NYISO MST - eTariffNYISO MST New York Independent System Operator, Inc. NYISO MST Document Published...

1031
NYISO MST New York Independent System Operator, Inc. NYISO MST Document Published On: 9/1/2020

Transcript of NYISO MST - eTariffNYISO MST New York Independent System Operator, Inc. NYISO MST Document Published...

  • NYISO MST

    New York Independent System Operator, Inc.

    NYISO MST

    Document Published On: 9/1/2020

  • Contents ---------------------------------------------- ......................................................................................... 27

    New York Independent System Operator, Inc. Market Administration and Control Area Services

    Tariff ............................................................................................................................................. 27

    1 Introduction and Purpose ....................................................................................................... 28

    2 DEFINITIONS ...................................................................................................................... 29

    2.1 Definitions - A ................................................................................................................ 30

    2.2 Definitions - B ................................................................................................................ 33

    2.3 Definitions - C ................................................................................................................ 35

    2.4 Definitions - D ................................................................................................................ 40

    2.5 Definitions - E ................................................................................................................ 43

    2.6 Definitions - F ................................................................................................................ 46

    2.7 Definitions - G ................................................................................................................ 47

    2.8 Definitions - H ................................................................................................................ 48

    2.9 Definitions - I ................................................................................................................. 49

    2.10 Definitions - J ................................................................................................................. 53

    2.11 Definitions - K ................................................................................................................ 54

    2.12 Definitions - L ................................................................................................................ 55

    2.13 Definitions - M ............................................................................................................... 58

    2.14 Definitions - N ................................................................................................................ 61

    2.15 Definitions - O ................................................................................................................ 65

    2.16 Definitions - P ................................................................................................................ 68

    2.17 Definitions - Q ................................................................................................................ 70

    2.18 Definitions - R ................................................................................................................ 71

    2.19 Definitions - S ................................................................................................................ 76

    2.20 Definitions - T ................................................................................................................ 81

    2.21 Definitions - U ................................................................................................................ 84

    2.22 Definitions - V ................................................................................................................ 85

    2.23 Definitions - W ............................................................................................................... 86

    2.24 Definitions - X ................................................................................................................ 87

    2.25 Definitions - Y ................................................................................................................ 88

    2.26 Definitions - Z ................................................................................................................ 89

    3 Term and Effectiveness ......................................................................................................... 90

    3.1 Effectiveness .................................................................................................................. 91

    3.2 Term and Termination .................................................................................................... 92

    3.3 Regulations ..................................................................................................................... 93

    3.4 Access to Complete and Accurate Data ......................................................................... 94

    3.5 ISO Procedures ............................................................................................................... 95

    3.5.1 Market Problems Reporting Procedure ................................................................... 95

    3.5.2 Provision of Data By Market Participants .............................................................. 96

    3.5.3 Provision of Data By Transmission Owners to Each Other ................................... 97

    3.6 Survival .......................................................................................................................... 99

    4 Market Services: Rights and Obligations .......................................................................... 100

    4.1 Market Services - General Rules .................................................................................. 101

    4.1.1 Overview ............................................................................................................... 101

  • 4.1.2 Independent System Operator Authority .............................................................. 101

    4.1.3 Informational and Reporting Requirements .......................................................... 102

    4.1.4 Scheduling Prerequisites ....................................................................................... 104

    4.1.5 Communication Requirements for Market Services ............................................. 104

    4.1.6 Customer Responsibilities .................................................................................... 105

    4.1.7 Customer Compliance with Laws, Regulations and Orders ................................. 105

    4.1.8 Commitment for Reliability .................................................................................. 106

    4.1.9 Cost Recovery for Units Responding to Local Reliability Rules Addressing Loss of

    Generator Gas Supply ......................................................................................................... 108

    4.1.9.1 Eligibility for Cost Recovery ......................................................................... 108

    4.1.9.1.1 Obligation to Test Automatic Fuel Swap Capability and Eligibility to Recover

    Costs of Performing Fuel Swap Tests ............................................................................. 108

    4.1.9.2 Variable Operating Cost Recovery ................................................................ 109

    4.1.9.3 Additional Cost Recovery ............................................................................. 110

    4.1.9.4 Billing ............................................................................................................ 112

    4.1.9.5 Other Provisions ............................................................................................ 112

    4.1.10 Reserved for Future Use ..................................................................................... 113

    4.1.11 Dual Participation ............................................................................................... 113

    4.2 Day-Ahead Markets and Schedules ................................................................................ 114

    4.2.1 Day-Ahead Load Forecasts, Bids and Bilateral Schedules ................................... 114

    4.2.1.1 General Customer Forecasting and Bidding Requirements .............................. 114

    4.2.1.2 Load Forecasts................................................................................................... 115

    4.2.1.3 Bids by Suppliers Using the ISO-Committed Flexible, Self-Committed Flexible

    or ISO-Committed Fixed Bid Modes to Supply Energy and/or Ancillary Services ....... 115

    4.2.1.3.1 General Rules ................................................................................................ 115

    4.2.1.3.2 Bid Parameters ............................................................................................... 117

    4.2.1.3.3 Upper Operating Limits, Lower Operating Limits, and Response Rates ...... 117

    4.2.1.4 Offers to Supply Energy from Self-Committed Fixed Generators ................... 119

    4.2.1.5 Bids to Supply Energy in Virtual Transactions ................................................. 119

    4.2.1.6 Bids to Purchase Energy in Virtual Transactions.............................................. 119

    4.2.1.7 Bilateral Transactions ........................................................................................ 119

    4.2.1.8 Bids to Purchase LBMP Energy in the Day-Ahead Market ............................. 120

    4.2.1.9 Day-Ahead Bids from Demand Reduction Providers and DSASP Providers to

    Supply Energy from Demand Reductions ...................................................................... 120

    4.2.2 ISO Responsibility to Establish a Statewide Load Forecast ................................. 121

    4.2.3 Security Constrained Unit Commitment (“SCUC”) ............................................. 121

    4.2.3.1 Reliability Forecast for the Dispatch Day ......................................................... 125

    4.2.4 Reliability Forecast for the Six Days Following the Dispatch Day ...................... 126

    4.2.5 Post the Day-Ahead Schedule ............................................................................... 128

    4.2.6 Day-Ahead LBMP Market Settlements ................................................................ 129

    4.3 In-Day Scheduling Changes ......................................................................................... 132

    4.4 Real-Time Markets and Schedules ................................................................................. 133

    4.4.1 Real-Time Commitment (“RTC”) ........................................................................ 133

    4.4.1.1 Overview ........................................................................................................... 133

    4.4.1.2 Bids and Other Requests ................................................................................... 133

  • 4.4.1.2.1 Real-Time Bids to Supply or Withdraw Energy and Supply Ancillary Services,

    other than External Transactions .................................................................................... 134

    4.4.1.2.2 Real-Time Bids Associated with Internal and External Bilateral Transactions

    136

    4.4.1.2.3 Self-Commitment Requests ........................................................................... 137

    4.4.1.2.4 ISO-Committed Fixed ................................................................................... 137

    4.4.1.3 External Transaction Scheduling ...................................................................... 138

    4.4.1.4 Posting Commitment/De-Commitment and External Transaction Scheduling

    Decisions ......................................................................................................................... 138

