Coal Valley Resources Inc. – Obed Mountain Mine A Subsidiary of WESTMORELAND COAL COMPANY
Obed Mountain Mine Wastewater Release
Monthly Status Report for December 2014
January 15, 2015
Obed Mountain Mine
Monthly Status Report – December January 15, 2015
i
Table of Contents
1.0 MONTHLY STATUS REPORT – DECEMBER 2014 ...................................................................... 1
2.0 EPO ACTIVITIES IN DECEMBER 2014 ..................................................................................... 1
2.1 CLAUSE 3 IMMEDIATE AND SHORT TERM SAMPLING AND MONITORING PLAN ............. 1
2.2 CLAUSES 6-10 - SOLIDS RECOVERY PLAN ........................................................................... 2
2.3 CLAUSES 10 – SOLIDS RECOVERY REPORT ........................................................................ 2
2.4 CLAUSE 11 LONG TERM SAMPLING AND MONITORING PLAN ........................................... 2
2.5 FISH SAMPLING AND MONITORING PLAN ............................................................................. 5
2.6 CLAUSE 15 - IMPACTS REPORT AND CLAUSE 17- IMPACTS ASSESSMENT PLAN .......... 5
2.7 CLAUSE 22- WILDLIFE MITIGATION PLAN .............................................................................. 5
2.8 CLAUSE 27 - REMEDIATION PLAN ........................................................................................... 6
2.9 CLAUSE 34 – WASTE MANAGEMENT PLAN ........................................................................... 6
2.10 CLAUSE 37 - WASTEWATER MANAGEMENT PLAN .............................................................. 6
2.11 HUMAN HEALTH RISK ASSESSMENT (“HHRA”) REPORT ..................................................... 7
3.0 PLANNED EPO ACTIVITIES FOR DECEMBER 2014 ............................................................... 7
3.1 REPORTING STRATEGY ........................................................................................................... 8
4.0 CLOSING .................................................................................................................................... 1
Obed Mountain Mine
Monthly Status Report - December January 15, 2015
1.0 MONTHLY STATUS REPORT – DECEMBER 2014
On November 19, 2013, Alberta Environment and Sustainable Resource Development ("ESRD")
issued Environmental Protection Order No. EPO-2013/34-CR, as amended (the "EPO"), to Coal
Valley Resources Inc. ("CVRI") and Sherritt International Corporation in respect of the Obed
Mountain Mine (the "Mine"). Oversight of the EPO transferred from ESRD to the Alberta Energy
Regulator ("AER") in March 2014. CVRI became a subsidiary of Westmoreland Coal Company in
April 2014.
This Monthly Status Report has been prepared in accordance with clauses 39 and 40 of the
EPO. The following documents are submitted in support of the December 2014 Monthly Status
Report:
1. Attachment 1 - Monthly Data Sonde Summary Tables
2. Attachments 2A,B and C - Request, Response and Map to OBED-COM-0059
3. Attachment 3 - Pictorial Update to Wildlife Report
4. Attachment 4 - Copy of Communication, Sampling Suspension
2.0 EPO Activities in December 2014
2.1 CLAUSE 3 IMMEDIATE AND SHORT TERM SAMPLING AND MONITORING
PLAN
CVRI received ESRD approval of the Immediate and Short-Term Sampling and Monitoring Plan
on February 7, 2014.
The implementation and execution of the Immediate and Short Term Sampling and Monitoring
Plan concluded on April 24th, 2014 when the Long Term Sampling and Monitoring Plan was
approved. All data that was previously collected under the Immediate and Short Term
Sampling and Monitoring Program has continued under the agreed upon terms outlined in the
approved Long Term Sampling and Monitoring Plan.
The requirements prescribed under Clause 3 the Immediate and Short Term Sampling and
Monitoring Plan are considered complete.
Obed Mountain Mine
Monthly Status Report – December January 15, 2015
2
2.2 CLAUSES 6-10 - SOLIDS RECOVERY PLAN
CVRI received ESRD approval of the Solids Recovery Plan on February 7, 2014. The approval of
the Solids Recovery Plan included contingencies and revisions that required the Solids Recovery
Plan to be updated and resubmitted to ESRD by February 14, 2014. The amended Solids
Recovery Plan was resubmitted to ESRD on February 14, 2014.
As part of the maintenance and operation of the sediment traps, the silt curtains were
scheduled to be removed in late fall. The curtains have been removed for the 2014/2015 winter
season and will be placed in stream prior to spring freshet 2015. A notice of activity will be
provided to all regulatory authorities prior activity.
