NXTCore ARINC801 Fiber Optic Terminus
Transcript of NXTCore ARINC801 Fiber Optic Terminus
NXTCore FOTP001 Rev 01 1/28/2012
NXTCore ARINC801 Fiber Optic Terminus Qualification Test Plan
1. Scope 1 Scope To define the test samples, test sequence and test methods used to validate the optical performance of NXTCon ARINC 801 fiber optic terminus. It is understood that the standard optical channel performance is governed by the optical terminus in conjunction with the connector and cable options. Optical performance has been generally governed by the performance criteria outlined in the ARINC Specification 801-2; Fiber Optic Connectors. NXTCon has utilized outside testing facilities certified by to ISO/IEC-17025:2005, Mil-STD-790 and ITL FOC to ensure the independent and quality nature of all data presented. Termini were installed onto cables and into connectors by a ISO9001/2008 supplier prior to submittal to the testing organization. 2 Order of Precedence 2. Order of Precedence In case of a conflict between the text of this document and the applicable referenced documents, the text of this document shall take precedence. of Test Articles 3. Description of Test Articles Item Part Number Qty Description 1 TA-1260-S-P 98 Optical terminus, loose structure 2 N/A 12 Cable assembly, Item 1 to Item 1, 62.5/125 multi-mode fiber,
1.8mm to 2.0mm diameter, 4 meters in length, -55ºC to 125ºC minimum rating, loose structure (Fiber: Carlisle P/N NFO(EP)-125-1) supplied pre-conditioned
3 N/A 25 Cable assembly, Item 1 to Item 1, 62.5/125 multi-mode fiber, 1.8mm to 2.0mm diameter, 4 meters in length, standard temperature rating, loose structure with Aramid strength member (Fiber: OFS)
4 N/A 1 Cable assembly, Item 9 to Item 9, 62.5/125 multi-mode fiber, 1.8mm to 2.0mm diameter, 4 meters in length, standard temperature rating, loose structure with Arimid strength member (Fiber: OFS)
5 N/A 4 Cable assembly, Item 1 to Item 1, 9/125 single-mode fiber, 1.8mm to 2.0mm diameter, bend insensitive, 4 meters in length, -55ºC to 125ºC minimum rating, semi-loose structure (Fiber: Carlisle P/N NFO(EP)-125-5B) supplied pre-conditioned
6 N/A 8 Cable assembly, Item 1 to Item 1, 9/125 single-mode fiber, 1.8mm to 2.0mm diameter, 4 meters in length, standard temperature rating, loose structure with Arimid strength member (Fiber: TBD by cable assembly supplier)
7 N/A 36 Patch cord, 900 μm, FC UPC to FC UPC, 62.5/125 multimode fiber, 4 meters in length
8 N/A 12 Patch cord, 900 μm, FC APC to FC APC, 9/125 single-mode fiber, 4 meters in length
9 N/A 2 Optical terminus, 801-conforming, Radial P/N F725 003 419
Termini intended for multimode cables with loose structure and termini intended for single-mode cables with loose structure, shall be installed in ARINC801 capable connectors. The termini and connectors are intended for continuous operation at any temperature between -55ºC and 125ºC. Fiber optic termini supplied are certified to be of production source and quality.
NXTCore FOTP001 Rev 01 1/28/2012
Cable/Terminus assembly and crimping of the crimp sleeve shall be performed by an outside source cable assembly supplier using standard termination methods per the applicable ARINC documents. Fiber optic cable, supplied to the cable assembly supplier will be pre-conditioned for 5 cycles, -55°C to 135°C with a 5 minute ramp time between temperature extremes and each temperature plateau stabilized for at least 30 minutes. The cable assembly supplier will affix a unique label to each cable assembly to ensure performance and end face traceability throughout the entire test regimen. The cable assembly supplier will complete and record end face geometry per Telcordia Core GR-326 and per TIA/EIA-568-C.3. These measurements shall be made using a calibrated interferometer. The cable assembly supplier shall perform and record initial attenuation and return loss testing on all cable assemblies. All necessary test fixtures will be supplied by the selected independent testing laboratory. The test connectors shall be populated according to the following table:
Connector Variant Multimode position Single-mode position
Connector 1 A1, A3 --- Connector 2 A1, A2, A4, A5 --- Connector 3 A1, A5 A2, A4 Connector 4 A1, A2, A6, A7 A3, A5
Note: Item 4 containing the Radial terminus shall be populated into connector according to the above table and considered part of Group D. This will be considered for intermate performance. 4. Guide Pins When using NXTcon optical termini within ARINC801 connector systems all mating conditions are to be tested with standard ARINC801 specification guidance features installed into connectors. 5. Test Sequence The test plan is divided into four (4) groups of test sequences. Groups A, B and C shall each be comprised of four mated, fully populated connector pairs and each group will consist of 16 optical channels or 32 total termini. Group D shall be comprised of one mated, fully populated connector pair and will consist of 2 optical channels or 4 total termini. Each pair of connectors shall go through the listed tests in the order specified. The test sequence is given in the table on the following page. Test Procedure Group A
Environmental Group B Mechanical Environment
Group C Mechanical Usage
Group D Intermate
Attenuation and splicing X X X X
Return loss X X X Thermal cycling X Humidity X Temperature life X Salt spray X Thermal shock X Vibration X Mechanical shock X
Maintenance aging X
Mating durability X Cable Pull-out X Termini retention force X
Return loss X X X X
NXTCore FOTP001 Rev 01 1/28/2012
6. Test Procuredures All electrical configuration specifications, tests or electrical failure criteria associated with the following referenced test specifications are not applicable for the following tests. 6.1 Optical All the following optical performance tests shall be performed at a nominal wavelength of 1300 nm for multimode and 1550 nm for single-mode. Multimode tests shall use overfill launch conditions as defined in TIA-455-54B (FOTP-54) or IEC 60793-1-40 (TIA-455-78B (FOTP-78)), paragraph A.1.3. 6.1.1 Attenuation Requirements: Test in accordance with TIA-455-171A (FOTP-171), Method D1 (multimode) and D3 (single-mode). Criteria: Fiber optic connector assemblies shall have a maximum attenuation of 0.3 dB for multimode connections. For all single-mode connections, measure and record only. No failure criterion exists for single-mode connections. 6.1.2 Return Loss Requirements: Test as specified in paragraph 2.4.3.2 of ARINC Specification 801-2 and in accordance with TIA/EIA-455-107A (FOTP-107). Return loss should be a minimum of 20 dB for multimode PC polish termini and 30 dB for single-mode PC polish termini. Criteria: Measure and record return loss measurements. 6.1.3 Change in Transmittance (CIT) Requirements: Where tests specify a CIT measurement, CIT should be measured in accordance with TIA-455-20B (FOTP-20), Method A. Launch conditions for CIT measurements should be an Equilibrium Modal Distribution profile. Measurements shall be recorded before, during, and after the test, unless otherwise specified. The measurement made during a test need not be continuous, unless otherwise specified, but should be made at the extremities of the test conditions. Criteria: Unless otherwise specified in this test plan, the CIT for any test should not exceed 0.5 dB for multimode connections. For all single-mode connections, measure and record only. No failure criterion exists for single-mode connections. 6.2 Environmental Category 6.2.1 Thermal Cycling Requirements: Test as specified in ANSI/TIA-455-3B (FOTP-3) with the following procedure and criteria, which is based from paragraph 2.4.4.1 of ARINC Specification 801-2 with exceptions. Procedure: Connectors shall be tested using Test Condition D, 10 cycles, with Step 1 set at -55°C ±2°C and Step 2 set at 125°C ±2°C. Both of these temperature plateau intervals shall not be less than 30 minutes. The rate of the environmental chamber air temperature change, between the minimum and maximum temperature
NXTCore FOTP001 Rev 01 1/28/2012
extremes, shall be between 50 and 70 minutes. No stabilization is necessary for Step 3 as it is the indicator of the start/end of each cycle. At the completion of the last cycle, the connector assemblies shall be returned to 23ºC ±5°C and there shall be no damage detrimental to operation of the assembly after being subjected to the temperature extremes. The CIT measurements shall be taken continuously throughout and at 23ºC ±5°C at the end of the test. The frequency of CIT measurements taken throughout the test will be up to the discretion of the testing laboratory, although an absolute minimum frequency of CIT measurements taken every 5 minutes will be herein required. Stabilization shall be considered achieved at least 30 minutes after the start of each plateau interval. Criteria: Fiber optic connector assemblies shall pass the CIT test as stated in 6.1.3 of this test plan and a visual inspection in accordance with the requirements of TIA-455-13A (FOTP-13). 6.2.2 Humidity Requirements: Test as specified in paragraph 4.5.15 of MIL-DTL-24308G and in accordance with EIA-364-31B, Method IV (-10ºC to +65ºC, 10 cycles, 240 hours). Optional cold shock required. Connectors are to remain in a mated condition throughout the test using the provided jackscrew hardware system. Panel mounting not required. Procedure: The CIT measurements shall be taken upon stabilization at every temperature plateau and at 25ºC at the end of the test. Stabilization shall be considered achieved at least 30 minutes after the start of each plateau interval. Criteria: Fiber optic connector assemblies shall pass a CIT test. 6.2.3 Temperature Life: Requirements: Test as specified in TIA/EIA-455-4C (FOTP-4) with the following procedure and criteria, which is based from paragraph 2.4.4.2 of ARINC Specification 801-2 with exceptions. Procedure: The temperature exposure shall be 125ºC ± 2ºC for the duration of 1,000 hours. CIT measurements shall initially be recorded at 25ºC ±2°C, once every hour for the duration of the test and at the conclusion of testing upon return to 25ºC ±2°C. Cleaning of the termini is permitted prior to and post testing, but not during the test. Criteria: Fiber optic connector assemblies shall pass a CIT test and a visual examination using the failure criteria referenced in paragraph 5.9 of TIA/EIA-455-4C (FOTP-4). 6.2.4 Salt Spray: Requirements: Test as specified in paragraph 2.4.4.5 of ARINC Specification 801-2 the testing requirements of TIA-455-16A (FOTP-16), test condition C. Procedure: After exposure, a CIT test shall be performed. The connector assemblies shall then be thoroughly washed with tap water to remove all salt deposits and then shall be dried in a circulating air oven at a temperature of 38ºC ± 3ºC for a period of 12 hours. They shall then be visually examined for evidence of corrosion. Criteria: Fiber optic connector assemblies shall pass a CIT test and visual inspection. Mating and un-mating force testing is not required during final inspection of the connector assemblies. 6.2.5 Thermal Shock
NXTCore FOTP001 Rev 01 1/28/2012
Requirements: Test as specified in paragraph 4.5.13.1 of MIL-DTL-24308G and in accordance with EIA-364-32F with the exception that no plateau interval shall be less than 30 minutes. Procedure: Connectors shall be tested using Method A, Test Condition I, 5 cycles, unless otherwise specified. At the completion of the last cycle, the connector assemblies shall be returned to 25ºC and there shall be no damage detrimental to operation of the assembly after being subjected to the temperature extremes. The CIT measurements shall be taken continuously throughout and at 25°C at the end of the test. The frequency of CIT measurements taken throughout the test will be up to the discretion of the testing laboratory, although an absolute minimum frequency of CIT measurements taken every 5 minutes will be herein required. Stabilization shall be considered achieved at least 30 minutes after the start of each plateau interval. Criteria: No CIT failure criterion exists for this test; measure and record only. Visual inspection, using the failure criteria outlined in paragraph 4.6 of EIA-364-32F, is required. 6.3 Mechanical Environment 6.3.1 Mechanical Vibration Requirements: Test as specified in paragraph 4.5.13.1 of MIL-DTL-24308G and in accordance with EIA-364-32F with the exception that no plateau interval shall be less than 30 minutes. Procedure: Connectors shall be tested using Method A, Test Condition I, 5 cycles, unless otherwise specified. At the completion of the last cycle, the connector assemblies shall be returned to 25ºC and there shall be no damage detrimental to operation of the assembly after being subjected to the temperature extremes. The CIT measurements shall be taken continuously throughout and at 25°C at the end of the test. The frequency of CIT measurements taken throughout the test will be up to the discretion of the testing laboratory, although an absolute minimum frequency of CIT measurements taken every 5 minutes will be herein required. Stabilization shall be considered achieved at least 30 minutes after the start of each plateau interval. Criteria: No CIT failure criterion exists for this test; measure and record only. Visual inspection, using the failure criteria outlined in paragraph 4.6 of EIA-364-32F, is required. 6.3.2 Mechanical Shock Requirements: Phase 1: Test as specified in paragraph 4.5.16 of MIL-DTL-24308G and in accordance with EIA-364-28F, test condition IV. Phase 2: Test as specified in paragraph 4.5.16 of MIL-DTL-24308G and in accordance with EIA-364-28F, test condition IV with the following exception: The 20-minute cycle shall be performed two times in each of the three mutually perpendicular directions (total of six times), so that the motion shall be applied for a total period of approximately 2 hours. Procedure: Phase 1 & 2: Two separate tests consisting of Phase 1 & 2 are to be performed. The first test will consist of a test fixture with two mated pair test sample mounted. The second test will consist of a test fixture with a secondary mated pair test sample mounted. Connector pairs shall be held together by their locking mechanism. Phase 1: CIT shall be measured before and after the vibrations, and shall not be monitored during the vibration application when the discontinuity detector is in use.
NXTCore FOTP001 Rev 01 1/28/2012
Phase 2: The test laboratory is restricted to two simultaneous channels when monitoring for a 1μsec discontinuity. For this reason, it is necessary to only use two multi-mode channels, one from each connector test sample. Criteria: During phase 1 of the test, there shall be no optical discontinuities in excess of 50 microseconds and a change in power >0.5 dB. At the conclusion of phase 1, fiber optic connector assemblies shall pass a CIT test. In addition, the mated connectors shall not be damaged and there shall be no loosening of parts due to vibration. During phase 2 of the test, there shall be no optical discontinuities in excess of 1 microsecond and a change in power >1.0 dB. Failure of this phase of the test will not constitute a failure of the test samples. A CIT test and visual inspection are not required after phase 2. 6.4 Mechanical Use 6.4.1 Maintenance Aging Requirements: Test as specified in paragraph 2.4.5.7 of ARINC Specification 801-2 and in accordance with EIA-364-24B. Procedure: All termini shall be removed and reinstalled ten times using the appropriate insertion and removal tools. Criteria: The termini insertion force should be measured during the first and last cycles and should not exceed 36 N (8 pounds). 6.4.2 Mating Durability Requirements: Test as specified in paragraph 4.5.18 of MIL-DTL-24308G and in accordance with EIA-364-09C, which meets or exceeds the testing requirements of TIA-455-21A (FOTP-21). The following detail applies: a. Manual mating and un-mating of test samples, 500 cycles at a rate between 100 and 300 cycles per hour. b. (Salt spray requirement removed here due to its absence in ARINC 801-2 and 2008 test plan) Procedure: 500 cycles of engagement and separation shall be performed. A cycle shall be defined as the point at which optical termini are fully disengaged to a point at which the connectors are fully mated and termini are fully engaged. Connector shells are not required to be fully unmated. A CIT test shall be performed after every 100 cycles. Termini may be cleaned prior to each measurement. Criteria: Fiber optic connector assemblies shall pass CIT tests and at the conclusion of the test, the connectors, adapters and termini shall be inspected for visual damage using the failure criteria outlined in paragraph 4.6 of TIA-455-21A (FOTP-21). 6.4.3 Cable Pull-out Force Requirements: Test as specified in TIA-455-6B (FOTP-6) Method 1. Procedure: This test applies only to cables with 1.8mm to 2.1mm outer jacket diameter and reinforced with an Aramid strength member. Mount the test sample in a test fixture such that adequate support is provided. The test load shall be applied as follows with a rate of pull being 89N/min ±4N: Load 1: Apply 12 lb force at 0° for at least 5 seconds but no more than 10 seconds.