    4.4.1.5 External Transaction Settlements ...................................................................... 141

    4.4.2 Real-Time Dispatch .............................................................................................. 141

    4.4.2.1 Overview ........................................................................................................... 141

    4.4.2.2 External Transaction Scheduling ...................................................................... 142

    4.4.2.3 Calculating Real-Time Market LBMPs and Advisory Prices ........................... 143

    4.4.2.4 Real-Time Pricing Rules for Scheduling Ten Minute Resources ..................... 143

    4.4.2.5 Converting to Demand Reduction, Special Case Resource Capacity scheduled as

    Operating Reserves, Regulation or Energy in the Real-Time Market ............................ 143

    4.4.2.6 Converting to Demand Reduction Curtailment Services Provider Capacity

    scheduled as Operating Reserves, Regulation or Energy in the Real-Time Market ....... 144

    4.4.2.7 Post the Real-Time Schedule ............................................................................ 145

    4.4.3 Real-Time Dispatch - Corrective Action Mode .................................................... 146

    4.4.3.1 RTD-CAM Modes............................................................................................. 147

    4.4.3.1.1 Reserve Pickup .............................................................................................. 147

    4.4.3.1.2 Maximum Generation Pickup ........................................................................ 148

    4.4.3.1.3 Base Points ASAP -- No Commitments ........................................................ 148

    4.4.3.1.4 Base Points ASAP -- Commit As Needed ..................................................... 148

    4.4.3.1.5 Re-Sequencing Mode .................................................................................... 149

    4.4.3.2 Calculating Real-Time LBMPs ......................................................................... 149

    4.4.4 Identifying the Pricing and Scheduling Rules That Apply to External Transactions

    149

    4.5 Real-Time Market Settlements ....................................................................................... 153

    4.5.1 Settlement for Customers Scheduled To Sell Energy in Virtual Transactions in

    Load Zones.......................................................................................................................... 155

    4.5.2 Real-Time Market Settlements for Energy Injections or When Actual Demand

    Reductions are Less Than Scheduled Demand Reductions ................................................ 155

    4.5.2.1 General Rules for Suppliers .............................................................................. 155

    A Supplier shall pay or be paid for Energy imbalance to account for differences between

    Actual Energy Injections, real-time Energy schedules and Day-Ahead Energy schedules.

    ......................................................................................................................................... 155

    4.5.2.2 Failed Transactions ........................................................................................... 157

    4.5.2.3 Capacity Limited Resources and Energy Limited Resources ........................... 158

    4.5.2.4 Demand Reductions .......................................................................................... 159

    4.5.3 Real-Time Market Settlements for Energy Withdrawals Other Than in Virtual

    Transactions ........................................................................................................................ 160

    4.5.3.1 General Rules .................................................................................................... 160

    4.5.3.2 Failed Transactions ........................................................................................... 161

  • 4.5.4 Settlement for Customers Scheduled To Purchase Energy in Virtual Transactions in

    Load Zones.......................................................................................................................... 162

    4.5.5 Settlement for Trading Hub Energy Owner when POI is a Trading Hub ............. 162

    4.5.6 Settlement for Trading Hub Energy Owner when POW is a Trading Hub .......... 163

    4.6 Payments ......................................................................................................................... 164

    4.6.1 Payments to Suppliers of Regulation Service ....................................................... 164

    4.6.2 Payments to Suppliers of Reactive Supply and Voltage Support Service (“Voltage

    Support Service”) ................................................................................................................ 164

    4.6.3 Payments to Suppliers for Operating Reserves ..................................................... 164

    4.6.4 Payments to Generators for Black Start Capability .............................................. 164

    4.6.5 Day-Ahead Margin Assurance Payments ............................................................. 164

    4.6.6 Bid Production Cost Guarantee Payments ............................................................ 165

    4.6.6.1 Day-Ahead BPCG for Generators ..................................................................... 165

    4.6.6.2 Day-Ahead BPCG for Imports .......................................................................... 165

    4.6.6.3 Real-Time BPCG for Generators in RTD Intervals Other than Supplemental

    Event Intervals ................................................................................................................ 166

    4.6.6.4 BPCG for Generators for Supplemental Event Intervals .................................. 166

    4.6.6.5 Real-Time BPCG for External Transactions ..................................................... 167

    4.6.6.6 BPCG for Long Start-Up Time Generators Whose Starts Are Aborted by the ISO

    Prior to their Dispatch ..................................................................................................... 167

    4.6.6.7 BPCG for Demand Reduction in the Day-Ahead Market ................................. 168

    4.6.6.8 BPCG for Special Case Resources .................................................................... 168

    4.6.6.9 Day-Ahead BPCG for Demand Side Resources Scheduled to Provide

    Synchronized Operating Reserves and/ or Regulation Service ...................................... 168

    4.6.6.10 Real-Time BPCG for Demand Side Resources Scheduled to Provide

    Synchronized Operating Reserves and/ or Regulation Service ...................................... 169

    4.7 Procurement of Station Power ........................................................................................ 170

    5 CONTROL AREA SERVICES: RIGHTS AND OBLIGATIONS ................................... 173

    5.1 Control Area Services .................................................................................................. 174

    5.1.1 Customer Compliance with Reliability Standards; Penalties ............................... 175

    5.1.1.1 Customer Compliance with Reliability Standards: ........................................... 175

    5.1.1.2 Direct Assignment of Penalty Costs: ................................................................ 175

    5.1.1.3 ISO’s Recovery of Penalty Costs Through Schedule 11: ................................. 176

    5.1.2 Incorporation of Certain Business Practice Standards .......................................... 176

    5.2 Independent System Operator Authority...................................................................... 179

    5.2.1 Suspension of Virtual Transactions ...................................................................... 179

    5.2.2 Suspension of the Ability of Generators to Increase Their Bids in Real-Time .... 180

    5.3 Control Center Operation ................................................................................................ 182

    5.3.1 Back-Up Operation ............................................................................................... 182

    5.3.2 Market Participant and Customer Obligations ...................................................... 183

    5.3.3 Billing and Settlement........................................................................................... 183

    5.4 Operation Under Adverse Conditions .......................................................................... 184

    5.5 Major Emergency State................................................................................................... 186

    5.6 Requirements For Inclusion Within The New York Control Area ................................. 187

    5.7 Requirements For Entities Not Located Within The New York Control Area ............... 188

    5.8 Communication and Metering Requirements for Control Area Services ....................... 189

  • 5.8.1 Collection and Communication of Energy Forecasting Data by Intermittent Power

    Resources that Depend on Wind or Solar Energy as Their Fuel ........................................ 190

    5.9 Installed Capacity and Locational Export Capacity ........................................................ 192

    5.10 NYCA Minimum Installed Capacity Requirement ..................................................... 194

    5.11 Requirements Applicable to LSEs ............................................................................... 196

    5.11.1 Allocation of the NYCA Minimum Unforced Capacity Requirement ............... 196

    5.11.2 LSE Obligations .................................................................................................... 199

