-1

    25/42

  • 8/4/2019 October 11th Bond Issue-1

    26/42

  • 8/4/2019 October 11th Bond Issue-1

    27/42

    Parker Middle SchoolGrades 6-8

    12/14 New Classrooms (Safe Rooms)

    Minor Renovations On ExistingBuilding, Full ADA Compliance

    Add Interior And Exterior SecuritySurveillance System

    Expand Parking And Access Road

  • 8/4/2019 October 11th Bond Issue-1

    28/42

  • 8/4/2019 October 11th Bond Issue-1

    29/42

  • 8/4/2019 October 11th Bond Issue-1

    30/42

  • 8/4/2019 October 11th Bond Issue-1

    31/42

  • 8/4/2019 October 11th Bond Issue-1

    32/42

    Other Facility Improvements

    Comprehensive Technology Upgrades

    Transportation Upgrades Improved Parking

    Apply For FEMA Safe Room Funding

    For All Sites

  • 8/4/2019 October 11th Bond Issue-1

    33/42

    Transportation

    Three activity busses - $400K

    Video cameras & recorders all busses

    $15K A/C all busses $70K

    Current communication devices all

    busses $15K Total $500K

  • 8/4/2019 October 11th Bond Issue-1

    34/42

  • 8/4/2019 October 11th Bond Issue-1

    35/42

    Part III:

    These are reasons to make a

    difference

  • 8/4/2019 October 11th Bond Issue-1

    36/42

    Cost Savings of Master Project

    Utilities

    Travel

    Maintenance Technology

    Administrative Costs

  • 8/4/2019 October 11th Bond Issue-1

    37/42

    Other Benefits ofMaster Plan

    Safe, Secure, & Sanitary Campuses for all Students All sites to meet ADA Compliance Equity in Class Size, Curriculum Resources, &

    Student Activities

    All Classrooms, Media Centers, & Computer Labs21st Century Equipped A Gym @ all sites, provides indoor activities during

    inclement weather More parental options

    Students are with the same peer group throughoutschool years Greater Ownership Eliminate unhealthy competition & comparisons

  • 8/4/2019 October 11th Bond Issue-1

    38/42

    Capital Improvement

    Projects1979-Present

  • 8/4/2019 October 11th Bond Issue-1

    39/42

  • 8/4/2019 October 11th Bond Issue-1

    40/42

    2012-2013IMPACTTO

    TAXPAYER

  • 8/4/2019 October 11th Bond Issue-1

    41/42

    2012-2013 IMPACT TO TAXPAYER

    ESTIMATED OVERALL TAX INCREASE

    TAXING ENTITY 2011-12 MILLAGE 2012-13 MILLAGE MILLAGE CHANGE % INCREASE

    PITTS CO. 21.11 21.11 0.00

    VO-TECH 12.40 12.40 0.00

    MCA SCHOOLS 42.00 52.50 10.50__________________________________________________________________________________

    75.51 86.01 10.50 13.91%

  • 8/4/2019 October 11th Bond Issue-1

    42/42

    Voter Registration Dates

    September 16, 2011 This is the last daythat anyone can register in order to vote inthe October 11, 2011, Bond Election

    Until October 5th Time frame forrequesting an Absentee Ballot

    Friday, October 7th Monday, October

    10th Early voting days