Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500...

52
Government Of India Ministry of Power Central Electricity Authority New Delhi Power Sector Oct-2017

Transcript of Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500...

Page 1: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

Government Of India

Ministry of Power

Central Electricity Authority

New Delhi

Power Sector

Oct-2017

SN Section A - Highlights of Power Sector Page

1 Electricity Generation for Oct 2017 (BU) 1A amp 1B

2 Generating Capacity Addition for Oct 2017 (MW) 2

3 List of Projects Commissioned in Oct 2017 3

4 All India Installed Capacity (MW) Region-wise as on 31102017 3

5 All India Installed Capacity (MW) Sector-wise as on 31102017 4

6 Transmission Lines Added during Oct 2017 (Ckms) 5

7 Transformation Capacity Addition during Oct 2017 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Oct 2017 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Oct 2017 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31102017

13 Average cost of Power amp Average Realisation

All India per capita consumption of Electricity (KWh)

15 All India Coal consumption for Power Generation (MT)

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Oct 2017 13

3 Installed Capacity in various Regions including their shares 14-19

1 Programme and Achievements of Transmission Lines in Oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

1 Programme and Achievements of Sub-Stations in Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

1 Power Supply Position (Provisional) for Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since 2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA upto Oct 2017

1 Rate of sale of power for the year 2014-2015 33-41

Section H - Rate of sale of power for the year 2015-2016

Executive Summary for the Month of Oct 2017

32

11

20

21

31

Section B - Capacity Addition

Section C - Transmission Lines

Section D - Sub Stations

Section E - Electricity Generation

Section F - Power supply position

Contents

Section G - Growth of Power Sector

SN Contents Page

1Electricity Generation (Conventional Sources) for Oct 2017 (BU) 1

2 Generating Capacity Addition for Oct 2017 (MW) 2

3 List of Projects Commissioned in Oct 2017 3

4 All India Installed Capacity (MW) Region-wise as on 31102017 3

5 All India Installed Capacity (MW) Sector-wise as on 31102017 4

6 Transmission Lines Added during Oct 2017 (Ckms) 5

7 Transformation Capacity Addition during Octt 2017 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Oct 2017 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Oct 2017 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31102017

13 Average cost of Power amp Average Realisation

14 All India per capita consumption of Electricity (KWh)

15 All India Coal consumption for Power Generation (MT)

Section A - Highlights of Power Sector

11

Achievement

Oct-17

Thermal 8505 8778

Hydro 1108

Nuclear 312

Bhutan Import 0632

All India 102617 284

Type

Thermal

Hydro

Nuclear

Bhutan Import

All India

1A

1 Electricity Generation for Oct 2017 (BU)

Oct-17Type

Achievement

Oct-16

Targets Change

wrt 2016

92466

441709874679869

0486

46688353

-88322140

0443 -885

20185

490

12004

Oct 16 Oct 17

104670

3155

Change

Electricity Generation During April 2016 to Oct 2016 amp April 2017 to Oct 2017 (BU)

1069

3059

99785

0589

56889 59678

8902

0893

99785

104670

97000

98000

99000

100000

101000

102000

103000

104000

105000

106000

BU

Oct-16 Oct-17

679869709874

0000

100000

200000

300000

400000

500000

600000

700000

800000

BU

Oct 16 Oct 17

Month

Generation from

Conventional Sources

Generation

from

Renewable

Sources

Total

Generation

from

Conventional

Sources

Generation

from

Renewable

Sources

Total

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(MU) (MU) (MU) (MU) (MU) (MU) () () ()

Apr-17 103160 6932 110092 99345 5082 104427 384 3640 542

May-17 107295 8666 115961 99903 6820 106723 740 2707 866

Jun-17 97525 10228 107753 97326 8118 105444 020 2599 219

Jul-17 97912 12928 110840 96442 9554 105996 152 3532 457

Aug-17 94606 10857 105463 95237 9571 104808 -066 1344 062

Sep-17 98072 7516 105588 95741 8279 104020 243 -922 151

1B

Wind

Solar

Biomass

Bagasse

Small Hydro

Others

Total

Electricity Generation From Renewable (source wise)

April- Sep 2017 vis-agrave-vis April- Sep 2016

Electricity Generation (Conventional amp Renewable Sources)April 2017- Sep 2017 vis-agrave-vis April 2016- Sep 2016

All Figure in MU

Source-Wise All India

Generation from Renwables

For the Month of Commulative value for the period

Sep 2017 Sep 2016 Sep2017 Sep 2016

Generation

(April 2016- Sep 2016)

Generation

(April 2017- Sep 2017) Growth

389711 559624 3706559 3160253

199408 10152 1080476 572593

2731 37605 174225 20434

27042 32608 207578 279623

99283 95152 458244 501514

8825 1436 42629 9187

751579 827945 5669711 472751

Achievement Targets Achievement

Thermal 0 1460 0 DIV0

Hydro 70 30 0 10000

Nuclear 0 0 0 000

All India 70 1490 0 -10000

Apr -16 to Oct16 Apr -17 to Oct-17 Change

Thermal 36085 4300 19

Hydro 320 278 100

Nuclear 0 0 NA

All India 39285 45780 17

2

2 Generating Capacity Addition for Oct 2017 (MW)

Generating Capacity Addition during April 16 to Sept 16 amp April 17 to Sept 17 (MW)

Change wrt 2017TypeOct-17

700

000

10

20

30

40

50

60

70

80

1 Oct-17

39285

45780

3600

3800

4000

4200

4400

4600

4800

1Apr -16 to Oct16 Apr -17 to Oct-17

(i) Thermal

(ii)

(iii)

Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total

Northern 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Western 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Southern 4338202 647366 76158 5061726 332000 1174803 2772832 9341361

Eastern 2712664 10000 000 2722664 000 483412 102732 3308808

North-East 52002 173605 3600 229207 000 131200 28541 388948

Islands 000 000 4005 4005 000 000 1210 5215

ALL INDIA 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Note Captive Genaration is not included in the total RES as on 31122016 3

Thermal

Nuclear

Hydro

3 List of Projects Commissioned During Oct 2017

4 All India Installed Capacity (MW) Region-wise as on 31102017

NIL

NIL

NIL

21941451

678000

44765426015766

33111758

40726

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 33111758

Sector

Coal Gas Diesel Total

State 6378050 707895 36393 7122338 000 2979800 197690 10299827

Private 7449600 1058060 47370 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

All India 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

State 10299827

Private 14701706

Central 8110225

5 All India Installed Capacity (MW) Sector-wise as on 31102017

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31122016

State 10299827 31

Private 14701706 44

Central 8110225 25

All India Installed Capacity(MW) as on 31-10-2017 (Sector-Wise)

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

5

3778 2151

16398 13120

2574 0

4029 2046

6017 8923

0 0

406 0

639 245

212 324

1257 569

Transmission Lines Added during Apr 15 to Oct 16 amp Apr 16 to Oct17 (Ckms)

Apr 15 - Oct16 Apr 16 - Oct 17

0 0

6 Transmission Lines Added during Oct 2017 (Ckms)

Oct-16 Oct-17

0 0

16398

13120

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

ckm

s

Apr 15 to Oct 16 Apr 16 to Oct 17

1257

569

0

200

400

600

800

1000

1200

1400

1

ck

ms

Oct16 Oct 17

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

1500 3000

All India Transformation Capacity Addition during Apr 16 to Oct 16 amp Apr

17 to Oct17 (MVA)

45665

0

10000

23020

9645

39060

13500

15920

8140

0

April 16 to Oct 16 April 16 to Oct 17

1600

0

0

3600

2575

1025

7 Transformation Capacity Addition During Oct 2017 (MVA)

0

0

500

1100

0 0

Oct-16 Oct-17

1600

3600

0

500

1000

1500

2000

2500

3000

3500

4000

MV

A

Transformation Capacity Addition during Oct 2017

Oct-16 Oct-17

39060

45665

0

74520

1

MV

A

April 16 to Oct 16 April 16 to Oct 17

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandOct 16 0 0 0 0 496 0 30 275 0

Oct 17 0 0 150 0 516 0 0 0 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Haveli

Oct 16 5 0 0 37 0 0 0

Oct 17 16 0 14 2062 0 0 25

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Oct16 1 11 277 43 0 11 0

Oct 17 0 11 3 134 6 4 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions

0 0

150

0

516

0 0 0 00 0 0 0

496

0 30

275

0

0

400

800

Chan

dig

ar

h

Delh

i

Hary

ana

HP

Jamp

K

Pu

nj

ab

Raja

sth

an

UP

Utr

ak

hand

MW

Northern States (MW) Oct 17 Oct 16

16

0 14

2062

0 0 25

5 0 0 37

0 0 0

0

5000

Ch

attis

garh

Guja

rat

MP

Mah

ara

st

ra

Da

man amp

Diu

Da

dar

Na

gar

Ha

veliM

W

Western States (MW) Oct 17 Oct 16

0 11 3134

6 4 01 11

277

43 0 11 00

500

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Southern State (MW) Oct 17 Oct16

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct 16 181 0 0 0 45 0 8

Oct 17 0 0 0 150 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct 16 2 58 0 0 0 0 0

Oct 17 6 77 4 0 2 2 12

9

0 0 0

150

0 0 4

181

0 0 0

45

0 8

0

50

100

150

200

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW)Oct 17 Oct 16

6

77

4 0 2 2

12

2 0 0 0 0 0

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Oct 16 Oct 17

Central 6790 6914

State 5734 5423

Private 5666 5666

ALL INDIA 5993 5969

Month PLF 2016 PLF 2017

Apr 6681 6559

May 6215 6439

June 7324 7015

July 6721 6845

Aug 6991 6617

Sep 5793 6069

Oct 5993 5969

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Oct 2017

67

90

57

34

56

66

59

93

69

14

54

23

56

66

59

69

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Apr 2016 and Oct 2017

Oct 16 Oct 17

621

5

643

9

60

80

Ap

ril

Axis

Title

Axis Title

All India PLF Month-wise

2016 2017

2010-11 2011-12 2012-13 2013-14 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumers P Provisional

Total Number of Villages

597464

Pump sets Energised

as on 31-03-2016

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Actual

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31052017

Villiages Electrified (Nos) as on 311017

9925594 599

Villages electrified

15 All India Coal consumption for Power Generation (MT)

520

14 All India per capita consumption of Electricity ( KWh)

Average Revenue Realization(paiseunit)

21191474

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is

provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data As

such each monthly report of Village electrification of CEA is independent of the earlier published reports

Pump sets Energised as on 31-10-17

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer may not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Sep 2017 and April 2016 to Oct 2017 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1586860 2220135 5366050 9173045

Hydro 258402 227600 61900 547902

Nuclear 200000 000 000 200000

Total 2045262 2447735 5427950 9920947

Acievement 7812 15761 11592 11205

1 Capacity Addtion Targets and Achievements in the 12th Plan

Achievement of Capacity Addition during the Current Plan upto March 2017

Achievements upto Mar 2017 during the 12th Plan

723

400

0

108

970

0

53

000

0

54

790

2

20

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 9920947 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 4880 1460 0 6340 910 -5430

State 3546 0 0 4446 660 -3786

Pvt 2940 0 0 4170 2220 -1950

Total 11366 1460 0 14956 3790 -11166

Central 800 0 0 610 30 -580

State 300 30 0 428 100 -328

Pvt 205 0 0 217 0 -217

Total 1305 30 0 1255 130 -1125

Nuclear Central 500 0 0 0 0 0

Central 6180 1460 0 6950 940 -6010

State 3846 30 0 4874 760 -4114

Pvt 3145 0 0 4387 2220 -2167

Total 13171 1490 0 16211 3920 -12291

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct 2017

Thermal

2 Capacity Addition Targets Achievements During Oct 2017

Oct-17 April 17 - Oct 17Schemes Sector

Target 2017-18

14

95

6

12

55

0

16

21

1

37

90

13

0

0

39

20

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2017-18 Target

Achievement

1460

030

0

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Target Achievement

MW

Targets and Achievement during Oct 2017Thermal

Hydro

Nuclear

Coal Gas Diesel Total

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Sub Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Sub Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Sub Total 4338202 647366 5061726 332000 1174803 2772832 9341361

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Sub Total 2712664 10000 000 2722664 000 483412 102732 3308808

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Sub Total 52002 173605 3600 229207 000 131200 28541 388948

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1210 5215

State 6378050 707895 7122338 000 2979800 197690 10299827

Private 7449600 1058060 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

Total 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092017 is given below (in MW)

438955 3270064 1477169 6015766

A Oct 2017 0 MW

B Oct 2017 35 MW

C Oct 2017 0 MW

D Oct 2017 A-B-C -35 MW

1 NAMRUP CCPP U-1 (20 MW) has been retired from the State Sector of Assam

2 LAKWA GT U-4 (15 MW) has been retired from the State Sector of Assam

Capacity Removed due to

change to CPP from IPP during

Net Capacity Added during

2 Allocation from UNCHAHAR TPS U-6 (500 MW) FARAKKA STPS U-6 (500 MW) and KORBA STPS U-7 (500 MW) has been revised

as per GM Division allocation as on 30092017

Small

Hydro Power

Total

Capacity

Islands

Bio-PowerSolar Power

Waste to EnergyWind Power

Capacity Added during

Capacity Retired during

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102017)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

(UTILITIES)

RES

(MNRE)

Northern Region

Western Region

818170 11408

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092017

BM PowerCogen

Southern Region

Eastern Region

North Eastern

Region

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 7066 104788

Central 377972 20701 000 398673 10283 72309 000 481265

Sub-Total 478394 211541 000 689935 10283 72309 7066 779593

State 272000 15000 000 287000 000 108451 5930 401381

Private 408078 000 000 408078 000 20000 30679 458757

Central 127872 53561 000 181434 10094 66370181 000 257898

Sub-Total 807950 68561 000 876512 10094 194821 36609 1118035

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 57983 157183

Central 17390 6201 000 23591 2895 122388 000 148874

Sub-Total 17390 6201 000 23591 2895 291048 83644 401178

State 000 17500 000 17500 000 123000 10803 151303

Private 000 000 000 000 000 000 5082 5082

Central 48739 12907 000 61647 6798 104898 000 173343

Sub-Total 48739 30407 000 79147 6798 227898 15885 329728

State 262000 15000 000 277000 000 257023 12780 546803

Private 511550 000 000 511550 000 28800 107812 648162

Central 83058 26401 000 109459 19681 92342 000 221482

Sub-Total 856608 41401 000 898009 19681 378165 120592 1416447

State 585000 60380 000 645380 000 108796 2385 756561

Private 388200 000 000 388200 000 10400 660476 1059076

Central 117325 22110 000 139435 55674 73901 000 269010

Sub-Total 1090525 82490 000 1173015 55674 193097 662861 2084647

State 577300 000 000 577300 000 72410 2510 652220

Private 871433 000 000 871433 000 84200 244508 1200141

Central 333839 54949 000 388788 28948 166493 000 584229

Sub-Total 1782572 54949 000 1837521 28948 323103 247018 2436590

State 000 000 000 000 000 125215 6287 131502

Private 9900 45000 000 54900 000 8800 46381 110081

Central 33174 6966 000 40140 3124 47554 000 90818

Sub-Total 43074 51966 000 95040 3124 181569 52668 332401

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1572 1572

Central 3665 1503 000 5167 801 10171 000 16139

Sub-Total 3665 1503 000 5167 801 10171 1572 17711

120003 29105 000 149108 23703 70195 000 243007

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Grand Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Uttar Pradesh

Uttarakhand

Chandigarh

NuclearHydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102017)

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Modewise breakup

Grand TotalThermalOwnership Sector

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Central - Unallocated

Total (Northern

Region)

Punjab

Rajasthan

RES

(MNRE)

(As on 31102017)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 051 4851

Central 45112 2220 000 47332 2600 000 000 49932

Sub-Total 45112 7020 000 52132 2600 000 056 54788

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1031 1031

Central 12296 4840 000 17136 700 000 000 17836

Sub-Total 12296 4840 000 17136 700 000 1031 18867

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 686953 1859520

Central 301209 42400 000 343609 55900 000 000 399509

Sub-Total 1552776 656182 000 2208958 55900 77200 687753 3029811

State 408000 000 000 408000 000 170366 8396 586762

Private 557400 10000 000 567400 000 000 371617 939017

Central 272070 25700 000 297770 27300 152000 000 477070

Sub-Total 1237470 35700 000 1273170 27300 322366 380013 2002849

State 328000 000 000 328000 000 12000 1105 341105

Private 759000 000 000 759000 000 000 41597 800597

Central 155344 000 000 155344 4800 000 000 160144

Sub-Total 1242344 000 000 1242344 4800 12000 42702 1301846

State 1017000 67200 000 1084200 000 285084 20812 1390096

Private 1245600 56800 000 1302400 000 48100 750121 2100621

Central 421943 251300 000 673243 69000 000 000 742243

Sub-Total 2684543 375300 000 3059843 69000 333184 770933 4232960

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 048 048

Central 16921 7140 000 24061 900 000 000 24961

Sub-Total 16921 7140 000 24061 900 000 048 25009

199400 19759 000 219159 22800 000 000 241959

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Grand Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Hydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Goa

Daman amp Diu

Gujarat

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Madhya Pradesh

RES

(MNRE)Nuclear

Grand TotalThermalOwnership Sector

Modewise breakup

Maharashtra

Chhattisgarh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 441000 23540 000 464540 000 167360 8950 640850

Private 387388 369412 3680 760480 000 000 645447 1405927

Central 160760 000 000 160760 12727 000 000 173487

Sub-Total 989148 392952 3680 1385780 12727 167360 654397 2220264

State 408250 000 000 408250 000 238993 000 647243

Private 83945 95088 000 179033 000 000 239336 418369

Central 187812 000 000 187812 14873 000 000 202685

Sub-Total 680007 95088 000 775095 14873 238993 239336 1268297

State 502000 000 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 761814 960184

Central 242920 000 000 242920 69800 000 000 312720

Sub-Total 940770 000 956082 69800 359980 777347 2163209

State 000 000 15996 000 188150 14502 218648

Private 61500 17400 000 78900 000 000 18557 97457

Central 110818 35958 000 146776 36200 000 000 182976

Sub-Total 172318 53358 241672 36200 188150 33059 499081

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 575247 000 000 1056418 1631665

Central 438952 000 000 438952 144800 000 000 583752

Sub-Total 1354719 102718 1498607 144800 220320 1068688 2932415

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 005 005

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 005 36695

166400 000 000 166400 45000 000 000 211400

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Grand Total 4338202 647366 5061726 332000 1174803 2772832 9341361

Andhra Pradesh

Puducherry

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Southern

Region)

Karnataka

Kerala

Tamil Nadu

NLC

Central - Unallocated

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Telangana

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 28100 000 000 28100 000 000 25358 53458

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 340533 000 000 340533 000 11000 32428 383960

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 2037 75037

Central 84874 000 000 84874 000 6100 000 90974

Sub-Total 199874 000 000 199874 000 19100 2442 221416

State 552000 10000 000 562000 000 98600 9195 669795

Private 227500 000 000 227500 000 000 34003 261503

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 855577 10000 000 865577 000 139600 43198 1048375

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 18822 312722

Central 163390 000 000 163390 000 8900 000 172290

Sub-Total 499290 000 000 499290 000 215092 19452 733834

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 29100 001 29101

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 71500 5212 85415

110183 000 000 110183 000 8501 000 118684

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Grand Total 2712664 10000 000 2722664 000 483412 102732 3308808

(As on 31102017)

Coal Gas Diesel Total

State 000 28845 000 28845 000 10000 3001 41846

Private 000 2450 000 2450 000 000 1521 3971

Central 27902 43556 000 71458 000 33123 000 104581

Sub-Total 27902 74851 000 102753 000 43123 4522 150398

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 439 439

Central 2470 4682 000 7152 000 9745 000 16897

Sub-Total 2470 4682 000 7152 000 9745 10899 27796

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 6519 000 20528

Sub-Total 3040 10969 000 14009 000 38719 3109 55837

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 3740 43695 000 47435 000 6238 000 53673

Sub-Total 3740 60645 000 64385 000 6238 2101 72724

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 131 131

Central 3140 7157 000 10297 000 8893 000 19190

Sub-Total 3140 7157 3600 13897 000 8893 676 23466

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 2140 4893 000 7033 000 5337 000 12370

Sub-Total 2140 4893 000 7033 000 5337 3067 15437

State 000 000 000 000 000 000 4147 4147

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 6419 000 12535

Sub-Total 2070 4046 000 6116 000 6419 4167 16702

7500 6362 000 13862 000 12726 000 26588

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Grand Total 52002 173605 3600 229207 000 131200 28541 388948

Modewise breakup

Bihar

Hydro

(Renewable)

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

RES

(MNRE)

Total (Eastern

Region)

Ownership Sector

Assam

Odisha

State Ownership Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Sikkim

Jharkhand

West Bengal

DVC

Grand TotalThermal

Central - Unallocated

Nuclear

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 610 610

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1135 5140

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1210 5215

Hydro

(Renewable)

RES

(MNRE)

Total (Islands)

State Ownership Sector

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

Andaman amp

Nicobar

lakshadweep

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Modewise breakup

Grand TotalThermalNuclear

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 2: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

SN Section A - Highlights of Power Sector Page

1 Electricity Generation for Oct 2017 (BU) 1A amp 1B

2 Generating Capacity Addition for Oct 2017 (MW) 2

3 List of Projects Commissioned in Oct 2017 3

4 All India Installed Capacity (MW) Region-wise as on 31102017 3

5 All India Installed Capacity (MW) Sector-wise as on 31102017 4

6 Transmission Lines Added during Oct 2017 (Ckms) 5

7 Transformation Capacity Addition during Oct 2017 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Oct 2017 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Oct 2017 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31102017

13 Average cost of Power amp Average Realisation

All India per capita consumption of Electricity (KWh)

15 All India Coal consumption for Power Generation (MT)

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Oct 2017 13

3 Installed Capacity in various Regions including their shares 14-19

1 Programme and Achievements of Transmission Lines in Oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

1 Programme and Achievements of Sub-Stations in Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

1 Electricity Generation (MU) Targets and Achievements for 2016-17 22

1 Power Supply Position (Provisional) for Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since 2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA upto Oct 2017

1 Rate of sale of power for the year 2014-2015 33-41

Section H - Rate of sale of power for the year 2015-2016

Executive Summary for the Month of Oct 2017

32

11

20

21

31

Section B - Capacity Addition

Section C - Transmission Lines

Section D - Sub Stations

Section E - Electricity Generation

Section F - Power supply position

Contents

Section G - Growth of Power Sector

SN Contents Page

1Electricity Generation (Conventional Sources) for Oct 2017 (BU) 1

2 Generating Capacity Addition for Oct 2017 (MW) 2

3 List of Projects Commissioned in Oct 2017 3

4 All India Installed Capacity (MW) Region-wise as on 31102017 3

5 All India Installed Capacity (MW) Sector-wise as on 31102017 4

6 Transmission Lines Added during Oct 2017 (Ckms) 5

7 Transformation Capacity Addition during Octt 2017 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Oct 2017 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Oct 2017 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31102017

13 Average cost of Power amp Average Realisation

14 All India per capita consumption of Electricity (KWh)

15 All India Coal consumption for Power Generation (MT)

Section A - Highlights of Power Sector

11

Achievement

Oct-17

Thermal 8505 8778

Hydro 1108

Nuclear 312

Bhutan Import 0632

All India 102617 284

Type

Thermal

Hydro

Nuclear

Bhutan Import

All India

1A

1 Electricity Generation for Oct 2017 (BU)

Oct-17Type

Achievement

Oct-16

Targets Change

wrt 2016

92466

441709874679869

0486

46688353

-88322140

0443 -885

20185

490

12004

Oct 16 Oct 17

104670

3155

Change

Electricity Generation During April 2016 to Oct 2016 amp April 2017 to Oct 2017 (BU)

1069

3059

99785

0589

56889 59678

8902

0893

99785

104670

97000

98000

99000

100000

101000

102000

103000

104000

105000

106000

BU

Oct-16 Oct-17

679869709874

0000

100000

200000

300000

400000

500000

600000

700000

800000

BU

Oct 16 Oct 17

Month

Generation from

Conventional Sources

Generation

from

Renewable

Sources

Total

Generation

from

Conventional

Sources

Generation

from

Renewable

Sources

Total

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(MU) (MU) (MU) (MU) (MU) (MU) () () ()

Apr-17 103160 6932 110092 99345 5082 104427 384 3640 542

May-17 107295 8666 115961 99903 6820 106723 740 2707 866

Jun-17 97525 10228 107753 97326 8118 105444 020 2599 219

Jul-17 97912 12928 110840 96442 9554 105996 152 3532 457

Aug-17 94606 10857 105463 95237 9571 104808 -066 1344 062

Sep-17 98072 7516 105588 95741 8279 104020 243 -922 151

1B

Wind

Solar

Biomass

Bagasse

Small Hydro

Others

Total

Electricity Generation From Renewable (source wise)

April- Sep 2017 vis-agrave-vis April- Sep 2016

Electricity Generation (Conventional amp Renewable Sources)April 2017- Sep 2017 vis-agrave-vis April 2016- Sep 2016

All Figure in MU

Source-Wise All India

Generation from Renwables

For the Month of Commulative value for the period

Sep 2017 Sep 2016 Sep2017 Sep 2016

Generation

(April 2016- Sep 2016)

Generation

(April 2017- Sep 2017) Growth

389711 559624 3706559 3160253

199408 10152 1080476 572593

2731 37605 174225 20434

27042 32608 207578 279623

99283 95152 458244 501514

8825 1436 42629 9187

751579 827945 5669711 472751

Achievement Targets Achievement

Thermal 0 1460 0 DIV0

Hydro 70 30 0 10000

Nuclear 0 0 0 000

All India 70 1490 0 -10000

Apr -16 to Oct16 Apr -17 to Oct-17 Change

Thermal 36085 4300 19

Hydro 320 278 100

Nuclear 0 0 NA

All India 39285 45780 17

2

2 Generating Capacity Addition for Oct 2017 (MW)

Generating Capacity Addition during April 16 to Sept 16 amp April 17 to Sept 17 (MW)

Change wrt 2017TypeOct-17

700

000

10

20

30

40

50

60

70

80

1 Oct-17

39285

45780

3600

3800

4000

4200

4400

4600

4800

1Apr -16 to Oct16 Apr -17 to Oct-17

(i) Thermal

(ii)

(iii)

Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total

Northern 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Western 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Southern 4338202 647366 76158 5061726 332000 1174803 2772832 9341361

Eastern 2712664 10000 000 2722664 000 483412 102732 3308808

North-East 52002 173605 3600 229207 000 131200 28541 388948

Islands 000 000 4005 4005 000 000 1210 5215

ALL INDIA 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Note Captive Genaration is not included in the total RES as on 31122016 3

Thermal

Nuclear

Hydro

3 List of Projects Commissioned During Oct 2017

4 All India Installed Capacity (MW) Region-wise as on 31102017

NIL

NIL

NIL

21941451

678000

44765426015766

33111758

40726

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 33111758

Sector

Coal Gas Diesel Total

State 6378050 707895 36393 7122338 000 2979800 197690 10299827

Private 7449600 1058060 47370 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

All India 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

State 10299827

Private 14701706

Central 8110225

5 All India Installed Capacity (MW) Sector-wise as on 31102017

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31122016

State 10299827 31

Private 14701706 44

Central 8110225 25

All India Installed Capacity(MW) as on 31-10-2017 (Sector-Wise)

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

5

3778 2151

16398 13120

2574 0

4029 2046

6017 8923

0 0

406 0

639 245

212 324

1257 569

Transmission Lines Added during Apr 15 to Oct 16 amp Apr 16 to Oct17 (Ckms)

Apr 15 - Oct16 Apr 16 - Oct 17

0 0

6 Transmission Lines Added during Oct 2017 (Ckms)

Oct-16 Oct-17

0 0

16398

13120

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

ckm

s

Apr 15 to Oct 16 Apr 16 to Oct 17

1257

569

0

200

400

600

800

1000

1200

1400

1

ck

ms

Oct16 Oct 17

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

1500 3000

All India Transformation Capacity Addition during Apr 16 to Oct 16 amp Apr

17 to Oct17 (MVA)

45665

0

10000

23020

9645

39060

13500

15920

8140

0

April 16 to Oct 16 April 16 to Oct 17

1600

0

0

3600

2575

1025

7 Transformation Capacity Addition During Oct 2017 (MVA)

0

0

500

1100

0 0

Oct-16 Oct-17

1600

3600

0

500

1000

1500

2000

2500

3000

3500

4000

MV

A

Transformation Capacity Addition during Oct 2017

Oct-16 Oct-17

39060

45665

0

74520

1

MV

A

April 16 to Oct 16 April 16 to Oct 17

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandOct 16 0 0 0 0 496 0 30 275 0

Oct 17 0 0 150 0 516 0 0 0 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Haveli

Oct 16 5 0 0 37 0 0 0

Oct 17 16 0 14 2062 0 0 25

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Oct16 1 11 277 43 0 11 0

Oct 17 0 11 3 134 6 4 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions

0 0

150

0

516

0 0 0 00 0 0 0

496

0 30

275

0

0

400

800

Chan

dig

ar

h

Delh

i

Hary

ana

HP

Jamp

K

Pu

nj

ab

Raja

sth

an

UP

Utr

ak

hand

MW

Northern States (MW) Oct 17 Oct 16

16

0 14

2062

0 0 25

5 0 0 37

0 0 0

0

5000

Ch

attis

garh

Guja

rat

MP

Mah

ara

st

ra

Da

man amp

Diu

Da

dar

Na

gar

Ha

veliM

W

Western States (MW) Oct 17 Oct 16

0 11 3134

6 4 01 11

277

43 0 11 00

500

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Southern State (MW) Oct 17 Oct16

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct 16 181 0 0 0 45 0 8

Oct 17 0 0 0 150 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct 16 2 58 0 0 0 0 0

Oct 17 6 77 4 0 2 2 12

9

0 0 0

150

0 0 4

181

0 0 0

45

0 8

0

50

100

150

200

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW)Oct 17 Oct 16

6

77

4 0 2 2

12

2 0 0 0 0 0

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Oct 16 Oct 17

Central 6790 6914

State 5734 5423

Private 5666 5666

ALL INDIA 5993 5969

Month PLF 2016 PLF 2017

Apr 6681 6559

May 6215 6439

June 7324 7015

July 6721 6845

Aug 6991 6617

Sep 5793 6069

Oct 5993 5969

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Oct 2017

67

90

57

34

56

66

59

93

69

14

54

23

56

66

59

69

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Apr 2016 and Oct 2017

Oct 16 Oct 17

621

5

643

9

60

80

Ap

ril

Axis

Title

Axis Title

All India PLF Month-wise

2016 2017

2010-11 2011-12 2012-13 2013-14 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumers P Provisional

Total Number of Villages

597464

Pump sets Energised

as on 31-03-2016

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Actual

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31052017

Villiages Electrified (Nos) as on 311017

9925594 599

Villages electrified

15 All India Coal consumption for Power Generation (MT)

520

14 All India per capita consumption of Electricity ( KWh)

Average Revenue Realization(paiseunit)

21191474

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is

provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data As

such each monthly report of Village electrification of CEA is independent of the earlier published reports

Pump sets Energised as on 31-10-17

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer may not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Sep 2017 and April 2016 to Oct 2017 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1586860 2220135 5366050 9173045

Hydro 258402 227600 61900 547902

Nuclear 200000 000 000 200000

Total 2045262 2447735 5427950 9920947

Acievement 7812 15761 11592 11205

1 Capacity Addtion Targets and Achievements in the 12th Plan

Achievement of Capacity Addition during the Current Plan upto March 2017

Achievements upto Mar 2017 during the 12th Plan

723

400

0

108

970

0

53

000

0

54

790

2

20

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 9920947 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 4880 1460 0 6340 910 -5430

State 3546 0 0 4446 660 -3786

Pvt 2940 0 0 4170 2220 -1950

Total 11366 1460 0 14956 3790 -11166

Central 800 0 0 610 30 -580

State 300 30 0 428 100 -328

Pvt 205 0 0 217 0 -217

Total 1305 30 0 1255 130 -1125

Nuclear Central 500 0 0 0 0 0

Central 6180 1460 0 6950 940 -6010

State 3846 30 0 4874 760 -4114

Pvt 3145 0 0 4387 2220 -2167

Total 13171 1490 0 16211 3920 -12291

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct 2017

Thermal

2 Capacity Addition Targets Achievements During Oct 2017

Oct-17 April 17 - Oct 17Schemes Sector

Target 2017-18

14

95

6

12

55

0

16

21

1

37

90

13

0

0

39

20

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2017-18 Target

Achievement

1460

030

0

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Target Achievement

MW

Targets and Achievement during Oct 2017Thermal

Hydro

Nuclear

Coal Gas Diesel Total

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Sub Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Sub Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Sub Total 4338202 647366 5061726 332000 1174803 2772832 9341361

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Sub Total 2712664 10000 000 2722664 000 483412 102732 3308808

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Sub Total 52002 173605 3600 229207 000 131200 28541 388948

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1210 5215

State 6378050 707895 7122338 000 2979800 197690 10299827

Private 7449600 1058060 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

Total 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092017 is given below (in MW)

438955 3270064 1477169 6015766

A Oct 2017 0 MW

B Oct 2017 35 MW

C Oct 2017 0 MW

D Oct 2017 A-B-C -35 MW

1 NAMRUP CCPP U-1 (20 MW) has been retired from the State Sector of Assam

2 LAKWA GT U-4 (15 MW) has been retired from the State Sector of Assam

Capacity Removed due to

change to CPP from IPP during

Net Capacity Added during

2 Allocation from UNCHAHAR TPS U-6 (500 MW) FARAKKA STPS U-6 (500 MW) and KORBA STPS U-7 (500 MW) has been revised

as per GM Division allocation as on 30092017

Small

Hydro Power

Total

Capacity

Islands

Bio-PowerSolar Power

Waste to EnergyWind Power

Capacity Added during

Capacity Retired during

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102017)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

(UTILITIES)

RES

(MNRE)

Northern Region

Western Region

818170 11408

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092017

BM PowerCogen

Southern Region

Eastern Region

North Eastern

Region

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 7066 104788

Central 377972 20701 000 398673 10283 72309 000 481265

Sub-Total 478394 211541 000 689935 10283 72309 7066 779593

State 272000 15000 000 287000 000 108451 5930 401381

Private 408078 000 000 408078 000 20000 30679 458757

Central 127872 53561 000 181434 10094 66370181 000 257898

Sub-Total 807950 68561 000 876512 10094 194821 36609 1118035

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 57983 157183

Central 17390 6201 000 23591 2895 122388 000 148874

Sub-Total 17390 6201 000 23591 2895 291048 83644 401178

State 000 17500 000 17500 000 123000 10803 151303

Private 000 000 000 000 000 000 5082 5082

Central 48739 12907 000 61647 6798 104898 000 173343

Sub-Total 48739 30407 000 79147 6798 227898 15885 329728

State 262000 15000 000 277000 000 257023 12780 546803

Private 511550 000 000 511550 000 28800 107812 648162

Central 83058 26401 000 109459 19681 92342 000 221482

Sub-Total 856608 41401 000 898009 19681 378165 120592 1416447

State 585000 60380 000 645380 000 108796 2385 756561

Private 388200 000 000 388200 000 10400 660476 1059076

Central 117325 22110 000 139435 55674 73901 000 269010

Sub-Total 1090525 82490 000 1173015 55674 193097 662861 2084647

State 577300 000 000 577300 000 72410 2510 652220

Private 871433 000 000 871433 000 84200 244508 1200141

Central 333839 54949 000 388788 28948 166493 000 584229

Sub-Total 1782572 54949 000 1837521 28948 323103 247018 2436590

State 000 000 000 000 000 125215 6287 131502

Private 9900 45000 000 54900 000 8800 46381 110081

Central 33174 6966 000 40140 3124 47554 000 90818

Sub-Total 43074 51966 000 95040 3124 181569 52668 332401

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1572 1572

Central 3665 1503 000 5167 801 10171 000 16139

Sub-Total 3665 1503 000 5167 801 10171 1572 17711

120003 29105 000 149108 23703 70195 000 243007

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Grand Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Uttar Pradesh

Uttarakhand

Chandigarh

NuclearHydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102017)

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Modewise breakup

Grand TotalThermalOwnership Sector

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Central - Unallocated

Total (Northern

Region)

Punjab

Rajasthan

RES

(MNRE)

(As on 31102017)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 051 4851

Central 45112 2220 000 47332 2600 000 000 49932

Sub-Total 45112 7020 000 52132 2600 000 056 54788

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1031 1031

Central 12296 4840 000 17136 700 000 000 17836

Sub-Total 12296 4840 000 17136 700 000 1031 18867

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 686953 1859520

Central 301209 42400 000 343609 55900 000 000 399509

Sub-Total 1552776 656182 000 2208958 55900 77200 687753 3029811

State 408000 000 000 408000 000 170366 8396 586762

Private 557400 10000 000 567400 000 000 371617 939017

Central 272070 25700 000 297770 27300 152000 000 477070

Sub-Total 1237470 35700 000 1273170 27300 322366 380013 2002849

State 328000 000 000 328000 000 12000 1105 341105

Private 759000 000 000 759000 000 000 41597 800597

Central 155344 000 000 155344 4800 000 000 160144

Sub-Total 1242344 000 000 1242344 4800 12000 42702 1301846

State 1017000 67200 000 1084200 000 285084 20812 1390096

Private 1245600 56800 000 1302400 000 48100 750121 2100621

Central 421943 251300 000 673243 69000 000 000 742243

Sub-Total 2684543 375300 000 3059843 69000 333184 770933 4232960

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 048 048

Central 16921 7140 000 24061 900 000 000 24961

Sub-Total 16921 7140 000 24061 900 000 048 25009

199400 19759 000 219159 22800 000 000 241959

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Grand Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Hydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Goa

Daman amp Diu

Gujarat

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Madhya Pradesh

RES

(MNRE)Nuclear

Grand TotalThermalOwnership Sector

Modewise breakup

Maharashtra

Chhattisgarh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 441000 23540 000 464540 000 167360 8950 640850

Private 387388 369412 3680 760480 000 000 645447 1405927

Central 160760 000 000 160760 12727 000 000 173487

Sub-Total 989148 392952 3680 1385780 12727 167360 654397 2220264

State 408250 000 000 408250 000 238993 000 647243

Private 83945 95088 000 179033 000 000 239336 418369

Central 187812 000 000 187812 14873 000 000 202685

Sub-Total 680007 95088 000 775095 14873 238993 239336 1268297

State 502000 000 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 761814 960184

Central 242920 000 000 242920 69800 000 000 312720

Sub-Total 940770 000 956082 69800 359980 777347 2163209

State 000 000 15996 000 188150 14502 218648

Private 61500 17400 000 78900 000 000 18557 97457

Central 110818 35958 000 146776 36200 000 000 182976

Sub-Total 172318 53358 241672 36200 188150 33059 499081

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 575247 000 000 1056418 1631665

Central 438952 000 000 438952 144800 000 000 583752

Sub-Total 1354719 102718 1498607 144800 220320 1068688 2932415

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 005 005

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 005 36695

166400 000 000 166400 45000 000 000 211400

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Grand Total 4338202 647366 5061726 332000 1174803 2772832 9341361

Andhra Pradesh

Puducherry

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Southern

Region)

Karnataka

Kerala

Tamil Nadu

NLC

Central - Unallocated

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Telangana

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 28100 000 000 28100 000 000 25358 53458

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 340533 000 000 340533 000 11000 32428 383960

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 2037 75037

Central 84874 000 000 84874 000 6100 000 90974

Sub-Total 199874 000 000 199874 000 19100 2442 221416

State 552000 10000 000 562000 000 98600 9195 669795

Private 227500 000 000 227500 000 000 34003 261503

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 855577 10000 000 865577 000 139600 43198 1048375

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 18822 312722

Central 163390 000 000 163390 000 8900 000 172290

Sub-Total 499290 000 000 499290 000 215092 19452 733834

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 29100 001 29101

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 71500 5212 85415

110183 000 000 110183 000 8501 000 118684

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Grand Total 2712664 10000 000 2722664 000 483412 102732 3308808

(As on 31102017)

Coal Gas Diesel Total

State 000 28845 000 28845 000 10000 3001 41846

Private 000 2450 000 2450 000 000 1521 3971

Central 27902 43556 000 71458 000 33123 000 104581

Sub-Total 27902 74851 000 102753 000 43123 4522 150398

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 439 439

Central 2470 4682 000 7152 000 9745 000 16897

Sub-Total 2470 4682 000 7152 000 9745 10899 27796

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 6519 000 20528

Sub-Total 3040 10969 000 14009 000 38719 3109 55837

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 3740 43695 000 47435 000 6238 000 53673

Sub-Total 3740 60645 000 64385 000 6238 2101 72724

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 131 131

Central 3140 7157 000 10297 000 8893 000 19190

Sub-Total 3140 7157 3600 13897 000 8893 676 23466

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 2140 4893 000 7033 000 5337 000 12370

Sub-Total 2140 4893 000 7033 000 5337 3067 15437

State 000 000 000 000 000 000 4147 4147

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 6419 000 12535

Sub-Total 2070 4046 000 6116 000 6419 4167 16702

7500 6362 000 13862 000 12726 000 26588

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Grand Total 52002 173605 3600 229207 000 131200 28541 388948

Modewise breakup

Bihar

Hydro

(Renewable)

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

RES

(MNRE)

Total (Eastern

Region)

Ownership Sector

Assam

Odisha

State Ownership Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Sikkim

Jharkhand

West Bengal

DVC

Grand TotalThermal

Central - Unallocated

Nuclear

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 610 610

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1135 5140

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1210 5215

Hydro

(Renewable)

RES

(MNRE)

Total (Islands)

State Ownership Sector

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

Andaman amp

Nicobar

lakshadweep

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Modewise breakup

Grand TotalThermalNuclear

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 3: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