    5.11.3 Load-Shifting Adjustments ................................................................................... 200

    5.11.4 LSE Locational Minimum Installed Capacity Requirements ............................... 201

    5.11.5 The Locational Minimum Unforced Capacity Requirement ................................ 204

    5.11.6 Determination of Locality Exchange Factor: ........................................................ 206

    5.12 Requirements Applicable to Installed Capacity Suppliers ........................................... 207

    5.12.1 Installed Capacity Supplier Qualification Requirements ...................................... 207

    5.12.2 Additional Provisions Applicable to External Installed Capacity Suppliers ........ 216

    5.12.2.1 Provisions Addressing the Applicable External Control Area ...................... 216

    5.12.2.2 Additional Provisions Addressing Internal Deliverability and Import Rights

    216

    5.12.2.3 One-Time Conversion of Grandfathered Quebec (via Chateauguay) Interface

    Rights. 219

    5.12.2.4 Offer Cap Applicable to Certain External CRIS Rights ................................ 221

    5.12.3 Installed Capacity Supplier Outage Scheduling Requirements ............................ 221

    5.12.4 Required Certification for Installed Capacity ....................................................... 222

    5.12.5 Operating Data Reporting Requirements .............................................................. 223

    5.12.5.1 Generators, System Resources, Energy Limited Resources, Energy storage

    Resources, Responsible Interface Parties, Intermittent Power Resources, Limited Control

    Run-of-River Hydro Resources and Municipally Owned Generation ............................ 224

    5.12.5.2 Control Area System Resources .................................................................... 224

    5.12.5.3 Transmission Projects Granted Unforced Capacity Deliverability Rights .... 224

    5.12.5.4 Transmission Projects Granted External-to ROS Deliverability Rights ....... 225

    5.12.6 Capacity Calculations, Operating Data Default, Value and Collection ................ 225

    5.12.6.1 ICAP Calculation for Behind-the-Meter Net Generation Resources ............ 225

    5.12.6.1.1 Adjusted DMGC ............................................................................................ 225

    5.12.6.1.2 Adjusted Host Load ....................................................................................... 226

    5.12.6.1.2.1 Average Coincident Host Load .................................................................. 226

    5.12.6.1.2.2 Determination of Adjusted Host Load ........................................................ 227

    5.12.6.2 UCAP Calculations........................................................................................ 227

    5.12.6.3 Default Unforced Capacity ............................................................................ 231

    5.12.6.4 Exception for Certain Equipment Failures .................................................... 232

    5.12.6.5 Unforced Capacity, Outage Data and Operational Information Associated with

    External-to-ROS Deliverability Rights ........................................................................... 232

    5.12.7 Availability Requirements .................................................................................... 232

    5.12.8 Unforced Capacity Sales ....................................................................................... 233

    5.12.9 Sales of Unforced Capacity by System Resources ............................................... 236

    5.12.10 Curtailment of External Transactions In-Hour.................................................. 237

  • 5.12.11 Responsible Interface Parties, Municipally-Owned Generation, Energy Limited

    Resources, Intermittent Power Resources, and Installed Capacity Suppliers with Energy

    Duration Limitations ........................................................................................................... 237

    5.12.11.1 Responsible Interface Parties ........................................................................ 237

    5.12.11.1.1 Special Case Resource Average Coincident Load ...................................... 241

    5.12.11.1.2 Use of a Provisional Average Coincident Load .......................................... 244

    5.12.11.1.3 Reporting a SCR Change of Load or SCR Change of Status ...................... 247

    5.12.11.1.3.1 SCR Change of Load ............................................................................... 247

    5.12.11.1.3.2 SCR Change of Status .............................................................................. 247

    5.12.11.1.4 Average Coincident Load of an SCR Aggregation ..................................... 248

    5.12.11.1.5 Use of an Incremental Average Coincident Load ....................................... 248

    5.12.11.2 Existing Municipally-Owned Generation ...................................................... 252

    5.12.11.3 Energy Limited Resources ............................................................................. 253

    5.12.11.4 Intermittent Power Resources ........................................................................ 253

    5.12.11.5 Installed Capacity Suppliers with an Energy Duration Limitation ................. 254

    5.12.12 Sanctions Applicable to Installed Capacity Suppliers and Transmission Owners

    254

    5.12.12.1 Sanctions for Failing to Provide Required Information ................................ 255

    5.12.12.2 Sanctions for Failing to Comply with Scheduling, Bidding, and Notification

    Requirements .................................................................................................................. 256

    5.12.14 Energy Duration Limitations and Duration Adjustment Factors for Installed

    Capacity Suppliers .............................................................................................................. 261

    5.12.14.1 Counting Incremental Penetration of Resources with Energy Duration

    Limitations ...................................................................................................................... 263

    5.12.14.2 Adjusted Installed Capacity ............................................................................ 264

    5.12.14.3 Periodic Review of Capacity Values ............................................................. 265

    5.13 Installed Capacity Auctions ......................................................................................... 267

    5.13.1 General Auction Requirements ............................................................................. 267

    5.13.2 Capability Period Auction ................................................................................... 268

    5.13.3 Monthly Auctions ................................................................................................. 269

    5.13.4 Detailed Installed Capacity Auction Description ................................................. 269

    5.14 Installed Capacity Spot Market Auction and Installed Capacity Supplier Deficiencies

    270

    5.14.1 LSE Participation in the ICAP Spot Market Auction ........................................... 270

    5.14.1.1 ICAP Spot Market Auction ......................................................................... 270

    5.14.1.2 Demand Curve and Adjustments .................................................................. 272

    5.14.1.2.1 Periodic Reviews of ICAP Demand Curves Applicable Prior to the 2017/2018

    Capability Year ............................................................................................................... 273

    5.14.1.2.2 Periodic Reviews of ICAP Demand Curves Applicable Beginning with the

    2017/2018 Capability Year ............................................................................................. 277

    5.14.1.2.2.1 Annual Updates for Peaking Plant Gross Cost ........................................... 279

    5.14.1.2.2.2 Annual Updates for Net Energy and Ancillary Revenue Offset ................ 281

    5.14.1.2.2.3 Annual Updates for ICAP Demand Curve Parameters .............................. 285

    5.14.1.2.2.4 Periodic Review Procedures ....................................................................... 288

    5.14.1.3 Supplemental Supply Fee ............................................................................. 291

    5.14.2 Installed Capacity Supplier Shortfalls and Deficiency Charges ........................ 293

  • 5.14.2.1 General Provisions........................................................................................ 293

    5.14.2.2 Additional Provisions Applicable to External Installed Capacity Suppliers 295

    5.14.2.3 Additional Provisions Applicable to RIPs .................................................... 296

    5.14.2.3.1 Shortfall for Provisional ACL ....................................................................... 296

    5.14.2.3.2 Shortfall for Incremental ACL ...................................................................... 297

    5.14.2.3.3 Shortfall for SCR Change of Status .............................................................. 298

    5.14.2.3.4 Shortfall for RIP Portfolio Performance ...................................................... 299

    5.14.3 Application of Installed Capacity Supplier Deficiency Charges ....................... 299

    5.14.3.1 General Application of Deficiency Charges ................................................. 299

    5.14.3.2 Installed Capacity Rebates ........................................................................... 299

    (i) New York City.......................................................................................................... 299

    (ii) Long Island ........................................................................................................... 300

    (iii) G-J ......................................................................................................................... 300

    (iv) Rest of State .......................................................................................................... 300

