o /OG/~O~'t. 1 AU G2014mkvdc.maharashtra.etenders.in/tnduploads/mkvdc/press... · 2014-08-04 · 2...

4
~~I~I~ wmrr ~ ~Cf)ltI ~~IJi\SCi5, ~ - qq (ligj'<I~ ~lIxi'1lill ~ ~) ~ ~ (~lC ~Cf)&q), \11cltiq~1 fctmrr,lJOT ft:rq;r '+fCf'1", sjllCXSClI'! W;, ~ m,:J;UT-99 =Cj')T"TT11l6fC't rTT ll (o~o) ~~9~o9~o / ~~9~~~~ if>cRl(o~o) ~~9~1919~~ ~-~- [email protected] ~Elt1I~c cespwrdpune.com ~, /OG/~O~'t. o 1 AU G 2014 ~~ flk11{1 ~ ~Ch~ ~ fllC"lI{1. ~ : f.:rfCl~Il{~ ~aCf)lill ChI4Cf=t1IC"1- d{l41:S1 ~Ch~ - NJ 1001 'lRUT ChI<1cll fcfi.m. 911.~ "ff ~~ (m.9f1. ~o/'t'--\o m.~) ~ 1OflnlChl1Of cr~. ~: ChI4ChI~l ~, d{l41i) 'tRUTfcrqp-r, fllC"lI{1 ~~T. tBf9f1. ~Mm/cnT.~\9/~~\9~, ~: ~O/O\9/~O~'t. fClt5jllifCflC"lCh11Of1~ fGO"""IiCf) : oVOG/~O~'t "*ft ~~.oo CfI\Ji(11$1I;J~1 ~aCf)l~ ~fctCf=t1 ~~ Chi4 c mnfllal ~~ 3TT%". ~ : ~fctCf=t1 ~l1T.l1.-31. (fc:f.~.)<If.:rr~ ~ C~IT.~. -rrrn- ) ~~(fcrn) \J1<1Bq~1fcrqp-r, :rT-'t~~ o~~ ~ Cf)14Cf)I~l~,d{JOOtl\Sl 'tRUTfcrqp-r, flIC"II{1 <If.:rr1Of1f~(1lflk)l cr qlaq{ICfI Cf){Olfilal "{CfRT. >Rf: ~~d-31-~/>mT-'--\. C:\Users\s1ss7689\Oesktop\Pingali Pre Tender 01082014\Meet. Lr. Pingali (CE to SE)1 01082014.doc

Transcript of o /OG/~O~'t. 1 AU G2014mkvdc.maharashtra.etenders.in/tnduploads/mkvdc/press... · 2014-08-04 · 2...

Page 1: o /OG/~O~'t. 1 AU G2014mkvdc.maharashtra.etenders.in/tnduploads/mkvdc/press... · 2014-08-04 · 2 Point No Points raised Clarification 2 The lead of hearting for the work is presently

~~I~I~ wmrr ~ ~Cf)ltI ~~IJi\SCi5, ~ - qq(ligj'<I~ ~lIxi'1lill ~ ~)

~ ~ (~lC ~Cf)&q), \11cltiq~1 fctmrr,lJOTft:rq;r '+fCf'1", sjllCXSClI'!W;, ~ m,:J;UT-99

=Cj')T"TT11l6fC'trTTll (o~o) ~~9~o9~o / ~~9~~~~ if>cRl(o~o) ~~9~1919~~~-~- [email protected] ~Elt1I~c cespwrdpune.com

~,/OG/~O~'t.

o 1 AU G 2014~~

flk11{1 ~ ~Ch~ ~fllC"lI{1.

~ : f.:rfCl~Il{~ ~aCf)lill ChI4Cf=t1IC"1-d{l41:S1~Ch~ - NJ 1001'lRUT ChI<1cll fcfi.m. 911.~ "ff ~~(m.9f1. ~o/'t'--\o m.~) ~ 1OflnlChl1Ofcr~.

~: ChI4ChI~l ~, d{l41i) 'tRUTfcrqp-r, fllC"lI{1 ~~T.

tBf9f1. ~Mm/cnT.~\9/~~\9~, ~: ~O/O\9/~O~'t.

fClt5jllifCflC"lCh11Of1~fGO"""IiCf): oVOG/~O~'t "*ft ~~.oo CfI\Ji(11$1I;J~1 ~aCf)l~ ~fctCf=t1

~~ Chi4cmnfllal ~~ 3TT%".

~ : ~fctCf=t1

~l1T.l1.-31. (fc:f.~.)<If.:rr~ ~C~IT.~. -rrrn- )

~~(fcrn)\J1<1Bq~1fcrqp-r, :rT-'t~~o~~

~ Cf)14Cf)I~l~,d{JOOtl\Sl 'tRUTfcrqp-r, flIC"II{1 <If.:rr1Of1f~(1lflk)l cr qlaq{ICfI Cf){Olfilal"{CfRT.

>Rf: ~~d-31-~/>mT-'--\.

