Objective AOP05

10
The European Organisation for the Safety of Air Navigatio Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015

description

Objective AOP05. Objective AOP05. Comprehensive Explanation Link to European ATM Master Plan Most important SLoA (s) Supporting Material ESSIP Report 2013 Objective Coordinator’s Analysis, recommendations, tips & tricks Conclusions Links and contacts. Comprehensive Explanation. - PowerPoint PPT Presentation

Transcript of Objective AOP05

Page 1: Objective AOP05

The European Organisation for the Safety of Air Navigation

Objective AOP05

Note: objective postponed 12 months in ESSIP Plan Edition 2015

Page 2: Objective AOP05

November 2015 2

Objective AOP05

• Comprehensive Explanation• Link to European ATM Master Plan• Most important SLoA(s)• Supporting Material• ESSIP Report 2014• Objective Coordinator’s Analysis, recommendations, tips & tricks• Conclusions• Links and contacts

Page 3: Objective AOP05

November 2015 3

Comprehensive Explanation

Implement Airport Collaborative Decision Making (CDM)• This objective aims at implementing A-CDM to enhance the

operational efficiency of airports and improve their integration into the Air Traffic Management Network (ATMN) while maintaining or improving the safety levels;

• The applicability area is presented in Table 8 of Part IV Annex B of the ESSIP 2012 document;

• Initial operational capability - 01/2004, Full operational capability - 01/2016

• PCP Related

Page 4: Objective AOP05

November 2015 4

Link to European ATM Master Plan

• [AO-0501]-Improved Operations in Adverse Conditions through Airport Collaborative Decision Making;

• [AO-0601]-Improved Turn-Round Process through Collaborative Decision Making;

• [AO-0602]-Collaborative Pre-departure Sequencing;• [AO-0603]-Improved De-icing Operation through Collaborative Decision

Making;• Enablers:

• PRO-204a• PRO-204b• PRO-204c• AIRPORT-31• PRO-213a• PRO-213b• PRO-214a• PRO-073

Page 5: Objective AOP05

November 2015 5

Most important SLoA(s)

• APO01/ASP01/USE01- Define and agree performance objectives and KPIs at local level specific to airport operations in accordance with A-CDM Manual guidelines;

• APO02/ASP02/USE02 - Define and implement local airport operations procedures for information sharing through Letters of Agreement (LoAS) and/or Memorandum of Understanding (MoU) in accordance with A-CDM Manual guidelines;

• APO03/ASP03/USE03 - Define and implement local procedures for turnaround processes in accordance with CDM manual guidelines (baseline CDM);

• APO05 Define and implement the exchange of messages, Flight Update Message (FUM) and Departure Planning Information (DPI) between CFMU and the airport in accordance with A-CDM Manual guidelines;

• APO06/USE05 Define and implement procedures for CDM in adverse conditions including de-icing according to airport CDM Manual guidelines.

Page 6: Objective AOP05

November 2015 6

Supporting Material

• EUROCAE-ED-141-Minimum Technical Specifications for airport Collaborative Decision Making (Airport-CDM) Systems, dated October 2008;

• EUROCAE-ED-145-Airport-CDM Interface Specification, dated October 2008;

• EUROCAE-ED-146-Guidelines for Test and Validation Related to Airport CDM Interoperability, dated October 2008

Url: http://boutique.eurocae.net/catalog/index.php

Page 7: Objective AOP05

November 2015 7

Supporting Material

• EUROCONTROL-Airport CDM Functional Requirements Document, Edition 4.0, dated May 2009;

• EUROCONTROL-Airport CDM Implementation Manual, Edition 4,0, Dated 01.04.2012

Url : http://www.euro-cdm.org/library_eurocontrol_implementation.php• ETSI-EN303 212, V1.1.1 - Airport Collaborative Decision

Making (A-CDM); Community Specification for application under the Single European Sky Interoperability Regulation EC 552/2004, dated 01.06.2010, OJ 2010/C 168/04

Url : http://webapp.etsi.org/workprogram/SimpleSearch/QueryForm.asp

Page 8: Objective AOP05

November 2015 8

ESSIP Report 2014

ESSIP FOC: 01/2016

Planned Achievement: 06/2016 (80% completion)

20% complete

(months): +5

Late

Page 9: Objective AOP05

November 2015 9

Objective Coordinator’s Analysis, recommendations, tips & tricks

• More elaborate explanation of chosen progress assessment is required.

• Objective aligned with Deployment Programme and PCP – postponed for 12 months

Page 10: Objective AOP05

November 2015 10

Links and contacts

• Objective Coordinator: Predrag Vranjkovic, +32 2 729 3257

[email protected]

Yi Xiong, +32 2 729 3528

[email protected]

• DNM Objective Expert: Paul Adamson, +32 2 729 5183

[email protected]