SN Contents Page

1Electricity Generation (Conventional Sources) for Oct 2017 (BU) 1

2 Generating Capacity Addition for Oct 2017 (MW) 2

3 List of Projects Commissioned in Oct 2017 3

4 All India Installed Capacity (MW) Region-wise as on 31102017 3

5 All India Installed Capacity (MW) Sector-wise as on 31102017 4

6 Transmission Lines Added during Oct 2017 (Ckms) 5

7 Transformation Capacity Addition during Octt 2017 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Oct 2017 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Oct 2017 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31102017

13 Average cost of Power amp Average Realisation

14 All India per capita consumption of Electricity (KWh)

15 All India Coal consumption for Power Generation (MT)

Section A - Highlights of Power Sector

11

Achievement

Oct-17

Thermal 8505 8778

Hydro 1108

Nuclear 312

Bhutan Import 0632

All India 102617 284

Type

Thermal

Hydro

Nuclear

Bhutan Import

All India

1A

1 Electricity Generation for Oct 2017 (BU)

Oct-17Type

Achievement

Oct-16

Targets Change

wrt 2016

92466

441709874679869

0486

46688353

-88322140

0443 -885

20185

490

12004

Oct 16 Oct 17

104670

3155

Change

Electricity Generation During April 2016 to Oct 2016 amp April 2017 to Oct 2017 (BU)

1069

3059

99785

0589

56889 59678

8902

0893

99785

104670

97000

98000

99000

100000

101000

102000

103000

104000

105000

106000

BU

Oct-16 Oct-17

679869709874

0000

100000

200000

300000

400000

500000

600000

700000

800000

BU

Oct 16 Oct 17

Month

Generation from

Conventional Sources

Generation

from

Renewable

Sources

Total

Generation

from

Conventional

Sources

Generation

from

Renewable

Sources

Total

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(MU) (MU) (MU) (MU) (MU) (MU) () () ()

Apr-17 103160 6932 110092 99345 5082 104427 384 3640 542

May-17 107295 8666 115961 99903 6820 106723 740 2707 866

Jun-17 97525 10228 107753 97326 8118 105444 020 2599 219

Jul-17 97912 12928 110840 96442 9554 105996 152 3532 457

Aug-17 94606 10857 105463 95237 9571 104808 -066 1344 062

Sep-17 98072 7516 105588 95741 8279 104020 243 -922 151

1B

Wind

Solar

Biomass

Bagasse

Small Hydro

Others

Total

Electricity Generation From Renewable (source wise)

April- Sep 2017 vis-agrave-vis April- Sep 2016

Electricity Generation (Conventional amp Renewable Sources)April 2017- Sep 2017 vis-agrave-vis April 2016- Sep 2016

All Figure in MU

Source-Wise All India

Generation from Renwables

For the Month of Commulative value for the period

Sep 2017 Sep 2016 Sep2017 Sep 2016

Generation

(April 2016- Sep 2016)

Generation

(April 2017- Sep 2017) Growth

389711 559624 3706559 3160253

199408 10152 1080476 572593

2731 37605 174225 20434

27042 32608 207578 279623

99283 95152 458244 501514

8825 1436 42629 9187

751579 827945 5669711 472751

Achievement Targets Achievement

Thermal 0 1460 0 DIV0

Hydro 70 30 0 10000

Nuclear 0 0 0 000

All India 70 1490 0 -10000

Apr -16 to Oct16 Apr -17 to Oct-17 Change

Thermal 36085 4300 19

Hydro 320 278 100

Nuclear 0 0 NA

All India 39285 45780 17

2

2 Generating Capacity Addition for Oct 2017 (MW)

Generating Capacity Addition during April 16 to Sept 16 amp April 17 to Sept 17 (MW)

Change wrt 2017TypeOct-17

700

000

10

20

30

40

50

60

70

80

1 Oct-17

39285

45780

3600

3800

4000

4200

4400

4600

4800

1Apr -16 to Oct16 Apr -17 to Oct-17

(i) Thermal

(ii)

(iii)

Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total

Northern 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Western 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Southern 4338202 647366 76158 5061726 332000 1174803 2772832 9341361

Eastern 2712664 10000 000 2722664 000 483412 102732 3308808

North-East 52002 173605 3600 229207 000 131200 28541 388948

Islands 000 000 4005 4005 000 000 1210 5215

ALL INDIA 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Note Captive Genaration is not included in the total RES as on 31122016 3

Thermal

Nuclear

Hydro

3 List of Projects Commissioned During Oct 2017

4 All India Installed Capacity (MW) Region-wise as on 31102017

NIL

NIL

NIL

21941451

678000

44765426015766

33111758

40726

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 33111758

Sector

Coal Gas Diesel Total

State 6378050 707895 36393 7122338 000 2979800 197690 10299827

Private 7449600 1058060 47370 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

All India 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

State 10299827

Private 14701706

Central 8110225

5 All India Installed Capacity (MW) Sector-wise as on 31102017

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31122016

State 10299827 31

Private 14701706 44

Central 8110225 25

All India Installed Capacity(MW) as on 31-10-2017 (Sector-Wise)

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

5

3778 2151

16398 13120

2574 0

4029 2046

6017 8923

0 0

406 0

639 245

212 324

1257 569

Transmission Lines Added during Apr 15 to Oct 16 amp Apr 16 to Oct17 (Ckms)

Apr 15 - Oct16 Apr 16 - Oct 17

0 0

6 Transmission Lines Added during Oct 2017 (Ckms)

Oct-16 Oct-17

0 0

16398

13120

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

ckm

s

Apr 15 to Oct 16 Apr 16 to Oct 17

1257

569

0

200

400

600

800

1000

1200

1400

1

ck

ms

Oct16 Oct 17

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

1500 3000

All India Transformation Capacity Addition during Apr 16 to Oct 16 amp Apr

17 to Oct17 (MVA)

45665

0

10000

23020

9645

39060

13500

15920

8140

0

April 16 to Oct 16 April 16 to Oct 17

1600

0

0

3600

2575

1025

7 Transformation Capacity Addition During Oct 2017 (MVA)

0

0

500

1100

0 0

Oct-16 Oct-17

1600

3600

0

500

1000

1500

2000

2500

3000

3500

4000

MV

A

Transformation Capacity Addition during Oct 2017

Oct-16 Oct-17

39060

45665

0

74520

1

MV

A

April 16 to Oct 16 April 16 to Oct 17

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandOct 16 0 0 0 0 496 0 30 275 0

Oct 17 0 0 150 0 516 0 0 0 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Haveli

Oct 16 5 0 0 37 0 0 0

Oct 17 16 0 14 2062 0 0 25

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Oct16 1 11 277 43 0 11 0

Oct 17 0 11 3 134 6 4 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions

0 0

150

0

516

0 0 0 00 0 0 0

496

0 30

275

0

0

400

800

Chan

dig

ar

h

Delh

i

Hary

ana

HP

Jamp

K

Pu

nj

ab

Raja

sth

an

UP

Utr

ak

hand

MW

Northern States (MW) Oct 17 Oct 16

16

0 14

2062

0 0 25

5 0 0 37

0 0 0

0

5000

Ch

attis

garh

Guja

rat

MP

Mah

ara

st

ra

Da

man amp

Diu

Da

dar

Na

gar

Ha

veliM

W

Western States (MW) Oct 17 Oct 16

0 11 3134

6 4 01 11

277

43 0 11 00

500

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Southern State (MW) Oct 17 Oct16

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct 16 181 0 0 0 45 0 8

Oct 17 0 0 0 150 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct 16 2 58 0 0 0 0 0

Oct 17 6 77 4 0 2 2 12

9

0 0 0

150

0 0 4

181

0 0 0

45

0 8

0

50

100

150

200

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW)Oct 17 Oct 16

6

77

4 0 2 2

12

2 0 0 0 0 0

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Oct 16 Oct 17

Central 6790 6914

State 5734 5423

Private 5666 5666

ALL INDIA 5993 5969

Month PLF 2016 PLF 2017

Apr 6681 6559

May 6215 6439

June 7324 7015

July 6721 6845

Aug 6991 6617

Sep 5793 6069

Oct 5993 5969

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Oct 2017

67

90

57

34

56

66

59

93

69

14

54

23

56

66

59

69

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Apr 2016 and Oct 2017

Oct 16 Oct 17

621

5

643

9

60

80

Ap

ril

Axis

Title

Axis Title

All India PLF Month-wise

2016 2017

2010-11 2011-12 2012-13 2013-14 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumers P Provisional

Total Number of Villages

597464

Pump sets Energised

as on 31-03-2016

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Actual

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31052017

Villiages Electrified (Nos) as on 311017

9925594 599

Villages electrified

15 All India Coal consumption for Power Generation (MT)

520

14 All India per capita consumption of Electricity ( KWh)

Average Revenue Realization(paiseunit)

21191474

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is

provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data As

such each monthly report of Village electrification of CEA is independent of the earlier published reports

Pump sets Energised as on 31-10-17

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer may not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Sep 2017 and April 2016 to Oct 2017 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1586860 2220135 5366050 9173045

Hydro 258402 227600 61900 547902

Nuclear 200000 000 000 200000

Total 2045262 2447735 5427950 9920947

Acievement 7812 15761 11592 11205

1 Capacity Addtion Targets and Achievements in the 12th Plan

Achievement of Capacity Addition during the Current Plan upto March 2017

Achievements upto Mar 2017 during the 12th Plan

723

400

0

108

970

0

53

000

0

54

790

2

20

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 9920947 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 4880 1460 0 6340 910 -5430

State 3546 0 0 4446 660 -3786

Pvt 2940 0 0 4170 2220 -1950

Total 11366 1460 0 14956 3790 -11166

Central 800 0 0 610 30 -580

State 300 30 0 428 100 -328

Pvt 205 0 0 217 0 -217

Total 1305 30 0 1255 130 -1125

Nuclear Central 500 0 0 0 0 0

Central 6180 1460 0 6950 940 -6010

State 3846 30 0 4874 760 -4114

Pvt 3145 0 0 4387 2220 -2167

Total 13171 1490 0 16211 3920 -12291

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct 2017

Thermal

2 Capacity Addition Targets Achievements During Oct 2017

Oct-17 April 17 - Oct 17Schemes Sector

Target 2017-18

14

95

6

12

55

0

16

21

1

37

90

13

0

0

39

20

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2017-18 Target

Achievement

1460

030

0

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Target Achievement

MW

Targets and Achievement during Oct 2017Thermal

Hydro

Nuclear

Coal Gas Diesel Total

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Sub Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Sub Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Sub Total 4338202 647366 5061726 332000 1174803 2772832 9341361

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Sub Total 2712664 10000 000 2722664 000 483412 102732 3308808

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Sub Total 52002 173605 3600 229207 000 131200 28541 388948

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1210 5215

State 6378050 707895 7122338 000 2979800 197690 10299827

Private 7449600 1058060 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

Total 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092017 is given below (in MW)

438955 3270064 1477169 6015766

A Oct 2017 0 MW

B Oct 2017 35 MW

C Oct 2017 0 MW

D Oct 2017 A-B-C -35 MW

1 NAMRUP CCPP U-1 (20 MW) has been retired from the State Sector of Assam

2 LAKWA GT U-4 (15 MW) has been retired from the State Sector of Assam

Capacity Removed due to

change to CPP from IPP during

Net Capacity Added during

2 Allocation from UNCHAHAR TPS U-6 (500 MW) FARAKKA STPS U-6 (500 MW) and KORBA STPS U-7 (500 MW) has been revised

as per GM Division allocation as on 30092017

Small

Hydro Power

Total

Capacity

Islands

Bio-PowerSolar Power

Waste to EnergyWind Power

Capacity Added during

Capacity Retired during

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102017)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

(UTILITIES)

RES

(MNRE)

Northern Region

Western Region

818170 11408

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092017

BM PowerCogen

Southern Region

Eastern Region

North Eastern

Region

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 7066 104788

Central 377972 20701 000 398673 10283 72309 000 481265

Sub-Total 478394 211541 000 689935 10283 72309 7066 779593

State 272000 15000 000 287000 000 108451 5930 401381

Private 408078 000 000 408078 000 20000 30679 458757

Central 127872 53561 000 181434 10094 66370181 000 257898

Sub-Total 807950 68561 000 876512 10094 194821 36609 1118035

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 57983 157183

Central 17390 6201 000 23591 2895 122388 000 148874

Sub-Total 17390 6201 000 23591 2895 291048 83644 401178

State 000 17500 000 17500 000 123000 10803 151303

Private 000 000 000 000 000 000 5082 5082

Central 48739 12907 000 61647 6798 104898 000 173343

Sub-Total 48739 30407 000 79147 6798 227898 15885 329728

State 262000 15000 000 277000 000 257023 12780 546803

Private 511550 000 000 511550 000 28800 107812 648162

Central 83058 26401 000 109459 19681 92342 000 221482

Sub-Total 856608 41401 000 898009 19681 378165 120592 1416447

State 585000 60380 000 645380 000 108796 2385 756561

Private 388200 000 000 388200 000 10400 660476 1059076

Central 117325 22110 000 139435 55674 73901 000 269010

Sub-Total 1090525 82490 000 1173015 55674 193097 662861 2084647

State 577300 000 000 577300 000 72410 2510 652220

Private 871433 000 000 871433 000 84200 244508 1200141

Central 333839 54949 000 388788 28948 166493 000 584229

Sub-Total 1782572 54949 000 1837521 28948 323103 247018 2436590

State 000 000 000 000 000 125215 6287 131502

Private 9900 45000 000 54900 000 8800 46381 110081

Central 33174 6966 000 40140 3124 47554 000 90818

Sub-Total 43074 51966 000 95040 3124 181569 52668 332401

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1572 1572

Central 3665 1503 000 5167 801 10171 000 16139

Sub-Total 3665 1503 000 5167 801 10171 1572 17711

120003 29105 000 149108 23703 70195 000 243007

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Grand Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Uttar Pradesh

Uttarakhand

Chandigarh

NuclearHydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102017)

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Modewise breakup

Grand TotalThermalOwnership Sector

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Central - Unallocated

Total (Northern

Region)

Punjab

Rajasthan

RES

(MNRE)

(As on 31102017)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 051 4851

Central 45112 2220 000 47332 2600 000 000 49932

Sub-Total 45112 7020 000 52132 2600 000 056 54788

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1031 1031

Central 12296 4840 000 17136 700 000 000 17836

Sub-Total 12296 4840 000 17136 700 000 1031 18867

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 686953 1859520

Central 301209 42400 000 343609 55900 000 000 399509

Sub-Total 1552776 656182 000 2208958 55900 77200 687753 3029811

State 408000 000 000 408000 000 170366 8396 586762

Private 557400 10000 000 567400 000 000 371617 939017

Central 272070 25700 000 297770 27300 152000 000 477070

Sub-Total 1237470 35700 000 1273170 27300 322366 380013 2002849

State 328000 000 000 328000 000 12000 1105 341105

Private 759000 000 000 759000 000 000 41597 800597

Central 155344 000 000 155344 4800 000 000 160144

Sub-Total 1242344 000 000 1242344 4800 12000 42702 1301846

State 1017000 67200 000 1084200 000 285084 20812 1390096

Private 1245600 56800 000 1302400 000 48100 750121 2100621

Central 421943 251300 000 673243 69000 000 000 742243

Sub-Total 2684543 375300 000 3059843 69000 333184 770933 4232960

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 048 048

Central 16921 7140 000 24061 900 000 000 24961

Sub-Total 16921 7140 000 24061 900 000 048 25009

199400 19759 000 219159 22800 000 000 241959

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Grand Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Hydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Goa

Daman amp Diu

Gujarat

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Madhya Pradesh

RES

(MNRE)Nuclear

Grand TotalThermalOwnership Sector

Modewise breakup

Maharashtra

Chhattisgarh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 441000 23540 000 464540 000 167360 8950 640850

Private 387388 369412 3680 760480 000 000 645447 1405927

Central 160760 000 000 160760 12727 000 000 173487

Sub-Total 989148 392952 3680 1385780 12727 167360 654397 2220264

State 408250 000 000 408250 000 238993 000 647243

Private 83945 95088 000 179033 000 000 239336 418369

Central 187812 000 000 187812 14873 000 000 202685

Sub-Total 680007 95088 000 775095 14873 238993 239336 1268297

State 502000 000 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 761814 960184

Central 242920 000 000 242920 69800 000 000 312720

Sub-Total 940770 000 956082 69800 359980 777347 2163209

State 000 000 15996 000 188150 14502 218648

Private 61500 17400 000 78900 000 000 18557 97457

Central 110818 35958 000 146776 36200 000 000 182976

Sub-Total 172318 53358 241672 36200 188150 33059 499081

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 575247 000 000 1056418 1631665

Central 438952 000 000 438952 144800 000 000 583752

Sub-Total 1354719 102718 1498607 144800 220320 1068688 2932415

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 005 005

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 005 36695

166400 000 000 166400 45000 000 000 211400

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Grand Total 4338202 647366 5061726 332000 1174803 2772832 9341361

Andhra Pradesh

Puducherry

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Southern

Region)

Karnataka

Kerala

Tamil Nadu

NLC

Central - Unallocated

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Telangana

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 28100 000 000 28100 000 000 25358 53458

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 340533 000 000 340533 000 11000 32428 383960

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 2037 75037

Central 84874 000 000 84874 000 6100 000 90974

Sub-Total 199874 000 000 199874 000 19100 2442 221416

State 552000 10000 000 562000 000 98600 9195 669795

Private 227500 000 000 227500 000 000 34003 261503

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 855577 10000 000 865577 000 139600 43198 1048375

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 18822 312722

Central 163390 000 000 163390 000 8900 000 172290

Sub-Total 499290 000 000 499290 000 215092 19452 733834

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 29100 001 29101

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 71500 5212 85415

110183 000 000 110183 000 8501 000 118684

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Grand Total 2712664 10000 000 2722664 000 483412 102732 3308808

(As on 31102017)

Coal Gas Diesel Total

State 000 28845 000 28845 000 10000 3001 41846

Private 000 2450 000 2450 000 000 1521 3971

Central 27902 43556 000 71458 000 33123 000 104581

Sub-Total 27902 74851 000 102753 000 43123 4522 150398

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 439 439

Central 2470 4682 000 7152 000 9745 000 16897

Sub-Total 2470 4682 000 7152 000 9745 10899 27796

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 6519 000 20528

Sub-Total 3040 10969 000 14009 000 38719 3109 55837

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 3740 43695 000 47435 000 6238 000 53673

Sub-Total 3740 60645 000 64385 000 6238 2101 72724

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 131 131

Central 3140 7157 000 10297 000 8893 000 19190

Sub-Total 3140 7157 3600 13897 000 8893 676 23466

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 2140 4893 000 7033 000 5337 000 12370

Sub-Total 2140 4893 000 7033 000 5337 3067 15437

State 000 000 000 000 000 000 4147 4147

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 6419 000 12535

Sub-Total 2070 4046 000 6116 000 6419 4167 16702

7500 6362 000 13862 000 12726 000 26588

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Grand Total 52002 173605 3600 229207 000 131200 28541 388948

Modewise breakup

Bihar

Hydro

(Renewable)

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

RES

(MNRE)

Total (Eastern

Region)

Ownership Sector

Assam

Odisha

State Ownership Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Sikkim

Jharkhand

West Bengal

DVC

Grand TotalThermal

Central - Unallocated

Nuclear

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 610 610

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1135 5140

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1210 5215

Hydro

(Renewable)

RES

(MNRE)

Total (Islands)

State Ownership Sector

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

Andaman amp

Nicobar

lakshadweep

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Modewise breakup

Grand TotalThermalNuclear

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 4: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

Achievement

Oct-17

Thermal 8505 8778

Hydro 1108

Nuclear 312

Bhutan Import 0632

All India 102617 284

Type

Thermal

Hydro

Nuclear

Bhutan Import

All India

1A

1 Electricity Generation for Oct 2017 (BU)

Oct-17Type

Achievement

Oct-16

Targets Change

wrt 2016

92466

441709874679869

0486

46688353

-88322140

0443 -885

20185

490

12004

Oct 16 Oct 17

104670

3155

Change

Electricity Generation During April 2016 to Oct 2016 amp April 2017 to Oct 2017 (BU)

1069

3059

99785

0589

56889 59678

8902

0893

99785

104670

97000

98000

99000

100000

101000

102000

103000

104000

105000

106000

BU

Oct-16 Oct-17

679869709874

0000

100000

200000

300000

400000

500000

600000

700000

800000

BU

Oct 16 Oct 17

Month

Generation from

Conventional Sources

Generation

from

Renewable

Sources

Total

Generation

from

Conventional

Sources

Generation

from

Renewable

Sources

Total

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(MU) (MU) (MU) (MU) (MU) (MU) () () ()

Apr-17 103160 6932 110092 99345 5082 104427 384 3640 542

May-17 107295 8666 115961 99903 6820 106723 740 2707 866

Jun-17 97525 10228 107753 97326 8118 105444 020 2599 219

Jul-17 97912 12928 110840 96442 9554 105996 152 3532 457

Aug-17 94606 10857 105463 95237 9571 104808 -066 1344 062

Sep-17 98072 7516 105588 95741 8279 104020 243 -922 151

1B

Wind

Solar

Biomass

Bagasse

Small Hydro

Others

Total

Electricity Generation From Renewable (source wise)

April- Sep 2017 vis-agrave-vis April- Sep 2016

Electricity Generation (Conventional amp Renewable Sources)April 2017- Sep 2017 vis-agrave-vis April 2016- Sep 2016

All Figure in MU

Source-Wise All India

Generation from Renwables

For the Month of Commulative value for the period

Sep 2017 Sep 2016 Sep2017 Sep 2016

Generation

(April 2016- Sep 2016)

Generation

(April 2017- Sep 2017) Growth

389711 559624 3706559 3160253

199408 10152 1080476 572593

2731 37605 174225 20434

27042 32608 207578 279623

99283 95152 458244 501514

8825 1436 42629 9187

751579 827945 5669711 472751

Achievement Targets Achievement

Thermal 0 1460 0 DIV0

Hydro 70 30 0 10000

Nuclear 0 0 0 000

All India 70 1490 0 -10000

Apr -16 to Oct16 Apr -17 to Oct-17 Change

Thermal 36085 4300 19

Hydro 320 278 100

Nuclear 0 0 NA

All India 39285 45780 17

2

2 Generating Capacity Addition for Oct 2017 (MW)

Generating Capacity Addition during April 16 to Sept 16 amp April 17 to Sept 17 (MW)

Change wrt 2017TypeOct-17

700

000

10

20

30

40

50

60

70

80

1 Oct-17

39285

45780

3600

3800

4000

4200

4400

4600

4800

1Apr -16 to Oct16 Apr -17 to Oct-17

(i) Thermal

(ii)

(iii)

Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total

Northern 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Western 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Southern 4338202 647366 76158 5061726 332000 1174803 2772832 9341361

Eastern 2712664 10000 000 2722664 000 483412 102732 3308808

North-East 52002 173605 3600 229207 000 131200 28541 388948

Islands 000 000 4005 4005 000 000 1210 5215

ALL INDIA 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Note Captive Genaration is not included in the total RES as on 31122016 3

Thermal

Nuclear

Hydro

3 List of Projects Commissioned During Oct 2017

4 All India Installed Capacity (MW) Region-wise as on 31102017

NIL

NIL

NIL

21941451

678000

44765426015766

33111758

40726

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 33111758

Sector

Coal Gas Diesel Total

State 6378050 707895 36393 7122338 000 2979800 197690 10299827

Private 7449600 1058060 47370 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

All India 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

State 10299827

Private 14701706

Central 8110225

5 All India Installed Capacity (MW) Sector-wise as on 31102017

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31122016

State 10299827 31

Private 14701706 44

Central 8110225 25

All India Installed Capacity(MW) as on 31-10-2017 (Sector-Wise)

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

5

3778 2151

16398 13120

2574 0

4029 2046

6017 8923

0 0

406 0

639 245

212 324

1257 569

Transmission Lines Added during Apr 15 to Oct 16 amp Apr 16 to Oct17 (Ckms)

Apr 15 - Oct16 Apr 16 - Oct 17

0 0

6 Transmission Lines Added during Oct 2017 (Ckms)

Oct-16 Oct-17

0 0

16398

13120

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

ckm

s

Apr 15 to Oct 16 Apr 16 to Oct 17

1257

569

0

200

400

600

800

1000

1200

1400

1

ck

ms

Oct16 Oct 17

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

1500 3000

All India Transformation Capacity Addition during Apr 16 to Oct 16 amp Apr

17 to Oct17 (MVA)

45665

0

10000

23020

9645

39060

13500

15920

8140

0

April 16 to Oct 16 April 16 to Oct 17

1600

0

0

3600

2575

1025

7 Transformation Capacity Addition During Oct 2017 (MVA)

0

0

500

1100

0 0

Oct-16 Oct-17

1600

3600

0

500

1000

1500

2000

2500

3000

3500

4000

MV

A

Transformation Capacity Addition during Oct 2017

Oct-16 Oct-17

39060

45665

0

74520

1

MV

A

April 16 to Oct 16 April 16 to Oct 17

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandOct 16 0 0 0 0 496 0 30 275 0

Oct 17 0 0 150 0 516 0 0 0 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Haveli

Oct 16 5 0 0 37 0 0 0

Oct 17 16 0 14 2062 0 0 25

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Oct16 1 11 277 43 0 11 0

Oct 17 0 11 3 134 6 4 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions

0 0

150

0

516

0 0 0 00 0 0 0

496

0 30

275

0

0

400

800

Chan

dig

ar

h

Delh

i

Hary

ana

HP

Jamp

K

Pu

nj

ab

Raja

sth

an

UP

Utr

ak

hand

MW

Northern States (MW) Oct 17 Oct 16

16

0 14

2062

0 0 25

5 0 0 37

0 0 0

0

5000

Ch

attis

garh

Guja

rat

MP

Mah

ara

st

ra

Da

man amp

Diu

Da

dar

Na

gar

Ha

veliM

W

Western States (MW) Oct 17 Oct 16

0 11 3134

6 4 01 11

277

43 0 11 00

500

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Southern State (MW) Oct 17 Oct16

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct 16 181 0 0 0 45 0 8

Oct 17 0 0 0 150 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct 16 2 58 0 0 0 0 0

Oct 17 6 77 4 0 2 2 12

9

0 0 0

150

0 0 4

181

0 0 0

45

0 8

0

50

100

150

200

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW)Oct 17 Oct 16

6

77

4 0 2 2

12

2 0 0 0 0 0

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Oct 16 Oct 17

Central 6790 6914

State 5734 5423

Private 5666 5666

ALL INDIA 5993 5969

Month PLF 2016 PLF 2017

Apr 6681 6559

May 6215 6439

June 7324 7015

July 6721 6845

Aug 6991 6617

Sep 5793 6069

Oct 5993 5969

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Oct 2017

67

90

57

34

56

66

59

93

69

14

54

23

56

66

59

69

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Apr 2016 and Oct 2017

Oct 16 Oct 17

621

5

643

9

60

80

Ap

ril

Axis

Title

Axis Title

All India PLF Month-wise

2016 2017

2010-11 2011-12 2012-13 2013-14 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumers P Provisional

Total Number of Villages

597464

Pump sets Energised

as on 31-03-2016

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Actual

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31052017

Villiages Electrified (Nos) as on 311017

9925594 599

Villages electrified

15 All India Coal consumption for Power Generation (MT)

520

14 All India per capita consumption of Electricity ( KWh)

Average Revenue Realization(paiseunit)

21191474

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is

provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data As

such each monthly report of Village electrification of CEA is independent of the earlier published reports

Pump sets Energised as on 31-10-17

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer may not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Sep 2017 and April 2016 to Oct 2017 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1586860 2220135 5366050 9173045

Hydro 258402 227600 61900 547902

Nuclear 200000 000 000 200000

Total 2045262 2447735 5427950 9920947

Acievement 7812 15761 11592 11205

1 Capacity Addtion Targets and Achievements in the 12th Plan

Achievement of Capacity Addition during the Current Plan upto March 2017

Achievements upto Mar 2017 during the 12th Plan

723

400

0

108

970

0

53

000

0

54

790

2

20

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 9920947 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 4880 1460 0 6340 910 -5430

State 3546 0 0 4446 660 -3786

Pvt 2940 0 0 4170 2220 -1950

Total 11366 1460 0 14956 3790 -11166

Central 800 0 0 610 30 -580

State 300 30 0 428 100 -328

Pvt 205 0 0 217 0 -217

Total 1305 30 0 1255 130 -1125

Nuclear Central 500 0 0 0 0 0

Central 6180 1460 0 6950 940 -6010

State 3846 30 0 4874 760 -4114

Pvt 3145 0 0 4387 2220 -2167

Total 13171 1490 0 16211 3920 -12291

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct 2017

Thermal

2 Capacity Addition Targets Achievements During Oct 2017

Oct-17 April 17 - Oct 17Schemes Sector

Target 2017-18

14

95

6

12

55

0

16

21

1

37

90

13

0

0

39

20

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2017-18 Target

Achievement

1460

030

0

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Target Achievement

MW

Targets and Achievement during Oct 2017Thermal

Hydro

Nuclear

Coal Gas Diesel Total

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Sub Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Sub Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Sub Total 4338202 647366 5061726 332000 1174803 2772832 9341361

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Sub Total 2712664 10000 000 2722664 000 483412 102732 3308808

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Sub Total 52002 173605 3600 229207 000 131200 28541 388948

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1210 5215

State 6378050 707895 7122338 000 2979800 197690 10299827

Private 7449600 1058060 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

Total 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092017 is given below (in MW)

438955 3270064 1477169 6015766

A Oct 2017 0 MW

B Oct 2017 35 MW

C Oct 2017 0 MW

D Oct 2017 A-B-C -35 MW

1 NAMRUP CCPP U-1 (20 MW) has been retired from the State Sector of Assam

2 LAKWA GT U-4 (15 MW) has been retired from the State Sector of Assam

Capacity Removed due to

change to CPP from IPP during

Net Capacity Added during

2 Allocation from UNCHAHAR TPS U-6 (500 MW) FARAKKA STPS U-6 (500 MW) and KORBA STPS U-7 (500 MW) has been revised

as per GM Division allocation as on 30092017

Small

Hydro Power

Total

Capacity

Islands

Bio-PowerSolar Power

Waste to EnergyWind Power

Capacity Added during

Capacity Retired during

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102017)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

(UTILITIES)

RES

(MNRE)

Northern Region

Western Region

818170 11408

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092017

BM PowerCogen

Southern Region

Eastern Region

North Eastern

Region

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 7066 104788

Central 377972 20701 000 398673 10283 72309 000 481265

Sub-Total 478394 211541 000 689935 10283 72309 7066 779593

State 272000 15000 000 287000 000 108451 5930 401381

Private 408078 000 000 408078 000 20000 30679 458757

Central 127872 53561 000 181434 10094 66370181 000 257898

Sub-Total 807950 68561 000 876512 10094 194821 36609 1118035

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 57983 157183

Central 17390 6201 000 23591 2895 122388 000 148874

Sub-Total 17390 6201 000 23591 2895 291048 83644 401178

State 000 17500 000 17500 000 123000 10803 151303

Private 000 000 000 000 000 000 5082 5082

Central 48739 12907 000 61647 6798 104898 000 173343

Sub-Total 48739 30407 000 79147 6798 227898 15885 329728

State 262000 15000 000 277000 000 257023 12780 546803

Private 511550 000 000 511550 000 28800 107812 648162

Central 83058 26401 000 109459 19681 92342 000 221482

Sub-Total 856608 41401 000 898009 19681 378165 120592 1416447

State 585000 60380 000 645380 000 108796 2385 756561

Private 388200 000 000 388200 000 10400 660476 1059076

Central 117325 22110 000 139435 55674 73901 000 269010

Sub-Total 1090525 82490 000 1173015 55674 193097 662861 2084647

State 577300 000 000 577300 000 72410 2510 652220

Private 871433 000 000 871433 000 84200 244508 1200141

Central 333839 54949 000 388788 28948 166493 000 584229

Sub-Total 1782572 54949 000 1837521 28948 323103 247018 2436590

State 000 000 000 000 000 125215 6287 131502

Private 9900 45000 000 54900 000 8800 46381 110081

Central 33174 6966 000 40140 3124 47554 000 90818

Sub-Total 43074 51966 000 95040 3124 181569 52668 332401

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1572 1572

Central 3665 1503 000 5167 801 10171 000 16139

Sub-Total 3665 1503 000 5167 801 10171 1572 17711

120003 29105 000 149108 23703 70195 000 243007

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Grand Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Uttar Pradesh

Uttarakhand

Chandigarh

NuclearHydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102017)

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Modewise breakup

Grand TotalThermalOwnership Sector

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Central - Unallocated

Total (Northern

Region)

Punjab

Rajasthan

RES

(MNRE)

(As on 31102017)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 051 4851

Central 45112 2220 000 47332 2600 000 000 49932

Sub-Total 45112 7020 000 52132 2600 000 056 54788

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1031 1031

Central 12296 4840 000 17136 700 000 000 17836

Sub-Total 12296 4840 000 17136 700 000 1031 18867

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 686953 1859520

Central 301209 42400 000 343609 55900 000 000 399509

Sub-Total 1552776 656182 000 2208958 55900 77200 687753 3029811

State 408000 000 000 408000 000 170366 8396 586762

Private 557400 10000 000 567400 000 000 371617 939017

Central 272070 25700 000 297770 27300 152000 000 477070

Sub-Total 1237470 35700 000 1273170 27300 322366 380013 2002849

State 328000 000 000 328000 000 12000 1105 341105

Private 759000 000 000 759000 000 000 41597 800597

Central 155344 000 000 155344 4800 000 000 160144

Sub-Total 1242344 000 000 1242344 4800 12000 42702 1301846

State 1017000 67200 000 1084200 000 285084 20812 1390096

Private 1245600 56800 000 1302400 000 48100 750121 2100621

Central 421943 251300 000 673243 69000 000 000 742243

Sub-Total 2684543 375300 000 3059843 69000 333184 770933 4232960

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 048 048

Central 16921 7140 000 24061 900 000 000 24961

Sub-Total 16921 7140 000 24061 900 000 048 25009

199400 19759 000 219159 22800 000 000 241959

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Grand Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Hydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Goa

Daman amp Diu

Gujarat

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Madhya Pradesh

RES

(MNRE)Nuclear

Grand TotalThermalOwnership Sector

Modewise breakup

Maharashtra

Chhattisgarh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 441000 23540 000 464540 000 167360 8950 640850

Private 387388 369412 3680 760480 000 000 645447 1405927

Central 160760 000 000 160760 12727 000 000 173487

Sub-Total 989148 392952 3680 1385780 12727 167360 654397 2220264

State 408250 000 000 408250 000 238993 000 647243

Private 83945 95088 000 179033 000 000 239336 418369

Central 187812 000 000 187812 14873 000 000 202685

Sub-Total 680007 95088 000 775095 14873 238993 239336 1268297

State 502000 000 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 761814 960184

Central 242920 000 000 242920 69800 000 000 312720

Sub-Total 940770 000 956082 69800 359980 777347 2163209

State 000 000 15996 000 188150 14502 218648

Private 61500 17400 000 78900 000 000 18557 97457

Central 110818 35958 000 146776 36200 000 000 182976

Sub-Total 172318 53358 241672 36200 188150 33059 499081

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 575247 000 000 1056418 1631665

Central 438952 000 000 438952 144800 000 000 583752

Sub-Total 1354719 102718 1498607 144800 220320 1068688 2932415

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 005 005

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 005 36695

166400 000 000 166400 45000 000 000 211400

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Grand Total 4338202 647366 5061726 332000 1174803 2772832 9341361

Andhra Pradesh

Puducherry

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Southern

Region)

Karnataka

Kerala

Tamil Nadu

NLC

Central - Unallocated

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Telangana

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 28100 000 000 28100 000 000 25358 53458

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 340533 000 000 340533 000 11000 32428 383960

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 2037 75037

Central 84874 000 000 84874 000 6100 000 90974

Sub-Total 199874 000 000 199874 000 19100 2442 221416

State 552000 10000 000 562000 000 98600 9195 669795

Private 227500 000 000 227500 000 000 34003 261503

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 855577 10000 000 865577 000 139600 43198 1048375

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 18822 312722

Central 163390 000 000 163390 000 8900 000 172290

Sub-Total 499290 000 000 499290 000 215092 19452 733834

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 29100 001 29101

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 71500 5212 85415

110183 000 000 110183 000 8501 000 118684

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Grand Total 2712664 10000 000 2722664 000 483412 102732 3308808

(As on 31102017)

Coal Gas Diesel Total

State 000 28845 000 28845 000 10000 3001 41846

Private 000 2450 000 2450 000 000 1521 3971

Central 27902 43556 000 71458 000 33123 000 104581

Sub-Total 27902 74851 000 102753 000 43123 4522 150398

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 439 439

Central 2470 4682 000 7152 000 9745 000 16897

Sub-Total 2470 4682 000 7152 000 9745 10899 27796

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 6519 000 20528

Sub-Total 3040 10969 000 14009 000 38719 3109 55837

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 3740 43695 000 47435 000 6238 000 53673

Sub-Total 3740 60645 000 64385 000 6238 2101 72724

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 131 131

Central 3140 7157 000 10297 000 8893 000 19190

Sub-Total 3140 7157 3600 13897 000 8893 676 23466

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 2140 4893 000 7033 000 5337 000 12370

Sub-Total 2140 4893 000 7033 000 5337 3067 15437

State 000 000 000 000 000 000 4147 4147

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 6419 000 12535

Sub-Total 2070 4046 000 6116 000 6419 4167 16702

7500 6362 000 13862 000 12726 000 26588

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Grand Total 52002 173605 3600 229207 000 131200 28541 388948

Modewise breakup

Bihar

Hydro

(Renewable)

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

RES

(MNRE)

Total (Eastern

Region)

Ownership Sector

Assam

Odisha

State Ownership Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Sikkim

Jharkhand

West Bengal

DVC

Grand TotalThermal

Central - Unallocated

Nuclear

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 610 610

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1135 5140

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1210 5215

Hydro

(Renewable)

RES

(MNRE)

Total (Islands)

State Ownership Sector

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

Andaman amp

Nicobar

lakshadweep

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Modewise breakup

Grand TotalThermalNuclear

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 5: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

Month

Generation from

Conventional Sources

Generation

from

Renewable

Sources

Total

Generation

from

Conventional

Sources

Generation

from

Renewable

Sources

Total

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(MU) (MU) (MU) (MU) (MU) (MU) () () ()

Apr-17 103160 6932 110092 99345 5082 104427 384 3640 542

May-17 107295 8666 115961 99903 6820 106723 740 2707 866

Jun-17 97525 10228 107753 97326 8118 105444 020 2599 219

Jul-17 97912 12928 110840 96442 9554 105996 152 3532 457

Aug-17 94606 10857 105463 95237 9571 104808 -066 1344 062

Sep-17 98072 7516 105588 95741 8279 104020 243 -922 151

1B

Wind

Solar

Biomass

Bagasse

Small Hydro

Others

Total

Electricity Generation From Renewable (source wise)

April- Sep 2017 vis-agrave-vis April- Sep 2016

Electricity Generation (Conventional amp Renewable Sources)April 2017- Sep 2017 vis-agrave-vis April 2016- Sep 2016

All Figure in MU

Source-Wise All India

Generation from Renwables

For the Month of Commulative value for the period

Sep 2017 Sep 2016 Sep2017 Sep 2016

Generation

(April 2016- Sep 2016)

Generation

(April 2017- Sep 2017) Growth

389711 559624 3706559 3160253

199408 10152 1080476 572593

2731 37605 174225 20434

27042 32608 207578 279623

99283 95152 458244 501514

8825 1436 42629 9187

751579 827945 5669711 472751

Achievement Targets Achievement

Thermal 0 1460 0 DIV0

Hydro 70 30 0 10000

Nuclear 0 0 0 000

All India 70 1490 0 -10000

Apr -16 to Oct16 Apr -17 to Oct-17 Change

Thermal 36085 4300 19

Hydro 320 278 100

Nuclear 0 0 NA

All India 39285 45780 17

2

2 Generating Capacity Addition for Oct 2017 (MW)

Generating Capacity Addition during April 16 to Sept 16 amp April 17 to Sept 17 (MW)

Change wrt 2017TypeOct-17

700

000

10

20

30

40

50

60

70

80

1 Oct-17

39285

45780

3600

3800

4000

4200

4400

4600

4800

1Apr -16 to Oct16 Apr -17 to Oct-17

(i) Thermal

(ii)

(iii)

Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total

Northern 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Western 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Southern 4338202 647366 76158 5061726 332000 1174803 2772832 9341361

Eastern 2712664 10000 000 2722664 000 483412 102732 3308808

North-East 52002 173605 3600 229207 000 131200 28541 388948

Islands 000 000 4005 4005 000 000 1210 5215

ALL INDIA 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Note Captive Genaration is not included in the total RES as on 31122016 3

Thermal

Nuclear

Hydro

3 List of Projects Commissioned During Oct 2017

4 All India Installed Capacity (MW) Region-wise as on 31102017

NIL

NIL

NIL

21941451

678000

44765426015766

33111758

40726

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 33111758

Sector

Coal Gas Diesel Total

State 6378050 707895 36393 7122338 000 2979800 197690 10299827

Private 7449600 1058060 47370 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

All India 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

State 10299827

Private 14701706

Central 8110225

5 All India Installed Capacity (MW) Sector-wise as on 31102017

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31122016

State 10299827 31

Private 14701706 44

Central 8110225 25

All India Installed Capacity(MW) as on 31-10-2017 (Sector-Wise)

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

5

3778 2151

16398 13120

2574 0

4029 2046

6017 8923

0 0

406 0

639 245

212 324

1257 569

Transmission Lines Added during Apr 15 to Oct 16 amp Apr 16 to Oct17 (Ckms)

Apr 15 - Oct16 Apr 16 - Oct 17

0 0

6 Transmission Lines Added during Oct 2017 (Ckms)

Oct-16 Oct-17

0 0

16398

13120

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

ckm

s

Apr 15 to Oct 16 Apr 16 to Oct 17

1257

569

0

200

400

600

800

1000

1200

1400

1

ck

ms

Oct16 Oct 17

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

1500 3000

All India Transformation Capacity Addition during Apr 16 to Oct 16 amp Apr

17 to Oct17 (MVA)

