    DSS for SWRO Plant O&MTechnical experience and lessonslearned from O&M of a membrane basedwater plant

    Dr. Senthilmurugan, Technology Manager ABB Water Industry Segment Initiative, 17 April - 2012

  • 7/30/2019 O and M Water Midde East-ABB-Senthil RO DSS-Ver1

    2/14

    O&M of SWRO plant

    ABB profile in water Market

    Challenges in O&M of SWRO plant

    Importance of DSS for O&M of SWRO plant

    Asset management of SWRO plant

    Membranes, Pumps, ERDs, Pretreatment filters etc.

    Advance operation of SWRO plant

    Energy optimization (operation of RO / NF/UF/MFmembranes, Pumps, ERDs, filters etc. )

    Maintenance schedule optimization (membranes,pumps)

    ABBs solution for O&M of SWRO plant

    Optimax Membrane Performance

    DSS for O&M of SWRO plant

    Content of talk

    Month DD, Year | Sl ide 2 ABB Group

    ABB profile in waterMarket

    Challenges

    Importance of DSS

    Asset Management

    Advance operation

    ABB solution

    Summary

    ERD - Energy recovery deviceSWRO- Sea Water Reverse Osmosis

  • 7/30/2019 O and M Water Midde East-ABB-Senthil RO DSS-Ver1

    3/14

    ABB in Water cycle

    ABB profile in water

    Market

    Challenges

    Importance of DSS Asset Management

    Advance operation

    ABB solution

    Summary

    Where do we operate in Water market and applications?

    Month DD, Year | Sl ide 3 ABB Group

    Overall Water

    Cycle

    Basics Pumping

    Stations

    Desalination

    Water Treatment

    Waste water

    treatment

    Water Network

    Wastewater

    Network

    Irrigation Water Industry water

    Sum up

    Raw water

    Pumping station

    Desalination plants

    IRRIGATION WATER

    Pumping stationsIrrigation Network

    INDUSTRY WATERIndustrial Pumping stationsIndustrial Water TreatmentIndustrial Wastewater Treatment

    Waste Water

    NetworkWater Network

    Waste Water

    Treatment Plants

    WaterTreatment Plants

    Water Discharge & Monitoring

    Water Abstraction &

    Monitoring

  • 7/30/2019 O and M Water Midde East-ABB-Senthil RO DSS-Ver1

    4/14

    A proper selection and operation of pretreatment process

    will prevent or minimize bio fouling,scaling and membrane plugging in reverseosmosis units

    Optimal operation and accurate control offlow and pressure to pretreatment system

    leads to energy minimization inpretreatment and RO section

    leads to life extension for RO andpretreatment filters

    also leads to minimal performancedegradation of membrane due to fouling

    Typical maintenance activities of

    pretreatment units to sustain plant productionlevel such as

    Flushing of membrane (order of days)

    Chemical cleaning of membrane (order ofmonths)

    Partial replacement / full replacement ofmembrane elements (order of years)

    ABB profile in waterMarket

    Challenges

    Importance of DSS

    Asset Management

    Advance operation

    ABB solution

    Summary

    SWRO desalination plant O&M activitiesChallenges in Operation of SWRO plant

    Month DD, Year | S lide 4 ABB Group

    Conventional pretreatment

    Membrane based pretreatment

    MF UF NF

    Sea water Treated water

    to desalting unit

  • 7/30/2019 O and M Water Midde East-ABB-Senthil RO DSS-Ver1

    5/14

    High pressure is applied at membrane feed

    side

    to overcome the osmotic pressure of thesolute

    to cause transport of the solvent from feedside to permeate side (product water)

    Particles accumulate near the membrane

    surface (concentration polarization)

    concentration increases over time

    membrane performance decreases

    Membrane fouling rate due to concentration

    polarization is influenced by multiple factors,

    e.g. changes in process conditions

    (temperature, feed flow concentration,)