As per the direction from the AER OMM will be submitting 1 TFA to cover all sediment traps
2.3 CLAUSES 10 – SOLIDS RECOVERY REPORT
CVRI submits updates to the Clause 10 – Solids Recovery Report as part of the Quarterly
Progression reporting requirements. There is no new activity to report under Clause 10 – Solids
Recovery Report.
2.4 CLAUSE 11 LONG TERM SAMPLING AND MONITORING PLAN
CVRI received approval of the Long-Term Sampling and Monitoring Plan retroactive to April 24,
2014.
The Long-Term Sampling and Monitoring Plan is fully implemented and replaces the
requirements outlined in Clause 3, the Immediate and Short Term Sampling and Monitoring
Plan.
CVRI collects and reports on samples to the AER on a weekly basis. The data collected is
reviewed and discussions regarding the findings are provided in the Quarterly Progress Report.
Water sampling on the Mine site, as required under EPEA Approval No. 10119-02-00
(the "Approval"), and as prescribed by the approved EPO Plans are summarized below.
Obed Mountain Mine
Monthly Status Report – December January 15, 2015
3
CVRI has received a rollback of the surface water sampling requirements for the 2014-2015
winter period. The request for the rollback mirrors the winter procedure that was implemented
for the winter season 2013-2014 and was implemented November 15, 2014.
Suspension of sampling occurred along the Athabasca due to an incident related to ice
conditions. Sampling will resume on Monday January 19th, 2015. Please see Attachment 4 for
additional details.
Table 1: Obed Sampling and Monitoring Requirements During Pumping Operations
Location Requirements Frequency Notes
Oldman Creek (OMC) NTU, pH 2X/Day U/S and D/S while pumping
TSS samples collected when NTU>50
Water Chemistry 1X/ week
Baseline Creek (BLC) NTU, pH 2X/Day D/S while pumping
TSS Samples collected when NTU>50
Water Chemistry 1X/ week
Pump Discharges NTU, pH, Flow, Volume Every 6 hours while pumping
Includes: MTP, ELP1, Pond 5. TSS samples are collected when NTU>50
Table 2: Obed Regular On-Site Sampling and Monitoring Operations
Location Classification Frequency Requirements
East Limb Pond 1 (ELP1) Major Pond Daily 3X/week for pH, TSS Daily for NTU
Bi-weekly for Nitrates
East Limb Pond 2 (ELP2) Major Pond Daily 3X/week for pH, TSS Daily for NTU
Bi-weekly for Nitrates
South Plateau Pond 1 (SPP1)
Major Pond Daily 3X/week for pH, TSS Daily for NTU
Bi-weekly for Nitrates
South Plateau Pond 2 (SPP2)
Major Pond Daily 3X/week for pH, TSS Daily for NTU
Bi-weekly for Nitrates
South Plateau Pond 3 (SPP3)
Major Pond Daily 3X/week for pH, TSS Daily for NTU
Bi-weekly for Nitrates
Main Tailing Pond (MTP)
Major Pond Daily 3X/week for pH, TSS Daily for NTU
Bi-weekly for Nitrates
Obed Mountain Mine
Monthly Status Report – December January 15, 2015
4
Monthly Water Chemistry
Pond 5 Minor Pond Daily 3X/week for pH, TSS Daily for NTU
Bi-weekly for Nitrates
Load-Out Settling Pond 2 (LSP2)
Minor Pond Weekly 1X/week for pH, TSS, NTU
Monthly for nitrates
Load-Out Settling Pond 3 (LSP3)
Minor Pond Weekly 1X/week for pH, TSS, NTU
Monthly for nitrates
Table 3: Obed Water Sampling and Monitoring Program
Site Name Watercourse UTM Data Collection Frequency
Easting Northing Water Data Sonde
Water Sediment Toxicity
Near-Field Sample Sites1 (See Figure 1)
APC –US3 Apetowun Creek 470657 5937715
May, July and September
APC Apetowun Creek 472400 5938941
15-min2 May, July and September
APC-DS3 Apetowun Creek 477133 5943213
PLC-US Plante Creek 482483 5945393 15-min2
PLC-DS Plante Creek 483639 5942193
2 x weekly
15-min2 May, July and September
ATR-US Athabasca River 476280 5931218
15-min2 May, July and September
ATR –PLC Athabasca River 485385 5940747 15-min2
ATR-D1 Athabasca River 478576 5950378
May, July and September
ATR-D2 Athabasca River 489498 5965837 15-min2
Far-Field Sample Sites1 (See Figure 2)
ATR-WD1 Athabasca River 660944 6028061
ATR-FF23 Athabasca River 605947 6002848
ATR-FF33 Athabasca River 564752 6003585
ATR-AD1 Athabasca River 658459 6025745 Monthly
ATR-FF5 Athabasca River 475330 6286105
ATR-FF6 Athabasca River 463203 6332042
ATR-FF7 Athabasca River 470022 6463222
Obed Mountain Mine
Monthly Status Report – December January 15, 2015
5
2.5 Fish Sampling and Monitoring Plan
Approval of the Fish Sampling and Monitoring Plan has been received with a contingency that a
technical review meeting will be held in late January 2015. The intent of the technical review is
to discuss the data findings and determine if the approved plan is providing the requisite
information or if changes to the Fish Sampling and Monitoring Plan are required. In addition to
the technical meeting, an addendum request for rationale for sampling technique fish liver
versus muscle will be posted with the approved plan once consensus has been reached.