NXTCore FOTP001 Rev 01 1/28/2012
Criteria: For the procedure above, remove the load and after at least 10 seconds, measure and record the CIT. 6.4.4 Terminus Retention Force Requirements: Test as specified in paragraph 2.4.5.3 of ARINC Specification 801-2 and in accordance with EIA-364-38C, either Method A or B. Procedure: The test load shall be 12 lb force. Note: This test is intended to prove the integrity of the connector terminus retention feature and not to prove the attachment of the cable terminus. Criteria: All termini shall be retained with no damage to the termini, the connector inserts or to the retention mechanisms. 6.2.4 Salt
Test Datasheet Test Report by:Experior Laboratories, Inc.
1400 Fujikura FSM-17S
3/8/2014
1407 Fujikura CT-30 210941224 JGR BR5
1258 Hewlett Packard 81533B1102
Return Loss [dB] 20 for MM and 30 for SM 45 4/4
Insertion Loss [dB] 0.3 (for MM only)
Norman MetznerJZ/HR
JZ/HR
Performed By
3/21/2012 9:25 AM
Post Test Cleanup
3/21/12 1pm
Setup Check
Signoff
0.28 4/4
NMjohn kim
JZ/HR HR
Requirement
Starting IL/RL measurements for SM samples.
Customer Witness
3/21/2012 9:28AM
Initials
Category
Project EngineerSignoff by
Technical Director
3411G05696
Model Number Serial Number 42280
687
9069033
81524A 3248G01181 3411G05264
63162
Reference Only Reference Only750004 1/3/2013 Quad-Wave Backreflection Meter 1/3/2012 10:43:29 AM
Optical Power Head HP 81524A
Temperature
23 °C
Reference Only
29 %RH
Measurements / Inspection
IL [dB], RL [dB]
none
Nonconformity / Deviation
Specific Test Conditions
Last Cal Date
none
9/6/2012
Reference Only Reference Only
Reference Only Reference Only
3/8/2012 3:22:08 PM
DS Revision
03/23/12
Optical Head Interface
Fiber Fusion Splicer Fiber Cleaver
Service Project Number SPN Test ID # Humidity
1451 1300nm MM Return Loss Meter 9/6/2011 5:38:40 PM122785 Rifocs 781RL-13-110
Hewlett Packard
Test Sample Description
ARINC801 Connector
1103 Hewlett Packard
Instrum. Number Manufacturer Extech Fujikura Fujikura
14021405
81533B
CT-30 FSM-50S 12161 Reference Only
Reference Only Optical Head Interface10/31/2012
Reference Only 10/31/2011 2:10:44 PM Optical Power Head
Fiber Cleaver Reference Only Fiber Fusion Splicer
11965 GA-1
Test Specification / Standard
TIA-455-171A (FOTP-171), Method D1 (multimode) and D3 (single-mode)
2.4.3.2 of ARINC Specification 801-2 and in accordance with
TIA/EIA-455-107A (FOTP-107).
Fiber optic connector assemblies shall have a maximum attenuation of 0.3 dB for
multimode connections. For all single-mode connections, measure and record only. No
failure criterion exists for single-mode connections
Return loss should be a minimum of 20 dB for multimode PC polish termini and 30 dB for
single-mode PC polish termini
NM
Bench Cleaning Equipment List
03/21/12
Date/Time 3/23/20123/21/2012 9:25 AM
Compliance
Event Log
Completed IL/RL measurements for SM samples. Retested 24W7 A5 due to high IL. Cleaned ferrule endface and now passes. Also did the same to 17W5 A2.
Finished Initial IL-RL Measurements for all MM Samples
Test Title
NXTCore
CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS
CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS
1260
Event Log
Results Summary
Product Name Purchase Order #
177125
Start Date
3/21/2012
Completion Date
3/21/2012
Anomaly / Interruption
none
IL-RL
Max/Min Measurement Value
1254 Hewlett Packard
Reference Only
Experior Test Procedure # (if applicable)
EPTP-1002 TransmittanceEPTP-1005 Return Loss
Part Number
3248G01541
Cal Due Date5/3/2012 5/3/2011 1:03:12 PM Temperature Humidity Datalogger
Instrument Description
9:30 AMDate Time
1:00 PM
12:00PM9:00AM02/21/12 Started Preparation for Initial IL-RL Measurements for all MM Samples
JZ
JZ/HR
HR
03/21/12
Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 3
Sample # Channel Power [dBm] Cutback [dbm] IL [dB] RL [dB]
A1 mm -11.43 -11.37 0.06 >45A3 mm -11.42 -11.36 0.02 >45A1 mm -11.54 -11.49 0.05 >45A2 mm -11.53 -11.5 0.03 >45A4 mm -11.55 -11.51 0.04 >45A5 mm -11.56 -11.52 0.04 >45A1 mm -11.42 -11.40 0.02 >45A2 sm -5.68 -5.43 0.25 55.5A4 sm -5.67 -5.41 0.26 56.4A5 mm -11.42 -11.39 0.03 >45A1 mm -11.42 -11.39 0.03 >45A2 mm -11.40 -11.38 0.02 >45A3 sm -5.67 -5.39 0.28 55.8A5 sm -5.62 -5.39 0.23 52.1A6 mm -11.42 -11.39 0.03 >45A7 mm -11.42 -11.38 0.04 >45
A1 mm 0.00A2 sm -5.78 -5.39 0.38 56.8A4 sm 0.00A5 mm 0.00A1 mm 0.00A2 mm 0.00A3 sm -5.67 -5.39 0.28 55.8A5 sm -5.75 -5.39 0.36 55.9A6 mm 0.00A7 mm 0.00A5 sm -5.72 -5.39 0.33 56.1
24W7
MULTIMODE @1300nm, Singlemode @1550nm
3W3
17W5
Initial Results
24W7
17W5
5W5
Test Datasheet Test Report by:Experior Laboratories, Inc.
04/09/12 1:00 PM
8:00 AM04/04/1204/05/1204/06/12
8:55 AM
9:30 AM7:55 AM
04/10/1204/11/1204/12/12
NM
Collected interim data and checked compliance as well as system performanceCollected interim data and checked compliance as well as system performance
Collected interim data and checked compliance as well as system performanceCollected interim data and checked compliance as well as system performanceCollected interim data and checked compliance as well as system performance
Collected interim data and checked compliance as well as system performancePaused test and collected data due to expected power outage
Collected interim data and checked compliance as well as system performance
Triple 1300nm LED Source
SC Series
81637B 715RF-24
1020
04/02/1204/03/12 8:00 AM
1072 JDS
Agilent
9/29/2013
Instrument Description
Date Time
2x44 Optical Switch 2x44 Optical Switch
Fast Optical Power Meter Multimode 62.5 Optical Switch
Agilent1198
Reference Only Reference Only
Reference Only Reference Only
Cal Due Date11/7/2012 11/7/2011 6:08:50 PM Ref Only
Anomaly / Interruption
none
Humidity
Max/Min Measurement Value
1071 JDS
9/29/2011 2:47:02 PM
Experior Test Procedure # (if applicable)
EPTP-1002 TransmittanceEPWI-1044 Chamber controller programming
Part Number
Test Item Purchase Order #
177125
Start Date
3/30/2012
Completion Date
4/12/2012
Test Title
NXTCore
CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS
CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS
1264
Event Log
Results Summary
4/12/12 9am
Test completed
3/30/12 6:30 AM
Compliance
Event Log03/30/12
Date/Time
9:48 AM Baselined and resumed test
8:25 AM
8:00 AM6:30 PM
11965 GA-3
Test Specification / Standard
4.5.15 of MIL-DTL-24308G and in accordance with EIA-364-31B, Method IV, optional cold shock required. -10ºC to +65ºC, 10 cycles, 240 hours
NM
Bench Cleaning Equipment List
Instrum. Number Manufacturer Rifocs Rifocs
11551191
1x8 Optical Switch
1187
Optotest OP750
2 cu ft Environmental Chamber
Reference Only ED155457 JDS Uniphase SB Series
DS Revision
04/12/12
Return Loss Module
1310/1490/1550/1625nm Laser Fast Optical Power Meter
Service Project Number SPN Test ID # Humidity
none
Reference Only
12/8/2011 11:47:26 AM 12/8/2012
2/3/2012 4:56:12 PM 2/3/2014
4/20/2011 7:15:11 PM
Temperature
23 °C
Ref Only
29 %RH
Measurements / Inspection
CIT [dB], Temperature [C]
none
Nonconformity / Deviation
Specific Test Conditions
Last Cal DateModel Number Serial Number 753R-1300
10397
129236
SC Series EG001153 EG001152
DE41300321124741
Started Humidity test
Customer Witness
3/30/12 6:30 AM
Initials
Category
Project EngineerSignoff by
Technical Director
Test Sample Description
ARINC801 Connector
8:11 AM
-0.14 4/4
NMjohn kim
NM N/A
Requirement
3/30/12 6:30 AMNorman Metzner
NMNM
Performed By
DE40500226 ZH-21460 Cincinnati Subzero
81610A 9/29/2011 2:45:32 PM1016 Agilent 81637B DE41300332
Z9913064
9/29/2013
4/20/2012
CIT [dB] MM 0.5
Post Test Cleanup
4/12/12 9am
Setup Check
Signoff
CIT [dB] SM 0.5 0.05 2/2
Uncontrolled when printed 1 of 1 0003-022 Test Data sheet Template (rev P)
SP
N 1
1965
GA
-3 H
um
idit
y M
M C
IT
-0.5
-0.4
-0.3
-0.2
-0.10
0.1
0.2
0.3
0.4
0.5
050
100
150
200
250
300
Tim
e [h
]
CIT [dB]
-20
020406080100
120
Temperature [°C] Humidity [%]
3W3-
A1
3W3-
A3
5W5-
A1
5W5-
A2
5W5-
A4
5W5-
A5
17W
5-A
117
W5-
A5
24W
7-A
124
W7-
A2
24W
7-A
624
W7-
A7
Tem
pera
ture
Hum
idity
SP
N 1
1965
GA
-3 H
um
idit
y S
M C
IT
-0.5
-0.4
-0.3
-0.2
-0.10
0.1
0.2
0.3
0.4
0.5
050
100
150
200
250
300
Tim
e [h
]
CIT[dB]
-20
020406080100
120
Temperature [°C] Humidity [%]
17W
5-A
217
W5-
A4
24W
7-A
324
W7-
A5
Mon
itor -
5Te
mpe
ratu
reH
umid
ity
Test
Dat
ashe
etTe
st R
epor
t by:
Exp
erio
r Lab
orat
orie
s, In
c.
1x2
4 S
ingl
emod
e O
ptic
al S
witc
h R
efer
ence
Onl
y R
efer
ence
Onl
y10
01 A
gile
nt 8
1635
A D
E38
6015
65 D
ual O
ptic
al P
ower
Met
er 9
/29/
2011
1:2
0:11
PM
9/29
/201
3
1005
1283
Rifo
cs 7
15R
F-24
1220
Agi
lent
816
54A
DE
38A
0078
5
-0.
09/-0
.09
-
Set
up
Ch
eck
Sig
noff
CIT
[dB
] MM
-
Po
st T
est
Cle
anu
p
6/6/
12 4
pm
Dua
l Opt
ical
Pow
er M
eter
DE
3860
1594
9/2
9/20
11 1
:19:
01 P
M 1
310/
1550
nm L
aser
Sou
rce
12/
9/20
11 3
:56:
59 P
M12
1439
Agi
lent
9/29
/201
3
12/2
/201
2
Req
uir
emen
t
6/5/
12 1
pmN
orm
an M
etzn
erJB
NM
NM
john
kim
NM
HR
-
Cu
sto
mer
Wit
nes
s
6/5/
12 5
pm
Cat
ego
ry
Pro
ject
En
gin
eerN
XTC
ore
EG
0011
53 E
G00
1152
none
Ref
eren
ce O
nly
12/
8/20
11 1
1:47
:26
AM
12/8
/201
2 D
E40
5002
26
DE
4130
0321
1247
41
Las
t C
al D
ate
Inst
rum
ent
Des
crip
tio
n T
riple
130
0nm
LE
D S
ourc
e M
ultim
ode
62.5
Opt
ical
Sw
itch
Mo
del
Nu
mb
erS
eria
l Nu
mb
er
753
R-1
300
1292
36
29 %
RH
Mea
sure
men
ts /
Insp
ecti
on
CIT
[dB
], Te
mpe
ratu
re [C
]
none
No
nco
nfo
rmit
y / D
evia
tio
n
Sp
ecif
ic T
est
Co
nd
itio
ns
2/3
/201
2 4:
56:1
2 P
M2/
3/20
14
12/
2/20
11 1
0:53
:32
AM
9/29
/201
312
/9/2
012
9/2
9/20
11 2
:45:
32 P
M
DS
Rev
isio
n
06/0
8/12
Ret
urn
Loss
Mod
ule
131
0/14
90/1
550/
1625
nm L
aser
Fas
t Opt
ical
Pow
er M
eter
Ser
vice
Pro
ject
Nu
mb
er S
PN
Tes
t ID
#H
um
idit
yT
emp
erat
ure
23 °
C
VTS
1.5
Ref
eren
ce O
nly
ED
1554
57 J
DS
Uni
phas
e S
B S
erie
s 1
x8 O
ptic
al S
witc
h
Agi
lent
816
35A
1.5
cu
ft Th
erm
al S
hock
Cha
mbe
r
1039
7 8
1637
B D
E41
3003
32
93-
VT1
2231
Opt
otes
t O
P75
0
816
10A
1057
Cin
ncin
ati S
ubZe
ro
1016
Agi
lent
1187
1196
5G
A-6
Tes
t S
pec
ific
atio
n /
Sta
nd
ard
4.5.
13.1
of M
IL-D
TL-2
4308
G a
nd in
acc
orda
nce
with
E
IA-3
64-3
2FM
etho
d A
, Tes
t Con
ditio
n I,
5 cy
cles
-55
°C (+
0, -3
), 12
5 °C
(+3,
-0)
NM
Ben
ch C
lean
ing
Eq
uip
men
t L
ist
TA00
01 w
/con
nect
ors
6/6/
12 4
pm
0.02
/-0.2
4
An
om
aly
/ In
terr
up
tio
n
Tes
t T
itle
NX
TCon
1264
6/5/
12 1
pm
Co
mp
lian
ce
Dat
e/Ti
me
Cu
sto
mer
Nam
eP
urc
has
e O
rder
#
1771
25
Sta
rt D
ate
6/5/
2012
Co
mp
leti
on
Dat
e
6/8/
2012
Test
was
per
form
ed tw
ice:
One
tim
e w
ith 8
5C a
s hi
gh te
mpe
ratu
re, t
he s
econ
d tim
e w
ith 1
25C
as
high
tem
pera
ture
Ther
mal
Sho
ck
Max
/Min
Mea
sure
men
t V
alu
e
1071
JD
S
9/2
9/20
11 2
:47:
02 P
M
Exp
erio
r T
est
Pro
ced
ure
# (
if a
pp
licab
le)
EP
TP-1
002
Tran
smitt
ance
EP
WI-1
044
Cha
mbe
r con
trolle
r pro
gram
min
g
Par
t N
um
ber
Ref
eren
ce O
nly
Inst
rum
. Nu
mb
er
Ref
eren
ce O
nly
Cal
Du
e D
ate
11/7
/201
2 1
1/7/
2011
6:0
8:50
PM
Ref
Onl
y
Man
ufa
ctu
rer
Rifo
cs R
ifocs
Ref
Onl
y
Res
ult
s S
um
mar
y
Per
form
ed B
y
CIT
[dB
] SM
Eve
nt
Lo
gS
ign
off
by
Tec
hn
ical
Dir
ecto
r
Tes
t S
amp
le D
escr
ipti
on
2x4
4 O
ptic
al S
witc
h 2
x44
Opt
ical
Sw
itch
1198
Agi
lent
715
RF-
24
1155
1191
9/29
/201
3
Ref
eren
ce O
nly
Ref
eren
ce O
nly
1020
1072
JD
S S
C S
erie
s
816
37B
Fas
t Opt
ical
Pow
er M
eter
SC
Ser
ies
Unc
ontro
lled
whe
n pr
inte
d00
03-0
22 T
est D
ata
shee
t Tem
plat
e (r
ev P
)1
of 1
93
Test
Dat
ashe
etTe
st R
epor
t by:
Exp
erio
r Lab
orat
orie
s, In
c.