    Root cause analysis for changing foulingrate is difficult

    Actions to overcome fouling include cleaning

    (backwashing, chemical cleaning),

    membrane exchange, change of pump

    setpoints to keep productivity level

    ABB profile in waterMarket

    Challenges

    Importance of DSS

    Asset Management

    Advance operation

    ABB solution

    Summary

    SWRO desalination plant O&M activitiesChallenges in in Operation of SWRO plant

    Month DD, Year | Sl ide 5 ABB Group

    Time

    Membraneperformance

    Differentialpressure

    Permeateflux

  • 7/30/2019 O and M Water Midde East-ABB-Senthil RO DSS-Ver1

    6/14

    SWRO desalination plant O&M activities

    Major process units of SWRO plant

    RO, UF / MF membranes of pretreatment units, Pumps, ERD

    Due to fouling the membrane under goes for regular maintenancesactives such as

    Flushing of membrane (order of days)

    Cleaning of membrane (order of months)

    Partial replacement / full replacement of membrane elements(order of years)

    Due to regular wear and tear of pumps, ERD, the efficiency of pumpsvaries ~ 5%, the maintenance activities are

    Maintenance for mechanical components Challenge: how to schedule of maintenance activates of membrane

    systems

    To optimize water production cost

    To minimize carbon footprint per m3 of water production

    ABB profile in waterMarket

    Challenges

    Importance of DSS

    Asset Management

    Advance operation

    ABB solution

    Summary

    Challenges in Maintenance of SWRO plant

    Month DD, Year | Sl ide 6 ABB Group

    MF - Micro FiltrationUF Ultra Filtration

  • 7/30/2019 O and M Water Midde East-ABB-Senthil RO DSS-Ver1

    7/14

    Decision support system (DSS) for SWRO plant

    Membrane fouling monitoring and its impact on membranechemical cleaning schedules, and optimization of RO process(Gauder et al., 2010) is important

    Lu et al., (2006) determined optimal membrane maintenanceschedules without considering the membrane life cycle intooptimization problem fromulation

    ABBs DSS for SWRO calculates the optimal membranemaintenance schedules

    By minimizing water production cost over membrane lifetime

    Also helps in minimizing the specific energy consumption

    (SEC) of the plant by optimally distributing the productionload among RO trains.

    The proposed DSS consists of several functionalities, namely,scheduler, load distributor, membrane management systemand simulator.

    ABB profile in waterMarket

    Challenges

    Importance of DSS

    Asset Management

    Advance operation

    ABB solution

    Summary

    Importance of scheduling membrane maintenance activities

    Month DD, Year | Sl ide 7 ABB Group

  • 7/30/2019 O and M Water Midde East-ABB-Senthil RO DSS-Ver1

    8/14

    Estimation of optimal membranemaintenance schedules

    Reduces unplanned plant outages due tonon-optimal schedules.

    Minimizes the overall water production costduring membrane life cycle and considersconstraints on

    product quality - in order to maintainacceptable salt level in the product water,

    product water demand - in order toachieve the plant production target, andalso

    concentration polarization factor - toimprove membrane life time, duringoptimization.

    The trend of water permeability parameter

    with respect to membrane chemicalcleaning and replacement schedules (referFig)

    The water permeability increases as andwhen the membrane gets cleaned orreplaced.

    The optimal schedule is always better thanfixed schedule in terms of production cost

    ABB profile in waterMarket

    Challenges

    Importance of DSS

    Asset

    Management

    Advance operation

    ABB solution

    Summary

    Decision support system (DSS) for SWROScheduler

    Month DD, Year | S lide 8 ABB Group

  • 7/30/2019 O and M Water Midde East-ABB-Senthil RO DSS-Ver1

    9/14

    Provides the membrane operational and maintenancehistory for analysis like

    Any violations (process or maintenance) happened inpast operation

    Provides proof for membrane warranty from operationperspectives

    It can extracts events like cleaning and chemical andwater usage back flushing and chemical cleaning

    It also facil itates operator to represent process violationsby means of rules.

