Page 1: Object Data Management Plant Engineering Life Cylcle Conference – April 11 th 2005 Camiel Meijneken, project engineer at ProRail Infraprojects.

Object Data Management

Plant Engineering Life Cylcle Conference – April 11th

2005

Camiel Meijneken, project engineer at ProRail Infraprojects

Page 2: Object Data Management Plant Engineering Life Cylcle Conference – April 11 th 2005 Camiel Meijneken, project engineer at ProRail Infraprojects.

ProRail - Ambitions in railinfra / 2

The world of ProRail:Railways and stations in The Netherlands

Ministry of Transport and

Public Works

Parliament

Local government

PRORAIL

Engineering companies Construction companies

Management

concession

Transport

concession

Railway companies

Page 3: Object Data Management Plant Engineering Life Cylcle Conference – April 11 th 2005 Camiel Meijneken, project engineer at ProRail Infraprojects.

ProRail - Ambitions in railinfra / 3

DIFFICULTIES WITH PROJECTCONTROL

* more complex regulations (NL, EU)* complex decision making environment * outsourcing engineering & knowledge* new contracting methods in the building sector* more emphasis on controllability and assessment.

Page 4: Object Data Management Plant Engineering Life Cylcle Conference – April 11 th 2005 Camiel Meijneken, project engineer at ProRail Infraprojects.

ProRail - Ambitions in railinfra / 4

REQUIREMENTS

CONTRACTS

DRAWINGS

COSTS

PERMITS

RISKS

Page 5: Object Data Management Plant Engineering Life Cylcle Conference – April 11 th 2005 Camiel Meijneken, project engineer at ProRail Infraprojects.

ProRail - Ambitions in railinfra / 5

PROJECT CONTROL

* Objects form the hierarchical basis for projects

Systems Engineering“Expliciet Werken®” strategy (working explicitly)

Page 6: Object Data Management Plant Engineering Life Cylcle Conference – April 11 th 2005 Camiel Meijneken, project engineer at ProRail Infraprojects.

ProRail - Ambitions in railinfra / 6

REQUIREMENTS

CONTRACTS

DRAWINGS

COSTS

PERMITS

RISKS

Page 7: Object Data Management Plant Engineering Life Cylcle Conference – April 11 th 2005 Camiel Meijneken, project engineer at ProRail Infraprojects.

ProRail - Ambitions in railinfra / 7

REQUIREMENTS

CONTRACTS

DRAWINGS

COSTS

PERMITS

RISKS

OBJECTS

Page 8: Object Data Management Plant Engineering Life Cylcle Conference – April 11 th 2005 Camiel Meijneken, project engineer at ProRail Infraprojects.

ProRail - Ambitions in railinfra / 8

PROJECT CONTROL, KEY-WORDS:

structure, controlability,unambigiousity, coherency, traceability, rapportability,transferability of information,auditability (public funds)

Page 9: Object Data Management Plant Engineering Life Cylcle Conference – April 11 th 2005 Camiel Meijneken, project engineer at ProRail Infraprojects.

ProRail - Ambitions in railinfra / 9

ProRail’s “Expliciet Werken®” strategy (working explicitly)

Goal of EW: Ensure efficient and effective communication between people and parties

• Maximize transparency by explicit processes

• Guarantee that everybody is talking about the same thing/object

• Apply hierarchic structures for large amounts of information to obtain better traceability

• Faster, cheaper and quality controlled realization of projects

Page 10: Object Data Management Plant Engineering Life Cylcle Conference – April 11 th 2005 Camiel Meijneken, project engineer at ProRail Infraprojects.

ProRail - Ambitions in railinfra / 10

PROJECT CONTROL -OBJECT DATA MANAGEMENT COUPLED TO OBJECTS:Requirements breakdown, permits, drawings, cost estimations, planning

OBJECTS CLASSED TO:contracts

Page 11: Object Data Management Plant Engineering Life Cylcle Conference – April 11 th 2005 Camiel Meijneken, project engineer at ProRail Infraprojects.

