![Page 1: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/1.jpg)
NWPMA2017 Conference
Concrete Pavement Design Tools
Jim Powell, P.E. Executive Director
American Concrete Pavement Association, Northwest Chapter
![Page 2: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/2.jpg)
![Page 3: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/3.jpg)
Concrete Pavement Longevity
• Hallmark of concrete pavements • >50 year old pavements common… • SR 522 in Washington • Built 1917 • Rehab in 2001
![Page 4: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/4.jpg)
Benefits of Longevity
• Less-frequent reconstruction • Lower consumption of raw materials
– Cement, aggregates, steel
• Lower energy consumption • Congestion
![Page 5: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/5.jpg)
Benefits of Longevity
• Reduction in pollutants – Manufacturing, construction, congestion
• Infrequent construction zones • Real economic benefits…
![Page 6: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/6.jpg)
Pavement Design !!
![Page 7: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/7.jpg)
PAVEMENT DESIGN
NCHRP 1-26 Phase II Final Report
The new pavement will be built in the future, on subgrades often not yet exposed or accessible; using materials not yet manufactured from sources not yet identified; by a contractor who submitted the successful "low dollar" bid, employing unidentified personnel and procedures under climatic conditions that are frequently less than ideal.
![Page 8: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/8.jpg)
Design Procedures
• Empirical Design Procedures – Based on observed performance
• AASHTO 1993 Design Guide – Based on AASHO Road Test
• Mechanistic/Empirical Design Procedures – Based on mathematically calculated pavement
responses • ACPA Design Procedure – StreetPave • AASHTO MEPDG
![Page 9: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/9.jpg)
Concrete Pavement Design Tools
• Roadways – AASHTO 93 (WinPAS) – StreetPave – DarwinME – OptiPave
• Overlays – StreetPave – BCOA-ME
• Industrial – AirPave – PCASE (Corps of Engineers)
![Page 10: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/10.jpg)
AASHTO 93 DESIGN GuideWinPAS
The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement structures of known thickness under moving loads of known magnitude and frequency.
![Page 11: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/11.jpg)
AASHO Road Test Location
![Page 12: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/12.jpg)
Typical AASHO Loop Layout
Test Tangent = 6800 ft. South tangents & west turnarounds: Rigid North tangents & east turnarounds: Flexible Section Length = 100 ft AC = 240 JRCP = 120 JPCP 368 rigid test sections 468 flexible test sections
![Page 13: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/13.jpg)
AASHO Road Test PerformanceSurviving Sections
Loop 3
1.0
2.0
3.0
4.0
5.0
0 250 500 750 1000 1250
Serv
icea
bilit
y
Concrete (36 Sect)
Asphalt (4 Sect)
Loop 4
1.0
2.0
3.0
4.0
5.0
0 250 500 750 1000 1250Load Applications
Serv
icea
bilit
y
Loop 5
1.0
2.0
3.0
4.0
5.0
0 250 500 750 1000 1250
Serv
icea
bilit
y
Loop 6
1.0
2.0
3.0
4.0
5.0
0 250 500 750 1000 1250Load Applications
Serv
icea
bilit
yConcrete (38 Sect)
Asphalt (10 Sect)
Concrete (39 Sect)Asphalt (11 Sect)
Concrete (47 Sect)Asphalt (17 Sect)
![Page 14: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/14.jpg)
AASHO Road Test Empirical Loop Equation
Slab
Thi
ckne
ss (i
n.)
0
3
5
8
10
Axle Load (kips)0 14 28 42 56
10,000 Apps.100,000 Apps.1,000,000 Apps.XY (Scatter) 4XY (Scatter) 5XY (Scatter) 6
Single Axle
Tandem Axle
For experimental design 1
![Page 15: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/15.jpg)
AASHO Road Test Extended Design Equation
• Empirical Loop Equation only good for conditions at the AASHO Road Test
• Researchers wanted to extend equation to other sites with different:
• Materials • Subgrades • Climates • Traffic Loadings
![Page 16: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/16.jpg)
Log(ESALs) Z * s + 7.35 * Log(D + 1) - 0.06R o
=
( )
+
LogPSI
4.5 - 1.5
1 +1.624 * 10
D
7
⎡
⎣⎢⎤
⎦⎥
+
⎡
⎣
⎢⎢⎢⎢⎢
⎤
⎦
⎥⎥⎥⎥⎥
Δ
1 8 46.
