O FUTURO DO GÁS · Unless legally required, Golar LNG undertakes no obligation to update publicly...
Transcript of O FUTURO DO GÁS · Unless legally required, Golar LNG undertakes no obligation to update publicly...
Forward Looking StatementsNASDAQ: GLNG and GMLP
This presentation contains forward-looking statements (as defined in Section 21E of the Securities Exchange Act of1934, as amended) which reflects management’s current expectations, estimates and projections about itsoperations. All statements, other than statements of historical facts, that address activities and events that will,should, could or may occur in the future are forward-looking statements. Words such as “may,” “could,” “should,”“would,” “expect,” “plan,” “anticipate,” “intend,” “forecast,” “believe,” “estimate,” “predict,” “propose,” “potential,”“continue,” or the negative of these terms and similar expressions are intended to identify such forward-lookingstatements. These statements are not guarantees of future performance and are subject to certain risks, uncertaintiesand other factors, some of which are beyond our control and are difficult to predict. Therefore, actual outcomes andresults may differ materially from what is expressed or forecasted in such forward-looking statements. You should notplace undue reliance on these forward-looking statements, which speak only as of the date of this presentation.Unless legally required, Golar LNG undertakes no obligation to update publicly any forward-looking statementswhether as a result of new information, future events or otherwise.Among the important factors that could cause actual results to differ materially from those in the forward-lookingstatements are: changes in liquefied natural gas ( LNG) floating storage and regasification unit (FSRU) and floatingliquefaction natural gas vessel (FLNGV) market trends, including charter rates, ship values and technologicaladvancements; changes in our ability to retrofit vessels as FSRUs and FLNGVs, our ability to obtain financing for suchconversions on acceptable terms or at all, and the timing of the delivery and acceptance of such converted vessels;changes in the supply of or demand for LNG or LNG carried by sea; a material decline or prolonged weakness in ratesfor LNG carriers or FSRUs; changes in trading patterns that affect the opportunities for the profitable operation of LNGcarriers, FSRUs or FLNGVs; changes in the supply of or demand for natural gas generally or in particular regions;changes in our relationships with major chartering parties; changes in the availability of vessels to purchase, the timeit takes to construct new vessels, or vessels’ useful lives; failure of shipyards to comply with delivery schedules on atimely basis or at all; our ability to integrate and realize the benefits of acquisitions; changes in our ability to sellvessels to Golar LNG Partners LP, or Golar Partners; changes in our relationship with Golar Partners; changes to rulesand regulations applicable to LNG carriers, FSRUs or FLNGVs; actions taken by regulatory authorities that mayprohibit the access of LNG carriers, FSRUs or FLNGVs to various ports; our inability to achieve successful utilization ofour expanded fleet and inability to expand beyond the carriage of LNG; increases in costs including among otherthings crew wages, insurance, provisions, repairs and maintenance; changes in general domestic and internationalpolitical conditions, particularly where we operate; changes in our ability to obtain additional financing on acceptableterms or at all; and other factors listed from time to time in reports or other materials that we have filed with theSecurities and Exchange Commission, including our most recent annual report on Form 20-F. Unpredictable orunknown factors also could have material adverse effects on forward-looking statements.
3
O gás é o combustível da transição energética e neste painel
vamos abordar temas como tendências para a indústria do
gás no mundo e no Brasil, universalização e mobilidade e
novas tecnologias.
• Visão geral da Golar
• Projeto Integrado GNL to Power - Sergipe
• Outras projetos de Geração Termelétrica a GNL
• Outros usos para o GNL
Agenda
4
Portfolio do Grupo Golar LNG
Steam
LNGC
Unidades: 06
Volume:
135-146k m³
Boil-off:
0.15-0.25%
Construção:
2000-2006
Modern DFDE
Unidades: 10
Volume: 160k m³
Boil-off:
0.10-0.15%
Construção:
2013-2014
FSRU
Unidades: 8
Size: 125k-170k cbm
Capacidade Regas:
7 -21 MMm³/dia Construção:
2007-2017
Floating LNG
Unidades: 1 (2017)
Capacidade:
2.4mtpa
Em Conversão:
2
Golar Power – Visão dos negócios
50% 50%
FSRU & LNGCs Geração de Energia
Sergipe: 1.551GW CCGT (50%)Golar Nanook (100%) under charter for 25yrs
Terminais de GNL
Sergipe Terminal 50%
Golar Celsius (100%)Golar Penguin
(100%)
Sergipe II (75%)
1600MW
Barcarena (50%)
1600MW
Distribuição de GNL
Golar Power Small-scale/ LNG Distribution
(100%)
Santa Catarina
(100%)Croatia (49%)
Ivory Coast (6%) Barcarena (50%)
Avenir LNG (25% through Golar LNG)
6
Golar Spirit em Pecem, Brasil (em modernização no estaleiro)
Golar Freeze, Jamaica)Golar Winter, TRBA Bahia
Nusantara Regas Satu naIndonesia
Golar Eskimo em Aqaba, Jordan
Golar Igloo em Mina Al-Ahmadi, Kuwait
Terminais Golar em Operação
7
Golar Tundra, FSRU/LNGC Golar Penguin, LNGC/FSRUGolar Celsius, LNGC/FSRU
Golar Nanook, em comissionamento SE Hilli FLNG em CamarõesGolar Vinking em Conversão para Croácia
Outras unidades
Projeto Integrado LNG-to-Power – Projeto Sergipe
A UTE Sergipe será uma das maiores termelétricas da América Latina com uma capacidade instalada de 1,55 GW, onde a Golar Power tem uma participação de 50%. A usina está atualmente em comissionamento e a sua entrada em operação esperada para janeiro 2020. O investimento total é de US$ 1,6 bilhões.
