NUR-SULTAN · Almaty Calgary Abu Dhabi Baku. 1 million population 15 billion GRP 2,6 billion tax...
Transcript of NUR-SULTAN · Almaty Calgary Abu Dhabi Baku. 1 million population 15 billion GRP 2,6 billion tax...
N U R - S U LTA N
C i t y o f i n v e s t m e n t s
1
The first place in the ranking of competitiveness of the regions of Kazakhstan - 2018 Total contribution to GDP-98 (2018 г) Fast growing consumer market Favorable conditions for creating a business in the framework of the International Financial Center
laquoAstanaraquo Availability of investment sites for investment projects Support of potential and existing investors through Regional Institute for attracting investments -
laquoAstana Investraquo
WHY INVEST IN NUR-SULTAN
002611
58
11
Year 1997 2007 2018 2025
GRP trillion tenge
19
424
1067
1997 2007 2018
bln tenge
287
574
1031
1700
1997 2007 2018 2025
thousands теnge
Average annual population growth rate
Growth almost 50 times
Growth more than 200 times
Investment in fixed assets
The total investment for 20 years was more than 9 trillion tenge In 2018 the volume of investments amounted to 1067 million
tenge which is 21 more than in the corresponding period lastyear
External investments in fixed assets in 2018 amounted to 265billion tenge which is 13 times more than the same indicator in2017
The share of off-budget investments was about 824
INVESTMENT IN FIXED ASSETSOF NUR-SULTAN CITY
14 15 16 17 18
1021
4
SMALL AND MEDIUM-SIZED BUSINESSES
Gross value added to SMB billions of USD
2013 2014 2015 2016 2017 2018
268
657
586
738
425
641
Product output by subjects of SMB billions of USD
2013 2014 2015 2016 2017 2018
384
966 888
1136
713
925
Number of employees in the field of SMB thousands people
2013 2014 2015 2016 2017 2018
1980
25322902
3251 325
3424
555
Share of small and medium-sized
businesses in GRP structure
FOREIGN INVESTMENT IN NUR-SULTAN CITY
14 15 16 17 18
OF FOREIGN INVESTMENTS IN GENERAL VOLUME OF INVESTMENTS
NUMBER OF FOREIGN COMPANIES IN NUR-SULTAN CITY
2015 2016 2017 2018
x 2
1
x 1
2
05
x 4 x 8x 05
Po
pu
lati
on
mill
ion
pe
op
le
Population growth in 15 years
Almaty
Kazan
Minsk
Calgary
Abu Dhabi
Nur-Sultan
THE NUR-SULTAN IS ONE OF THE FASTEST GROWING CITIESin the world outside Сhina and exceeded the population growth rate of all comparable cities
The world population of cities and growth rate in 15 years Population growth of Nur-Sultan and comparable cities in 1998 - 2017
Nur-Sultan is the leader in terms of population growth among comparable cities
Nur-Sultan is one of the cities with a rapidly growing population
In terms of population growth Nur-Sultan is conceded only to the cities of China and some African countries
Cities of China
Nur-Sultan and comparablecities
Cities of other countries
Nur-Sultan is significantly ahead of all comparable cities (except Abu Dhabi) in terms of population growth
11
16
18
22
24
21
38
16
34
47
45
138
54
276
242
7
Warsaw
Kazan
Novosibirsk
Tashkent
Helsinki
Minsk
Canberra
Ankara
Brasilia
Moscow
Almaty
Calgary
Abu Dhabi
Baku
1 million population
15 billion GRP
26 billion tax revenue
500 thousand of the economically active population
SUSTAINABLE STRUCTURE OF THE CITY ECONOMY
17 million population
29 billion GRP
53 billion tax revenue
800 thousand of the
economically active population
Year2017
Year 2025
102
37
50
64
158
96
293
87
113
Finance
Tourism
Industry
Transportation and communication
Trade
Construction
Business services real estatetransactionsRampD
Socıal sector and publicadministration
Other activities
13
7
8
10
1585
31
642
Finance
Tourism
Industry
Transport and communications
Trade
Construction
Business services real estatetransactions RampD
Social sector and publicadministration
Other activities
(16 times)
(2 times)
(12 times)
(15 times)
( 19 times)
(07 times)
(105 times)
4
9
PRIORITY SECTORS
01Trade and logistics
land preparation of a presentation package
02Modern production
preparation of common fields of cooperation with Nazarbayev University and SEZ residents
03Development
reduction of administrative barriers in the development cluster
04Sportstrategy for the development of sports facilitiesdetailed plan for the development of mass sports
05Culture creative sectors
concept of a creative cluster laquoZhastarraquo investor presentation package
06Healthcareattracting investors to manage and build new hospitals
07Educationattracting investors to manage and build new schools
08AIFCattraction of international funds and financial corporations
09Tourism
attraction of investments for the construction of tourist facilities
10Services for the public sector and TNC
attraction of international legal investment and other companies
10
1-st BENEFITS PACKAGEAcceptance criteria
Employment of foreign labor withoutquota and permission for a period upto one year after objectcommissioning both for the owner ofthe priority project and for thecontracting companies
Employment offoreign labor
Defined by the Resolution of Kazakhstan Government No 13 ldquoOn some issues of the implementation of state support for investmentsrdquo dated January 14 2016 In 2019 1 MCI = 2525 KZTAccording to the exchange rate of the National Bank of Kazakhstan on 15042019 $1 = 37959 KZT euro 1 = 42943 KZT
Compliance with the list of PRIORITY ACTIVITIES
The participation of the statesubject of the quasi-state sector - as a
foundershareholder is not more than 26 and such participation is not more
than 5 years from the date of registration of the investment contract
Compliance with the list of PRIORITY ACTIVITIES
If creating new productions ndashthe volume of investments
should be at least 2 million MCI
If expansion and modernization - at least 5 million MCI
Сustom benefits State in-kind grantsTax benefits
Customs duties 0 up to 5 years on
import ofbull equipment and its componentsbull spare partsbull raw materials and supplies
Land plots buildings machinery and equipment in property
0 VAT on import of raw
materials and equipment
2-nd BENEFITS PACKAGEAcceptance criteria 1-st BENEFITS
PACKAGE
Except VAT on import Corporate Income Tax (up to 10 years up to 3 years forexpansion and modernization of projects)
Land Tax(up to 10 years)
Property Tax(up to 8 years)
0
Tax benefits
STATE SUPPORT OF INVESTMENT PROJECTS(INVESTMENT COTRACTS)
11
TAX INCENTIVES
Corporate Income Tax - 0
Land Tax - 0
Property Tax - 0
CUSTOMSI NCENTIVESCustoms Exemption from import on raw materials and equipment
(it is necessary to conclude a Special Investment Contract up to 15 years subject to the sale of final products
in the territory of the EEU)
LAND WITH INFRASTRUCTURE
Free cost land for the entire period of SEZ operation
Available infrastructure (electricitysewage heat and water supplyrailway automobile
roads)
EMPLOYMENT OF FOREIGN LABOR
Simplified paperwork procedure for hiring foreign employees
Permits and quotas exemption for projects which investments exceed 1 million MCI for period during construction and installation work and 1 year after commissioningIn 2019 1 MCI = 2525 KZT
SEZ laquoАSTANA ndash NEW CITYraquo
SEZ laquoАSTANA-ТЕCHNOPOLUSraquo
The above-mentioned benefits are provided regardless of the amount of investment and are issued for the entire period of SEZ operation
PERIOD 2002-2027
AREA 763471 hectares (Administrative and business center Industrial Park 1- 598 hectares)
PRIORITYACTIVITIES
Mixed (construction industry engineeringaviation light industry food etc)
Webhttpsinvestinastanakzenpage-sezhttpsmapinvestgovkzmapzone_filter=5B25D (map)
PERIOD 2017-2042 гг
AREA 58442 hectares (ıncludıng Nazarbayev Unıversıty-15132 hectares)
PRIORITY ACTIVITIES
Mixed (innovations RampD high technologies mechanical engineering food industry metallurgy pharmaceuticals etc)
Webhttpsinvestinastanakzenpage-sezhttptechnopoliskzru
SPECIAL ECONOMIC ZONES PREFERENCES
12
Type of ProjectTax benefits
Term
Custombenefits
Term
State in-kind grants
(land plots buildings
equipment)
Engineering infrastructure (utilities auto and railway)
Simplified procedure of foreign laboremployment
VAT on import0
CIT0
Land Tax0
Property Tax0
1 Investment project + 5 ____ ____ ____ +5 + ____ ____
2 Investment priority project
21 Construction of new industries
____ +10 +10 +8 +5 + ____ +
22 Expansion or modernization of existing industries
____ +3 ____ ____ +5 + ____ +
3 Special Economic Zone (benefits for the
entire period of SEZ operation)
+ + + + + Land plot (10 years)
+ +
INVESTMENT PREFERENCES IN COMPARISON
13
Investment project implementation stages by signing the INVESTMENT CONTRACT
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Receiving a preliminary letter of
land approval (Аkimat)
Preparation and approval of Act of land selection situational scheme
(local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
5wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning
Assignment technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution of mayoron the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
Conclusion of the Investment contract
(Committee for investments MIA)
35 wd
Independent land assessment
(Investor)
3wd
Formation of packageof documents
(Investor)
10wd
14
01Application in the form established by theauthorized body for investments
02Certificate of state registration (re-registration) of the legal entity
Сopy of the charter of the legal entity certified bythe signature of the Chief and the seal of the legalentity (if any)03
Business plan of investment project drawn up inaccordance with the requirements established bythe authorized body04
05Preliminary letter of approval from the Akimat forthe provision of land
06Assessment of the land from independentapprising company
07Documents confirming financial assurance (own or borrowed) The following types of financial assurance may be applied
711) Bank statement on the availability of funds on
the applicants account
722) Bank guarantee
733) Opening agreement line of credit
The list of documents required for the conclusion of an INVESTMENT CONTRACT
15
Investment project implementation stages by signing the agreement of SPECIAL ECONOMIC ZONE participant
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Preparation and approval of Act of land selection situational scheme(Local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
Construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
10wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning Assignment
Technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution ofmayor on the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
5wd
~
Formation of packageof documents
(Investor)
Conclusion of Contract on the activities carrying out as the SEZ
participant
(Management company)
Obtaining of a certificate of SEZ participant
(MIID РК)
16
01Applicantrsquos details form approved by
the Authorised Body
02Legal entity state registration (re-registration) certificate
03Copy of the identification document of the chiefexecutive officer of the Applicant
04Сopy of the legal entity charter
05
Сopy of the decision of the supreme body of the legalentity on performance of activity in the Special EconomicZone territory
06Сopy of financial reports as of the last reporting date
07Feasibility study of the project meeting therequirements imposed by the Authorised Body
08
Statements of the acquiring bank with regard to theApplicantrsquos bank accounts financial movement (on theabsence of the record) and credit report from the creditbureau
09
Statement from the tax administration at the place of theregistration record on availability or absence of taxes andother compulsory budgetary payments in arrears
10
Documents confirming the financial assurance of theapplicant are provided during the year (money bankguarantee guarantee pledge of property insurancecontract)
The list of documents required for the conclusion of contract on the activities carrying out as the SEZ participant
AKIMAT OF NUR-SULTAN
Indsustry Departments of Nur-Sultan city akimat
Development Instıtutıons(Astana Innovations SEC laquoAstanaraquo)
Regional Representatives ofKAZAKH INVEST
INVESTORCCID laquoASTANA INVESTraquo
Diplomatic corps
AssociationsSINGLE OPERATOR FOR ATTRACTING INVESTMENTS
Obtaınıng of investment preferences (investment contract SEZ status etc)