45665

0

10000

23020

9645

39060

13500

15920

8140

0

April 16 to Oct 16 April 16 to Oct 17

1600

0

0

3600

2575

1025

7 Transformation Capacity Addition During Oct 2017 (MVA)

0

0

500

1100

0 0

Oct-16 Oct-17

1600

3600

0

500

1000

1500

2000

2500

3000

3500

4000

MV

A

Transformation Capacity Addition during Oct 2017

Oct-16 Oct-17

39060

45665

0

74520

1

MV

A

April 16 to Oct 16 April 16 to Oct 17

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandOct 16 0 0 0 0 496 0 30 275 0

Oct 17 0 0 150 0 516 0 0 0 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Haveli

Oct 16 5 0 0 37 0 0 0

Oct 17 16 0 14 2062 0 0 25

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Oct16 1 11 277 43 0 11 0

Oct 17 0 11 3 134 6 4 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions

0 0

150

0

516

0 0 0 00 0 0 0

496

0 30

275

0

0

400

800

Chan

dig

ar

h

Delh

i

Hary

ana

HP

Jamp

K

Pu

nj

ab

Raja

sth

an

UP

Utr

ak

hand

MW

Northern States (MW) Oct 17 Oct 16

16

0 14

2062

0 0 25

5 0 0 37

0 0 0

0

5000

Ch

attis

garh

Guja

rat

MP

Mah

ara

st

ra

Da

man amp

Diu

Da

dar

Na

gar

Ha

veliM

W

Western States (MW) Oct 17 Oct 16

0 11 3134

6 4 01 11

277

43 0 11 00

500

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Southern State (MW) Oct 17 Oct16

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct 16 181 0 0 0 45 0 8

Oct 17 0 0 0 150 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct 16 2 58 0 0 0 0 0

Oct 17 6 77 4 0 2 2 12

9

0 0 0

150

0 0 4

181

0 0 0

45

0 8

0

50

100

150

200

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW)Oct 17 Oct 16

6

77

4 0 2 2

12

2 0 0 0 0 0

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Oct 16 Oct 17

Central 6790 6914

State 5734 5423

Private 5666 5666

ALL INDIA 5993 5969

Month PLF 2016 PLF 2017

Apr 6681 6559

May 6215 6439

June 7324 7015

July 6721 6845

Aug 6991 6617

Sep 5793 6069

Oct 5993 5969

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Oct 2017

67

90

57

34

56

66

59

93

69

14

54

23

56

66

59

69

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Apr 2016 and Oct 2017

Oct 16 Oct 17

621

5

643

9

60

80

Ap

ril

Axis

Title

Axis Title

All India PLF Month-wise

2016 2017

2010-11 2011-12 2012-13 2013-14 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumers P Provisional

Total Number of Villages

597464

Pump sets Energised

as on 31-03-2016

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Actual

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31052017

Villiages Electrified (Nos) as on 311017

9925594 599

Villages electrified

15 All India Coal consumption for Power Generation (MT)

520

14 All India per capita consumption of Electricity ( KWh)

Average Revenue Realization(paiseunit)

21191474

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is

provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data As

such each monthly report of Village electrification of CEA is independent of the earlier published reports

Pump sets Energised as on 31-10-17

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer may not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Sep 2017 and April 2016 to Oct 2017 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1586860 2220135 5366050 9173045

Hydro 258402 227600 61900 547902

Nuclear 200000 000 000 200000

Total 2045262 2447735 5427950 9920947

Acievement 7812 15761 11592 11205

1 Capacity Addtion Targets and Achievements in the 12th Plan

Achievement of Capacity Addition during the Current Plan upto March 2017

Achievements upto Mar 2017 during the 12th Plan

723

400

0

108

970

0

53

000

0

54

790

2

20

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 9920947 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 4880 1460 0 6340 910 -5430

State 3546 0 0 4446 660 -3786

Pvt 2940 0 0 4170 2220 -1950

Total 11366 1460 0 14956 3790 -11166

Central 800 0 0 610 30 -580

State 300 30 0 428 100 -328

Pvt 205 0 0 217 0 -217

Total 1305 30 0 1255 130 -1125

Nuclear Central 500 0 0 0 0 0

Central 6180 1460 0 6950 940 -6010

State 3846 30 0 4874 760 -4114

Pvt 3145 0 0 4387 2220 -2167

Total 13171 1490 0 16211 3920 -12291

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct 2017

Thermal

2 Capacity Addition Targets Achievements During Oct 2017

Oct-17 April 17 - Oct 17Schemes Sector

Target 2017-18

14

95

6

12

55

0

16

21

1

37

90

13

0

0

39

20

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2017-18 Target

Achievement

1460

030

0

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Target Achievement

MW

Targets and Achievement during Oct 2017Thermal

Hydro

Nuclear

Coal Gas Diesel Total

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Sub Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Sub Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Sub Total 4338202 647366 5061726 332000 1174803 2772832 9341361

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Sub Total 2712664 10000 000 2722664 000 483412 102732 3308808

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Sub Total 52002 173605 3600 229207 000 131200 28541 388948

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1210 5215

State 6378050 707895 7122338 000 2979800 197690 10299827

Private 7449600 1058060 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

Total 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092017 is given below (in MW)

438955 3270064 1477169 6015766

A Oct 2017 0 MW

B Oct 2017 35 MW

C Oct 2017 0 MW

D Oct 2017 A-B-C -35 MW

1 NAMRUP CCPP U-1 (20 MW) has been retired from the State Sector of Assam

2 LAKWA GT U-4 (15 MW) has been retired from the State Sector of Assam

Capacity Removed due to

change to CPP from IPP during

Net Capacity Added during

2 Allocation from UNCHAHAR TPS U-6 (500 MW) FARAKKA STPS U-6 (500 MW) and KORBA STPS U-7 (500 MW) has been revised

as per GM Division allocation as on 30092017

Small

Hydro Power

Total

Capacity

Islands

Bio-PowerSolar Power

Waste to EnergyWind Power

Capacity Added during

Capacity Retired during

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102017)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

(UTILITIES)

RES

(MNRE)

Northern Region

Western Region

818170 11408

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092017

BM PowerCogen

Southern Region

Eastern Region

North Eastern

Region

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 7066 104788

Central 377972 20701 000 398673 10283 72309 000 481265

Sub-Total 478394 211541 000 689935 10283 72309 7066 779593

State 272000 15000 000 287000 000 108451 5930 401381

Private 408078 000 000 408078 000 20000 30679 458757

Central 127872 53561 000 181434 10094 66370181 000 257898

Sub-Total 807950 68561 000 876512 10094 194821 36609 1118035

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 57983 157183

Central 17390 6201 000 23591 2895 122388 000 148874

Sub-Total 17390 6201 000 23591 2895 291048 83644 401178

State 000 17500 000 17500 000 123000 10803 151303

Private 000 000 000 000 000 000 5082 5082

Central 48739 12907 000 61647 6798 104898 000 173343

Sub-Total 48739 30407 000 79147 6798 227898 15885 329728

State 262000 15000 000 277000 000 257023 12780 546803

Private 511550 000 000 511550 000 28800 107812 648162

Central 83058 26401 000 109459 19681 92342 000 221482

Sub-Total 856608 41401 000 898009 19681 378165 120592 1416447

State 585000 60380 000 645380 000 108796 2385 756561

Private 388200 000 000 388200 000 10400 660476 1059076

Central 117325 22110 000 139435 55674 73901 000 269010

Sub-Total 1090525 82490 000 1173015 55674 193097 662861 2084647

State 577300 000 000 577300 000 72410 2510 652220

Private 871433 000 000 871433 000 84200 244508 1200141

Central 333839 54949 000 388788 28948 166493 000 584229

Sub-Total 1782572 54949 000 1837521 28948 323103 247018 2436590

State 000 000 000 000 000 125215 6287 131502

Private 9900 45000 000 54900 000 8800 46381 110081

Central 33174 6966 000 40140 3124 47554 000 90818

Sub-Total 43074 51966 000 95040 3124 181569 52668 332401

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1572 1572

Central 3665 1503 000 5167 801 10171 000 16139

Sub-Total 3665 1503 000 5167 801 10171 1572 17711

120003 29105 000 149108 23703 70195 000 243007

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Grand Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Uttar Pradesh

Uttarakhand

Chandigarh

NuclearHydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102017)

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Modewise breakup

Grand TotalThermalOwnership Sector

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Central - Unallocated

Total (Northern

Region)

Punjab

Rajasthan

RES

(MNRE)

(As on 31102017)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 051 4851

Central 45112 2220 000 47332 2600 000 000 49932

Sub-Total 45112 7020 000 52132 2600 000 056 54788

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1031 1031

Central 12296 4840 000 17136 700 000 000 17836

Sub-Total 12296 4840 000 17136 700 000 1031 18867

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 686953 1859520

Central 301209 42400 000 343609 55900 000 000 399509

Sub-Total 1552776 656182 000 2208958 55900 77200 687753 3029811

State 408000 000 000 408000 000 170366 8396 586762

Private 557400 10000 000 567400 000 000 371617 939017

Central 272070 25700 000 297770 27300 152000 000 477070

Sub-Total 1237470 35700 000 1273170 27300 322366 380013 2002849

State 328000 000 000 328000 000 12000 1105 341105

Private 759000 000 000 759000 000 000 41597 800597

Central 155344 000 000 155344 4800 000 000 160144

Sub-Total 1242344 000 000 1242344 4800 12000 42702 1301846

State 1017000 67200 000 1084200 000 285084 20812 1390096

Private 1245600 56800 000 1302400 000 48100 750121 2100621

Central 421943 251300 000 673243 69000 000 000 742243

Sub-Total 2684543 375300 000 3059843 69000 333184 770933 4232960

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 048 048

Central 16921 7140 000 24061 900 000 000 24961

Sub-Total 16921 7140 000 24061 900 000 048 25009

199400 19759 000 219159 22800 000 000 241959

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Grand Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Hydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Goa

Daman amp Diu

Gujarat

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Madhya Pradesh

RES

(MNRE)Nuclear

Grand TotalThermalOwnership Sector

Modewise breakup

Maharashtra

Chhattisgarh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 441000 23540 000 464540 000 167360 8950 640850

Private 387388 369412 3680 760480 000 000 645447 1405927

Central 160760 000 000 160760 12727 000 000 173487

Sub-Total 989148 392952 3680 1385780 12727 167360 654397 2220264

State 408250 000 000 408250 000 238993 000 647243

Private 83945 95088 000 179033 000 000 239336 418369

Central 187812 000 000 187812 14873 000 000 202685

Sub-Total 680007 95088 000 775095 14873 238993 239336 1268297

State 502000 000 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 761814 960184

Central 242920 000 000 242920 69800 000 000 312720

Sub-Total 940770 000 956082 69800 359980 777347 2163209

State 000 000 15996 000 188150 14502 218648

Private 61500 17400 000 78900 000 000 18557 97457

Central 110818 35958 000 146776 36200 000 000 182976

Sub-Total 172318 53358 241672 36200 188150 33059 499081

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 575247 000 000 1056418 1631665

Central 438952 000 000 438952 144800 000 000 583752

Sub-Total 1354719 102718 1498607 144800 220320 1068688 2932415

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 005 005

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 005 36695

166400 000 000 166400 45000 000 000 211400

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Grand Total 4338202 647366 5061726 332000 1174803 2772832 9341361

Andhra Pradesh

Puducherry

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Southern

Region)

Karnataka

Kerala

Tamil Nadu

NLC

Central - Unallocated

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Telangana

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 28100 000 000 28100 000 000 25358 53458

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 340533 000 000 340533 000 11000 32428 383960

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 2037 75037

Central 84874 000 000 84874 000 6100 000 90974

Sub-Total 199874 000 000 199874 000 19100 2442 221416

State 552000 10000 000 562000 000 98600 9195 669795

Private 227500 000 000 227500 000 000 34003 261503

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 855577 10000 000 865577 000 139600 43198 1048375

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 18822 312722

Central 163390 000 000 163390 000 8900 000 172290

Sub-Total 499290 000 000 499290 000 215092 19452 733834

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 29100 001 29101

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 71500 5212 85415

110183 000 000 110183 000 8501 000 118684

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Grand Total 2712664 10000 000 2722664 000 483412 102732 3308808

(As on 31102017)

Coal Gas Diesel Total

State 000 28845 000 28845 000 10000 3001 41846

Private 000 2450 000 2450 000 000 1521 3971

Central 27902 43556 000 71458 000 33123 000 104581

Sub-Total 27902 74851 000 102753 000 43123 4522 150398

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 439 439

Central 2470 4682 000 7152 000 9745 000 16897

Sub-Total 2470 4682 000 7152 000 9745 10899 27796

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 6519 000 20528

Sub-Total 3040 10969 000 14009 000 38719 3109 55837

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 3740 43695 000 47435 000 6238 000 53673

Sub-Total 3740 60645 000 64385 000 6238 2101 72724

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 131 131

Central 3140 7157 000 10297 000 8893 000 19190

Sub-Total 3140 7157 3600 13897 000 8893 676 23466

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 2140 4893 000 7033 000 5337 000 12370

Sub-Total 2140 4893 000 7033 000 5337 3067 15437

State 000 000 000 000 000 000 4147 4147

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 6419 000 12535

Sub-Total 2070 4046 000 6116 000 6419 4167 16702

7500 6362 000 13862 000 12726 000 26588

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Grand Total 52002 173605 3600 229207 000 131200 28541 388948

Modewise breakup

Bihar

Hydro

(Renewable)

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

RES

(MNRE)

Total (Eastern

Region)

Ownership Sector

Assam

Odisha

State Ownership Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Sikkim

Jharkhand

West Bengal

DVC

Grand TotalThermal

Central - Unallocated

Nuclear

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 610 610

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1135 5140

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1210 5215

Hydro

(Renewable)

RES

(MNRE)

Total (Islands)

State Ownership Sector

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

Andaman amp

Nicobar

lakshadweep

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Modewise breakup

Grand TotalThermalNuclear

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 6: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

Achievement Targets Achievement

Thermal 0 1460 0 DIV0

Hydro 70 30 0 10000

Nuclear 0 0 0 000

All India 70 1490 0 -10000

Apr -16 to Oct16 Apr -17 to Oct-17 Change

Thermal 36085 4300 19

Hydro 320 278 100

Nuclear 0 0 NA

All India 39285 45780 17

2

2 Generating Capacity Addition for Oct 2017 (MW)

Generating Capacity Addition during April 16 to Sept 16 amp April 17 to Sept 17 (MW)

Change wrt 2017TypeOct-17

700

000

10

20

30

40

50

60

70

80

1 Oct-17

39285

45780

3600

3800

4000

4200

4400

4600

4800

1Apr -16 to Oct16 Apr -17 to Oct-17

(i) Thermal

(ii)

(iii)

Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total

Northern 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Western 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Southern 4338202 647366 76158 5061726 332000 1174803 2772832 9341361

Eastern 2712664 10000 000 2722664 000 483412 102732 3308808

North-East 52002 173605 3600 229207 000 131200 28541 388948

Islands 000 000 4005 4005 000 000 1210 5215

ALL INDIA 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Note Captive Genaration is not included in the total RES as on 31122016 3

Thermal

Nuclear

Hydro

3 List of Projects Commissioned During Oct 2017

4 All India Installed Capacity (MW) Region-wise as on 31102017

NIL

NIL

NIL

21941451

678000

44765426015766

33111758

40726

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 33111758

Sector

Coal Gas Diesel Total

State 6378050 707895 36393 7122338 000 2979800 197690 10299827

Private 7449600 1058060 47370 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

All India 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

State 10299827

Private 14701706

Central 8110225

5 All India Installed Capacity (MW) Sector-wise as on 31102017

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31122016

State 10299827 31

Private 14701706 44

Central 8110225 25

All India Installed Capacity(MW) as on 31-10-2017 (Sector-Wise)

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

5

3778 2151

16398 13120

2574 0

4029 2046

6017 8923

0 0

406 0

639 245

212 324

1257 569

Transmission Lines Added during Apr 15 to Oct 16 amp Apr 16 to Oct17 (Ckms)

Apr 15 - Oct16 Apr 16 - Oct 17

0 0

6 Transmission Lines Added during Oct 2017 (Ckms)

Oct-16 Oct-17

0 0

16398

13120

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

ckm

s

Apr 15 to Oct 16 Apr 16 to Oct 17

1257

569

0

200

400

600

800

1000

1200

1400

1

ck

ms

Oct16 Oct 17

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

1500 3000

All India Transformation Capacity Addition during Apr 16 to Oct 16 amp Apr

17 to Oct17 (MVA)

45665

0

10000

23020

9645

39060

13500

15920

8140

0

April 16 to Oct 16 April 16 to Oct 17

1600

0

0

3600

2575

1025

7 Transformation Capacity Addition During Oct 2017 (MVA)

0

0

500

1100

0 0

Oct-16 Oct-17

1600

3600

0

500

1000

1500

2000

2500

3000

3500

4000

MV

A

Transformation Capacity Addition during Oct 2017

Oct-16 Oct-17

39060

45665

0

74520

1

MV

A

April 16 to Oct 16 April 16 to Oct 17

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandOct 16 0 0 0 0 496 0 30 275 0

Oct 17 0 0 150 0 516 0 0 0 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Haveli

Oct 16 5 0 0 37 0 0 0

Oct 17 16 0 14 2062 0 0 25

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Oct16 1 11 277 43 0 11 0

Oct 17 0 11 3 134 6 4 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions

0 0

150

0

516

0 0 0 00 0 0 0

496

0 30

275

0

0

400

800

Chan

dig

ar

h

Delh

i

Hary

ana

HP

Jamp

K

Pu

nj

ab

Raja

sth

an

UP

Utr

ak

hand

MW

Northern States (MW) Oct 17 Oct 16

16

0 14

2062

0 0 25

5 0 0 37

0 0 0

0

5000

Ch

attis

garh

Guja

rat

MP

Mah

ara

st

ra

Da

man amp

Diu

Da

dar

Na

gar

Ha

veliM

W

Western States (MW) Oct 17 Oct 16

0 11 3134

6 4 01 11

277

43 0 11 00

500

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Southern State (MW) Oct 17 Oct16

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct 16 181 0 0 0 45 0 8

Oct 17 0 0 0 150 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct 16 2 58 0 0 0 0 0

Oct 17 6 77 4 0 2 2 12

9

0 0 0

150

0 0 4

181

0 0 0

45

0 8

0

50

100

150

200

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW)Oct 17 Oct 16

6

77

4 0 2 2

12

2 0 0 0 0 0

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Oct 16 Oct 17

Central 6790 6914

State 5734 5423

Private 5666 5666

ALL INDIA 5993 5969

Month PLF 2016 PLF 2017

Apr 6681 6559

May 6215 6439

June 7324 7015

July 6721 6845

Aug 6991 6617

Sep 5793 6069

Oct 5993 5969

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Oct 2017

67

90

57

34

56

66

59

93

69

14

54

23

56

66

59

69

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Apr 2016 and Oct 2017

Oct 16 Oct 17

621

5

643

9

60

80

Ap

ril

Axis

Title

Axis Title

All India PLF Month-wise

2016 2017

2010-11 2011-12 2012-13 2013-14 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumers P Provisional

Total Number of Villages

597464

Pump sets Energised

as on 31-03-2016

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Actual

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31052017

Villiages Electrified (Nos) as on 311017

9925594 599

Villages electrified

15 All India Coal consumption for Power Generation (MT)

520

14 All India per capita consumption of Electricity ( KWh)

Average Revenue Realization(paiseunit)

21191474

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is

provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data As

such each monthly report of Village electrification of CEA is independent of the earlier published reports

Pump sets Energised as on 31-10-17

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer may not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Sep 2017 and April 2016 to Oct 2017 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1586860 2220135 5366050 9173045

Hydro 258402 227600 61900 547902

Nuclear 200000 000 000 200000

Total 2045262 2447735 5427950 9920947

Acievement 7812 15761 11592 11205

1 Capacity Addtion Targets and Achievements in the 12th Plan

Achievement of Capacity Addition during the Current Plan upto March 2017

Achievements upto Mar 2017 during the 12th Plan

723

400

0

108

970

0

53

000

0

54

790

2

20

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 9920947 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 4880 1460 0 6340 910 -5430

State 3546 0 0 4446 660 -3786

Pvt 2940 0 0 4170 2220 -1950

Total 11366 1460 0 14956 3790 -11166

Central 800 0 0 610 30 -580

State 300 30 0 428 100 -328

Pvt 205 0 0 217 0 -217

Total 1305 30 0 1255 130 -1125

Nuclear Central 500 0 0 0 0 0

Central 6180 1460 0 6950 940 -6010

State 3846 30 0 4874 760 -4114

Pvt 3145 0 0 4387 2220 -2167

Total 13171 1490 0 16211 3920 -12291

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct 2017

Thermal

2 Capacity Addition Targets Achievements During Oct 2017

Oct-17 April 17 - Oct 17Schemes Sector

Target 2017-18

14

95

6

12

55

0

16

21

1

37

90

13

0

0

39

20

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2017-18 Target

Achievement

1460

030

0

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Target Achievement

MW

Targets and Achievement during Oct 2017Thermal

Hydro

Nuclear

Coal Gas Diesel Total

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Sub Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Sub Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Sub Total 4338202 647366 5061726 332000 1174803 2772832 9341361

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Sub Total 2712664 10000 000 2722664 000 483412 102732 3308808

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Sub Total 52002 173605 3600 229207 000 131200 28541 388948

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1210 5215

State 6378050 707895 7122338 000 2979800 197690 10299827

Private 7449600 1058060 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

Total 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092017 is given below (in MW)

438955 3270064 1477169 6015766

A Oct 2017 0 MW

B Oct 2017 35 MW

C Oct 2017 0 MW

D Oct 2017 A-B-C -35 MW

1 NAMRUP CCPP U-1 (20 MW) has been retired from the State Sector of Assam

2 LAKWA GT U-4 (15 MW) has been retired from the State Sector of Assam

Capacity Removed due to

change to CPP from IPP during

Net Capacity Added during

2 Allocation from UNCHAHAR TPS U-6 (500 MW) FARAKKA STPS U-6 (500 MW) and KORBA STPS U-7 (500 MW) has been revised

as per GM Division allocation as on 30092017

Small

Hydro Power

Total

Capacity

Islands

Bio-PowerSolar Power

Waste to EnergyWind Power

Capacity Added during

Capacity Retired during

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102017)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

(UTILITIES)

RES

(MNRE)

Northern Region

Western Region

818170 11408

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092017

BM PowerCogen

Southern Region

Eastern Region

North Eastern

Region

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 7066 104788

Central 377972 20701 000 398673 10283 72309 000 481265

Sub-Total 478394 211541 000 689935 10283 72309 7066 779593

State 272000 15000 000 287000 000 108451 5930 401381

Private 408078 000 000 408078 000 20000 30679 458757

Central 127872 53561 000 181434 10094 66370181 000 257898

Sub-Total 807950 68561 000 876512 10094 194821 36609 1118035

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 57983 157183

Central 17390 6201 000 23591 2895 122388 000 148874

Sub-Total 17390 6201 000 23591 2895 291048 83644 401178

State 000 17500 000 17500 000 123000 10803 151303

Private 000 000 000 000 000 000 5082 5082

Central 48739 12907 000 61647 6798 104898 000 173343

Sub-Total 48739 30407 000 79147 6798 227898 15885 329728

State 262000 15000 000 277000 000 257023 12780 546803

Private 511550 000 000 511550 000 28800 107812 648162

Central 83058 26401 000 109459 19681 92342 000 221482

Sub-Total 856608 41401 000 898009 19681 378165 120592 1416447

State 585000 60380 000 645380 000 108796 2385 756561

Private 388200 000 000 388200 000 10400 660476 1059076

Central 117325 22110 000 139435 55674 73901 000 269010

Sub-Total 1090525 82490 000 1173015 55674 193097 662861 2084647

State 577300 000 000 577300 000 72410 2510 652220

Private 871433 000 000 871433 000 84200 244508 1200141

Central 333839 54949 000 388788 28948 166493 000 584229

Sub-Total 1782572 54949 000 1837521 28948 323103 247018 2436590

State 000 000 000 000 000 125215 6287 131502

Private 9900 45000 000 54900 000 8800 46381 110081

Central 33174 6966 000 40140 3124 47554 000 90818

Sub-Total 43074 51966 000 95040 3124 181569 52668 332401

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1572 1572

Central 3665 1503 000 5167 801 10171 000 16139

Sub-Total 3665 1503 000 5167 801 10171 1572 17711

120003 29105 000 149108 23703 70195 000 243007

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Grand Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Uttar Pradesh

Uttarakhand

Chandigarh

NuclearHydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102017)

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Modewise breakup

Grand TotalThermalOwnership Sector

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Central - Unallocated

Total (Northern

Region)

Punjab

Rajasthan

RES

(MNRE)

(As on 31102017)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 051 4851

Central 45112 2220 000 47332 2600 000 000 49932

Sub-Total 45112 7020 000 52132 2600 000 056 54788

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1031 1031

Central 12296 4840 000 17136 700 000 000 17836

Sub-Total 12296 4840 000 17136 700 000 1031 18867

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 686953 1859520

Central 301209 42400 000 343609 55900 000 000 399509

Sub-Total 1552776 656182 000 2208958 55900 77200 687753 3029811

State 408000 000 000 408000 000 170366 8396 586762

Private 557400 10000 000 567400 000 000 371617 939017

Central 272070 25700 000 297770 27300 152000 000 477070

Sub-Total 1237470 35700 000 1273170 27300 322366 380013 2002849

State 328000 000 000 328000 000 12000 1105 341105

Private 759000 000 000 759000 000 000 41597 800597

Central 155344 000 000 155344 4800 000 000 160144

Sub-Total 1242344 000 000 1242344 4800 12000 42702 1301846

State 1017000 67200 000 1084200 000 285084 20812 1390096

Private 1245600 56800 000 1302400 000 48100 750121 2100621

Central 421943 251300 000 673243 69000 000 000 742243

Sub-Total 2684543 375300 000 3059843 69000 333184 770933 4232960

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 048 048

Central 16921 7140 000 24061 900 000 000 24961

Sub-Total 16921 7140 000 24061 900 000 048 25009

199400 19759 000 219159 22800 000 000 241959

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Grand Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Hydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Goa

Daman amp Diu

Gujarat

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Madhya Pradesh

RES

(MNRE)Nuclear

Grand TotalThermalOwnership Sector

Modewise breakup

Maharashtra

Chhattisgarh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 441000 23540 000 464540 000 167360 8950 640850

Private 387388 369412 3680 760480 000 000 645447 1405927

Central 160760 000 000 160760 12727 000 000 173487

Sub-Total 989148 392952 3680 1385780 12727 167360 654397 2220264

State 408250 000 000 408250 000 238993 000 647243

Private 83945 95088 000 179033 000 000 239336 418369

Central 187812 000 000 187812 14873 000 000 202685

Sub-Total 680007 95088 000 775095 14873 238993 239336 1268297

State 502000 000 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 761814 960184

Central 242920 000 000 242920 69800 000 000 312720

Sub-Total 940770 000 956082 69800 359980 777347 2163209

State 000 000 15996 000 188150 14502 218648

Private 61500 17400 000 78900 000 000 18557 97457

Central 110818 35958 000 146776 36200 000 000 182976

Sub-Total 172318 53358 241672 36200 188150 33059 499081

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 575247 000 000 1056418 1631665

Central 438952 000 000 438952 144800 000 000 583752

Sub-Total 1354719 102718 1498607 144800 220320 1068688 2932415

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 005 005

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 005 36695

166400 000 000 166400 45000 000 000 211400

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Grand Total 4338202 647366 5061726 332000 1174803 2772832 9341361

Andhra Pradesh

Puducherry

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Southern

Region)

Karnataka

Kerala

Tamil Nadu

NLC

Central - Unallocated

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Telangana

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 28100 000 000 28100 000 000 25358 53458

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 340533 000 000 340533 000 11000 32428 383960

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 2037 75037

Central 84874 000 000 84874 000 6100 000 90974

Sub-Total 199874 000 000 199874 000 19100 2442 221416

State 552000 10000 000 562000 000 98600 9195 669795

Private 227500 000 000 227500 000 000 34003 261503

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 855577 10000 000 865577 000 139600 43198 1048375

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 18822 312722

Central 163390 000 000 163390 000 8900 000 172290

Sub-Total 499290 000 000 499290 000 215092 19452 733834

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 29100 001 29101

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 71500 5212 85415

110183 000 000 110183 000 8501 000 118684

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Grand Total 2712664 10000 000 2722664 000 483412 102732 3308808

(As on 31102017)

Coal Gas Diesel Total

State 000 28845 000 28845 000 10000 3001 41846

Private 000 2450 000 2450 000 000 1521 3971

Central 27902 43556 000 71458 000 33123 000 104581

Sub-Total 27902 74851 000 102753 000 43123 4522 150398

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 439 439

Central 2470 4682 000 7152 000 9745 000 16897

Sub-Total 2470 4682 000 7152 000 9745 10899 27796

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 6519 000 20528

Sub-Total 3040 10969 000 14009 000 38719 3109 55837

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 3740 43695 000 47435 000 6238 000 53673

Sub-Total 3740 60645 000 64385 000 6238 2101 72724

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 131 131

Central 3140 7157 000 10297 000 8893 000 19190

Sub-Total 3140 7157 3600 13897 000 8893 676 23466

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 2140 4893 000 7033 000 5337 000 12370

Sub-Total 2140 4893 000 7033 000 5337 3067 15437

State 000 000 000 000 000 000 4147 4147

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 6419 000 12535

Sub-Total 2070 4046 000 6116 000 6419 4167 16702

7500 6362 000 13862 000 12726 000 26588

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Grand Total 52002 173605 3600 229207 000 131200 28541 388948

Modewise breakup

Bihar

Hydro

(Renewable)

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

RES

(MNRE)

Total (Eastern

Region)

Ownership Sector

Assam

Odisha

State Ownership Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Sikkim

Jharkhand

West Bengal

DVC

Grand TotalThermal

Central - Unallocated

Nuclear

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 610 610

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1135 5140

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1210 5215

Hydro

(Renewable)

RES

(MNRE)

Total (Islands)

State Ownership Sector

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

Andaman amp

Nicobar

lakshadweep

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Modewise breakup

Grand TotalThermalNuclear

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 7: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

(i) Thermal

(ii)

(iii)

Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total

Northern 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Western 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Southern 4338202 647366 76158 5061726 332000 1174803 2772832 9341361

Eastern 2712664 10000 000 2722664 000 483412 102732 3308808

North-East 52002 173605 3600 229207 000 131200 28541 388948

Islands 000 000 4005 4005 000 000 1210 5215

ALL INDIA 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Note Captive Genaration is not included in the total RES as on 31122016 3

Thermal

Nuclear

Hydro

3 List of Projects Commissioned During Oct 2017

4 All India Installed Capacity (MW) Region-wise as on 31102017

NIL

NIL

NIL

21941451

678000

44765426015766

33111758

40726

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 33111758

Sector

Coal Gas Diesel Total

State 6378050 707895 36393 7122338 000 2979800 197690 10299827

Private 7449600 1058060 47370 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

All India 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

State 10299827

Private 14701706

Central 8110225

5 All India Installed Capacity (MW) Sector-wise as on 31102017

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31122016

State 10299827 31

Private 14701706 44

Central 8110225 25

All India Installed Capacity(MW) as on 31-10-2017 (Sector-Wise)

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

5

3778 2151

16398 13120

2574 0

4029 2046

6017 8923

0 0

406 0

639 245

212 324

1257 569

Transmission Lines Added during Apr 15 to Oct 16 amp Apr 16 to Oct17 (Ckms)

Apr 15 - Oct16 Apr 16 - Oct 17

0 0

6 Transmission Lines Added during Oct 2017 (Ckms)

Oct-16 Oct-17

0 0

16398

13120

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

ckm

s

Apr 15 to Oct 16 Apr 16 to Oct 17

1257

569

0

200

400

600

800

1000

1200

1400

1

ck

ms

Oct16 Oct 17

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

1500 3000

All India Transformation Capacity Addition during Apr 16 to Oct 16 amp Apr

17 to Oct17 (MVA)

45665

0

10000

23020

9645

39060

13500

15920

8140

0

April 16 to Oct 16 April 16 to Oct 17

1600

0

0

3600

2575

1025

7 Transformation Capacity Addition During Oct 2017 (MVA)

0

0

500

1100

0 0

Oct-16 Oct-17

1600

3600

0

500

1000

1500

2000

2500

3000

3500

4000

MV

A

Transformation Capacity Addition during Oct 2017

Oct-16 Oct-17

39060

45665

0

74520

1

MV

A

April 16 to Oct 16 April 16 to Oct 17

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandOct 16 0 0 0 0 496 0 30 275 0

Oct 17 0 0 150 0 516 0 0 0 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Haveli

Oct 16 5 0 0 37 0 0 0

Oct 17 16 0 14 2062 0 0 25

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Oct16 1 11 277 43 0 11 0

Oct 17 0 11 3 134 6 4 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions

0 0

150

0

516

0 0 0 00 0 0 0

496

0 30

275

0

0

400

800

Chan

dig

ar

h

Delh

i

Hary

ana

HP

Jamp

K

Pu

nj

ab

Raja

sth

an

UP

Utr

ak

hand

MW

Northern States (MW) Oct 17 Oct 16

16

0 14

2062

0 0 25

5 0 0 37

0 0 0

0

5000

Ch

attis

garh

Guja

rat

MP

Mah

ara

st

ra

Da

man amp

Diu

Da

dar

Na

gar

Ha

veliM

W

Western States (MW) Oct 17 Oct 16

0 11 3134

6 4 01 11

277

43 0 11 00

500

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Southern State (MW) Oct 17 Oct16

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct 16 181 0 0 0 45 0 8

Oct 17 0 0 0 150 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct 16 2 58 0 0 0 0 0

Oct 17 6 77 4 0 2 2 12

9

0 0 0

150

0 0 4

181

0 0 0

45

0 8

0

50

100

150

200

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW)Oct 17 Oct 16

6

77

4 0 2 2

12

2 0 0 0 0 0

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Oct 16 Oct 17

Central 6790 6914

State 5734 5423

Private 5666 5666

ALL INDIA 5993 5969

Month PLF 2016 PLF 2017

Apr 6681 6559

May 6215 6439

June 7324 7015

July 6721 6845

Aug 6991 6617

Sep 5793 6069

Oct 5993 5969

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Oct 2017

67

90

57

34

56

66

59

93

69

14

54

23

56

66

59

69

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Apr 2016 and Oct 2017

Oct 16 Oct 17

621

5

643

9

60

80

Ap

ril

Axis

Title

Axis Title

All India PLF Month-wise

2016 2017

2010-11 2011-12 2012-13 2013-14 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumers P Provisional

Total Number of Villages

597464

Pump sets Energised

as on 31-03-2016

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Actual

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31052017

Villiages Electrified (Nos) as on 311017

9925594 599

Villages electrified

15 All India Coal consumption for Power Generation (MT)

520

14 All India per capita consumption of Electricity ( KWh)

Average Revenue Realization(paiseunit)

21191474

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is

provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data As

such each monthly report of Village electrification of CEA is independent of the earlier published reports

Pump sets Energised as on 31-10-17

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer may not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Sep 2017 and April 2016 to Oct 2017 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1586860 2220135 5366050 9173045

Hydro 258402 227600 61900 547902

Nuclear 200000 000 000 200000

Total 2045262 2447735 5427950 9920947

Acievement 7812 15761 11592 11205

1 Capacity Addtion Targets and Achievements in the 12th Plan

Achievement of Capacity Addition during the Current Plan upto March 2017

Achievements upto Mar 2017 during the 12th Plan

723

400

0

108

970

0

53

000

0

54

790

2

20

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 9920947 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 4880 1460 0 6340 910 -5430

State 3546 0 0 4446 660 -3786

Pvt 2940 0 0 4170 2220 -1950

Total 11366 1460 0 14956 3790 -11166

Central 800 0 0 610 30 -580

State 300 30 0 428 100 -328

Pvt 205 0 0 217 0 -217

Total 1305 30 0 1255 130 -1125

Nuclear Central 500 0 0 0 0 0

Central 6180 1460 0 6950 940 -6010

State 3846 30 0 4874 760 -4114

Pvt 3145 0 0 4387 2220 -2167

Total 13171 1490 0 16211 3920 -12291

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct 2017

Thermal

2 Capacity Addition Targets Achievements During Oct 2017

Oct-17 April 17 - Oct 17Schemes Sector

Target 2017-18

14

95

6

12

55

0

16

21

1

37

90

13

0

0

39

20

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2017-18 Target

Achievement

1460

030

0

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Target Achievement

MW

Targets and Achievement during Oct 2017Thermal

Hydro

Nuclear

Coal Gas Diesel Total

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Sub Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Sub Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Sub Total 4338202 647366 5061726 332000 1174803 2772832 9341361

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Sub Total 2712664 10000 000 2722664 000 483412 102732 3308808

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Sub Total 52002 173605 3600 229207 000 131200 28541 388948

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1210 5215

State 6378050 707895 7122338 000 2979800 197690 10299827

Private 7449600 1058060 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

Total 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092017 is given below (in MW)

438955 3270064 1477169 6015766

A Oct 2017 0 MW

B Oct 2017 35 MW

C Oct 2017 0 MW

D Oct 2017 A-B-C -35 MW

1 NAMRUP CCPP U-1 (20 MW) has been retired from the State Sector of Assam

2 LAKWA GT U-4 (15 MW) has been retired from the State Sector of Assam

Capacity Removed due to

change to CPP from IPP during

Net Capacity Added during

2 Allocation from UNCHAHAR TPS U-6 (500 MW) FARAKKA STPS U-6 (500 MW) and KORBA STPS U-7 (500 MW) has been revised

as per GM Division allocation as on 30092017

Small

Hydro Power

Total

Capacity

Islands

Bio-PowerSolar Power

Waste to EnergyWind Power

Capacity Added during

Capacity Retired during

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102017)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

(UTILITIES)

RES

(MNRE)

Northern Region

Western Region

818170 11408

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092017

BM PowerCogen

Southern Region

Eastern Region

North Eastern

Region

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 7066 104788

Central 377972 20701 000 398673 10283 72309 000 481265

Sub-Total 478394 211541 000 689935 10283 72309 7066 779593

State 272000 15000 000 287000 000 108451 5930 401381

Private 408078 000 000 408078 000 20000 30679 458757

Central 127872 53561 000 181434 10094 66370181 000 257898

Sub-Total 807950 68561 000 876512 10094 194821 36609 1118035

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 57983 157183

Central 17390 6201 000 23591 2895 122388 000 148874

Sub-Total 17390 6201 000 23591 2895 291048 83644 401178

State 000 17500 000 17500 000 123000 10803 151303

Private 000 000 000 000 000 000 5082 5082

Central 48739 12907 000 61647 6798 104898 000 173343

Sub-Total 48739 30407 000 79147 6798 227898 15885 329728

State 262000 15000 000 277000 000 257023 12780 546803

Private 511550 000 000 511550 000 28800 107812 648162

Central 83058 26401 000 109459 19681 92342 000 221482

Sub-Total 856608 41401 000 898009 19681 378165 120592 1416447

State 585000 60380 000 645380 000 108796 2385 756561

Private 388200 000 000 388200 000 10400 660476 1059076

Central 117325 22110 000 139435 55674 73901 000 269010

Sub-Total 1090525 82490 000 1173015 55674 193097 662861 2084647

State 577300 000 000 577300 000 72410 2510 652220

Private 871433 000 000 871433 000 84200 244508 1200141

Central 333839 54949 000 388788 28948 166493 000 584229

Sub-Total 1782572 54949 000 1837521 28948 323103 247018 2436590

State 000 000 000 000 000 125215 6287 131502

Private 9900 45000 000 54900 000 8800 46381 110081

Central 33174 6966 000 40140 3124 47554 000 90818

Sub-Total 43074 51966 000 95040 3124 181569 52668 332401

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1572 1572

Central 3665 1503 000 5167 801 10171 000 16139

Sub-Total 3665 1503 000 5167 801 10171 1572 17711

120003 29105 000 149108 23703 70195 000 243007

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Grand Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Uttar Pradesh

Uttarakhand

Chandigarh

NuclearHydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102017)

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Modewise breakup

Grand TotalThermalOwnership Sector

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Central - Unallocated

Total (Northern

Region)

Punjab

Rajasthan

RES

(MNRE)

(As on 31102017)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 051 4851

Central 45112 2220 000 47332 2600 000 000 49932

Sub-Total 45112 7020 000 52132 2600 000 056 54788

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1031 1031

Central 12296 4840 000 17136 700 000 000 17836

Sub-Total 12296 4840 000 17136 700 000 1031 18867

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 686953 1859520

Central 301209 42400 000 343609 55900 000 000 399509

Sub-Total 1552776 656182 000 2208958 55900 77200 687753 3029811

State 408000 000 000 408000 000 170366 8396 586762

Private 557400 10000 000 567400 000 000 371617 939017

Central 272070 25700 000 297770 27300 152000 000 477070

Sub-Total 1237470 35700 000 1273170 27300 322366 380013 2002849

State 328000 000 000 328000 000 12000 1105 341105

Private 759000 000 000 759000 000 000 41597 800597

Central 155344 000 000 155344 4800 000 000 160144

Sub-Total 1242344 000 000 1242344 4800 12000 42702 1301846

State 1017000 67200 000 1084200 000 285084 20812 1390096

Private 1245600 56800 000 1302400 000 48100 750121 2100621

Central 421943 251300 000 673243 69000 000 000 742243

Sub-Total 2684543 375300 000 3059843 69000 333184 770933 4232960

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 048 048

Central 16921 7140 000 24061 900 000 000 24961

Sub-Total 16921 7140 000 24061 900 000 048 25009

199400 19759 000 219159 22800 000 000 241959

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Grand Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Hydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Goa