The fish tissue data has been collected and submitted to the AER. A copy of the information will
be posted on the Obed website and an addendum to the Fish Sampling and Monitoring Plan by
January 21st, 2015.
2.6 Clause 15 - Impacts Report and Clause 17- Impacts Assessment Plan
CLAUSE 15 - IMPACTS REPORT
CVRI submitted an Interim Impacts Report on January 17, 2014. On May 16, 2014, CVRI
submitted the Impacts Report as prescribed by the EPO. No communication regarding the
Impacts Report has been received as of December 7, 2014. The Final Impacts Report will be
updated and resubmitted on May 15th, 2015..
CLAUSE 17 - IMPACTS ASSESSMENT PLAN
CVRI received approval of the Impacts Assessment Plan retroactive to April 24, 2014. Approval
of the Impacts Assessment Plan included contingencies and revisions that required a response.
The Impacts Assessment Plan was resubmitted to the AER on May 27, 2014. The Impact
Assessment Plan has ben implemented. There is no new activity to report under Clause 17
Impact Assessment Plan..
2.7 Clause 22- Wildlife Mitigation Plan
CVRI received approval of the Wildlife Mitigation Plan retroactive to April 24, 2014.
Obed Mountain Mine
Monthly Status Report – December January 15, 2015
6
Data related to the Wildlife Mitigation Plan was submitted to the AER on October 15, 2014 as
part of the Quarterly Progress Report. The submitted October submission is available on the
Obed website. Provided in Attachment 3 is a pictorial update from the wildlife cameras at
Obed. The images provided were captured from the following cameras:
1. WC#7 and WC#8 are on the Spillway and drained beaver pond on Obed Mountain Mine.
2. WC#3 and WC#6 are Apetowun Creek upstream of the DX crossing.
3. WC#12 and WC#20 are on the control tributary which joins Apetowun just above the
blowout.
2.8 Clause 27 - Remediation Plan
On May 16, 2014, CVRI submitted the Remediation Plan as prescribed by the EPO. The
Remediation Plan will be updated on a quarterly basis as outlined in the Reporting Strategy. The
next update will be provided on January 15, 2015. The Final Remediation Plan will be
submitted May 15, 2015.
2.9 Clause 34 – Waste Management Plan
CVRI received approval of the Waste Management Plan on February 11, 2014. Included in the
ESRD approval of the Waste Management Plan was a request to respond to outstanding
questions and resubmit the plan by February 14, 2014. CVRI addressed the concerns and
resubmitted the plan. No updates or planned activity in the next 30 days.
2.10 Clause 37 - Wastewater Management Plan
CVRI received approval for the Wastewater Management Plan on February 11, 2014. Included
in the approval was a request to update ESRD as to the expected completion of the Medium
Term Plan. CVRI provided an update to ESRD and submitted the Medium Term Plan (Clause 37
of the EPO) to ESRD on February 28, 2014.