ProRail - Ambitions in railinfra / 11

CONTRACTSREQUIREMENTSSPECIFICATIONS OBJECTS

DESIGN

PERMITSDRAWINGSDOCUMENTSRISKS

Page 12: Object Data Management Plant Engineering Life Cylcle Conference – April 11 th 2005 Camiel Meijneken, project engineer at ProRail Infraprojects.

ProRail - Ambitions in railinfra / 12

ADDED VALUE OF ODM SYSTEM(as used until now, (14 projectdatabases))

* unambiguousity in data (in-/external)* Object related (parts of) specifications* ‘Blank spots’ in specifications* “Survival” of data

Page 13: Object Data Management Plant Engineering Life Cylcle Conference – April 11 th 2005 Camiel Meijneken, project engineer at ProRail Infraprojects.

ProRail - Ambitions in railinfra / 13

NEAR FUTURE DEVELOPMENTS

* Web-based access to ODM databases* External parties demand for more accountability for tax payers money* Branch wide structurisation of information streams* Information-architecture of the Infra management & control department

Page 14: Object Data Management Plant Engineering Life Cylcle Conference – April 11 th 2005 Camiel Meijneken, project engineer at ProRail Infraprojects.

ProRail - Ambitions in railinfra / 14

CIVIL INFRASTRUCTURE:

PRODUCT LIFECYCLE MANAGEMENT

Page 15: Object Data Management Plant Engineering Life Cylcle Conference – April 11 th 2005 Camiel Meijneken, project engineer at ProRail Infraprojects.

ProRail - Ambitions in railinfra / 15

To support this way of working:

SMARTEAM ODM System

Based on SMARTEAM PLM platformCreated in close collaboration by:

Page 16: Object Data Management Plant Engineering Life Cylcle Conference – April 11 th 2005 Camiel Meijneken, project engineer at ProRail Infraprojects.

ProRail - Ambitions in railinfra / 16

SUMMARIZING

• CHALLENGEMaintain integral control overincreasingly complicated processes

• SOLUTIONSystems Engineering methodologies,Supported and structured by anObject Data Management system and “Expliciet Werken®”

Page 17: Object Data Management Plant Engineering Life Cylcle Conference – April 11 th 2005 Camiel Meijneken, project engineer at ProRail Infraprojects.

ProRail - Ambitions in railinfra / 17

END OF PRESENTATION

Screen views of the SMARTEAM application enclosed in the presentation on the Proceedings CD Rom.

Also: Information Market stand of IBM.

Time for questions / remarks?

Page 18: Object Data Management Plant Engineering Life Cylcle Conference – April 11 th 2005 Camiel Meijneken, project engineer at ProRail Infraprojects.

ProRail - Ambitions in railinfra / 18

POSING

• An ODM system is essential to keep good control of complex projects

• Projects in the public domain are by definition complex, as well as implementing solutions

Page 19: Object Data Management Plant Engineering Life Cylcle Conference – April 11 th 2005 Camiel Meijneken, project engineer at ProRail Infraprojects.

ProRail - Ambitions in railinfra / 19

How to contact ProRail:

ProRail Infraprojects, ProjectcentreCamiel Meijneken, Project Engineer

PO Box 20383500 GA Utrecht

[email protected]

Page 20: Object Data Management Plant Engineering Life Cylcle Conference – April 11 th 2005 Camiel Meijneken, project engineer at ProRail Infraprojects.

ProRail - Ambitions in railinfra / 20

Page 21: Object Data Management Plant Engineering Life Cylcle Conference – April 11 th 2005 Camiel Meijneken, project engineer at ProRail Infraprojects.

ProRail - Ambitions in railinfra / 21

Page 22: Object Data Management Plant Engineering Life Cylcle Conference – April 11 th 2005 Camiel Meijneken, project engineer at ProRail Infraprojects.

ProRail - Ambitions in railinfra / 22