Consultations on state support measures Assistance in licensing procedures(land construction etc)
Visa and migration support permission for the Foreign Labor Workforce)
OUR SERVICES
Investors supportat all stages of the project
Regional Council on attracting investors and improving the investment climate in Nur-Sultan
MISSION promoting the development of the capital by attracting investments in priority areas of the economy including on the principles of partnership between the state and businessVISION an effective regional institution as a ldquoSingle Windowrdquo for investors in the capital
Investment portal of Nur-Sultan httpsinvestinastanakz
THE ROLE OF A SINGLE OPERATOR FOR ATTRACTING INVESTMENTS
wwwinvestinastanakz
httpswwwfacebookcomastanainvest
infoinvestastanakz
+7 (7172) 64-72-01
frac12 Koshkarbayev street 3-th floor
WE ARE READY FOR COOPERATION
- lrmD2019СайтПрезентации и публикацииАнглENG General presentation for investorspptxlrm
-
The first place in the ranking of competitiveness of the regions of Kazakhstan - 2018 Total contribution to GDP-98 (2018 г) Fast growing consumer market Favorable conditions for creating a business in the framework of the International Financial Center
laquoAstanaraquo Availability of investment sites for investment projects Support of potential and existing investors through Regional Institute for attracting investments -
laquoAstana Investraquo
WHY INVEST IN NUR-SULTAN
002611
58
11
Year 1997 2007 2018 2025
GRP trillion tenge
19
424
1067
1997 2007 2018
bln tenge
287
574
1031
1700
1997 2007 2018 2025
thousands теnge
Average annual population growth rate
Growth almost 50 times
Growth more than 200 times
Investment in fixed assets
The total investment for 20 years was more than 9 trillion tenge In 2018 the volume of investments amounted to 1067 million
tenge which is 21 more than in the corresponding period lastyear
External investments in fixed assets in 2018 amounted to 265billion tenge which is 13 times more than the same indicator in2017
The share of off-budget investments was about 824
INVESTMENT IN FIXED ASSETSOF NUR-SULTAN CITY
14 15 16 17 18
1021
4
SMALL AND MEDIUM-SIZED BUSINESSES
Gross value added to SMB billions of USD
2013 2014 2015 2016 2017 2018
268
657
586
738
425
641
Product output by subjects of SMB billions of USD
2013 2014 2015 2016 2017 2018
384
966 888
1136
713
925
Number of employees in the field of SMB thousands people
2013 2014 2015 2016 2017 2018
1980
25322902
3251 325
3424
555
Share of small and medium-sized
businesses in GRP structure
FOREIGN INVESTMENT IN NUR-SULTAN CITY
14 15 16 17 18
OF FOREIGN INVESTMENTS IN GENERAL VOLUME OF INVESTMENTS
NUMBER OF FOREIGN COMPANIES IN NUR-SULTAN CITY
2015 2016 2017 2018
x 2
1
x 1
2
05
x 4 x 8x 05
Po
pu
lati
on
mill
ion
pe
op
le
Population growth in 15 years
Almaty
Kazan
Minsk
Calgary
Abu Dhabi
Nur-Sultan
THE NUR-SULTAN IS ONE OF THE FASTEST GROWING CITIESin the world outside Сhina and exceeded the population growth rate of all comparable cities
The world population of cities and growth rate in 15 years Population growth of Nur-Sultan and comparable cities in 1998 - 2017
Nur-Sultan is the leader in terms of population growth among comparable cities
Nur-Sultan is one of the cities with a rapidly growing population
In terms of population growth Nur-Sultan is conceded only to the cities of China and some African countries
Cities of China
Nur-Sultan and comparablecities
Cities of other countries
Nur-Sultan is significantly ahead of all comparable cities (except Abu Dhabi) in terms of population growth
11
16
18
22
24
21
38
16
34
47
45
138
54
276
242
7
Warsaw
Kazan
Novosibirsk
Tashkent
Helsinki
Minsk
Canberra
Ankara
Brasilia
Moscow
Almaty
Calgary
Abu Dhabi
Baku
1 million population
15 billion GRP
26 billion tax revenue
500 thousand of the economically active population
SUSTAINABLE STRUCTURE OF THE CITY ECONOMY
17 million population
29 billion GRP
53 billion tax revenue
800 thousand of the
economically active population
Year2017
Year 2025
102
37
50
64
158
96
293
87
113
Finance
Tourism
Industry
Transportation and communication
Trade
Construction
Business services real estatetransactionsRampD
Socıal sector and publicadministration
Other activities
13
7
8
10
1585
31
642
Finance
Tourism
Industry
Transport and communications
Trade
Construction
Business services real estatetransactions RampD
Social sector and publicadministration
Other activities
(16 times)
(2 times)
(12 times)
(15 times)
( 19 times)
(07 times)
(105 times)
4
9
PRIORITY SECTORS
01Trade and logistics
land preparation of a presentation package
02Modern production
preparation of common fields of cooperation with Nazarbayev University and SEZ residents
03Development
reduction of administrative barriers in the development cluster
04Sportstrategy for the development of sports facilitiesdetailed plan for the development of mass sports
05Culture creative sectors
concept of a creative cluster laquoZhastarraquo investor presentation package
06Healthcareattracting investors to manage and build new hospitals
07Educationattracting investors to manage and build new schools
08AIFCattraction of international funds and financial corporations
09Tourism
attraction of investments for the construction of tourist facilities
10Services for the public sector and TNC
attraction of international legal investment and other companies
10
1-st BENEFITS PACKAGEAcceptance criteria
Employment of foreign labor withoutquota and permission for a period upto one year after objectcommissioning both for the owner ofthe priority project and for thecontracting companies
Employment offoreign labor
Defined by the Resolution of Kazakhstan Government No 13 ldquoOn some issues of the implementation of state support for investmentsrdquo dated January 14 2016 In 2019 1 MCI = 2525 KZTAccording to the exchange rate of the National Bank of Kazakhstan on 15042019 $1 = 37959 KZT euro 1 = 42943 KZT
Compliance with the list of PRIORITY ACTIVITIES
The participation of the statesubject of the quasi-state sector - as a
foundershareholder is not more than 26 and such participation is not more
than 5 years from the date of registration of the investment contract
Compliance with the list of PRIORITY ACTIVITIES
If creating new productions ndashthe volume of investments
should be at least 2 million MCI
If expansion and modernization - at least 5 million MCI
Сustom benefits State in-kind grantsTax benefits
Customs duties 0 up to 5 years on
import ofbull equipment and its componentsbull spare partsbull raw materials and supplies
Land plots buildings machinery and equipment in property
0 VAT on import of raw
materials and equipment
2-nd BENEFITS PACKAGEAcceptance criteria 1-st BENEFITS
PACKAGE
Except VAT on import Corporate Income Tax (up to 10 years up to 3 years forexpansion and modernization of projects)
Land Tax(up to 10 years)
Property Tax(up to 8 years)
0
Tax benefits
STATE SUPPORT OF INVESTMENT PROJECTS(INVESTMENT COTRACTS)
11
TAX INCENTIVES
Corporate Income Tax - 0
Land Tax - 0
Property Tax - 0
CUSTOMSI NCENTIVESCustoms Exemption from import on raw materials and equipment
(it is necessary to conclude a Special Investment Contract up to 15 years subject to the sale of final products
in the territory of the EEU)
LAND WITH INFRASTRUCTURE
Free cost land for the entire period of SEZ operation
Available infrastructure (electricitysewage heat and water supplyrailway automobile
roads)
EMPLOYMENT OF FOREIGN LABOR
Simplified paperwork procedure for hiring foreign employees
Permits and quotas exemption for projects which investments exceed 1 million MCI for period during construction and installation work and 1 year after commissioningIn 2019 1 MCI = 2525 KZT
SEZ laquoАSTANA ndash NEW CITYraquo
SEZ laquoАSTANA-ТЕCHNOPOLUSraquo
The above-mentioned benefits are provided regardless of the amount of investment and are issued for the entire period of SEZ operation
PERIOD 2002-2027
AREA 763471 hectares (Administrative and business center Industrial Park 1- 598 hectares)
PRIORITYACTIVITIES
Mixed (construction industry engineeringaviation light industry food etc)
Webhttpsinvestinastanakzenpage-sezhttpsmapinvestgovkzmapzone_filter=5B25D (map)
PERIOD 2017-2042 гг
AREA 58442 hectares (ıncludıng Nazarbayev Unıversıty-15132 hectares)
PRIORITY ACTIVITIES
Mixed (innovations RampD high technologies mechanical engineering food industry metallurgy pharmaceuticals etc)
Webhttpsinvestinastanakzenpage-sezhttptechnopoliskzru
SPECIAL ECONOMIC ZONES PREFERENCES
12
Type of ProjectTax benefits
Term
Custombenefits
Term
State in-kind grants
(land plots buildings
equipment)
Engineering infrastructure (utilities auto and railway)
Simplified procedure of foreign laboremployment
VAT on import0
CIT0
Land Tax0
Property Tax0
1 Investment project + 5 ____ ____ ____ +5 + ____ ____
2 Investment priority project
21 Construction of new industries
____ +10 +10 +8 +5 + ____ +
22 Expansion or modernization of existing industries
____ +3 ____ ____ +5 + ____ +
3 Special Economic Zone (benefits for the
entire period of SEZ operation)
+ + + + + Land plot (10 years)
+ +
INVESTMENT PREFERENCES IN COMPARISON
13
Investment project implementation stages by signing the INVESTMENT CONTRACT
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Receiving a preliminary letter of
land approval (Аkimat)
Preparation and approval of Act of land selection situational scheme
(local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
5wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning
Assignment technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution of mayoron the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
Conclusion of the Investment contract
(Committee for investments MIA)
35 wd
Independent land assessment
(Investor)
3wd
Formation of packageof documents
(Investor)
10wd
14
01Application in the form established by theauthorized body for investments
02Certificate of state registration (re-registration) of the legal entity
Сopy of the charter of the legal entity certified bythe signature of the Chief and the seal of the legalentity (if any)03
Business plan of investment project drawn up inaccordance with the requirements established bythe authorized body04
05Preliminary letter of approval from the Akimat forthe provision of land
06Assessment of the land from independentapprising company
07Documents confirming financial assurance (own or borrowed) The following types of financial assurance may be applied
711) Bank statement on the availability of funds on
the applicants account
722) Bank guarantee
733) Opening agreement line of credit
The list of documents required for the conclusion of an INVESTMENT CONTRACT
15
Investment project implementation stages by signing the agreement of SPECIAL ECONOMIC ZONE participant
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Preparation and approval of Act of land selection situational scheme(Local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
Construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
10wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning Assignment
Technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution ofmayor on the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
5wd
~
Formation of packageof documents
(Investor)
Conclusion of Contract on the activities carrying out as the SEZ
participant
(Management company)
Obtaining of a certificate of SEZ participant
(MIID РК)
16
01Applicantrsquos details form approved by
the Authorised Body
02Legal entity state registration (re-registration) certificate
03Copy of the identification document of the chiefexecutive officer of the Applicant
04Сopy of the legal entity charter
05
Сopy of the decision of the supreme body of the legalentity on performance of activity in the Special EconomicZone territory
06Сopy of financial reports as of the last reporting date
07Feasibility study of the project meeting therequirements imposed by the Authorised Body
08
Statements of the acquiring bank with regard to theApplicantrsquos bank accounts financial movement (on theabsence of the record) and credit report from the creditbureau
09