06/0
8/12
06/0
7/12
NMJB
06/0
6/12
06/0
5/12
1:00
PM
Sta
rted
ram
mpi
ng c
ham
ber t
o te
mpe
ratu
re
Sta
rted
equi
pmen
t set
up a
nd ro
uted
sam
ples
in c
ham
ber t
o pr
epar
e fo
r the
rmal
sho
ck a
t 125
CTh
erm
al s
hock
cyc
ling
com
plet
ed, r
etur
ned
sam
ples
to a
mbi
ent
cham
ber a
t tem
pera
ture
, sta
rted
ther
mal
sho
ck
Sta
rted
equi
pmen
t set
up a
nd ro
uted
sam
ples
in c
ham
ber
Init
ials
Sta
rted
ram
mpi
ng c
ham
ber t
o te
mpe
ratu
re
Ther
mal
sho
ck c
yclin
g co
mpl
eted
, ret
urne
d sa
mpl
es to
am
bien
t
Vis
ual I
nspe
ctio
nno
dam
age
detri
men
tal t
o th
e pe
rform
ance
of t
he
conn
ecto
rno
dam
age
obse
rved
4/4
8:00
AM
cham
ber a
t tem
pera
ture
, sta
rted
ther
mal
sho
ck
8:15
AM
5:00
PM
1:00
PM
base
lined
opt
ical
sys
tem
base
lined
opt
ical
sys
tem
7:45
AM
Eve
nt
Lo
gD
ate
Tim
e
8:45
AM
5:00
PM
1:45
PM
3:00
PM
Unc
ontro
lled
whe
n pr
inte
d00
03-0
22 T
est D
ata
shee
t Tem
plat
e (r
ev P
)2
of 1
93
SP
N 1
1965
GA
-6 T
her
mal
Sh
ock
MM
CIT
85°
C
-0.5
-0.4
-0.3
-0.2
-0.10
0.1
0.2
0.3
0.4
0.5
01
23
45
6
Tim
e [h
]
CIT [dB]
-80
-60
-40
-20
020406080100
Temperature [°C]
3W3-
A1
3W3-
A3
5W5-
A1
5W5-
A2
5W5-
A4
5W5-
A5
17W
5-A
117
W5-
A5
24W
7-A
124
W7-
A2
24W
7-A
624
W7-
A7
Tem
pera
ture
SP
N 1
1965
GA
-6 T
her
mal
Sh
ock
SM
CIT
85°
C
-0.5
-0.4
-0.3
-0.2
-0.10
0.1
0.2
0.3
0.4
0.5
01
23
45
6
Tim
e [h
]
CIT[dB]
-80
-60
-40
-20
020406080100
Temperature [°C]
17W
5-A
217
W5-
A4
24W
7-A
324
W7-
A5
Mon
itor -
5Te
mpe
ratu
re
SP
N 1
1965
GA
-6 T
her
mal
Sh
ock
MM
CIT
85°
C
-0.5
-0.4
-0.3
-0.2
-0.10
0.1
0.2
0.3
0.4
0.5
01
23
45
6
Tim
e [h
]
CIT [dB]
-100
-50
050100
150
Temperature [°C]
3W3-
A1
3W3-
A3
5W5-
A1
5W5-
A2
5W5-
A4
5W5-
A5
17W
5-A
117
W5-
A5
24W
7-A
124
W7-
A2
24W
7-A
624
W7-
A7
Ser
ies1
3
SP
N 1
1965
GA
-6 T
her
mal
Sh
ock
SM
CIT
85°
C
-0.5
-0.4
-0.3
-0.2
-0.10
0.1
0.2
0.3
0.4
0.5
01
23
45
6
Tim
e [h
]
CIT[dB]
-100
-50
050100
150
Temperature [°C]
17W
5-A
217
W5-
A4
24W
7-A
324
W7-
A5
Tem
pera
ture
Test Datasheet Test Report by:Experior Laboratories, Inc.
8:00 AM04/02/12
03/28/12 Finished setup and started satbilityNMProgrammed chamber and started test
Test completed03/29/1203/30/12 6:30 PM
Triple 1300nm LED SourceInstrument Description
Date Time
2x44 Optical Switch 2x44 Optical Switch
Fast Optical Power Meter Multimode 62.5 Optical Switch
Agilent1198
Cal Due Date11/7/2012 11/7/2011 6:08:50 PM Ref Only
Reference Only Reference Only
Reference Only Reference Only
9/29/2013
Anomaly / Interruption
none
Thermal Cycling
Max/Min Measurement Value
1071 JDS
9/29/2011 2:47:02 PM
Experior Test Procedure # (if applicable)
EPTP-1002 TransmittanceEPWI-1044 Chamber controller programming
Part Number
Product Name Purchase Order #
177125
Start Date
3/28/2012
Completion Date
3/30/2012
Test Title
NXTCore
CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS
CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS
1264
Event Log
Results Summary
4/2/2012 11am3/28/12 4pm
Compliance
Event Log
6:30 PM
Date/Time
11:00 AM
4:00 PM
11965 GA-2
Test Specification / Standard
TIA-455-20B(FOTP-20), Method A
ANSI/TIA-455-3B (FOTP-3), 2.4.4.1 of ARINC Specification 801-2
Test Condition D, 10 cycles, with Step 1 set at -55°C ±2°C and Step 2 set at 125°C ±2°C
temperature plateau intervals shall not be less than 30 minutes. The rate of the
environmental chamber air temperature change, between the minimum and maximumtemperature extremes, shall be between 50
and 70 minutes.CIT measured every 2 minutes
NM
Bench Cleaning Equipment List
1020
SC Series
81637B 715RF-24
Instrum. Number Manufacturer Rifocs Rifocs
1072 JDS
Agilent
1155 1x8 Optical Switch Reference Only ED155457 JDS Uniphase SB Series
DS Revision
04/02/12
Return Loss Module
1310/1490/1550/1625nm Laser Fast Optical Power Meter
Service Project Number SPN Test ID # Humidity
Last Cal Date
none
Reference Only
12/8/2011 11:47:26 AM 12/8/2012
2/3/2012 4:56:12 PM 2/3/2014
4/20/2011 7:15:11 PM ZH-2
Temperature
23 °C
Ref Only
29 %RH
Measurements / Inspection
CIT [dB], Temperature [C]
none
Nonconformity / Deviation
Specific Test Conditions
9/29/2011 2:45:32 PM 9/29/2013
2 cu ft Environmental Chamber Z9913064
Model Number Serial Number 753R-1300
10397
129236
SC Series EG001153 EG001152
DE41300321124741
Started optical system setup and routed samples in chamber
Customer Witness
3/28/12 4pm
Initials
Category
Project EngineerSignoff by
Technical Director
Test Sample Description
ARINC801 Connector
Collected data
-0.35 4/4
NMjohn kim
NM N/A
Requirement
3/28/12 4pm
81610A1187
Norman MetznerNM
NM
Performed By
DE40500226
1191 Optotest OP750
4/20/2012
1016 Agilent 81637B DE41300332
1460 Cincinnati Subzero
CIT [dB] MM 0.5
Post Test Cleanup
N/A
Setup Check
Signoff
CIT [dB] SM -- -0.08 2/2
Uncontrolled when printed 1 of 1 0003-022 Test Data sheet Template (rev P)
SP
N 1
1965
GA
-2 T
her
mal
Cyc
ling
MM
CIT
-0.4
-0.3
5
-0.3
-0.2
5
-0.2
-0.1
5
-0.1
-0.0
50
0.05
05
1015
2025
3035
Tim
e [h
]
CIT [dB]
-100
-50
050100
150
Temperature [°C]
3W3-
A1
3W3-
A3
5W5-
A1
5W5-
A2
5W5-
A4
5W5-
A5
17W
5-A
117
W5-
A5
24W
7-A
124
W7-
A2
24W
7-A
624
W7-
A7
MM
UP
MM
DO
WN
Tem
pera
ture
SP
N 1
1965
GA
-2 T
her
mal
Cyc
ling
SM
CIT
-0.1
-0.0
8
-0.0
6
-0.0
4
-0.0
20
0.02
0.04
05
1015
2025
3035
Tim
e [h
]
CIT[dB]
-100
-50
050100
150
Temperature [°C]
17W
5-A
217
W5-
A4
24W
7-A
324
W7-
A5
Mon
itor -
5Te
mpe
ratu
re
Test Datasheet Test Report by:Experior Laboratories, Inc.
Requirement
6/2/20127:30am
8:30am
7:45am8:30pm
9:00am
06/05/12
Reference Only 2x44 Optical Switch
6:00am
Performed By
CIT [dB] SM
Date Time
10201072 JDS
81637B
Category
Calibrate ph meter and checked ph of salt solution (ph = 6.55)
Max/Min Measurement Value
Rifocs Rifocs1198
ph/Conductivity Meter DE40500226
Instrument Description
Multimode 62.5 Optical Switch Triple 1300nm LED Source
715RF-24 124741
Instrum. Number
Reference Only
11/7/2011 6:08:50 PM
Fast Optical Power Meter Agilent Ref Only
Last Cal DateModel NumberManufacturer
9/29/2011 2:47:02 PM
Associated 81635A
MX-92161521 Hanna Instruments
OP750
1071 JDS SC Series
81610A AgilentHI98129
2x44 Optical Switch 1x8 Optical Switch Reference Only
DE41300321 EG001153 EG001152
Anomaly / Interruption
EPTP-1002 Transmittance
Part Number
Reference Only1155
Agilent
1191
1000
Customer Name Purchase Order #
177125
Start Date
6/2/2012
Completion Date
6/5/2012
Test Title
NXTCon
CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS
CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS
1264
Started 12h dry-out period at 38 deg C
8:30am
6/5/12 1pm
took samples out of oven
6/2/12 6:00am
Compliance
Event Log
Date/Time
-0.13/0.03
MD/JB
11965 GA-5
Test Specification / Standard
4.5.19 of MIL-DTL-24308G, EIA-364-26B, testcondition B
TIA-455-16A (FOTP-16), test condition C, based from paragraph 2.4.4.5 of ARINC
Specification 801-2
48h of salt spray followed by dry-out at 38ºC ± 3ºC for a period of 12 hours
NM
Bench Cleaning
Temperature
23 °C
9/29/2013
Reference Only
2/3/2014
Calibrated Before Use 12/16/2011 9:50:02 AM
9/29/2013
Reference Only Optotest
ED155457 JDS Uniphase SB Series 1310/1490/1550/1625nm Laser
Fast Optical Power Meter 2/3/2012 4:56:12 PM
Service Project Number SPN Test ID #
2/21/2014
DS Revision
06/05/12
Humidity
Ref Only
Cal Due Date11/7/2012
Calibrated Before Use
9/29/2011 2:45:32 PM 12/8/2011 11:47:26 AM 12/8/2012
29 %RH
Measurements / Inspection
CIT [dB], Temperature [°C]
none
Nonconformity / Deviation
Specific Test Conditions
none
Salt Spray
Requirement
6/1/12 3pm
Pass
Serial Number 753R-1300
10397
129236
SC Series
Project EngineerSignoff by
Technical Director
Test Sample Description
Combo-D connector
Customer Witness
none
Event LogEquipment List
Experior Test Procedure # (if applicable)
Setup Check
11:45 AM Completed Post Test Measurements for all four Samples
9:00pm
1:00 AM8:45 AM9:30am Baselined single and multimode
Started Post Test Measurements for 3W3Setup Test Equipment for Post Test Measurements
dry-out period completed
Air PressureTemperature
4/4
Started warming up salt spray chamberPrepared salt solution
Put samples in salt spray chamber, started 48 hour exposure @ 35cLoaded salt solution on salt spray tank
2/2
Results Summary
Norman MetznerMD
john kimNMJB
M-15483
2/21/2012 5:25:52 PM DE38601573
MD
12/16/20129368 Salt Spray chamber
1016 Agilent 81637B DE41300332 Return Loss Module1187
1059 Dual Optical Power Meter
CIT [dB] MM 0.5
Post Test Cleanup
6/5/12 1pm
Signoff
Deg CSalt Solution Collected Pass/Fail
6/2/12 6:30am
0.5 -0.12/-0.04
Pass 12-18 psi40-42 Pass 16 psi
35 34-41
NM
Initials
JB
MD
corrosion observed, see tab "Post Test Pictures", however, no cracking or pitting 4/4
Removed samples from salt spray, finished 48 hour exposure @ 35cRinsed samples in warm water for 5 minutes and took after test pictures
MD
Visula Inspection no damage due to corrosion
06/04/12 8:45am
7:40am
Front Beaker 30 mL Pass Chamber TemperatureRear Beaker 17 mL Tower Temperature Pass
Salt Solution
42 pH 6.63Requirement 6.5-7.2 pH
Pass/FailRequirement Pass/Fail Pass/Fail
Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 4
3W3 FRONT 3W3 BACK
5W5 FRONT
17W5 FRONT
24W7 FRONT
5W5 BACK
17W5 BACK
24W7 BACK
A1
mm
A3
mm
A1
mm
A2
mm
A4
mm
A5
mm
A1
mm
A2
smA
4 sm
A5
mm
A1
mm
A2
mm
A3
smA
5 sm
A6
mm
A7
mm
0.06
0.02
0.05
0.03
0.04
0.04
0.02
0.25
0.26
0.03
0.03
0.02
0.28
0.23
0.03
0.04
Initi
al IL
0.01
0.01
0.01
-0.0
1-0
.01
0.01
-0.0
4-0
.03
-0.0
1-0
.05
-0.0
4-0
.03
-0.0
40.
02-0
.03
-0.0
3C
IT a
fter T
herm
al C
ycle
-0.0
1-0
.06
-0.0
1-0
.07
-0.0
30.
01-0
.03
-0.0
20.
04-0
.03
-0.0
40.
02-0
.01
0.05
-0.0
1-0
.12
CIT
afte
r Hum
idity
0.00
0.04
-0.0
10.
060.
01-0
.02
0.02
0.02
0.01
0.06
0.03
0.02
0.01
-0.0
30.
010.