    5.15 Payment and Allocation of Installed Capacity Auction Rebates ................................. 302

    5.16 New Capacity Zone Study and Procedures .................................................................. 303

    5.16.1 NCZ Study Methodology. ..................................................................................... 303

    5.16.2 New Capacity Zone Boundary .............................................................................. 306

    5.16.3 Indicative NCZ Locational Minimum Installed Capacity Requirement ............... 306

    5.16.4 NCZ Report ........................................................................................................... 306

    5.17 Expedited Dispute Resolution Procedures ................................................................... 308

    5.17.1 Five-Day Consultation Period............................................................................... 308

    5.17.2 Written Submissions ............................................................................................. 308

    5.17.3 Appointment of the Arbitrator .............................................................................. 308

    5.17.4 Arbitration Proceeding .......................................................................................... 309

    5.17.5 Arbitration Award ................................................................................................. 309

    5.17.6 Limited Appeal ..................................................................................................... 310

    5.18 Generator Outages and Generator Obligations While in These Outages ..................... 311

    5.18.1 Forced Outages and Commenced Repair Determinations .................................... 311

    5.18.2 ICAP Ineligible Forced Outage ............................................................................ 315

    5.18.2.3 ICAP Ineligible Force Outage Expiration ..................................................... 316

    5.18.3 Mothball Outage ................................................................................................... 318

    5.18.3.3 Mothball Outage Expiration .......................................................................... 319

    5.18.4 Return to Service of Generators in a Mothball Outage or an ICAP Ineligible Forced

    Outage to Resolve a Reliability Issue ................................................................................. 321

    5.18.5 Temporary Use of Interconnection Point to Resolve a Reliability Issue .............. 322

    5.18.6 Retired and Termination of Existing Interconnection Agreements ...................... 324

    6 Confidentiality .................................................................................................................... 326

    6.1 Access to Confidential Information ............................................................................. 326

    6.2 Use of Confidential Information .................................................................................. 326

    6.3 Disclosure of Bid Information...................................................................................... 327

    6.4 Survival ........................................................................................................................... 327

    7 Billing and Payment ............................................................................................................ 328

    7.1 ISO as Counterparty; Right to Net or Set Off; ISO Clearing Account ........................ 329

    7.1.1 ISO as Counterparty .......................................................................................... 329

    7.1.2 Right to Net or Set Off Obligations Owed ........................................................ 329

  • 7.1.3 ISO Clearing Account ....................................................................................... 329

    7.1.4 ISO Liability for Payment ................................................................................. 329

    7.2 Billing and Payment Procedures ..................................................................................... 331

    7.2.1 Billing and Settlement Information ...................................................................... 331

    7.2.2 Invoicing and Payment ......................................................................................... 331

    7.2.2.1 Weekly Invoice ................................................................................................. 331

    7.2.2.2 Monthly Invoice ................................................................................................ 332

    7.2.2.3 Payment by the Customer ................................................................................. 332

    7.2.2.4 Payment by the ISO........................................................................................... 333

    7.2.3 Use of Estimated Data and Meter Data................................................................. 333

    7.2.4 Method of Payment ............................................................................................... 333

    7.2.5 TCC Auction Settlements ..................................................................................... 334

    7.2.6 Verification of Payments ...................................................................................... 335

    7.2.7 Payments for TSCs ............................................................................................... 335

    7.3 Interest on Unpaid Balances ......................................................................................... 337

    7.4 Billing Disputes ............................................................................................................ 338

    7.4.1 Settlement Cycle for Services Furnished On and After January 1, 2009 ............. 338

    7.4.1.1 ISO Corrections or Adjustments and Customer Challenges to the Accuracy of

    Settlement Information ................................................................................................... 338

    7.4.1.2 Review and Correction of Challenged Invoices ................................................ 340

    7.4.2 Expedited Dispute Resolution Procedures for Unresolved Settlement Challenges

    342

    7.4.2.1 Applicability of Expedited Dispute Resolution Procedures .............................. 342

    7.4.2.2 Initiation of Expedited Dispute Resolution Proceeding .................................... 343

    7.4.2.3 Participation by Other Interested Customers .................................................... 343

    7.4.2.4 Selection of a Neutral ........................................................................................ 344

    7.4.2.5 Conduct of the Expedited Dispute Resolution Proceeding ............................... 345

    7.4.2.6 Allocation of Costs ............................................................................................ 345

    7.5 Customer Default ......................................................................................................... 346

    7.5.1 Events of Default .................................................................................................. 346

    7.5.2 Cure ....................................................................................................................... 348

    7.5.3 ISO Remedies ....................................................................................................... 348

    7.5.4 Forward Contracts ................................................................................................. 350

    7.5.5 Notice to Customers ................................................................................................ 350

    7.6 Survival ........................................................................................................................... 351

    8 Eligibility For ISO Services ................................................................................................ 352

    8.1 Requirements Common to all Customers ....................................................................... 352

    8.1.1 Creditworthiness ................................................................................................... 352

    8.1.2 Completed Application and Minimum Technical Requirements ......................... 352

    8.1.3 Additional Eligibility Requirements for all Customers ........................................ 352

    8.2 Additional Requirements Applicable to Suppliers ......................................................... 354

    8.3 Additional Requirements Applicable to LSEs ................................................................ 354

    8.4 Eligibility to Obtain Services Under This Tariff In Response To Sales Tax Issues ....... 354

    9 Application And Registration Procedure ............................................................................ 359

    9.1 Application ................................................................................................................... 359

    9.2 Completed Application ................................................................................................... 359

  • 9.3 Approval of Application and/or Notice of Deficient Application .................................. 360

    9.4 Filing of Service Agreement ........................................................................................... 360

    10 Recordkeeping and Audit ................................................................................................... 361

    11 Dispute Resolution Procedure............................................................................................. 362

    11.1 Purpose and Applicability of Dispute Resolution Procedure ....................................... 363

    11.1.1 Purpose and General Provisions ........................................................................... 363

    11.1.2 Exceptions ............................................................................................................. 363

    11.2 Initiation of Dispute Resolution Proceedings.............................................................. 365

    11.2.1 Notice of Dispute .................................................................................................. 365

    11.2.2 Parties to Dispute Resolution Proceeding ............................................................. 365

    11.3 Informal Discussions .................................................................................................... 366

    11.4 Available Formal Proceedings ..................................................................................... 367

    11.4.1................................................................................................................................... 367

    11.4.2................................................................................................................................... 367

    11.4.3................................................................................................................................... 367

    11.5 Non-Binding Mediation ............................................................................................... 368

    11.5.1 Selection of a Mediator ......................................................................................... 368

    11.5.2 Scope of Mediator’s Duties .................................................................................. 368

    11.5.3 Costs ...................................................................................................................... 369

    11.6 Arbitration ................................................................................................................ 370

    11.6.1 Procedural Provisions ........................................................................................... 370

    11.6.1.1 Selection of an Arbitrator .............................................................................. 370

    11.6.1.2 Scope of Arbitrator’s Duties .......................................................................... 371

    11.6.2 The Arbitration Decision ...................................................................................... 371

    11.6.3 Costs ...................................................................................................................... 372

    11.6.4 Filing and Finality. ................................................................................................ 372

    11.7 Consolidation of Related Arbitration Proceedings....................................................... 374

    11.8 Ongoing Duty to Perform ............................................................................................. 375