Statement from the tax administration at the place of theregistration record on availability or absence of taxes andother compulsory budgetary payments in arrears
10
Documents confirming the financial assurance of theapplicant are provided during the year (money bankguarantee guarantee pledge of property insurancecontract)
The list of documents required for the conclusion of contract on the activities carrying out as the SEZ participant
AKIMAT OF NUR-SULTAN
Indsustry Departments of Nur-Sultan city akimat
Development Instıtutıons(Astana Innovations SEC laquoAstanaraquo)
Regional Representatives ofKAZAKH INVEST
INVESTORCCID laquoASTANA INVESTraquo
Diplomatic corps
AssociationsSINGLE OPERATOR FOR ATTRACTING INVESTMENTS
Obtaınıng of investment preferences (investment contract SEZ status etc)
Consultations on state support measures Assistance in licensing procedures(land construction etc)
Visa and migration support permission for the Foreign Labor Workforce)
OUR SERVICES
Investors supportat all stages of the project
Regional Council on attracting investors and improving the investment climate in Nur-Sultan
MISSION promoting the development of the capital by attracting investments in priority areas of the economy including on the principles of partnership between the state and businessVISION an effective regional institution as a ldquoSingle Windowrdquo for investors in the capital
Investment portal of Nur-Sultan httpsinvestinastanakz
THE ROLE OF A SINGLE OPERATOR FOR ATTRACTING INVESTMENTS
wwwinvestinastanakz
httpswwwfacebookcomastanainvest
infoinvestastanakz
+7 (7172) 64-72-01
frac12 Koshkarbayev street 3-th floor
WE ARE READY FOR COOPERATION
- lrmD2019СайтПрезентации и публикацииАнглENG General presentation for investorspptxlrm
-
INVESTMENT IN FIXED ASSETSOF NUR-SULTAN CITY
14 15 16 17 18
1021
4
SMALL AND MEDIUM-SIZED BUSINESSES
Gross value added to SMB billions of USD
2013 2014 2015 2016 2017 2018
268
657
586
738
425
641
Product output by subjects of SMB billions of USD
2013 2014 2015 2016 2017 2018
384
966 888
1136
713
925
Number of employees in the field of SMB thousands people
2013 2014 2015 2016 2017 2018
1980
25322902
3251 325
3424
555
Share of small and medium-sized
businesses in GRP structure
FOREIGN INVESTMENT IN NUR-SULTAN CITY
14 15 16 17 18
OF FOREIGN INVESTMENTS IN GENERAL VOLUME OF INVESTMENTS
NUMBER OF FOREIGN COMPANIES IN NUR-SULTAN CITY
2015 2016 2017 2018
x 2
1
x 1
2
05
x 4 x 8x 05
Po
pu
lati
on
mill
ion
pe
op
le
Population growth in 15 years
Almaty
Kazan
Minsk
Calgary
Abu Dhabi
Nur-Sultan
THE NUR-SULTAN IS ONE OF THE FASTEST GROWING CITIESin the world outside Сhina and exceeded the population growth rate of all comparable cities
The world population of cities and growth rate in 15 years Population growth of Nur-Sultan and comparable cities in 1998 - 2017
Nur-Sultan is the leader in terms of population growth among comparable cities
Nur-Sultan is one of the cities with a rapidly growing population
In terms of population growth Nur-Sultan is conceded only to the cities of China and some African countries
Cities of China
Nur-Sultan and comparablecities
Cities of other countries
Nur-Sultan is significantly ahead of all comparable cities (except Abu Dhabi) in terms of population growth
11
16
18
22
24
21
38
16
34
47
45
138
54
276
242
7
Warsaw
Kazan
Novosibirsk
Tashkent
Helsinki
Minsk
Canberra
Ankara
Brasilia
Moscow
Almaty
Calgary
Abu Dhabi
Baku
1 million population
15 billion GRP
26 billion tax revenue
500 thousand of the economically active population
SUSTAINABLE STRUCTURE OF THE CITY ECONOMY
17 million population
29 billion GRP
53 billion tax revenue
800 thousand of the
economically active population
Year2017
Year 2025
102
37
50
64
158
96
293
87
113
Finance
Tourism
Industry
Transportation and communication
Trade
Construction
Business services real estatetransactionsRampD
Socıal sector and publicadministration
Other activities
13
7
8
10
1585
31
642
Finance
Tourism
Industry
Transport and communications
Trade
Construction
Business services real estatetransactions RampD
Social sector and publicadministration
Other activities
(16 times)
(2 times)
(12 times)
(15 times)
( 19 times)
(07 times)
(105 times)
4
9
PRIORITY SECTORS
01Trade and logistics
land preparation of a presentation package
02Modern production
preparation of common fields of cooperation with Nazarbayev University and SEZ residents
03Development
reduction of administrative barriers in the development cluster
04Sportstrategy for the development of sports facilitiesdetailed plan for the development of mass sports
05Culture creative sectors
concept of a creative cluster laquoZhastarraquo investor presentation package
06Healthcareattracting investors to manage and build new hospitals
07Educationattracting investors to manage and build new schools
08AIFCattraction of international funds and financial corporations
09Tourism
attraction of investments for the construction of tourist facilities
10Services for the public sector and TNC
attraction of international legal investment and other companies
10
1-st BENEFITS PACKAGEAcceptance criteria
Employment of foreign labor withoutquota and permission for a period upto one year after objectcommissioning both for the owner ofthe priority project and for thecontracting companies
Employment offoreign labor
Defined by the Resolution of Kazakhstan Government No 13 ldquoOn some issues of the implementation of state support for investmentsrdquo dated January 14 2016 In 2019 1 MCI = 2525 KZTAccording to the exchange rate of the National Bank of Kazakhstan on 15042019 $1 = 37959 KZT euro 1 = 42943 KZT
Compliance with the list of PRIORITY ACTIVITIES
The participation of the statesubject of the quasi-state sector - as a
foundershareholder is not more than 26 and such participation is not more
than 5 years from the date of registration of the investment contract
Compliance with the list of PRIORITY ACTIVITIES
If creating new productions ndashthe volume of investments
should be at least 2 million MCI
If expansion and modernization - at least 5 million MCI
Сustom benefits State in-kind grantsTax benefits
Customs duties 0 up to 5 years on
import ofbull equipment and its componentsbull spare partsbull raw materials and supplies
Land plots buildings machinery and equipment in property
0 VAT on import of raw
materials and equipment
2-nd BENEFITS PACKAGEAcceptance criteria 1-st BENEFITS
PACKAGE
Except VAT on import Corporate Income Tax (up to 10 years up to 3 years forexpansion and modernization of projects)
Land Tax(up to 10 years)
Property Tax(up to 8 years)
0
Tax benefits
STATE SUPPORT OF INVESTMENT PROJECTS(INVESTMENT COTRACTS)
11
TAX INCENTIVES
Corporate Income Tax - 0
Land Tax - 0
Property Tax - 0
CUSTOMSI NCENTIVESCustoms Exemption from import on raw materials and equipment
(it is necessary to conclude a Special Investment Contract up to 15 years subject to the sale of final products
in the territory of the EEU)
LAND WITH INFRASTRUCTURE
Free cost land for the entire period of SEZ operation
Available infrastructure (electricitysewage heat and water supplyrailway automobile
roads)
EMPLOYMENT OF FOREIGN LABOR
Simplified paperwork procedure for hiring foreign employees
Permits and quotas exemption for projects which investments exceed 1 million MCI for period during construction and installation work and 1 year after commissioningIn 2019 1 MCI = 2525 KZT
SEZ laquoАSTANA ndash NEW CITYraquo
SEZ laquoАSTANA-ТЕCHNOPOLUSraquo
The above-mentioned benefits are provided regardless of the amount of investment and are issued for the entire period of SEZ operation
PERIOD 2002-2027
AREA 763471 hectares (Administrative and business center Industrial Park 1- 598 hectares)
PRIORITYACTIVITIES
Mixed (construction industry engineeringaviation light industry food etc)
Webhttpsinvestinastanakzenpage-sezhttpsmapinvestgovkzmapzone_filter=5B25D (map)
PERIOD 2017-2042 гг
AREA 58442 hectares (ıncludıng Nazarbayev Unıversıty-15132 hectares)
PRIORITY ACTIVITIES
Mixed (innovations RampD high technologies mechanical engineering food industry metallurgy pharmaceuticals etc)
Webhttpsinvestinastanakzenpage-sezhttptechnopoliskzru
SPECIAL ECONOMIC ZONES PREFERENCES
12
Type of ProjectTax benefits
Term
Custombenefits
Term
State in-kind grants
(land plots buildings
equipment)
Engineering infrastructure (utilities auto and railway)
Simplified procedure of foreign laboremployment
VAT on import0
CIT0
Land Tax0
Property Tax0
1 Investment project + 5 ____ ____ ____ +5 + ____ ____
2 Investment priority project
21 Construction of new industries
____ +10 +10 +8 +5 + ____ +
22 Expansion or modernization of existing industries
____ +3 ____ ____ +5 + ____ +
3 Special Economic Zone (benefits for the
entire period of SEZ operation)
+ + + + + Land plot (10 years)
+ +
INVESTMENT PREFERENCES IN COMPARISON
13
Investment project implementation stages by signing the INVESTMENT CONTRACT
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Receiving a preliminary letter of
land approval (Аkimat)
Preparation and approval of Act of land selection situational scheme
(local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
5wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning
Assignment technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution of mayoron the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
Conclusion of the Investment contract
(Committee for investments MIA)
35 wd
Independent land assessment
(Investor)
3wd
Formation of packageof documents
(Investor)
10wd
14
01Application in the form established by theauthorized body for investments
02Certificate of state registration (re-registration) of the legal entity
Сopy of the charter of the legal entity certified bythe signature of the Chief and the seal of the legalentity (if any)03
Business plan of investment project drawn up inaccordance with the requirements established bythe authorized body04
05Preliminary letter of approval from the Akimat forthe provision of land
06Assessment of the land from independentapprising company
07Documents confirming financial assurance (own or borrowed) The following types of financial assurance may be applied
711) Bank statement on the availability of funds on
the applicants account
722) Bank guarantee
733) Opening agreement line of credit
The list of documents required for the conclusion of an INVESTMENT CONTRACT
15
Investment project implementation stages by signing the agreement of SPECIAL ECONOMIC ZONE participant
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Preparation and approval of Act of land selection situational scheme(Local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
Construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
10wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning Assignment
Technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution ofmayor on the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
5wd
~
Formation of packageof documents
(Investor)
Conclusion of Contract on the activities carrying out as the SEZ
participant
(Management company)
Obtaining of a certificate of SEZ participant
(MIID РК)
16
01Applicantrsquos details form approved by
the Authorised Body
02Legal entity state registration (re-registration) certificate
03Copy of the identification document of the chiefexecutive officer of the Applicant
04Сopy of the legal entity charter
05
Сopy of the decision of the supreme body of the legalentity on performance of activity in the Special EconomicZone territory
06Сopy of financial reports as of the last reporting date
07Feasibility study of the project meeting therequirements imposed by the Authorised Body
08
Statements of the acquiring bank with regard to theApplicantrsquos bank accounts financial movement (on theabsence of the record) and credit report from the creditbureau
09
Statement from the tax administration at the place of theregistration record on availability or absence of taxes andother compulsory budgetary payments in arrears
10
Documents confirming the financial assurance of theapplicant are provided during the year (money bankguarantee guarantee pledge of property insurancecontract)
The list of documents required for the conclusion of contract on the activities carrying out as the SEZ participant
AKIMAT OF NUR-SULTAN