In accordance with the Medium Term Plan, CVRI completed the following submissions:
1. Geotechnical Information – March 17, 2014;
Obed Mountain Mine
Monthly Status Report – December January 15, 2015
7
2. Causation Report and required data – March 18, 2014;
3. Application under the Water Act to Construct Red/Green Pit Dam – March 26, 2014;
a. SIRs received, response submitted May 30, 2014;
b. Follow-up to SIRs received June 16, 2014;
i. Request for clarification received from the AER on July 2, 2014;
4. Application under the Coal Conservation Act to amend Licence C 2009-1 (Red/Green
Pit Dam) – March 26, 2014; and
5. Red/Green Perimeter Assessment Report – March 31, 2014.
CVRI has received approval to amend Licence C 2009-1 (Red-Green Pit Dam). CVRI is now in the
process of reviewing the approval in terms of end land use planning and plans to submit an
update to the AER with the 3 year reclamation plan in March 2015.
2.11 Human Health Risk Assessment (“HHRA”) Report
CVRI submitted an updated Table of Contents to Alberta Health ("AH") on August 27, 2014 for
review and feedback. AH provided a written response on September 5, 2014 to help direct
CVRI in the development of a detailed HHRA. The development of the HHRA has been in
coordination with the Fish Sampling and Monitoring Plan. The HHRA is progressing into its final
phase, with a final submission date of January 21st, 2015.
3.0 PLANNED EPO ACTIVITIES FOR DECEMBER 2014
During the month of December, CVRI will continue with:
1. Surface water quality sampling and monitoring;
2. Data collection as prescribed by the Long-Term Sampling and Monitoring Plan, Impacts
Assessment Plan, and Wildlife Mitigation Plan; and
3. Updates to the Obed website.
CVRI was granted a November 15, 2014 start date for the seasonal roll back under the Long-
Term Sampling and Monitoring Plan requirements. This change has been implemented and
sampling under the modified conditions continues.
Obed Mountain Mine
Monthly Status Report - December January 15, 2015
3.1 REPORTING STRATEGY
Table 4: Obed Reporting Program May 2014-April 2015
Report Type EPO
Clause
Submission
Frequency
Description Status
Action Summary Clause 21 Weekly
Thursdays
Details the weekly action
related to operations and EPO
related activities.
Ongoing
Monthly Update Clause 39 Monthly - on or
before the 7th
day of each
month.
A status report in writing that
contains a summary of all
activities undertaken in
accordance with the EPO in
the previous month and all
activities that are planned for
the next month. Inclusion of
Clause 10 Solids Recovery
Report updated initiated in
July.
Ongoing
December Report
Submitted
Impacts Report Clause 15 May 16, 2014 A report of all data collected
(including references to data
collection locations) and all
conclusions regarding the
impacts to the receptors and
habitats as identified during
implementation of the
Impacts Assessment Plan (the
‘’Impacts Report’’). See EPO
Amendment 1 for date
change.
Initial Submission
complete.
Remediation Plan Clause 27 May 16, 2014 A detailed remediation plan –
See EPO Amendment 1 for
date change.
Initial submission
complete.
Progression
Report
Clauses 15
and 27
July 15, 2014 Provide scheduled data
updates and proposed
modifications to EPO plans
submitted under Clauses 15
and 27. SIR response period of
30 days.
Complete
Obed Mountain Mine
Monthly Status Report – December January 15, 2015
9
Progression
Report
Clauses 15
and 27
October 15,
2014
Provide scheduled data
updates and proposed
modifications to EPO plans
submitted under Clauses 15
and 27. SIR response period of
30 days.
Complete
Progression
Report
Clauses 15
and 27
January 15, 2014 Provide scheduled data
updates and proposed
modifications to EPO plans
submitted under Clauses 15
and 27. SIR response period of
30 days.
Submitted
Final - Impacts
Assessment
Report
Clause 15 Internal Review
April 1, 2015
AER Submission
May 15th
, 2015*
Amendments to May 16, 2014
submission based upon data
collected in the 2014/2015
season.
In development
Final -
Remediation Plan
Clause 27 Internal Review
April 1, 2015
AER Submission
May 15th, 2015*
Amendments to May 16, 2014
submission based upon data
collected in the 2014/2015
season.
In development
Final Report Dependent upon
completion of
remediation
activities and
sign off from the
AER.
Required 30 days after the
completion of all
requirements as prescribed by
the EPO.
* Proposal to confirm date has been submitted to the AER. The Final report dates were never identified in the EPO
or the Amendment.
Obed Mountain Mine
Monthly Status Report - December January 15, 2015
4.0 CLOSING
CVRI continues to communicate with the AER to collect and submit data and information as
prescribed by the approved plans. The submission of regularly scheduled progress reports and
defined response periods allows CVRI and the AER to continue to communicate in a clear and
effective manner until the final Impacts Report and Reclamation Report are submitted.