Standard Normal Deviate
Overall Standard Deviation
Depth
( )+ 4.22 - 0.32pt
*[ ]
( )
LogS' C D 1.132
215.63 * J * D - 18.42
E / k
c d0.75
0.75
c
−
⎡
⎣
⎢⎢
⎤
⎦
⎥⎥
⎡
⎣
⎢⎢⎢⎢⎢
⎤
⎦
⎥⎥⎥⎥⎥0 25.
* *
Change in Serviceability
Terminal Serviceability
DrainageCoefficient
Load Transfer
Modulus of Rupture
Modulus of Elasticity
Modulus of Subgrade Reaction
1986-93 Rigid Pavement Design Equation
![Page 17: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/17.jpg)
AASHTO DESIGNConcrete Properties
Use average, in-field strength for design (not minimum specified)
If specify minimum flexural strength at 28-day of 550 psi & allow 10% of beams to fall below minimum:
STEP 1 Estimate SDEV: 9% for typical ready mix. SDEV = 550 * 0.09 = 50 psi STEP 2 S’c design = S’c minimum + z * SDEV S’c design = 550 + 1.282 * 50 S’c design = 614 psi
![Page 18: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/18.jpg)
AASHTO DESIGN Subgrade Soil Relationships
MR = 1,500 * CBR MR = 1,000 + 500 * R
These relationships given in the guide between MR and CBR and R-values over estimates actual MR values.
Be careful when using the AASHTO Subgrade Soil Relationships
![Page 19: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/19.jpg)
AASHTO DESIGN Subgrade Soil Relationships
Res
ilien
t Mod
ulus
, MR
(p
si)
0
40,000
80,000
120,000
160,000
CBR (%)0 25 50 75 100
AASHTOActual ACPA
Data: NCHRP Report 128.
![Page 20: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/20.jpg)
AASHTO DESIGN k-Value Determination
The relationships between k and MR (base - no base) give inconsistent results with high in-situ MR Values.
For Example, Assume MR = 12,000 psi with no-base k = MR /19.4 = 619 psi/in with 6” granular base k = 574 psi/in (from Fig 3.3) As the MR value increases, the difference becomes greater. Neither value is very realistic. Historical values are 150-250 psi/in.
![Page 21: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/21.jpg)
AASHTO DESIGN Loss of Support
Reduces k-value due to expected erosion of subgrade. LOS = 0 models conditions at the AASHO road test. Upper 3 feet were required to be:
AASHO A-6 (clay) Group Index = 9-13 Plastic Index = 11-15 Liquid Limit 27-32 80-85% passed the #200 Sieve
![Page 22: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/22.jpg)
AASHTO DESIGNSubgrade Strength
Use Loss of Support = 0 (otherwise your using a huge fudge factor)
All cracking of rigid pavements at the AASHO road test were preceded by the pumping of material from underneath the slab.
The primary mode of failure at the road test was loss of support in the poor clay soil.
Therefore, AASHTO design equations already account for support loss.
![Page 23: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/23.jpg)
AASHTO DESIGNDrainage Coefficient
The subgrade soil at the AASHO road test was a very poorly draining clay soil.
Therefore the AASHTO design equations already account for a poor drainage condition. Modern open-graded bases and more free-draining soils are design options which can be modeled with Cd > 1.0
Use Drainage Coeff > 1.0 (otherwise using a huge fudge factor)
![Page 24: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/24.jpg)
AASHTO DESIGNReliability
Log ESALs
SE
RV
ICE
AB
ILIT
Y
pt
po
Design Curve
PerformanceCurve
![Page 25: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/25.jpg)
AASHTO DESIGNReliability
Another way to think about reliability is to consider that at 90% reliability, only 10% of the pavement will have “failed” by the end of the design period.
If you are comparing a new concrete section to a new asphalt section use the same reliability for each.
Make design evaluations at 50% reliability.
