OASIS Overview TC Process

23
OData Technical Committee Kick-off July 26, 2012

description

OASIS Overview TC Process. OData Technical Committee Kick-off July 26, 2012. Agenda. TC Process Overview Recommendations for Spec Editing. TC Process Overview. TC Process Overview. TC Process is created by OASIS Board, carried out by TC Adminstration Job of TC Administration - PowerPoint PPT Presentation

Transcript of OASIS Overview TC Process

Page 1: OASIS Overview  TC Process

OData Technical Committee Kick-offJuly 26, 2012

Page 2: OASIS Overview  TC Process

Agenda• TC Process Overview • Recommendations for Spec

Editing

07/26/2012 OASIS Presentation to OData TC 2

Page 3: OASIS Overview  TC Process
Page 4: OASIS Overview  TC Process

TC Process Overview• TC Process is created by OASIS Board, carried

out by TC Adminstration• Job of TC Administration

Support activities of OASIS members Turn TC Process guidelines into practical rules Communicate procedures & best practices to TCs Represent TC interests to Board Improve tools & support for members Recommend improvements to process itself

07/26/2012 OASIS Presentation to OData TC 4

Page 5: OASIS Overview  TC Process

Work Product LifecycleYour work products will progress through

the following stages for a Standards Track Work Product:

1. Working draft (no official standing) 2. Committee Specification Draft3. Committee Specification Public Review Draft 4. Committee Specification 5. Candidate OASIS Standard 6. OASIS Standard7. Approved Errata

07/26/2012 OASIS Presentation to OData TC 5

Page 6: OASIS Overview  TC Process

Work Product LifecycleStages for a Non-Standards Track Work

Product:1. Working draft (no official standing)

2. Committee Note Draft 3. Committee Note

Non-Standards Track Work Products are non-normative and are not implemented – educational papers, marketing collateral, etc.

Administrative documents (meeting minutes, etc.) must be maintained on OASIS-provided systems

07/26/2012 OASIS Presentation to OData TC 6

Page 7: OASIS Overview  TC Process

Work Product Lifecycle

07/26/2012 OASIS Presentation to OData TC 7

Page 8: OASIS Overview  TC Process

Making contributionsTC members may contribute existing or new

work to the TC for consideration in its work TC is under no obligation to do anything with itContribution only gives OASIS non-exclusive

right to use and republish. Full rights remain with the contributor

Process is simple:Load contribution to TC’s document repository Send email to the TC mailing list announcing the

contribution and including a link to the uploaded file

07/26/2012 OASIS Presentation to OData TC 8

Page 9: OASIS Overview  TC Process

Contacts with TC AdminActivity Timeframe TCA Interactions

Working Draft Up to TC Request WD template

Approve Committee Spec / Note Draft

Up to TC Request CSD/CND upload (optional)

Public Review CSD: 30 days 1st / 15 days subsequentCND: 15 days

Request public review

Approve Committee Specification / Note

After final public review Request Special Majority ballot Upload & announce CS

Approve Candidate OASIS Standard

After Committee Specification

Request Special Majority ballot

Public review 60 days Announce results

Membership vote After public review Launch membership ballot

OASIS Standard After successful ballot Upload & announce OS

07/26/2012 OASIS Presentation to OData TC 9

Page 10: OASIS Overview  TC Process

TC Process OverviewSome other things to keep in mind:• TCs run on Roberts Rules of Order,

including its requirements for quorum• To vote, you must maintain meeting

attendance • Gain rights at first meeting or after attending

two consecutive meetings • Lose rights by missing two consecutive

meetings unless during a leave of absence

07/26/2012 OASIS Presentation to OData TC 10

Page 11: OASIS Overview  TC Process
Page 12: OASIS Overview  TC Process

Starting a Working Draft Except for custom publishing systems, working

drafts are done in either .doc or .odt formats First step is to request a starter document /

template from TC Admin Captures all metadata TC Admin determines the file names and URLs Ensures that TC Admin can handle publishing

your work expeditiously Request ticket is at https://www.oasis-

open.org/resources/tc-admin-requests/work-product-registration-template-request

07/26/2012 OASIS Presentation to OData TC 12

Page 13: OASIS Overview  TC Process

Managing Your Working DraftThe first draft will be labeled Working Draft

01 in the starter document and –wd01 on the filename Each revision should be incremented (e.g. 02,