08C
IT a
fter T
emp
Life
0.06
0.03
0.06
0.05
0.07
0.04
0.07
0.28
0.22
0.05
0.08
0.01
0.32
0.19
0.06
0.11
IL b
efor
e S
alt S
pray
0.15
0.05
0.12
0.1
0.2
0.12
0.07
0.32
0.28
0.12
0.07
0.05
0.44
0.29
0.05
0.08
IL a
fter S
alt S
pray
-0.0
9-0
.02
-0.0
6-0
.05
-0.1
3-0
.08
0.00
-0.0
4-0
.06
-0.0
70.
01-0
.04
-0.1
2-0
.10
0.01
0.03
CIT
afte
r Sal
t Spr
ay
-38.
66-3
8.56
-38.
63-3
8.61
-38.
71-3
8.63
-38.
58-8
.49
-8.4
5-3
8.63
-38.
58-3
8.56
-8.6
1-8
.46
-38.
56-3
8.59
sam
ple
pow
er-3
8.51
-38.
51-3
8.51
-38.
51-3
8.51
-38.
51-3
8.51
-8.1
7-8
.17
-38.
51-3
8.51
-38.
51-8
.17
-8.1
7-3
8.51
-38.
51ba
selin
e
3W3
17W
5
For C
IT a
fter S
alt
24W
7TE
ST
5W5
Test Datasheet Test Report by:Experior Laboratories, Inc.
8:28 AM
11:30 AM8:34 AM
04/23/12
8:00 AM04/18/1204/19/1204/20/12
05/01/1204/30/12
04/24/12 9:00 AM
AG
NM
05/23/12 8:20am05/22/12 8:10am
7:45am
05/03/1205/14/1205/15/12
Collected interim data and checked compliance as well as system performance
Collected interim data and checked compliance as well as system performance
05/18/1210:30am
8:45am
05/17/12
05/02/12
04/25/1204/26/1204/27/12
Collected interim data and checked compliance as well as system performanceCollected interim data and checked compliance as well as system performanceCollected interim data and checked compliance as well as system performance
Collected interim data and checked compliance as well as system performance (power outage on Saturday, chamber idled at 23), restarted chamber
10201072 JDS
SC Series
81637B
04/16/1204/17/12 4:45 PM
04/13/124:45 PM2:00 PM
Performed By
CIT [dB] SM
Instrument Description
Date Time
2x44 Optical Switch2x44 Optical Switch
Fast Optical Power MeterMultimode 62.5 Optical Switch
Agilent
Triple 1300nm LED Source1198
Instrum. Number
Reference Only
Cal Due Date11/7/2012 11/7/2011 6:08:50 PMRef Only
Manufacturer Rifocs Rifocs
none
Temperature Life
Max/Min Measurement Value
1071 JDS
9/29/2011 2:47:02 PM
Experior Test Procedure # (if applicable)
EPTP-1002 TransmittanceEPWI-1044 Chamber controller programming
Part Number
Reference Only
Event Log
Results Summary
Customer Name Purchase Order #
177125
Start Date
4/13/2012
Completion Date
5/27/2012
Anomaly / Interruption
Test Title
NXTCon
9:20am05/21/12 8:10am Collected interim data and checked compliance as well as system performance
CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS
CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS
1264
Collected interim data and checked compliance as well as system performanceCollected interim data and checked compliance as well as system performance
11:00am05/29/12 9am
05/24/12 8:20am
3:22 PM Collected interim data and checked compliance as well as system performance
9:00 AM
5/30/12 9am
Collected interim data and checked compliance as well as system performance
4/13/12 2pm
Compliance
Event Log
Date/Time
Started Temperature Life test
Test finished, collected data
11965 GA-4
Test Specification / Standard
TIA/EIA-455-4C (FOTP-4) with the following procedure and criteria, which is
based from paragraph 2.4.4.2 of ARINC Specification 801-2
The temperature exposure shall be 125ºC ± 2ºC for the duration of 1,000 hours
NM
Bench Cleaning
11911x8 Optical Switch
1187
Optotest OP750
2 cu ft Environmental Chamber Agilent
ED155457 JDS Uniphase SB Series1155 Reference Only
12/8/2011 11:47:26 AM 12/8/2012
2/3/2012 4:56:12 PM 2/3/2014
Collected interim data and checked compliance as well as system performance
Collected interim data and checked compliance as well as system performance, SM system crashedBaselined and restarted sm system
Collected interim data and checked compliance as well as system performance
Return Loss Module
1310/1490/1550/1625nm LaserFast Optical Power Meter
Service Project Number SPN Test ID #
Reference Only
Ref Only
DS Revision
05/30/12
HumidityTemperature
23 °C
9/29/2013
Reference OnlyReference Only
29 %RH
Measurements / Inspection
CIT [dB], Temperature [C]
none
Nonconformity / Deviation
Specific Test Conditions
Last Cal DateModel Number Serial Number 753R-1300
10397
129236
SC Series EG001153EG001152
DE41300321124741 715RF-24
Customer Witness
4/13/12 2pm
Initials
Category
Project EngineerSignoff by
Technical Director
Test Sample Description
Combo-D connector none
Norman Metzner
3:00 PM Collected interim raw data
10:30 AM
8:54 AM8:44 AM9:00 AM Collected interim data and checked compliance as well as system performance
Collected interim data and checked compliance as well as system performanceCollected interim data and checked compliance as well as system performance
NMNM NDY
Collected interim data and checked compliance as well as system performanceCollected interim data and checked compliance as well as system performance
0.34/-0.04 4/4
NM
Collected interim data and checked compliance as well as system performanceCollected interim data and checked compliance as well as system performance
ZH-21460 Cincinnati Subzero 81610A
9/29/2011 2:45:32 PM1016 Agilent 81637B DE41300332
Z9913064DE40500226
9/29/2013
4/12/2013 4/12/2012
0.5 0.11/-0.04
CIT [dB] MM 0.5
Post Test Cleanup
NDYNM
NM
2/2
Requirement
4/13/12 2pmjohn kim
Equipment List Setup Check
Signoff
Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 341
SP
N 1
1965
GA
-4 T
emp
erat
ure
Lif
e M
M C
IT
-0.5
-0.4
-0.3
-0.2
-0.10
0.1
0.2
0.3
0.4
0.5
020
040
060
080
010
0012
00
Tim
e [h
]
CIT [dB]
020406080100
120
140
Temperature [°C]
3W3-
A1
3W3-
A3
5W5-
A1
5W5-
A2
5W5-
A4
5W5-
A5
17W
5-A
117
W5-
A5
24W
7-A
124
W7-
A2
24W
7-A
624
W7-
A7
Tem
pera
ture
SP
N 1
1965
GA
-4 T
emp
erat
ure
Lif
e S
M C
IT
-0.5
-0.4
-0.3
-0.2
-0.10
0.1
0.2
0.3
0.4
0.5
020
040
060
080
010
0012
00
Tim
e [h
]
CIT[dB]
020406080100
120
140
Temperature [°C]
17W
5-A
217
W5-
A4
24W
7-A
324
W7-
A5
Mon
itor -
5Te
mpe
ratu
re
Test Datasheet Test Report by:Experior Laboratories, Inc.
45 4/4Return Loss [dB]
HR
Date Time7:30AM9:30AM06/11/12
Signoff NM
Requirement
Equipment List
1224 JGR BR5
Norman MetznerHR
Harris R
Performed By
6/11/12 7:30AM
Post Test Cleanup
6/11/12 9:30AM
Finished RL test to all Samples
Customer Witness
6/11/12 7:30AM
Initials
Category
Project EngineerSignoff by
Technical Director
john kimHR HR
20 for MM and 30 for SM
Model Number Serial Number 42280 9069033
750004 1/3/2013 Quad-Wave Backreflection Meter 1/3/2012 10:43:29 AM
RL [dB]
none
Nonconformity / Deviation
Specific Test Conditions
Temperature
23 °C 55 %RH
Measurements / Inspection
DS Revision
06/11/12
Service Project Number SPN Test ID # Humidity
none
9/6/20121451 1300nm MM Return Loss Meter 9/6/2011 5:38:40 PM122785 Rifocs 781RL-13-110
Test Sample Description
Rectangular ARINC801
Setup Check
11965 GA-7
Test Specification / Standard
2.4.3.2 of ARINC Specification 801-2 and in accordance with
TIA/EIA-455-107A (FOTP-107).
Return loss should be a minimum of 20 dB for multimode PC polish termini and 30 dB for
single-mode PC polish termini
NM
Bench Cleaning
Date/Time
Started Preparation and Reference for RL Reference Test
6/11/12 11am6/11/12 7:30AM
Compliance
Event Log
Test Title
NXTCon
CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS
CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS
1260
Event Log
Results Summary
Customer Name Purchase Order #
177125
Start Date
6/11/2012
Completion Date
6/11/2012
Anomaly / Interruption
none
Return Loss
Max/Min Measurement Value
Experior Test Procedure # (if applicable)
EPTP-1005 Return Loss
Part Number
Instrum. Number Manufacturer Extech
Cal Due Date5/3/20135/3/2012 Temperature Humidity Datalogger
Instrument Description Last Cal Date
Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 2
Sample # Channel RL [dB]
A1 mm >45A3 mm >45A1 mm >45A2 mm >45A4 mm >45A5 mm >45A1 mm >45A2 sm 55.9A4 sm 56.7A5 mm >45A1 mm >45A2 mm >45A3 sm 56.6A5 sm 56.1A6 mm >45A7 mm >45
24W7
MULTIMODE @1300nm, Singlemode @1550nm
3W3
5W5
17W5
Test Datasheet Test Report by:Experior Laboratories, Inc.
Finish testing IL-RL retesting
HRRetested the 2 single mode the A2 RL is too low, save the second Results
11:15 AM
2:30PMDate Time
8:00AM1:30PM
11:30AM03/13/12
03/14/12
Cal Due Date5/3/2012 5/3/2011 1:03:12 PM Temperature Humidity Datalogger
Instrument Description
3248G01541
Anomaly / Interruption
none
IL-RL
Max/Min Measurement Value
1254 Hewlett Packard
Reference Only
Experior Test Procedure # (if applicable)
EPTP-1002 TransmittanceEPTP-1005 Return Loss
Part Number
Product Name Purchase Order #
177125
Start Date
3/12/2012
Completion Date
3/14/2012
Test Title
NXTCore
CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS
CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS
1260
Event Log
Results Summary
3/19/12 3pm3/12/12 12:30PM
Compliance
Event Log
Started IL-RL re-testing, samples have been unmated by customer and termini for all singlemode channels have been replacedFinished IL-RL for all the Samples for Vibration Test
03/12/12
Date/Time
11965 GA-1
Test Specification / Standard
TIA-455-171A (FOTP-171), Method D1 (multimode) and D3 (single-mode)
2.4.3.2 of ARINC Specification 801-2 and in accordance with
TIA/EIA-455-107A (FOTP-107).
Fiber optic connector assemblies shall have a maximum attenuation of 0.3 dB for
multimode connections. For all single-mode connections, measure and record only. No
failure criterion exists for single-mode connections
Return loss should be a minimum of 20 dB for multimode PC polish termini and 30 dB for
single-mode PC polish termini
NM
Bench Cleaning Equipment List
Reference Only
Reference Only Optical Head Interface10/31/2012
Reference Only 10/31/2011 2:10:44 PM Optical Power Head
Fiber Cleaver Reference Only Fiber Fusion Splicer
81533B
CT-30 FSM-50S 12161
1103 Hewlett Packard
Instrum. Number Manufacturer Extech Fujikura Fujikura
14021405
Test Sample Description
Combo-D connector
Hewlett Packard
1451 1300nm MM Return Loss Meter 9/6/2011 5:38:40 PM122785 Rifocs 781RL-13-110
DS Revision
03/23/12
Optical Head Interface
Fiber Fusion Splicer Fiber Cleaver
Service Project Number SPN Test ID # Humidity
Scott Youngkin
9/6/2012
Reference Only Reference Only
Reference Only Reference Only
3/8/2012 3:22:08 PM
Temperature
23 °C
Reference Only
29 %RH
Measurements / Inspection
IL [dB], RL [dB]
none
Nonconformity / Deviation
Specific Test Conditions
Last Cal Date
Reference Only Reference Only750004 1/3/2013 Quad-Wave Backreflection Meter 1/3/2012 10:43:29 AM
Optical Power Head HP 81524A 3411G05696
Model Number Serial Number 42280
687
9069033
81524A 3248G01181 3411G05264
63162
Started IL-RL measurements
Customer Witness
3/13/12/ 7:30AM
Initials
Category
Project EngineerSignoff by
Technical Director
0.07 4/4
NMjohn kim
HR/JZ NDY
Requirement
Performed By
3/12/12 12:30PM
Post Test Cleanup
NDY
Setup Check
Signoff
Insertion Loss [dB] 0.3 (for MM only)
Norman MetznerHR
JZ/HR
Return Loss [dB] 20 for MM and 30 for SM 45 4/4
BR5
1258 Hewlett Packard 81533B1102
1400 Fujikura FSM-17S
3/8/2014
1407 Fujikura CT-30 210941224 JGR
Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 3
Sample # Channel Power [dBm] Cutback [dbm] IL [dB] RL [dB]
A1 mm -11.42 -11.40 0.02 >45A3 mm -11.40 -11.39 0.01 >45A1 mm -11.41 -11.39 0.02 >45A2 mm -11.41 -11.39 0.02 >45A4 mm -11.40 -11.39 0.01 >45A5 mm -11.44 -11.41 0.03 >45A1 mm -11.58 -11.54 0.04 >45A2 sm -5.68 -5.66 0.02 54.4A4 sm -5.60 -5.57 0.03 56.5A5 mm -11.47 -11.44 0.03 >45A1 mm -11.40 -11.36 0.04 >45A2 mm -11.38 -11.33 0.05 >45A3 sm -5.31 -5.24 0.07 56.6A5 sm -5.25 -5.21 0.04 55.1A6 mm -11.25 -11.22 0.03 >45A7 mm -11.20 -11.18 0.02 >45
A1 mm -11.31 -11.29 0.02 >45A2 mm -11.64 -11.56 0.08 >45A4 mm -11.57 -11.56 0.01 >45A5 mm -11.54 -11.48 0.06 >45A1 mm -11.47 -11.44 0.03 >45A2 sm -4.49 -4.47 0.02 59.8A4 sm -5.51 -5.49 0.02 59.3A5 mm -11.51 -11.47 0.04 >45
24W7
Retest
5W5
17W5
MULTIMODE @1300nm, Singlemode @1550nm
3W3
5W5
17W5
Test Datasheet Test Report by:Experior Laboratories, Inc.