Never compare designs at different reliabilities (reliability = factor of safety)
![Page 26: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/26.jpg)
AASTHO Design Procedure Evaluation - JPCP
• The 1986-93 Equation is an “unbiased” predictor, but it is not accurate – Pred/Act ranged from 0.1 to over 10
• If designed with a high reliability, it will yield a conservative design
From: Evaluation of the AASHTO Design Equations and Recommended Improvements
SHRP-P-394 (1994)
![Page 27: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/27.jpg)
PCAPAV DESIGN PROCEDURE
PCAPAV - a mechanistic thickness design procedure. Based on:
– Theoretical Studies – Model & Full-scale tests – Experimental test roads
• i.e. AASHO Road Test – Performance of normal
pavements
![Page 28: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/28.jpg)
StreetPave Thickness Design Procedure
• Pavement design tool geared primarily for roads & streets
• Based on the PCA’s pavement thickness design methodology
• Assesses adequacy of concrete thickness using both fatigue and erosion criteria
![Page 29: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/29.jpg)
StreetPave’s Origins
• PCA thickness design methodology for JPCP – first published in 1966
• used slab stress/fatigue asthe sole design criterion for determining thickness
– updated in 1984 • failure by erosion (pumping) • edge support
![Page 30: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/30.jpg)
StreetPave’s Origins
• StreetPave – released in 2005 by ACPA – tailored for streets and roads – improvements included:
• enhanced concrete fatigue model w/reliability component
• ability to analyze tridem axles in the traffic spectrum
• new recommendations for dowel bars, joint spacing, subgrade/subbase moduli, etc.
• side-by-side design comparison to asphalt sections
![Page 31: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/31.jpg)
Fatigue – Total Damage
• Cumulative damage:
where, FDtotal = total fatigue damage, % FDsingle = fatigue damage from single axle loads, % FDtandem = fatigue damage from tandem axle loads, % FDtridem = fatigue damage from tridem axle loads, %
!�"�#�$�#�%�&� = !�"�(�)�*�+�&�,� + !�"�#�%�*�.�,�/� + !�"�#�0�)�.�,�/�
MECHANISTIC DESIGN … but validated
![Page 32: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/32.jpg)
Fatigue – Test DataN
110
1001000
10000100000
100000010000000
1000000001000000000
Stress ratio, SR0.4 0.46 0.52 0.58 0.64 0.7 0.76 0.82 0.88 0.94 1
Roesler (SS) Roesler (SB) Kesler Ballinger Murdock & Kesler
![Page 33: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/33.jpg)
Fatigue - Model ComparisonPr
edic
ted
log
(N)
02468
101214
Stress ratio, SR0.4 0.6 0.7 0.9 1 1.2
StreetPave (R @ 50 percent)StreetPave (R @ 90 percent)PCA
![Page 34: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/34.jpg)
!�"�#�$�#�%�&� = !�"�(�)�*�+�&�,� + !�"�#�%�*�.�,�/� + !�"�#�0�)�.�,�/�
Faulting – Total Erosion
• Cumulative erosion:
where, EDtotal = total erosion damage, % EDsingle = erosion damage from single axle loads, % EDtandem = erosion damage
from tandem axle loads, % EDtridem = erosion damage
from tridem axle loads, %
EMPIRICAL DESIGN
![Page 35: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/35.jpg)
Faulting – Erosion per Load Group
• Erosion damage (ED) for each load group is computed per Miner’s damage hypothesis:
where, n = number of load applications Ne = allowable
applications to erosion failure
!�"� = $�%�&�
![Page 36: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/36.jpg)
Faulting – Power
• Rate or work or power:
where, δeq = equivalent corner deflection, in. k = composite k-value of subgrade/subbase • Idea is that, for a unit area, a thinner pavement
with a shorter deflection basin (e.g., smaller radius of relative stiffness) will receive a faster punch
!�"�#�$�%� = 268.7 ,-�1.27 ∗ 0�$�1�2
ℎ3�4
![Page 37: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/37.jpg)
Faulting – Erosion Failure
• Pavement thickness incrementally increased and EDtotal calculated until it reaches 100 percent
![Page 38: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/38.jpg)
StreetPave – Design Inputs
• Design Life • Reliability • % Slabs Cracked • Traffic
– Volume – Load – Growth – Distribution
K-value Subgrade & Subbase(s)
Thickness Modulus
Edge Support Dowel Bars Concrete
Strength Modulus of Elasticity
![Page 39: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/39.jpg)
Controlling Factors
• Fatigue usually controls design of light-traffic pavements – Single-axles usually cause more fatigue damage
• Erosion usually controls design of undoweled medium- and heavy-traffic pavements – Tandem and tridem axles usually cause more
erosion damage
![Page 40: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/40.jpg)
AASHTO 93 vs. StreetPave
• Traffic spectrum factors in – not just ESALs!