Daman amp Diu

Gujarat

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Madhya Pradesh

RES

(MNRE)Nuclear

Grand TotalThermalOwnership Sector

Modewise breakup

Maharashtra

Chhattisgarh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 441000 23540 000 464540 000 167360 8950 640850

Private 387388 369412 3680 760480 000 000 645447 1405927

Central 160760 000 000 160760 12727 000 000 173487

Sub-Total 989148 392952 3680 1385780 12727 167360 654397 2220264

State 408250 000 000 408250 000 238993 000 647243

Private 83945 95088 000 179033 000 000 239336 418369

Central 187812 000 000 187812 14873 000 000 202685

Sub-Total 680007 95088 000 775095 14873 238993 239336 1268297

State 502000 000 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 761814 960184

Central 242920 000 000 242920 69800 000 000 312720

Sub-Total 940770 000 956082 69800 359980 777347 2163209

State 000 000 15996 000 188150 14502 218648

Private 61500 17400 000 78900 000 000 18557 97457

Central 110818 35958 000 146776 36200 000 000 182976

Sub-Total 172318 53358 241672 36200 188150 33059 499081

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 575247 000 000 1056418 1631665

Central 438952 000 000 438952 144800 000 000 583752

Sub-Total 1354719 102718 1498607 144800 220320 1068688 2932415

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 005 005

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 005 36695

166400 000 000 166400 45000 000 000 211400

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Grand Total 4338202 647366 5061726 332000 1174803 2772832 9341361

Andhra Pradesh

Puducherry

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Southern

Region)

Karnataka

Kerala

Tamil Nadu

NLC

Central - Unallocated

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Telangana

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 28100 000 000 28100 000 000 25358 53458

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 340533 000 000 340533 000 11000 32428 383960

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 2037 75037

Central 84874 000 000 84874 000 6100 000 90974

Sub-Total 199874 000 000 199874 000 19100 2442 221416

State 552000 10000 000 562000 000 98600 9195 669795

Private 227500 000 000 227500 000 000 34003 261503

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 855577 10000 000 865577 000 139600 43198 1048375

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 18822 312722

Central 163390 000 000 163390 000 8900 000 172290

Sub-Total 499290 000 000 499290 000 215092 19452 733834

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 29100 001 29101

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 71500 5212 85415

110183 000 000 110183 000 8501 000 118684

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Grand Total 2712664 10000 000 2722664 000 483412 102732 3308808

(As on 31102017)

Coal Gas Diesel Total

State 000 28845 000 28845 000 10000 3001 41846

Private 000 2450 000 2450 000 000 1521 3971

Central 27902 43556 000 71458 000 33123 000 104581

Sub-Total 27902 74851 000 102753 000 43123 4522 150398

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 439 439

Central 2470 4682 000 7152 000 9745 000 16897

Sub-Total 2470 4682 000 7152 000 9745 10899 27796

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 6519 000 20528

Sub-Total 3040 10969 000 14009 000 38719 3109 55837

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 3740 43695 000 47435 000 6238 000 53673

Sub-Total 3740 60645 000 64385 000 6238 2101 72724

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 131 131

Central 3140 7157 000 10297 000 8893 000 19190

Sub-Total 3140 7157 3600 13897 000 8893 676 23466

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 2140 4893 000 7033 000 5337 000 12370

Sub-Total 2140 4893 000 7033 000 5337 3067 15437

State 000 000 000 000 000 000 4147 4147

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 6419 000 12535

Sub-Total 2070 4046 000 6116 000 6419 4167 16702

7500 6362 000 13862 000 12726 000 26588

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Grand Total 52002 173605 3600 229207 000 131200 28541 388948

Modewise breakup

Bihar

Hydro

(Renewable)

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

RES

(MNRE)

Total (Eastern

Region)

Ownership Sector

Assam

Odisha

State Ownership Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Sikkim

Jharkhand

West Bengal

DVC

Grand TotalThermal

Central - Unallocated

Nuclear

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 610 610

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1135 5140

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1210 5215

Hydro

(Renewable)

RES

(MNRE)

Total (Islands)

State Ownership Sector

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

Andaman amp

Nicobar

lakshadweep

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Modewise breakup

Grand TotalThermalNuclear

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 8: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

Sector

Coal Gas Diesel Total

State 6378050 707895 36393 7122338 000 2979800 197690 10299827

Private 7449600 1058060 47370 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

All India 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

State 10299827

Private 14701706

Central 8110225

5 All India Installed Capacity (MW) Sector-wise as on 31102017

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31122016

State 10299827 31

Private 14701706 44

Central 8110225 25

All India Installed Capacity(MW) as on 31-10-2017 (Sector-Wise)

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

5

3778 2151

16398 13120

2574 0

4029 2046

6017 8923

0 0

406 0

639 245

212 324

1257 569

Transmission Lines Added during Apr 15 to Oct 16 amp Apr 16 to Oct17 (Ckms)

Apr 15 - Oct16 Apr 16 - Oct 17

0 0

6 Transmission Lines Added during Oct 2017 (Ckms)

Oct-16 Oct-17

0 0

16398

13120

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

ckm

s

Apr 15 to Oct 16 Apr 16 to Oct 17

1257

569

0

200

400

600

800

1000

1200

1400

1

ck

ms

Oct16 Oct 17

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

1500 3000

All India Transformation Capacity Addition during Apr 16 to Oct 16 amp Apr

17 to Oct17 (MVA)

45665

0

10000

23020

9645

39060

13500

15920

8140

0

April 16 to Oct 16 April 16 to Oct 17

1600

0

0

3600

2575

1025

7 Transformation Capacity Addition During Oct 2017 (MVA)

0

0

500

1100

0 0

Oct-16 Oct-17

1600

3600

0

500

1000

1500

2000

2500

3000

3500

4000

MV

A

Transformation Capacity Addition during Oct 2017

Oct-16 Oct-17

39060

45665

0

74520

1

MV

A

April 16 to Oct 16 April 16 to Oct 17

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandOct 16 0 0 0 0 496 0 30 275 0

Oct 17 0 0 150 0 516 0 0 0 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Haveli

Oct 16 5 0 0 37 0 0 0

Oct 17 16 0 14 2062 0 0 25

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Oct16 1 11 277 43 0 11 0

Oct 17 0 11 3 134 6 4 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions

0 0

150

0

516

0 0 0 00 0 0 0

496

0 30

275

0

0

400

800

Chan

dig

ar

h

Delh

i

Hary

ana

HP

Jamp

K

Pu

nj

ab

Raja

sth

an

UP

Utr

ak

hand

MW

Northern States (MW) Oct 17 Oct 16

16

0 14

2062

0 0 25

5 0 0 37

0 0 0

0

5000

Ch

attis

garh

Guja

rat

MP

Mah

ara

st

ra

Da

man amp

Diu

Da

dar

Na

gar

Ha

veliM

W

Western States (MW) Oct 17 Oct 16

0 11 3134

6 4 01 11

277

43 0 11 00

500

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Southern State (MW) Oct 17 Oct16

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct 16 181 0 0 0 45 0 8

Oct 17 0 0 0 150 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct 16 2 58 0 0 0 0 0

Oct 17 6 77 4 0 2 2 12

9

0 0 0

150

0 0 4

181

0 0 0

45

0 8

0

50

100

150

200

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW)Oct 17 Oct 16

6

77

4 0 2 2

12

2 0 0 0 0 0

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Oct 16 Oct 17

Central 6790 6914

State 5734 5423

Private 5666 5666

ALL INDIA 5993 5969

Month PLF 2016 PLF 2017

Apr 6681 6559

May 6215 6439

June 7324 7015

July 6721 6845

Aug 6991 6617

Sep 5793 6069

Oct 5993 5969

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Oct 2017

67

90

57

34

56

66

59

93

69

14

54

23

56

66

59

69

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Apr 2016 and Oct 2017

Oct 16 Oct 17

621

5

643

9

60

80

Ap

ril

Axis

Title

Axis Title

All India PLF Month-wise

2016 2017

2010-11 2011-12 2012-13 2013-14 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumers P Provisional

Total Number of Villages

597464

Pump sets Energised

as on 31-03-2016

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Actual

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31052017

Villiages Electrified (Nos) as on 311017

9925594 599

Villages electrified

15 All India Coal consumption for Power Generation (MT)

520

14 All India per capita consumption of Electricity ( KWh)

Average Revenue Realization(paiseunit)

21191474

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is

provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data As

such each monthly report of Village electrification of CEA is independent of the earlier published reports

Pump sets Energised as on 31-10-17

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer may not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Sep 2017 and April 2016 to Oct 2017 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1586860 2220135 5366050 9173045

Hydro 258402 227600 61900 547902

Nuclear 200000 000 000 200000

Total 2045262 2447735 5427950 9920947

Acievement 7812 15761 11592 11205

1 Capacity Addtion Targets and Achievements in the 12th Plan

Achievement of Capacity Addition during the Current Plan upto March 2017

Achievements upto Mar 2017 during the 12th Plan

723

400

0

108

970

0

53

000

0

54

790

2

20

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 9920947 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 4880 1460 0 6340 910 -5430

State 3546 0 0 4446 660 -3786

Pvt 2940 0 0 4170 2220 -1950

Total 11366 1460 0 14956 3790 -11166

Central 800 0 0 610 30 -580

State 300 30 0 428 100 -328

Pvt 205 0 0 217 0 -217

Total 1305 30 0 1255 130 -1125

Nuclear Central 500 0 0 0 0 0

Central 6180 1460 0 6950 940 -6010

State 3846 30 0 4874 760 -4114

Pvt 3145 0 0 4387 2220 -2167

Total 13171 1490 0 16211 3920 -12291

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct 2017

Thermal

2 Capacity Addition Targets Achievements During Oct 2017

Oct-17 April 17 - Oct 17Schemes Sector

Target 2017-18

14

95

6

12

55

0

16

21

1

37

90

13

0

0

39

20

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2017-18 Target

Achievement

1460

030

0

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Target Achievement

MW

Targets and Achievement during Oct 2017Thermal

Hydro

Nuclear

Coal Gas Diesel Total

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Sub Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Sub Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Sub Total 4338202 647366 5061726 332000 1174803 2772832 9341361

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Sub Total 2712664 10000 000 2722664 000 483412 102732 3308808

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Sub Total 52002 173605 3600 229207 000 131200 28541 388948

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1210 5215

State 6378050 707895 7122338 000 2979800 197690 10299827

Private 7449600 1058060 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

Total 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092017 is given below (in MW)

438955 3270064 1477169 6015766

A Oct 2017 0 MW

B Oct 2017 35 MW

C Oct 2017 0 MW

D Oct 2017 A-B-C -35 MW

1 NAMRUP CCPP U-1 (20 MW) has been retired from the State Sector of Assam

2 LAKWA GT U-4 (15 MW) has been retired from the State Sector of Assam

Capacity Removed due to

change to CPP from IPP during

Net Capacity Added during

2 Allocation from UNCHAHAR TPS U-6 (500 MW) FARAKKA STPS U-6 (500 MW) and KORBA STPS U-7 (500 MW) has been revised

as per GM Division allocation as on 30092017

Small

Hydro Power

Total

Capacity

Islands

Bio-PowerSolar Power

Waste to EnergyWind Power

Capacity Added during

Capacity Retired during

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102017)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

(UTILITIES)

RES

(MNRE)

Northern Region

Western Region

818170 11408

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092017

BM PowerCogen

Southern Region

Eastern Region

North Eastern

Region

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 7066 104788

Central 377972 20701 000 398673 10283 72309 000 481265

Sub-Total 478394 211541 000 689935 10283 72309 7066 779593

State 272000 15000 000 287000 000 108451 5930 401381

Private 408078 000 000 408078 000 20000 30679 458757

Central 127872 53561 000 181434 10094 66370181 000 257898

Sub-Total 807950 68561 000 876512 10094 194821 36609 1118035

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 57983 157183

Central 17390 6201 000 23591 2895 122388 000 148874

Sub-Total 17390 6201 000 23591 2895 291048 83644 401178

State 000 17500 000 17500 000 123000 10803 151303

Private 000 000 000 000 000 000 5082 5082

Central 48739 12907 000 61647 6798 104898 000 173343

Sub-Total 48739 30407 000 79147 6798 227898 15885 329728

State 262000 15000 000 277000 000 257023 12780 546803

Private 511550 000 000 511550 000 28800 107812 648162

Central 83058 26401 000 109459 19681 92342 000 221482

Sub-Total 856608 41401 000 898009 19681 378165 120592 1416447

State 585000 60380 000 645380 000 108796 2385 756561

Private 388200 000 000 388200 000 10400 660476 1059076

Central 117325 22110 000 139435 55674 73901 000 269010

Sub-Total 1090525 82490 000 1173015 55674 193097 662861 2084647

State 577300 000 000 577300 000 72410 2510 652220

Private 871433 000 000 871433 000 84200 244508 1200141

Central 333839 54949 000 388788 28948 166493 000 584229

Sub-Total 1782572 54949 000 1837521 28948 323103 247018 2436590

State 000 000 000 000 000 125215 6287 131502

Private 9900 45000 000 54900 000 8800 46381 110081

Central 33174 6966 000 40140 3124 47554 000 90818

Sub-Total 43074 51966 000 95040 3124 181569 52668 332401

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1572 1572

Central 3665 1503 000 5167 801 10171 000 16139

Sub-Total 3665 1503 000 5167 801 10171 1572 17711

120003 29105 000 149108 23703 70195 000 243007

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Grand Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Uttar Pradesh

Uttarakhand

Chandigarh

NuclearHydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102017)

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Modewise breakup

Grand TotalThermalOwnership Sector

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Central - Unallocated

Total (Northern

Region)

Punjab

Rajasthan

RES

(MNRE)

(As on 31102017)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 051 4851

Central 45112 2220 000 47332 2600 000 000 49932

Sub-Total 45112 7020 000 52132 2600 000 056 54788

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1031 1031

Central 12296 4840 000 17136 700 000 000 17836

Sub-Total 12296 4840 000 17136 700 000 1031 18867

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 686953 1859520

Central 301209 42400 000 343609 55900 000 000 399509

Sub-Total 1552776 656182 000 2208958 55900 77200 687753 3029811

State 408000 000 000 408000 000 170366 8396 586762

Private 557400 10000 000 567400 000 000 371617 939017

Central 272070 25700 000 297770 27300 152000 000 477070

Sub-Total 1237470 35700 000 1273170 27300 322366 380013 2002849

State 328000 000 000 328000 000 12000 1105 341105

Private 759000 000 000 759000 000 000 41597 800597

Central 155344 000 000 155344 4800 000 000 160144

Sub-Total 1242344 000 000 1242344 4800 12000 42702 1301846

State 1017000 67200 000 1084200 000 285084 20812 1390096

Private 1245600 56800 000 1302400 000 48100 750121 2100621

Central 421943 251300 000 673243 69000 000 000 742243

Sub-Total 2684543 375300 000 3059843 69000 333184 770933 4232960

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 048 048

Central 16921 7140 000 24061 900 000 000 24961

Sub-Total 16921 7140 000 24061 900 000 048 25009

199400 19759 000 219159 22800 000 000 241959

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Grand Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Hydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Goa

Daman amp Diu

Gujarat

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Madhya Pradesh

RES

(MNRE)Nuclear

Grand TotalThermalOwnership Sector

Modewise breakup

Maharashtra

Chhattisgarh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 441000 23540 000 464540 000 167360 8950 640850

Private 387388 369412 3680 760480 000 000 645447 1405927

Central 160760 000 000 160760 12727 000 000 173487

Sub-Total 989148 392952 3680 1385780 12727 167360 654397 2220264

State 408250 000 000 408250 000 238993 000 647243

Private 83945 95088 000 179033 000 000 239336 418369

Central 187812 000 000 187812 14873 000 000 202685

Sub-Total 680007 95088 000 775095 14873 238993 239336 1268297

State 502000 000 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 761814 960184

Central 242920 000 000 242920 69800 000 000 312720

Sub-Total 940770 000 956082 69800 359980 777347 2163209

State 000 000 15996 000 188150 14502 218648

Private 61500 17400 000 78900 000 000 18557 97457

Central 110818 35958 000 146776 36200 000 000 182976

Sub-Total 172318 53358 241672 36200 188150 33059 499081

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 575247 000 000 1056418 1631665

Central 438952 000 000 438952 144800 000 000 583752

Sub-Total 1354719 102718 1498607 144800 220320 1068688 2932415

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 005 005

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 005 36695

166400 000 000 166400 45000 000 000 211400

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Grand Total 4338202 647366 5061726 332000 1174803 2772832 9341361

Andhra Pradesh

Puducherry

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Southern

Region)

Karnataka

Kerala

Tamil Nadu

NLC

Central - Unallocated

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Telangana

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 28100 000 000 28100 000 000 25358 53458

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 340533 000 000 340533 000 11000 32428 383960

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 2037 75037

Central 84874 000 000 84874 000 6100 000 90974

Sub-Total 199874 000 000 199874 000 19100 2442 221416

State 552000 10000 000 562000 000 98600 9195 669795

Private 227500 000 000 227500 000 000 34003 261503

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 855577 10000 000 865577 000 139600 43198 1048375

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 18822 312722

Central 163390 000 000 163390 000 8900 000 172290

Sub-Total 499290 000 000 499290 000 215092 19452 733834

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 29100 001 29101

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 71500 5212 85415

110183 000 000 110183 000 8501 000 118684

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Grand Total 2712664 10000 000 2722664 000 483412 102732 3308808

(As on 31102017)

Coal Gas Diesel Total

State 000 28845 000 28845 000 10000 3001 41846

Private 000 2450 000 2450 000 000 1521 3971

Central 27902 43556 000 71458 000 33123 000 104581

Sub-Total 27902 74851 000 102753 000 43123 4522 150398

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 439 439

Central 2470 4682 000 7152 000 9745 000 16897

Sub-Total 2470 4682 000 7152 000 9745 10899 27796

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 6519 000 20528

Sub-Total 3040 10969 000 14009 000 38719 3109 55837

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 3740 43695 000 47435 000 6238 000 53673

Sub-Total 3740 60645 000 64385 000 6238 2101 72724

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 131 131

Central 3140 7157 000 10297 000 8893 000 19190

Sub-Total 3140 7157 3600 13897 000 8893 676 23466

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 2140 4893 000 7033 000 5337 000 12370

Sub-Total 2140 4893 000 7033 000 5337 3067 15437

State 000 000 000 000 000 000 4147 4147

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 6419 000 12535

Sub-Total 2070 4046 000 6116 000 6419 4167 16702

7500 6362 000 13862 000 12726 000 26588

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Grand Total 52002 173605 3600 229207 000 131200 28541 388948

Modewise breakup

Bihar

Hydro

(Renewable)

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

RES

(MNRE)

Total (Eastern

Region)

Ownership Sector

Assam

Odisha

State Ownership Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Sikkim

Jharkhand

West Bengal

DVC

Grand TotalThermal

Central - Unallocated

Nuclear

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 610 610

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1135 5140

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1210 5215

Hydro

(Renewable)

RES

(MNRE)

Total (Islands)

State Ownership Sector

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

Andaman amp

Nicobar

lakshadweep

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Modewise breakup

Grand TotalThermalNuclear

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 9: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

5

3778 2151

16398 13120

2574 0

4029 2046

6017 8923

0 0

406 0

639 245

212 324

1257 569

Transmission Lines Added during Apr 15 to Oct 16 amp Apr 16 to Oct17 (Ckms)

Apr 15 - Oct16 Apr 16 - Oct 17

0 0

6 Transmission Lines Added during Oct 2017 (Ckms)

Oct-16 Oct-17

0 0

16398

13120

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

ckm

s

Apr 15 to Oct 16 Apr 16 to Oct 17

1257

569

0

200

400

600

800

1000

1200

1400

1

ck

ms

Oct16 Oct 17

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

1500 3000

All India Transformation Capacity Addition during Apr 16 to Oct 16 amp Apr

17 to Oct17 (MVA)

45665

0

10000

23020

9645

39060

13500

15920

8140

0

April 16 to Oct 16 April 16 to Oct 17

1600

0

0

3600

2575

1025

7 Transformation Capacity Addition During Oct 2017 (MVA)

0

0

500

1100

0 0

Oct-16 Oct-17

1600

3600

0

500

1000

1500

2000

2500

3000

3500

4000

MV

A

Transformation Capacity Addition during Oct 2017

Oct-16 Oct-17

39060

45665

0

74520

1

MV

A

April 16 to Oct 16 April 16 to Oct 17

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandOct 16 0 0 0 0 496 0 30 275 0

Oct 17 0 0 150 0 516 0 0 0 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Haveli

Oct 16 5 0 0 37 0 0 0

Oct 17 16 0 14 2062 0 0 25

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Oct16 1 11 277 43 0 11 0

Oct 17 0 11 3 134 6 4 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions

0 0

150

0

516

0 0 0 00 0 0 0

496

0 30

275

0

0

400

800

Chan

dig

ar

h

Delh

i

Hary

ana

HP

Jamp

K

Pu

nj

ab

Raja

sth

an

UP

Utr

ak

hand

MW

Northern States (MW) Oct 17 Oct 16

16

0 14

2062

0 0 25

5 0 0 37

0 0 0

0

5000

Ch

attis

garh

Guja

rat

MP

Mah

ara

st

ra

Da

man amp

Diu

Da

dar

Na

gar

Ha

veliM

W

Western States (MW) Oct 17 Oct 16

0 11 3134

6 4 01 11

277

43 0 11 00

500

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Southern State (MW) Oct 17 Oct16

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct 16 181 0 0 0 45 0 8

Oct 17 0 0 0 150 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct 16 2 58 0 0 0 0 0

Oct 17 6 77 4 0 2 2 12

9

0 0 0

150

0 0 4

181

0 0 0

45

0 8

0

50

100

150

200

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW)Oct 17 Oct 16

6

77

4 0 2 2

12

2 0 0 0 0 0

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Oct 16 Oct 17

Central 6790 6914

State 5734 5423

Private 5666 5666

ALL INDIA 5993 5969

Month PLF 2016 PLF 2017

Apr 6681 6559

May 6215 6439

June 7324 7015

July 6721 6845

Aug 6991 6617

Sep 5793 6069

Oct 5993 5969

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Oct 2017

67

90

57

34

56

66

59

93

69

14

54

23

56

66

59

69

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Apr 2016 and Oct 2017

Oct 16 Oct 17

621

5

643

9

60

80

Ap

ril

Axis

Title

Axis Title

All India PLF Month-wise

2016 2017

2010-11 2011-12 2012-13 2013-14 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumers P Provisional

Total Number of Villages

597464

Pump sets Energised

as on 31-03-2016

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Actual

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31052017

Villiages Electrified (Nos) as on 311017

9925594 599

Villages electrified

15 All India Coal consumption for Power Generation (MT)

520

14 All India per capita consumption of Electricity ( KWh)

Average Revenue Realization(paiseunit)

21191474

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is

provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data As

such each monthly report of Village electrification of CEA is independent of the earlier published reports

Pump sets Energised as on 31-10-17

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer may not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Sep 2017 and April 2016 to Oct 2017 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1586860 2220135 5366050 9173045

Hydro 258402 227600 61900 547902

Nuclear 200000 000 000 200000

Total 2045262 2447735 5427950 9920947

Acievement 7812 15761 11592 11205

1 Capacity Addtion Targets and Achievements in the 12th Plan

Achievement of Capacity Addition during the Current Plan upto March 2017

Achievements upto Mar 2017 during the 12th Plan

723

400

0

108

970

0

53

000

0

54

790

2

20

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 9920947 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 4880 1460 0 6340 910 -5430

State 3546 0 0 4446 660 -3786

Pvt 2940 0 0 4170 2220 -1950

Total 11366 1460 0 14956 3790 -11166

Central 800 0 0 610 30 -580

State 300 30 0 428 100 -328

Pvt 205 0 0 217 0 -217

Total 1305 30 0 1255 130 -1125

Nuclear Central 500 0 0 0 0 0

Central 6180 1460 0 6950 940 -6010

State 3846 30 0 4874 760 -4114

Pvt 3145 0 0 4387 2220 -2167

Total 13171 1490 0 16211 3920 -12291

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct 2017

Thermal

2 Capacity Addition Targets Achievements During Oct 2017

Oct-17 April 17 - Oct 17Schemes Sector

Target 2017-18

14

95

6

12

55

0

16

21

1

37

90

13

0

0

39

20

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2017-18 Target

Achievement

1460

030

0

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Target Achievement

MW

Targets and Achievement during Oct 2017Thermal

Hydro

Nuclear

Coal Gas Diesel Total

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Sub Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Sub Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Sub Total 4338202 647366 5061726 332000 1174803 2772832 9341361

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Sub Total 2712664 10000 000 2722664 000 483412 102732 3308808

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Sub Total 52002 173605 3600 229207 000 131200 28541 388948

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1210 5215

State 6378050 707895 7122338 000 2979800 197690 10299827

Private 7449600 1058060 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

Total 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092017 is given below (in MW)

438955 3270064 1477169 6015766

A Oct 2017 0 MW

B Oct 2017 35 MW

C Oct 2017 0 MW

D Oct 2017 A-B-C -35 MW

1 NAMRUP CCPP U-1 (20 MW) has been retired from the State Sector of Assam

2 LAKWA GT U-4 (15 MW) has been retired from the State Sector of Assam

Capacity Removed due to

change to CPP from IPP during

Net Capacity Added during

2 Allocation from UNCHAHAR TPS U-6 (500 MW) FARAKKA STPS U-6 (500 MW) and KORBA STPS U-7 (500 MW) has been revised

as per GM Division allocation as on 30092017

Small

Hydro Power

Total

Capacity

Islands

Bio-PowerSolar Power

Waste to EnergyWind Power

Capacity Added during

Capacity Retired during

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102017)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

(UTILITIES)

RES

(MNRE)

Northern Region

Western Region

818170 11408

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092017

BM PowerCogen

Southern Region

Eastern Region

North Eastern

Region

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 7066 104788

Central 377972 20701 000 398673 10283 72309 000 481265

Sub-Total 478394 211541 000 689935 10283 72309 7066 779593

State 272000 15000 000 287000 000 108451 5930 401381

Private 408078 000 000 408078 000 20000 30679 458757

Central 127872 53561 000 181434 10094 66370181 000 257898

Sub-Total 807950 68561 000 876512 10094 194821 36609 1118035

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 57983 157183

Central 17390 6201 000 23591 2895 122388 000 148874

Sub-Total 17390 6201 000 23591 2895 291048 83644 401178

State 000 17500 000 17500 000 123000 10803 151303

Private 000 000 000 000 000 000 5082 5082

Central 48739 12907 000 61647 6798 104898 000 173343

Sub-Total 48739 30407 000 79147 6798 227898 15885 329728

State 262000 15000 000 277000 000 257023 12780 546803

Private 511550 000 000 511550 000 28800 107812 648162

Central 83058 26401 000 109459 19681 92342 000 221482

Sub-Total 856608 41401 000 898009 19681 378165 120592 1416447

State 585000 60380 000 645380 000 108796 2385 756561

Private 388200 000 000 388200 000 10400 660476 1059076

Central 117325 22110 000 139435 55674 73901 000 269010

Sub-Total 1090525 82490 000 1173015 55674 193097 662861 2084647

State 577300 000 000 577300 000 72410 2510 652220

Private 871433 000 000 871433 000 84200 244508 1200141

Central 333839 54949 000 388788 28948 166493 000 584229

Sub-Total 1782572 54949 000 1837521 28948 323103 247018 2436590

State 000 000 000 000 000 125215 6287 131502

Private 9900 45000 000 54900 000 8800 46381 110081

Central 33174 6966 000 40140 3124 47554 000 90818

Sub-Total 43074 51966 000 95040 3124 181569 52668 332401

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1572 1572

Central 3665 1503 000 5167 801 10171 000 16139

Sub-Total 3665 1503 000 5167 801 10171 1572 17711

120003 29105 000 149108 23703 70195 000 243007

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Grand Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Uttar Pradesh

Uttarakhand

Chandigarh

NuclearHydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102017)

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Modewise breakup

Grand TotalThermalOwnership Sector

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Central - Unallocated

Total (Northern

Region)

Punjab

Rajasthan

RES

(MNRE)

(As on 31102017)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 051 4851

Central 45112 2220 000 47332 2600 000 000 49932

Sub-Total 45112 7020 000 52132 2600 000 056 54788

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1031 1031

Central 12296 4840 000 17136 700 000 000 17836

Sub-Total 12296 4840 000 17136 700 000 1031 18867

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 686953 1859520

Central 301209 42400 000 343609 55900 000 000 399509

Sub-Total 1552776 656182 000 2208958 55900 77200 687753 3029811

State 408000 000 000 408000 000 170366 8396 586762

Private 557400 10000 000 567400 000 000 371617 939017

Central 272070 25700 000 297770 27300 152000 000 477070

Sub-Total 1237470 35700 000 1273170 27300 322366 380013 2002849

State 328000 000 000 328000 000 12000 1105 341105

Private 759000 000 000 759000 000 000 41597 800597

Central 155344 000 000 155344 4800 000 000 160144

Sub-Total 1242344 000 000 1242344 4800 12000 42702 1301846

State 1017000 67200 000 1084200 000 285084 20812 1390096

Private 1245600 56800 000 1302400 000 48100 750121 2100621

Central 421943 251300 000 673243 69000 000 000 742243

Sub-Total 2684543 375300 000 3059843 69000 333184 770933 4232960

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 048 048

Central 16921 7140 000 24061 900 000 000 24961

Sub-Total 16921 7140 000 24061 900 000 048 25009

199400 19759 000 219159 22800 000 000 241959

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Grand Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Hydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Goa

Daman amp Diu

Gujarat

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Madhya Pradesh

RES

(MNRE)Nuclear

Grand TotalThermalOwnership Sector

Modewise breakup

Maharashtra

Chhattisgarh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 441000 23540 000 464540 000 167360 8950 640850

Private 387388 369412 3680 760480 000 000 645447 1405927

Central 160760 000 000 160760 12727 000 000 173487

Sub-Total 989148 392952 3680 1385780 12727 167360 654397 2220264

State 408250 000 000 408250 000 238993 000 647243

Private 83945 95088 000 179033 000 000 239336 418369

Central 187812 000 000 187812 14873 000 000 202685

Sub-Total 680007 95088 000 775095 14873 238993 239336 1268297

State 502000 000 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 761814 960184

Central 242920 000 000 242920 69800 000 000 312720

Sub-Total 940770 000 956082 69800 359980 777347 2163209

State 000 000 15996 000 188150 14502 218648

Private 61500 17400 000 78900 000 000 18557 97457

Central 110818 35958 000 146776 36200 000 000 182976

Sub-Total 172318 53358 241672 36200 188150 33059 499081

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 575247 000 000 1056418 1631665

Central 438952 000 000 438952 144800 000 000 583752

Sub-Total 1354719 102718 1498607 144800 220320 1068688 2932415

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 005 005

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 005 36695

166400 000 000 166400 45000 000 000 211400

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Grand Total 4338202 647366 5061726 332000 1174803 2772832 9341361

Andhra Pradesh

Puducherry

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Southern

Region)

Karnataka

Kerala

Tamil Nadu

NLC

Central - Unallocated

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Telangana

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 28100 000 000 28100 000 000 25358 53458

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 340533 000 000 340533 000 11000 32428 383960

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 2037 75037

Central 84874 000 000 84874 000 6100 000 90974

Sub-Total 199874 000 000 199874 000 19100 2442 221416

State 552000 10000 000 562000 000 98600 9195 669795

Private 227500 000 000 227500 000 000 34003 261503

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 855577 10000 000 865577 000 139600 43198 1048375

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 18822 312722

Central 163390 000 000 163390 000 8900 000 172290

Sub-Total 499290 000 000 499290 000 215092 19452 733834

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 29100 001 29101

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 71500 5212 85415

110183 000 000 110183 000 8501 000 118684

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Grand Total 2712664 10000 000 2722664 000 483412 102732 3308808

(As on 31102017)

Coal Gas Diesel Total

State 000 28845 000 28845 000 10000 3001 41846

Private 000 2450 000 2450 000 000 1521 3971

Central 27902 43556 000 71458 000 33123 000 104581

Sub-Total 27902 74851 000 102753 000 43123 4522 150398

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 439 439

Central 2470 4682 000 7152 000 9745 000 16897

Sub-Total 2470 4682 000 7152 000 9745 10899 27796

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 6519 000 20528

Sub-Total 3040 10969 000 14009 000 38719 3109 55837

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 3740 43695 000 47435 000 6238 000 53673

Sub-Total 3740 60645 000 64385 000 6238 2101 72724

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 131 131

Central 3140 7157 000 10297 000 8893 000 19190

Sub-Total 3140 7157 3600 13897 000 8893 676 23466

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 2140 4893 000 7033 000 5337 000 12370

Sub-Total 2140 4893 000 7033 000 5337 3067 15437

State 000 000 000 000 000 000 4147 4147

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 6419 000 12535

Sub-Total 2070 4046 000 6116 000 6419 4167 16702

7500 6362 000 13862 000 12726 000 26588

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Grand Total 52002 173605 3600 229207 000 131200 28541 388948

Modewise breakup

Bihar

Hydro

(Renewable)

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

RES

(MNRE)

Total (Eastern

Region)

Ownership Sector

Assam

Odisha

State Ownership Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Sikkim

Jharkhand

West Bengal

DVC

Grand TotalThermal

Central - Unallocated

Nuclear

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 610 610

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1135 5140

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1210 5215

Hydro

(Renewable)

RES

(MNRE)

Total (Islands)

State Ownership Sector

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

Andaman amp

Nicobar

lakshadweep

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Modewise breakup

Grand TotalThermalNuclear

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 10: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

1500 3000

All India Transformation Capacity Addition during Apr 16 to Oct 16 amp Apr

17 to Oct17 (MVA)

45665

0

10000

23020

9645

39060

13500

15920

8140

0

April 16 to Oct 16 April 16 to Oct 17

1600

0

0

3600

2575

1025

7 Transformation Capacity Addition During Oct 2017 (MVA)

0

0

500

1100

0 0

Oct-16 Oct-17

1600

3600

0

500

1000

1500

2000

2500

3000

3500

4000

MV

A

Transformation Capacity Addition during Oct 2017

Oct-16 Oct-17

39060

45665

0

74520

1

MV

A

April 16 to Oct 16 April 16 to Oct 17

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandOct 16 0 0 0 0 496 0 30 275 0

Oct 17 0 0 150 0 516 0 0 0 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Haveli

Oct 16 5 0 0 37 0 0 0

Oct 17 16 0 14 2062 0 0 25

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Oct16 1 11 277 43 0 11 0

Oct 17 0 11 3 134 6 4 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions

0 0

150

0

516

0 0 0 00 0 0 0

496

0 30

275

0

0

400

800

Chan

dig

ar

h

Delh

i

Hary

ana

HP

Jamp

K

Pu

nj

ab

Raja

sth

an

UP

Utr

ak

hand

MW

Northern States (MW) Oct 17 Oct 16

16

0 14

2062

0 0 25

5 0 0 37

0 0 0

0

5000

Ch

attis

garh

Guja

rat

MP

Mah

ara

st

ra

Da

man amp

Diu

Da

dar

Na

gar

Ha

veliM

W

Western States (MW) Oct 17 Oct 16

0 11 3134

6 4 01 11

277

43 0 11 00

500

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Southern State (MW) Oct 17 Oct16

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct 16 181 0 0 0 45 0 8

Oct 17 0 0 0 150 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct 16 2 58 0 0 0 0 0

Oct 17 6 77 4 0 2 2 12

9

0 0 0

150

0 0 4

181

0 0 0

45

0 8

0

50

100

150

200

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW)Oct 17 Oct 16

6

77

4 0 2 2

12

2 0 0 0 0 0

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Oct 16 Oct 17

Central 6790 6914

State 5734 5423

Private 5666 5666

ALL INDIA 5993 5969

Month PLF 2016 PLF 2017

Apr 6681 6559

May 6215 6439

June 7324 7015

July 6721 6845

Aug 6991 6617

Sep 5793 6069

Oct 5993 5969

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Oct 2017

67

90

57

34

56

66

59

93

69

14

54

23

56

66

59

69

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Apr 2016 and Oct 2017

Oct 16 Oct 17

621

5

643

9

60

80

Ap

ril

Axis

Title

Axis Title

All India PLF Month-wise

2016 2017

2010-11 2011-12 2012-13 2013-14 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumers P Provisional

Total Number of Villages

597464

Pump sets Energised

as on 31-03-2016

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Actual

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31052017

Villiages Electrified (Nos) as on 311017

9925594 599

Villages electrified

15 All India Coal consumption for Power Generation (MT)

520

14 All India per capita consumption of Electricity ( KWh)

Average Revenue Realization(paiseunit)

21191474

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is

provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data As

such each monthly report of Village electrification of CEA is independent of the earlier published reports

Pump sets Energised as on 31-10-17

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer may not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Sep 2017 and April 2016 to Oct 2017 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1586860 2220135 5366050 9173045

Hydro 258402 227600 61900 547902

Nuclear 200000 000 000 200000

Total 2045262 2447735 5427950 9920947

Acievement 7812 15761 11592 11205

1 Capacity Addtion Targets and Achievements in the 12th Plan

Achievement of Capacity Addition during the Current Plan upto March 2017

Achievements upto Mar 2017 during the 12th Plan

723

400

0

108

970

0

53

000

0

54

790

2

20

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 9920947 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 4880 1460 0 6340 910 -5430

State 3546 0 0 4446 660 -3786

Pvt 2940 0 0 4170 2220 -1950

Total 11366 1460 0 14956 3790 -11166

Central 800 0 0 610 30 -580

State 300 30 0 428 100 -328

Pvt 205 0 0 217 0 -217

Total 1305 30 0 1255 130 -1125

Nuclear Central 500 0 0 0 0 0

Central 6180 1460 0 6950 940 -6010

State 3846 30 0 4874 760 -4114

Pvt 3145 0 0 4387 2220 -2167

Total 13171 1490 0 16211 3920 -12291

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct 2017

Thermal

2 Capacity Addition Targets Achievements During Oct 2017

Oct-17 April 17 - Oct 17Schemes Sector

Target 2017-18

14

95

6

12

55

0

16

21

1

37

90

13

0

0

39

20

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2017-18 Target

Achievement

1460

030

0

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Target Achievement

MW

Targets and Achievement during Oct 2017Thermal

Hydro

Nuclear

Coal Gas Diesel Total

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Sub Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Sub Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Sub Total 4338202 647366 5061726 332000 1174803 2772832 9341361

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Sub Total 2712664 10000 000 2722664 000 483412 102732 3308808

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Sub Total 52002 173605 3600 229207 000 131200 28541 388948

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1210 5215

State 6378050 707895 7122338 000 2979800 197690 10299827

Private 7449600 1058060 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

Total 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092017 is given below (in MW)

438955 3270064 1477169 6015766

A Oct 2017 0 MW

B Oct 2017 35 MW

C Oct 2017 0 MW

D Oct 2017 A-B-C -35 MW

1 NAMRUP CCPP U-1 (20 MW) has been retired from the State Sector of Assam

2 LAKWA GT U-4 (15 MW) has been retired from the State Sector of Assam

Capacity Removed due to

change to CPP from IPP during

Net Capacity Added during

2 Allocation from UNCHAHAR TPS U-6 (500 MW) FARAKKA STPS U-6 (500 MW) and KORBA STPS U-7 (500 MW) has been revised

as per GM Division allocation as on 30092017

Small

Hydro Power

Total

Capacity

Islands

Bio-PowerSolar Power

Waste to EnergyWind Power

Capacity Added during

Capacity Retired during

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102017)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

(UTILITIES)

RES

(MNRE)

Northern Region

Western Region

818170 11408

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092017

BM PowerCogen

Southern Region

Eastern Region

North Eastern

Region

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 7066 104788

Central 377972 20701 000 398673 10283 72309 000 481265

Sub-Total 478394 211541 000 689935 10283 72309 7066 779593

State 272000 15000 000 287000 000 108451 5930 401381

Private 408078 000 000 408078 000 20000 30679 458757

Central 127872 53561 000 181434 10094 66370181 000 257898

Sub-Total 807950 68561 000 876512 10094 194821 36609 1118035

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 57983 157183

Central 17390 6201 000 23591 2895 122388 000 148874

Sub-Total 17390 6201 000 23591 2895 291048 83644 401178

State 000 17500 000 17500 000 123000 10803 151303

Private 000 000 000 000 000 000 5082 5082

Central 48739 12907 000 61647 6798 104898 000 173343

Sub-Total 48739 30407 000 79147 6798 227898 15885 329728

State 262000 15000 000 277000 000 257023 12780 546803

Private 511550 000 000 511550 000 28800 107812 648162

Central 83058 26401 000 109459 19681 92342 000 221482

Sub-Total 856608 41401 000 898009 19681 378165 120592 1416447

State 585000 60380 000 645380 000 108796 2385 756561

Private 388200 000 000 388200 000 10400 660476 1059076

Central 117325 22110 000 139435 55674 73901 000 269010

Sub-Total 1090525 82490 000 1173015 55674 193097 662861 2084647

State 577300 000 000 577300 000 72410 2510 652220

Private 871433 000 000 871433 000 84200 244508 1200141

Central 333839 54949 000 388788 28948 166493 000 584229

Sub-Total 1782572 54949 000 1837521 28948 323103 247018 2436590

State 000 000 000 000 000 125215 6287 131502

Private 9900 45000 000 54900 000 8800 46381 110081

Central 33174 6966 000 40140 3124 47554 000 90818

Sub-Total 43074 51966 000 95040 3124 181569 52668 332401

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1572 1572

Central 3665 1503 000 5167 801 10171 000 16139

Sub-Total 3665 1503 000 5167 801 10171 1572 17711

120003 29105 000 149108 23703 70195 000 243007

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Grand Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Uttar Pradesh

Uttarakhand

Chandigarh

NuclearHydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102017)

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Modewise breakup

Grand TotalThermalOwnership Sector

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Central - Unallocated

Total (Northern

Region)

Punjab

Rajasthan

RES

(MNRE)