    11.9 Rights Under the Federal Power Act............................................................................ 376

    12 Liability and Indemnification ............................................................................................. 377

    12.1 Force Majeure ........................................................................................................... 377

    12.2 Claims by Employees and Insurance ........................................................................ 378

    12.3 Limitation on Liability.............................................................................................. 378

    12.4 Indemnification ......................................................................................................... 379

    12.5 Other Remedies ............................................................................................................ 380

    12.6 Survival ........................................................................................................................ 380

    13 Metering .............................................................................................................................. 381

    13.1 General Requirements .............................................................................................. 381

    13.2 Requirements Pertaining to Customers ........................................................................ 381

    13.2.1 Load Serving Entities ............................................................................................ 382

    13.2.2 Ancillary Service Suppliers .................................................................................. 382

    13.2.3 Estimation of Metering ......................................................................................... 382

    13.2.4 Energy Storage Resources .................................................................................... 382

    13.3 Metering Requirements for Demand Side Resources .................................................. 383

    13.3.1 Responsibility for Metering and Meter Data Services for Aggregations and

    Demand Side Resources ..................................................................................................... 383

  • 13.3.2 Meter Services Entity Requirements .................................................................... 385

    13.3.2.1 Eligibility Determination for Meter Services Entity ..................................... 385

    13.3.2.2 Standards of Conduct for Meter Services Entities ......................................... 388

    13.3.2.3 ISO Audits and Corrective Actions ............................................................... 388

    14 Miscellaneous ..................................................................................................................... 390

    14.1 Notices ...................................................................................................................... 390

    14.2 Tax Exempt Financing Pursuant to Section 142 (f) of the Internal Revenue Code ..... 390

    14.3 LIPA and NYPA Tax Exempt Obligations .................................................................. 391

    14.4 Amendments ............................................................................................................. 391

    14.5 Applicable Law and Forum ...................................................................................... 392

    14.6 Counterparts.............................................................................................................. 392

    14.7 Waiver ...................................................................................................................... 393

    14.8 Assignment ............................................................................................................... 393

    14.9 Representations, Warranties & Covenants ............................................................... 393

    15 ISO Market Administration and Control Area Service Tariff Rate Schedules ................... 394

    15.1 Rate Schedule 1 - ISO Annual Budget Charge and Other Non-Budget Charges and

    Payments ................................................................................................................................. 395

    15.2 Rate Schedule 2 - Payments for Supplying Voltage Support Service.......................... 396

    15.2.1 Responsibilities ..................................................................................................... 397

    15.2.1.1 Suppliers ........................................................................................................ 397

    15.2.2 Payments ............................................................................................................... 399

    15.2.2.1 Annual Payment for Voltage Support Service .............................................. 399

    15.2.2.2 Lost Opportunity Costs .................................................................................. 400

    15.2.2.3 Other Payments to Synchronous Condensers and Qualified Non-Generator

    Voltage Support Resources ............................................................................................. 402

    15.2.3 Failure to Perform by Suppliers ............................................................................ 402

    15.2.4 Failure to Respond to ISO's Request for Steady-State Voltage Control ............... 404

    15.2.5 Failure to Provide Voltage Support Service When a Contingency Occurs on the

    NYS Power System............................................................................................................. 405

    15.2.6 Failure to Maintain an Automatic Voltage Regulator or Commence Timely Repairs

    406

    15.2.7 Consistence with Cross-Sound Scheduled Line Protocols ................................... 407

    15.3 Rate Schedule 3 - Payments for Regulation Service .................................................... 408

    15.3.1 Obligations of the ISO and Suppliers ................................................................... 408

    15.3.1.1 The ISO shall: ................................................................................................ 408

    15.3.1.2 Each Supplier shall: ....................................................................................... 409

    15.3.2 Selection of Suppliers in the Day-Ahead Market and the Real-Time Market ...... 410

    15.3.2.1 Bidding Process ............................................................................................. 411

    15.3.3 Monitoring Regulation Service Performance and Performance Related Payment

    Adjustments ........................................................................................................................ 412

    15.3.4 Regulation Service Settlements - Day-Ahead Market .......................................... 412

    15.3.4.1 Calculation of Day-Ahead Market Prices ...................................................... 412

    15.3.4.2 Other Day-Ahead Payments .......................................................................... 414

    15.3.5 Regulation Service Settlements - Real-Time Market ........................................... 414

    15.3.5.1 Calculation of Real-Time Market Prices ...................................................... 414

  • 15.3.5.2 Real-Time Regulation Capacity Balancing Payments, Regulation Movement

    Payments and Performance Charges ............................................................................... 415

    15.3.5.3 Other Real-Time Regulation Service Payments ............................................ 416

    15.3.5.4 Performance-Based Adjustment to Payments for Regulation Service Providers

    and Performance Based Charges .................................................................................... 417

    15.3.5.4.1 Performance-Based Adjustment to Payments for Regulation Service Suppliers

    417

    15.3.6 Energy Settlement Rules for Generators Providing Regulation Service .............. 418

    15.3.6.1 Energy Settlements ........................................................................................ 418

    15.3.6.2 Additional Payments/Charges ....................................................................... 419

    15.3.6.2.1 Additional Payments/Charges When AGC Base Point Signals Exceed RTD

    Base Point Signals........................................................................................................... 419

    15.3.6.2.2 Additional Charges/Payments When AGC Base Point Signals Are Lower than

    RTD Base Point Signals.................................................................................................. 420

    15.3.7 Regulation Service Demand Curve ....................................................................... 421

    15.3.8 Temporary Suspension of Regulation Service Markets During Reserve Pickups and

    Maximum Generation ......................................................................................................... 423

    15.3A Rate Schedule “3-A” -Charges Applicable to Suppliers That Are Not Providing

    Regulation Service .................................................................................................................. 424

    15.3A.1 Persistent Undergeneration Charges ................................................................. 424

    15.3A.1.1 Overgeneration Charges ................................................................................ 425

    15.3A.1.2 Persistent Over-Withdrawal Charges ............................................................ 425

    15.3A.2 Exemptions ........................................................................................................ 426

    15.4 Rate Schedule 4 - Payments for Supplying Operating Reserves ................................. 429

    15.4.1 General Responsibilities and Requirements ......................................................... 429

    15.4.1.1 ISO Responsibilities ...................................................................................... 429

    15.4.1.2 Supplier Eligibility Criteria ........................................................................... 431

    15.4.1.2.1 Spinning Reserve: .......................................................................................... 431

    15.4.1.2.2 10-Minute Non-Synchronized Reserve: ........................................................ 431

    15.4.1.2.3 30-Minute Reserve: ....................................................................................... 432

    15.4.1.2.4 Self-Committed Fixed and ISO-Committed Fixed Generators: .................... 432

    15.4.1.3 Other Supplier Requirements ........................................................................ 432

    15.4.2 General Day-Ahead Market Rules ........................................................................ 434

    15.4.2.1 Bidding and Bid Selection ............................................................................. 434

    15.4.2.2 ISO Notice Requirement ............................................................................... 435

    15.4.2.3 Real-Time Market Responsibilities of Suppliers Scheduled to Provide

    Operating Reserves in the Day-Ahead Market ............................................................... 435