Indsustry Departments of Nur-Sultan city akimat
Development Instıtutıons(Astana Innovations SEC laquoAstanaraquo)
Regional Representatives ofKAZAKH INVEST
INVESTORCCID laquoASTANA INVESTraquo
Diplomatic corps
AssociationsSINGLE OPERATOR FOR ATTRACTING INVESTMENTS
Obtaınıng of investment preferences (investment contract SEZ status etc)
Consultations on state support measures Assistance in licensing procedures(land construction etc)
Visa and migration support permission for the Foreign Labor Workforce)
OUR SERVICES
Investors supportat all stages of the project
Regional Council on attracting investors and improving the investment climate in Nur-Sultan
MISSION promoting the development of the capital by attracting investments in priority areas of the economy including on the principles of partnership between the state and businessVISION an effective regional institution as a ldquoSingle Windowrdquo for investors in the capital
Investment portal of Nur-Sultan httpsinvestinastanakz
THE ROLE OF A SINGLE OPERATOR FOR ATTRACTING INVESTMENTS
wwwinvestinastanakz
httpswwwfacebookcomastanainvest
infoinvestastanakz
+7 (7172) 64-72-01
frac12 Koshkarbayev street 3-th floor
WE ARE READY FOR COOPERATION
- lrmD2019СайтПрезентации и публикацииАнглENG General presentation for investorspptxlrm
-
4
SMALL AND MEDIUM-SIZED BUSINESSES
Gross value added to SMB billions of USD
2013 2014 2015 2016 2017 2018
268
657
586
738
425
641
Product output by subjects of SMB billions of USD
2013 2014 2015 2016 2017 2018
384
966 888
1136
713
925
Number of employees in the field of SMB thousands people
2013 2014 2015 2016 2017 2018
1980
25322902
3251 325
3424
555
Share of small and medium-sized
businesses in GRP structure
FOREIGN INVESTMENT IN NUR-SULTAN CITY
14 15 16 17 18
OF FOREIGN INVESTMENTS IN GENERAL VOLUME OF INVESTMENTS
NUMBER OF FOREIGN COMPANIES IN NUR-SULTAN CITY
2015 2016 2017 2018
x 2
1
x 1
2
05
x 4 x 8x 05
Po
pu
lati
on
mill
ion
pe
op
le
Population growth in 15 years
Almaty
Kazan
Minsk
Calgary
Abu Dhabi
Nur-Sultan
THE NUR-SULTAN IS ONE OF THE FASTEST GROWING CITIESin the world outside Сhina and exceeded the population growth rate of all comparable cities
The world population of cities and growth rate in 15 years Population growth of Nur-Sultan and comparable cities in 1998 - 2017
Nur-Sultan is the leader in terms of population growth among comparable cities
Nur-Sultan is one of the cities with a rapidly growing population
In terms of population growth Nur-Sultan is conceded only to the cities of China and some African countries
Cities of China
Nur-Sultan and comparablecities
Cities of other countries
Nur-Sultan is significantly ahead of all comparable cities (except Abu Dhabi) in terms of population growth
11
16
18
22
24
21
38
16
34
47
45
138
54
276
242
7
Warsaw
Kazan
Novosibirsk
Tashkent
Helsinki
Minsk
Canberra
Ankara
Brasilia
Moscow
Almaty
Calgary
Abu Dhabi
Baku
1 million population
15 billion GRP
26 billion tax revenue
500 thousand of the economically active population
SUSTAINABLE STRUCTURE OF THE CITY ECONOMY
17 million population
29 billion GRP
53 billion tax revenue
800 thousand of the
economically active population
Year2017
Year 2025
102
37
50
64
158
96
293
87
113
Finance
Tourism
Industry
Transportation and communication
Trade
Construction
Business services real estatetransactionsRampD
Socıal sector and publicadministration
Other activities
13
7
8
10
1585
31
642
Finance
Tourism
Industry
Transport and communications
Trade
Construction
Business services real estatetransactions RampD
Social sector and publicadministration
Other activities
(16 times)
(2 times)
(12 times)
(15 times)
( 19 times)
(07 times)
(105 times)
4
9
PRIORITY SECTORS
01Trade and logistics
land preparation of a presentation package
02Modern production
preparation of common fields of cooperation with Nazarbayev University and SEZ residents
03Development
reduction of administrative barriers in the development cluster
04Sportstrategy for the development of sports facilitiesdetailed plan for the development of mass sports
05Culture creative sectors
concept of a creative cluster laquoZhastarraquo investor presentation package
06Healthcareattracting investors to manage and build new hospitals
07Educationattracting investors to manage and build new schools
08AIFCattraction of international funds and financial corporations
09Tourism
attraction of investments for the construction of tourist facilities
10Services for the public sector and TNC
attraction of international legal investment and other companies
10
1-st BENEFITS PACKAGEAcceptance criteria
Employment of foreign labor withoutquota and permission for a period upto one year after objectcommissioning both for the owner ofthe priority project and for thecontracting companies
Employment offoreign labor
Defined by the Resolution of Kazakhstan Government No 13 ldquoOn some issues of the implementation of state support for investmentsrdquo dated January 14 2016 In 2019 1 MCI = 2525 KZTAccording to the exchange rate of the National Bank of Kazakhstan on 15042019 $1 = 37959 KZT euro 1 = 42943 KZT
Compliance with the list of PRIORITY ACTIVITIES
The participation of the statesubject of the quasi-state sector - as a
foundershareholder is not more than 26 and such participation is not more
than 5 years from the date of registration of the investment contract
Compliance with the list of PRIORITY ACTIVITIES
If creating new productions ndashthe volume of investments
should be at least 2 million MCI
If expansion and modernization - at least 5 million MCI
Сustom benefits State in-kind grantsTax benefits
Customs duties 0 up to 5 years on
import ofbull equipment and its componentsbull spare partsbull raw materials and supplies
Land plots buildings machinery and equipment in property
0 VAT on import of raw
materials and equipment
2-nd BENEFITS PACKAGEAcceptance criteria 1-st BENEFITS
PACKAGE
Except VAT on import Corporate Income Tax (up to 10 years up to 3 years forexpansion and modernization of projects)
Land Tax(up to 10 years)
Property Tax(up to 8 years)
0
Tax benefits
STATE SUPPORT OF INVESTMENT PROJECTS(INVESTMENT COTRACTS)
11
TAX INCENTIVES
Corporate Income Tax - 0
Land Tax - 0
Property Tax - 0
CUSTOMSI NCENTIVESCustoms Exemption from import on raw materials and equipment
(it is necessary to conclude a Special Investment Contract up to 15 years subject to the sale of final products
in the territory of the EEU)
LAND WITH INFRASTRUCTURE
Free cost land for the entire period of SEZ operation
Available infrastructure (electricitysewage heat and water supplyrailway automobile
roads)
EMPLOYMENT OF FOREIGN LABOR
Simplified paperwork procedure for hiring foreign employees
Permits and quotas exemption for projects which investments exceed 1 million MCI for period during construction and installation work and 1 year after commissioningIn 2019 1 MCI = 2525 KZT
SEZ laquoАSTANA ndash NEW CITYraquo
SEZ laquoАSTANA-ТЕCHNOPOLUSraquo
The above-mentioned benefits are provided regardless of the amount of investment and are issued for the entire period of SEZ operation
PERIOD 2002-2027
AREA 763471 hectares (Administrative and business center Industrial Park 1- 598 hectares)
PRIORITYACTIVITIES
Mixed (construction industry engineeringaviation light industry food etc)
Webhttpsinvestinastanakzenpage-sezhttpsmapinvestgovkzmapzone_filter=5B25D (map)
PERIOD 2017-2042 гг
AREA 58442 hectares (ıncludıng Nazarbayev Unıversıty-15132 hectares)
PRIORITY ACTIVITIES
Mixed (innovations RampD high technologies mechanical engineering food industry metallurgy pharmaceuticals etc)
Webhttpsinvestinastanakzenpage-sezhttptechnopoliskzru
SPECIAL ECONOMIC ZONES PREFERENCES
12
Type of ProjectTax benefits
Term
Custombenefits
Term
State in-kind grants
(land plots buildings
equipment)
Engineering infrastructure (utilities auto and railway)
Simplified procedure of foreign laboremployment
VAT on import0
CIT0
Land Tax0
Property Tax0
1 Investment project + 5 ____ ____ ____ +5 + ____ ____
2 Investment priority project
21 Construction of new industries
____ +10 +10 +8 +5 + ____ +
22 Expansion or modernization of existing industries
____ +3 ____ ____ +5 + ____ +
3 Special Economic Zone (benefits for the
entire period of SEZ operation)
+ + + + + Land plot (10 years)
+ +
INVESTMENT PREFERENCES IN COMPARISON
13
Investment project implementation stages by signing the INVESTMENT CONTRACT
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Receiving a preliminary letter of
land approval (Аkimat)
Preparation and approval of Act of land selection situational scheme
(local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
5wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning
Assignment technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution of mayoron the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
Conclusion of the Investment contract
(Committee for investments MIA)
35 wd
Independent land assessment
(Investor)
3wd
Formation of packageof documents
(Investor)
10wd
14
01Application in the form established by theauthorized body for investments
02Certificate of state registration (re-registration) of the legal entity
Сopy of the charter of the legal entity certified bythe signature of the Chief and the seal of the legalentity (if any)03
Business plan of investment project drawn up inaccordance with the requirements established bythe authorized body04
05Preliminary letter of approval from the Akimat forthe provision of land
06Assessment of the land from independentapprising company
07Documents confirming financial assurance (own or borrowed) The following types of financial assurance may be applied
711) Bank statement on the availability of funds on
the applicants account
722) Bank guarantee
733) Opening agreement line of credit
The list of documents required for the conclusion of an INVESTMENT CONTRACT
15
Investment project implementation stages by signing the agreement of SPECIAL ECONOMIC ZONE participant
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Preparation and approval of Act of land selection situational scheme(Local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
Construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
10wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning Assignment
Technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution ofmayor on the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
5wd
~
Formation of packageof documents
(Investor)
Conclusion of Contract on the activities carrying out as the SEZ
participant
(Management company)
Obtaining of a certificate of SEZ participant
(MIID РК)
16
01Applicantrsquos details form approved by
the Authorised Body
02Legal entity state registration (re-registration) certificate
03Copy of the identification document of the chiefexecutive officer of the Applicant
04Сopy of the legal entity charter
05
Сopy of the decision of the supreme body of the legalentity on performance of activity in the Special EconomicZone territory
06Сopy of financial reports as of the last reporting date
07Feasibility study of the project meeting therequirements imposed by the Authorised Body
08
Statements of the acquiring bank with regard to theApplicantrsquos bank accounts financial movement (on theabsence of the record) and credit report from the creditbureau
09
Statement from the tax administration at the place of theregistration record on availability or absence of taxes andother compulsory budgetary payments in arrears
10
Documents confirming the financial assurance of theapplicant are provided during the year (money bankguarantee guarantee pledge of property insurancecontract)
The list of documents required for the conclusion of contract on the activities carrying out as the SEZ participant
AKIMAT OF NUR-SULTAN
Indsustry Departments of Nur-Sultan city akimat
Development Instıtutıons(Astana Innovations SEC laquoAstanaraquo)
Regional Representatives ofKAZAKH INVEST
INVESTORCCID laquoASTANA INVESTraquo
Diplomatic corps
AssociationsSINGLE OPERATOR FOR ATTRACTING INVESTMENTS
Obtaınıng of investment preferences (investment contract SEZ status etc)
Consultations on state support measures Assistance in licensing procedures(land construction etc)
Visa and migration support permission for the Foreign Labor Workforce)