(As on 31102017)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 051 4851

Central 45112 2220 000 47332 2600 000 000 49932

Sub-Total 45112 7020 000 52132 2600 000 056 54788

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1031 1031

Central 12296 4840 000 17136 700 000 000 17836

Sub-Total 12296 4840 000 17136 700 000 1031 18867

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 686953 1859520

Central 301209 42400 000 343609 55900 000 000 399509

Sub-Total 1552776 656182 000 2208958 55900 77200 687753 3029811

State 408000 000 000 408000 000 170366 8396 586762

Private 557400 10000 000 567400 000 000 371617 939017

Central 272070 25700 000 297770 27300 152000 000 477070

Sub-Total 1237470 35700 000 1273170 27300 322366 380013 2002849

State 328000 000 000 328000 000 12000 1105 341105

Private 759000 000 000 759000 000 000 41597 800597

Central 155344 000 000 155344 4800 000 000 160144

Sub-Total 1242344 000 000 1242344 4800 12000 42702 1301846

State 1017000 67200 000 1084200 000 285084 20812 1390096

Private 1245600 56800 000 1302400 000 48100 750121 2100621

Central 421943 251300 000 673243 69000 000 000 742243

Sub-Total 2684543 375300 000 3059843 69000 333184 770933 4232960

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 048 048

Central 16921 7140 000 24061 900 000 000 24961

Sub-Total 16921 7140 000 24061 900 000 048 25009

199400 19759 000 219159 22800 000 000 241959

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Grand Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Hydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Goa

Daman amp Diu

Gujarat

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Madhya Pradesh

RES

(MNRE)Nuclear

Grand TotalThermalOwnership Sector

Modewise breakup

Maharashtra

Chhattisgarh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 441000 23540 000 464540 000 167360 8950 640850

Private 387388 369412 3680 760480 000 000 645447 1405927

Central 160760 000 000 160760 12727 000 000 173487

Sub-Total 989148 392952 3680 1385780 12727 167360 654397 2220264

State 408250 000 000 408250 000 238993 000 647243

Private 83945 95088 000 179033 000 000 239336 418369

Central 187812 000 000 187812 14873 000 000 202685

Sub-Total 680007 95088 000 775095 14873 238993 239336 1268297

State 502000 000 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 761814 960184

Central 242920 000 000 242920 69800 000 000 312720

Sub-Total 940770 000 956082 69800 359980 777347 2163209

State 000 000 15996 000 188150 14502 218648

Private 61500 17400 000 78900 000 000 18557 97457

Central 110818 35958 000 146776 36200 000 000 182976

Sub-Total 172318 53358 241672 36200 188150 33059 499081

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 575247 000 000 1056418 1631665

Central 438952 000 000 438952 144800 000 000 583752

Sub-Total 1354719 102718 1498607 144800 220320 1068688 2932415

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 005 005

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 005 36695

166400 000 000 166400 45000 000 000 211400

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Grand Total 4338202 647366 5061726 332000 1174803 2772832 9341361

Andhra Pradesh

Puducherry

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Southern

Region)

Karnataka

Kerala

Tamil Nadu

NLC

Central - Unallocated

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Telangana

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 28100 000 000 28100 000 000 25358 53458

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 340533 000 000 340533 000 11000 32428 383960

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 2037 75037

Central 84874 000 000 84874 000 6100 000 90974

Sub-Total 199874 000 000 199874 000 19100 2442 221416

State 552000 10000 000 562000 000 98600 9195 669795

Private 227500 000 000 227500 000 000 34003 261503

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 855577 10000 000 865577 000 139600 43198 1048375

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 18822 312722

Central 163390 000 000 163390 000 8900 000 172290

Sub-Total 499290 000 000 499290 000 215092 19452 733834

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 29100 001 29101

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 71500 5212 85415

110183 000 000 110183 000 8501 000 118684

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Grand Total 2712664 10000 000 2722664 000 483412 102732 3308808

(As on 31102017)

Coal Gas Diesel Total

State 000 28845 000 28845 000 10000 3001 41846

Private 000 2450 000 2450 000 000 1521 3971

Central 27902 43556 000 71458 000 33123 000 104581

Sub-Total 27902 74851 000 102753 000 43123 4522 150398

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 439 439

Central 2470 4682 000 7152 000 9745 000 16897

Sub-Total 2470 4682 000 7152 000 9745 10899 27796

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 6519 000 20528

Sub-Total 3040 10969 000 14009 000 38719 3109 55837

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 3740 43695 000 47435 000 6238 000 53673

Sub-Total 3740 60645 000 64385 000 6238 2101 72724

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 131 131

Central 3140 7157 000 10297 000 8893 000 19190

Sub-Total 3140 7157 3600 13897 000 8893 676 23466

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 2140 4893 000 7033 000 5337 000 12370

Sub-Total 2140 4893 000 7033 000 5337 3067 15437

State 000 000 000 000 000 000 4147 4147

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 6419 000 12535

Sub-Total 2070 4046 000 6116 000 6419 4167 16702

7500 6362 000 13862 000 12726 000 26588

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Grand Total 52002 173605 3600 229207 000 131200 28541 388948

Modewise breakup

Bihar

Hydro

(Renewable)

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

RES

(MNRE)

Total (Eastern

Region)

Ownership Sector

Assam

Odisha

State Ownership Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Sikkim

Jharkhand

West Bengal

DVC

Grand TotalThermal

Central - Unallocated

Nuclear

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 610 610

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1135 5140

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1210 5215

Hydro

(Renewable)

RES

(MNRE)

Total (Islands)

State Ownership Sector

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

Andaman amp

Nicobar

lakshadweep

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Modewise breakup

Grand TotalThermalNuclear

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 11: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandOct 16 0 0 0 0 496 0 30 275 0

Oct 17 0 0 150 0 516 0 0 0 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Haveli

Oct 16 5 0 0 37 0 0 0

Oct 17 16 0 14 2062 0 0 25

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Oct16 1 11 277 43 0 11 0

Oct 17 0 11 3 134 6 4 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions

0 0

150

0

516

0 0 0 00 0 0 0

496

0 30

275

0

0

400

800

Chan

dig

ar

h

Delh

i

Hary

ana

HP

Jamp

K

Pu

nj

ab

Raja

sth

an

UP

Utr

ak

hand

MW

Northern States (MW) Oct 17 Oct 16

16

0 14

2062

0 0 25

5 0 0 37

0 0 0

0

5000

Ch

attis

garh

Guja

rat

MP

Mah

ara

st

ra

Da

man amp

Diu

Da

dar

Na

gar

Ha

veliM

W

Western States (MW) Oct 17 Oct 16

0 11 3134

6 4 01 11

277

43 0 11 00

500

AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep

Southern State (MW) Oct 17 Oct16

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct 16 181 0 0 0 45 0 8

Oct 17 0 0 0 150 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct 16 2 58 0 0 0 0 0

Oct 17 6 77 4 0 2 2 12

9

0 0 0

150

0 0 4

181

0 0 0

45

0 8

0

50

100

150

200

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW)Oct 17 Oct 16

6

77

4 0 2 2

12

2 0 0 0 0 0

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Oct 16 Oct 17

Central 6790 6914

State 5734 5423

Private 5666 5666

ALL INDIA 5993 5969

Month PLF 2016 PLF 2017

Apr 6681 6559

May 6215 6439

June 7324 7015

July 6721 6845

Aug 6991 6617

Sep 5793 6069

Oct 5993 5969

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Oct 2017

67

90

57

34

56

66

59

93

69

14

54

23

56

66

59

69

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Apr 2016 and Oct 2017

Oct 16 Oct 17

621

5

643

9

60

80

Ap

ril

Axis

Title

Axis Title

All India PLF Month-wise

2016 2017

2010-11 2011-12 2012-13 2013-14 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumers P Provisional

Total Number of Villages

597464

Pump sets Energised

as on 31-03-2016

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Actual

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31052017

Villiages Electrified (Nos) as on 311017

9925594 599

Villages electrified

15 All India Coal consumption for Power Generation (MT)

520

14 All India per capita consumption of Electricity ( KWh)

Average Revenue Realization(paiseunit)

21191474

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is

provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data As

such each monthly report of Village electrification of CEA is independent of the earlier published reports

Pump sets Energised as on 31-10-17

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer may not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Sep 2017 and April 2016 to Oct 2017 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1586860 2220135 5366050 9173045

Hydro 258402 227600 61900 547902

Nuclear 200000 000 000 200000

Total 2045262 2447735 5427950 9920947

Acievement 7812 15761 11592 11205

1 Capacity Addtion Targets and Achievements in the 12th Plan

Achievement of Capacity Addition during the Current Plan upto March 2017

Achievements upto Mar 2017 during the 12th Plan

723

400

0

108

970

0

53

000

0

54

790

2

20

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 9920947 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 4880 1460 0 6340 910 -5430

State 3546 0 0 4446 660 -3786

Pvt 2940 0 0 4170 2220 -1950

Total 11366 1460 0 14956 3790 -11166

Central 800 0 0 610 30 -580

State 300 30 0 428 100 -328

Pvt 205 0 0 217 0 -217

Total 1305 30 0 1255 130 -1125

Nuclear Central 500 0 0 0 0 0

Central 6180 1460 0 6950 940 -6010

State 3846 30 0 4874 760 -4114

Pvt 3145 0 0 4387 2220 -2167

Total 13171 1490 0 16211 3920 -12291

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct 2017

Thermal

2 Capacity Addition Targets Achievements During Oct 2017

Oct-17 April 17 - Oct 17Schemes Sector

Target 2017-18

14

95

6

12

55

0

16

21

1

37

90

13

0

0

39

20

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2017-18 Target

Achievement

1460

030

0

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Target Achievement

MW

Targets and Achievement during Oct 2017Thermal

Hydro

Nuclear

Coal Gas Diesel Total

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Sub Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Sub Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Sub Total 4338202 647366 5061726 332000 1174803 2772832 9341361

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Sub Total 2712664 10000 000 2722664 000 483412 102732 3308808

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Sub Total 52002 173605 3600 229207 000 131200 28541 388948

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1210 5215

State 6378050 707895 7122338 000 2979800 197690 10299827

Private 7449600 1058060 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

Total 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092017 is given below (in MW)

438955 3270064 1477169 6015766

A Oct 2017 0 MW

B Oct 2017 35 MW

C Oct 2017 0 MW

D Oct 2017 A-B-C -35 MW

1 NAMRUP CCPP U-1 (20 MW) has been retired from the State Sector of Assam

2 LAKWA GT U-4 (15 MW) has been retired from the State Sector of Assam

Capacity Removed due to

change to CPP from IPP during

Net Capacity Added during

2 Allocation from UNCHAHAR TPS U-6 (500 MW) FARAKKA STPS U-6 (500 MW) and KORBA STPS U-7 (500 MW) has been revised

as per GM Division allocation as on 30092017

Small

Hydro Power

Total

Capacity

Islands

Bio-PowerSolar Power

Waste to EnergyWind Power

Capacity Added during

Capacity Retired during

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102017)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

(UTILITIES)

RES

(MNRE)

Northern Region

Western Region

818170 11408

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092017

BM PowerCogen

Southern Region

Eastern Region

North Eastern

Region

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 7066 104788

Central 377972 20701 000 398673 10283 72309 000 481265

Sub-Total 478394 211541 000 689935 10283 72309 7066 779593

State 272000 15000 000 287000 000 108451 5930 401381

Private 408078 000 000 408078 000 20000 30679 458757

Central 127872 53561 000 181434 10094 66370181 000 257898

Sub-Total 807950 68561 000 876512 10094 194821 36609 1118035

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 57983 157183

Central 17390 6201 000 23591 2895 122388 000 148874

Sub-Total 17390 6201 000 23591 2895 291048 83644 401178

State 000 17500 000 17500 000 123000 10803 151303

Private 000 000 000 000 000 000 5082 5082

Central 48739 12907 000 61647 6798 104898 000 173343

Sub-Total 48739 30407 000 79147 6798 227898 15885 329728

State 262000 15000 000 277000 000 257023 12780 546803

Private 511550 000 000 511550 000 28800 107812 648162

Central 83058 26401 000 109459 19681 92342 000 221482

Sub-Total 856608 41401 000 898009 19681 378165 120592 1416447

State 585000 60380 000 645380 000 108796 2385 756561

Private 388200 000 000 388200 000 10400 660476 1059076

Central 117325 22110 000 139435 55674 73901 000 269010

Sub-Total 1090525 82490 000 1173015 55674 193097 662861 2084647

State 577300 000 000 577300 000 72410 2510 652220

Private 871433 000 000 871433 000 84200 244508 1200141

Central 333839 54949 000 388788 28948 166493 000 584229

Sub-Total 1782572 54949 000 1837521 28948 323103 247018 2436590

State 000 000 000 000 000 125215 6287 131502

Private 9900 45000 000 54900 000 8800 46381 110081

Central 33174 6966 000 40140 3124 47554 000 90818

Sub-Total 43074 51966 000 95040 3124 181569 52668 332401

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1572 1572

Central 3665 1503 000 5167 801 10171 000 16139

Sub-Total 3665 1503 000 5167 801 10171 1572 17711

120003 29105 000 149108 23703 70195 000 243007

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Grand Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Uttar Pradesh

Uttarakhand

Chandigarh

NuclearHydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102017)

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Modewise breakup

Grand TotalThermalOwnership Sector

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Central - Unallocated

Total (Northern

Region)

Punjab

Rajasthan

RES

(MNRE)

(As on 31102017)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 051 4851

Central 45112 2220 000 47332 2600 000 000 49932

Sub-Total 45112 7020 000 52132 2600 000 056 54788

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1031 1031

Central 12296 4840 000 17136 700 000 000 17836

Sub-Total 12296 4840 000 17136 700 000 1031 18867

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 686953 1859520

Central 301209 42400 000 343609 55900 000 000 399509

Sub-Total 1552776 656182 000 2208958 55900 77200 687753 3029811

State 408000 000 000 408000 000 170366 8396 586762

Private 557400 10000 000 567400 000 000 371617 939017

Central 272070 25700 000 297770 27300 152000 000 477070

Sub-Total 1237470 35700 000 1273170 27300 322366 380013 2002849

State 328000 000 000 328000 000 12000 1105 341105

Private 759000 000 000 759000 000 000 41597 800597

Central 155344 000 000 155344 4800 000 000 160144

Sub-Total 1242344 000 000 1242344 4800 12000 42702 1301846

State 1017000 67200 000 1084200 000 285084 20812 1390096

Private 1245600 56800 000 1302400 000 48100 750121 2100621

Central 421943 251300 000 673243 69000 000 000 742243

Sub-Total 2684543 375300 000 3059843 69000 333184 770933 4232960

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 048 048

Central 16921 7140 000 24061 900 000 000 24961

Sub-Total 16921 7140 000 24061 900 000 048 25009

199400 19759 000 219159 22800 000 000 241959

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Grand Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Hydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Goa

Daman amp Diu

Gujarat

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Madhya Pradesh

RES

(MNRE)Nuclear

Grand TotalThermalOwnership Sector

Modewise breakup

Maharashtra

Chhattisgarh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 441000 23540 000 464540 000 167360 8950 640850

Private 387388 369412 3680 760480 000 000 645447 1405927

Central 160760 000 000 160760 12727 000 000 173487

Sub-Total 989148 392952 3680 1385780 12727 167360 654397 2220264

State 408250 000 000 408250 000 238993 000 647243

Private 83945 95088 000 179033 000 000 239336 418369

Central 187812 000 000 187812 14873 000 000 202685

Sub-Total 680007 95088 000 775095 14873 238993 239336 1268297

State 502000 000 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 761814 960184

Central 242920 000 000 242920 69800 000 000 312720

Sub-Total 940770 000 956082 69800 359980 777347 2163209

State 000 000 15996 000 188150 14502 218648

Private 61500 17400 000 78900 000 000 18557 97457

Central 110818 35958 000 146776 36200 000 000 182976

Sub-Total 172318 53358 241672 36200 188150 33059 499081

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 575247 000 000 1056418 1631665

Central 438952 000 000 438952 144800 000 000 583752

Sub-Total 1354719 102718 1498607 144800 220320 1068688 2932415

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 005 005

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 005 36695

166400 000 000 166400 45000 000 000 211400

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Grand Total 4338202 647366 5061726 332000 1174803 2772832 9341361

Andhra Pradesh

Puducherry

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Southern

Region)

Karnataka

Kerala

Tamil Nadu

NLC

Central - Unallocated

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Telangana

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 28100 000 000 28100 000 000 25358 53458

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 340533 000 000 340533 000 11000 32428 383960

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 2037 75037

Central 84874 000 000 84874 000 6100 000 90974

Sub-Total 199874 000 000 199874 000 19100 2442 221416

State 552000 10000 000 562000 000 98600 9195 669795

Private 227500 000 000 227500 000 000 34003 261503

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 855577 10000 000 865577 000 139600 43198 1048375

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 18822 312722

Central 163390 000 000 163390 000 8900 000 172290

Sub-Total 499290 000 000 499290 000 215092 19452 733834

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 29100 001 29101

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 71500 5212 85415

110183 000 000 110183 000 8501 000 118684

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Grand Total 2712664 10000 000 2722664 000 483412 102732 3308808

(As on 31102017)

Coal Gas Diesel Total

State 000 28845 000 28845 000 10000 3001 41846

Private 000 2450 000 2450 000 000 1521 3971

Central 27902 43556 000 71458 000 33123 000 104581

Sub-Total 27902 74851 000 102753 000 43123 4522 150398

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 439 439

Central 2470 4682 000 7152 000 9745 000 16897

Sub-Total 2470 4682 000 7152 000 9745 10899 27796

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 6519 000 20528

Sub-Total 3040 10969 000 14009 000 38719 3109 55837

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 3740 43695 000 47435 000 6238 000 53673

Sub-Total 3740 60645 000 64385 000 6238 2101 72724

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 131 131

Central 3140 7157 000 10297 000 8893 000 19190

Sub-Total 3140 7157 3600 13897 000 8893 676 23466

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 2140 4893 000 7033 000 5337 000 12370

Sub-Total 2140 4893 000 7033 000 5337 3067 15437

State 000 000 000 000 000 000 4147 4147

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 6419 000 12535

Sub-Total 2070 4046 000 6116 000 6419 4167 16702

7500 6362 000 13862 000 12726 000 26588

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Grand Total 52002 173605 3600 229207 000 131200 28541 388948

Modewise breakup

Bihar

Hydro

(Renewable)

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

RES

(MNRE)

Total (Eastern

Region)

Ownership Sector

Assam

Odisha

State Ownership Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Sikkim

Jharkhand

West Bengal

DVC

Grand TotalThermal

Central - Unallocated

Nuclear

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 610 610

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1135 5140

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1210 5215

Hydro

(Renewable)

RES

(MNRE)

Total (Islands)

State Ownership Sector

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

Andaman amp

Nicobar

lakshadweep

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Modewise breakup

Grand TotalThermalNuclear

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 12: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Oct 16 181 0 0 0 45 0 8

Oct 17 0 0 0 150 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Oct 16 2 58 0 0 0 0 0

Oct 17 6 77 4 0 2 2 12

9

0 0 0

150

0 0 4

181

0 0 0

45

0 8

0

50

100

150

200

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW)Oct 17 Oct 16

6

77

4 0 2 2

12

2 0 0 0 0 0

0

100

Aru

na

ch

al

Assa

m

Ma

nip

ur

Meghal

aya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Oct 16 Oct 17

Central 6790 6914

State 5734 5423

Private 5666 5666

ALL INDIA 5993 5969

Month PLF 2016 PLF 2017

Apr 6681 6559

May 6215 6439

June 7324 7015

July 6721 6845

Aug 6991 6617

Sep 5793 6069

Oct 5993 5969

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Oct 2017

67

90

57

34

56

66

59

93

69

14

54

23

56

66

59

69

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Apr 2016 and Oct 2017

Oct 16 Oct 17

621

5

643

9

60

80

Ap

ril

Axis

Title

Axis Title

All India PLF Month-wise

2016 2017

2010-11 2011-12 2012-13 2013-14 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumers P Provisional

Total Number of Villages

597464

Pump sets Energised

as on 31-03-2016

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Actual

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31052017

Villiages Electrified (Nos) as on 311017

9925594 599

Villages electrified

15 All India Coal consumption for Power Generation (MT)

520

14 All India per capita consumption of Electricity ( KWh)

Average Revenue Realization(paiseunit)

21191474

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is

provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data As

such each monthly report of Village electrification of CEA is independent of the earlier published reports

Pump sets Energised as on 31-10-17

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer may not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Sep 2017 and April 2016 to Oct 2017 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1586860 2220135 5366050 9173045

Hydro 258402 227600 61900 547902

Nuclear 200000 000 000 200000

Total 2045262 2447735 5427950 9920947

Acievement 7812 15761 11592 11205

1 Capacity Addtion Targets and Achievements in the 12th Plan

Achievement of Capacity Addition during the Current Plan upto March 2017

Achievements upto Mar 2017 during the 12th Plan

723

400

0

108

970

0

53

000

0

54

790

2

20

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 9920947 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 4880 1460 0 6340 910 -5430

State 3546 0 0 4446 660 -3786

Pvt 2940 0 0 4170 2220 -1950

Total 11366 1460 0 14956 3790 -11166

Central 800 0 0 610 30 -580

State 300 30 0 428 100 -328

Pvt 205 0 0 217 0 -217

Total 1305 30 0 1255 130 -1125

Nuclear Central 500 0 0 0 0 0

Central 6180 1460 0 6950 940 -6010

State 3846 30 0 4874 760 -4114

Pvt 3145 0 0 4387 2220 -2167

Total 13171 1490 0 16211 3920 -12291

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct 2017

Thermal

2 Capacity Addition Targets Achievements During Oct 2017

Oct-17 April 17 - Oct 17Schemes Sector

Target 2017-18

14

95

6

12

55

0

16

21

1

37

90

13

0

0

39

20

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2017-18 Target

Achievement

1460

030

0

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Target Achievement

MW

Targets and Achievement during Oct 2017Thermal

Hydro

Nuclear

Coal Gas Diesel Total

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Sub Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Sub Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Sub Total 4338202 647366 5061726 332000 1174803 2772832 9341361

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Sub Total 2712664 10000 000 2722664 000 483412 102732 3308808

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Sub Total 52002 173605 3600 229207 000 131200 28541 388948

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1210 5215

State 6378050 707895 7122338 000 2979800 197690 10299827

Private 7449600 1058060 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

Total 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092017 is given below (in MW)

438955 3270064 1477169 6015766

A Oct 2017 0 MW

B Oct 2017 35 MW

C Oct 2017 0 MW

D Oct 2017 A-B-C -35 MW

1 NAMRUP CCPP U-1 (20 MW) has been retired from the State Sector of Assam

2 LAKWA GT U-4 (15 MW) has been retired from the State Sector of Assam

Capacity Removed due to

change to CPP from IPP during

Net Capacity Added during

2 Allocation from UNCHAHAR TPS U-6 (500 MW) FARAKKA STPS U-6 (500 MW) and KORBA STPS U-7 (500 MW) has been revised

as per GM Division allocation as on 30092017

Small

Hydro Power

Total

Capacity

Islands

Bio-PowerSolar Power

Waste to EnergyWind Power

Capacity Added during

Capacity Retired during

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102017)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

(UTILITIES)

RES

(MNRE)

Northern Region

Western Region

818170 11408

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092017

BM PowerCogen

Southern Region

Eastern Region

North Eastern

Region

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 7066 104788

Central 377972 20701 000 398673 10283 72309 000 481265

Sub-Total 478394 211541 000 689935 10283 72309 7066 779593

State 272000 15000 000 287000 000 108451 5930 401381

Private 408078 000 000 408078 000 20000 30679 458757

Central 127872 53561 000 181434 10094 66370181 000 257898

Sub-Total 807950 68561 000 876512 10094 194821 36609 1118035

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 57983 157183

Central 17390 6201 000 23591 2895 122388 000 148874

Sub-Total 17390 6201 000 23591 2895 291048 83644 401178

State 000 17500 000 17500 000 123000 10803 151303

Private 000 000 000 000 000 000 5082 5082

Central 48739 12907 000 61647 6798 104898 000 173343

Sub-Total 48739 30407 000 79147 6798 227898 15885 329728

State 262000 15000 000 277000 000 257023 12780 546803

Private 511550 000 000 511550 000 28800 107812 648162

Central 83058 26401 000 109459 19681 92342 000 221482

Sub-Total 856608 41401 000 898009 19681 378165 120592 1416447

State 585000 60380 000 645380 000 108796 2385 756561

Private 388200 000 000 388200 000 10400 660476 1059076

Central 117325 22110 000 139435 55674 73901 000 269010

Sub-Total 1090525 82490 000 1173015 55674 193097 662861 2084647

State 577300 000 000 577300 000 72410 2510 652220

Private 871433 000 000 871433 000 84200 244508 1200141

Central 333839 54949 000 388788 28948 166493 000 584229

Sub-Total 1782572 54949 000 1837521 28948 323103 247018 2436590

State 000 000 000 000 000 125215 6287 131502

Private 9900 45000 000 54900 000 8800 46381 110081

Central 33174 6966 000 40140 3124 47554 000 90818

Sub-Total 43074 51966 000 95040 3124 181569 52668 332401

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1572 1572

Central 3665 1503 000 5167 801 10171 000 16139

Sub-Total 3665 1503 000 5167 801 10171 1572 17711

120003 29105 000 149108 23703 70195 000 243007

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Grand Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Uttar Pradesh

Uttarakhand

Chandigarh

NuclearHydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102017)

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Modewise breakup

Grand TotalThermalOwnership Sector

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Central - Unallocated

Total (Northern

Region)

Punjab

Rajasthan

RES

(MNRE)

(As on 31102017)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 051 4851

Central 45112 2220 000 47332 2600 000 000 49932

Sub-Total 45112 7020 000 52132 2600 000 056 54788

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1031 1031

Central 12296 4840 000 17136 700 000 000 17836

Sub-Total 12296 4840 000 17136 700 000 1031 18867

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 686953 1859520

Central 301209 42400 000 343609 55900 000 000 399509

Sub-Total 1552776 656182 000 2208958 55900 77200 687753 3029811

State 408000 000 000 408000 000 170366 8396 586762

Private 557400 10000 000 567400 000 000 371617 939017

Central 272070 25700 000 297770 27300 152000 000 477070

Sub-Total 1237470 35700 000 1273170 27300 322366 380013 2002849

State 328000 000 000 328000 000 12000 1105 341105

Private 759000 000 000 759000 000 000 41597 800597

Central 155344 000 000 155344 4800 000 000 160144

Sub-Total 1242344 000 000 1242344 4800 12000 42702 1301846

State 1017000 67200 000 1084200 000 285084 20812 1390096

Private 1245600 56800 000 1302400 000 48100 750121 2100621

Central 421943 251300 000 673243 69000 000 000 742243

Sub-Total 2684543 375300 000 3059843 69000 333184 770933 4232960

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 048 048

Central 16921 7140 000 24061 900 000 000 24961

Sub-Total 16921 7140 000 24061 900 000 048 25009

199400 19759 000 219159 22800 000 000 241959

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Grand Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Hydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Goa

Daman amp Diu

Gujarat

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Madhya Pradesh

RES

(MNRE)Nuclear

Grand TotalThermalOwnership Sector

Modewise breakup

Maharashtra

Chhattisgarh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 441000 23540 000 464540 000 167360 8950 640850

Private 387388 369412 3680 760480 000 000 645447 1405927

Central 160760 000 000 160760 12727 000 000 173487

Sub-Total 989148 392952 3680 1385780 12727 167360 654397 2220264

State 408250 000 000 408250 000 238993 000 647243

Private 83945 95088 000 179033 000 000 239336 418369

Central 187812 000 000 187812 14873 000 000 202685

Sub-Total 680007 95088 000 775095 14873 238993 239336 1268297

State 502000 000 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 761814 960184

Central 242920 000 000 242920 69800 000 000 312720

Sub-Total 940770 000 956082 69800 359980 777347 2163209

State 000 000 15996 000 188150 14502 218648

Private 61500 17400 000 78900 000 000 18557 97457

Central 110818 35958 000 146776 36200 000 000 182976

Sub-Total 172318 53358 241672 36200 188150 33059 499081

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 575247 000 000 1056418 1631665

Central 438952 000 000 438952 144800 000 000 583752

Sub-Total 1354719 102718 1498607 144800 220320 1068688 2932415

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 005 005

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 005 36695

166400 000 000 166400 45000 000 000 211400

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Grand Total 4338202 647366 5061726 332000 1174803 2772832 9341361

Andhra Pradesh

Puducherry

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Southern

Region)

Karnataka

Kerala

Tamil Nadu

NLC

Central - Unallocated

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Telangana

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 28100 000 000 28100 000 000 25358 53458

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 340533 000 000 340533 000 11000 32428 383960

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 2037 75037

Central 84874 000 000 84874 000 6100 000 90974

Sub-Total 199874 000 000 199874 000 19100 2442 221416

State 552000 10000 000 562000 000 98600 9195 669795

Private 227500 000 000 227500 000 000 34003 261503

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 855577 10000 000 865577 000 139600 43198 1048375

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 18822 312722

Central 163390 000 000 163390 000 8900 000 172290

Sub-Total 499290 000 000 499290 000 215092 19452 733834

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 29100 001 29101

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 71500 5212 85415

110183 000 000 110183 000 8501 000 118684

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Grand Total 2712664 10000 000 2722664 000 483412 102732 3308808

(As on 31102017)

Coal Gas Diesel Total

State 000 28845 000 28845 000 10000 3001 41846

Private 000 2450 000 2450 000 000 1521 3971

Central 27902 43556 000 71458 000 33123 000 104581

Sub-Total 27902 74851 000 102753 000 43123 4522 150398

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 439 439

Central 2470 4682 000 7152 000 9745 000 16897

Sub-Total 2470 4682 000 7152 000 9745 10899 27796

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 6519 000 20528

Sub-Total 3040 10969 000 14009 000 38719 3109 55837

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 3740 43695 000 47435 000 6238 000 53673

Sub-Total 3740 60645 000 64385 000 6238 2101 72724

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 131 131

Central 3140 7157 000 10297 000 8893 000 19190

Sub-Total 3140 7157 3600 13897 000 8893 676 23466

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 2140 4893 000 7033 000 5337 000 12370

Sub-Total 2140 4893 000 7033 000 5337 3067 15437

State 000 000 000 000 000 000 4147 4147

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 6419 000 12535

Sub-Total 2070 4046 000 6116 000 6419 4167 16702

7500 6362 000 13862 000 12726 000 26588

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Grand Total 52002 173605 3600 229207 000 131200 28541 388948

Modewise breakup

Bihar

Hydro

(Renewable)

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

RES

(MNRE)

Total (Eastern

Region)

Ownership Sector

Assam

Odisha

State Ownership Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Sikkim

Jharkhand

West Bengal

DVC

Grand TotalThermal

Central - Unallocated

Nuclear

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 610 610

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1135 5140

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1210 5215

Hydro

(Renewable)

RES

(MNRE)

Total (Islands)

State Ownership Sector

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

Andaman amp

Nicobar

lakshadweep

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Modewise breakup

Grand TotalThermalNuclear

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 13: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

Sector Oct 16 Oct 17

Central 6790 6914

State 5734 5423

Private 5666 5666

ALL INDIA 5993 5969

Month PLF 2016 PLF 2017

Apr 6681 6559

May 6215 6439

June 7324 7015

July 6721 6845

Aug 6991 6617

Sep 5793 6069

Oct 5993 5969

For Coal and Lignite based Power Plants

10

PLF

All India PLF Month-wise

10 All India PLF Sector-wise for Oct 2017

67

90

57

34

56

66

59

93

69

14

54

23

56

66

59

69

000

1000

2000

3000

4000

5000

6000

7000

8000

Central State Private ALL INDIA

P

LF

Sector-Wise Plant Load Factor for Apr 2016 and Oct 2017

Oct 16 Oct 17

621

5

643

9

60

80

Ap

ril

Axis

Title

Axis Title

All India PLF Month-wise

2016 2017

2010-11 2011-12 2012-13 2013-14 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumers P Provisional

Total Number of Villages

597464

Pump sets Energised

as on 31-03-2016

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Actual

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31052017

Villiages Electrified (Nos) as on 311017

9925594 599

Villages electrified

15 All India Coal consumption for Power Generation (MT)

520

14 All India per capita consumption of Electricity ( KWh)

Average Revenue Realization(paiseunit)

21191474

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is

provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data As

such each monthly report of Village electrification of CEA is independent of the earlier published reports

Pump sets Energised as on 31-10-17

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer may not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Sep 2017 and April 2016 to Oct 2017 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1586860 2220135 5366050 9173045

Hydro 258402 227600 61900 547902

Nuclear 200000 000 000 200000

Total 2045262 2447735 5427950 9920947

Acievement 7812 15761 11592 11205

1 Capacity Addtion Targets and Achievements in the 12th Plan

Achievement of Capacity Addition during the Current Plan upto March 2017

Achievements upto Mar 2017 during the 12th Plan

723

400

0

108

970

0

53

000

0

54

790

2

20

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 9920947 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 4880 1460 0 6340 910 -5430

State 3546 0 0 4446 660 -3786

Pvt 2940 0 0 4170 2220 -1950

Total 11366 1460 0 14956 3790 -11166

Central 800 0 0 610 30 -580

State 300 30 0 428 100 -328

Pvt 205 0 0 217 0 -217

Total 1305 30 0 1255 130 -1125

Nuclear Central 500 0 0 0 0 0

Central 6180 1460 0 6950 940 -6010

State 3846 30 0 4874 760 -4114

Pvt 3145 0 0 4387 2220 -2167

Total 13171 1490 0 16211 3920 -12291

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct 2017

Thermal

2 Capacity Addition Targets Achievements During Oct 2017

Oct-17 April 17 - Oct 17Schemes Sector

Target 2017-18

14

95

6

12

55

0

16

21

1

37

90

13

0

0

39

20

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2017-18 Target

Achievement

1460

030

0

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Target Achievement

MW

Targets and Achievement during Oct 2017Thermal

Hydro

Nuclear

Coal Gas Diesel Total

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Sub Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Sub Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Sub Total 4338202 647366 5061726 332000 1174803 2772832 9341361

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Sub Total 2712664 10000 000 2722664 000 483412 102732 3308808

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Sub Total 52002 173605 3600 229207 000 131200 28541 388948

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1210 5215

State 6378050 707895 7122338 000 2979800 197690 10299827

Private 7449600 1058060 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

Total 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092017 is given below (in MW)

438955 3270064 1477169 6015766

A Oct 2017 0 MW

B Oct 2017 35 MW

C Oct 2017 0 MW

D Oct 2017 A-B-C -35 MW

1 NAMRUP CCPP U-1 (20 MW) has been retired from the State Sector of Assam

2 LAKWA GT U-4 (15 MW) has been retired from the State Sector of Assam

Capacity Removed due to

change to CPP from IPP during

Net Capacity Added during

2 Allocation from UNCHAHAR TPS U-6 (500 MW) FARAKKA STPS U-6 (500 MW) and KORBA STPS U-7 (500 MW) has been revised

as per GM Division allocation as on 30092017

Small

Hydro Power

Total

Capacity

Islands

Bio-PowerSolar Power

Waste to EnergyWind Power

Capacity Added during

Capacity Retired during

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102017)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

(UTILITIES)

RES

(MNRE)

Northern Region

Western Region

818170 11408

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092017

BM PowerCogen

Southern Region

Eastern Region

North Eastern

Region

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 7066 104788

Central 377972 20701 000 398673 10283 72309 000 481265

Sub-Total 478394 211541 000 689935 10283 72309 7066 779593

State 272000 15000 000 287000 000 108451 5930 401381

Private 408078 000 000 408078 000 20000 30679 458757

Central 127872 53561 000 181434 10094 66370181 000 257898

Sub-Total 807950 68561 000 876512 10094 194821 36609 1118035

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 57983 157183

Central 17390 6201 000 23591 2895 122388 000 148874

Sub-Total 17390 6201 000 23591 2895 291048 83644 401178

State 000 17500 000 17500 000 123000 10803 151303

Private 000 000 000 000 000 000 5082 5082

Central 48739 12907 000 61647 6798 104898 000 173343

Sub-Total 48739 30407 000 79147 6798 227898 15885 329728

State 262000 15000 000 277000 000 257023 12780 546803

Private 511550 000 000 511550 000 28800 107812 648162

Central 83058 26401 000 109459 19681 92342 000 221482

Sub-Total 856608 41401 000 898009 19681 378165 120592 1416447

State 585000 60380 000 645380 000 108796 2385 756561

Private 388200 000 000 388200 000 10400 660476 1059076

Central 117325 22110 000 139435 55674 73901 000 269010

Sub-Total 1090525 82490 000 1173015 55674 193097 662861 2084647

State 577300 000 000 577300 000 72410 2510 652220

Private 871433 000 000 871433 000 84200 244508 1200141

Central 333839 54949 000 388788 28948 166493 000 584229

Sub-Total 1782572 54949 000 1837521 28948 323103 247018 2436590

State 000 000 000 000 000 125215 6287 131502

Private 9900 45000 000 54900 000 8800 46381 110081

Central 33174 6966 000 40140 3124 47554 000 90818

Sub-Total 43074 51966 000 95040 3124 181569 52668 332401

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1572 1572

Central 3665 1503 000 5167 801 10171 000 16139

Sub-Total 3665 1503 000 5167 801 10171 1572 17711

120003 29105 000 149108 23703 70195 000 243007

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Grand Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Uttar Pradesh

Uttarakhand

Chandigarh

NuclearHydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102017)

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Modewise breakup

Grand TotalThermalOwnership Sector

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Central - Unallocated

Total (Northern

Region)

Punjab

Rajasthan

RES

(MNRE)

(As on 31102017)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 051 4851

Central 45112 2220 000 47332 2600 000 000 49932

Sub-Total 45112 7020 000 52132 2600 000 056 54788

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1031 1031

Central 12296 4840 000 17136 700 000 000 17836

Sub-Total 12296 4840 000 17136 700 000 1031 18867

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 686953 1859520

Central 301209 42400 000 343609 55900 000 000 399509

Sub-Total 1552776 656182 000 2208958 55900 77200 687753 3029811

State 408000 000 000 408000 000 170366 8396 586762

Private 557400 10000 000 567400 000 000 371617 939017

Central 272070 25700 000 297770 27300 152000 000 477070

Sub-Total 1237470 35700 000 1273170 27300 322366 380013 2002849

State 328000 000 000 328000 000 12000 1105 341105

Private 759000 000 000 759000 000 000 41597 800597

Central 155344 000 000 155344 4800 000 000 160144

Sub-Total 1242344 000 000 1242344 4800 12000 42702 1301846

State 1017000 67200 000 1084200 000 285084 20812 1390096

Private 1245600 56800 000 1302400 000 48100 750121 2100621

Central 421943 251300 000 673243 69000 000 000 742243

Sub-Total 2684543 375300 000 3059843 69000 333184 770933 4232960

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 048 048

Central 16921 7140 000 24061 900 000 000 24961

Sub-Total 16921 7140 000 24061 900 000 048 25009

199400 19759 000 219159 22800 000 000 241959

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Grand Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Hydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Goa

Daman amp Diu

Gujarat

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Madhya Pradesh

RES

(MNRE)Nuclear

Grand TotalThermalOwnership Sector

Modewise breakup

Maharashtra

Chhattisgarh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 441000 23540 000 464540 000 167360 8950 640850

Private 387388 369412 3680 760480 000 000 645447 1405927

Central 160760 000 000 160760 12727 000 000 173487

Sub-Total 989148 392952 3680 1385780 12727 167360 654397 2220264

State 408250 000 000 408250 000 238993 000 647243

Private 83945 95088 000 179033 000 000 239336 418369

Central 187812 000 000 187812 14873 000 000 202685

Sub-Total 680007 95088 000 775095 14873 238993 239336 1268297

State 502000 000 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 761814 960184

Central 242920 000 000 242920 69800 000 000 312720

Sub-Total 940770 000 956082 69800 359980 777347 2163209

State 000 000 15996 000 188150 14502 218648

Private 61500 17400 000 78900 000 000 18557 97457

Central 110818 35958 000 146776 36200 000 000 182976

Sub-Total 172318 53358 241672 36200 188150 33059 499081

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 575247 000 000 1056418 1631665

Central 438952 000 000 438952 144800 000 000 583752

Sub-Total 1354719 102718 1498607 144800 220320 1068688 2932415

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 005 005

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 005 36695

166400 000 000 166400 45000 000 000 211400

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Grand Total 4338202 647366 5061726 332000 1174803 2772832 9341361

Andhra Pradesh

Puducherry

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Southern

Region)

Karnataka

Kerala

Tamil Nadu

NLC

Central - Unallocated

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Telangana

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 28100 000 000 28100 000 000 25358 53458

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 340533 000 000 340533 000 11000 32428 383960

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 2037 75037

Central 84874 000 000 84874 000 6100 000 90974

Sub-Total 199874 000 000 199874 000 19100 2442 221416

State 552000 10000 000 562000 000 98600 9195 669795

Private 227500 000 000 227500 000 000 34003 261503

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 855577 10000 000 865577 000 139600 43198 1048375

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 18822 312722

Central 163390 000 000 163390 000 8900 000 172290

Sub-Total 499290 000 000 499290 000 215092 19452 733834

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 29100 001 29101

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 71500 5212 85415

110183 000 000 110183 000 8501 000 118684

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Grand Total 2712664 10000 000 2722664 000 483412 102732 3308808

(As on 31102017)

Coal Gas Diesel Total

State 000 28845 000 28845 000 10000 3001 41846

Private 000 2450 000 2450 000 000 1521 3971

Central 27902 43556 000 71458 000 33123 000 104581

Sub-Total 27902 74851 000 102753 000 43123 4522 150398

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 439 439

Central 2470 4682 000 7152 000 9745 000 16897

Sub-Total 2470 4682 000 7152 000 9745 10899 27796

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 6519 000 20528

Sub-Total 3040 10969 000 14009 000 38719 3109 55837

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 3740 43695 000 47435 000 6238 000 53673

Sub-Total 3740 60645 000 64385 000 6238 2101 72724

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 131 131

Central 3140 7157 000 10297 000 8893 000 19190

Sub-Total 3140 7157 3600 13897 000 8893 676 23466

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 2140 4893 000 7033 000 5337 000 12370