    15.4.3 General Real-Time Market Rules ......................................................................... 436

    15.4.3.1 Bid Selection.................................................................................................. 436

    15.4.3.2 ISO Notice Requirement ............................................................................... 437

    15.4.3.3 Obligation to Make Resources Available to Provide Operating Reserves .... 437

    15.4.3.4 Activation of Operating Reserves .................................................................. 437

    15.4.3.5 Performance Tracking and Supplier Disqualifications .................................. 438

    15.4.4 Operating Reserves Settlements - General Rules ................................................. 438

    15.4.4.1 Establishing Locational Reserve and Scarcity Reserve Requirement Prices 438

  • 15.4.4.2 Settlements Involving Suppliers of Operating Reserves Located on Long

    Island 439

    15.4.4.3 “Cascading” of Operating Reserves .............................................................. 439

    15.4.5 Operating Reserve Settlements – Day-Ahead Market .......................................... 440

    15.4.5.1 Calculation of Day-Ahead Market Clearing Prices ....................................... 440

    15.4.5.2 Other Day-Ahead Payments .......................................................................... 443

    15.4.6 Operating Reserve Settlements – Real-Time Market ........................................... 443

    15.4.6.1 Calculation of Real-Time Market Clearing Prices ........................................ 443

    15.4.6.2 Establishment of Scarcity Reserve Requirements in the Real-Time Market

    During EDRP/SCR Activations ...................................................................................... 450

    15.4.6.3 Operating Reserve Balancing Payments ........................................................ 451

    15.4.6.4 Other Real-Time Payments ........................................................................... 452

    15.4.7 Operating Reserve Demand Curves and Scarcity Reserve Demand Curve .......... 452

    15.4.8 Self-Supply ........................................................................................................... 466

    15.5 Rate Schedule 5 - Payments and Charges for Black Start and System Restoration

    Services ................................................................................................................................... 468

    15.5.1 Requirements ........................................................................................................ 468

    15.5.2 Payments to Generators for Provision of Restoration Services Under the ISO Plan

    and Transmission Owners’ Plans, Excluding the Consolidated Edison Plan ..................... 469

    15.5.3 Charges to Support Payments to Generators Under the ISO Plan and Individual

    Transmission Owners’ Plans, Excluding the Consolidated Edison Plan. ........................... 470

    15.5.4 Payments to Generators Providing Restoration Services Under the Consolidated

    Edison Plan and Recovery of Associated Costs ................................................................. 471

    15.5.4.1 Payments to Generators that Provide Restoration Services Under the

    Consolidated Edison Plan ............................................................................................... 474

    15.5.4.1.1 Commitment Requirements for Restoration Services .............................. 474

    15.5.4.1.2 Generator Testing and Training Requirements ........................................ 476

    15.5.4.1.3 Payments to Generators for Providing Restoration Services Under the

    Consolidated Edison Plan ........................................................................................... 476

    15.5.4.1.3.1 Standard Compensation .......................................................................... 476

    ......................................................................................................................................... 477

    15.5.4.1.3.2 Unit-Specific Compensation ................................................................... 479

    15.5.4.1.3.3 Eligibility for Additional Cost Recovery ................................................ 480

    15.5.4.1.3.4 Forfeiture of Payments As a Result of Failed Black Start Capability Tests

    481

    15.5.4.2 Charges to Support Payments to Generators Under the Consolidated Edison

    Plan 481

    Rate Schedule 5. Appendix I Restoration Services Certification Form ................................. 483

    15.6 Rate Schedule 6 - Quick Start Reserves ..................................................................... 484

    15.6.1 Qualification to Provide Quick Start Reserves ..................................................... 484

    15.6.2 Purchase and Selection of Quick Start Reserves and Associated Duties.............. 485

    15.6.3 Duty to Produce Energy ........................................................................................ 488

    15.6.4 Failure to Achieve Timely Synchronization ......................................................... 488

  • 15.6.5 Payments to Suppliers; Payments by Load Serving Entities ................................ 489

    15.6.6 Dispute Resolution ................................................................................................ 490

    15.7 Rate Schedule 7 - Charges for Intermittent Power Resource Forecasting Services ... 492

    15.7.1 Responsibilities ..................................................................................................... 492

    15.7.2 Charges ................................................................................................................. 492

    15.8 Rate Schedule 8 – Payments to RMR Generators ................................................. 493

    15.8.1 Payment to an RMR Generator Providing Service Pursuant to an RMR Agreement with an Availability and Performance Rate ............................................... 493

    15.8.2 Performance Incentive Payment ....................................................................... 494

    15.8.3 Availability Incentive Payment .......................................................................... 495

    15.8.4 Limitation on Total Penalties, Sanctions and Deficiency Charges Assessed to

    RMR Generators Providing Service Pursuant to an RMR Agreement with an

    Availability and Performance Rate ................................................................................. 497

    15.8.5 Payment to an RMR Generator Providing Service Pursuant to an RMR Agreement with a Rate Other Than an Availability and Performance Rate .............. 498

    15.8.6 Payment to an Interim Service Provider .......................................................... 498

    15.8.7 Recovery of Capital Expenditures or Above Market Rates from Former RMR

    Generators, Former Interim Service Providers and Generators Returning from ICAP

    Ineligible Forced Outages................................................................................................. 501

    15.8.7.1 Recovery of Capital Expenditures from Former RMR Generators, Former

    Interim Service Providers and Generators Returning from ICAP Ineligible Forced

    Outages 502

    15.8.7.2 Recovery of Above Market Revenues from Former RMR Generators ......... 506

    15.9 Rate Schedule 9 – Reserved for future use ................................................................. 508

    15.10 Rate Schedule 10 - Charges for Market Participants utilizing a Meter Services Entity in

    the ISO Wholesale markets ..................................................................................................... 509

    15.10.1 Responsibilities ................................................................................................. 510

    15.10.2 Charges .............................................................................................................. 510

    16 Attachment A - Form Of Service Agreement For New York ISO Market Administration and

    Control Area Services Tariff ....................................................................................................... 511

    17 Attachment B ...................................................................................................................... 515

    17.1 LBMP Calculation ...................................................................................................... 516

    17.1.1 LBMP Bus Calculation Method............................................................................ 517

    17.1.1.1 Determining Shift Factors and Incremental System Losses .......................... 518

    17.1.1.1.1 Determining Expected Unscheduled Power Flows ....................................... 519

    17.1.1.1.2 Determining Expected Power Flows Resulting from NYISO Interchange

    Schedules 519

    17.1.1.1.3 Scheduled Lines and Chateauguay Interconnection with Hydro Quebec ..... 521

    17.1.2 Real-Time LBMP Calculation Procedures ........................................................... 521

    17.1.2.1 General Procedures ........................................................................................ 521

    17.1.2.1.1 Overview ....................................................................................................... 521

    17.1.2.1.2 Description of the Real-Time Dispatch Process ............................................ 523

    17.1.2.1.2.1 The First Pass ............................................................................................. 523

    17.1.2.1.2.1.1 Upper and Lower Dispatch Limits for Dispatchable Resources Other Than

    Intermittent Power Resources That Depend on Wind as Their Fuel .............................. 524

  • 17.1.2.1.2.1.2 Upper and Lower Dispatch Limits for Intermittent Power Resources That

