NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 1
December 2013
NEW YORK GATEWAY CONNECTIONS IMPROVEMENT
PROJECT TO THE US PEACE BRIDGE PLAZA
December 18, 2013
Connecticut Street Armory, Buffalo, NY
Public Hearing
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 2
December 2013
NEW YORK GATEWAY CONNECTIONS IMPROVEMENT
PROJECT TO THE US PEACE BRIDGE PLAZA
December 18, 2013
Connecticut Street Armory, Buffalo, NY
Public Hearing
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 3
December 2013
Technical Presentation
Purpose, Need, and Objectives
Planned Improvements
NEPA Process
Anticipated Benefits
Environmental Studies
Right-of-Way
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 4
December 2013
The purpose is to reduce the use of the local streets by interstate traffic
and provide access to the existing Plaza at its current location.
The primary need of the project is to address the limited direct
access between the Plaza and I-190
Purpose and Need
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 5
December 2013
Project Objectives
To address the need for direct access
from the Plaza to the northbound lanes
of Interstate 190.
To redirect through traffic from Front
Park, and to remove Baird Drive.
To replace the Porter Avenue Bridge
over I-190
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 6
December 2013
Major Project Improvements
Ramp D
Ramp PN
Shoreline Trail
New Bridge
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 7
December 2013
NEPA PROCESS SCOPING =
• Opportunity for public and agencies to
identify issues for consideration in the
DEIS
DEIS =
• Evaluates reasonable alternatives
• Assesses effects of the action
• Identifies preferred alternative
• Public Hearing
FEIS & ROD =
• Consideration of comments received on
DEIS
• Describes mitigation measures (as
necessary)
• Provides basis for decision
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 8
December 2013
NEPA PROCESS
Outcomes from Public and Agency Input:
1. Relocation of Shoreline Trail (Riverwalk)
Allows Expanded Waterfront Views of Niagara River and
Lake Erie
2. Replacement of Porter Avenue Bridge over I-190
Reduced Overall Construction Impacts on Public
3. Improvements to Security Around US Plaza
Construction of Perimeter Wall
4. Improvements to Traffic Incident Notification on I-190
New Variable Message Signs on Northbound I-190
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9
December 2013
NEPA PROCESS
Outcomes from Public and Agency Input:
5. Improved Porter Avenue Access to LaSalle Park
Share-Use Path Along South Side of Porter Ave
6. Improved Driver Directions for Exiting US Plaza
New Signage Directing Exiting Vehicles
7. Improved Vehicle and Pedestrian Access within Front Park
Relocated Driveway and Paths
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 10
December 2013
NEPA PROCESS
DEIS PHASE – Public and Agency Review
1. DEIS is Available for Public Review at:
Buffalo and Erie County Public Library’s Niagara Branch and
Central, or Downtown Buffalo, Library
NYS Dept of Transportation’s Region 5 Offices at 100
Seneca Street in Buffalo
Online at https://www.dot.ny.gov/nygateway
During today’s Public Hearing at the Written Comment Table
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 11
December 2013
NEPA PROCESS
DEIS PHASE – Public and Agency Review
1. DEIS Comment Period:
Verbal comments received today
Written comments accepted through January 13, 2014 either by E-Mail or by US Mail
2. Comment Responses:
Comments received will be considered and responses will be
documented in the Final EIS
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 12
December 2013
Benefits of Removing Baird Drive
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 13
December 2013
Benefits of Removing Baird Drive
4.5 Acres
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 14
December 2013
Benefits of Building Ramp D
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 15
December 2013
Benefits of Improved Ped/Bike Facilities
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 16
December 2013
Benefits of Replacing Porter Avenue Bridge
Narrow Lanes
and Shoulder
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 17
December 2013
Benefits of Relocation of the Shoreline Trail (Riverwalk)
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 18
December 2013
Environmental Studies
Coastal Zone Consistency
Determination
Stormwater Management
Social Effects
Historic Properties
Archaeological Resources
Parks and Recreation Areas
Visual Resources
Air Quality
Energy and Greenhouse Gas Emissions
Noise
Hazardous Waste and Contaminated
Materials
Construction Effects
Indirect and Secondary Effects
Cumulative Effects
Environmental studies included:
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 19
December 2013
Environmental Studies and Results
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 20
December 2013
No residential or commercial
relocations required
3 Public Agencies
CSX Railroad
1 Private Owner
Right-of-Way
Porter Ave. Fourth Street.
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 21
December 2013
Right-of-Way
• Contact each affected property owner
• Deliver a copy of the acquisition map
• Explain the project and the effect that it will have on the property
• Provide a preliminary time table and information regarding the
Department's acquisition process
• Order an appraisal
• Inspection of the property
• Appraisal reports
• Direct damages
• Indirect damages
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 22
December 2013
Right-of-Way
• Temporary easement
• One-offer system
• Full offer of compensation
• Filing a map and notice of appropriation
• Agreement is signed
• Uniform Relocation Assistance and Real Property Acquisition Policies
Act of 1970
• If you must move... We can help
• Just compensation
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 23
December 2013
NEW YORK GATEWAY CONNECTIONS IMPROVEMENT
PROJECT TO THE US PEACE BRIDGE PLAZA
Visit us at: www.dot.ny.gov/nygateway
Email: [email protected]
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 24
December 2013
NEW YORK GATEWAY CONNECTIONS IMPROVEMENT
PROJECT TO THE US PEACE BRIDGE PLAZA
Thank You
NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 25
December 2013
NEW YORK GATEWAY CONNECTIONS IMPROVEMENT
PROJECT TO THE US PEACE BRIDGE PLAZA
December 18, 2013
Connecticut Street Armory, Buffalo, NY
Public Hearing