44.5
55.5
66.5
77.5
88.5
99.510
10.511
- 500 1,000 1,500 2,000
Requ
ired
Conc
rete
Thi
ckne
ss
ADTT
WinPAS
StreetPave
![Page 41: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/41.jpg)
DARWIN ME Mechanistic-Empirical Design
=+Mechanistic Elements
Empirical Elements
Pavement Performance Prediction
![Page 42: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/42.jpg)
M-E Design Basics
• Calculate critical pavement response (i.e., stresses, strains, and deflections) due to: – Traffic loading. – Environmental conditions.
• Accumulate damage over time.
• Mechanistically: • Empirically:• Relate damage over
time to pavement distresses through calibrated models, e.g.: – Cracking, Faulting,
Roughness in JPCP. – Punchouts, Crack Width,
Roughness in CRCP. • Accumulate damage
over time.
MECHANISTIC + EMPIRICAL DESIGN
![Page 43: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/43.jpg)
INPUTS, INPUTS, INPUTS!!!!
![Page 44: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/44.jpg)
INPUTS, INPUTS, INPUTS!!!!
![Page 45: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/45.jpg)
OUTPUTS, OUTPUTS, OUTPUTS!!!
![Page 46: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/46.jpg)
Heavy Traffic, w/ Edge Support
Heavy Traffic, with Edge Support
Thic
knes
s, in
.
5
5.5
6
6.5
7
k-value, pci0 75 150 225 300
2002DG_R=75PCAACPA_R=95ACPA_R=75
![Page 47: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/47.jpg)
Heavy Traffic, no Edge Support
Heavy Traffic, no Edge Support
Thic
knes
s, in
.
5.5
6.38
7.25
8.13
9
k-value, pci0 75 150 225 300
2002DG_R=75PCAACPA_R=95ACPA_R=75
![Page 48: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/48.jpg)
Summary / Conclusions
• At heavy traffic levels: – ME Design Guide is still fairly close to PCA and
ACPA at 95% reliability – ME Design Guide not as sensitive to edge
support condition
![Page 49: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/49.jpg)
Thin Concrete Pavements
![Page 50: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/50.jpg)
Influence of Slab Geometry on Stresses
![Page 51: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/51.jpg)
Position of the Loads and Dimension of the Slabs
AASHTO DesignTCP® Design
![Page 52: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/52.jpg)
Slabs Sizes and Thickness For Same Top Stress (363 psi)
Concrete Thickness: 10 in.
Slabs: 15 ft x 12 ft
Concrete Thickness: 6.3 in. Slabs 6 ft x 6 ft
![Page 53: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/53.jpg)
Characteristics of TCP Design
• Small slabs (1.4 to 2.4) meters long (5ft-8ft) • Less curl/warp; smaller crack width
• Granular base (fines < 8%) 15 cm thick • Less pumping/faulting potential
• Normal or fiber reinforced concrete • Geotextile between the subgrade and base, if needed • Thin joint cut (<2.5 mm wide) • No joints sealing • Optimized dowel bar system or no dowels • Lateral confinement with curb, shoulder , vertical steel
pins or FRC • Widened outer lane
![Page 54: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/54.jpg)
TCP Design
Cumulative fatigue damage, like StreetPave Islab 2000 runs for stresses; NCHRP 1-37 for fatigue
ESALs used for simplicity Environment considered in calculations
MECHANISTIC DESIGN … but validated
![Page 55: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/55.jpg)
Non-Standard Loads
![Page 56: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/56.jpg)
ACPA AirPave Procedure
– Westergaard Analysis – Center Loading – Gear Rotation – Gear Configuration – Number of wheels – Tire contact area – Tire pressure
Loading Condition
![Page 57: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/57.jpg)
AirPave
![Page 58: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/58.jpg)
AirPave
![Page 59: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/59.jpg)
AirPave
![Page 60: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/60.jpg)
AirPave
![Page 61: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/61.jpg)
AirPave
![Page 62: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/62.jpg)
EverFE
![Page 63: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/63.jpg)
EverFE
![Page 64: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/64.jpg)
EverFE
![Page 65: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/65.jpg)
EverFE
![Page 66: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/66.jpg)
PCASE
![Page 67: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/67.jpg)
Overlay Experiences
• Spokane, WA – 3 sections on I-90, 3”, 4”, 5” – Constructed in 2004 – Eastbound AADT 40,000 – Excellent performance in 4” and 5” sections – Reconstructed in 2011
![Page 68: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/68.jpg)
![Page 69: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/69.jpg)
![Page 70: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/70.jpg)
BCOA - ME
![Page 71: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/71.jpg)