    It will provide % hrs of plant is operated above thresholdvalue recommended by supplier and OEM

    Compares the OEM and optimal schedules

    Decision support system (DSS) for SWROMembrane Management System (MMS)

    Month DD, Year | Sl ide 9 ABB Group

    ABB profile in waterMarket

    Challenges

    Importance of DSS

    Asset

    Management

    Advance operation

    ABB solution

    Summary

    Operation

    C Cleaning

    R Replacement

    OEM Schedules Optimal

    Schedules

    C 20/08/2010 10/08/2010

    C&R 16/04/2011 25/05/2011

    C 2/10/2011 30/9/2011

    C&R 10/10/2015 1/12/2015

  • 7/30/2019 O and M Water Midde East-ABB-Senthil RO DSS-Ver1

    10/14

    In RO plant, several RO trains will berunning in parallel

    Each train will have differentmembrane fouling status

    Trains that are more fouled requiremore energy to produce samequantity of product water

    Optimal production load distributionamong RO trains is required tominimize overall SEC of a ROsection

    ABB profile in waterMarket

    Challenges

    Importance of DSS

    Asset Management

    Advance operation

    ABB solution

    Summary

    Decision support system (DSS) for SWROLoad distributor

    Month DD, Year | Sl ide 10 ABB Group

  • 7/30/2019 O and M Water Midde East-ABB-Senthil RO DSS-Ver1

    11/14

    The simulator helps the operator to validatedifferent scenarios which otherwise cannot betested in the real plant.

    It helps the operator in analyzing the effect ofoperational and maintenance parameters(such as feed flow, feed pressure and numberof membrane cleanings) on the productioncost.

    Simulator allows to compare differentmembrane maintenance schedules in terms ofcost ($/m3 of product water produced).

    ABB profile in waterMarket

    Challenges

    Importance of DSS

    Asset Management

    Advance operation

    ABB solution

    Summary

    Decision support system (DSS) for SWROSimulator

    Month DD, Year | Sl ide 11 ABB Group

  • 7/30/2019 O and M Water Midde East-ABB-Senthil RO DSS-Ver1

    12/14

    ABBs solution for SWRO plant

    Optimax Membrane Performance

    Monitor membrane fouling and optimize membraneoperation including pumps and Membranes

    Overcomes known drawbacks of other approaches(ASTM and thumb rule)

    Provides advanced operation of membrane systems Consists of two modules:

    Module 1: Online Membrane Performance Monitoring

    Module 2: Online Membrane Process Optimization

    Applicable for membrane systems based on ReverseOsmosis (RO) and Nano-Filtration (NF) treatmenttechnology

    Model-based membrane monitoring solution for individualmembrane trains

    For more details: http://www.abb.com/water

    ABB profile in waterMarket

    Challenges

    Importance of DSS

    Asset Management

    Advance operation

    ABB solution

    Summary

    Advance Operation and Maintenance

    Month DD, Year | Sl ide 12 ABB Group

  • 7/30/2019 O and M Water Midde East-ABB-Senthil RO DSS-Ver1

    13/14

    Scheduler

    Provides optimal schedule formembrane maintenance activities

    When the membrane are to becleaned and replaced

    How much % of membranes are tobe replaced

    Load distributor

    Provides optimal production load

    distribution between RO trains

    Optimal production load

    distribution minimizes overall

    specific energy consumption

    Membrane Management System

    Provides operational andmaintenance history

    Displays process violations viaalarms

    Conditions for processviolations can be provided bymeans of rules

    Simulator

    Facilitates to validate what - ifscenarios

    How energy consumptionchanges with processvariables

    How production cost changeswith membrane maintenanceactivities

    ABB profile in waterMarket

    Challenges

    Importance of DSS

    Asset Management

    Advance operation

    ABB solution

    Summary

    SummaryDSS for SWRO Plant O&M

    Month DD, Year | Sl ide 13 ABB Group

  • 7/30/2019 O and M Water Midde East-ABB-Senthil RO DSS-Ver1

    14/14