OUR SERVICES
Investors supportat all stages of the project
Regional Council on attracting investors and improving the investment climate in Nur-Sultan
MISSION promoting the development of the capital by attracting investments in priority areas of the economy including on the principles of partnership between the state and businessVISION an effective regional institution as a ldquoSingle Windowrdquo for investors in the capital
Investment portal of Nur-Sultan httpsinvestinastanakz
THE ROLE OF A SINGLE OPERATOR FOR ATTRACTING INVESTMENTS
wwwinvestinastanakz
httpswwwfacebookcomastanainvest
infoinvestastanakz
+7 (7172) 64-72-01
frac12 Koshkarbayev street 3-th floor
WE ARE READY FOR COOPERATION
- lrmD2019СайтПрезентации и публикацииАнглENG General presentation for investorspptxlrm
-
FOREIGN INVESTMENT IN NUR-SULTAN CITY
14 15 16 17 18
OF FOREIGN INVESTMENTS IN GENERAL VOLUME OF INVESTMENTS
NUMBER OF FOREIGN COMPANIES IN NUR-SULTAN CITY
2015 2016 2017 2018
x 2
1
x 1
2
05
x 4 x 8x 05
Po
pu
lati
on
mill
ion
pe
op
le
Population growth in 15 years
Almaty
Kazan
Minsk
Calgary
Abu Dhabi
Nur-Sultan
THE NUR-SULTAN IS ONE OF THE FASTEST GROWING CITIESin the world outside Сhina and exceeded the population growth rate of all comparable cities
The world population of cities and growth rate in 15 years Population growth of Nur-Sultan and comparable cities in 1998 - 2017
Nur-Sultan is the leader in terms of population growth among comparable cities
Nur-Sultan is one of the cities with a rapidly growing population
In terms of population growth Nur-Sultan is conceded only to the cities of China and some African countries
Cities of China
Nur-Sultan and comparablecities
Cities of other countries
Nur-Sultan is significantly ahead of all comparable cities (except Abu Dhabi) in terms of population growth
11
16
18
22
24
21
38
16
34
47
45
138
54
276
242
7
Warsaw
Kazan
Novosibirsk
Tashkent
Helsinki
Minsk
Canberra
Ankara
Brasilia
Moscow
Almaty
Calgary
Abu Dhabi
Baku
1 million population
15 billion GRP
26 billion tax revenue
500 thousand of the economically active population
SUSTAINABLE STRUCTURE OF THE CITY ECONOMY
17 million population
29 billion GRP
53 billion tax revenue
800 thousand of the
economically active population
Year2017
Year 2025
102
37
50
64
158
96
293
87
113
Finance
Tourism
Industry
Transportation and communication
Trade
Construction
Business services real estatetransactionsRampD
Socıal sector and publicadministration
Other activities
13
7
8
10
1585
31
642
Finance
Tourism
Industry
Transport and communications
Trade
Construction
Business services real estatetransactions RampD
Social sector and publicadministration
Other activities
(16 times)
(2 times)
(12 times)
(15 times)
( 19 times)
(07 times)
(105 times)
4
9
PRIORITY SECTORS
01Trade and logistics
land preparation of a presentation package
02Modern production
preparation of common fields of cooperation with Nazarbayev University and SEZ residents
03Development
reduction of administrative barriers in the development cluster
04Sportstrategy for the development of sports facilitiesdetailed plan for the development of mass sports
05Culture creative sectors
concept of a creative cluster laquoZhastarraquo investor presentation package
06Healthcareattracting investors to manage and build new hospitals
07Educationattracting investors to manage and build new schools
08AIFCattraction of international funds and financial corporations
09Tourism
attraction of investments for the construction of tourist facilities
10Services for the public sector and TNC
attraction of international legal investment and other companies
10
1-st BENEFITS PACKAGEAcceptance criteria
Employment of foreign labor withoutquota and permission for a period upto one year after objectcommissioning both for the owner ofthe priority project and for thecontracting companies
Employment offoreign labor
Defined by the Resolution of Kazakhstan Government No 13 ldquoOn some issues of the implementation of state support for investmentsrdquo dated January 14 2016 In 2019 1 MCI = 2525 KZTAccording to the exchange rate of the National Bank of Kazakhstan on 15042019 $1 = 37959 KZT euro 1 = 42943 KZT
Compliance with the list of PRIORITY ACTIVITIES
The participation of the statesubject of the quasi-state sector - as a
foundershareholder is not more than 26 and such participation is not more
than 5 years from the date of registration of the investment contract
Compliance with the list of PRIORITY ACTIVITIES
If creating new productions ndashthe volume of investments
should be at least 2 million MCI
If expansion and modernization - at least 5 million MCI
Сustom benefits State in-kind grantsTax benefits
Customs duties 0 up to 5 years on
import ofbull equipment and its componentsbull spare partsbull raw materials and supplies
Land plots buildings machinery and equipment in property
0 VAT on import of raw
materials and equipment
2-nd BENEFITS PACKAGEAcceptance criteria 1-st BENEFITS
PACKAGE
Except VAT on import Corporate Income Tax (up to 10 years up to 3 years forexpansion and modernization of projects)
Land Tax(up to 10 years)
Property Tax(up to 8 years)
0
Tax benefits
STATE SUPPORT OF INVESTMENT PROJECTS(INVESTMENT COTRACTS)
11
TAX INCENTIVES
Corporate Income Tax - 0
Land Tax - 0
Property Tax - 0
CUSTOMSI NCENTIVESCustoms Exemption from import on raw materials and equipment
(it is necessary to conclude a Special Investment Contract up to 15 years subject to the sale of final products
in the territory of the EEU)
LAND WITH INFRASTRUCTURE
Free cost land for the entire period of SEZ operation
Available infrastructure (electricitysewage heat and water supplyrailway automobile
roads)
EMPLOYMENT OF FOREIGN LABOR
Simplified paperwork procedure for hiring foreign employees
Permits and quotas exemption for projects which investments exceed 1 million MCI for period during construction and installation work and 1 year after commissioningIn 2019 1 MCI = 2525 KZT
SEZ laquoАSTANA ndash NEW CITYraquo
SEZ laquoАSTANA-ТЕCHNOPOLUSraquo
The above-mentioned benefits are provided regardless of the amount of investment and are issued for the entire period of SEZ operation
PERIOD 2002-2027
AREA 763471 hectares (Administrative and business center Industrial Park 1- 598 hectares)
PRIORITYACTIVITIES
Mixed (construction industry engineeringaviation light industry food etc)
Webhttpsinvestinastanakzenpage-sezhttpsmapinvestgovkzmapzone_filter=5B25D (map)
PERIOD 2017-2042 гг
AREA 58442 hectares (ıncludıng Nazarbayev Unıversıty-15132 hectares)
PRIORITY ACTIVITIES
Mixed (innovations RampD high technologies mechanical engineering food industry metallurgy pharmaceuticals etc)
Webhttpsinvestinastanakzenpage-sezhttptechnopoliskzru
SPECIAL ECONOMIC ZONES PREFERENCES
12
Type of ProjectTax benefits
Term
Custombenefits
Term
State in-kind grants
(land plots buildings
equipment)
Engineering infrastructure (utilities auto and railway)
Simplified procedure of foreign laboremployment
VAT on import0
CIT0
Land Tax0
Property Tax0
1 Investment project + 5 ____ ____ ____ +5 + ____ ____
2 Investment priority project
21 Construction of new industries
____ +10 +10 +8 +5 + ____ +
22 Expansion or modernization of existing industries
____ +3 ____ ____ +5 + ____ +
3 Special Economic Zone (benefits for the
entire period of SEZ operation)
+ + + + + Land plot (10 years)
+ +
INVESTMENT PREFERENCES IN COMPARISON
13
Investment project implementation stages by signing the INVESTMENT CONTRACT
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Receiving a preliminary letter of
land approval (Аkimat)
Preparation and approval of Act of land selection situational scheme
(local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
5wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning
Assignment technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution of mayoron the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
Conclusion of the Investment contract
(Committee for investments MIA)
35 wd
Independent land assessment
(Investor)
3wd
Formation of packageof documents
(Investor)
10wd
14
01Application in the form established by theauthorized body for investments
02Certificate of state registration (re-registration) of the legal entity
Сopy of the charter of the legal entity certified bythe signature of the Chief and the seal of the legalentity (if any)03
Business plan of investment project drawn up inaccordance with the requirements established bythe authorized body04
05Preliminary letter of approval from the Akimat forthe provision of land
06Assessment of the land from independentapprising company
07Documents confirming financial assurance (own or borrowed) The following types of financial assurance may be applied
711) Bank statement on the availability of funds on
the applicants account
722) Bank guarantee
733) Opening agreement line of credit
The list of documents required for the conclusion of an INVESTMENT CONTRACT
15
Investment project implementation stages by signing the agreement of SPECIAL ECONOMIC ZONE participant
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Preparation and approval of Act of land selection situational scheme(Local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
Construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
10wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning Assignment
Technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution ofmayor on the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
5wd
~
Formation of packageof documents
(Investor)
Conclusion of Contract on the activities carrying out as the SEZ
participant
(Management company)
Obtaining of a certificate of SEZ participant
(MIID РК)
16
01Applicantrsquos details form approved by
the Authorised Body
02Legal entity state registration (re-registration) certificate
03Copy of the identification document of the chiefexecutive officer of the Applicant
04Сopy of the legal entity charter
05
Сopy of the decision of the supreme body of the legalentity on performance of activity in the Special EconomicZone territory
06Сopy of financial reports as of the last reporting date
07Feasibility study of the project meeting therequirements imposed by the Authorised Body
08
Statements of the acquiring bank with regard to theApplicantrsquos bank accounts financial movement (on theabsence of the record) and credit report from the creditbureau
09
Statement from the tax administration at the place of theregistration record on availability or absence of taxes andother compulsory budgetary payments in arrears
10
Documents confirming the financial assurance of theapplicant are provided during the year (money bankguarantee guarantee pledge of property insurancecontract)
The list of documents required for the conclusion of contract on the activities carrying out as the SEZ participant
AKIMAT OF NUR-SULTAN
Indsustry Departments of Nur-Sultan city akimat
Development Instıtutıons(Astana Innovations SEC laquoAstanaraquo)
Regional Representatives ofKAZAKH INVEST
INVESTORCCID laquoASTANA INVESTraquo
Diplomatic corps
AssociationsSINGLE OPERATOR FOR ATTRACTING INVESTMENTS
Obtaınıng of investment preferences (investment contract SEZ status etc)
Consultations on state support measures Assistance in licensing procedures(land construction etc)
Visa and migration support permission for the Foreign Labor Workforce)
OUR SERVICES
Investors supportat all stages of the project
Regional Council on attracting investors and improving the investment climate in Nur-Sultan
MISSION promoting the development of the capital by attracting investments in priority areas of the economy including on the principles of partnership between the state and businessVISION an effective regional institution as a ldquoSingle Windowrdquo for investors in the capital
Investment portal of Nur-Sultan httpsinvestinastanakz
THE ROLE OF A SINGLE OPERATOR FOR ATTRACTING INVESTMENTS
wwwinvestinastanakz
httpswwwfacebookcomastanainvest
infoinvestastanakz
+7 (7172) 64-72-01
frac12 Koshkarbayev street 3-th floor
WE ARE READY FOR COOPERATION
- lrmD2019СайтПрезентации и публикацииАнглENG General presentation for investorspptxlrm
-
NUMBER OF FOREIGN COMPANIES IN NUR-SULTAN CITY
