NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 1 December 2013 NEW YORK GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA December 18, 2013 Connecticut Street Armory, Buffalo, NY Public Hearing

Transcript of NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS...

Page 1: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 1

December 2013

NEW YORK GATEWAY CONNECTIONS IMPROVEMENT

PROJECT TO THE US PEACE BRIDGE PLAZA

December 18, 2013

Connecticut Street Armory, Buffalo, NY

Public Hearing

Page 2: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 2

December 2013

NEW YORK GATEWAY CONNECTIONS IMPROVEMENT

PROJECT TO THE US PEACE BRIDGE PLAZA

December 18, 2013

Connecticut Street Armory, Buffalo, NY

Public Hearing

Page 3: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 3

December 2013

Technical Presentation

Purpose, Need, and Objectives

Planned Improvements

NEPA Process

Anticipated Benefits

Environmental Studies

Right-of-Way

Page 4: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 4

December 2013

The purpose is to reduce the use of the local streets by interstate traffic

and provide access to the existing Plaza at its current location.

The primary need of the project is to address the limited direct

access between the Plaza and I-190

Purpose and Need

Page 5: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 5

December 2013

Project Objectives

To address the need for direct access

from the Plaza to the northbound lanes

of Interstate 190.

To redirect through traffic from Front

Park, and to remove Baird Drive.

To replace the Porter Avenue Bridge

over I-190

Page 6: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 6

December 2013

Major Project Improvements

Ramp D

Ramp PN

Shoreline Trail

New Bridge

Page 7: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 7

December 2013

NEPA PROCESS SCOPING =

• Opportunity for public and agencies to

identify issues for consideration in the

DEIS

DEIS =

• Evaluates reasonable alternatives

• Assesses effects of the action

• Identifies preferred alternative

• Public Hearing

FEIS & ROD =

• Consideration of comments received on

DEIS

• Describes mitigation measures (as

necessary)

• Provides basis for decision

Page 8: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 8

December 2013

NEPA PROCESS

Outcomes from Public and Agency Input:

1. Relocation of Shoreline Trail (Riverwalk)

Allows Expanded Waterfront Views of Niagara River and

Lake Erie

2. Replacement of Porter Avenue Bridge over I-190

Reduced Overall Construction Impacts on Public

3. Improvements to Security Around US Plaza

Construction of Perimeter Wall

4. Improvements to Traffic Incident Notification on I-190

New Variable Message Signs on Northbound I-190

Page 9: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9

December 2013

NEPA PROCESS

Outcomes from Public and Agency Input:

5. Improved Porter Avenue Access to LaSalle Park

Share-Use Path Along South Side of Porter Ave

6. Improved Driver Directions for Exiting US Plaza

New Signage Directing Exiting Vehicles

7. Improved Vehicle and Pedestrian Access within Front Park

Relocated Driveway and Paths

Page 10: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 10

December 2013

NEPA PROCESS

DEIS PHASE – Public and Agency Review

1. DEIS is Available for Public Review at:

Buffalo and Erie County Public Library’s Niagara Branch and

Central, or Downtown Buffalo, Library

NYS Dept of Transportation’s Region 5 Offices at 100

Seneca Street in Buffalo

Online at https://www.dot.ny.gov/nygateway

During today’s Public Hearing at the Written Comment Table

Page 11: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 11

December 2013

NEPA PROCESS

DEIS PHASE – Public and Agency Review

1. DEIS Comment Period:

Verbal comments received today

Written comments accepted through January 13, 2014 either by E-Mail or by US Mail

2. Comment Responses:

Comments received will be considered and responses will be

documented in the Final EIS

Page 12: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 12

December 2013

Benefits of Removing Baird Drive

Page 13: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 13

December 2013

Benefits of Removing Baird Drive

4.5 Acres

Page 14: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 14

December 2013

Benefits of Building Ramp D

Page 15: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 15

December 2013

Benefits of Improved Ped/Bike Facilities

Page 16: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 16

December 2013

Benefits of Replacing Porter Avenue Bridge

Narrow Lanes

and Shoulder

Page 17: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 17

December 2013

Benefits of Relocation of the Shoreline Trail (Riverwalk)

Page 18: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 18

December 2013

Environmental Studies

Coastal Zone Consistency

Determination

Stormwater Management

Social Effects

Historic Properties

Archaeological Resources

Parks and Recreation Areas

Visual Resources

Air Quality

Energy and Greenhouse Gas Emissions

Noise

Hazardous Waste and Contaminated

Materials

Construction Effects

Indirect and Secondary Effects

Cumulative Effects

Environmental studies included:

Page 19: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 19

December 2013

Environmental Studies and Results

Page 20: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 20

December 2013

No residential or commercial

relocations required

3 Public Agencies

CSX Railroad

1 Private Owner

Right-of-Way

Porter Ave. Fourth Street.

Page 21: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 21

December 2013

Right-of-Way

• Contact each affected property owner

• Deliver a copy of the acquisition map

• Explain the project and the effect that it will have on the property

• Provide a preliminary time table and information regarding the

Department's acquisition process

• Order an appraisal

• Inspection of the property

• Appraisal reports

• Direct damages

• Indirect damages

Page 22: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 22

December 2013

Right-of-Way

• Temporary easement

• One-offer system

• Full offer of compensation

• Filing a map and notice of appropriation

• Agreement is signed

• Uniform Relocation Assistance and Real Property Acquisition Policies

Act of 1970

• If you must move... We can help

• Just compensation

Page 23: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 23

December 2013

NEW YORK GATEWAY CONNECTIONS IMPROVEMENT

PROJECT TO THE US PEACE BRIDGE PLAZA

Visit us at: www.dot.ny.gov/nygateway

Email: [email protected]

Page 24: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 24

December 2013

NEW YORK GATEWAY CONNECTIONS IMPROVEMENT

PROJECT TO THE US PEACE BRIDGE PLAZA

Thank You

Page 25: NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE … · 2013-12-20 · NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 9 December 2013 NEPA PROCESS Outcomes

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA 25

December 2013

NEW YORK GATEWAY CONNECTIONS IMPROVEMENT

PROJECT TO THE US PEACE BRIDGE PLAZA

December 18, 2013

Connecticut Street Armory, Buffalo, NY

Public Hearing