Customer Witness
none
04/13/12 NM1:00 PM Started X-Axis shock, 3 positive, 3 negative
03/23/12 Changed datasheet name from G1-3 to G1-42:20 PM
Return Loss Module 12/16/2011 11:40:19 AM 12/16/20121028 Agilent 81610A DE40500414 Temperature Humidity Datalogger 5/3/2011 1:03:12 PM 5/3/2012
1x24 Multimode Optical Switch Reference Only Reference Only
Optical Power Head
42280 9069033
Hewlett Packard 81524A 3248G01181
Hewlett Packard 81533B 3411G05264 Optical Head Interface
1103
1254 BR5 750004 Quad-Wave Backreflection Meter 1/3/2012 10:43:29 AM
715RF-24-106 1221141260 Extech
11:45 AM
Date/Time
Performed By
NMNorman Metzner3/19/12 11:45am
NM
Took final CIT measurements
03/19/12 NM2:15 PM Rotated fixture, started Z-Axis shock, 3 positive, 3 negative2:00 PM Rotated fixture, started Y-Axis shock, 3 positive, 3 negative 1:45 PM Started X-Axis shock, 3 positive, 3 negative
Took final CIT measurements 1:09 PM
1:03 PM Rotated fixture, started Y-Axis shock, 3 positive, 3 negative 1:06 PM Rotated fixture, started Z-Axis shock, 3 positive, 3 negative
Cal Due DateReference Only
10/31/20121/3/2013
Reference Only
Started Shock setup
4/4
9/11/2012
Reference Only
Category
Test Sample Description
ARINC801 Compatible Connector
10/26/2011 9:31:58 AM 10/26/201212/9/2011
10/31/2011 2:10:44 PM
2/3/14 Optical Power Meter
2 Channel Vibration Controller
Humidity
38 %RH
10/24/2011 2:28:02 PM 10/24/201212/9/2012
Instrument Description
Specific Test Conditions
10mV/G Triaxial Accelerometer
DS RevisionTemperature
23 °C
Service Project Number SPN Test ID #
04/16/12
QPL 8-channel 1300nm LED 2/3/121085 Discontinuity Monitor 8 channel 9/11/2011 3:33:44 PM
1217 Rifocs
10351111
Experior Photonics
1266 Rifocs
1224 JGR
Last Cal DateInstrum. Number Manufacturer Model Number Serial Number Unholtz Dickie SA30-SO92 3117 - 271
EP-TE1004 1002
555B 122347 SN 2008
0dffcf1145
Requirement
4/13/12 4pm3/19/12 11:45am
NM
Bench Cleaning Equipment List
Results Summary
NM NM
Project Engineer
Signoff
11965 GB-3
Test Specification / Standard
4.5.17 of MIL-DTL-24308GEIA-364-27C, test condition E
Phase 1: 50g, 18 shocks, 11ms-> no discontinuities of >0.5dB for 50us during and
CIT not to exceed 0.5dB after
Initials
Reference Only Electrodynamic Vibration System
NM
Event LogPost Test Cleanup Setup CheckSignoff by
Technical Director
john kim3/19/12 11:45am 4/13/12 4pm
Experior Test Procedure # (if applicable)
EPWI-1043 ETS Vibration System Operating ProcedureEPWI-1100 Vibration Controller Programming
EPTP-1002 TransmittanceEPTP-1004 Optical Signal Discontinuity
Part Number
CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS
CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS
1119
EP-TE2000
Dytran Vibration Research VRC8555B
3055A1
4/4
Event Log
Product Name Purchase Order #
177125
Anomaly / Interruption
none
CIT [dB] after +/- 0.5dB 0.01/-0.06
Mechanical Shock Phase 1
Start Date
3/19/2012
Completion Date
4/13/2012
Test Title
NXTCore
Max/Min Measurement Value Compliance
Measurements / Inspection
Acceleration [g], Frequency [Hz], Discontinuity [us], CIT [dB]
none
Nonconformity / Deviation
1219 Experior Photonics
no discontinuity of +/- 0.5dB for more than 50us no discontinuities
Date Time
Discontinuity
Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 4
Y-AxisInitial P [dBm] Discontinuity Discontinuity Final P [dBm] CIT [dB] Discontinuity
A1 mm -17.81 PASS PASS -17.82 -0.01 PASSA3 mm -17.73 PASS PASS -17.75 -0.02 PASSA1 mm -18.11 PASS PASS -18.14 -0.03 PASSA2 mm -17.72 PASS PASS -17.72 0.00 PASSA4 mm -17.48 PASS PASS -17.54 -0.06 PASSA5 mm -17.94 PASS PASS -17.93 0.01 PASSA1 mm -17.84 PASS PASS -17.84 0.00 PASSA2 sm -14.67 PASS PASS -14.69 -0.02 PASSA4 sm -14.62 PASS PASS -14.63 -0.01 PASSA5 mm -17.79 PASS PASS -17.79 0.00 PASSA1 mm -17.47 PASS PASS -17.51 -0.04 PASSA2 mm -17.62 PASS PASS -17.63 -0.01 PASSA3 sm -12.14 PASS PASS -12.13 0.01 PASSA5 sm -12.22 PASS PASS -12.22 0.00 PASSA6 mm -17.95 PASS PASS -17.95 0.00 PASSA7 mm -18.13 PASS PASS -18.13 0.00 PASS
5W5
17W5
24W7
Phase 1: Mechanical Shock screening for 50us/0.5dB discontinuity
3W3
Z-AxisConnector ID Channel X-Axis
-60
-40
-20
020
4060
-40
-20020406080
Tim
e (m
s)
Acceleration (G)
Ac
ce
lera
tio
n
De
man
d
Co
ntro
l
-60
-40
-20
020
4060
-80
-60
-40
-2002040
Tim
e (m
s)
Acceleration (G)
Ac
ce
lera
tio
n
Dem
and
Con
trol
-60
-40
-20
020
406
0-4
0
-20020406080
Tim
e (m
s)
Acceleration (G)
Ac
ce
lera
tio
n
Dem
and
Con
trol
-60
-40
-20
020
4060
-80
-60
-40
-2002040
Tim
e (m
s)
Acceleration (G)
Ac
ce
lera
tio
n
Dem
and
Con
trol
-60
-40
-20
020
4060
-40
-20020406080
Tim
e (m
s)
Acceleration (G)
Ac
ce
lera
tio
n
Dem
and
Con
trol
-60
-40
-20
020
4060
-80
-60
-40
-200204060
Tim
e (m
s)
Acceleration (G)
Ac
ce
lera
tio
n
Dem
and
Con
trol
X-A
XIS
PO
SIT
IVE
3W
3/24
W7
Y-A
XIS
PO
SIT
IVE
3W
3/24
W7
Z-A
XIS
PO
SIT
IVE
3W
3/24
W7
Z-A
XIS
NE
GA
TIV
E 3
W3/
24W
7
Y-A
XIS
NE
GA
TIV
E 3
W3/
24W
7
X-A
XIS
NE
GA
TIV
E
-60
-40
-20
020
4060
-40
-20020406080
Tim
e (m
s)
Acceleration (G)
Ac
ce
lera
tio
n
Dem
and
Con
trol
-60
-40
-20
020
4060
-40
-20020406080
Tim
e (m
s)
Acceleration (G)
Ac
ce
lera
tio
n
Dem
and
Con
trol
-60
-40
-20
020
4060
-40
-20020406080
Tim
e (m
s)
Acceleration (G)
Ac
ce
lera
tio
n
Dem
and
Con
trol
-60
-40
-20
020
4060
-80
-60
-40
-200204060
Tim
e (m
s)
Acceleration (G)
Ac
ce
lera
tio
n
Dem
and
Con
trol
-60
-40
-20
020
4060
-80
-60
-40
-200204060
Tim
e (m
s)
Acceleration (G)
Ac
ce
lera
tio
n
Dem
and
Con
trol
-60
-40
-20
020
4060
-80
-60
-40
-200204060
Tim
e (m
s)
Acceleration (G)
Ac
ce
lera
tio
n
Dem
and
Con
trol
Z-A
XIS
PO
SIT
IVE
5W
5/17
W5
X-A
XIS
PO
SIT
IVE
5W
5/17
W5
Y-A
XIS
PO
SIT
IVE
5W
5/17
W5
Y-A
XIS
NE
GA
TIV
E
X-A
XIS
NE
GA
TIV
E
Z-A
XIS
NE
GA
TIV
E 5
W5/
17W
5
Test Datasheet Test Report by:Experior Laboratories, Inc.
4/4
9:01 AM8:53 AM8:52 AM
no discontinuity of +/- 1dB for more than 1us no discontinuities
Date Time
Discontinuity
Test Title
1219 Experior Photonics
1119
Project Engineer
Results Summary
2 Channel Vibration Controller
NXTCore
Max/Min Measurement Value Compliance
Measurements / Inspection
Acceleration [g], Frequency [Hz], Discontinuity [us], CIT [dB]
none
Nonconformity / Deviation
EPWI-1043 ETS Vibration System Operating ProcedureEPWI-1100 Vibration Controller Programming
EPTP-1002 TransmittanceEPTP-1004 Optical Signal Discontinuity
Part Number
CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS
CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS
Start Date
4/12/2012
Completion Date
4/13/2012
Product Name Purchase Order #
177125
Anomaly / Interruption
none
CIT [dB] after not required -0.04
Mechanical Shock Phase 2
Event Log
04/12/12
3:34 PM
Flipped axis, Performed y-axis shock positive
Quad-Wave Backreflection Meter
Reference Only Electrodynamic Vibration System Unholtz Dickie SA30-SO92 3117 - 271
0dffcf1145 3055A1
1/3/2012 10:43:29 AM
Signoff
Bench Cleaning
NM
Equipment List Event LogPost Test Cleanup Setup CheckSignoff by
Technical Director
john kim4/12/12 8:45am 4/12/12 11:30am 4/12/12 8:45am
NMNM NM
11965 GB-5
Test Specification / Standard
4.5.17 of MIL-DTL-24308GEIA-364-27C, test condition E
Phase 2: 50g, 18 shocks, 11ms-> no discontinuities of >1dB for 1us during not to
exceed
Initials
Requirement
4/13/12 4pm
Instrument Description
Dytran
1002
555B 122347 SN 2008 EP-TE2000
Vibration Research VRC8555B
EP-TE1004
Instrum. Number Manufacturer Model Number Serial Number
1217 Rifocs
10351111
2/3/14 QPL 8-channel 1300nm LED 2/3/121085 Discontinuity Monitor 8 channel 9/11/2011 3:33:44 PM Experior Photonics
DS RevisionTemperature
23 °C
Service Project Number SPN Test ID #
04/16/12
Optical Power Meter
Humidity
38 %RH
10/24/2011 2:28:02 PM 10/24/201212/9/2012
Reference OnlyLast Cal Date
Specific Test Conditions
10mV/G Triaxial Accelerometer
9/11/2012
10/26/2011 9:31:58 AM 10/26/201212/9/2011
10/31/2011 2:10:44 PM
Reference Only
Cal Due Date
10/31/20121/3/2013
Reference Only
Performed x-axis shock positive
4/4
Category
Test Sample Description
ARINC801 Connector
Rotated fixture, started X-Axis shock, 1 positive, 1 negative3:38 PM Took final CIT measurements
NM
Rotated fixture, started Y-Axis shock, 1 positive, 1 negative
Flipped axis, Performed z-axis shock positivePerformed y-axis shock negative
8:46 AM Performed x-axis shock negative
3:32 PM
04/13/12 3:36 PM
Started Z-Axis shock, 1 positive, 1 negative9:02 AM Performed z-axis shock negative
8:45 AM
Date/Time
Performed By
NMNorman Metzner4/12/12 8:45am
NM
715RF-24-106 1221141260 Extech1266 Rifocs
BR5 7500041224 JGR1103
1254
Optical Power Head
42280 9069033
Hewlett Packard 81524A 3248G01181
Hewlett Packard 81533B 3411G05264 Optical Head Interface
Temperature Humidity Datalogger 5/3/2011 1:03:12 PM 5/3/2012 1x24 Multimode Optical Switch Reference Only Reference Only
Return Loss Module 12/16/2011 11:40:19 AM 12/16/20121028 Agilent 81610A DE40500414
Customer Witness
none
Experior Test Procedure # (if applicable)
Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 4
Y-AxisInitial P [dBm] Discontinuity Discontinuity Final P [dBm] CIT [dB] Discontinuity
A1 mm -17.56 PASS PASS -17.56 0.00 PASSA3 mm -17.65 PASS PASS -17.63 0.02 PASSA1 mm -18.15 PASS PASS -18.14 0.01 PASSA2 mm -17.74 PASS PASS -17.72 0.02 PASSA4 mm -17.52 PASS PASS -17.54 -0.02 PASSA5 mm -17.93 PASS PASS -17.93 0.00 PASSA1 mm -17.85 PASS PASS -17.84 0.01 PASSA2 sm -14.73 PASS PASS -14.69 0.04 PASSA4 sm -14.62 PASS PASS -14.63 -0.01 PASSA5 mm -17.75 PASS PASS -17.79 -0.04 PASSA1 mm -17.97 PASS PASS -17.96 0.01 PASSA2 mm -17.86 PASS PASS -17.86 0.00 PASSA3 sm -14.49 PASS PASS -14.52 -0.03 PASSA5 sm -14.70 PASS PASS -14.71 -0.01 PASSA6 mm -18.18 PASS PASS -18.18 0.00 PASSA7 mm -18.33 PASS PASS -18.33 0.00 PASS
Phase 2: Mechanical Shock screening for 1us/>1dB discontinuity
Connector ID Channel X-Axis Z-Axis
3W3
5W5
17W5
24W7
-60
-40
-20
020
4060
-80
-60
-40
-200204060
Tim
e (m
s)
Acceleration (G)
Ac
ce
lera
tio
n
Dem
and
Con
trol
-60
-40
-20
020
4060
-60
-40
-20020406080
Tim
e (m
s)
Acceleration (G)
Ac
ce
lera
tio
n
Dem
and
Con
trol
-60
-40
-20
020
4060
-60
-40
-20020406080
Tim
e (m
s)
Acceleration (G)
Ac
ce
lera
tio
n
Dem
and
Con
trol
-60
-40
-20
020
4060
-80
-60
-40
-200204060
Tim
e (m
s)
Acceleration (G)
Ac
ce
lera
tio
n
Dem
and
Con
trol
-60
-40
-20
020
4060
-80
-60
-40
-200204060
Tim
e (m
s)
Acceleration (G)
Ac
ce
lera
tio
n
De
man
d
Co
ntro
l-6
0-4
0-2
00
204
060
-40
-20020406080
Tim
e (m
s)
Acceleration (G)
Ac
ce
lera
tio
n
De
man
d
Co
ntro
l
Z-A
XIS
NE
GA
TIV
E 3
W3/
24W
7
Y-A
XIS
NE
GA
TIV
E 3
W3/
24W
7
X-A
XIS
NE
GA
TIV
E
X-A
XIS
PO
SIT
IVE
3W
3/24
W7
Y-A
XIS
PO
SIT
IVE
3W
3/24
W7
Z-A
XIS
PO
SIT
IVE
3W
3/24
W7
-60
-40
-20
020
4060
-60
-40
-20020406080
Tim
e (m
s)
Acceleration (G)
Ac
ce
lera
tio
n
Dem
and
Con
trol
-60
-40
-20
020
4060
-80
-60
-40
-200204060
Tim
e (m
s)
Acceleration (G)
Ac
ce
lera
tio
n
Dem
and
Con
trol
-60
-40
-20
020
4060
-60
-40
-20020406080
Tim
e (m
s)
Acceleration (G)
Ac
ce
lera
tio
n
Dem
and
Con
trol
-60
-40
-20
020
4060
-60
-40
-20020406080
Tim
e (m
s)
Acceleration (G)
Ac
ce
lera
tio
n
Dem
and
Con
trol
-60
-40
-20
020
4060
-80
-60
-40
-200204060
Tim
e (m
s)
Acceleration (G)
Ac
ce
lera
tio
n
Dem
and
Con
trol
-60
-40
-20
020
4060
-80
-60
-40
-200204060
Tim
e (m
s)Acceleration (G)
Ac
ce
lera
tio
n
Dem
and
Con
trol
X-A
XIS
PO
SIT
IVE
5W
5/17
W5
Y-A
XIS
PO
SIT
IVE
5W
5/17
W5
Z-A
XIS
PO
SIT
IVE
5W
5/17
W5
Y-A
XIS
NE
GA
TIV
E 5
W5/
17W
5
X-A
XIS
NE
GA
TIV
E
Z-A
XIS
NE
GA
TIV
E 5
W5/
17W
5
Test Datasheet Test Report by:Experior Laboratories, Inc.
