O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management...

31
Metering, Billing/CIS America 2008, San Diego, CA Title of presentation O. Wayne Young Director Meter Reading, Billing & Collections JEA Jacksonville, Florida

Transcript of O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management...

Page 1: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

Title of presentationO. Wayne Young

Director Meter Reading, Billing & Collections

JEA

Jacksonville, Florida

Page 2: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

JEA at a Glance

• Originally “Jacksonville Electric Authority”•In 1997 JEA took over water and sewage for the city

•About 2300 permanent employees• Customer base

•422,000 electric•292,000 water•223,000 sewer

• Service Territory: 900 square miles• 8th Largest Municipal in the US

Page 3: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

AMR Project Overview

• Main focus: customer service, system reliability and accuracy, and cost savings

• Multi-department and multi-year project •Replacement or retro-fit of approx. 360,000 electric an 280,000 water meters to communicate with network

•Development of interfaces to JEA information systems including its customer information systems (CC&B), outage management system (OMS), field maintenance system (FMS), Meter Data Management System (MDMS) etc.

Page 4: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

Cellnet Based Network Meter Reading System

Meter-RFE

CellMaster

`

Cellnet SystemController

OCDB

MicroCellController (MCC)

RF Transmission: - 1 way communication - Transmits every 5 minutes

RF Transmission: - 2 way communication - Typical communication once per day - On-demand capability

Leased circuit: - 2 way communication - Always on

Page 5: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

JEA Territory – AMI Coverage

Page 6: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

AMI Overview – AMI Coverage

Page 7: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

AMI Overview – MCC Locations

Page 8: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

Why JEA Chose MDMS?

•Key recommendation from SLB study

•AMI vendor was just a data provider

•JEA’s new Customer Information System (CIS) had not fully stabilized and adding complex interfaces to it was not feasible

•JEA built its own MDM system to store data, interface with vendor data base and eliminate/reduce new CIS interfaces

•Complexity and lack of internal SMEs in AMR lead to external vendor

Page 9: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

• Single repository for all meter sources

• Easier access to meter data for analysis and business intelligence

• Interfaces to other essential systems (Outage management, System Planning, Data Warehouse, etc.)

• MDMS will be easier to change for BPL, mesh RF and other NMR technologies

• Easier to develop new exception processing in MDMS

Why JEA Chose MDMS?

Page 10: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

• CIS and vendor data file interface

• Meter Asset Management

• Network Asset Management

• Data Collection Service Upgrade

• Virtual Move In/Out, Service Risk

• Customer Service Enhancement (leak detection, excessive consumption, etc.)

• Recovering lost revenue by identifying meter resets

Scope of Initial AMS MDMS Project

Page 11: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

• Revenue Enhancement (improved estimation, identification of zero consumption meters, etc.)

• Outage Management

• Distribution planning and engineering

• Bellwether Meters for Outage Management

• Transformer load management

• Single repository for analysis and business intelligence

Scope of Initial AMS MDMS Project

Page 12: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

Other Read Sources

(FFDS, FMS, CC&B, etc.)

Other Read Sources

(FFDS, FMS, CC&B, etc.)

MV90MV90

NMR (Cellnet)

NMR (Cellnet)

ITRONITRON

MDMS

CC&B

GIS

DataWarehouse

• Daily usage• VEE•SLS Data•Interval usage

• Connectivity data

• Interval Data• Winter Peak• Summer Peak• Non-Coincident Peak

• Customer data

Meter Reads Source Systems Data Repository BI Applications

Ad hoc Analytics

Canned Reports

GIS

0

10

20

30

40

50

60

70

80

90

1st Qtr 2nd Qtr 3rd Qtr 4th Qtr

East

West

North

•Transformer non coincient peak•Transformer winter peak•Transformer summer peak

Business Intelligence

•Transformer peak threshold•Transformer peak by month

•Daily transformer load

• Daily Usage

Load Research

AMI System Flow & Business Intelligence

Page 13: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

•MDMS Web Viewer (CSR/Billing Support/other areas)

•MDMS Interface to Outage Application

•Special Outage Interface –Duval County School Board

AMI Overview – MDM System Interfaces

Page 14: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

AMI Overview – MDM System Web Viewer

Page 15: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

JEA NMR - Duval County School Board Facilities Outage Map

AMI Overview – Outage Map

Page 16: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

AMI Overview – Outage Map

Page 17: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

• Utilized Data• 15 Minute electric interval consumption (Data Warehouse – AMI / MV90)

• Daily electric and water consumption (MDM System)

• Outputs - Load characteristics • Electric - Cost of Service / Rate Making•Water - Usage Statistics / Seasonal Indexes

• Transformer Loading – TLM Factors• Distribution System Loading

Load and Customer Research

Page 18: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

• Using NMR Data

• Develop table of factors to convert daily energy use into peak demand estimates

• Factors developed for high, medium and low customers

• Residential & Commercial Classes

• Data Collection & Cleaning• Collected 15 minute interval data for one year

• Very High Quality NMR Data• Validation, Estimation & Edit (VEE) Process

• Accuracy• 90/10 Confidence Interval

Transformer Load Management (TLM) Factors

Page 19: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

Electric Meters Currently Monitored - “Today”

NMR (~2500) + MV90 (~1000) 3,500

Intervals per Day 96

Total readings per day 336,000

Total readings per year 122,640,000

√ Just for

fun!

Load ResearchHow Much Data is it REALLY?