2015 2016 2017 2018
x 2
1
x 1
2
05
x 4 x 8x 05
Po
pu
lati
on
mill
ion
pe
op
le
Population growth in 15 years
Almaty
Kazan
Minsk
Calgary
Abu Dhabi
Nur-Sultan
THE NUR-SULTAN IS ONE OF THE FASTEST GROWING CITIESin the world outside Сhina and exceeded the population growth rate of all comparable cities
The world population of cities and growth rate in 15 years Population growth of Nur-Sultan and comparable cities in 1998 - 2017
Nur-Sultan is the leader in terms of population growth among comparable cities
Nur-Sultan is one of the cities with a rapidly growing population
In terms of population growth Nur-Sultan is conceded only to the cities of China and some African countries
Cities of China
Nur-Sultan and comparablecities
Cities of other countries
Nur-Sultan is significantly ahead of all comparable cities (except Abu Dhabi) in terms of population growth
11
16
18
22
24
21
38
16
34
47
45
138
54
276
242
7
Warsaw
Kazan
Novosibirsk
Tashkent
Helsinki
Minsk
Canberra
Ankara
Brasilia
Moscow
Almaty
Calgary
Abu Dhabi
Baku
1 million population
15 billion GRP
26 billion tax revenue
500 thousand of the economically active population
SUSTAINABLE STRUCTURE OF THE CITY ECONOMY
17 million population
29 billion GRP
53 billion tax revenue
800 thousand of the
economically active population
Year2017
Year 2025
102
37
50
64
158
96
293
87
113
Finance
Tourism
Industry
Transportation and communication
Trade
Construction
Business services real estatetransactionsRampD
Socıal sector and publicadministration
Other activities
13
7
8
10
1585
31
642
Finance
Tourism
Industry
Transport and communications
Trade
Construction
Business services real estatetransactions RampD
Social sector and publicadministration
Other activities
(16 times)
(2 times)
(12 times)
(15 times)
( 19 times)
(07 times)
(105 times)
4
9
PRIORITY SECTORS
01Trade and logistics
land preparation of a presentation package
02Modern production
preparation of common fields of cooperation with Nazarbayev University and SEZ residents
03Development
reduction of administrative barriers in the development cluster
04Sportstrategy for the development of sports facilitiesdetailed plan for the development of mass sports
05Culture creative sectors
concept of a creative cluster laquoZhastarraquo investor presentation package
06Healthcareattracting investors to manage and build new hospitals
07Educationattracting investors to manage and build new schools
08AIFCattraction of international funds and financial corporations
09Tourism
attraction of investments for the construction of tourist facilities
10Services for the public sector and TNC
attraction of international legal investment and other companies
10
1-st BENEFITS PACKAGEAcceptance criteria
Employment of foreign labor withoutquota and permission for a period upto one year after objectcommissioning both for the owner ofthe priority project and for thecontracting companies
Employment offoreign labor
Defined by the Resolution of Kazakhstan Government No 13 ldquoOn some issues of the implementation of state support for investmentsrdquo dated January 14 2016 In 2019 1 MCI = 2525 KZTAccording to the exchange rate of the National Bank of Kazakhstan on 15042019 $1 = 37959 KZT euro 1 = 42943 KZT
Compliance with the list of PRIORITY ACTIVITIES
The participation of the statesubject of the quasi-state sector - as a
foundershareholder is not more than 26 and such participation is not more
than 5 years from the date of registration of the investment contract
Compliance with the list of PRIORITY ACTIVITIES
If creating new productions ndashthe volume of investments
should be at least 2 million MCI
If expansion and modernization - at least 5 million MCI
Сustom benefits State in-kind grantsTax benefits
Customs duties 0 up to 5 years on
import ofbull equipment and its componentsbull spare partsbull raw materials and supplies
Land plots buildings machinery and equipment in property
0 VAT on import of raw
materials and equipment
2-nd BENEFITS PACKAGEAcceptance criteria 1-st BENEFITS
PACKAGE
Except VAT on import Corporate Income Tax (up to 10 years up to 3 years forexpansion and modernization of projects)
Land Tax(up to 10 years)
Property Tax(up to 8 years)
0
Tax benefits
STATE SUPPORT OF INVESTMENT PROJECTS(INVESTMENT COTRACTS)
11
TAX INCENTIVES
Corporate Income Tax - 0
Land Tax - 0
Property Tax - 0
CUSTOMSI NCENTIVESCustoms Exemption from import on raw materials and equipment
(it is necessary to conclude a Special Investment Contract up to 15 years subject to the sale of final products
in the territory of the EEU)
LAND WITH INFRASTRUCTURE
Free cost land for the entire period of SEZ operation
Available infrastructure (electricitysewage heat and water supplyrailway automobile
roads)
EMPLOYMENT OF FOREIGN LABOR
Simplified paperwork procedure for hiring foreign employees
Permits and quotas exemption for projects which investments exceed 1 million MCI for period during construction and installation work and 1 year after commissioningIn 2019 1 MCI = 2525 KZT
SEZ laquoАSTANA ndash NEW CITYraquo
SEZ laquoАSTANA-ТЕCHNOPOLUSraquo
The above-mentioned benefits are provided regardless of the amount of investment and are issued for the entire period of SEZ operation
PERIOD 2002-2027
AREA 763471 hectares (Administrative and business center Industrial Park 1- 598 hectares)
PRIORITYACTIVITIES
Mixed (construction industry engineeringaviation light industry food etc)
Webhttpsinvestinastanakzenpage-sezhttpsmapinvestgovkzmapzone_filter=5B25D (map)
PERIOD 2017-2042 гг
AREA 58442 hectares (ıncludıng Nazarbayev Unıversıty-15132 hectares)
PRIORITY ACTIVITIES
Mixed (innovations RampD high technologies mechanical engineering food industry metallurgy pharmaceuticals etc)
Webhttpsinvestinastanakzenpage-sezhttptechnopoliskzru
SPECIAL ECONOMIC ZONES PREFERENCES
12
Type of ProjectTax benefits
Term
Custombenefits
Term
State in-kind grants
(land plots buildings
equipment)
Engineering infrastructure (utilities auto and railway)
Simplified procedure of foreign laboremployment
VAT on import0
CIT0
Land Tax0
Property Tax0
1 Investment project + 5 ____ ____ ____ +5 + ____ ____
2 Investment priority project
21 Construction of new industries
____ +10 +10 +8 +5 + ____ +
22 Expansion or modernization of existing industries
____ +3 ____ ____ +5 + ____ +
3 Special Economic Zone (benefits for the
entire period of SEZ operation)
+ + + + + Land plot (10 years)
+ +
INVESTMENT PREFERENCES IN COMPARISON
13
Investment project implementation stages by signing the INVESTMENT CONTRACT
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Receiving a preliminary letter of
land approval (Аkimat)
Preparation and approval of Act of land selection situational scheme
(local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
5wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning
Assignment technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution of mayoron the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
Conclusion of the Investment contract
(Committee for investments MIA)
35 wd
Independent land assessment
(Investor)
3wd
Formation of packageof documents
(Investor)
10wd
14
01Application in the form established by theauthorized body for investments
02Certificate of state registration (re-registration) of the legal entity
Сopy of the charter of the legal entity certified bythe signature of the Chief and the seal of the legalentity (if any)03
Business plan of investment project drawn up inaccordance with the requirements established bythe authorized body04
05Preliminary letter of approval from the Akimat forthe provision of land
06Assessment of the land from independentapprising company
07Documents confirming financial assurance (own or borrowed) The following types of financial assurance may be applied
711) Bank statement on the availability of funds on
the applicants account
722) Bank guarantee
733) Opening agreement line of credit
The list of documents required for the conclusion of an INVESTMENT CONTRACT
15
Investment project implementation stages by signing the agreement of SPECIAL ECONOMIC ZONE participant
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Preparation and approval of Act of land selection situational scheme(Local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
Construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
10wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning Assignment
Technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution ofmayor on the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
5wd
~
Formation of packageof documents
(Investor)
Conclusion of Contract on the activities carrying out as the SEZ
participant
(Management company)
Obtaining of a certificate of SEZ participant
(MIID РК)
16
01Applicantrsquos details form approved by
the Authorised Body
02Legal entity state registration (re-registration) certificate
03Copy of the identification document of the chiefexecutive officer of the Applicant
04Сopy of the legal entity charter
05
Сopy of the decision of the supreme body of the legalentity on performance of activity in the Special EconomicZone territory
06Сopy of financial reports as of the last reporting date
07Feasibility study of the project meeting therequirements imposed by the Authorised Body
08
Statements of the acquiring bank with regard to theApplicantrsquos bank accounts financial movement (on theabsence of the record) and credit report from the creditbureau
09
Statement from the tax administration at the place of theregistration record on availability or absence of taxes andother compulsory budgetary payments in arrears
10
Documents confirming the financial assurance of theapplicant are provided during the year (money bankguarantee guarantee pledge of property insurancecontract)
The list of documents required for the conclusion of contract on the activities carrying out as the SEZ participant
AKIMAT OF NUR-SULTAN
Indsustry Departments of Nur-Sultan city akimat
Development Instıtutıons(Astana Innovations SEC laquoAstanaraquo)
Regional Representatives ofKAZAKH INVEST
INVESTORCCID laquoASTANA INVESTraquo
Diplomatic corps
AssociationsSINGLE OPERATOR FOR ATTRACTING INVESTMENTS
Obtaınıng of investment preferences (investment contract SEZ status etc)
Consultations on state support measures Assistance in licensing procedures(land construction etc)
Visa and migration support permission for the Foreign Labor Workforce)
OUR SERVICES
Investors supportat all stages of the project
Regional Council on attracting investors and improving the investment climate in Nur-Sultan
MISSION promoting the development of the capital by attracting investments in priority areas of the economy including on the principles of partnership between the state and businessVISION an effective regional institution as a ldquoSingle Windowrdquo for investors in the capital
Investment portal of Nur-Sultan httpsinvestinastanakz
THE ROLE OF A SINGLE OPERATOR FOR ATTRACTING INVESTMENTS
wwwinvestinastanakz
httpswwwfacebookcomastanainvest
infoinvestastanakz
+7 (7172) 64-72-01
frac12 Koshkarbayev street 3-th floor
WE ARE READY FOR COOPERATION
- lrmD2019СайтПрезентации и публикацииАнглENG General presentation for investorspptxlrm
-
x 2
1
x 1
2
05
x 4 x 8x 05
Po
pu
lati
on
mill
ion
pe
op
le
Population growth in 15 years
Almaty
Kazan
Minsk
Calgary
Abu Dhabi
Nur-Sultan
THE NUR-SULTAN IS ONE OF THE FASTEST GROWING CITIESin the world outside Сhina and exceeded the population growth rate of all comparable cities
The world population of cities and growth rate in 15 years Population growth of Nur-Sultan and comparable cities in 1998 - 2017
Nur-Sultan is the leader in terms of population growth among comparable cities
Nur-Sultan is one of the cities with a rapidly growing population
In terms of population growth Nur-Sultan is conceded only to the cities of China and some African countries
Cities of China
Nur-Sultan and comparablecities
Cities of other countries
Nur-Sultan is significantly ahead of all comparable cities (except Abu Dhabi) in terms of population growth
11
16
18
22
24
21
38
16
34
47
45
138
54
276
242
7
Warsaw
Kazan
Novosibirsk
Tashkent
Helsinki
Minsk
Canberra
Ankara
Brasilia
Moscow
Almaty
Calgary
Abu Dhabi
Baku
1 million population
15 billion GRP