Performed By
04/13/12
1:45 PM1:40 PM
04/11/12
Routed cables and took baseline measurements
Finished x-axisChanged axis to x and started vibration
12/16/2012Return Loss Module 12/16/2011 11:40:19 AM
1254 Hewlett Packard 81533B
Temperature Humidity Datalogger122114
1260 Extech 42280 9069033
Optical Head Interface
1103 Hewlett Packard 81524A1224 JGR BR5
1028 Agilent 81610A DE40500414
Signoff
1266 Rifocs 715RF-24-106
NMjohn kimNM
8:00 AM
Initials
Category Requirement
4/13/12 4pm4/11/12 8am 4/11/12 8am 4/13/12 4pm
Test Sample Description
ARINC801 Connector System
Norman Metzner
Project Engineer
NMNM
1:00 PMFinished y-axis
Changed axis to y and started vibration 11:15 AM11:25 AM12:05 PM
2:00 PM Changed axis to y and started vibration Finished y-axis
2:45 PM Changed axis to z and started vibration
Reference Only
3:30 PM Took final power measurement3:25 PM Finished z-axis
Results Summary
Specific Test Conditions
3248G01181750004
3411G05264 1x24 Multimode Optical Switch
Optical Power Head Quad-Wave Backreflection Meter
DS Revision
04/16/12
Service Project Number SPN Test ID # Temperature
23 °C
Humidity
38 %RH
9/11/2012
Reference Only Reference Only
10/31/2011 2:10:44 PM1085 Discontinuity Monitor 8 channel 9/11/2011 3:33:44 PM1002
1111 555B 122347
Instrum. Number Manufacturer Model Number
1217 Rifocs
1035 Unholtz Dickie
SN 2008
Serial Number
Experior Photonics
1145 0dffcf
EP-TE1004
3117 - 271 SA30-SO92
12/9/201210/24/2012
2/3/14 QPL 8-channel 1300nm LED 2/3/12 10/24/2011 2:28:02 PM Optical Power Meter
2 Channel Vibration Controller
Instrument Description
10/26/201212/9/2011
10mV/G Triaxial Accelerometer
Cal Due DateReference OnlyReference Only Electrodynamic Vibration System
Last Cal Date
10/26/2011 9:31:58 AM
10/31/2012
none
Customer Witness
Event Log
1/3/2012 10:43:29 AM 1/3/2013 Reference Only
Signoff byTechnical Director
5/3/2011 1:03:12 PM 5/3/2012
Bench Cleaning Equipment List Post Test Cleanup Setup Check
11965 GB-3
Test Specification / Standard
4.5.16 of MIL-DTL-24308GEIA-364-28F, test condition IV
Phase 2: 10-2000-10Hz sine sweep in 20 minutes, 2 times in each of the 3 axes, total 2
hours -> no discontinuities of >1dB for 1us during not to exceed
Experior Test Procedure # (if applicable)
4/11/12 8am
NM
EP-TE2000
Dytran Vibration Research VRC8555B
3055A1
4/4
04/10/12 4:00 PM
2:40 PM
1:15 PM1:55 PM
10:35 AM
Product Name Purchase Order #
177125
Anomaly / Interruption
none
CIT [dB] after not required -0.04
Vibration Phase 2
Start Date
4/10/2012
Completion Date
4/13/2012 NXTCore
Max/Min Measurement Value Compliance
Measurements / Inspection
Acceleration [g], Frequency [Hz], Discontinuity [us], CIT [dB]
none
Nonconformity / Deviation
EPWI-1043 ETS Vibration System Operating ProcedureEPWI-1100 Vibration Controller Programming
EPTP-1002 TransmittanceEPTP-1004 Optical Signal Discontinuity
Part Number
CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS
CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS
Date Time Event Log
Test Title
1219 Experior Photonics
Discontinuity
1119
Date/Time
NM
Mounted test samples to vibration cube
4/4
NM
no discontinuity of +/- 1dB for more than 1us no discontinuities
Took final power measurement Armed discontinuity system and started vibration x-axis
Finished x-axis
Finished z-axis Armed discontinuity system and started vibration z-axis
Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 4
Y-AxisInitial P [dBm] Discontinuity Discontinuity Final P [dBm] CIT [dB] Discontinuity
A1 mm -17.52 PASS PASS -17.56 -0.04 PASSA3 mm -17.68 PASS PASS -17.65 0.03 PASSA1 mm -18.14 PASS PASS -18.15 -0.01 PASSA2 mm -17.72 PASS PASS -17.74 -0.02 PASSA4 mm -17.54 PASS PASS -17.52 0.02 PASSA5 mm -17.93 PASS PASS -17.93 0.00 PASSA1 mm -17.84 PASS PASS -17.85 -0.01 PASSA2 sm -14.69 PASS PASS -14.73 -0.04 PASSA4 sm -14.63 PASS PASS -14.62 0.01 PASSA5 mm -17.79 PASS PASS -17.75 0.04 PASSA1 mm -17.98 PASS PASS -17.97 0.01 PASSA2 mm -17.87 PASS PASS -17.86 0.01 PASSA3 sm -14.48 PASS PASS -14.49 -0.01 PASSA5 sm -14.69 PASS PASS -14.70 -0.01 PASSA6 mm -18.14 PASS PASS -18.18 -0.04 PASSA7 mm -18.34 PASS PASS -18.33 0.01 PASS
3W3
5W5
17W5
24W7
Phase 2: Sine Vibration screening for 1us/>1dB discontinuity
Connector ID Channel Z-Axis X-Axis
2000
1010
010
00
50.0 0.1
1.0
10.0
Fre
quen
cy (
Hz)
Acceleration (G peak)
Acc
ele
rati
on P
rofi
le
De
man
d
Co
ntro
l
Ch
2
2000
10
100
100
0
50.0 0.1
1.0
10.0
Fre
quen
cy (
Hz)
Acceleration (G peak)
Acc
ele
rati
on P
rofi
le
Dem
and
Con
trol
Ch2
2000
1010
010
00
50.0
0.1
1.0
10.0
Fre
quen
cy (
Hz)
Acceleration (G peak)
Acc
ele
rati
on P
rofi
le
Dem
and
Con
trol
Ch2
Y-A
XIS
Z-A
XIS
Y-A
XIS
X-A
XIS
X-A
XIS
3W
3/24
W7
Y-A
XIS
3W
3/24
W7
Z-A
XIS
3W
3/24
W7
200
010
100
100
0
50.0 0.1
1.0
10.0
Fre
quen
cy (
Hz)
Acceleration (G peak)
Acc
ele
rati
on P
rofi
le
De
man
d
Co
ntro
l
Ch
2
2000
10
100
100
0
50.0 0.1
1.0
10.0
Fre
quen
cy (
Hz)
Acceleration (G peak)
Acc
ele
rati
on P
rofi
le
Dem
and
Con
trol
Ch2
200
010
100
100
0
50.0 0.1
1.0
10.0
Fre
quen
cy (
Hz)
Acceleration (G peak)
Acc
ele
rati
on P
rofi
le
De
man
d
Co
ntro
l
Ch
2
Z-A
XIS
5W
5/17
W5
X-A
XIS
5W
5/17
W5
Y-A
XIS
5W
5/17
W5
Y-A
XIS
X-A
XIS
Z-A
XIS
Test Datasheet Test Report by:Experior Laboratories, Inc.
Performed By
04/13/12
1:45 PM1:40 PM
04/11/12
Routed cables and took baseline measurements
Finished x-axisChanged axis to x and started vibration
12/16/2012Return Loss Module 12/16/2011 11:40:19 AM
1254 Hewlett Packard 81533B
Temperature Humidity Datalogger122114
1260 Extech 42280 9069033
Optical Head Interface
1103 Hewlett Packard 81524A1224 JGR BR5
1028 Agilent 81610A DE40500414
Signoff
1266 Rifocs 715RF-24-106
NMjohn kimNM
8:00 AM
Initials
Category Requirement
4/13/12 4pm4/11/12 8am 4/11/12 8am 4/13/12 4pm
Test Sample Description
ARINC801 Connector System
Norman Metzner
Project Engineer
NMNM
1:00 PMFinished y-axis
Changed axis to y and started vibration 11:15 AM11:25 AM12:05 PM
2:00 PM Changed axis to y and started vibration Finished y-axis
2:45 PM Changed axis to z and started vibration
Reference Only
3:30 PM Took final power measurement3:25 PM Finished z-axis
Results Summary
Specific Test Conditions
3248G01181750004
3411G05264 1x24 Multimode Optical Switch
Optical Power Head Quad-Wave Backreflection Meter
DS Revision
04/16/12
Service Project Number SPN Test ID # Temperature
23 °C
Humidity
38 %RH
9/11/2012
Reference Only Reference Only
10/31/2011 2:10:44 PM1085 Discontinuity Monitor 8 channel 9/11/2011 3:33:44 PM1002
1111 555B 122347
Instrum. Number Manufacturer Model Number
1217 Rifocs
1035 Unholtz Dickie
SN 2008
Serial Number
Experior Photonics
1145 0dffcf
EP-TE1004
3117 - 271 SA30-SO92
12/9/201210/24/2012
2/3/14 QPL 8-channel 1300nm LED 2/3/12 10/24/2011 2:28:02 PM Optical Power Meter
2 Channel Vibration Controller
Instrument Description
10/26/201212/9/2011
10mV/G Triaxial Accelerometer
Cal Due DateReference OnlyReference Only Electrodynamic Vibration System
Last Cal Date
10/26/2011 9:31:58 AM
10/31/2012
none
Customer Witness
Event Log
1/3/2012 10:43:29 AM 1/3/2013 Reference Only
Signoff byTechnical Director
5/3/2011 1:03:12 PM 5/3/2012
Bench Cleaning Equipment List Post Test Cleanup Setup Check
11965 GB-3
Test Specification / Standard
4.5.16 of MIL-DTL-24308GEIA-364-28F, test condition IV
Phase 2: 10-2000-10Hz sine sweep in 20 minutes, 2 times in each of the 3 axes, total 2
hours -> no discontinuities of >1dB for 1us during not to exceed
Experior Test Procedure # (if applicable)
4/11/12 8am
NM
EP-TE2000
Dytran Vibration Research VRC8555B
3055A1
4/4
04/10/12 4:00 PM
2:40 PM
1:15 PM1:55 PM
10:35 AM
Product Name Purchase Order #
177125
Anomaly / Interruption
none
CIT [dB] after not required -0.04
Vibration Phase 2
Start Date
4/10/2012
Completion Date
4/13/2012 NXTCore
Max/Min Measurement Value Compliance
Measurements / Inspection
Acceleration [g], Frequency [Hz], Discontinuity [us], CIT [dB]
none
Nonconformity / Deviation
EPWI-1043 ETS Vibration System Operating ProcedureEPWI-1100 Vibration Controller Programming
EPTP-1002 TransmittanceEPTP-1004 Optical Signal Discontinuity
Part Number
CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS
CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS
Date Time Event Log
Test Title
1219 Experior Photonics
Discontinuity
1119
Date/Time
NM
Mounted test samples to vibration cube
4/4
NM
no discontinuity of +/- 1dB for more than 1us no discontinuities
Took final power measurement Armed discontinuity system and started vibration x-axis
Finished x-axis
Finished z-axis Armed discontinuity system and started vibration z-axis
Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 4
Y-AxisInitial P [dBm] Discontinuity Discontinuity Final P [dBm] CIT [dB] Discontinuity
A1 mm -17.52 PASS PASS -17.56 -0.04 PASSA3 mm -17.68 PASS PASS -17.65 0.03 PASSA1 mm -18.14 PASS PASS -18.15 -0.01 PASSA2 mm -17.72 PASS PASS -17.74 -0.02 PASSA4 mm -17.54 PASS PASS -17.52 0.02 PASSA5 mm -17.93 PASS PASS -17.93 0.00 PASSA1 mm -17.84 PASS PASS -17.85 -0.01 PASSA2 sm -14.69 PASS PASS -14.73 -0.04 PASSA4 sm -14.63 PASS PASS -14.62 0.01 PASSA5 mm -17.79 PASS PASS -17.75 0.04 PASSA1 mm -17.98 PASS PASS -17.97 0.01 PASSA2 mm -17.87 PASS PASS -17.86 0.01 PASSA3 sm -14.48 PASS PASS -14.49 -0.01 PASSA5 sm -14.69 PASS PASS -14.70 -0.01 PASSA6 mm -18.14 PASS PASS -18.18 -0.04 PASSA7 mm -18.34 PASS PASS -18.33 0.01 PASS
3W3
5W5
17W5
24W7
Phase 2: Sine Vibration screening for 1us/>1dB discontinuity
Connector ID Channel Z-Axis X-Axis
2000
1010
010
00
50.0 0.1
1.0
10.0
Fre
quen
cy (
Hz)
Acceleration (G peak)
Acc
ele
rati
on P
rofi
le
De
man
d
Co
ntro
l
Ch
2
2000
10
100
100
0
50.0 0.1
1.0
10.0
Fre
quen
cy (
Hz)
Acceleration (G peak)
Acc
ele
rati
on P
rofi
le
Dem
and
Con
trol
Ch2
2000
1010
010
00
50.0
0.1
1.0
10.0
Fre
quen
cy (
Hz)
Acceleration (G peak)
Acc
ele
rati
on P
rofi
le
Dem
and
Con
trol
Ch2
Y-A
XIS
Z-A
XIS
Y-A
XIS
X-A
XIS
X-A
XIS
3W
3/24
W7
Y-A
XIS
3W
3/24
W7
Z-A
XIS
3W
3/24
W7
200
010
100
100
0
50.0 0.1
1.0
10.0
Fre
quen
cy (
Hz)
Acceleration (G peak)
Acc
ele
rati
on P
rofi
le
De
man
d
Co
ntro
l
Ch
2
2000
10
100
100
0
50.0 0.1
1.0
10.0
Fre
quen
cy (
Hz)
Acceleration (G peak)
Acc
ele
rati
on P
rofi
le
Dem
and
Con
trol
Ch2
200
010
100
100
0
50.0 0.1
1.0
10.0
Fre
quen
cy (
Hz)
Acceleration (G peak)
Acc
ele
rati
on P
rofi
le
De
man
d
Co
ntro
l
Ch
2
Z-A
XIS
5W
5/17
W5
X-A
XIS
5W
5/17
W5
Y-A
XIS
5W
5/17
W5
Y-A
XIS
X-A
XIS
Z-A
XIS
Test Datasheet Test Report by:Experior Laboratories, Inc.
Performed By
Completed IL/RL for all MM samples.
750004 1/3/2013 Quad-Wave Backreflection Meter 1/3/2012 10:43:29 AM
6871407 Fujikura CT-30 210941400 Fujikura FSM-17S
1224 JGR BR5
1258 Hewlett Packard HP 81524A 3248G015411102 Hewlett Packard 81533B 3411G05696
john kimJZ/HR
Initials
Category Requirement
Signoff
3/23/12 10am
Time
Date/Time
JZ
1:30 PM Starting IL/RL measurements for sm samples.
Norman Metzner
Project EngineerSignoff by
Technical Director
none
Test Sample Description
S/N's and termini position's are reversed.