Sub-Total 2140 4893 000 7033 000 5337 3067 15437

State 000 000 000 000 000 000 4147 4147

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 6419 000 12535

Sub-Total 2070 4046 000 6116 000 6419 4167 16702

7500 6362 000 13862 000 12726 000 26588

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Grand Total 52002 173605 3600 229207 000 131200 28541 388948

Modewise breakup

Bihar

Hydro

(Renewable)

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

RES

(MNRE)

Total (Eastern

Region)

Ownership Sector

Assam

Odisha

State Ownership Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Sikkim

Jharkhand

West Bengal

DVC

Grand TotalThermal

Central - Unallocated

Nuclear

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 610 610

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1135 5140

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1210 5215

Hydro

(Renewable)

RES

(MNRE)

Total (Islands)

State Ownership Sector

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

Andaman amp

Nicobar

lakshadweep

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Modewise breakup

Grand TotalThermalNuclear

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 14: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

2010-11 2011-12 2012-13 2013-14 2014-15

TampD Losses 2397 2365 2304 2146 2277(P)

ATampC Losses 2635 2663 2548 2258 2462(P)

Note As per PFC for utilities selling directly to consumers P Provisional

Total Number of Villages

597464

Pump sets Energised

as on 31-03-2016

20434180

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2014-15 1010

2015-16 1075

(Gross Generation+Net Import) Mid Year Population Provisional

2013-14 4894

2014-15 5304

2015-16 5459

Actual

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification amp Pumpsets Energised as on 31052017

Villiages Electrified (Nos) as on 311017

9925594 599

Villages electrified

15 All India Coal consumption for Power Generation (MT)

520

14 All India per capita consumption of Electricity ( KWh)

Average Revenue Realization(paiseunit)

21191474

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries

Community Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is

provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was

Updated every month based on the information received from statesdistribution utilities as and when

reported but the data for all the states for a particular month was generally not made available

simultaneously to reflect the countrywide picture for a particular month Number of total villages and

number of electrified villages have also been adjusted for changes observed from Census 2011 data As

such each monthly report of Village electrification of CEA is independent of the earlier published reports

Pump sets Energised as on 31-10-17

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited

locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy

Sources a Distribution Transformer may not be necessary)

Figures are based on the data available in DDUGJY website

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Sep 2017 and April 2016 to Oct 2017 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1586860 2220135 5366050 9173045

Hydro 258402 227600 61900 547902

Nuclear 200000 000 000 200000

Total 2045262 2447735 5427950 9920947

Acievement 7812 15761 11592 11205

1 Capacity Addtion Targets and Achievements in the 12th Plan

Achievement of Capacity Addition during the Current Plan upto March 2017

Achievements upto Mar 2017 during the 12th Plan

723

400

0

108

970

0

53

000

0

54

790

2

20

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 9920947 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 4880 1460 0 6340 910 -5430

State 3546 0 0 4446 660 -3786

Pvt 2940 0 0 4170 2220 -1950

Total 11366 1460 0 14956 3790 -11166

Central 800 0 0 610 30 -580

State 300 30 0 428 100 -328

Pvt 205 0 0 217 0 -217

Total 1305 30 0 1255 130 -1125

Nuclear Central 500 0 0 0 0 0

Central 6180 1460 0 6950 940 -6010

State 3846 30 0 4874 760 -4114

Pvt 3145 0 0 4387 2220 -2167

Total 13171 1490 0 16211 3920 -12291

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct 2017

Thermal

2 Capacity Addition Targets Achievements During Oct 2017

Oct-17 April 17 - Oct 17Schemes Sector

Target 2017-18

14

95

6

12

55

0

16

21

1

37

90

13

0

0

39

20

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2017-18 Target

Achievement

1460

030

0

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Target Achievement

MW

Targets and Achievement during Oct 2017Thermal

Hydro

Nuclear

Coal Gas Diesel Total

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Sub Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Sub Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Sub Total 4338202 647366 5061726 332000 1174803 2772832 9341361

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Sub Total 2712664 10000 000 2722664 000 483412 102732 3308808

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Sub Total 52002 173605 3600 229207 000 131200 28541 388948

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1210 5215

State 6378050 707895 7122338 000 2979800 197690 10299827

Private 7449600 1058060 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

Total 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092017 is given below (in MW)

438955 3270064 1477169 6015766

A Oct 2017 0 MW

B Oct 2017 35 MW

C Oct 2017 0 MW

D Oct 2017 A-B-C -35 MW

1 NAMRUP CCPP U-1 (20 MW) has been retired from the State Sector of Assam

2 LAKWA GT U-4 (15 MW) has been retired from the State Sector of Assam

Capacity Removed due to

change to CPP from IPP during

Net Capacity Added during

2 Allocation from UNCHAHAR TPS U-6 (500 MW) FARAKKA STPS U-6 (500 MW) and KORBA STPS U-7 (500 MW) has been revised

as per GM Division allocation as on 30092017

Small

Hydro Power

Total

Capacity

Islands

Bio-PowerSolar Power

Waste to EnergyWind Power

Capacity Added during

Capacity Retired during

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102017)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

(UTILITIES)

RES

(MNRE)

Northern Region

Western Region

818170 11408

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092017

BM PowerCogen

Southern Region

Eastern Region

North Eastern

Region

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 7066 104788

Central 377972 20701 000 398673 10283 72309 000 481265

Sub-Total 478394 211541 000 689935 10283 72309 7066 779593

State 272000 15000 000 287000 000 108451 5930 401381

Private 408078 000 000 408078 000 20000 30679 458757

Central 127872 53561 000 181434 10094 66370181 000 257898

Sub-Total 807950 68561 000 876512 10094 194821 36609 1118035

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 57983 157183

Central 17390 6201 000 23591 2895 122388 000 148874

Sub-Total 17390 6201 000 23591 2895 291048 83644 401178

State 000 17500 000 17500 000 123000 10803 151303

Private 000 000 000 000 000 000 5082 5082

Central 48739 12907 000 61647 6798 104898 000 173343

Sub-Total 48739 30407 000 79147 6798 227898 15885 329728

State 262000 15000 000 277000 000 257023 12780 546803

Private 511550 000 000 511550 000 28800 107812 648162

Central 83058 26401 000 109459 19681 92342 000 221482

Sub-Total 856608 41401 000 898009 19681 378165 120592 1416447

State 585000 60380 000 645380 000 108796 2385 756561

Private 388200 000 000 388200 000 10400 660476 1059076

Central 117325 22110 000 139435 55674 73901 000 269010

Sub-Total 1090525 82490 000 1173015 55674 193097 662861 2084647

State 577300 000 000 577300 000 72410 2510 652220

Private 871433 000 000 871433 000 84200 244508 1200141

Central 333839 54949 000 388788 28948 166493 000 584229

Sub-Total 1782572 54949 000 1837521 28948 323103 247018 2436590

State 000 000 000 000 000 125215 6287 131502

Private 9900 45000 000 54900 000 8800 46381 110081

Central 33174 6966 000 40140 3124 47554 000 90818

Sub-Total 43074 51966 000 95040 3124 181569 52668 332401

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1572 1572

Central 3665 1503 000 5167 801 10171 000 16139

Sub-Total 3665 1503 000 5167 801 10171 1572 17711

120003 29105 000 149108 23703 70195 000 243007

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Grand Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Uttar Pradesh

Uttarakhand

Chandigarh

NuclearHydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102017)

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Modewise breakup

Grand TotalThermalOwnership Sector

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Central - Unallocated

Total (Northern

Region)

Punjab

Rajasthan

RES

(MNRE)

(As on 31102017)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 051 4851

Central 45112 2220 000 47332 2600 000 000 49932

Sub-Total 45112 7020 000 52132 2600 000 056 54788

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1031 1031

Central 12296 4840 000 17136 700 000 000 17836

Sub-Total 12296 4840 000 17136 700 000 1031 18867

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 686953 1859520

Central 301209 42400 000 343609 55900 000 000 399509

Sub-Total 1552776 656182 000 2208958 55900 77200 687753 3029811

State 408000 000 000 408000 000 170366 8396 586762

Private 557400 10000 000 567400 000 000 371617 939017

Central 272070 25700 000 297770 27300 152000 000 477070

Sub-Total 1237470 35700 000 1273170 27300 322366 380013 2002849

State 328000 000 000 328000 000 12000 1105 341105

Private 759000 000 000 759000 000 000 41597 800597

Central 155344 000 000 155344 4800 000 000 160144

Sub-Total 1242344 000 000 1242344 4800 12000 42702 1301846

State 1017000 67200 000 1084200 000 285084 20812 1390096

Private 1245600 56800 000 1302400 000 48100 750121 2100621

Central 421943 251300 000 673243 69000 000 000 742243

Sub-Total 2684543 375300 000 3059843 69000 333184 770933 4232960

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 048 048

Central 16921 7140 000 24061 900 000 000 24961

Sub-Total 16921 7140 000 24061 900 000 048 25009

199400 19759 000 219159 22800 000 000 241959

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Grand Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Hydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Goa

Daman amp Diu

Gujarat

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Madhya Pradesh

RES

(MNRE)Nuclear

Grand TotalThermalOwnership Sector

Modewise breakup

Maharashtra

Chhattisgarh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 441000 23540 000 464540 000 167360 8950 640850

Private 387388 369412 3680 760480 000 000 645447 1405927

Central 160760 000 000 160760 12727 000 000 173487

Sub-Total 989148 392952 3680 1385780 12727 167360 654397 2220264

State 408250 000 000 408250 000 238993 000 647243

Private 83945 95088 000 179033 000 000 239336 418369

Central 187812 000 000 187812 14873 000 000 202685

Sub-Total 680007 95088 000 775095 14873 238993 239336 1268297

State 502000 000 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 761814 960184

Central 242920 000 000 242920 69800 000 000 312720

Sub-Total 940770 000 956082 69800 359980 777347 2163209

State 000 000 15996 000 188150 14502 218648

Private 61500 17400 000 78900 000 000 18557 97457

Central 110818 35958 000 146776 36200 000 000 182976

Sub-Total 172318 53358 241672 36200 188150 33059 499081

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 575247 000 000 1056418 1631665

Central 438952 000 000 438952 144800 000 000 583752

Sub-Total 1354719 102718 1498607 144800 220320 1068688 2932415

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 005 005

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 005 36695

166400 000 000 166400 45000 000 000 211400

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Grand Total 4338202 647366 5061726 332000 1174803 2772832 9341361

Andhra Pradesh

Puducherry

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Southern

Region)

Karnataka

Kerala

Tamil Nadu

NLC

Central - Unallocated

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Telangana

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 28100 000 000 28100 000 000 25358 53458

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 340533 000 000 340533 000 11000 32428 383960

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 2037 75037

Central 84874 000 000 84874 000 6100 000 90974

Sub-Total 199874 000 000 199874 000 19100 2442 221416

State 552000 10000 000 562000 000 98600 9195 669795

Private 227500 000 000 227500 000 000 34003 261503

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 855577 10000 000 865577 000 139600 43198 1048375

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 18822 312722

Central 163390 000 000 163390 000 8900 000 172290

Sub-Total 499290 000 000 499290 000 215092 19452 733834

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 29100 001 29101

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 71500 5212 85415

110183 000 000 110183 000 8501 000 118684

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Grand Total 2712664 10000 000 2722664 000 483412 102732 3308808

(As on 31102017)

Coal Gas Diesel Total

State 000 28845 000 28845 000 10000 3001 41846

Private 000 2450 000 2450 000 000 1521 3971

Central 27902 43556 000 71458 000 33123 000 104581

Sub-Total 27902 74851 000 102753 000 43123 4522 150398

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 439 439

Central 2470 4682 000 7152 000 9745 000 16897

Sub-Total 2470 4682 000 7152 000 9745 10899 27796

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 6519 000 20528

Sub-Total 3040 10969 000 14009 000 38719 3109 55837

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 3740 43695 000 47435 000 6238 000 53673

Sub-Total 3740 60645 000 64385 000 6238 2101 72724

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 131 131

Central 3140 7157 000 10297 000 8893 000 19190

Sub-Total 3140 7157 3600 13897 000 8893 676 23466

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 2140 4893 000 7033 000 5337 000 12370

Sub-Total 2140 4893 000 7033 000 5337 3067 15437

State 000 000 000 000 000 000 4147 4147

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 6419 000 12535

Sub-Total 2070 4046 000 6116 000 6419 4167 16702

7500 6362 000 13862 000 12726 000 26588

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Grand Total 52002 173605 3600 229207 000 131200 28541 388948

Modewise breakup

Bihar

Hydro

(Renewable)

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

RES

(MNRE)

Total (Eastern

Region)

Ownership Sector

Assam

Odisha

State Ownership Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Sikkim

Jharkhand

West Bengal

DVC

Grand TotalThermal

Central - Unallocated

Nuclear

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 610 610

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1135 5140

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1210 5215

Hydro

(Renewable)

RES

(MNRE)

Total (Islands)

State Ownership Sector

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

Andaman amp

Nicobar

lakshadweep

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Modewise breakup

Grand TotalThermalNuclear

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 15: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Sep 2017 and April 2016 to Oct 2017 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1586860 2220135 5366050 9173045

Hydro 258402 227600 61900 547902

Nuclear 200000 000 000 200000

Total 2045262 2447735 5427950 9920947

Acievement 7812 15761 11592 11205

1 Capacity Addtion Targets and Achievements in the 12th Plan

Achievement of Capacity Addition during the Current Plan upto March 2017

Achievements upto Mar 2017 during the 12th Plan

723

400

0

108

970

0

53

000

0

54

790

2

20

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 9920947 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 4880 1460 0 6340 910 -5430

State 3546 0 0 4446 660 -3786

Pvt 2940 0 0 4170 2220 -1950

Total 11366 1460 0 14956 3790 -11166

Central 800 0 0 610 30 -580

State 300 30 0 428 100 -328

Pvt 205 0 0 217 0 -217

Total 1305 30 0 1255 130 -1125

Nuclear Central 500 0 0 0 0 0

Central 6180 1460 0 6950 940 -6010

State 3846 30 0 4874 760 -4114

Pvt 3145 0 0 4387 2220 -2167

Total 13171 1490 0 16211 3920 -12291

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct 2017

Thermal

2 Capacity Addition Targets Achievements During Oct 2017

Oct-17 April 17 - Oct 17Schemes Sector

Target 2017-18

14

95

6

12

55

0

16

21

1

37

90

13

0

0

39

20

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2017-18 Target

Achievement

1460

030

0

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Target Achievement

MW

Targets and Achievement during Oct 2017Thermal

Hydro

Nuclear

Coal Gas Diesel Total

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Sub Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Sub Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Sub Total 4338202 647366 5061726 332000 1174803 2772832 9341361

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Sub Total 2712664 10000 000 2722664 000 483412 102732 3308808

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Sub Total 52002 173605 3600 229207 000 131200 28541 388948

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1210 5215

State 6378050 707895 7122338 000 2979800 197690 10299827

Private 7449600 1058060 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

Total 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092017 is given below (in MW)

438955 3270064 1477169 6015766

A Oct 2017 0 MW

B Oct 2017 35 MW

C Oct 2017 0 MW

D Oct 2017 A-B-C -35 MW

1 NAMRUP CCPP U-1 (20 MW) has been retired from the State Sector of Assam

2 LAKWA GT U-4 (15 MW) has been retired from the State Sector of Assam

Capacity Removed due to

change to CPP from IPP during

Net Capacity Added during

2 Allocation from UNCHAHAR TPS U-6 (500 MW) FARAKKA STPS U-6 (500 MW) and KORBA STPS U-7 (500 MW) has been revised

as per GM Division allocation as on 30092017

Small

Hydro Power

Total

Capacity

Islands

Bio-PowerSolar Power

Waste to EnergyWind Power

Capacity Added during

Capacity Retired during

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102017)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

(UTILITIES)

RES

(MNRE)

Northern Region

Western Region

818170 11408

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092017

BM PowerCogen

Southern Region

Eastern Region

North Eastern

Region

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 7066 104788

Central 377972 20701 000 398673 10283 72309 000 481265

Sub-Total 478394 211541 000 689935 10283 72309 7066 779593

State 272000 15000 000 287000 000 108451 5930 401381

Private 408078 000 000 408078 000 20000 30679 458757

Central 127872 53561 000 181434 10094 66370181 000 257898

Sub-Total 807950 68561 000 876512 10094 194821 36609 1118035

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 57983 157183

Central 17390 6201 000 23591 2895 122388 000 148874

Sub-Total 17390 6201 000 23591 2895 291048 83644 401178

State 000 17500 000 17500 000 123000 10803 151303

Private 000 000 000 000 000 000 5082 5082

Central 48739 12907 000 61647 6798 104898 000 173343

Sub-Total 48739 30407 000 79147 6798 227898 15885 329728

State 262000 15000 000 277000 000 257023 12780 546803

Private 511550 000 000 511550 000 28800 107812 648162

Central 83058 26401 000 109459 19681 92342 000 221482

Sub-Total 856608 41401 000 898009 19681 378165 120592 1416447

State 585000 60380 000 645380 000 108796 2385 756561

Private 388200 000 000 388200 000 10400 660476 1059076

Central 117325 22110 000 139435 55674 73901 000 269010

Sub-Total 1090525 82490 000 1173015 55674 193097 662861 2084647

State 577300 000 000 577300 000 72410 2510 652220

Private 871433 000 000 871433 000 84200 244508 1200141

Central 333839 54949 000 388788 28948 166493 000 584229

Sub-Total 1782572 54949 000 1837521 28948 323103 247018 2436590

State 000 000 000 000 000 125215 6287 131502

Private 9900 45000 000 54900 000 8800 46381 110081

Central 33174 6966 000 40140 3124 47554 000 90818

Sub-Total 43074 51966 000 95040 3124 181569 52668 332401

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1572 1572

Central 3665 1503 000 5167 801 10171 000 16139

Sub-Total 3665 1503 000 5167 801 10171 1572 17711

120003 29105 000 149108 23703 70195 000 243007

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Grand Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Uttar Pradesh

Uttarakhand

Chandigarh

NuclearHydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102017)

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Modewise breakup

Grand TotalThermalOwnership Sector

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Central - Unallocated

Total (Northern

Region)

Punjab

Rajasthan

RES

(MNRE)

(As on 31102017)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 051 4851

Central 45112 2220 000 47332 2600 000 000 49932

Sub-Total 45112 7020 000 52132 2600 000 056 54788

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1031 1031

Central 12296 4840 000 17136 700 000 000 17836

Sub-Total 12296 4840 000 17136 700 000 1031 18867

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 686953 1859520

Central 301209 42400 000 343609 55900 000 000 399509

Sub-Total 1552776 656182 000 2208958 55900 77200 687753 3029811

State 408000 000 000 408000 000 170366 8396 586762

Private 557400 10000 000 567400 000 000 371617 939017

Central 272070 25700 000 297770 27300 152000 000 477070

Sub-Total 1237470 35700 000 1273170 27300 322366 380013 2002849

State 328000 000 000 328000 000 12000 1105 341105

Private 759000 000 000 759000 000 000 41597 800597

Central 155344 000 000 155344 4800 000 000 160144

Sub-Total 1242344 000 000 1242344 4800 12000 42702 1301846

State 1017000 67200 000 1084200 000 285084 20812 1390096

Private 1245600 56800 000 1302400 000 48100 750121 2100621

Central 421943 251300 000 673243 69000 000 000 742243

Sub-Total 2684543 375300 000 3059843 69000 333184 770933 4232960

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 048 048

Central 16921 7140 000 24061 900 000 000 24961

Sub-Total 16921 7140 000 24061 900 000 048 25009

199400 19759 000 219159 22800 000 000 241959

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Grand Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Hydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Goa

Daman amp Diu

Gujarat

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Madhya Pradesh

RES

(MNRE)Nuclear

Grand TotalThermalOwnership Sector

Modewise breakup

Maharashtra

Chhattisgarh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 441000 23540 000 464540 000 167360 8950 640850

Private 387388 369412 3680 760480 000 000 645447 1405927

Central 160760 000 000 160760 12727 000 000 173487

Sub-Total 989148 392952 3680 1385780 12727 167360 654397 2220264

State 408250 000 000 408250 000 238993 000 647243

Private 83945 95088 000 179033 000 000 239336 418369

Central 187812 000 000 187812 14873 000 000 202685

Sub-Total 680007 95088 000 775095 14873 238993 239336 1268297

State 502000 000 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 761814 960184

Central 242920 000 000 242920 69800 000 000 312720

Sub-Total 940770 000 956082 69800 359980 777347 2163209

State 000 000 15996 000 188150 14502 218648

Private 61500 17400 000 78900 000 000 18557 97457

Central 110818 35958 000 146776 36200 000 000 182976

Sub-Total 172318 53358 241672 36200 188150 33059 499081

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 575247 000 000 1056418 1631665

Central 438952 000 000 438952 144800 000 000 583752

Sub-Total 1354719 102718 1498607 144800 220320 1068688 2932415

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 005 005

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 005 36695

166400 000 000 166400 45000 000 000 211400

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Grand Total 4338202 647366 5061726 332000 1174803 2772832 9341361

Andhra Pradesh

Puducherry

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Southern

Region)

Karnataka

Kerala

Tamil Nadu

NLC

Central - Unallocated

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Telangana

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 28100 000 000 28100 000 000 25358 53458

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 340533 000 000 340533 000 11000 32428 383960

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 2037 75037

Central 84874 000 000 84874 000 6100 000 90974

Sub-Total 199874 000 000 199874 000 19100 2442 221416

State 552000 10000 000 562000 000 98600 9195 669795

Private 227500 000 000 227500 000 000 34003 261503

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 855577 10000 000 865577 000 139600 43198 1048375

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 18822 312722

Central 163390 000 000 163390 000 8900 000 172290

Sub-Total 499290 000 000 499290 000 215092 19452 733834

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 29100 001 29101

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 71500 5212 85415

110183 000 000 110183 000 8501 000 118684

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Grand Total 2712664 10000 000 2722664 000 483412 102732 3308808

(As on 31102017)

Coal Gas Diesel Total

State 000 28845 000 28845 000 10000 3001 41846

Private 000 2450 000 2450 000 000 1521 3971

Central 27902 43556 000 71458 000 33123 000 104581

Sub-Total 27902 74851 000 102753 000 43123 4522 150398

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 439 439

Central 2470 4682 000 7152 000 9745 000 16897

Sub-Total 2470 4682 000 7152 000 9745 10899 27796

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 6519 000 20528

Sub-Total 3040 10969 000 14009 000 38719 3109 55837

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 3740 43695 000 47435 000 6238 000 53673

Sub-Total 3740 60645 000 64385 000 6238 2101 72724

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 131 131

Central 3140 7157 000 10297 000 8893 000 19190

Sub-Total 3140 7157 3600 13897 000 8893 676 23466

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 2140 4893 000 7033 000 5337 000 12370

Sub-Total 2140 4893 000 7033 000 5337 3067 15437

State 000 000 000 000 000 000 4147 4147

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 6419 000 12535

Sub-Total 2070 4046 000 6116 000 6419 4167 16702

7500 6362 000 13862 000 12726 000 26588

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Grand Total 52002 173605 3600 229207 000 131200 28541 388948

Modewise breakup

Bihar

Hydro

(Renewable)

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

RES

(MNRE)

Total (Eastern

Region)

Ownership Sector

Assam

Odisha

State Ownership Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Sikkim

Jharkhand

West Bengal

DVC

Grand TotalThermal

Central - Unallocated

Nuclear

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 610 610

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1135 5140

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1210 5215

Hydro

(Renewable)

RES

(MNRE)

Total (Islands)

State Ownership Sector

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

Andaman amp

Nicobar

lakshadweep

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Modewise breakup

Grand TotalThermalNuclear

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 16: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

(i) Targets

(MW)

TypeSector Central State Private Total

Thermal 1487800 1392200 4354000 7234000

Hydro 600400 160800 328500 1089700

Nuclear 530000 000 000 530000

Total 2618200 1553000 4682500 8853700

(ii)

(MW)

TypeSector Central State Private Total

Thermal 1586860 2220135 5366050 9173045

Hydro 258402 227600 61900 547902

Nuclear 200000 000 000 200000

Total 2045262 2447735 5427950 9920947

Acievement 7812 15761 11592 11205

1 Capacity Addtion Targets and Achievements in the 12th Plan

Achievement of Capacity Addition during the Current Plan upto March 2017

Achievements upto Mar 2017 during the 12th Plan

723

400

0

108

970

0

53

000

0

54

790

2

20

000

0

000

1000000

2000000

3000000

4000000

5000000

6000000

7000000

8000000

9000000

Thermal Hydro Nuclear

12th Plan Target 88537 MW Achieved so far 9920947 MW

Target Achievement

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 4880 1460 0 6340 910 -5430

State 3546 0 0 4446 660 -3786

Pvt 2940 0 0 4170 2220 -1950

Total 11366 1460 0 14956 3790 -11166

Central 800 0 0 610 30 -580

State 300 30 0 428 100 -328

Pvt 205 0 0 217 0 -217

Total 1305 30 0 1255 130 -1125

Nuclear Central 500 0 0 0 0 0

Central 6180 1460 0 6950 940 -6010

State 3846 30 0 4874 760 -4114

Pvt 3145 0 0 4387 2220 -2167

Total 13171 1490 0 16211 3920 -12291

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct 2017

Thermal

2 Capacity Addition Targets Achievements During Oct 2017

Oct-17 April 17 - Oct 17Schemes Sector

Target 2017-18

14

95

6

12

55

0

16

21

1

37

90

13

0

0

39

20

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2017-18 Target

Achievement

1460

030

0

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Target Achievement

MW

Targets and Achievement during Oct 2017Thermal

Hydro

Nuclear

Coal Gas Diesel Total

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Sub Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Sub Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Sub Total 4338202 647366 5061726 332000 1174803 2772832 9341361

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Sub Total 2712664 10000 000 2722664 000 483412 102732 3308808

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Sub Total 52002 173605 3600 229207 000 131200 28541 388948

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1210 5215

State 6378050 707895 7122338 000 2979800 197690 10299827

Private 7449600 1058060 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

Total 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092017 is given below (in MW)

438955 3270064 1477169 6015766

A Oct 2017 0 MW

B Oct 2017 35 MW

C Oct 2017 0 MW

D Oct 2017 A-B-C -35 MW

1 NAMRUP CCPP U-1 (20 MW) has been retired from the State Sector of Assam

2 LAKWA GT U-4 (15 MW) has been retired from the State Sector of Assam

Capacity Removed due to

change to CPP from IPP during

Net Capacity Added during

2 Allocation from UNCHAHAR TPS U-6 (500 MW) FARAKKA STPS U-6 (500 MW) and KORBA STPS U-7 (500 MW) has been revised

as per GM Division allocation as on 30092017

Small

Hydro Power

Total

Capacity

Islands

Bio-PowerSolar Power

Waste to EnergyWind Power

Capacity Added during

Capacity Retired during

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102017)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

(UTILITIES)

RES

(MNRE)

Northern Region

Western Region

818170 11408

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092017

BM PowerCogen

Southern Region

Eastern Region

North Eastern

Region

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 7066 104788

Central 377972 20701 000 398673 10283 72309 000 481265

Sub-Total 478394 211541 000 689935 10283 72309 7066 779593

State 272000 15000 000 287000 000 108451 5930 401381

Private 408078 000 000 408078 000 20000 30679 458757

Central 127872 53561 000 181434 10094 66370181 000 257898

Sub-Total 807950 68561 000 876512 10094 194821 36609 1118035

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 57983 157183

Central 17390 6201 000 23591 2895 122388 000 148874

Sub-Total 17390 6201 000 23591 2895 291048 83644 401178

State 000 17500 000 17500 000 123000 10803 151303

Private 000 000 000 000 000 000 5082 5082

Central 48739 12907 000 61647 6798 104898 000 173343

Sub-Total 48739 30407 000 79147 6798 227898 15885 329728

State 262000 15000 000 277000 000 257023 12780 546803

Private 511550 000 000 511550 000 28800 107812 648162

Central 83058 26401 000 109459 19681 92342 000 221482

Sub-Total 856608 41401 000 898009 19681 378165 120592 1416447

State 585000 60380 000 645380 000 108796 2385 756561

Private 388200 000 000 388200 000 10400 660476 1059076

Central 117325 22110 000 139435 55674 73901 000 269010

Sub-Total 1090525 82490 000 1173015 55674 193097 662861 2084647

State 577300 000 000 577300 000 72410 2510 652220

Private 871433 000 000 871433 000 84200 244508 1200141

Central 333839 54949 000 388788 28948 166493 000 584229

Sub-Total 1782572 54949 000 1837521 28948 323103 247018 2436590

State 000 000 000 000 000 125215 6287 131502

Private 9900 45000 000 54900 000 8800 46381 110081

Central 33174 6966 000 40140 3124 47554 000 90818

Sub-Total 43074 51966 000 95040 3124 181569 52668 332401

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1572 1572

Central 3665 1503 000 5167 801 10171 000 16139

Sub-Total 3665 1503 000 5167 801 10171 1572 17711

120003 29105 000 149108 23703 70195 000 243007

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Grand Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Uttar Pradesh

Uttarakhand

Chandigarh

NuclearHydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102017)

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Modewise breakup

Grand TotalThermalOwnership Sector

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Central - Unallocated

Total (Northern

Region)

Punjab

Rajasthan

RES

(MNRE)

(As on 31102017)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 051 4851

Central 45112 2220 000 47332 2600 000 000 49932

Sub-Total 45112 7020 000 52132 2600 000 056 54788

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1031 1031

Central 12296 4840 000 17136 700 000 000 17836

Sub-Total 12296 4840 000 17136 700 000 1031 18867

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 686953 1859520

Central 301209 42400 000 343609 55900 000 000 399509

Sub-Total 1552776 656182 000 2208958 55900 77200 687753 3029811

State 408000 000 000 408000 000 170366 8396 586762

Private 557400 10000 000 567400 000 000 371617 939017

Central 272070 25700 000 297770 27300 152000 000 477070

Sub-Total 1237470 35700 000 1273170 27300 322366 380013 2002849

State 328000 000 000 328000 000 12000 1105 341105

Private 759000 000 000 759000 000 000 41597 800597

Central 155344 000 000 155344 4800 000 000 160144

Sub-Total 1242344 000 000 1242344 4800 12000 42702 1301846

State 1017000 67200 000 1084200 000 285084 20812 1390096

Private 1245600 56800 000 1302400 000 48100 750121 2100621

Central 421943 251300 000 673243 69000 000 000 742243

Sub-Total 2684543 375300 000 3059843 69000 333184 770933 4232960

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 048 048

Central 16921 7140 000 24061 900 000 000 24961

Sub-Total 16921 7140 000 24061 900 000 048 25009

199400 19759 000 219159 22800 000 000 241959

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Grand Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Hydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Goa

Daman amp Diu

Gujarat

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Madhya Pradesh

RES

(MNRE)Nuclear

Grand TotalThermalOwnership Sector

Modewise breakup

Maharashtra

Chhattisgarh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 441000 23540 000 464540 000 167360 8950 640850

Private 387388 369412 3680 760480 000 000 645447 1405927

Central 160760 000 000 160760 12727 000 000 173487

Sub-Total 989148 392952 3680 1385780 12727 167360 654397 2220264

State 408250 000 000 408250 000 238993 000 647243

Private 83945 95088 000 179033 000 000 239336 418369

Central 187812 000 000 187812 14873 000 000 202685

Sub-Total 680007 95088 000 775095 14873 238993 239336 1268297

State 502000 000 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 761814 960184

Central 242920 000 000 242920 69800 000 000 312720

Sub-Total 940770 000 956082 69800 359980 777347 2163209

State 000 000 15996 000 188150 14502 218648

Private 61500 17400 000 78900 000 000 18557 97457

Central 110818 35958 000 146776 36200 000 000 182976

Sub-Total 172318 53358 241672 36200 188150 33059 499081

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 575247 000 000 1056418 1631665

Central 438952 000 000 438952 144800 000 000 583752

Sub-Total 1354719 102718 1498607 144800 220320 1068688 2932415

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 005 005

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 005 36695

166400 000 000 166400 45000 000 000 211400

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Grand Total 4338202 647366 5061726 332000 1174803 2772832 9341361

Andhra Pradesh

Puducherry

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Southern

Region)

Karnataka

Kerala

Tamil Nadu

NLC

Central - Unallocated

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Telangana

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 28100 000 000 28100 000 000 25358 53458

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 340533 000 000 340533 000 11000 32428 383960

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 2037 75037

Central 84874 000 000 84874 000 6100 000 90974

Sub-Total 199874 000 000 199874 000 19100 2442 221416

State 552000 10000 000 562000 000 98600 9195 669795

Private 227500 000 000 227500 000 000 34003 261503

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 855577 10000 000 865577 000 139600 43198 1048375

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 18822 312722

Central 163390 000 000 163390 000 8900 000 172290

Sub-Total 499290 000 000 499290 000 215092 19452 733834

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 29100 001 29101

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 71500 5212 85415

110183 000 000 110183 000 8501 000 118684

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Grand Total 2712664 10000 000 2722664 000 483412 102732 3308808

(As on 31102017)

Coal Gas Diesel Total

State 000 28845 000 28845 000 10000 3001 41846

Private 000 2450 000 2450 000 000 1521 3971

Central 27902 43556 000 71458 000 33123 000 104581

Sub-Total 27902 74851 000 102753 000 43123 4522 150398

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 439 439

Central 2470 4682 000 7152 000 9745 000 16897

Sub-Total 2470 4682 000 7152 000 9745 10899 27796

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 6519 000 20528

Sub-Total 3040 10969 000 14009 000 38719 3109 55837

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 3740 43695 000 47435 000 6238 000 53673

Sub-Total 3740 60645 000 64385 000 6238 2101 72724

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 131 131

Central 3140 7157 000 10297 000 8893 000 19190

Sub-Total 3140 7157 3600 13897 000 8893 676 23466

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 2140 4893 000 7033 000 5337 000 12370

Sub-Total 2140 4893 000 7033 000 5337 3067 15437

State 000 000 000 000 000 000 4147 4147

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 6419 000 12535

Sub-Total 2070 4046 000 6116 000 6419 4167 16702

7500 6362 000 13862 000 12726 000 26588

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Grand Total 52002 173605 3600 229207 000 131200 28541 388948

Modewise breakup

Bihar

Hydro

(Renewable)

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

RES

(MNRE)

Total (Eastern

Region)

Ownership Sector

Assam

Odisha

State Ownership Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Sikkim

Jharkhand

West Bengal

DVC

Grand TotalThermal

Central - Unallocated

Nuclear

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 610 610

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1135 5140

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1210 5215

Hydro

(Renewable)

RES

(MNRE)

Total (Islands)

State Ownership Sector

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

Andaman amp

Nicobar

lakshadweep

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Modewise breakup

Grand TotalThermalNuclear

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 17: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

(MW)

Deviation

Target Achievement Target Achievement (+) (-)

Central 4880 1460 0 6340 910 -5430

State 3546 0 0 4446 660 -3786

Pvt 2940 0 0 4170 2220 -1950

Total 11366 1460 0 14956 3790 -11166

Central 800 0 0 610 30 -580

State 300 30 0 428 100 -328

Pvt 205 0 0 217 0 -217

Total 1305 30 0 1255 130 -1125

Nuclear Central 500 0 0 0 0 0

Central 6180 1460 0 6950 940 -6010

State 3846 30 0 4874 760 -4114

Pvt 3145 0 0 4387 2220 -2167

Total 13171 1490 0 16211 3920 -12291

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Oct 2017

Thermal

2 Capacity Addition Targets Achievements During Oct 2017

Oct-17 April 17 - Oct 17Schemes Sector

Target 2017-18

14

95

6

12

55

0

16

21

1

37

90

13

0

0

39

20

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2017-18 Target

Achievement

1460

030

0

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Target Achievement

MW

Targets and Achievement during Oct 2017Thermal

Hydro

Nuclear

Coal Gas Diesel Total

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Sub Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Sub Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Sub Total 4338202 647366 5061726 332000 1174803 2772832 9341361

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Sub Total 2712664 10000 000 2722664 000 483412 102732 3308808

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Sub Total 52002 173605 3600 229207 000 131200 28541 388948

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1210 5215

State 6378050 707895 7122338 000 2979800 197690 10299827

Private 7449600 1058060 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

Total 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092017 is given below (in MW)

438955 3270064 1477169 6015766

A Oct 2017 0 MW

B Oct 2017 35 MW

C Oct 2017 0 MW

D Oct 2017 A-B-C -35 MW

1 NAMRUP CCPP U-1 (20 MW) has been retired from the State Sector of Assam

2 LAKWA GT U-4 (15 MW) has been retired from the State Sector of Assam

Capacity Removed due to

change to CPP from IPP during

Net Capacity Added during

2 Allocation from UNCHAHAR TPS U-6 (500 MW) FARAKKA STPS U-6 (500 MW) and KORBA STPS U-7 (500 MW) has been revised

as per GM Division allocation as on 30092017

Small

Hydro Power

Total

Capacity

Islands

Bio-PowerSolar Power

Waste to EnergyWind Power

Capacity Added during

Capacity Retired during

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102017)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

(UTILITIES)

RES

(MNRE)

Northern Region

Western Region

818170 11408

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092017

BM PowerCogen

Southern Region

Eastern Region

North Eastern

Region

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 7066 104788

Central 377972 20701 000 398673 10283 72309 000 481265

Sub-Total 478394 211541 000 689935 10283 72309 7066 779593

State 272000 15000 000 287000 000 108451 5930 401381

Private 408078 000 000 408078 000 20000 30679 458757

Central 127872 53561 000 181434 10094 66370181 000 257898

Sub-Total 807950 68561 000 876512 10094 194821 36609 1118035

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 57983 157183

Central 17390 6201 000 23591 2895 122388 000 148874

Sub-Total 17390 6201 000 23591 2895 291048 83644 401178

State 000 17500 000 17500 000 123000 10803 151303

Private 000 000 000 000 000 000 5082 5082

Central 48739 12907 000 61647 6798 104898 000 173343

Sub-Total 48739 30407 000 79147 6798 227898 15885 329728

State 262000 15000 000 277000 000 257023 12780 546803

Private 511550 000 000 511550 000 28800 107812 648162

Central 83058 26401 000 109459 19681 92342 000 221482

Sub-Total 856608 41401 000 898009 19681 378165 120592 1416447

State 585000 60380 000 645380 000 108796 2385 756561

Private 388200 000 000 388200 000 10400 660476 1059076

Central 117325 22110 000 139435 55674 73901 000 269010

Sub-Total 1090525 82490 000 1173015 55674 193097 662861 2084647

State 577300 000 000 577300 000 72410 2510 652220

Private 871433 000 000 871433 000 84200 244508 1200141

Central 333839 54949 000 388788 28948 166493 000 584229

Sub-Total 1782572 54949 000 1837521 28948 323103 247018 2436590

State 000 000 000 000 000 125215 6287 131502

Private 9900 45000 000 54900 000 8800 46381 110081

Central 33174 6966 000 40140 3124 47554 000 90818

Sub-Total 43074 51966 000 95040 3124 181569 52668 332401

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1572 1572

Central 3665 1503 000 5167 801 10171 000 16139

Sub-Total 3665 1503 000 5167 801 10171 1572 17711

120003 29105 000 149108 23703 70195 000 243007

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Grand Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Uttar Pradesh

Uttarakhand

Chandigarh

NuclearHydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102017)

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Modewise breakup

Grand TotalThermalOwnership Sector

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Central - Unallocated

Total (Northern

Region)

Punjab

Rajasthan

RES

(MNRE)

(As on 31102017)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 051 4851

Central 45112 2220 000 47332 2600 000 000 49932

Sub-Total 45112 7020 000 52132 2600 000 056 54788

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1031 1031

Central 12296 4840 000 17136 700 000 000 17836

Sub-Total 12296 4840 000 17136 700 000 1031 18867

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 686953 1859520

Central 301209 42400 000 343609 55900 000 000 399509

Sub-Total 1552776 656182 000 2208958 55900 77200 687753 3029811

State 408000 000 000 408000 000 170366 8396 586762

Private 557400 10000 000 567400 000 000 371617 939017

Central 272070 25700 000 297770 27300 152000 000 477070

Sub-Total 1237470 35700 000 1273170 27300 322366 380013 2002849

State 328000 000 000 328000 000 12000 1105 341105

Private 759000 000 000 759000 000 000 41597 800597

Central 155344 000 000 155344 4800 000 000 160144

Sub-Total 1242344 000 000 1242344 4800 12000 42702 1301846

State 1017000 67200 000 1084200 000 285084 20812 1390096

Private 1245600 56800 000 1302400 000 48100 750121 2100621

Central 421943 251300 000 673243 69000 000 000 742243

Sub-Total 2684543 375300 000 3059843 69000 333184 770933 4232960

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 048 048

Central 16921 7140 000 24061 900 000 000 24961

Sub-Total 16921 7140 000 24061 900 000 048 25009

199400 19759 000 219159 22800 000 000 241959

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Grand Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Hydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Goa

Daman amp Diu

Gujarat

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Madhya Pradesh

RES

(MNRE)Nuclear

Grand TotalThermalOwnership Sector

Modewise breakup

Maharashtra

Chhattisgarh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 441000 23540 000 464540 000 167360 8950 640850

Private 387388 369412 3680 760480 000 000 645447 1405927

Central 160760 000 000 160760 12727 000 000 173487

Sub-Total 989148 392952 3680 1385780 12727 167360 654397 2220264

State 408250 000 000 408250 000 238993 000 647243

Private 83945 95088 000 179033 000 000 239336 418369

Central 187812 000 000 187812 14873 000 000 202685

Sub-Total 680007 95088 000 775095 14873 238993 239336 1268297

State 502000 000 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 761814 960184

Central 242920 000 000 242920 69800 000 000 312720

Sub-Total 940770 000 956082 69800 359980 777347 2163209

State 000 000 15996 000 188150 14502 218648

Private 61500 17400 000 78900 000 000 18557 97457

Central 110818 35958 000 146776 36200 000 000 182976

Sub-Total 172318 53358 241672 36200 188150 33059 499081

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 575247 000 000 1056418 1631665