26 billion tax revenue
500 thousand of the economically active population
SUSTAINABLE STRUCTURE OF THE CITY ECONOMY
17 million population
29 billion GRP
53 billion tax revenue
800 thousand of the
economically active population
Year2017
Year 2025
102
37
50
64
158
96
293
87
113
Finance
Tourism
Industry
Transportation and communication
Trade
Construction
Business services real estatetransactionsRampD
Socıal sector and publicadministration
Other activities
13
7
8
10
1585
31
642
Finance
Tourism
Industry
Transport and communications
Trade
Construction
Business services real estatetransactions RampD
Social sector and publicadministration
Other activities
(16 times)
(2 times)
(12 times)
(15 times)
( 19 times)
(07 times)
(105 times)
4
9
PRIORITY SECTORS
01Trade and logistics
land preparation of a presentation package
02Modern production
preparation of common fields of cooperation with Nazarbayev University and SEZ residents
03Development
reduction of administrative barriers in the development cluster
04Sportstrategy for the development of sports facilitiesdetailed plan for the development of mass sports
05Culture creative sectors
concept of a creative cluster laquoZhastarraquo investor presentation package
06Healthcareattracting investors to manage and build new hospitals
07Educationattracting investors to manage and build new schools
08AIFCattraction of international funds and financial corporations
09Tourism
attraction of investments for the construction of tourist facilities
10Services for the public sector and TNC
attraction of international legal investment and other companies
10
1-st BENEFITS PACKAGEAcceptance criteria
Employment of foreign labor withoutquota and permission for a period upto one year after objectcommissioning both for the owner ofthe priority project and for thecontracting companies
Employment offoreign labor
Defined by the Resolution of Kazakhstan Government No 13 ldquoOn some issues of the implementation of state support for investmentsrdquo dated January 14 2016 In 2019 1 MCI = 2525 KZTAccording to the exchange rate of the National Bank of Kazakhstan on 15042019 $1 = 37959 KZT euro 1 = 42943 KZT
Compliance with the list of PRIORITY ACTIVITIES
The participation of the statesubject of the quasi-state sector - as a
foundershareholder is not more than 26 and such participation is not more
than 5 years from the date of registration of the investment contract
Compliance with the list of PRIORITY ACTIVITIES
If creating new productions ndashthe volume of investments
should be at least 2 million MCI
If expansion and modernization - at least 5 million MCI
Сustom benefits State in-kind grantsTax benefits
Customs duties 0 up to 5 years on
import ofbull equipment and its componentsbull spare partsbull raw materials and supplies
Land plots buildings machinery and equipment in property
0 VAT on import of raw
materials and equipment
2-nd BENEFITS PACKAGEAcceptance criteria 1-st BENEFITS
PACKAGE
Except VAT on import Corporate Income Tax (up to 10 years up to 3 years forexpansion and modernization of projects)
Land Tax(up to 10 years)
Property Tax(up to 8 years)
0
Tax benefits
STATE SUPPORT OF INVESTMENT PROJECTS(INVESTMENT COTRACTS)
11
TAX INCENTIVES
Corporate Income Tax - 0
Land Tax - 0
Property Tax - 0
CUSTOMSI NCENTIVESCustoms Exemption from import on raw materials and equipment
(it is necessary to conclude a Special Investment Contract up to 15 years subject to the sale of final products
in the territory of the EEU)
LAND WITH INFRASTRUCTURE
Free cost land for the entire period of SEZ operation
Available infrastructure (electricitysewage heat and water supplyrailway automobile
roads)
EMPLOYMENT OF FOREIGN LABOR
Simplified paperwork procedure for hiring foreign employees
Permits and quotas exemption for projects which investments exceed 1 million MCI for period during construction and installation work and 1 year after commissioningIn 2019 1 MCI = 2525 KZT
SEZ laquoАSTANA ndash NEW CITYraquo
SEZ laquoАSTANA-ТЕCHNOPOLUSraquo
The above-mentioned benefits are provided regardless of the amount of investment and are issued for the entire period of SEZ operation
PERIOD 2002-2027
AREA 763471 hectares (Administrative and business center Industrial Park 1- 598 hectares)
PRIORITYACTIVITIES
Mixed (construction industry engineeringaviation light industry food etc)
Webhttpsinvestinastanakzenpage-sezhttpsmapinvestgovkzmapzone_filter=5B25D (map)
PERIOD 2017-2042 гг
AREA 58442 hectares (ıncludıng Nazarbayev Unıversıty-15132 hectares)
PRIORITY ACTIVITIES
Mixed (innovations RampD high technologies mechanical engineering food industry metallurgy pharmaceuticals etc)
Webhttpsinvestinastanakzenpage-sezhttptechnopoliskzru
SPECIAL ECONOMIC ZONES PREFERENCES
12
Type of ProjectTax benefits
Term
Custombenefits
Term
State in-kind grants
(land plots buildings
equipment)
Engineering infrastructure (utilities auto and railway)
Simplified procedure of foreign laboremployment
VAT on import0
CIT0
Land Tax0
Property Tax0
1 Investment project + 5 ____ ____ ____ +5 + ____ ____
2 Investment priority project
21 Construction of new industries
____ +10 +10 +8 +5 + ____ +
22 Expansion or modernization of existing industries
____ +3 ____ ____ +5 + ____ +
3 Special Economic Zone (benefits for the
entire period of SEZ operation)
+ + + + + Land plot (10 years)
+ +
INVESTMENT PREFERENCES IN COMPARISON
13
Investment project implementation stages by signing the INVESTMENT CONTRACT
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Receiving a preliminary letter of
land approval (Аkimat)
Preparation and approval of Act of land selection situational scheme
(local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
5wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning
Assignment technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution of mayoron the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
Conclusion of the Investment contract
(Committee for investments MIA)
35 wd
Independent land assessment
(Investor)
3wd
Formation of packageof documents
(Investor)
10wd
14
01Application in the form established by theauthorized body for investments
02Certificate of state registration (re-registration) of the legal entity
Сopy of the charter of the legal entity certified bythe signature of the Chief and the seal of the legalentity (if any)03
Business plan of investment project drawn up inaccordance with the requirements established bythe authorized body04
05Preliminary letter of approval from the Akimat forthe provision of land
06Assessment of the land from independentapprising company
07Documents confirming financial assurance (own or borrowed) The following types of financial assurance may be applied
711) Bank statement on the availability of funds on
the applicants account
722) Bank guarantee
733) Opening agreement line of credit
The list of documents required for the conclusion of an INVESTMENT CONTRACT
15
Investment project implementation stages by signing the agreement of SPECIAL ECONOMIC ZONE participant
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Preparation and approval of Act of land selection situational scheme(Local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
Construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
10wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning Assignment
Technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution ofmayor on the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
5wd
~
Formation of packageof documents
(Investor)
Conclusion of Contract on the activities carrying out as the SEZ
participant
(Management company)
Obtaining of a certificate of SEZ participant
(MIID РК)
16
01Applicantrsquos details form approved by
the Authorised Body
02Legal entity state registration (re-registration) certificate
03Copy of the identification document of the chiefexecutive officer of the Applicant
04Сopy of the legal entity charter
05
Сopy of the decision of the supreme body of the legalentity on performance of activity in the Special EconomicZone territory
06Сopy of financial reports as of the last reporting date
07Feasibility study of the project meeting therequirements imposed by the Authorised Body
08
Statements of the acquiring bank with regard to theApplicantrsquos bank accounts financial movement (on theabsence of the record) and credit report from the creditbureau
09
Statement from the tax administration at the place of theregistration record on availability or absence of taxes andother compulsory budgetary payments in arrears
10
Documents confirming the financial assurance of theapplicant are provided during the year (money bankguarantee guarantee pledge of property insurancecontract)
The list of documents required for the conclusion of contract on the activities carrying out as the SEZ participant
AKIMAT OF NUR-SULTAN
Indsustry Departments of Nur-Sultan city akimat
Development Instıtutıons(Astana Innovations SEC laquoAstanaraquo)
Regional Representatives ofKAZAKH INVEST
INVESTORCCID laquoASTANA INVESTraquo
Diplomatic corps
AssociationsSINGLE OPERATOR FOR ATTRACTING INVESTMENTS
Obtaınıng of investment preferences (investment contract SEZ status etc)
Consultations on state support measures Assistance in licensing procedures(land construction etc)
Visa and migration support permission for the Foreign Labor Workforce)
OUR SERVICES
Investors supportat all stages of the project
Regional Council on attracting investors and improving the investment climate in Nur-Sultan
MISSION promoting the development of the capital by attracting investments in priority areas of the economy including on the principles of partnership between the state and businessVISION an effective regional institution as a ldquoSingle Windowrdquo for investors in the capital
Investment portal of Nur-Sultan httpsinvestinastanakz
THE ROLE OF A SINGLE OPERATOR FOR ATTRACTING INVESTMENTS
wwwinvestinastanakz
httpswwwfacebookcomastanainvest
infoinvestastanakz
+7 (7172) 64-72-01
frac12 Koshkarbayev street 3-th floor
WE ARE READY FOR COOPERATION
- lrmD2019СайтПрезентации и публикацииАнглENG General presentation for investorspptxlrm
-
1 million population
15 billion GRP
26 billion tax revenue
500 thousand of the economically active population
SUSTAINABLE STRUCTURE OF THE CITY ECONOMY
17 million population
29 billion GRP
53 billion tax revenue
800 thousand of the
economically active population
Year2017
Year 2025
102
37
50
64
158
96
293
87
113
Finance
Tourism
Industry
Transportation and communication
Trade
Construction
Business services real estatetransactionsRampD
Socıal sector and publicadministration
Other activities
13
7
8
10
1585
31
642
Finance
Tourism
Industry
Transport and communications
Trade
Construction
Business services real estatetransactions RampD
Social sector and publicadministration
Other activities
(16 times)
(2 times)
(12 times)
(15 times)
( 19 times)
(07 times)
(105 times)
4
9
PRIORITY SECTORS
01Trade and logistics
land preparation of a presentation package
02Modern production
preparation of common fields of cooperation with Nazarbayev University and SEZ residents
03Development
reduction of administrative barriers in the development cluster
04Sportstrategy for the development of sports facilitiesdetailed plan for the development of mass sports
05Culture creative sectors
concept of a creative cluster laquoZhastarraquo investor presentation package
06Healthcareattracting investors to manage and build new hospitals
07Educationattracting investors to manage and build new schools
08AIFCattraction of international funds and financial corporations
09Tourism
attraction of investments for the construction of tourist facilities
10Services for the public sector and TNC
attraction of international legal investment and other companies
10
1-st BENEFITS PACKAGEAcceptance criteria
Employment of foreign labor withoutquota and permission for a period upto one year after objectcommissioning both for the owner ofthe priority project and for thecontracting companies
Employment offoreign labor
Defined by the Resolution of Kazakhstan Government No 13 ldquoOn some issues of the implementation of state support for investmentsrdquo dated January 14 2016 In 2019 1 MCI = 2525 KZTAccording to the exchange rate of the National Bank of Kazakhstan on 15042019 $1 = 37959 KZT euro 1 = 42943 KZT