UTE Sergipe PPA Porto Sergipe I Terminal Integrado de GNL
Configuração 3x3x1 GE Timeline do ProjetoGolar Nanook
Capacidade Instalada de 1,55 GW
Contrato de EPC Full turn-key assinado com a
GE
LNG SPA assinado com a Exxon/Qatar JV
Está em fase de comissionamento
Receitas variáveis indexadas ao Brent
Financiamento ECA/IFC/IBD sob aprovação
FSRU novo desenvolvido pela Samsung
Entregue em Novembro de 2018
Capacidade de Armazenamento: 170.000 m³
Capacidade Regas: 21 MM m³/dia
A ser atracado a 6 km da UTE
Gasoduto submarino de 4,5 km
Leilão de energia A-5 de 2015
PPA de 25 anos
26 distribuidoras locais
Receita fixa indexada ao IPCA
Receitas variáveis indexadas ao Brent
COD em 1° de Janeiro de 2020
Abril 2015 – Obtenção do PPA
Maio 2016 – EPC assinado com a GE/Alston
Setembro 2016 – LNG SPA assinado
Outubro 2016 – FID/Down pagamentos do EPC
Agosto 2017 - Licença Instalação
Abril 2018 – Financial Close
Novembro 2018 – FSRU Nanook deixa o estaleiro;
Fevereiro 2019 – Primeira carga de GNL e chegada;
Janeiro 2020 – COD integrado FSRU + UTE
13
Leilão A-6 2019 – Registro de Projetos
2019 2018 2017 2016 2015 2014
Projetos Registrados (MW)
41.718 27.608 21.560 18.741 15.439 20.057
Projetos Qualificados (MW)
15.000 8.357 9.178 7.449 4.348 4.142
PPA Award (MW) ???? 363 2.139 5,5 1.515 3.059
Expansão da geração termelétrica - CEBARRA
Projeto Gov. Marcelo Deda
• 2x1 multi shaft ciclocombinado
• Class H technology
• 1,132MW potencia bruta e altaeficiencia nas consições locais
Projeto Laranjeiras
• 1x1 single shaft ciclocombinado
• Class H technology
• 609 MW potencia bruta e altaeficiencia nas consições locais
Subestação
• CEBARRA será conecatadana subestação da rede básicaPorto Sergipe I
15
CELBA – Resumo do Projeto
• Mar - 16: Initial assessment• Mar - 17: CELBA has been established • Jul - 17: Issued the EIA/RIMA • Apr - 18: 1st Public hearing took place in Barcarena• Jul - 18: 2nd Public hearing took place in Abaetetuba• Mar - 19: LP issued• Out - 19: LI issued• Out – 19: Terminal FID• Nov – 19: NTP
Térmicas a Gás Natural
Nova Expansão da Oferta
Quadro Hídrico desfavorável;
Inserção de fontes não despacháveis (eólicas e solares);
Alguns atrasos no sistema de transmissão;
Excessivo Despacho de térmica fora do mérito;
Substituição de térmicas a óleo e diesel até 2027;
A necessidade de segurança da operação com a implantação de térmicas flexíveis, a fim de atender a demanda
máxima e ainda a serviços ancilares crescentemente demandados em razão da alteração do perfil da matriz de
oferta de energia.
Tabela 1 – Expansão da oferta de capacidade (Tabela 4 da Nota técnica EPE, item 3.2.4.)
17
GNL um vetor para o Mercado Livre
INDUSTRIES
UTE PEAK SHAVING &
áreas isoladas
SMALL CITIES W/O
GAS PIPELINES
(LDCs)
Linha
Criogênica
Terminais
Primários(5 x FSRU &
1 x FLNG)
LNG TANKREGAS
NG
LNG TANKREGAS
NG
LNG TANKREGAS
LNG TANKREGAS
NG
LNG/CNG STATIONS
Terminais
Secundários
CABOTAGEM
LNG
LNG FUELED TRUCKS
Gas Doméstico Liquefação
GASODUTO VIRTUAL
GASODUTO VIRTUALBay de
Carregamento
Caminhões
GASODUTO VIRTUALBay de
Carregamento
Caminhões
GASODUTOS EXISTENTE
Produção
Domestica /
Gasbol
18
Viabilização do gás associado do pré sal no continente ajudará na independência energética do país
Mil m3/dia TBTU/dia MMm3/dia
32
Diesel importado
1,5
Energia diária
39
Gás natural
Substituição
diesel
importado
Substituição do
Gás da
Bolívia
Substituição
do GNL
importado
Total de
demanda
gerada
Produção
extra do
pré-sal
Surplus de
gás natural
Ao se viabilizar o gás associado do pré-sal
no continente brasileiro, ele poderia servir
como alternativa a diversos combustíveis,
hoje, importados. Ajudando a
independência energética do país.
Estimativa do gás necessário para substituir o
diesel importado
19
Utilização de GNL em veiculos pesados em substituição ao Diesel
LNG Tank 01
LNG Tank 02
Pressure
Build-up
Heat ExchangerBuffer
Tank
Valvula reguladora
Pressão
Filtro Gas
Natural
Motor
424 hp @ 1900 rpm
Liq 02 Liq 01
Vapor
Liquido
Vapor
Fluido Refrigerante