    Depend on Wind as Their Fuel ....................................................................................... 525

    17.1.2.1.2.1.3. Setting Physical Basepoints for Fixed Generators .................................. 525

    17.1.2.1.2.2 The Second Pass ........................................................................................ 526

    17.1.2.1.2.2.1 Upper and Lower Dispatch Limits for Dispatchable Resources Other Than

    Intermittent Power Resources That Depend on Wind as Their Fuel .............................. 527

    17.1.2.1.2.2.2 Upper and Lower Dispatch Limits for Intermittent Power Resources That

    Depend on Wind as Their Fuel ....................................................................................... 528

    17.1.2.1.2.3 The Third Pass ........................................................................................... 528

    17.1.2.1.3 Variations in RTD-CAM ............................................................................... 528

    17.1.2.1.4 The Real-Time Commitment (“RTC”) Process and Automated Mitigation . 529

    17.1.3 Day-Ahead LBMP Calculation Procedures .......................................................... 530

    17.1.4 Determination of Transmission Shortage Cost ..................................................... 533

    17.1.5 Zonal LBMP Calculation Method ........................................................................ 535

    17.1.6 Real Time LBMP Calculation Methods for Proxy Generator Buses, Non-

    Competitive Proxy Generator Buses and Proxy Generator Buses Associated with

    Designated Scheduled Lines ............................................................................................... 537

    17.1.6.1 Definitions ..................................................................................................... 537

    17.1.6.2 General Rules ................................................................................................ 537

    17.1.6.2.1 Pricing rules for Dynamically Scheduled Proxy Generator Buses ................ 538

    17.1.6.2.2 Pricing rules for Variably Scheduled Proxy Generator Buses ...................... 538

    17.1.6.2.3 Pricing rules for Proxy Generator Buses that are not Dynamically Scheduled

    or Variably Scheduled..................................................................................................... 539

    17.1.6.3 Rules for Non-Competitive Proxy Generator Buses and Associated Interfaces

    539

    17.1.6.3.1 Pricing rules for Non-Competitive, Dynamically Scheduled Proxy Generator

    Buses 539

    17.1.6.3.2 Pricing rules for Non-Competitive, Variably Scheduled Proxy Generator

    Buses 539

    17.1.6.3.3 Pricing rules for Non-Competitive Proxy Generator Buses that are not

    Dynamically Scheduled or Variably Scheduled Proxy Generator Buses ....................... 540

    17.1.6.4 Special Pricing Rules for Proxy Generator Buses Associated with Designated

    Scheduled Lines .............................................................................................................. 541

    17.1.6.4.1 Pricing rules for Dynamically Scheduled Proxy Generator Buses that are

    associated with Designated Scheduled Lines ................................................................. 541

    17.1.6.4.2 Pricing rules for Variably Scheduled Proxy Generator Buses that are

    associated with Designated Scheduled Lines ................................................................. 541

    17.1.6.4.3 Pricing rules for Proxy Generator Buses that are associated with Designated

    Scheduled Lines that are not Dynamically Scheduled or Variably Scheduled Proxy

    Generator Buses .............................................................................................................. 542

    17.1.6.5 Method of Calculating Marginal Loss and Congestion Components of Real-

    Time LBMP at Non-Competitive Proxy Generator Buses and Proxy Generator Buses that

    are Subject to the Special Pricing Rule for Designated Scheduled Lines ....................... 543

    17.2 Accounting For Transmission Losses ......................................................................... 544

    17.2.1 Charges ................................................................................................................. 544

    17.2.1.1 Loss Model .................................................................................................... 544

  • 17.2.1.2 Residual Loss Payment .................................................................................. 544

    17.2.2 Computation of Residual Loss Payments ............................................................. 544

    17.2.2.1 Marginal Losses Component LBMP ............................................................. 544

    17.2.2.1.1 Marginal Losses Component Day-Ahead ..................................................... 545

    17.2.2.1.2 Marginal Losses Component Real -Time ...................................................... 545

    17.2.2.2 Payments and Charges ................................................................................... 545

    17.2.2.3 Day-Ahead Payments and Charges ............................................................... 545

    17.2.2.4 Real-Time Payments and Charges ................................................................. 546

    17.3 Bilateral Transaction Bidding, Transmission Service, Schedules and Curtailment ... 548

    17.4 Sale and Award Of Transmission Congestion Contracts ("TCCs") ........................... 549

    17.5 Congestion Settlements Related To the Day-Ahead Market and TCC Auction

    Settlements .............................................................................................................................. 550

    18 Attachment C -Formulas For Determining Bid Production Cost Guarantee Payments ..... 551

    18.1 Introduction ................................................................................................................. 552

    18.2 Day-Ahead BPCG For Generators .............................................................................. 553

    18.2.1 Eligibility to Receive a Day-Ahead BPCG for Generators .................................. 553

    18.2.1.1 Eligibility. ...................................................................................................... 553

    18.2.1.2 Non-Eligibility (includes both partial and complete exclusions). ................. 553

    18.2.2 Formulas for Determining Day-Ahead BPCG for Generators ............................. 553

    18.2.2.1 Applicable Formula. A Supplier’s BPCG for Generator “g” shall be as

    follows: 553

    18.2.2.2 Variable Definitions. The terms used in this Section 18.2.2 shall be defined as

    follows: 554

    18.3 Day-Ahead BPCG For Imports ................................................................................... 556

    18.3.1 Eligibility to Receive a Day-Ahead BPCG for Imports........................................ 556

    18.3.2 BPCG Calculated by Transaction ID .................................................................... 556

    18.3.3 Formula for Determining Day-Ahead BPCG for Imports .................................... 556

    18.4 Real-Time BPCG For Generators In RTD Intervals Other Than Supplemental Event

    Intervals................................................................................................................................... 557

    18.4.1 Eligibility for Receiving Real-Time BPCG for Generators in RTD Intervals Other

    Than Supplemental Event Intervals .................................................................................... 557

    18.4.1.1 Eligibility. ...................................................................................................... 557

    18.4.1.2 Non-Eligibility (includes both partial and complete exclusions). ................. 557

    18.4.2 Formula for Determining Real-Time BPCG for Generators in RTD Intervals Other

    Than Supplemental Event Intervals .................................................................................... 558

    18.4.3 Bids Used For Intervals at the End of the Hour .................................................... 563

    18.5.1 Eligibility for BPCG for Generators in Supplemental Event Intervals ................. 564

    18.5.1.1 Eligibility ....................................................................................................... 564

    18.5.1.2 Non-Eligibility (includes both partial and complete exclusions) .................. 564

    18.5.1.3 Additional Eligibility ..................................................................................... 564

    18.5.2 Formula for Determining BPCG for Generators in Supplemental Event Intervals

    565

    18.7. BPCG for Long Start-Up Time Generators Whose Starts are Aborted by the ISO Prior

    to their dispatch ....................................................................................................................... 568

    18.7.1 Eligibility for BPCG for Long Start-Up Time Generators Whose Starts Are

    Aborted by the ISO Prior to their Dispatch ........................................................................ 568

  • 18.7.2 Methodology for Determining BPCG for Long Start-Up Time Generators Whose

    Starts are Aborted by the ISO Prior to their Dispatch ........................................................ 568