Customer Witness
Optical Power Head 3/8/2012 3:22:08 PM 3/8/2014
Reference Only Reference Only Reference Only Reference Only
Reference Only Reference Only
Humidity
10/31/2011 2:10:44 PM
Last Cal Date
9/6/2012
Temperature
23 °C
10/31/2012 Reference Only
Reference Only
29 %RH
DS Revision
03/23/12
Optical Head Interface
Fiber Fusion Splicer Fiber Cleaver
Service Project Number SPN Test ID #
CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS
CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS
14021405
ARINC801
Reference Only Optical Head Interface Reference Only1451 1300nm MM Return Loss Meter 9/6/2011 5:38:40 PM
Optical Power Head Fiber Cleaver
122785
1103 Hewlett Packard
Instrum. Number Manufacturer Model Number Serial Number Extech 42280 9069033
781RL-13-110
81524A 3248G01181 3411G05264
Rifocs
6316212161
Instrument Description
Reference Only Reference Only
Fiber Fusion Splicer
Cal Due Date5/3/2012 5/3/2011 1:03:12 PM Temperature Humidity Datalogger
JZ/HR
3/20/2012 1:25 PM 3/20/2012 1:27PM 3/21/12 4:30pm
11965 GC-1
Test Specification / Standard
TIA-455-171A (FOTP-171), Method D1 (multimode) and D3 (single-mode)
2.4.3.2 of ARINC Specification 801-2 and in accordance with
TIA/EIA-455-107A (FOTP-107).
Fiber optic connector assemblies shall have a maximum attenuation of 0.3 dB for
multimode connections. For all single-mode connections, measure and record only. No
failure criterion exists for single-mode connections
Return loss should be a minimum of 20 dB for multimode PC polish termini and 30 dB for
single-mode PC polish termini
Experior Test Procedure # (if applicable)
EPTP-1002 TransmittanceEPTP-1005 Return Loss
Part Number
Equipment List Post Test Cleanup Setup Check
NMJZ
1260
81533B
Fujikura Fujikura CT-30
FSM-50S
Product Name Purchase Order #
177125
IL-RL
Start Date
3/20/2012
Completion Date
3/21/2012
Test Title
NXTCore
03/20/12Date
03/20/1203/21/1203/21/1203/21/12
03/20/12
Results Summary
3/20/2012 1:25 PM
Anomaly / Interruption
none
1254 Hewlett Packard
Event Log
NM
Bench Cleaning
Measurements / Inspection
IL [dB], RL [dB]
none
Nonconformity / Deviation
Specific Test Conditions
1:30 PM
Completed IL/RL measurements for sm samples. A5 IL was high. Will inspect ferrule endfaces, clean and retest.
Max/Min Measurement Value Compliance
9:00AM
Event Log
Completed IL/RL measurements for MM 2:30PM Starting IL/RL measurements for MM samples.4:25 PM
JZJZ
HR
A5 = Inspected and cleaned ferrule endface. Retested and passed. JZ/HRJZJZ
2:00 PM4:30 PM03/21/12
Insertion Loss [dB] 0.3 (for MM only) 0.20 4/4
Return Loss [dB] 20 for MM and 30 for SM 45 4/4
Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 3
Sample # Channel Power [dBm] Cutback [dbm] IL [dB] RL [dB]
A1 mm -11.37 -11.34 0.03 >45A3 mm -11.36 .-11.34 0.02 >45A1 mm -11.34 -11.32 0.02 >45A2 mm -11.36 -11.32 0.04 >45A4 mm -11.36 -11.33 0.03 >45A5 mm -11.37 -11.34 0.03 >45A1 mm -11.53 -11.47 0.05 >45A2 sm -5.57 -5.41 0.16 56.7A4 sm -5.60 -5.41 0.20 57.1A5 mm -11.50 -11.48 0.02 >45A1 mm -11.48 -11.47 0.00 >45A2 mm -11.49 -11.48 0.01 >45A3 sm -5.55 -5.39 0.16 51.1A5 sm -5.54 -5.40 0.14 59.5A6 mm -11.53 -11.48 0.06 >45A7 mm -11.53 -11.48 0.04 >45
A1 mm 0.00A2 mm 0.00A3 sm -5.52 -5.40 0.11 58.7A5 sm -5.74 -5.40 0.34 59.8A6 mm 0.00A7 mm 0.00
MULTIMODE @1300nm, Singlemode @1550nm
3W3
24W7
24W7
17W5
5W5
Initial Results
Test Datasheet Test Report by:Experior Laboratories, Inc.
10:45AM04/24/12
Finished 500 Cycles Mating Durability on 24W7Start Preparation and Mounting Sample 24W7 to the Plate to start Mating Durability
3:30PM
4/4
0.11/-0.08 2/2
Time
Date/Time
HR
no damage observed
Customer Witness
ARINC801 Compliant Connectors
4/23/12 7:00AM 4/23/12 7:30AM
Signoff
4/25/12 4:30pm4/25/12 3:30PM
NM
Signoff byTechnical Director
none
John KimHarris R
Performed By
Norman Metzner
Project Engineer
Start Preparation and Mounting Sample 17W5 into the Plate to start Mating Durability3:30PM Finished 500 Cycles Mating Durability on 17W5
Reference Only3/8/2014
Reference Only
50 %RH
Reference Only 3/8/2012 3:22:08 PM
Cal Due Date5/3/2012 5/3/2011 1:03:12 PM
Measurements / Inspection
DS Revision
04/25/12
Service Project Number SPN Test ID # Humidity
Reference Only
10/31/2012
Temperature
23 °C
1310/1550nm Laser Source 10/31/2011 2:11:01 PM DE38A00785 12/9/2012
CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS
CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS
DE38A00709 81654A1026
Test Sample Description
1123 Tempo
12561257
Temperature Humidity DataloggerLast Cal DateInstrument Description
11965 GC-3
Test Specification / Standard
4.5.18 of MIL-DTL-24308G and in accordance with EIA-364-09C, TIA-455-21A (FOTP-21)
Manual mating and un-mating of test samples, 500 cycles at a rate between 100
and 300 cycles per hour.CIT test shall be performed after every 100
cycles. Termini shall be cleaned prior to each measurement.
Part Number
NMHR
Bench Cleaning
Hewlett Packard Hewlett Packard HP 81533A
HP 81524A
Customer Name Purchase Order #
177125
Mating Durability
Start Date
4/23/2012
Completion Date
4/25/2012
Test Title
NXTCon
7:00AM
Equipment List
HR
CIT [dB] SM
Results Summary
4/24/12 8am
4/4
Date
Category Requirement
Instrum. Number Manufacturer
Visual Inspection No damage
0.5
1260
81654A
Post Test Cleanup Setup Check
Model Number Serial Number
850/1300nm Dual LED Source Optical Head Interface Optical Power Head
42280
Experior Test Procedure # (if applicable)
per referenced industry standard
Event Log
Extech
Agilent
2949G00504 3248G01658
9069033
252B D91114 1310/1550nm Laser Source 12/9/2011 3:56:59 PM
CIT [dB]
none
Nonconformity / Deviation
Specific Test Conditions
Anomaly / Interruption
Max/Min Measurement Value Compliance
Event Log
CIT [dB] MM 0.5 0.08/-0.03
none
1220 Agilent
7:00AM04/25/12
04/25/1210:30AM
Initials
Finished 500 Cycles Mating Durability on 5W5Start Preparation and Mounting Sample 5W5 into the Plate to start Mating Durability HR
Finished 500 cycles Mating Durability on 3W3Started Mating Durability on 3W3
Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 3
Sam
ple
#C
han
nel
Po
wer
bef
ore
[d
Bm
]P
ow
er a
fter
100
cy
cles
[d
Bm
]C
IT a
fter
100
cy
cles
[d
B]
Po
wer
aft
er 2
00
cycl
es [
dB
m]
CIT
aft
er 2
00
cycl
es [
dB
]P
ow
er a
fter
300
cy
cles
[d
Bm
]P
ow
er a
fter
400
cy
cles
[d
Bm
]C
IT a
fter
400
cy
cles
[d
B]
Po
wer
aft
er 5
00
cycl
es [
dB
m]
CIT
aft
er 5
00
cycl
es [
dB
]
A1
mm
-38.
54-3
8.55
-0.0
1-3
8.55
-0.0
1-3
8.54
0.00
-38.
540.
00-3
8.54
0.00
A3
mm
-37.
55-3
7.56
-0.0
1-3
7.55
0.00
-37.
550.
00-3
7.55
0.00
-37.
550.
00A
1 m
m-3
7.00
-37.
01-0
.01
-37.
01-0
.01
-37.
000.
00-3
7.00
0.00
-36.
990.
02A
2 m
m-3
8.07
-38.
09-0
.01
-38.
080.
00-3
8.09
-0.0
2-3
8.07
0.00
-38.
070.
00A
4 m
m-3
7.42
-37.
420.
00-3
7.42
0.00
-37.
420.
00-3
7.42
0.00
-37.
420.
00A
5 m
m-3
8.53
-38.
530.
00-3
8.49
0.04
-38.
510.
01-3
8.49
0.04
-38.
500.
03A
1 m
m-3
8.68
-38.
680.
00-3
8.67
0.01
-38.
680.
00-3
8.66
0.02
-38.
670.
01A
2 sm
-4.9
1-4
.88
0.03
-4.9
00.
01-4
.90
0.01
-4.9
00.
01-4
.90
0.01
A4
sm-2
.40
-2.3
80.
02-2
.38
0.02
-2.3
80.
02-2
.37
0.03
-2.3
70.
02A
5 m
m-3
8.77
-38.
770.
01-3
8.69
0.08
-38.
750.
02-3
8.78
0.00
-38.
750.
02A
1 m
m-3
9.96
-39.
900.
06-3
9.90
0.06
-39.
890.
07-3
9.89
0.07
-39.
890.
07A
2 m
m-3
8.36
-38.
350.
01-3
8.37
-0.0
1-3
8.36
0.01
-38.
350.
01-3
8.35
0.01
A3
sm-3
.59
-3.6
0-0
.01
-3.4
80.
11-3
.55
0.04
-3.5
70.
02-3
.58
0.02
A5
sm-5
.62
-5.6
5-0
.03
-5.6
8-0
.06
-5.7
0-0
.08
-5.5
70.
05-5
.60
0.03
A6
mm
-37.
47-3
7.47
-0.0
1-3
7.48
-0.0
1-3
7.49
-0.0
2-3
7.48
-0.0
1-3
7.49
-0.0
2A
7 m
m-3
8.09
-38.
10-0
.01
-38.
080.
01-3
8.08
0.01
-38.
080.
00-3
8.12
-0.0
3
MU
LT
IMO
DE
@13
00n
m, S
ing
lem
od
e @
1550
nm
3W3
24W
7
17W
5
5W5
Test Datasheet Test Report by:Experior Laboratories, Inc.
CIT [dB] SM 0.5 0.01/-0.03 2/2
CIT [dB] MM 0.5 0.03/-0.02 4/4
4:15 PM JZ
11:00 AMJZJZ
Starting test JZ
JZJZ
Nonconformity / Deviation
Specific Test Conditions
8:30 AM
Starting test
Max/Min Measurement Value Compliance
8:00 AM
Event Log
Test setup for 24w7 samples4:30 PM
Anomaly / Interruption
none
1258 Hewlett Packard
Extech 42280 9069034
04/27/12Date
04/27/1204/30/1204/30/1204/30/12
04/27/12
Customer Name Purchase Order #
177125
Cable Pull-out Force
Start Date
4/27/2012
Completion Date
4/30/2012
Test Title
NXTCon
1261
HP 81524A
ATS Hewlett Packard 81533B
1405 UTM
NMNDY
Results Summary
4/27/2012 8:00AM
NM
Completed 3w3 and 5w5 samples
Event LogBench Cleaning
ARINC801 Rectangular
Performed By
Part Number
Equipment List Post Test Cleanup Setup Check
4/27/2012 8:00AM NDY
11965 GC-4
Test Specification / Standard
TIA-455-6B (FOTP-6) Method 1
The test load shall be applied as follows with a rate of pull being 20 lb/min (89 N/min)
Load 1: Apply 12 lb force at 0° for at least 5 seconds but no more than 10 seconds.
-
Reference Only 5000 lbs Universal Tensile Machi
Cal Due Date5/3/2012 5/3/2011 1:03:01 PM Temperature Humidity Datalogger
Last Cal Date
81654A DE38A00709 3248G01541
Instrument Description
3411G05696 A911206-11-91
Instrum. Number Manufacturer Model Number Serial Number
1080
1026 Agilent1102
Tempo3/8/2014 Optical Power Head 3/8/2012 3:22:08 PM
1123 850/1300nm Dual LED Source Reference Only D91114 252B
CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS
CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS
DS Revision
05/01/12
Service Project Number SPN Test ID # Humidity
10/31/2011 2:11:01 PM
Reference Only
Temperature
22.8 °C
10/31/2012 Reference Only
Reference Only
43.8 %RH
Measurements / Inspection
CIT[dB], Force [lb]
none
1310/1550nm Laser Source Optical Head Interface
Reference Only
Customer WitnessExperior Test Procedure # (if applicable)
Completed 17w5 and 24w7 samples
8:00 AM Test setup. Preparing cables.
Norman Metzner
Project EngineerSignoff by
Technical Director
none
Test Sample Description
Initials
Category Requirement
Signoff
4/30/12 4:30pm
Time
Date/Time
JZJZ
4/27/2012 8:00AMjohn kimJZ
Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 5
Sample # Channel SidePower before
[dBm]Power after [dBm] CIT after [dB]
Female -20.45 -20.44 0.01Male -20.42 -20.41 0.01
Female -20.25 -20.23 0.02Male -21.45 -21.44 0.01
Female -19.72 -19.71 0.01Male -21.37 -21.38 -0.01
Female -21.10 -21.09 0.01Male -21.85 -21.85 0.00
Female -21.58 -21.55 0.03Male -20.98 -21.00 -0.02
Female -20.14 -20.12 0.02Male -22.22 -22.22 0.00
Female -20.60 -20.60 0.00Male -22.33 -22.32 0.01
Female 1.08 1.08 0.00Male 1.11 1.10 -0.01
Female 1.08 1.08 0.00Male 1.10 1.10 0.00
Female -22.60 -22.59 0.01Male -22.33 -22.32 0.01
Female -20.86 -20.86 0.00Male -20.56 -20.55 0.01
Female -21.01 -21.00 0.01Male -21.50 -21.50 0.00
Female 1.02 1.02 0.00Male 1.00 0.97 -0.03
Female 1.10 1.11 0.01Male 1.10 1.10 0.00
Female -20.56 -20.57 -0.01Male -21.31 -21.30 0.01
Female -21.26 -21.26 0.00Male -21.29 -21.30 -0.01
A6 mm
A7 mm
24W7
A1 mm
A2 mm
A3 sm
A5 sm
A2 sm
A4 sm
A5 mm
17W5
A4 mm
A5 mm
5W5
A1 mm
A1 mm
A2 mm
MULTIMODE @1300nm, Singlemode @1550nm
A1 mm
A3 mm3W3
Tim
e S
Load
lbX
Hea
d in
00.
002
00.
012
-0.0
050.
0000
010.
028
-0.0
060.
0000
120.
044
-0.0
050.
0000
290.
06-0
.005
0.00
0046
0.07
6-0
.004
0.00
0066
0.09
2-0
.004
0.00
0086
0.10
8-0
.004
0.00
0105
0.12
4-0
.004
0.00
0126
0.14
-0.0
030.
0001
450.
156
-0.0
030.
0001
660.
172
-0.0
020.
0001
890.
188
-0.0
010.
0002
110.
2-0
.001
0.00
023
0.21
6-0
.001
0.00
0255
0.23
20
0.00
0282
0.24
80
0.00
0311
0.26
40.