Page 20: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

• Aqua Lines – Missing 15 Min Data from Data Warehouse ‘stuck’ in MDM System

• ~13% of Total Intervals Missing

• ~30% Nov ’07 and ~40% Dec ‘07 15 Minute Intervals Missing from DW

• Intervals in Week Dec 21-28 Missing from MDM and DW….Why?

• Missing DW Data is Widespread Among All Rate Classes

VisualizeIT Energy Print – AMR Res Customer 15 Minute Interval Data

Aug ’07 to Feb ’08

Current AMI-MDM Data Challenges

Page 21: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

• Customer

•Household usage rates with comparable homes

•Real time notification of higher than expected usage

•Virtual irrigation metering

• Engineering and Operations

•Water hydraulic model calibration

•Water and Wastewater system optimization

Business Enablement

Page 22: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

• Purpose• Provide formal structure and process for planning, decision making and policy recommendations to support JEA AMS.

• Scope• Monthly review of submittals from stakeholders

• Deliverables• Timely responses to submittals requiring action within jurisdiction. Capital funding approval issues will require additional approvals.

• Critical Dependencies• Involvement from all affected work areas• Affected areas must submit documents to AMSSC for due diligence review

• Constructive interaction among members and stakeholders

Advanced Metering Systems Steering Committee Charter (AMSSC)

Page 23: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

Mission

� Evaluate Proposed Policy and Change Initiatives

Goals

� Cost Effective AMS Deployment

� Build Consensus Among AMS Stakeholders

� Adapt Business for AMS Initiatives

� Provide Continuity and Support for Processes Using AMS Functions and Information

Advanced Metering Systems Steering Committee Charter (AMSSC) Members

Page 24: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

• Must have the highest level of sponsorship and buy-in

• Internal resistance will manifest itself in many different forms. Strong executive leadership is required with frequent reminders to the company that this is an important project.

• Have a vision/plan to use data beyond billing

• Develop separate system to house data and interface with other systems

• CIS is not the right system

Lessons Learned

Page 25: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

• Deal with the organizational inertia to changes

• Don’t underestimate the scope of the process changes

• Use MDMS as the catalyst (and not a be all and end all system)

• Identify short and long term owners

• New method of doing business

• Identify the right ‘change agent’/early adopter

• Jobs will not necessarily be eliminated but they will change

• Partner with the right vendor

• AMR/MDMS is a new field for most utilities and so, finding internal resources with right skills/experience will be difficult

Lessons Learned

Page 26: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

• Manage stakeholder expectation

• Requirements will be fuzzy at best. New requirements will be surfacing as you deliver basic functionality. You must have a process to enhance the functionally delivered at the same time as you are adding new functionality.

• Spend as much time as necessary crafting

the contractual relationship with your

vendors (You will be glad you did!)

• Use Six Sigma or other quality tools during

the project to run things smoothly

Lessons Learned

Page 27: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

Wayne YoungDirector Meter Reading, Billing & Collections

JEA21 West Church St.

Jacksonville Florida, 32202Office: 904-665-7728

email: [email protected]

Questions?

Page 28: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

JEA Electric System• JEA owns and operates three generating plants and all transmission and distribution facilities.

• A fourth power plant, the St. Johns River Power Park (SJRPP), is owned jointly by JEA and the Florida Power & Light Company (FPL) and operated by JEA. JEA and FPL are also joint owners of Unit 4 at Georgia Power Company's coal-fired Robert W. Scherer Plant (Plant Scherer), which is located in Macon, Georgia.

• JEA produces 3.2 MW from a methane-fueled generating facility at the Girvin Road Landfill.

• JEA's System Installed Capacity is 3,213 MW, with a Peak Demand of 2919 MW at a 55% Load Factor.

Page 29: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

AMI Overview – MDM System Web Viewer

Page 30: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

• Outage Processing – MDMS will receive outage data within 6 to 11 minutes of outage and pass the data to FMS for processing similar to customer calls

• Restoration Processing – MDMS will receive restoration data within 6 to 11 minutes of restoration and pass the data to FMS; FMS will flag the outage as NMR verified restored

• Restoration Verification – FMS will send a list of meters to Cellnet (thru MDMS) to verify restoration status of each meter. Cellnet (thru MDMS) will send FMS status of each meter whether the service is restored, or is still out or other applicable status. OCC will use this process to perform

• Transformer restoration verification, Single lights out verification

• Call-back verification - FMS will now validate restoration status thru the NMR to eliminate/reduce requests to customer’for a callback when power is restored.

• Bellwether/Commercial Meters- better quality and more reliable outage and restoration data for bellwether meters (JEA specified) or commercial meters.

MDMS FY05 Deliverables –Outage Applications

Page 31: O. Wayne Young Director Meter Reading, Billing ... Young.pdf · •Meter Asset Management •Network Asset Management •Data Collection Service Upgrade ... •Water hydraulic model

Metering, Billing/CIS America 2008, San Diego, CA

• Work-Arounds Enabling Load Research

• Ad hoc projects using monthly data

• Develop Selective Sample

• Compatible Encoder & Resolution Combinations

• On-Demand Reads – Store in MDMS

• High Packet Success Ratio (PSR)

• Hard, Soft & Strategic Elements Being Analyzed Within Major Stakeholders

• Customer Service

• Water System Planning

• Conservation, Market Research & Brand Management

• DSM

• Rates

• Engineering & Operations

• Resolution Ranges

• 10 – 1000 Gallons

• Challenges to Performing Load Research

• Encoder Programming & Resolution Compatibility

• High Field Repairs

• Data Transmitted Only Once per 15 min

• Daily/Hourly data not available in DW

• Monthly data difficult to access in DW

Overview AMI Water