    18.8 BPCG For Demand Reduction In The Day-Ahead Market ........................................ 569

    18.8.1 Eligibility for BPCG for Demand Reduction in the Day-Ahead Market .............. 569

    18.8.2 Formula for Determining BPCG for Demand Reduction in the Day-Ahead Market

    569

    18.9 BPCG For Special Case Resources............................................................................. 571

    18.9.1 Eligibility for Special Case Resources BPCG ...................................................... 571

    18.9.2 Methodology for Determining Special Case Resources BPCG ............................ 571

    18.10 BPCG For Demand Side Resources Providing Synchronized Operating Reserves and /

    or Regulation Service In The Day-Ahead Market .................................................................. 572

    18.10.1 Eligibility for BPCG for Demand Side Resources Providing Synchronized

    Operating Reserves and / or Regulation Service in the Day-Ahead Market ...................... 572

    18.10.2 Formula for Determining BPCG for Demand Side Resources Providing

    Synchronized Operating Reserves and / or Regulation Service in the Day-Ahead Market 572

    18.11 BPCG For Demand Side Resources Providing Synchronized Operating Reserves and /

    or Regulation Service In The Real-Time Market ................................................................... 573

    18.11.1 Eligibility for BPCG for Demand Side Resources Providing Synchronized

    Operating Reserves and / or Regulation Service in the Real-Time Market ........................ 573

    18.11.2 Formula for Determining BPCG for Demand Side Resources Providing

    Synchronized Operating Reserves and / or Regulation Service in the Real-Time Market . 573

    18.12 Proration Of Start-Up Bid For Generators That Are Committed In The Day-Ahead

    Market, Or Via Supplemental Resource Evaluation ............................................................... 575

    18.12.1 Eligibility to Recover Operating Costs and Resulting Obligations .................. 575

    18.12.2 Proration of Eligible Start-Up Cost when a Generator Is Not Scheduled, or Does

    Not Operate to Meet the Schedule Specified in the Accepted Day-Ahead or SRE Start-Up

    Bid. 576

    18.12.2.1 Total Energy Required to be Provided in Order to Avoid Proration of a

    Generator’s Start-Up Costs ............................................................................................. 576

    18.12.2.2 Calculation of Prorated Start-Up Cost ........................................................... 577

    18.12.2.3 Additional Rules/Clarifications that Apply to the Calculation of Prorated Start-

    Up Cost 577

    19 Attachment D – This Section is reserved for future use ..................................................... 579

    20 Attachment E - Procedures for Reserving and Correcting Erroneous Energy and Ancillary

    Services Prices ............................................................................................................................ 580

    20.1 Market Clearing Price Errors Requiring Correction ................................................... 581

    20.1.1 Calculation Errors ................................................................................................. 581

    20.1.2 Errors in Selecting the Price-Setting Resource ..................................................... 581

    20.2 Methodology for Correcting Prices ............................................................................ 582

    20.3 Deadlines for Price Corrections .................................................................................. 583

    20.4 Reporting Requirements ............................................................................................. 584

    20.5 Liability ....................................................................................................................... 585

    21 Attachment F - Bid Restrictions ......................................................................................... 586

    21.1 Definitions................................................................................................................... 587

    21.2 Supremacy of Attachment F ....................................................................................... 588

    21.3 [This Section is Reserved for Future Use] .................................................................. 589

  • 21.4 Establishment of Bid Restrictions ............................................................................... 590

    21.4.1 Incremental Energy Bids and Minimum Generation Bids .................................... 590

    21.4.2 Bids to Import or to Export Energy ...................................................................... 591

    21.4.3 Bids to Schedule Wheels Through the NYCA ..................................................... 591

    21.4.4 CTS Interface Bids ................................................................................................ 592

    21.4.5 Virtual Load Bids and Virtual Supply Bids .......................................................... 592

    21.4.6 Price Cap Load Bids ............................................................................................. 592

    21.5 Applicability of Bid Restrictions ................................................................................ 593

    22 Attachment G - Emergency Demand Response Program ................................................... 594

    22.1 Effective Date ............................................................................................................. 594

    22.2 Qualification Requirements For Curtailment Services Providers ............................... 594

    22.3 Relationship Of The Emergency Demand Response Program To Other Demand Side

    Response Measures ................................................................................................................. 594

    22.4 Prohibition On The Double Subscription Of Load ..................................................... 595

    22.5 ISO Deployment Of The Emergency Demand Response Program ............................ 595

    22.6 Notification To Curtailment Service Providers .......................................................... 595

    22.7 Voluntariness Of Emergency Demand Response Program ........................................ 596

    22.8 Metering ...................................................................................................................... 596

    22.9 Verification ................................................................................................................. 596

    22.10 Payment .................................................................................................................... 597

    22.10.1 Curtailment Service Provider Eligibility Requirements for Payment ............... 597

    22.10.2 Payment for Program Deployment .................................................................... 597

    22.10.2.1 Program deployment lasting two hours or fewer ........................................... 597

    22.10.2.2. Program deployment lasting between two and three hours ........................... 598

    22.10.2.3 Program deployment exceeding three hours ................................................. 598

    22.11 Cost Allocation ........................................................................................................... 598

    23 Attachment H - ISO Market Power Mitigation Measures .................................................. 600

    23.1. Purpose and Objectives ............................................................................................... 601

    23.2 Conduct Warranting Mitigation .................................................................................. 603

    23.2.1 Definitions............................................................................................................. 603

    23.2.2 Conduct Subject to Mitigation .............................................................................. 611

    23.2.3 Conditions for the Imposition of Mitigation Measures ........................................ 611

    23.2.4 Categories of Conduct that May Warrant Mitigation ........................................... 612

    23.3 Criteria for Imposing Mitigation Measures ................................................................ 615

    23.3.1 Identification of Conduct Inconsistent with Competition ..................................... 615

    23.3.1.1 Thresholds for Identifying Physical Withholding ......................................... 615

    23.3.1.2 Thresholds for Identifying Economic Withholding ....................................... 617

    23.3.1.3 Thresholds for Identifying Uneconomic Production and Uneconomic

    Withdrawal of Energy ..................................................................................................... 625

    23.3.1.4 Reference Levels ........................................................................................... 627

    23.3.2 Material Price Effects or Changes in Guarantee Payments .................................. 649

    23.3.2.1 Market Impact Thresholds ............................................................................. 649

    23.3.2.2 Price Impact Analysis .................................................................................... 650

    23.3.2.3 Section 205 Filings ........................................................................................ 651

    23.3.3 Consultation with a Market Party ......................................................................... 652

    23.3.3.1 Consultation Process...................................................................................... 652

  • 23.3.3.2 Consultation Requirements............................................................................ 654

    23.3.3.3 Consultation Rules for Real-Time Guarantee Payment Mitigation ............... 655

    23.3.3.3.1 Real-Time Guarantee Payment Consultation Process ................................... 655

    23.3.3.3.2 Revising Reference Levels of Certain Generators Committed Out-of-Merit or

    via Supplemental Resource Evaluation for Conducting Real-Time Guarantee Payment

    Conduct and Impact Tests and Applying Mitigation in Accordance with Section

    23.3.1.2.3 of these Mitigation Measures ......................................................................... 662

    23.4 Mitigation Measures ................................................................................................... 665

    23.4.