001
0.00
0338
0.28
0.00
10.
0003
630.
296
0.00
10.
0003
880.
312
0.00
20.
0004
120.
328
0.00
20.
0004
380.
340.
002
0.00
0459
0.35
60.
003
0.00
049
0.38
40.
004
0.00
0539
0.42
80.
005
0.00
0609
0.45
20.
007
0.00
0646
0.46
80.
008
0.00
0671
0.48
40.
009
0.00
0701
0.50
40.
010.
0007
450.
516
0.01
10.
0007
710.
592
0.01
30.
0009
10.
624
0.01
50.
0009
70.
656
0.01
70.
0010
360.
684
0.01
90.
0010
880.
716
0.02
10.
0011
44
SP
N 1
1965
GC
-4 C
able
Pu
ll-o
ut
02468101214
05
1015
2025
3035
4045
50
Tim
e [s
]
Load [lb]
Test Datasheet Test Report by:Experior Laboratories, Inc.
Performed By
Continuing Termini Retention Force test. Started sample 5W5Completed sample 3W3 Ch. A1 and A2 male and female side
john kimJZ
Initials
Category
JZ
5/1/2012 8:30AM 5/1/2012 8:30AM 5/9/2012 9:30PM
8:30 AM Test setup. Removing samples from termini connector
Norman Metzner
Project EngineerSignoff by
Technical Director
Requirement
Signoff
5/15/12 8am
Time
Date/Time
Completed A1, A2, A3, A5 and A6 (female side) of sample 24W78:00 AM Continuing with sample 24W7 A7 female
6:45 PM Continuing test with A5 male3:20 PM Complete A7 female and A1, A2, A3, and A7 male side for sample 24W7
Continuing Termini Retention Force test
8:00 AM6:15 PM Completed sample 5W58:00 AM Continuing with sample 24W7
9:20 PM Completed A5 and A6 male side for sample 24W7. Completed Termini Retention Force test for all samples.
6/21/2012 Reference Only
46 %RH
Reference Only 6/21/2011 3:56:32 PM
Cal Due Date5/3/20135/3/2012
Measurements / Inspection
DS Revision
05/15/12
Service Project Number SPN Test ID # Humidity
Last Cal Date
Temperature
23 °C
CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS
CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS
Customer Witness
none
1203
ARINC801 Rectangular
Test Sample Description
199710 A911206-11-91
Instrum. Number Manufacturer Model Number Serial Number
1080 Extech 42280 9069034
Instrument Description
5000 lbs Universal Tensile Machi Temperature Humidity Datalogger
250 lbs. Load Cell
11965 GC-5
Test Specification / Standard
2.4.5.3 of ARINC Specification 801-2 and in accordance with EIA-364-38C, either Method A or B
The test load shall be 12 lb force at a rate of 89 newtons per minute ± 4 newtons
per minute (20 pounds per minute ± 1 pound per minute), maintain load for one hour Note: This test is intended to prove the
integrity of the connector terminus retention feature and not to prove the attachment of
the cable terminus
Experior Test Procedure # (if applicable)
per referenced industry standard
Part Number
Equipment List Post Test Cleanup Setup Check
NMJZJZ
1261 ATS
Interface SM-250 1405 UTM
Customer Name Purchase Order #
177125
Termini Retention Force
Start Date
5/1/2012
Completion Date
5/9/2012
Test Title
NXTCon
05/01/12Date
05/01/1205/02/1205/02/1205/03/12
05/01/12
Results Summary
5/1/2012 8:30AM
Anomaly / Interruption
none
Event Log
NM
Bench Cleaning
All termini shall be retained with no damage to the termini, the connector inserts or to the retention
mechanisms.
none
Nonconformity / Deviation
Specific Test Conditions
5:30 PM
Starting Termini Retention Force test with customer provided retention tool
Max/Min Measurement Value Compliance
8:00 AM
Event Log
Continuing Termini Retention Force test4:25 PM Completed female channels A1, A2, A4 and A5 of sample 17W5
10:30 AMJZJZ
Completed sample 17W5 female and male. Also 3W3 A1 female JZ
JZJZ
JZJZJZJZJZJZJZ05/09/12
05/09/1205/09/12
JZJZJZ
8:20 AM
05/09/12
4:45 PM
2:30 PM05/03/1205/04/1205/04/1205/07/1205/07/12
Visual Inspection No damage no damage observed 4/4
Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 14
Sample # Channel Side Tested [Y/N]
Female YMale Y
Female YMale Y
Female YMale Y
Female YMale Y
Female YMale Y
Female YMale Y
Female YMale Y
Female YMale Y
Female YMale Y
Female YMale Y
Female YMale Y
Female YMale Y
Female YMale Y
Female YMale Y
Female YMale Y
Female YMale Y
5W5
17W5
MULTIMODE @1300nm, Singlemode @1550nm
3W3A1 mm
A3 mm
A1 mm
A2 mm
A4 mm
A5 mm
A1 mm
A2 sm
A4 sm
A5 mm
24W7
A1 mm
A2 mm
A3 sm
A5 sm
A6 mm
A7 mm
Test Datasheet Test Report by:Experior Laboratories, Inc.
4/13/12 11am
Max Measurement Value Compliance
4/12/12 3pm 4/12/2012 3pm 4/13/12 11amjohn kimMD
HR
Performed By
Time
Date/Time
Category Requirement
Signoff MDMDNorman Metzner
Project EngineerSignoff by
Technical DirectorEquipment List Post Test Cleanup Setup Check
NM
none
Test Sample Description Customer Witness
Humidity
Last Cal Date
Temperature
23°C 35%RH
DS Revision
04/13/12
Service Project Number SPN Test ID #
CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS
CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS
ARINC801 Connector
Instrum. Number Manufacturer Model Number Serial Number Mark-10 MG10 41612
Instrument Description Cal Due Date4/9/20134/9/2012 10lbs. Force Gauge
11965 GC-2
Test Specification / Standard
2.4.5.7 of ARINC Specification 801-2 and in accordance with
EIA-364-24B
All termini shall be removed and reinstalled ten times using the appropriate insertion and
removal tools.
Experior Test Procedure # (if applicable)
-
Part Number
Product Name Purchase Order #
177125
Maintenance Aging
Start Date
4/9/2012
Completion Date
4/13/2012 NXTCore
Date
Anomaly / Interruption
none
Event Log
Termini Force during first and last cycle [lb]
1147
04/13/12 11:00AM
Test Title
Results Summary
4/12/12 3pm
Event Log
NM
Bench Cleaning
Measurements / Inspection
The termini insertion force should be measured during the first and last cycles and should not exceed 36 N (8
pounds).
none
Nonconformity / Deviation
Specific Test Conditions
Finished testing samples3:30PM
<8 1.93
Started testing samples3:00PM Started instruments setup
4/4
InitialsMDMDHR
04/12/12
Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 4
Removal Force [lb] Insertion Force [lb]
1st 0.67 0.3510th 0.71 0.411st 0.71 0.38
10th 0.75 0.371st 0.76 0.36
10th 0.80 0.351st 0.73 0.37
10th 0.77 0.441st 0.70 0.35
10th 0.81 0.371st 0.76 0.38
10th 0.80 0.361st 0.78 0.36
10th 0.74 0.431st 0.71 0.45
10th 0.76 0.511st 0.69 0.38
10th 0.78 0.451st 0.71 0.45
10th 0.77 0.341st 0.67 0.50
10th 0.79 0.391st 0.69 0.27
10th 0.71 0.391st 0.78 0.21
10th 0.82 0.601st 0.79 0.58
10th 0.74 0.401st 0.86 0.54
10th 0.64 0.361st 0.76 0.47
10th 0.74 0.32
Sample # Cycle
A1 mm3W3
A3 mm
PlugTerminius
5W5
A1 mm
A2 sm
A4 sm
A1 mm
A2 mm
A4 mm
A5 mm
A5 mm
17W5
24W7
A1 mm
A2 mm
A3 sm
A5 sm
A6 mm
A7 mm
Removal Force [lb] Insertion Force [lb]
1.75 1.47 PASS0.87 1.12 PASS1.44 .1.51 PASS1.04 1.64 PASS1.60 1.72 PASS1.42 1.48 PASS0.98 1.42 PASS1.05 1.61 PASS1.01 1.32 PASS0.98 1.29 PASS1.07 1.58 PASS1.01 1.45 PASS0.94 1.75 PASS1.08 1.66 PASS1.28 1.45 PASS1.01 1.54 PASS1.33 1.60 PASS1.18 1.55 PASS1.27 1.88 PASS1.26 1.93 PASS1.20 1.64 PASS1.18 1.38 PASS1.20 1.59 PASS1.27 1.53 PASS1.10 1.48 PASS1.42 1.82 PASS0.85 1.17 PASS1.08 1.54 PASS0.84 1.32 PASS1.04 1.37 PASS0.65 1.49 PASS0.71 1.41 PASS
Comply?Receptacle
Test Datasheet Test Report by:Experior Laboratories, Inc.
1224 JGR Hewlett Packard1258
45 4/4
BR5 HP 81524A
Norman MetznerHR
Harris R
Return Loss [dB] 20 for MM and 30 for SM
Requirement
5/3/12 7:30AM
Post Test Cleanup
5/11/12 2:30Pm
Setup Check
Signoff NM
Equipment List
Start Preparation Cleaning and Inspecting Ferrules for RL Measurements 5 W 5Finished RL to Sample 5 W 5
HR
Customer Witness
5/3/12 9:30AM
Initials
Category
Project EngineerSignoff by
Technical Director
john kimHR HR
Performed By
Model Number Serial Number 42280 9069033
750004 1/3/2013Quad-Wave Backreflection Meter 1/3/2012 10:43:29 AM3248G01541
RL [dB]
none
Nonconformity / Deviation
Specific Test Conditions
Temperature
23 °C 55 %RH
Measurements / Inspection
3/8/2012 3:22:08 PM 3/8/2014
DS Revision
05/15/12
Optical Power Head
Service Project Number SPN Test ID # Humidity
none
9/6/20121451 1300nm MM Return Loss Meter 9/6/2011 5:38:40 PM122785 Rifocs 781RL-13-110
Test Sample Description
ARINC801 Connector
11965 GC-6
Test Specification / Standard
2.4.3.2 of ARINC Specification 801-2 and in accordance with
TIA/EIA-455-107A (FOTP-107).
Return loss should be a minimum of 20 dB for multimode PC polish termini and 30 dB for
single-mode PC polish termini
NM
Bench Cleaning
Date/Time
Start Preparation Cleaning and Inspecting Ferrules for RL Measurements Sample 17 W 5
Finished RL to Sample 24W711:30AM
5/15/12 8am5/3/12 7:30AM
Compliance
Event Log
Finished RL to Sample 3 W 3Start Preparation Cleaning and Inspecting Ferrules for RL Measurements 3 W 3
Start Preparation Cleaning and Inspecting Ferrules for RL Measurements 24W7
Test Title
NXTCon
1260
Event Log
Results Summary
Customer Name Purchase Order #
177125
Start Date
5/3/2012
Completion Date
5/11/2012
Anomaly / Interruption
none
Return Loss
Max/Min Measurement Value
Experior Test Procedure # (if applicable)
EPTP-1005 Return Loss
Part Number
Instrum. Number Manufacturer Extech
Cal Due Date5/3/2012 5/3/2011 1:03:12 PMTemperature Humidity Datalogger
Instrument Description Last Cal Date
Date Time
3:30PM2:30PM9:30AM
05/03/12
7:30AM
7:30AM
2:30PM05/11/12
Finished RL to Sample 17 W 5HR
HR05/07/12 10:00AM
Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 2
Sample # Channel RL [dB]
A1 mm >45A3 mm >45A1 mm >45A2 mm >45A4 mm >45A5 mm >45A1 mm >45A2 sm 54.9A4 sm 55.7A5 mm >45A1 mm >45 A2 mm >45A3 sm 55.2A5 sm 55.3A6 mm >45A7 mm >45
24W7
MULTIMODE @1300nm, Singlemode @1550nm
3W3
5W5
17W5
Test Datasheet Test Report by:Experior Laboratories, Inc.
Performed By
john kimJZ
Initials
Category Requirement
Signoff
3/23/2012
Time
Date/Time
JZ
11:05 AM Starting IL/RL measurements.
Norman Metzner
Project EngineerSignoff by
Technical Director
none
Test Sample Description
Specific Test Conditions
9/6/2011 5:38:40 PM
43.1 %RH
Customer Witness
Reference Only
Temperature
23.3 °C
10/31/2012 Reference Only
DS Revision
03/23/12
Service Project Number SPN Test ID # Humidity
10/31/2011 2:10:44 PM
Combo-D connector
Reference Only Fiber Fusion Splicer Reference Only1405 Fiber Cleaver Reference Only
CBD3W3M000T2S-MOS, CBD3W3F000E2S-MOSCBD5W5M000T2S-MOS, CBD5W5F000E2S-MOS
CBD17W5M200T2S-MOS, CBD17W5F200E2S-MOSCBD24W7M200T2S-MOS, CBD24W7F200E2S-MOS
Optical Power Head Optical Head Interface
63162
1103 Hewlett Packard Hewlett Packard 81533B
1402 Fujikura FSM-50S Fujikura
3411G05264122785
Instrum. Number Manufacturer Model Number Serial Number
14511254
CT-30
81524A 3248G0118112161
Instrument Description
9/6/2012 Reference Only
1300nm MM Return Loss Meter
Cal Due Date5/3/2012 5/3/2011 1:03:12 PM Temperature Humidity Datalogger
Last Cal Date
11965 GD-1
Test Specification / Standard
TIA-455-171A (FOTP-171), Method D1 (multimode) and D3 (single-mode)
2.4.3.2 of ARINC Specification 801-2 and in accordance with
TIA/EIA-455-107A (FOTP-107).
Fiber optic connector assemblies shall have a maximum attenuation of 0.3 dB for
multimode connections. For all single-mode connections, measure and record only. No
failure criterion exists for single-mode connections
Return loss should be a minimum of 20 dB for multimode PC polish termini and 30 dB for
single-mode PC polish termini
Experior Test Procedure # (if applicable)
EPTP-1002 TransmittanceEPTP-1005 Return Loss
Part Number
1/1
3/22/2012 11:00 AM
NM
0.3 (for MM only) 0.07
3/22/2012 11:03AM 3/22/12 12:45pm
Product Name Purchase Order #
177125
IL-RL
Start Date
3/22/2012
Completion Date
3/23/2012
Test Title
Setup Check
NMJZJZ
Bench Cleaning Equipment List Post Test Cleanup
3/22/2012 11:00 AM
03/22/12Date
NXTCore
Anomaly / Interruption
none
781RL-13-110 Extech 42280 9069033
Max/Min Measurement Value
Return Loss [dB] 20 for MM and 30 for SM 45
Insertion Loss [dB]
Compliance
Measurements / Inspection
IL [dB], RL [dB]
none
Nonconformity / Deviation
Event Log
Results Summary
1260 Rifocs
Event Log
12:15 PM Completed IL/RL measurements. S/N's and pin #'s are reversed.JZJZ03/22/12
1/1
Uncontrolled when printed 0003-022 Test Data sheet Template (rev P)1 of 3
Sample # Channel Power [dBm] Cutback [dbm] IL [dB] RL [dB]
A1 mm -11.59 -11.57 0.02 >45A3 mm -11.64 -11.57 0.07 >45
MULTIMODE @1300nm, Singlemode @1550nm
3W3