03) Working drafts should be stored in the TC’s

document repository If your spec contains multiple files (e.g. wsdls,

schemas) all the content should be zipped into a single file and loaded into Kavi

07/26/2012 OASIS Presentation to OData TC 13

Page 14: OASIS Overview  TC Process

Managing Your Working DraftUse only alphanumeric characters, period and

hyphen in filenames. Do not use underscore or any other punctuation characters

Review the Naming Directives at http://docs.oasis-open.org/specGuidelines/ndr/namingDirectives.html for other considerations

Feel free to consult with TC Admin on how best to organize your specification and its components

07/26/2012 OASIS Presentation to OData TC 14

Page 15: OASIS Overview  TC Process

General Notes Do not change the styles defined in the

template. Doing so can cause problems when TC Admin prepares to publish your specification

Links to other components should be relative to the specification document’s locationTC Admin will prepare PDF and HTML

Graphics are best prepared in a separate product and linked into the draft as JPGs or PNGs

If your spec will have multiple parts, consult with TC Admin on naming and organization

07/26/2012 OASIS Presentation to OData TC 15

Page 16: OASIS Overview  TC Process

Approving a Working DraftMake sure required sections are in the

specificationNormative & non-normative references sectionsAcknowledgements section Conformance section (if going to public review) Separate plain-text files for any normative

computer code files included in the document Combine all components that are part of the

Draft (e.g. narrative files, schemas, examples) into a ZIP file and load the file to the TC’s document repository

07/26/2012 OASIS Presentation to OData TC 16

Page 17: OASIS Overview  TC Process

Approving a Working DraftVote can be by motion in a regular meeting

or by electronic ballot If by motion, make sure the motion language

and vote is recorded in the meeting minutes If by e-ballot, must run minimum 7 days

Motion language must include name and version number of the work product and the link to the ZIP file

After approval, enter appropriate tickets for TC Admin using the same ZIP file link

07/26/2012 OASIS Presentation to OData TC 17

Page 18: OASIS Overview  TC Process

Approving a Working Draft Approvals may not be contingent on “final

edits” or other changes The file the TC approves must be the same as

the file linked in the TC Admin ticket

07/26/2012 OASIS Presentation to OData TC 18

Page 19: OASIS Overview  TC Process

Managing Public ReviewsComments may only be accepted via the TC’s

–comment@ mailing list. No other inputs can be accepted

Chairs should subscribe to –comment@ list. TC should designate someone to subscribe and manage comments

All comments must be acknowledged. All comments must be tracked and a log maintained of all comments and the TC’s decisions on their resolutions

07/26/2012 OASIS Presentation to OData TC 19

Page 20: OASIS Overview  TC Process

Resources for the TCTC Administration home page -

https://www.oasis-open.org/resources/tcadmin

Provides links to documentation, forms and updates on TC Admin work queue

TC Process interactive flow chart - https://www.oasis-open.org/sites/www.oasis-open.org/files/TC-Process-gantt-chart.xls

Provides Gantt chart of process steps with links to documentation and forms

07/26/2012 OASIS Presentation to OData TC 20

Page 21: OASIS Overview  TC Process

Resources for the TCTC Admin support request forms -

https://www.oasis-open.org/resources/tc-admin-requests Used to submit requests for TC Admin actions

e.g. starting a public reviewOASIS TC Process -

https://www.oasis-open.org/policies-guidelines/tc-process

Basic policy document on which all rules and procedures are based

Naming Directives - http://docs.oasis-open.org/specGuidelines/ndr/namingDirectives.html

Rules for constructing filenames, etc.

07/26/2012 OASIS Presentation to OData TC 21

Page 22: OASIS Overview  TC Process

Resources for the TCTC Admin How-To Guide -

https://www.oasis-open.org/resources/tcadmin/tc-process-how-to-guide-introduction

Instructions on how to work within the OASIS TC Process with links to additional documentation, forms, etc.

TC Admin JIRA work queue - https://tools.oasis-open.org/issues/secure/IssueNavigator.jspa?reset=true&pid=10010&priority=3&resolution=-1

List of open support request tickets that TC Admin is processing

07/26/2012 OASIS Presentation to OData TC 22

Page 23: OASIS Overview  TC Process

07/26/2012 OASIS Presentation to OData TC 23