BCOA ME Sponsors
![Page 72: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/72.jpg)
BCOA ME Main Screen
![Page 73: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/73.jpg)
BCOA ME Traffic
![Page 74: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/74.jpg)
BCOA ME Environment
![Page 75: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/75.jpg)
BCOA ME Main Screen
![Page 76: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/76.jpg)
Macro Fibers
![Page 77: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/77.jpg)
BCOA ME Design w/ Fibers
![Page 78: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/78.jpg)
Repairs-Bonded Resurfacing of Asphalt or Composite Pavement
![Page 79: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/79.jpg)
Milling: Bonded Resurfacingof Asphalt or Composite Pavements
The three main objectives of milling:
1. to remove significant surface distortions that contain soft asphalt material, resulting in an inadequate bonding surface
2. to reduce high spots to help ensure minimum resurfacing depth and reduce the quantity of concrete needed to fill low spots; and
3. to roughen a portion of the surface to enhance bond development between the new concrete overlay and the existing asphalt. (don’t leave a thin lift)
![Page 80: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/80.jpg)
Milling: Bonded Resurfacingof Asphalt or Composite Pavements
• Complete removal of ruts is not needed when rutting in the existing asphalt pavement does not exceed 2”.
• Any ruts in the existing pavement are filled with concrete, resulting in a thicker concrete overlay above the ruts.
• A minimum of 3"–4" of asphalt should be left after milling because of the reliance on the asphalt pavement to carry a portion of the load.
![Page 81: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/81.jpg)
![Page 82: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/82.jpg)
![Page 83: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/83.jpg)
![Page 84: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/84.jpg)
![Page 85: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/85.jpg)
Important Elements-Bonded Resurfacing of Asphalt/Composite Pavement
• Clean Surface/Bond is important for good performance
• Thin milling may be required to eliminate significant surface distortions of 2” or more and provide good bond.
• Leave at least 3” remaining asphalt after milling.
•Control surface temperature of existing asphalt to below 120ºF. •Try to keep joints out of wheel paths. •Curing should be timely and adequate. •Small joint spacing to minimize bonding shear stress
![Page 86: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/86.jpg)
![Page 87: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/87.jpg)
![Page 88: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/88.jpg)
![Page 89: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/89.jpg)
![Page 90: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/90.jpg)
![Page 91: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/91.jpg)
![Page 92: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/92.jpg)
Overlay Experiences
• Kalispell – 5” on ?”-5” of HMA – 6’ joint spacing – 18,000 ADT in 2000 – 30% Trucks – Built in 2000 – Performing very well
![Page 93: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/93.jpg)
![Page 94: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/94.jpg)
![Page 95: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/95.jpg)
![Page 96: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/96.jpg)
![Page 97: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/97.jpg)
Overlay Experiences
• Bellevue – 3” PCC on 3” AC – Built 1998 – Still in service – Cracking in edge panels due to lack of
support. Edge panels have been replaced.
![Page 98: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/98.jpg)
![Page 99: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/99.jpg)
Overlay Experiences
• US 20/26 & Middleton Road • Built in 2005 • 4” on 4” • Still in service • Excellent performance
![Page 100: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/100.jpg)
![Page 101: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/101.jpg)
Other NW Projects
• Portland – NE Columbia Blvd.
• 4” – 6” PCC on 0” – 4” Asphalt – N. Denver Avenue
• 2.5” PCC on Variable Sections
• Eugene – Coburg Rd. – 6” PCC on 4” Asphalt
• Yakima – 40th and Knob Hill – 6” PCC on 2” – 4” Asphalt
![Page 102: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/102.jpg)
Portland
![Page 103: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/103.jpg)
Yakima
![Page 104: NWPMA 2017 Conference · 2017-10-18 · WinPAS The AASHO Road Test was conceived and sponsored by the American Association of State Highway Officials to study the performance of pavement](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e73da3373b71c0c016a10a8/html5/thumbnails/104.jpg)