Central 438952 000 000 438952 144800 000 000 583752

Sub-Total 1354719 102718 1498607 144800 220320 1068688 2932415

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 005 005

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 005 36695

166400 000 000 166400 45000 000 000 211400

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Grand Total 4338202 647366 5061726 332000 1174803 2772832 9341361

Andhra Pradesh

Puducherry

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Southern

Region)

Karnataka

Kerala

Tamil Nadu

NLC

Central - Unallocated

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Telangana

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 28100 000 000 28100 000 000 25358 53458

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 340533 000 000 340533 000 11000 32428 383960

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 2037 75037

Central 84874 000 000 84874 000 6100 000 90974

Sub-Total 199874 000 000 199874 000 19100 2442 221416

State 552000 10000 000 562000 000 98600 9195 669795

Private 227500 000 000 227500 000 000 34003 261503

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 855577 10000 000 865577 000 139600 43198 1048375

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 18822 312722

Central 163390 000 000 163390 000 8900 000 172290

Sub-Total 499290 000 000 499290 000 215092 19452 733834

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 29100 001 29101

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 71500 5212 85415

110183 000 000 110183 000 8501 000 118684

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Grand Total 2712664 10000 000 2722664 000 483412 102732 3308808

(As on 31102017)

Coal Gas Diesel Total

State 000 28845 000 28845 000 10000 3001 41846

Private 000 2450 000 2450 000 000 1521 3971

Central 27902 43556 000 71458 000 33123 000 104581

Sub-Total 27902 74851 000 102753 000 43123 4522 150398

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 439 439

Central 2470 4682 000 7152 000 9745 000 16897

Sub-Total 2470 4682 000 7152 000 9745 10899 27796

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 6519 000 20528

Sub-Total 3040 10969 000 14009 000 38719 3109 55837

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 3740 43695 000 47435 000 6238 000 53673

Sub-Total 3740 60645 000 64385 000 6238 2101 72724

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 131 131

Central 3140 7157 000 10297 000 8893 000 19190

Sub-Total 3140 7157 3600 13897 000 8893 676 23466

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 2140 4893 000 7033 000 5337 000 12370

Sub-Total 2140 4893 000 7033 000 5337 3067 15437

State 000 000 000 000 000 000 4147 4147

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 6419 000 12535

Sub-Total 2070 4046 000 6116 000 6419 4167 16702

7500 6362 000 13862 000 12726 000 26588

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Grand Total 52002 173605 3600 229207 000 131200 28541 388948

Modewise breakup

Bihar

Hydro

(Renewable)

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

RES

(MNRE)

Total (Eastern

Region)

Ownership Sector

Assam

Odisha

State Ownership Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Sikkim

Jharkhand

West Bengal

DVC

Grand TotalThermal

Central - Unallocated

Nuclear

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 610 610

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1135 5140

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1210 5215

Hydro

(Renewable)

RES

(MNRE)

Total (Islands)

State Ownership Sector

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

Andaman amp

Nicobar

lakshadweep

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Modewise breakup

Grand TotalThermalNuclear

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 18: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

Coal Gas Diesel Total

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Sub Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Sub Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Sub Total 4338202 647366 5061726 332000 1174803 2772832 9341361

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Sub Total 2712664 10000 000 2722664 000 483412 102732 3308808

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Sub Total 52002 173605 3600 229207 000 131200 28541 388948

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Sub Total 000 000 4005 4005 000 000 1210 5215

State 6378050 707895 7122338 000 2979800 197690 10299827

Private 7449600 1058060 8555030 000 328600 5818076 14701706

Central 5515000 749083 000 6264083 678000 1168142 000 8110225

Total 19342650 2515038 83763 21941451 678000 4476542 6015766 33111758

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 30092017 is given below (in MW)

438955 3270064 1477169 6015766

A Oct 2017 0 MW

B Oct 2017 35 MW

C Oct 2017 0 MW

D Oct 2017 A-B-C -35 MW

1 NAMRUP CCPP U-1 (20 MW) has been retired from the State Sector of Assam

2 LAKWA GT U-4 (15 MW) has been retired from the State Sector of Assam

Capacity Removed due to

change to CPP from IPP during

Net Capacity Added during

2 Allocation from UNCHAHAR TPS U-6 (500 MW) FARAKKA STPS U-6 (500 MW) and KORBA STPS U-7 (500 MW) has been revised

as per GM Division allocation as on 30092017

Small

Hydro Power

Total

Capacity

Islands

Bio-PowerSolar Power

Waste to EnergyWind Power

Capacity Added during

Capacity Retired during

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102017)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

(UTILITIES)

RES

(MNRE)

Northern Region

Western Region

818170 11408

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092017

BM PowerCogen

Southern Region

Eastern Region

North Eastern

Region

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 7066 104788

Central 377972 20701 000 398673 10283 72309 000 481265

Sub-Total 478394 211541 000 689935 10283 72309 7066 779593

State 272000 15000 000 287000 000 108451 5930 401381

Private 408078 000 000 408078 000 20000 30679 458757

Central 127872 53561 000 181434 10094 66370181 000 257898

Sub-Total 807950 68561 000 876512 10094 194821 36609 1118035

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 57983 157183

Central 17390 6201 000 23591 2895 122388 000 148874

Sub-Total 17390 6201 000 23591 2895 291048 83644 401178

State 000 17500 000 17500 000 123000 10803 151303

Private 000 000 000 000 000 000 5082 5082

Central 48739 12907 000 61647 6798 104898 000 173343

Sub-Total 48739 30407 000 79147 6798 227898 15885 329728

State 262000 15000 000 277000 000 257023 12780 546803

Private 511550 000 000 511550 000 28800 107812 648162

Central 83058 26401 000 109459 19681 92342 000 221482

Sub-Total 856608 41401 000 898009 19681 378165 120592 1416447

State 585000 60380 000 645380 000 108796 2385 756561

Private 388200 000 000 388200 000 10400 660476 1059076

Central 117325 22110 000 139435 55674 73901 000 269010

Sub-Total 1090525 82490 000 1173015 55674 193097 662861 2084647

State 577300 000 000 577300 000 72410 2510 652220

Private 871433 000 000 871433 000 84200 244508 1200141

Central 333839 54949 000 388788 28948 166493 000 584229

Sub-Total 1782572 54949 000 1837521 28948 323103 247018 2436590

State 000 000 000 000 000 125215 6287 131502

Private 9900 45000 000 54900 000 8800 46381 110081

Central 33174 6966 000 40140 3124 47554 000 90818

Sub-Total 43074 51966 000 95040 3124 181569 52668 332401

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1572 1572

Central 3665 1503 000 5167 801 10171 000 16139

Sub-Total 3665 1503 000 5167 801 10171 1572 17711

120003 29105 000 149108 23703 70195 000 243007

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Grand Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Uttar Pradesh

Uttarakhand

Chandigarh

NuclearHydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102017)

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Modewise breakup

Grand TotalThermalOwnership Sector

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Central - Unallocated

Total (Northern

Region)

Punjab

Rajasthan

RES

(MNRE)

(As on 31102017)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 051 4851

Central 45112 2220 000 47332 2600 000 000 49932

Sub-Total 45112 7020 000 52132 2600 000 056 54788

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1031 1031

Central 12296 4840 000 17136 700 000 000 17836

Sub-Total 12296 4840 000 17136 700 000 1031 18867

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 686953 1859520

Central 301209 42400 000 343609 55900 000 000 399509

Sub-Total 1552776 656182 000 2208958 55900 77200 687753 3029811

State 408000 000 000 408000 000 170366 8396 586762

Private 557400 10000 000 567400 000 000 371617 939017

Central 272070 25700 000 297770 27300 152000 000 477070

Sub-Total 1237470 35700 000 1273170 27300 322366 380013 2002849

State 328000 000 000 328000 000 12000 1105 341105

Private 759000 000 000 759000 000 000 41597 800597

Central 155344 000 000 155344 4800 000 000 160144

Sub-Total 1242344 000 000 1242344 4800 12000 42702 1301846

State 1017000 67200 000 1084200 000 285084 20812 1390096

Private 1245600 56800 000 1302400 000 48100 750121 2100621

Central 421943 251300 000 673243 69000 000 000 742243

Sub-Total 2684543 375300 000 3059843 69000 333184 770933 4232960

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 048 048

Central 16921 7140 000 24061 900 000 000 24961

Sub-Total 16921 7140 000 24061 900 000 048 25009

199400 19759 000 219159 22800 000 000 241959

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Grand Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Hydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Goa

Daman amp Diu

Gujarat

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Madhya Pradesh

RES

(MNRE)Nuclear

Grand TotalThermalOwnership Sector

Modewise breakup

Maharashtra

Chhattisgarh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 441000 23540 000 464540 000 167360 8950 640850

Private 387388 369412 3680 760480 000 000 645447 1405927

Central 160760 000 000 160760 12727 000 000 173487

Sub-Total 989148 392952 3680 1385780 12727 167360 654397 2220264

State 408250 000 000 408250 000 238993 000 647243

Private 83945 95088 000 179033 000 000 239336 418369

Central 187812 000 000 187812 14873 000 000 202685

Sub-Total 680007 95088 000 775095 14873 238993 239336 1268297

State 502000 000 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 761814 960184

Central 242920 000 000 242920 69800 000 000 312720

Sub-Total 940770 000 956082 69800 359980 777347 2163209

State 000 000 15996 000 188150 14502 218648

Private 61500 17400 000 78900 000 000 18557 97457

Central 110818 35958 000 146776 36200 000 000 182976

Sub-Total 172318 53358 241672 36200 188150 33059 499081

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 575247 000 000 1056418 1631665

Central 438952 000 000 438952 144800 000 000 583752

Sub-Total 1354719 102718 1498607 144800 220320 1068688 2932415

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 005 005

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 005 36695

166400 000 000 166400 45000 000 000 211400

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Grand Total 4338202 647366 5061726 332000 1174803 2772832 9341361

Andhra Pradesh

Puducherry

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Southern

Region)

Karnataka

Kerala

Tamil Nadu

NLC

Central - Unallocated

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Telangana

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 28100 000 000 28100 000 000 25358 53458

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 340533 000 000 340533 000 11000 32428 383960

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 2037 75037

Central 84874 000 000 84874 000 6100 000 90974

Sub-Total 199874 000 000 199874 000 19100 2442 221416

State 552000 10000 000 562000 000 98600 9195 669795

Private 227500 000 000 227500 000 000 34003 261503

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 855577 10000 000 865577 000 139600 43198 1048375

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 18822 312722

Central 163390 000 000 163390 000 8900 000 172290

Sub-Total 499290 000 000 499290 000 215092 19452 733834

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 29100 001 29101

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 71500 5212 85415

110183 000 000 110183 000 8501 000 118684

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Grand Total 2712664 10000 000 2722664 000 483412 102732 3308808

(As on 31102017)

Coal Gas Diesel Total

State 000 28845 000 28845 000 10000 3001 41846

Private 000 2450 000 2450 000 000 1521 3971

Central 27902 43556 000 71458 000 33123 000 104581

Sub-Total 27902 74851 000 102753 000 43123 4522 150398

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 439 439

Central 2470 4682 000 7152 000 9745 000 16897

Sub-Total 2470 4682 000 7152 000 9745 10899 27796

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 6519 000 20528

Sub-Total 3040 10969 000 14009 000 38719 3109 55837

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 3740 43695 000 47435 000 6238 000 53673

Sub-Total 3740 60645 000 64385 000 6238 2101 72724

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 131 131

Central 3140 7157 000 10297 000 8893 000 19190

Sub-Total 3140 7157 3600 13897 000 8893 676 23466

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 2140 4893 000 7033 000 5337 000 12370

Sub-Total 2140 4893 000 7033 000 5337 3067 15437

State 000 000 000 000 000 000 4147 4147

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 6419 000 12535

Sub-Total 2070 4046 000 6116 000 6419 4167 16702

7500 6362 000 13862 000 12726 000 26588

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Grand Total 52002 173605 3600 229207 000 131200 28541 388948

Modewise breakup

Bihar

Hydro

(Renewable)

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

RES

(MNRE)

Total (Eastern

Region)

Ownership Sector

Assam

Odisha

State Ownership Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Sikkim

Jharkhand

West Bengal

DVC

Grand TotalThermal

Central - Unallocated

Nuclear

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 610 610

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1135 5140

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1210 5215

Hydro

(Renewable)

RES

(MNRE)

Total (Islands)

State Ownership Sector

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

Andaman amp

Nicobar

lakshadweep

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Modewise breakup

Grand TotalThermalNuclear

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 19: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

Coal Gas Diesel Total

State 13500 180040 000 193540 000 000 000 193540

Private 86922 10800 000 97722 000 000 7066 104788

Central 377972 20701 000 398673 10283 72309 000 481265

Sub-Total 478394 211541 000 689935 10283 72309 7066 779593

State 272000 15000 000 287000 000 108451 5930 401381

Private 408078 000 000 408078 000 20000 30679 458757

Central 127872 53561 000 181434 10094 66370181 000 257898

Sub-Total 807950 68561 000 876512 10094 194821 36609 1118035

State 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 99200 57983 157183

Central 17390 6201 000 23591 2895 122388 000 148874

Sub-Total 17390 6201 000 23591 2895 291048 83644 401178

State 000 17500 000 17500 000 123000 10803 151303

Private 000 000 000 000 000 000 5082 5082

Central 48739 12907 000 61647 6798 104898 000 173343

Sub-Total 48739 30407 000 79147 6798 227898 15885 329728

State 262000 15000 000 277000 000 257023 12780 546803

Private 511550 000 000 511550 000 28800 107812 648162

Central 83058 26401 000 109459 19681 92342 000 221482

Sub-Total 856608 41401 000 898009 19681 378165 120592 1416447

State 585000 60380 000 645380 000 108796 2385 756561

Private 388200 000 000 388200 000 10400 660476 1059076

Central 117325 22110 000 139435 55674 73901 000 269010

Sub-Total 1090525 82490 000 1173015 55674 193097 662861 2084647

State 577300 000 000 577300 000 72410 2510 652220

Private 871433 000 000 871433 000 84200 244508 1200141

Central 333839 54949 000 388788 28948 166493 000 584229

Sub-Total 1782572 54949 000 1837521 28948 323103 247018 2436590

State 000 000 000 000 000 125215 6287 131502

Private 9900 45000 000 54900 000 8800 46381 110081

Central 33174 6966 000 40140 3124 47554 000 90818

Sub-Total 43074 51966 000 95040 3124 181569 52668 332401

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1572 1572

Central 3665 1503 000 5167 801 10171 000 16139

Sub-Total 3665 1503 000 5167 801 10171 1572 17711

120003 29105 000 149108 23703 70195 000 243007

State 1709800 287920 000 1997720 000 864355 66356 2928431

Private 2276083 55800 000 2331883 000 251400 1161559 3744842

Central 1263037 234406 000 1497443 162000 826622 000 2486065

Grand Total 5248920 578126 000 5827046 162000 1942377 1227915 9159338

Uttar Pradesh

Uttarakhand

Chandigarh

NuclearHydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 31102017)

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

Modewise breakup

Grand TotalThermalOwnership Sector

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Central - Unallocated

Total (Northern

Region)

Punjab

Rajasthan

RES

(MNRE)

(As on 31102017)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 051 4851

Central 45112 2220 000 47332 2600 000 000 49932

Sub-Total 45112 7020 000 52132 2600 000 056 54788

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1031 1031

Central 12296 4840 000 17136 700 000 000 17836

Sub-Total 12296 4840 000 17136 700 000 1031 18867

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 686953 1859520

Central 301209 42400 000 343609 55900 000 000 399509

Sub-Total 1552776 656182 000 2208958 55900 77200 687753 3029811

State 408000 000 000 408000 000 170366 8396 586762

Private 557400 10000 000 567400 000 000 371617 939017

Central 272070 25700 000 297770 27300 152000 000 477070

Sub-Total 1237470 35700 000 1273170 27300 322366 380013 2002849

State 328000 000 000 328000 000 12000 1105 341105

Private 759000 000 000 759000 000 000 41597 800597

Central 155344 000 000 155344 4800 000 000 160144

Sub-Total 1242344 000 000 1242344 4800 12000 42702 1301846

State 1017000 67200 000 1084200 000 285084 20812 1390096

Private 1245600 56800 000 1302400 000 48100 750121 2100621

Central 421943 251300 000 673243 69000 000 000 742243

Sub-Total 2684543 375300 000 3059843 69000 333184 770933 4232960

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 048 048

Central 16921 7140 000 24061 900 000 000 24961

Sub-Total 16921 7140 000 24061 900 000 048 25009

199400 19759 000 219159 22800 000 000 241959

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Grand Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Hydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Goa

Daman amp Diu

Gujarat

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Madhya Pradesh

RES

(MNRE)Nuclear

Grand TotalThermalOwnership Sector

Modewise breakup

Maharashtra

Chhattisgarh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 441000 23540 000 464540 000 167360 8950 640850

Private 387388 369412 3680 760480 000 000 645447 1405927

Central 160760 000 000 160760 12727 000 000 173487

Sub-Total 989148 392952 3680 1385780 12727 167360 654397 2220264

State 408250 000 000 408250 000 238993 000 647243

Private 83945 95088 000 179033 000 000 239336 418369

Central 187812 000 000 187812 14873 000 000 202685

Sub-Total 680007 95088 000 775095 14873 238993 239336 1268297

State 502000 000 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 761814 960184

Central 242920 000 000 242920 69800 000 000 312720

Sub-Total 940770 000 956082 69800 359980 777347 2163209

State 000 000 15996 000 188150 14502 218648

Private 61500 17400 000 78900 000 000 18557 97457

Central 110818 35958 000 146776 36200 000 000 182976

Sub-Total 172318 53358 241672 36200 188150 33059 499081

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 575247 000 000 1056418 1631665

Central 438952 000 000 438952 144800 000 000 583752

Sub-Total 1354719 102718 1498607 144800 220320 1068688 2932415

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 005 005

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 005 36695

166400 000 000 166400 45000 000 000 211400

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Grand Total 4338202 647366 5061726 332000 1174803 2772832 9341361

Andhra Pradesh

Puducherry

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Southern

Region)

Karnataka

Kerala

Tamil Nadu

NLC

Central - Unallocated

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Telangana

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 28100 000 000 28100 000 000 25358 53458

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 340533 000 000 340533 000 11000 32428 383960

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 2037 75037

Central 84874 000 000 84874 000 6100 000 90974

Sub-Total 199874 000 000 199874 000 19100 2442 221416

State 552000 10000 000 562000 000 98600 9195 669795

Private 227500 000 000 227500 000 000 34003 261503

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 855577 10000 000 865577 000 139600 43198 1048375

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 18822 312722

Central 163390 000 000 163390 000 8900 000 172290

Sub-Total 499290 000 000 499290 000 215092 19452 733834

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 29100 001 29101

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 71500 5212 85415

110183 000 000 110183 000 8501 000 118684

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Grand Total 2712664 10000 000 2722664 000 483412 102732 3308808

(As on 31102017)

Coal Gas Diesel Total

State 000 28845 000 28845 000 10000 3001 41846

Private 000 2450 000 2450 000 000 1521 3971

Central 27902 43556 000 71458 000 33123 000 104581

Sub-Total 27902 74851 000 102753 000 43123 4522 150398

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 439 439

Central 2470 4682 000 7152 000 9745 000 16897

Sub-Total 2470 4682 000 7152 000 9745 10899 27796

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 6519 000 20528

Sub-Total 3040 10969 000 14009 000 38719 3109 55837

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 3740 43695 000 47435 000 6238 000 53673

Sub-Total 3740 60645 000 64385 000 6238 2101 72724

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 131 131

Central 3140 7157 000 10297 000 8893 000 19190

Sub-Total 3140 7157 3600 13897 000 8893 676 23466

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 2140 4893 000 7033 000 5337 000 12370

Sub-Total 2140 4893 000 7033 000 5337 3067 15437

State 000 000 000 000 000 000 4147 4147

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 6419 000 12535

Sub-Total 2070 4046 000 6116 000 6419 4167 16702

7500 6362 000 13862 000 12726 000 26588

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Grand Total 52002 173605 3600 229207 000 131200 28541 388948

Modewise breakup

Bihar

Hydro

(Renewable)

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

RES

(MNRE)

Total (Eastern

Region)

Ownership Sector

Assam

Odisha

State Ownership Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Sikkim

Jharkhand

West Bengal

DVC

Grand TotalThermal

Central - Unallocated

Nuclear

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 610 610

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1135 5140

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1210 5215

Hydro

(Renewable)

RES

(MNRE)

Total (Islands)

State Ownership Sector

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

Andaman amp

Nicobar

lakshadweep

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Modewise breakup

Grand TotalThermalNuclear

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 20: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

(As on 31102017)

Coal Gas Diesel Total

State 000 000 000 000 000 000 005 005

Private 000 4800 000 4800 000 000 051 4851

Central 45112 2220 000 47332 2600 000 000 49932

Sub-Total 45112 7020 000 52132 2600 000 056 54788

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 1031 1031

Central 12296 4840 000 17136 700 000 000 17836

Sub-Total 12296 4840 000 17136 700 000 1031 18867

State 475000 217782 000 692782 000 77200 800 770782

Private 776567 396000 000 1172567 000 000 686953 1859520

Central 301209 42400 000 343609 55900 000 000 399509

Sub-Total 1552776 656182 000 2208958 55900 77200 687753 3029811

State 408000 000 000 408000 000 170366 8396 586762

Private 557400 10000 000 567400 000 000 371617 939017

Central 272070 25700 000 297770 27300 152000 000 477070

Sub-Total 1237470 35700 000 1273170 27300 322366 380013 2002849

State 328000 000 000 328000 000 12000 1105 341105

Private 759000 000 000 759000 000 000 41597 800597

Central 155344 000 000 155344 4800 000 000 160144

Sub-Total 1242344 000 000 1242344 4800 12000 42702 1301846

State 1017000 67200 000 1084200 000 285084 20812 1390096

Private 1245600 56800 000 1302400 000 48100 750121 2100621

Central 421943 251300 000 673243 69000 000 000 742243

Sub-Total 2684543 375300 000 3059843 69000 333184 770933 4232960

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 048 048

Central 16921 7140 000 24061 900 000 000 24961

Sub-Total 16921 7140 000 24061 900 000 048 25009

199400 19759 000 219159 22800 000 000 241959

State 2228000 284982 000 2512982 000 544650 31118 3088750

Private 3338567 467600 000 3806167 000 48100 1851418 5705685

Central 1424295 353359 000 1777654 184000 152000 000 2113654

Grand Total 6990862 1105941 000 8096803 184000 744750 1882536 10908089

Hydro

(Renewable)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Goa

Daman amp Diu

Gujarat

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

Madhya Pradesh

RES

(MNRE)Nuclear

Grand TotalThermalOwnership Sector

Modewise breakup

Maharashtra

Chhattisgarh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 441000 23540 000 464540 000 167360 8950 640850

Private 387388 369412 3680 760480 000 000 645447 1405927

Central 160760 000 000 160760 12727 000 000 173487

Sub-Total 989148 392952 3680 1385780 12727 167360 654397 2220264

State 408250 000 000 408250 000 238993 000 647243

Private 83945 95088 000 179033 000 000 239336 418369

Central 187812 000 000 187812 14873 000 000 202685

Sub-Total 680007 95088 000 775095 14873 238993 239336 1268297

State 502000 000 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 761814 960184

Central 242920 000 000 242920 69800 000 000 312720

Sub-Total 940770 000 956082 69800 359980 777347 2163209

State 000 000 15996 000 188150 14502 218648

Private 61500 17400 000 78900 000 000 18557 97457

Central 110818 35958 000 146776 36200 000 000 182976

Sub-Total 172318 53358 241672 36200 188150 33059 499081

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 575247 000 000 1056418 1631665

Central 438952 000 000 438952 144800 000 000 583752

Sub-Total 1354719 102718 1498607 144800 220320 1068688 2932415

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 005 005

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 005 36695

166400 000 000 166400 45000 000 000 211400

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Grand Total 4338202 647366 5061726 332000 1174803 2772832 9341361

Andhra Pradesh

Puducherry

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Southern

Region)

Karnataka

Kerala

Tamil Nadu

NLC

Central - Unallocated

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Telangana

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 28100 000 000 28100 000 000 25358 53458

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 340533 000 000 340533 000 11000 32428 383960

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 2037 75037

Central 84874 000 000 84874 000 6100 000 90974

Sub-Total 199874 000 000 199874 000 19100 2442 221416

State 552000 10000 000 562000 000 98600 9195 669795

Private 227500 000 000 227500 000 000 34003 261503

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 855577 10000 000 865577 000 139600 43198 1048375

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 18822 312722

Central 163390 000 000 163390 000 8900 000 172290

Sub-Total 499290 000 000 499290 000 215092 19452 733834

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 29100 001 29101

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 71500 5212 85415

110183 000 000 110183 000 8501 000 118684

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Grand Total 2712664 10000 000 2722664 000 483412 102732 3308808

(As on 31102017)

Coal Gas Diesel Total

State 000 28845 000 28845 000 10000 3001 41846

Private 000 2450 000 2450 000 000 1521 3971

Central 27902 43556 000 71458 000 33123 000 104581

Sub-Total 27902 74851 000 102753 000 43123 4522 150398

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 439 439

Central 2470 4682 000 7152 000 9745 000 16897

Sub-Total 2470 4682 000 7152 000 9745 10899 27796

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 6519 000 20528

Sub-Total 3040 10969 000 14009 000 38719 3109 55837

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 3740 43695 000 47435 000 6238 000 53673

Sub-Total 3740 60645 000 64385 000 6238 2101 72724

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 131 131

Central 3140 7157 000 10297 000 8893 000 19190

Sub-Total 3140 7157 3600 13897 000 8893 676 23466

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 2140 4893 000 7033 000 5337 000 12370

Sub-Total 2140 4893 000 7033 000 5337 3067 15437

State 000 000 000 000 000 000 4147 4147

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 6419 000 12535

Sub-Total 2070 4046 000 6116 000 6419 4167 16702

7500 6362 000 13862 000 12726 000 26588

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Grand Total 52002 173605 3600 229207 000 131200 28541 388948

Modewise breakup

Bihar

Hydro

(Renewable)

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

RES

(MNRE)

Total (Eastern

Region)

Ownership Sector

Assam

Odisha

State Ownership Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Sikkim

Jharkhand

West Bengal

DVC

Grand TotalThermal

Central - Unallocated

Nuclear

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 610 610

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1135 5140

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1210 5215

Hydro

(Renewable)

RES

(MNRE)

Total (Islands)

State Ownership Sector

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

Andaman amp

Nicobar

lakshadweep

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Modewise breakup

Grand TotalThermalNuclear

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 21: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

(As on 31102017)

Coal Gas Diesel Total

State 441000 23540 000 464540 000 167360 8950 640850

Private 387388 369412 3680 760480 000 000 645447 1405927

Central 160760 000 000 160760 12727 000 000 173487

Sub-Total 989148 392952 3680 1385780 12727 167360 654397 2220264

State 408250 000 000 408250 000 238993 000 647243

Private 83945 95088 000 179033 000 000 239336 418369

Central 187812 000 000 187812 14873 000 000 202685

Sub-Total 680007 95088 000 775095 14873 238993 239336 1268297

State 502000 000 514792 000 359980 15533 890305

Private 195850 000 2520 198370 000 000 761814 960184

Central 242920 000 000 242920 69800 000 000 312720

Sub-Total 940770 000 956082 69800 359980 777347 2163209

State 000 000 15996 000 188150 14502 218648

Private 61500 17400 000 78900 000 000 18557 97457

Central 110818 35958 000 146776 36200 000 000 182976

Sub-Total 172318 53358 241672 36200 188150 33059 499081

State 432000 52408 000 484408 000 220320 12270 716998

Private 483767 50310 575247 000 000 1056418 1631665

Central 438952 000 000 438952 144800 000 000 583752

Sub-Total 1354719 102718 1498607 144800 220320 1068688 2932415

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 10000 000 000 10000 000 000 000 10000

Sub-Total 10000 000 000 10000 000 000 000 10000

State 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 005 005

Central 24840 000 000 24840 8600 000 000 33440

Sub-Total 24840 3250 000 28090 8600 000 005 36695

166400 000 000 166400 45000 000 000 211400

State 1783250 79198 1891236 000 1174803 51255 3117294

Private 1212450 532210 1792030 000 000 2721577 4513607

Central 1342502 35958 000 1378460 332000 000 000 1710460

Grand Total 4338202 647366 5061726 332000 1174803 2772832 9341361

Andhra Pradesh

Puducherry

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Total (Southern

Region)

Karnataka

Kerala

Tamil Nadu

NLC

Central - Unallocated

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Telangana

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 28100 000 000 28100 000 000 25358 53458

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 340533 000 000 340533 000 11000 32428 383960

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 2037 75037

Central 84874 000 000 84874 000 6100 000 90974

Sub-Total 199874 000 000 199874 000 19100 2442 221416

State 552000 10000 000 562000 000 98600 9195 669795

Private 227500 000 000 227500 000 000 34003 261503

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 855577 10000 000 865577 000 139600 43198 1048375

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 18822 312722

Central 163390 000 000 163390 000 8900 000 172290

Sub-Total 499290 000 000 499290 000 215092 19452 733834

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 29100 001 29101

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 71500 5212 85415

110183 000 000 110183 000 8501 000 118684

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Grand Total 2712664 10000 000 2722664 000 483412 102732 3308808

(As on 31102017)

Coal Gas Diesel Total

State 000 28845 000 28845 000 10000 3001 41846

Private 000 2450 000 2450 000 000 1521 3971

Central 27902 43556 000 71458 000 33123 000 104581

Sub-Total 27902 74851 000 102753 000 43123 4522 150398

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 439 439

Central 2470 4682 000 7152 000 9745 000 16897

Sub-Total 2470 4682 000 7152 000 9745 10899 27796

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 6519 000 20528

Sub-Total 3040 10969 000 14009 000 38719 3109 55837

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 3740 43695 000 47435 000 6238 000 53673

Sub-Total 3740 60645 000 64385 000 6238 2101 72724

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 131 131

Central 3140 7157 000 10297 000 8893 000 19190

Sub-Total 3140 7157 3600 13897 000 8893 676 23466

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 2140 4893 000 7033 000 5337 000 12370

Sub-Total 2140 4893 000 7033 000 5337 3067 15437

State 000 000 000 000 000 000 4147 4147

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 6419 000 12535

Sub-Total 2070 4046 000 6116 000 6419 4167 16702

7500 6362 000 13862 000 12726 000 26588

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Grand Total 52002 173605 3600 229207 000 131200 28541 388948

Modewise breakup

Bihar

Hydro

(Renewable)

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

RES

(MNRE)

Total (Eastern

Region)

Ownership Sector

Assam

Odisha

State Ownership Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Sikkim

Jharkhand

West Bengal

DVC

Grand TotalThermal

Central - Unallocated

Nuclear

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 610 610

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1135 5140

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1210 5215

Hydro

(Renewable)

RES

(MNRE)

Total (Islands)

State Ownership Sector

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

Andaman amp

Nicobar

lakshadweep

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Modewise breakup

Grand TotalThermalNuclear

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 22: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

(As on 31102017)

Coal Gas Diesel Total

State 21000 000 000 21000 000 000 7070 28070

Private 28100 000 000 28100 000 000 25358 53458

Central 291433 000 000 291433 000 11000 000 302432

Sub-Total 340533 000 000 340533 000 11000 32428 383960

State 42000 000 000 42000 000 13000 405 55405

Private 73000 000 000 73000 000 000 2037 75037

Central 84874 000 000 84874 000 6100 000 90974

Sub-Total 199874 000 000 199874 000 19100 2442 221416

State 552000 10000 000 562000 000 98600 9195 669795

Private 227500 000 000 227500 000 000 34003 261503

Central 76077 000 000 76077 000 41000 000 117077

Sub-Total 855577 10000 000 865577 000 139600 43198 1048375

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000

Central 698504 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 698504 000 18620 000 717124

State 42000 000 000 42000 000 206192 630 248822

Private 293900 000 000 293900 000 000 18822 312722

Central 163390 000 000 163390 000 8900 000 172290

Sub-Total 499290 000 000 499290 000 215092 19452 733834

State 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 29100 001 29101

Central 8703 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 8703 000 71500 5212 85415

110183 000 000 110183 000 8501 000 118684

State 657000 10000 000 667000 000 353792 22511 1043303

Private 622500 000 000 622500 000 29100 80221 731821

Central 1433164 000 000 1433164 000 100520 000 1533684

Grand Total 2712664 10000 000 2722664 000 483412 102732 3308808

(As on 31102017)

Coal Gas Diesel Total

State 000 28845 000 28845 000 10000 3001 41846

Private 000 2450 000 2450 000 000 1521 3971

Central 27902 43556 000 71458 000 33123 000 104581

Sub-Total 27902 74851 000 102753 000 43123 4522 150398

State 000 000 000 000 000 000 10461 10461

Private 000 000 000 000 000 000 439 439

Central 2470 4682 000 7152 000 9745 000 16897

Sub-Total 2470 4682 000 7152 000 9745 10899 27796

State 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 006 006

Central 3040 10969 000 14009 000 6519 000 20528

Sub-Total 3040 10969 000 14009 000 38719 3109 55837

State 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 500 500

Central 3740 43695 000 47435 000 6238 000 53673

Sub-Total 3740 60645 000 64385 000 6238 2101 72724

State 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 131 131

Central 3140 7157 000 10297 000 8893 000 19190

Sub-Total 3140 7157 3600 13897 000 8893 676 23466

State 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 000

Central 2140 4893 000 7033 000 5337 000 12370

Sub-Total 2140 4893 000 7033 000 5337 3067 15437

State 000 000 000 000 000 000 4147 4147

Private 000 000 000 000 000 000 020 020

Central 2070 4046 000 6116 000 6419 000 12535

Sub-Total 2070 4046 000 6116 000 6419 4167 16702

7500 6362 000 13862 000 12726 000 26588

State 000 45795 3600 49395 000 42200 25925 117520

Private 000 2450 000 2450 000 000 2617 5067

Central 52002 125360 000 177362 000 89000 000 266362

Grand Total 52002 173605 3600 229207 000 131200 28541 388948

Modewise breakup

Bihar

Hydro

(Renewable)

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

RES

(MNRE)

Total (Eastern

Region)

Ownership Sector

Assam

Odisha

State Ownership Sector

Modewise breakup

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

Grand TotalThermalNuclear

Hydro

(Renewable)

RES

(MNRE)

Sikkim

Jharkhand

West Bengal

DVC

Grand TotalThermal

Central - Unallocated

Nuclear

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 31102017)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 610 610

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1135 5140

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1210 5215

Hydro

(Renewable)

RES

(MNRE)

Total (Islands)

State Ownership Sector

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

Andaman amp

Nicobar

lakshadweep

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Modewise breakup

Grand TotalThermalNuclear

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 23: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

(As on 31102017)

Coal Gas Diesel Total

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 610 610

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 4005 4005 000 000 1135 5140

State 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 075 075

State 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 685 685

Central 000 000 000 000 000 000 000 000

Grand Total 000 000 4005 4005 000 000 1210 5215

Hydro

(Renewable)

RES

(MNRE)

Total (Islands)

State Ownership Sector

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

Andaman amp

Nicobar

lakshadweep

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

Modewise breakup

Grand TotalThermalNuclear

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 24: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

SN Contents Page

1Programme and Achievements of Transmission Lines in Oct 2017 and during April

2016 to oct 2017

2 List of Transmission Lines CommissionedReady for commissioning during Oct 2017

Section C - Transmission Lines

20

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 25: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

Programme

2017-18 Programme Achievement Programme Achievement

Central Sector 0 0 0 0 0

State Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 0 0 0 0 0

JVPrivate Sector 0 0 0 0 0

Total 0 0 0 0 0

Central Sector 3665 0 0 200 1428

State Sector 416 0 0 416 335

JVPrivate Sector 846 0 0 846 283

Total 4927 0 0 1462 2046

Central Sector 4851 0 46 1738 3179

State Sector 5157 573 0 4561 4131

JVPrivate Sector 1416 188 199 974 1613

Total 11424 761 245 7273 8923

Central Sector 763 0 0 342 0

State Sector 5972 525 324 4903 2146

JVPrivate Sector 0 0 0 0 5

Total 6735 525 324 5245 2151

Grand Total 23086 1286 569 13980 13120

Voltage Level

(kV)

2

400

400

230

230

220

220

220

220

220

400

400

400

400

Total of PRIVATE SECTOR 199

Grand Total

12 LILO of one ckt of Sikar- Neemrana line at ESSEL 3

SEL 4113 Sterlite TPP (Vedanta)- Jharsuguda

569

PRIVATE SECTOR Sector

11 Ind - Barath (Power Plant (Shahjbahal) - IBPIL 124

10 Ataur-Indirapuram line WUPPTCL 31

9 Shirpur Power Plant - Amalner line MSETCL 70

324Total of STATE SECTOR

7 LILO of 2nd Ckt of Bansagar - Satna line at MPPTCL 11

8 LILO of one ckt of Satna (MPPTCL) - MPPTCL 4

5 Aligarh - Sikandra Rau line UPPTCL 35

6 Jajji - Rai line HVPNL 102

STATE SECTOR Sector

TANTRANS 69

3 Karuvalur - Shenbagapudur line TANTRANS 33

4 LILO of Ulundurpet - Villupuram line at

2 LILO of one ckt Gooty - Tumkur PGCIL 1

46Total of CENTRAL SECTOR

1LILO of Both ckt of Mundra UMPP - Limbdi

at Bachau (Triple)PGCIL 45

Sl NoName of

Transmission Lines

Executing

Agency

Line

Length

(cKM)1 3 5 6

Transmission Lines (220 kV and above) CommissionedReady for commissioning During

Oct-2017

400 kV

220kV

1 Programme and Achievementsof Transmission Lines in oct 2017 and during April 2016 to Oct 2017

+- 800 kV HVDC

+- 500 kV HVDC

765 kV

Apr 16 to Oct 17Oct 17

(Figs in ckms)

Voltage Level

Sector

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 26: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

SN Contents Page

1Programme and Achievements of Sub-Stations in May 2017 and during Apr 2016 to

Oct 2017

2 List of Sub Stations commissionedready for commisssioning during Oct 2017

Section D - Sub Stations

21

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 27: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

Programme

2017-18 Programme Achievement Achievement

Central Sector 3000 0 0 3000

State Sector 0 0 0 0

JVPrivate Sector 0 0 0 0

Total 3000 0 0 3000

Central Sector 17500 0 0 6000

State Sector 0 0 0 2500

JVPrivate Sector 1500 0 0 1500

Total 19000 0 0 10000

Central Sector 6260 0 1500 6445

State Sector 13215 0 75 12845

JVPrivate Sector 1330 0 1000 3730

Total 20805 0 2575 23020

Central Sector 330 0 0 110

State Sector 10843 263 1025 9355

JVPrivate Sector 0 0 0 180

Total 11173 263 1025 9645

Grand Total 53978 263 3600 45665

Sl

No

11

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

Name of

Sub Stations

Voltage

Ratio

(kVkV)

Executing AgencyCapacity

(MWMVA)

Maithon SS (Replacement of ICT-II) 400220 PGCIL 185

Satna ss (Extn) 400220 PGCIL 500

2 3 4 5

Kaithal ss (Extn ) 400220 PGCIL 315

Tumkur (Pavagada) Pooling Station 400220 PGCIL 500

Total of CENTRAL SECTOR 1500

Panchgaon 22066 HVPNL 160

Waluj (Aug) (100-50) 22033 MSETCL 50

Bonai (2nd Trf) 22033 OPTCL 20

Beed (Aug) 22033 MSETCL 25

Miraj (Aug) (200-100) 220132 MSETCL 100

Mangliya Ss 220132 MPPTCL 160

Kanjli (2nd Addl Trf) 22066 PSTCL 100

1100

Balasore (3rd Trf) 220132 OPTCL

Jahangirabad (Aug) (150-100) 220132 UPPTCL 50

7403

0

12840

1330

Total of PRIVATE SECTOR 1000

160

STATE SECTOR

Sultanpur (Aug) (315-240) 400220 UPPTCL 75

Sub-Stations (220 kV and above) CommissionedReady for commissioning During -OCT

2017

PRIVATE SECTOR

Indirapuram (New) 400220 WUPPTCL 1000

Sarnath (Aug) 220132 UPPTCL 200

Total of STATE SECTOR

10325

1185

1 Programme amp Achievement of sub- stations in Oct 2017 and during April 2016 to Oct 2017

0

29243

7403

0

(Fig in MVA)

765 kV

3000

6000

400 kV

220 kV

0

plusmn 800 kV HVDC

Programme

Apr 16 - Oct 17Oct-17Voltage Level

Sector

3000

1500

0

4500

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 28: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2017-18 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 29: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

Programme Achievement Ach Programme Achievement Ach

Central Sector 33974900 2848300 3007217 10558 19479700 20264448 10403

State Sector 33949400 2905600 2588830 8910 19731300 18005706 9125

PvtIPP Sector 34423900 2986800 3024867 10127 20153500 20244783 10045

PvtUTL Sector 1854600 161100 156973 9744 1112100 1163414 10461

Total 104202800 8901800 8777887 9861 60476600 59678351 9868

Central Sector 5502800 407200 408050 10021 4078300 4296181 10534

State Sector 7300500 696900 598283 8585 4889400 3779710 7730

PvtIPP Sector 1191700 83800 90139 10756 1010600 1080413 10691

PvtUTL Sector 145000 12500 11719 9375 87500 90320 10322

Total 1275738522 1200400 1108191 38737 10065800 9246624 9186

Central Sector 4097200 305900 312487 10215 2535300 2018559 7962

Total 4097200 305900 312487 10215 2535300 2018559 7962

Bhutan Import 500000 58900 63284 10744 367600 443888 12075

Central Sector 43574900 3561400 3727754 26093300 26579188 10186

State Sector 41249900 3602500 3187113 8847 24620700 21785416 8848

Pvt Sector 37615200 3244200 3283698 10122 22363700 22578930 10096

Total 122940000 10467000 10261849 9804 73445300 71387422 9720

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Sep-17 Sep-16 Upto Sep-17 Upto Sep-16

