The European Organisation for the Safety of Air Navigation
Objective AOP05
Note: objective postponed 12 months in ESSIP Plan Edition 2015
November 2015 2
Objective AOP05
• Comprehensive Explanation• Link to European ATM Master Plan• Most important SLoA(s)• Supporting Material• ESSIP Report 2014• Objective Coordinator’s Analysis, recommendations, tips & tricks• Conclusions• Links and contacts
November 2015 3
Comprehensive Explanation
Implement Airport Collaborative Decision Making (CDM)• This objective aims at implementing A-CDM to enhance the
operational efficiency of airports and improve their integration into the Air Traffic Management Network (ATMN) while maintaining or improving the safety levels;
• The applicability area is presented in Table 8 of Part IV Annex B of the ESSIP 2012 document;
• Initial operational capability - 01/2004, Full operational capability - 01/2016
• PCP Related
November 2015 4
Link to European ATM Master Plan
• [AO-0501]-Improved Operations in Adverse Conditions through Airport Collaborative Decision Making;
• [AO-0601]-Improved Turn-Round Process through Collaborative Decision Making;
• [AO-0602]-Collaborative Pre-departure Sequencing;• [AO-0603]-Improved De-icing Operation through Collaborative Decision
Making;• Enablers:
• PRO-204a• PRO-204b• PRO-204c• AIRPORT-31• PRO-213a• PRO-213b• PRO-214a• PRO-073
November 2015 5
Most important SLoA(s)
• APO01/ASP01/USE01- Define and agree performance objectives and KPIs at local level specific to airport operations in accordance with A-CDM Manual guidelines;
• APO02/ASP02/USE02 - Define and implement local airport operations procedures for information sharing through Letters of Agreement (LoAS) and/or Memorandum of Understanding (MoU) in accordance with A-CDM Manual guidelines;
• APO03/ASP03/USE03 - Define and implement local procedures for turnaround processes in accordance with CDM manual guidelines (baseline CDM);
• APO05 Define and implement the exchange of messages, Flight Update Message (FUM) and Departure Planning Information (DPI) between CFMU and the airport in accordance with A-CDM Manual guidelines;
• APO06/USE05 Define and implement procedures for CDM in adverse conditions including de-icing according to airport CDM Manual guidelines.
November 2015 6
Supporting Material
• EUROCAE-ED-141-Minimum Technical Specifications for airport Collaborative Decision Making (Airport-CDM) Systems, dated October 2008;
• EUROCAE-ED-145-Airport-CDM Interface Specification, dated October 2008;
• EUROCAE-ED-146-Guidelines for Test and Validation Related to Airport CDM Interoperability, dated October 2008
Url: http://boutique.eurocae.net/catalog/index.php
November 2015 7
Supporting Material
• EUROCONTROL-Airport CDM Functional Requirements Document, Edition 4.0, dated May 2009;
• EUROCONTROL-Airport CDM Implementation Manual, Edition 4,0, Dated 01.04.2012
Url : http://www.euro-cdm.org/library_eurocontrol_implementation.php• ETSI-EN303 212, V1.1.1 - Airport Collaborative Decision
Making (A-CDM); Community Specification for application under the Single European Sky Interoperability Regulation EC 552/2004, dated 01.06.2010, OJ 2010/C 168/04
Url : http://webapp.etsi.org/workprogram/SimpleSearch/QueryForm.asp
November 2015 8
ESSIP Report 2014
ESSIP FOC: 01/2016
Planned Achievement: 06/2016 (80% completion)
20% complete
(months): +5
Late
November 2015 9
Objective Coordinator’s Analysis, recommendations, tips & tricks
• More elaborate explanation of chosen progress assessment is required.
• Objective aligned with Deployment Programme and PCP – postponed for 12 months
November 2015 10
Links and contacts
• Objective Coordinator: Predrag Vranjkovic, +32 2 729 3257
Yi Xiong, +32 2 729 3528
• DNM Objective Expert: Paul Adamson, +32 2 729 5183