C:\Users\s1ss7689\Oesktop\Pingali Pre Tender 01082014\Meet. Lr. Pingali (CE to SE)1 01082014.doc

Page 2: o /OG/~O~'t. 1 AU G2014mkvdc.maharashtra.etenders.in/tnduploads/mkvdc/press... · 2014-08-04 · 2 Point No Points raised Clarification 2 The lead of hearting for the work is presently

MINUTES OF MEETING

Minutes of Pre tender conference held on 01/08/2014 @ 12 .00 Hrs. inthe chamber of Chief Engineer (S. P. ),Water Resources Department,

Sinchan Bhavan, Pune

E-tender No - 460

Name of work:- "Construction of Earthwork and Structures of PingaliFeeder canal in Km. No. 1 to 11 (Ch.O/OOOto 10/450)Tal. Man Dist. Satara."

The pre Tender conference for the above mentioned work was held inthe chamber of the Chief Engineer (SP),W.R.D.Pune on 01/08/2014 @ 12.00Hours.

Following Six bidders are qualified for this work.

1) MIs. Right Construction, Indapur, Pune2) MIs. Unique Builders, Malewadi-Akluj.3) MIs. Prathamesh construction, Miraj4) MIs. Shelke construction, Pune5) Ashoka Stapatya Pvt.Ud. & Unique Builders (JV.) Akluj6) MIs. Shree Sai construction, Daund, Pune.

Out of above Six bidder partners Ashoka Stapatya Pvt.Ud. & UniqueBuilders (JV.) Akluj & Shri. Sai construction, Daund, Pune attended themeeting. MIs. Ashoka Staptya Pvt.Ud. & Unique Builders, Akluj (JV.)submitted their points in writting.

Points raised by contractor and clarifications there of are as below.

As per POD Sec.1.2 (Method ofapplying) "The tender of JointVenture shall not be received by thecorporation unless the JV.agreement registered with Registrarof firm is submitted to the tenderreceiving authority."

It is clarified that contractorshould submit application forregistration of JV. to the Registrar offirms & produce before the workorder proof of such submission.

Points raised ClarificationPointNo

As per the rules of Register ofFirms, the firms of privatelimited companies andpartnership firms cannot beregistered with the register offirms. So only the approval ofC.E. to be allowed.

1

E:\Destop-4-8-2014\Pingali Pre Tender (POD) meet.182014\Pre Bid Minutes of MeeLdoc

1

Page 3: o /OG/~O~'t. 1 AU G2014mkvdc.maharashtra.etenders.in/tnduploads/mkvdc/press... · 2014-08-04 · 2 Point No Points raised Clarification 2 The lead of hearting for the work is presently

2

PointNo

Points raised Clarification

2 The lead of hearting for the workis presently considered fromPingali Tank but during theconsecutive summer seasonsmost of the hearting quantityhas been taken away by thepeople from nearby areas. Nowhearting is left in the tank so thelead for the above work shouldbe considered from AndhaliTank.

Tender condition prevail.Contractor should quote accordingly.

3 As the work is scattered in alength of 11 kms there ispossibility of a lot of wastage ofmaterial due to transportation &re-handling, so the rate ofconcrete for the above work beincreased by Ten percent.

Tender condition prevail.Contractor should quote accordingly.

4 The quantity of concrete ofvarious grades is approx 10000cum so provision Batching Plantbe made for Uniform mixturefrom grades & alsotransportation of Ready MixConcrete (RMC) of variousgrades may be reduce wastage& time.

Tender condition prevail.Contractor should quote accordingly.

5 The lead of sand for this work isform Maswad whereas for theworks of agencies SMS Infra,Nagpur, Prasad & Co.Hyderabad, Unique Builders,Akluj have lead from SolapurDistrict (Pandharpur). So thelead of sand for the above workbe taken from Pandharpur,Solapur Dist.

Tender stipulation shall prevail.Contractor should quote accordingly.

6 There are R.C.C. Structures &H.T. lines along the canal line.For these chiseling for rock tobe provided within 30 meterradius.

Tender condition prevail.Contractor should quote accordingly.

C:\Users\s1 ss7689\Desktop\Pingali Pre Tender meet.182014\Pre Bid Minutes of Meet..doc

Page 4: o /OG/~O~'t. 1 AU G2014mkvdc.maharashtra.etenders.in/tnduploads/mkvdc/press... · 2014-08-04 · 2 Point No Points raised Clarification 2 The lead of hearting for the work is presently

3

PointNo

Points raised Clarification

7 In Price variation clause specialconditions of contracts whilecalculating the cost of workdone dept. is already deductingthe cost of cement, steel etc.completely which is inclusive ofVAT and again deducting thetax of those material separatelyfrom cost of work' done which iscontradictory. Please consider.

Tender condition prevail.Contractor should quote accordingly.

8 There is no provision of clause38 and EIRL in the tender. Anychange due to design, drawings,etc. in the work executed, therate revision I new rates shouldbe payable to us.

Tender condition prevail.

9 The rate of metal & Sand shouldbe revised as per actual rates.

Tender condition prevail.

O.C.Approved by C.E.