12928 9442 3831854 2942478

22

1 Electricity Generation (MU) Targets and Achievememts for 2017-18

All India Energy Generation During April 2016 to Oct 2017 (MU)

Target (2017-18April 16 to Oct 17

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Oct 17

604766

100658

25353

734453

596784

92466

20186

713874

0

100000

200000

300000

400000

500000

600000

700000

800000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 30: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

SN Contents Page

1 Power Supply Position (Provisional) for Aug 2017 and April 2017 to Oct 2017 23

2 Peak Demand and Peak Met (Provisional) for Oct 2017 and Apr 2016 to Oct 2017 24

3 Power Supply Position (Revised) for Sep 2017 25

4 Peak Demand and Peak Met (Revised) for Sep 2017 26

5 Notified Power cuts Restrictions on Industries during Oct 2017 27

6 Power Supply to Agricultural Sector during Oct 2017 28

Section F - Power supply position

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 31: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 121 121 0 00 1116 1107 9 08

दिलिी Delhi 2641 2640 1 00 22088 22073 15 01

हरियजणज Haryana 4285 4285 0 00 32953 32953 0 00

दहिजचि परिश Himachal Pradesh 727 725 3 04 5441 5407 34 06

रमि कशिीि Jammu amp Kashmir 1532 1225 307 200 10641 8500 2141 201

परजब Punjab 4504 4504 0 00 38466 38466 0 00

िजरसथजन Rajasthan 6296 6175 121 19 40357 40017 340 08

उततर परिश Uttar Pradesh 10663 10422 241 23 76020 74774 1246 16

उततराखड Uttarakhand 1058 1058 0 00 8037 8014 22 03

उततरी कषतर Northern Region 31827 31154 673 21 235120 231313 3807 16

छततीसगढ़ Chhattisgarh 2369 2366 3 01 16092 16022 71 04

गरिजत Gujarat 10030 10030 0 00 63843 63843 0 00

िधय परिश Madhya Pradesh 4815 4815 0 00 35567 35566 0 00

िहजिजषटर Maharashtra 12056 11959 97 08 87226 86999 226 03

ििन औि दिउ Daman amp Diu 213 213 0 00 1471 1471 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli510 510 0 00 3561 3561 0 00

गोवज Goa 349 349 0 00 2397 2397 0 00

पशचिमी कषतर Western Region 30343 30243 100 03 210156 209859 297 01

आनधर परिश Andhra Pradesh 4627 4621 7 01 32873 32846 27 01

तिगजनज Telangana 4740 4734 6 01 33451 33432 18 01

कनजाटक Karnataka 4482 4474 8 02 36400 36373 28 01

किि Kerala 2010 2001 9 04 14453 14415 39 03

तमिि नजड Tamil Nadu 8279 8267 12 01 62686 62650 37 01

पडचिी Puducherry 212 212 0 02 1600 1597 4 02

िकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0

दकषकषणी कषतर Southern Region 24351 24309 42 02 181464 181312 152 01

बबहजि Bihar 2482 2471 10 04 16614 16266 348 21

िजिोिि घजटी ननगि DVC 1801 1792 8 05 12486 12391 95 08

झजिखणड Jharkhand 653 649 4 06 4469 4448 21 05

ओडडशज Odisha 2590 2581 9 03 17430 17416 14 01

पशशचि बगजि West Bengal 3995 3992 3 01 32396 32271 125 04

मिशककि Sikkim 38 38 0 01 250 250 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 184 165 20 106

परवी कषतर Eastern Region 11559 11524 35 03 83644 83041 603 07

अरणजचि परिश Arunachal Pradesh 74 72 1 18 455 447 8 18

अिि Assam 872 843 29 33 5839 5570 268 46

िणणपि Manipur 68 67 1 20 453 444 10 21

िघजिय Meghalaya 128 128 0 00 849 849 0 00

मिज़ोिि Mizoram 41 40 1 27 278 271 7 25

नजगजिड Nagaland 70 69 1 17 486 478 8 16

बिपिज Tripura 128 127 2 13 1686 1665 21 12

उततर-परवी कषतर North-Eastern Region 1381 1346 36 26 10045 9723 322 32

समपणण भारत All India 99461 98576 885 09 720430 715249 5182 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अकरबर 2017 October2017 अपरल2017 -अकरबर17 April2017 to October2017

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 32: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 244 244 0 00 363 363 0 00

दिलिी Delhi 4723 4723 0 00 6553 6526 27 04

हरियजणज Haryana 7860 7860 0 00 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1425 1425 0 00 1425 1425 0 00

रमि कशिीि Jammu amp Kashmir 2579 2063 516 200 2768 2214 554 200

परजब Punjab 8348 8348 0 00 11705 11705 0 00

िजरसथजन Rajasthan 10357 10357 0 00 10357 10357 0 00

उततर परिश Uttar Pradesh 17966 17966 0 00 20274 18061 2213 109

उततराखड Uttarakhand 1920 1920 0 00 2033 2033 0 00

उततरी कषतर Northern Region 52132 49562 2570 49 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 3651 3635 16 04 4169 3887 282 68

गरिजत Gujarat 16566 16566 0 00 16566 16566 0 00

िधय परिश Madhya Pradesh 10466 10453 14 01 10466 10453 14 01

िहजिजषटर Maharashtra 20310 18248 2062 102 22542 22494 48 02

ििन औि दिउ Daman amp Diu 349 349 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 542 517 25 47 559 558 1 02

पशचिमी कषतर Western Region 48981 47296 1685 34 49860 49788 72 01

आनधर परिश Andhra Pradesh 7726 7726 0 00 8063 8000 63 08

तिगजनज Telangana 7549 7538 11 01 9522 9500 22 02

कनजाटक Karnataka 8410 8406 3 00 9992 9987 5 01

किि Kerala 3748 3614 134 36 3889 3862 27 07

तमिि नजड Tamil Nadu 13490 13485 6 00 15001 14975 26 02

पडचिी Puducherry 363 360 4 11 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 39017 38905 112 03 42770 42535 235 05

बबहजि Bihar 4547 4547 0 00 4547 4547 0 00

िजिोिि घजटी ननगि DVC 2887 2887 0 00 2887 2887 0 00

झजिखणड Jharkhand 1217 1217 0 00 1260 1260 0 00

ओडडशज Odisha 4633 4483 150 32 4633 4483 150 32

पशशचि बगजि West Bengal 7849 7849 0 00 8137 8114 23 03

मिशककि Sikkim 90 90 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20504 20359 145 07 20504 20359 145 07

अरणजचि परिश Arunachal Pradesh 145 139 6 41 145 145 0 02

अिि Assam 1822 1745 77 42 1822 1745 77 42

िणणपि Manipur 174 170 4 23 174 170 4 23

िघजिय Meghalaya 300 300 0 00 325 325 0 00

मिज़ोिि Mizoram 88 86 2 23 88 86 2 23

नजगजिड Nagaland 137 135 2 15 147 146 1 09

बिपिज Tripura 303 291 12 40 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2596 2499 97 37 2629 2520 109 41

समपणण भारत All India 161967 157394 4573 28 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ िगज वजट नट Figures in MW netअपरल2017 -अकरबर17 April2017 to October2017

िजग की पनता ि किी Demand not Met

राजयStateअकरबर 2017 October2017

िजग की पनता ि किी Demand not Met

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 33: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

आकड़ मिमियन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपिबधतज ऊरजा आवशयकतज ऊरजा उपिबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 150 150 0 00 995 986 9 09

दिलिी Delhi 3130 3128 2 01 19448 19434 14 01

हरियजणज Haryana 4652 4652 0 00 28668 28668 0 00

दहिजचि परिश Himachal Pradesh 789 785 4 05 4714 4683 31 07

रमि कशिीि Jammu amp Kashmir 1504 1202 302 201 9109 7275 1834 201

परजब Punjab 5832 5832 0 00 33962 33962 0 00

िजरसथजन Rajasthan 6029 5963 66 11 34061 33842 219 06

उततर परिश Uttar Pradesh 11230 10976 254 23 65357 64352 1005 15

उततराखड Uttarakhand 1138 1136 2 02 6979 6956 22 03

उततरी कषतर Northern Region 34454 33824 630 18 203293 200158 3135 15

छततीसगढ़ Chhattisgarh 2389 2355 34 14 13723 13656 68 05

गरिजत Gujarat 9170 9170 0 00 53813 53813 0 00

िधय परिश Madhya Pradesh 5237 5237 0 00 30752 30751 0 00

िहजिजषटर Maharashtra 11501 11423 78 07 75170 75041 129 02

ििन औि दिउ Daman amp Diu 207 207 0 00 1258 1258 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli506 506 0 00 3050 3050 0 00

गोवज Goa 334 334 0 00 2048 2048 0 00

पशचिमी कषतर Western Region 29344 29232 112 04 179813 179616 197 01

आनधर परिश Andhra Pradesh 4543 4534 10 02 28246 28225 20 01

तिगजनज Telangana 5244 5239 5 01 28711 28699 12 00

कनजाटक Karnataka 4526 4520 7 01 31918 31898 20 01

किि Kerala 1961 1951 9 05 12443 12413 30 02

तमिि नजड Tamil Nadu 8233 8222 10 01 54407 54383 24 00

पडचिी Puducherry 219 218 1 05 1388 1385 3 02

िकष-दवीप Lakshadweep 4 4 0 0 24 24 0 0

दकषकषणी कषतर Southern Region 24727 24685 42 02 157113 157004 110 01

बबहजि Bihar 2548 2518 30 12 14132 13794 338 24

िजिोिि घजटी ननगि DVC 1806 1795 11 06 10685 10599 87 08

झजिखणड Jharkhand 635 626 9 14 3816 3799 17 04

ओडडशज Odisha 2613 2610 3 01 14840 14835 5 00

पशशचि बगजि West Bengal 4778 4762 17 03 28400 28279 121 04

मिशककि Sikkim 34 34 0 01 212 212 0 00

अडिजन-ननकोबजि Andaman- Nicobar 29 27 2 7 155 138 18 114

परवी कषतर Eastern Region 12414 12345 69 06 72086 71517 568 08

अरणजचि परिश Arunachal Pradesh 65 64 1 19 382 375 7 18

अिि Assam 899 855 44 49 4967 4727 240 48

िणणपि Manipur 66 65 1 20 385 377 8 21

िघजिय Meghalaya 115 115 0 00 721 721 0 00

मिज़ोिि Mizoram 38 37 1 26 237 231 6 24

नजगजिड Nagaland 72 70 1 16 416 409 7 16

बिपिज Tripura 271 268 2 08 1557 1538 19 12

उततर-परवी कषतर North-Eastern Region 1526 1475 51 33 8664 8378 287 33

समपणण भारत All India 102465 101560 905 09 620970 616673 4297 07

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

राजयState

ससतबर 2017 September2017 अपरल2017 - ससतबर17 April2017 to September2017

ऊरजा पनत ा ि किी ऊरजा पनत ा ि किीEnergy not Supplied Energy not Supplied

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 34: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

अधधकति िजग अधधकति उपिशबध अधधकति िजग अधधकति उपिशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 287 287 0 00 363 363 0 00

दिलिी Delhi 5661 5661 0 00 6553 6526 27 04

हरियजणज Haryana 9215 8932 283 31 9671 9539 132 14

दहिजचि परिश Himachal Pradesh 1413 1413 0 00 1413 1413 0 00

रमि कशिीि Jammu amp Kashmir 2704 2163 541 200 2768 2214 554 200

परजब Punjab 9939 9939 0 00 11705 11705 0 00

िजरसथजन Rajasthan 9900 9900 0 00 10347 10347 0 00

उततर परिश Uttar Pradesh 20007 17902 2105 105 20274 18061 2213 109

उततराखड Uttarakhand 2033 2033 0 00 2033 2033 0 00

उततरी कषतर Northern Region 57203 54649 2554 45 60749 58448 2301 38

छततीसगढ़ Chhattisgarh 4169 3817 352 84 4169 3887 282 68

गरिजत Gujarat 15498 15498 0 00 15695 15695 0 00

िधय परिश Madhya Pradesh 8251 8231 20 02 8402 8402 0 00

िहजिजषटर Maharashtra 19490 19428 63 03 22542 22494 48 02

ििन औि दिउ Daman amp Diu 351 351 0 00 351 351 0 00

िजिि व नगि हविी Dadra amp Nagar

Haveli790 790 0 00 790 790 0 00

गोवज Goa 509 508 1 02 559 558 1 02

पशचिमी कषतर Western Region 46382 45710 672 14 49860 49788 72 01

आनधर परिश Andhra Pradesh 8063 7992 71 09 8063 8000 63 08

तिगजनज Telangana 9522 9500 22 02 9522 9500 22 02

कनजाटक Karnataka 8450 8407 43 05 9992 9987 5 01

किि Kerala 3548 3529 19 05 3889 3862 27 07

तमिि नजड Tamil Nadu 13927 13879 48 03 15001 14975 26 02

पडचिी Puducherry 375 367 8 22 390 387 3 07

िकष-दवीप Lakshadweep 8 8 0 0 9 9 0 0

दकषकषणी कषतर Southern Region 41071 40852 219 05 42770 42535 235 05

बबहजि Bihar 4437 4428 9 02 4437 4428 9 02

िजिोिि घजटी ननगि DVC 2785 2749 36 13 2785 2749 36 13

झजिखणड Jharkhand 1212 1212 0 00 1260 1260 0 00

ओडडशज Odisha 4325 4325 0 00 4325 4325 0 00

पशशचि बगजि West Bengal 8137 8114 23 03 8137 8114 23 03

मिशककि Sikkim 87 87 0 00 91 91 0 00

अडिजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20274 20208 66 03 20274 20208 66 03

अरणजचि परिश Arunachal Pradesh 135 128 7 52 145 145 0 02

अिि Assam 1770 1718 52 29 1770 1718 52 29

िणणपि Manipur 166 165 1 08 166 165 1 08

िघजिय Meghalaya 325 325 0 00 325 325 0 00

मिज़ोिि Mizoram 87 85 2 23 87 85 1 14

नजगजिड Nagaland 147 141 6 40 147 146 1 09

बिपिज Tripura 342 342 0 00 342 342 0 00

उततर-परवी कषतर North-Eastern Region 2629 2520 109 41 2629 2520 109 41

समपणण भारत All India 162452 158550 3902 24 164066 160752 3314 20

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

िजग की पनता ि किी Demand not Met

राजयStateससतबर 2017 September2017

िजग की पनता ि किी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ िगज वजट नट Figures in MW netअपरल2017 - ससतबर17 April2017 to September2017

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 35: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi

हरियजणज Haryana

दहिजचि परिश Himachal Pradesh

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

गरिजत Gujarat

िधय परिश Madhya Pradesh

िहजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तिगजनज Telangana

कनजाटक Karnataka

किि Kerala

तमिि नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचि बगजि West Bengal

N

o No

tified

Cuts

N

o No

tified

Cuts

अकरबर 2017 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2017

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No Notified Cuts No Notified Cuts

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 36: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

अकरबर2017 October2017 अपरल2017 -अकरबर2017 April2017 - October2017उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलिी Delhi There is no agricultural load in Delhi There is no agricultural load in Delhi

हरियजणज Haryana 0927 hrsday 0800 - 0927 hrsday

दहिजचि परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and

uninterrupted power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमि कशिीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 902 hrsday 0400 - 0902 hrsday

िजरसथजन Rajasthan 0500 hrsday 0500 - 0645 hrsday

उततर परिश Uttar Pradesh 1800 hrsday 1800 - 1947 hrsday

उततराखड Uttarakhand 2400 hrsday 2242 - 2400 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

िधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-949 hrs day

Three-Phase (Mixed) Supply - 2326 hrs day

3 phase (irrigartion) 931- 0955 hrs day

3 phase (Mixed) Supply 2300 - 2326 hrs day

िहजिजषटर Maharashtra 8 hrsday 8-9 hrsday

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तिगजनज Telangana 09 hrsday 09 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किि Kerala No Restrictions No Restrictions

तमिि नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचि बगजि West Bengal About 23 hrsday About 23 hrsday

अकटबर 2017 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2017

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 37: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

SN Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Hydro 2017

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 38: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19342650 2515038 837629 21941451 6780 4476542 6015766 33111758

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW

Provisional

Coal Gas Diesel Nuclear Hydro Res Total

1934265 2515038 837629 678000 447654 60157655 22925174

29

All India Generating Installed Capacity ( MW ) (As on 31102017 )

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

Total Installed Capacity 33111758 MW

Coal Gas Diesel Nuclear Hydro Res

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 39: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

Transmission

System Type

Voltage

(KV) levelUnit

Ach At

the end

of 6th

Plan

Ach At

the end

of 7th

Plan

Ach At the

end of 8th

Plan (as

on

3131997)

Ach At the

end of 9th

Plan (as

on

3132002)

Ach as on

31032007

(End of 10th

Plan)

Ach as

on

31032012

(End of

11th Plan)

Ach as on

3092017

Target

31032017

(End of 12th

Plan)

765 ckm 0 0 0 1160 2184 5250 33286 32250

400 ckm 6029 19824 36142 49378 75722 106819 166465 144819

220 ckm 46005 59631 79600 96993 114629 135980 163268 170980

Total ckm 52034 79455 115742 147531 192535 248049 363019 348049

HVDC ckm 0 0 1634 4738 5872 9432 15556 16872

Total

(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 378575 364921

765 MVA 0 0 0 0 0 25000 177500 174000

400 MVA 9330 21580 40865 60380 92942 151027 261252 196027

220 MVA 37291 53742 84177 116363 156497 223774 321578 299774

Total AC MVA 46621 75322 125042 176743 249439 399801 760330 669801

HVDC MW 0 0 0 5200 8200 9750 21000 22500

AC+HVDC 46621 75322 125042 181943 257639 409551 781330 692301

Inter-regional

transmission

Capacity

MW 14050 27750 78050 65550

30

2 Growth of Transmission Sector Since 6th Plan

AC

Transmission

lines

AC Substations

Transformation

Capacity

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 40: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 5459

Actual

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14 957

2014-15 1010

2015-16

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1075

7335

7786

91441

8188

88363

(GrossGen+ Net Import) Mid-year population Actual

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information

received from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally

not made available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of

electrified villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village

electrification of CEA is independent of the earlier published reports

Nil

7 Status of Hydro Schemes Cleared by the CEA in Oct 2017

Name of Scheme

1999-002000-01

297594

010408 to 310309

010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th

Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

8629

3726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage

electrification since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

594599 21191474

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 42: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

SN Contents Page

1 Rate of sale of power for the year 2014-2015 33-41

Oct-17

RATE OF SALE OF POWER FOR THE YEAR 2014-2015

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 43: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 74600 18600

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 262400 20800

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 152400 25800

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 104300 42800

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 64300 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 109000 29600

CHUTAK NHPC LTD HYDRO-HYDRO 4400 13800 84400

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 236200 57000

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 359100 10600

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 45200 28000

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 328300 15600

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 119600 48400

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 26900 95400

SEWA - II NHPC LTD HYDRO-HYDRO 12000 59700 55200

ANTA CCPP NTPC LTD THERMAL-GASN 41930 90900 39900

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 146500 44600

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 201300 50300

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 375800 45000

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 563500 50000

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 292400 41100

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 107400 37800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 6209600 25600

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 690500 25500

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 642700 30700

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1505400 19300

TANDA TPS NTPC LTD THERMAL-COAL 44000 275700 39400

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 259400 35100

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 255600 35300

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 120200 39900

KOLDAM NTPC LTD HYDRO-HYDRO 80000 177400 55600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 307824 25363

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 760365 24884

NJHPS SJVNL HYDRO-HYDRO 150000 725540 28820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 198313 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 305107 55900

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 123085 51700

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 110609 41383

STATE SECTOR

PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 44780 269 79310

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14685 44920

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 13822 46280

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 47943 44710

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 74654 44680

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 370928 40820

RGTPP (UNIT 1TO 2) HPGCL THERMAL-COAL 120000 439227 43790

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 18691 20730

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 18834 11100

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 6185 22500

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 9839 17500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 31446 7100

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2721 22500

GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 4501 24200

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 4840 29000

RATE OF SALE OF POWER FOR THE YEAR 2015-2016

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 44: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 075 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 629 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 4924 17700

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 65546 22500

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 676 26700

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 680 25000

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 003 17700

KILLAR HPSEB HYDRO-HYDRO 030 043 31700

BHABA AUGUMENTATION POWER HPSEB HYDRO-HYDRO 450 1681 28400

CHAMVA HPSEB HYDRO-HYDRO 045 068 22600

GHANVI II HPSEB HYDRO-HYDRO 1000 4473 16600

GUMMA HPSEB HYDRO-HYDRO 300 176 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 44590 67400

RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 13500 3230 84700

PPS-I PPCL THERMAL-GAS 33000 150030 55100

PPS-III PPCL THERMAL-GAS 137120 183630 40800

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 66579 70794

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 5356 10525

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 25734 61476

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 352 4409

KARNAH MPH JampKPDD HYDRO-HYDRO 200 599 5322

CHENANI I JampKPDD HYDRO-HYDRO 2330 5382 12484

CHENANI II JampKPDD HYDRO-HYDRO 200 416 1578

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 1156 6895

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 505 4894

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 120 5007

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 655 7768

MARPACHOO JampKPDD HYDRO-HYDRO 075 060 1845

HAFTAL JampKPDD HYDRO-HYDRO 100 138 2534

SANJAK JampKPDD HYDRO-HYDRO 126 072 1943

GNDTPLANT BATHINDA PSPCL THERMAL-COAL 45000 81486 62249

GGSSTPLANT ROPAR PSPCL THERMAL-COAL 126000 360070 62249

GHTPLANT LEHRA MOHABAT PSPCL THERMAL-COAL 92000 285346 62249

SHANAN P H JOGINDER NGR PSPCL HYDRO-HYDRO 11000 52599 62249

UBDCPATHANKOT MALIKPUR PSPCL HYDRO-HYDRO 9135 31802 62249

ASHP ANANDPUR SAHIB PSPCL HYDRO-HYDRO 13400 66613 62249

MUKERIAN HYDEL TALWARA PSPCL HYDRO-HYDRO 20700 114894 62249

RANJIT SAGAR Dam(RSD) PSPCL HYDRO-HYDRO 60000 195170 62249

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 696232 39400

SURATGARH TPS RRVUNL THERMAL-COAL 150000 527555 44600

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 147874 35700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 118638 38600

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 132638 33350

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 47763 32000

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 98177 41500

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 28270 39000

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 16733 23000

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 656 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 332240 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 218636 36830

KHARA HEP UPJVNL HYDRO-HYDRO 7200 31868 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 7854 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 15993 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 40449 5500

UGC PS(NIRGAJINICHISALAWA) UPJVNL HYDRO-HYDRO 1370 2339 21300

EYC HEP UPJVNL HYDRO-HYDRO 600 398 22500

SHEETLA HEP UPJVNL HYDRO-HYDRO 360 193 27300

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 366527 25600

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 733492 24200

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 36429 49600

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 45: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 307492 49500

OBRA A TPS UPRVUNL THERMAL-COAL 28800 30726 33900

OBRA B TPS UPRVUNL THERMAL-COAL 100000 319629 21900

PANKI TPS UPRVUNL THERMAL-COAL 21000 45412 48500

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 64231 45600

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 252431 46800

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 286144 50700

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 80646 7200

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 74064 6600

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 12287 7800

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 20109 9600

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 11633 7200

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 36641 8400

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 13596 7200

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 47111 13600

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 121387 14200

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 49994 9800

PRIVATE SECTOR

INDIRA GANDHI STPS(IGSTPS) ARAVALI POWER CO PVT THERMAL-COAL 150000 541473 54620

MAHATMA GANDHI THERMAL POWER JHAJJAR POWER LTD THERMAL-COAL 132000 462735 44516

BASPA-II HEP JSW ENERGY LTD HYDRO-HYDRO 30000 129576 23500

KARCHAM WANGTOO HEP JSW ENERGY LTD HYDRO-HYDRO 100000 469633 31100

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 25374 31209

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 29101 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 310553 35590

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 639600 41100

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 29686 68900

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 31333 68300

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 28785 68200

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 33325 77300

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34418 66600

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 824000 33500

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 194036 33155

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 95348 47352

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 92300 37700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 117500 36100

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1551000 15600

KORBA III NTPC LTD THERMAL-COAL 50000 366600 25500

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1358700 25400

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 749100 24400

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 759300 21700

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 622100 21400

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 706600 25500

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 689000 30400

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 127500 27200

MOUDA I NTPC LTD THERMAL-COAL 100000 171800 50000

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 119708 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 177500 24243

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 117597 10174

BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 354964 37222

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 825433 29059

STATE SECTOR

GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 15610 13804 30329

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 47192 71100

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 142740 21300

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 195796 24230

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 366465 24360

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 309563 27800

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 519410 18100

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 46: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 751 55500

MTTPS CHAMPA CSPGCL THERMAL-COAL 50000 630 29850

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 1686 37820

BANGO HEP CSPGCL HYDRO-HYDRO 12000 28265 10770

MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 170 923 39390

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 568 25890

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8212 92200

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 30941 62200

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 116422 60500

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127700 39800

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 112182 33800

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 25353 38700

SIKKA TPS 1-2 GSECL THERMAL-COAL 24000 29018 88500

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 48764 52900

UKAI 1-5 GSECL THERMAL-COAL 85000 280851 41100

UKAI TPS 6 GSECL THERMAL-COAL 50000 229013 49500

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 418162 44900

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 97522 40500

KADANA HPS GSECL HYDRO-HYDRO 24200 27363 21100

UKAI HPS GSECL HYDRO-HYDRO 30500 49404 5000

UGBPS II GSECL THERMAL-GAS 37457 123759 63300

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 56700 18700

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 4700 11000

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 9700 13100

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 5800 16600

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 27000 5200

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 18800 3500

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 1500 22100

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 9500 30100

PENCH HPS MPPGCL HYDRO-HYDRO 16000 25000 9600

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 1800 23500

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 161100 29200

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 306600 39600

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 335000 36600

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 313900 35200

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 178400 49400

SSTPS PH-I MPPGCL THERMAL-COAL 120000 397800 62000

BHUSAWAL TPS II amp III MSPGCL THERMAL-COAL 42000 153632 45600

BHUSAWAL 4 amp 5 TPS MSPGCL THERMAL-COAL 100000 596604 45300

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1115662 32000

KHAPERKHEDA MSPGCL THERMAL-COAL 84000 442046 31400

KHAPERKHEDA 5 MSPGCL THERMAL-COAL 50000 302055 43700

KORADI TPS 5 6 amp 7 MSPGCL THERMAL-COAL 62000 159818 48400

KORADI TPS 8 MSPGCL THERMAL-COAL 66000 64930 27500

NASIK TPS MSPGCL THERMAL-COAL 63000 386970 48800

PARLI TPS 3 4 amp5 MSPGCL THERMAL-COAL 63000 37761 39100

PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 50000 76640 43800

PARAS 3 amp 4 MSPGCL THERMAL-COAL 50000 317368 38100

URAN CCPP MSPGCL THERMAL-GAS 67200 280127 31400

KOYANA I II amp III amp KDPH MSPGCL HYDRO-HYDRO 195600 296087 2400

VAITARANA amp OTHER STNS MSPGCL HYDRO-HYDRO 23300 75255 10200

BHIRA MSPGCL HYDRO-HYDRO 8000 7378 6400

TILLARI MSPGCL HYDRO-HYDRO 6600 4486 8700

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 145013 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 69895 20500

PRIVATE SECTOR

JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 120878 44800

JNSTPP(JAYPEE NIGRIE JP POWER VENTURES LTD THERMAL-COAL 132000 499121 27810

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 28500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 132000 870829 23500

MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 198000 1306200 32300

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 132000 762600 25500

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 47: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 198000 1143900 34200

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 562900 36495

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 218902 47941

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 491500 28600

GEPL-VEDANTA LTD POWER -I VEDANTA LTD THERMAL-GAS 3000 15744 24000

SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 3000 21576 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 7303900 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 23248 69724

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 70663 49157

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 143303 24334

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 126461 37160

PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 65500 87554 49800

MUNDRA UMPP COASTAL GUJARAT POWER THERMAL-IMP COAL 400000 2367900 23280

LANCO AMARKANTAK TPP U-I LANCO AMARKAN POWER LTD THERMAL-COAL 30000 204600 29900

LANCO AMARKANTAK TPP U-II LANCO AMARKAN POWER LTD THERMAL-COAL 30000 69000 27300

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 465800 30600

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 410100 33600

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 348074 37900

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 329800 40400

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 114900 44600

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 176700 40100

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 63700 17000

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23000 39600

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 23100 60400

DODSON LINDBLOM PH -I DODSON LINDBLOM HYDRO HYDRO-HYDRO 1200 4944 24300

DODSON LINDBLOM PH -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 4683 32800

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 180500 28600

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 584000 36000

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2367900 23300

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 277689 49163

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 300007 39066

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 954647 36281

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 66077 57781

NEYVELI TAMILNADU POWER -JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 331330 41017

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 13000 83500

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1517200 28600

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 381800 32600

SIMHADRI I NTPC LTD THERMAL-COAL 100000 678400 33900

SIMHADRI II NTPC LTD THERMAL-COAL 100000 687300 40700

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 700304 30786

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 293279 21161

KKNPP 1 NPCIL NUCLEAR-NUCLEAR 100000 205653 40730

MINICOY LAKSHADEEP THERMAL-DIESEL 440 763 26000

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1099 26000

AMINI LAKSHADEEP THERMAL-DIESEL 265 499 26000

ANDROTT LAKSHADEEP THERMAL-DIESEL 325 686 26000

KALPENI LAKSHADEEP THERMAL-DIESEL 125 362 26000

AGATTI LAKSHADEEP THERMAL-DIESEL 235 611 26000

KADMAT LAKSHADEEP THERMAL-DIESEL 200 448 26000

KILTAN LAKSHADEEP THERMAL-DIESEL 100 256 26000

CHETLET LAKSHADEEP THERMAL-DIESEL 100 161 26000

BITRA LAKSHADEEP THERMAL-DIESEL 043 026 26000

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 006 26000

STATE SECTOR

APGAS POWER COR LTD(VIJJE - I) ANDHRA PRADESH GPCL THERMAL-GAS 10000 2059 36376

APGAS POWER COR LTD(VIJJE -II) ANDHRA PRADESH GPCL THERMAL-GAS 17200 4688 32153

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 807909 45700

Dr NTTPS - IV (VIJAYAWADA TPS- 4) APGENCO THERMAL-COAL 50000 284011 45700

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 254901 45700

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 269597 45700

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 48: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 128670 45700

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 19839 45700

UPPER SILERU APGENCO HYDRO-HYDRO 24000 49841 45700

LOWER SILERU APGENCO HYDRO-HYDRO 46000 120934 45700

DONKARAI APGENCO HYDRO-HYDRO 2500 11555 45700

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 669 45700

CHETTIPETA APGENCO HYDRO-HYDRO 100 197 45700

MUCHKUND APGENCO HYDRO-HYDRO 12000 29967 45700

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 9504 45700

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 395384 35600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 322587 29400

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 287987 49000

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 35360 43800

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 299284 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 8294 46000

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 14775 3203

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 8851 1579

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 2965 4142

LJHES TSPGENCO HYDRO-HYDRO 8000 323 12721

PALAIR MINI HYDRO TSPGENCO HYDRO-HYDRO 200 004 29503

BELLARY TPS KPCL THERMAL-COAL 100000 572606 45530

RAICHUR TPS KPCL THERMAL-COAL 172000 1042270 39998

ALMATTI DPH HPS KPCL HYDRO-HYDRO 29000 14255 37952

BHADRA HPS KPCL HYDRO-HYDRO 3920 3855 63849

GERUSUPPA HPS KPCL HYDRO-HYDRO 24000 29367 17831

GHAT PRABHA HPS KPCL HYDRO-HYDRO 3200 3106 42905

MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 13920 30657 6101

KADRA HPS KPCL HYDRO-HYDRO 15000 21197 27271

NAGJHARI KPCL HYDRO-HYDRO 90000 222131 7473

KODASALLI HPS KPCL HYDRO-HYDRO 12000 19704 21227

MUNIRABAD HPS KPCL HYDRO-HYDRO 2800 6190 16124

SHARAVATHY HPS KPCL HYDRO-HYDRO 103500 272064 5910

SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 4200 26774 9933

VARAHI (UG) HPS KPCL HYDRO-HYDRO 46000 74810 16083

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 116895 54100

IDUKKI HPS KSEB HYDRO-HYDRO 78000 237327 54100

KAKKAD HPS KSEB HYDRO-HYDRO 5000 471 54100

KALLADA HPS KSEB HYDRO-HYDRO 1500 429 54100

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 57589 54100

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 805 54100

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 4481 54100

MALANKARA HPS KSEB HYDRO-HYDRO 1050 51097 54100

MADUPETTY KSEB HYDRO-HYDRO 200 203 54100

MALAMPUZHA KSEB HYDRO-HYDRO 250 904 54100

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 930 54100

URUMI ST I amp II KSEB HYDRO-HYDRO 615 3243 54100

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 556 54100

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7750 35207 54100

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 21860 54100

PANNIAR HPS KSEB HYDRO-HYDRO 3200 17393 54100

PORINGALKUTHU KSEB HYDRO-HYDRO 3200 15103 54100

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 3600 17077 54100

PEPPARA KSEB HYDRO-HYDRO 300 18364 54100

POOZHITHODE KSEB HYDRO-HYDRO 480 862 54100

PEECHI KSEB HYDRO-HYDRO 125 143 54100

RANI-PERUNADU KSEB HYDRO-HYDRO 400 766 54100

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 27576 54100

SENGULAM HPS KSEB HYDRO-HYDRO 4800 16091 54100

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 21022 54100

VILANGAD KSEB HYDRO-HYDRO 750 1275 54100

PLBE KSEB HYDRO-HYDRO 1600 10643 54100

CHIMMINI KSEB HYDRO-HYDRO 250 459 54100

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 49: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

ADIAN PARA KSEB HYDRO-HYDRO 350 236 54100

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 1325 54100

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 13738 54100

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 21292 44261

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 34736 59688

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 547133 59688

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 367416 59688

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 404639 59688

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 603196 59688

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 650137 59688

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 36368 59688

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 19000 67055 59688

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 51848 59688

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 953 59688

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 5615 59688

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 544 59688

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 11564 59688

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 097 59688

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 22965 59688

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 61967 59688

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 36417 59688

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 11733 59688

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 3761 59688

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2550 59688

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 9214 59688

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 24586 59688

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 4044 59688

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6222 59688

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6339 59688

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 5386 59688

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 3001 59688

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 320 59688

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 1071 59688

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 029 59688

THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 116 59688

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 50308 59688

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 3670 59688

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 9203 59688

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 11575 59688

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 3893 59688

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 7911 59688

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15241 59688

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 41106 59688

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 20663 59688

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 5656 59688

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 19227 59688

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 8555 59688

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 801 59688

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 27924 59688

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 485 59688

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 716 59688

BHAVANI KATTALAI (IIIampIII BB I amp II) TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 16444 59688

PRRUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 126 59688

PRIVATE SECTOR

LANCO TANJORE POWER LANCO TANJORE PCL THERMAL-GAS 12000 62021 36260

BSES KERALA POWER LTD RELIANCE INFRAS LTD THERMAL-GAS 16500 555 134100

JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GASN 21682 55146 49400

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 11543 61400

GVK GAUTAMI POWER LTD GVK GAUTAMI POWER LTD THERMAL-GASHSD 46400 10065 74900

SBU 1 JSW ENERGY LTD V NAGAR JSW ENERGY LTD THERMAL-IMP COAL 26000 202900 50300

SBU 2 JSW ENERGY LTD VNAGAR JSW ENERGY LTD THERMAL-IMP COAL 60000 422900 50400

LANCO KONDAPALLI PH-I LANCO KONDAPALLI POWER THERMAL-GAS 36814 47834 44900

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 50: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

LANCO KONDAPALLI PH-II LANCO KONDAPALLI POWER THERMAL-GAS 36600 94503 47000

LANCO KONDAPALLI PH-III A LANCO KONDAPALLI POWER THERMAL-GAS 37100 28311 47000

VIDARBHA INDUSTRIES VIDARBHA INDUS POWER LTD THERMAL-COAL 60000 365889 56900

SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 60000 368300 51400

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 169907 47100

MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 10600 3995 251000

UDUPI POWER CORPORATION LTD ADANI POWER LTD THERMAL-COAL 120000 768400 42300

SPECTRUM POWER GEN LTD SPECTRUM PG LTD THERMAL-GASN 20525 531653 52167

TAQA NEYVELI POWER COM TAQA NEYVELI THERMAL-LIG 25000 138493 37400

VALLUR THERMAL POWER STATION NTPC TECL THERMAL-COAL 150000 713051 37803

GMR VEMAGIRI POWER GEN LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 43665 47000

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 65795 58521

MAITHON HPS DVC HYDRO-HYDRO 6320 10728 28219

PANCHET HPS DVC HYDRO-HYDRO 8000 6778 37470

TILLAYA HPS DVC HYDRO-HYDRO 400 1054 77578

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34500 34200

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 271000 23000

TLDP -III NHPC LTD HYDRO-HYDRO 13200 51500 69000

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 875000 34500

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 269000 43000

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 500100 32700

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 919200 33200

BARH-II NTPC LTD THERMAL-COAL 132000 405600 52200

TALCHER TPS NTPC LTD THERMAL-COAL 46000 336300 25800

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 725300 22200

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1522700 21100

CHATHAM AampN ISLAND THERMAL-DIESEL 1500 2606 161900

PHONEIX BAY AampN ISLAND THERMAL-DIESEL 800 3249 161900

RAJ NIWAS AampN ISLAND THERMAL-DIESEL 051 007 161900

NEIL ISLAND AampN ISLAND THERMAL-DIESEL 063 185 61900

HAVELOCK AampN ISLAND THERMAL-DIESEL 173 713 61900

RUTLAND AampN ISLAND THERMAL-DIESEL 002 003 61900

BARATANG AampN ISLAND THERMAL-DIESEL 051 069 61900

RANGAT BAY amp BANAGAON AampN ISLAND THERMAL-DIESEL 1005 2170 61900

LONG ISLAND AampN ISLAND THERMAL-DIESEL 089 051 61900

STRAIGHT ISLAND AampN ISLAND THERMAL-DIESEL 002 004 108400

HANSPURI AampN ISLAND THERMAL-DIESEL 003 002 161900

SITA NAGAR AampN ISLAND THERMAL-DIESEL 237 510 161900

HUTBAY AampN ISLAND THERMAL-DIESEL 565 1003 161900

DUGONG CREEK AampN ISLAND THERMAL-DIESEL 005 007 161900

NPH CAR NICOBAR AampN ISLAND THERMAL-DIESEL 564 901 161900

KAMORTA (COMMUNITY P H AampN ISLAND THERMAL-DIESEL 112 249 161900

CHAMPION AampN ISLAND THERMAL-DIESEL 032 032 161900

KATCHAL AampN ISLAND THERMAL-DIESEL 123 129 161900

TERESSA AampN ISLAND THERMAL-DIESEL 076 074 161900

CHOWORA AampN ISLAND THERMAL-DIESEL 016 025 161900

CAMPBELL BAY COMM PH AampN ISLAND THERMAL-DIESEL 285 534 161900

GANDHI NAGAR AampN ISLAND THERMAL-DIESEL 006 012 161900

SHANTI NAGAR AampN ISLAND THERMAL-DIESEL 007 007 161900

GANESH NAGAR AampN ISLAND THERMAL-DIESEL 007 011 161900

STATE SECTOR

ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1500 1309 24900

SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 330 008 24900

SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 660 1266 24900

KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 1920 850 24900

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 51: Oct-2017 - CEA Capacity Addition During Oct, 2017 (MVA) 0 0 500 1100 0 Oct-16 Oct-17 1600 3600 0 500 1000 1500 2000 2500 3000 3500 4000 VA Transformation Capacity Addition during Oct

SIKIDIRI HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 13000 28554 11300

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 57800 10483

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 42751 8975

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 21163 2364

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 58339 5867

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 159099 14349

UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 71280 4359

IB VALLEY TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 311732 20160

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 232828 35161

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 197952 43055

KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 126000 512471 31223

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 598973 31935

BANDEL THERMAL POWER STA WEST BENGAL PDCL THERMAL-COAL 45000 94879 33206

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 338151 35147

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 60000 235174 32295

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 17172 65500

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 25272 65500

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 7638 65500

PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 90000 103707 65500

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2525 65500

PRIVATE SECTOR

LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 300 451 30000

MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 200 330 30000

RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 500 2128 40000

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 43002 23740

GCHARAMA SPV AampN ISLAND SOALR 500 626 77600

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 640700 69800

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3535 58900

ADHUNIK POWER amp NAT RES ADHUNIK POWER amp NAT RES THERMAL-COAL 54000 473040 44060

KAMALANGA TPS GMR KAMALANGA ENERGY THERMAL-COAL 105000 574709 34120

JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 346000 24900

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 38100 48600

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 77100 37300

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 71800 36500

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 79200 39300

MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 105000 678000 33900

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 24200 29100

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 29200 29100

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 19400 29100

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 53700 34600

AGARTALA GT NEEPCO THERMAL-GAS 13500 84445 44270

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 171494 40520

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 16220 55470

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 68303 11320

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 17407 21480

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 9679 18890

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 133222 22190

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 6542 12716 39000

STATE SECTOR

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39439 15492

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 87024 44183

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 47982 48419

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 8870 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 102 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 024 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 0004 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 5826 18400

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 11750 18200

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 18500 12200

UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1120 141 12200

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 630 18200

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44592 28300

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 180 39800

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 057 39800

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 332 39800

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 230 39800

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 598 39800

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 1422 39800

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 017 39800

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 23057 42560

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 46409 37320

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 2182 16800

Note

LIG Lignite N Naptha WHR Waste Heat Recovery