Compliance with the list of PRIORITY ACTIVITIES
The participation of the statesubject of the quasi-state sector - as a
foundershareholder is not more than 26 and such participation is not more
than 5 years from the date of registration of the investment contract
Compliance with the list of PRIORITY ACTIVITIES
If creating new productions ndashthe volume of investments
should be at least 2 million MCI
If expansion and modernization - at least 5 million MCI
Сustom benefits State in-kind grantsTax benefits
Customs duties 0 up to 5 years on
import ofbull equipment and its componentsbull spare partsbull raw materials and supplies
Land plots buildings machinery and equipment in property
0 VAT on import of raw
materials and equipment
2-nd BENEFITS PACKAGEAcceptance criteria 1-st BENEFITS
PACKAGE
Except VAT on import Corporate Income Tax (up to 10 years up to 3 years forexpansion and modernization of projects)
Land Tax(up to 10 years)
Property Tax(up to 8 years)
0
Tax benefits
STATE SUPPORT OF INVESTMENT PROJECTS(INVESTMENT COTRACTS)
11
TAX INCENTIVES
Corporate Income Tax - 0
Land Tax - 0
Property Tax - 0
CUSTOMSI NCENTIVESCustoms Exemption from import on raw materials and equipment
(it is necessary to conclude a Special Investment Contract up to 15 years subject to the sale of final products
in the territory of the EEU)
LAND WITH INFRASTRUCTURE
Free cost land for the entire period of SEZ operation
Available infrastructure (electricitysewage heat and water supplyrailway automobile
roads)
EMPLOYMENT OF FOREIGN LABOR
Simplified paperwork procedure for hiring foreign employees
Permits and quotas exemption for projects which investments exceed 1 million MCI for period during construction and installation work and 1 year after commissioningIn 2019 1 MCI = 2525 KZT
SEZ laquoАSTANA ndash NEW CITYraquo
SEZ laquoАSTANA-ТЕCHNOPOLUSraquo
The above-mentioned benefits are provided regardless of the amount of investment and are issued for the entire period of SEZ operation
PERIOD 2002-2027
AREA 763471 hectares (Administrative and business center Industrial Park 1- 598 hectares)
PRIORITYACTIVITIES
Mixed (construction industry engineeringaviation light industry food etc)
Webhttpsinvestinastanakzenpage-sezhttpsmapinvestgovkzmapzone_filter=5B25D (map)
PERIOD 2017-2042 гг
AREA 58442 hectares (ıncludıng Nazarbayev Unıversıty-15132 hectares)
PRIORITY ACTIVITIES
Mixed (innovations RampD high technologies mechanical engineering food industry metallurgy pharmaceuticals etc)
Webhttpsinvestinastanakzenpage-sezhttptechnopoliskzru
SPECIAL ECONOMIC ZONES PREFERENCES
12
Type of ProjectTax benefits
Term
Custombenefits
Term
State in-kind grants
(land plots buildings
equipment)
Engineering infrastructure (utilities auto and railway)
Simplified procedure of foreign laboremployment
VAT on import0
CIT0
Land Tax0
Property Tax0
1 Investment project + 5 ____ ____ ____ +5 + ____ ____
2 Investment priority project
21 Construction of new industries
____ +10 +10 +8 +5 + ____ +
22 Expansion or modernization of existing industries
____ +3 ____ ____ +5 + ____ +
3 Special Economic Zone (benefits for the
entire period of SEZ operation)
+ + + + + Land plot (10 years)
+ +
INVESTMENT PREFERENCES IN COMPARISON
13
Investment project implementation stages by signing the INVESTMENT CONTRACT
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Receiving a preliminary letter of
land approval (Аkimat)
Preparation and approval of Act of land selection situational scheme
(local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
5wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning
Assignment technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution of mayoron the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
Conclusion of the Investment contract
(Committee for investments MIA)
35 wd
Independent land assessment
(Investor)
3wd
Formation of packageof documents
(Investor)
10wd
14
01Application in the form established by theauthorized body for investments
02Certificate of state registration (re-registration) of the legal entity
Сopy of the charter of the legal entity certified bythe signature of the Chief and the seal of the legalentity (if any)03
Business plan of investment project drawn up inaccordance with the requirements established bythe authorized body04
05Preliminary letter of approval from the Akimat forthe provision of land
06Assessment of the land from independentapprising company
07Documents confirming financial assurance (own or borrowed) The following types of financial assurance may be applied
711) Bank statement on the availability of funds on
the applicants account
722) Bank guarantee
733) Opening agreement line of credit
The list of documents required for the conclusion of an INVESTMENT CONTRACT
15
Investment project implementation stages by signing the agreement of SPECIAL ECONOMIC ZONE participant
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Preparation and approval of Act of land selection situational scheme(Local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
Construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
10wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning Assignment
Technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution ofmayor on the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
5wd
~
Formation of packageof documents
(Investor)
Conclusion of Contract on the activities carrying out as the SEZ
participant
(Management company)
Obtaining of a certificate of SEZ participant
(MIID РК)
16
01Applicantrsquos details form approved by
the Authorised Body
02Legal entity state registration (re-registration) certificate
03Copy of the identification document of the chiefexecutive officer of the Applicant
04Сopy of the legal entity charter
05
Сopy of the decision of the supreme body of the legalentity on performance of activity in the Special EconomicZone territory
06Сopy of financial reports as of the last reporting date
07Feasibility study of the project meeting therequirements imposed by the Authorised Body
08
Statements of the acquiring bank with regard to theApplicantrsquos bank accounts financial movement (on theabsence of the record) and credit report from the creditbureau
09
Statement from the tax administration at the place of theregistration record on availability or absence of taxes andother compulsory budgetary payments in arrears
10
Documents confirming the financial assurance of theapplicant are provided during the year (money bankguarantee guarantee pledge of property insurancecontract)
The list of documents required for the conclusion of contract on the activities carrying out as the SEZ participant
AKIMAT OF NUR-SULTAN
Indsustry Departments of Nur-Sultan city akimat
Development Instıtutıons(Astana Innovations SEC laquoAstanaraquo)
Regional Representatives ofKAZAKH INVEST
INVESTORCCID laquoASTANA INVESTraquo
Diplomatic corps
AssociationsSINGLE OPERATOR FOR ATTRACTING INVESTMENTS
Obtaınıng of investment preferences (investment contract SEZ status etc)
Consultations on state support measures Assistance in licensing procedures(land construction etc)
Visa and migration support permission for the Foreign Labor Workforce)
OUR SERVICES
Investors supportat all stages of the project
Regional Council on attracting investors and improving the investment climate in Nur-Sultan
MISSION promoting the development of the capital by attracting investments in priority areas of the economy including on the principles of partnership between the state and businessVISION an effective regional institution as a ldquoSingle Windowrdquo for investors in the capital
Investment portal of Nur-Sultan httpsinvestinastanakz
THE ROLE OF A SINGLE OPERATOR FOR ATTRACTING INVESTMENTS
wwwinvestinastanakz
httpswwwfacebookcomastanainvest
infoinvestastanakz
+7 (7172) 64-72-01
frac12 Koshkarbayev street 3-th floor
WE ARE READY FOR COOPERATION
- lrmD2019СайтПрезентации и публикацииАнглENG General presentation for investorspptxlrm
-
9
PRIORITY SECTORS
01Trade and logistics
land preparation of a presentation package
02Modern production
preparation of common fields of cooperation with Nazarbayev University and SEZ residents
03Development
reduction of administrative barriers in the development cluster
04Sportstrategy for the development of sports facilitiesdetailed plan for the development of mass sports
05Culture creative sectors
concept of a creative cluster laquoZhastarraquo investor presentation package
06Healthcareattracting investors to manage and build new hospitals
07Educationattracting investors to manage and build new schools
08AIFCattraction of international funds and financial corporations
09Tourism
attraction of investments for the construction of tourist facilities
10Services for the public sector and TNC
attraction of international legal investment and other companies
10
1-st BENEFITS PACKAGEAcceptance criteria
Employment of foreign labor withoutquota and permission for a period upto one year after objectcommissioning both for the owner ofthe priority project and for thecontracting companies
Employment offoreign labor
Defined by the Resolution of Kazakhstan Government No 13 ldquoOn some issues of the implementation of state support for investmentsrdquo dated January 14 2016 In 2019 1 MCI = 2525 KZTAccording to the exchange rate of the National Bank of Kazakhstan on 15042019 $1 = 37959 KZT euro 1 = 42943 KZT
Compliance with the list of PRIORITY ACTIVITIES
The participation of the statesubject of the quasi-state sector - as a
foundershareholder is not more than 26 and such participation is not more
than 5 years from the date of registration of the investment contract
Compliance with the list of PRIORITY ACTIVITIES
If creating new productions ndashthe volume of investments
should be at least 2 million MCI
If expansion and modernization - at least 5 million MCI
Сustom benefits State in-kind grantsTax benefits
Customs duties 0 up to 5 years on
import ofbull equipment and its componentsbull spare partsbull raw materials and supplies
Land plots buildings machinery and equipment in property
0 VAT on import of raw
materials and equipment
2-nd BENEFITS PACKAGEAcceptance criteria 1-st BENEFITS
PACKAGE
Except VAT on import Corporate Income Tax (up to 10 years up to 3 years forexpansion and modernization of projects)
Land Tax(up to 10 years)
Property Tax(up to 8 years)
0
Tax benefits
STATE SUPPORT OF INVESTMENT PROJECTS(INVESTMENT COTRACTS)
11
TAX INCENTIVES
Corporate Income Tax - 0
Land Tax - 0
Property Tax - 0
CUSTOMSI NCENTIVESCustoms Exemption from import on raw materials and equipment
(it is necessary to conclude a Special Investment Contract up to 15 years subject to the sale of final products
in the territory of the EEU)
LAND WITH INFRASTRUCTURE
Free cost land for the entire period of SEZ operation
Available infrastructure (electricitysewage heat and water supplyrailway automobile
roads)
EMPLOYMENT OF FOREIGN LABOR
Simplified paperwork procedure for hiring foreign employees
Permits and quotas exemption for projects which investments exceed 1 million MCI for period during construction and installation work and 1 year after commissioningIn 2019 1 MCI = 2525 KZT
SEZ laquoАSTANA ndash NEW CITYraquo
SEZ laquoАSTANA-ТЕCHNOPOLUSraquo
The above-mentioned benefits are provided regardless of the amount of investment and are issued for the entire period of SEZ operation
PERIOD 2002-2027
AREA 763471 hectares (Administrative and business center Industrial Park 1- 598 hectares)
PRIORITYACTIVITIES
Mixed (construction industry engineeringaviation light industry food etc)
Webhttpsinvestinastanakzenpage-sezhttpsmapinvestgovkzmapzone_filter=5B25D (map)
PERIOD 2017-2042 гг
AREA 58442 hectares (ıncludıng Nazarbayev Unıversıty-15132 hectares)
PRIORITY ACTIVITIES
Mixed (innovations RampD high technologies mechanical engineering food industry metallurgy pharmaceuticals etc)
Webhttpsinvestinastanakzenpage-sezhttptechnopoliskzru
SPECIAL ECONOMIC ZONES PREFERENCES
12
Type of ProjectTax benefits
Term
Custombenefits
Term
State in-kind grants
(land plots buildings
equipment)
Engineering infrastructure (utilities auto and railway)
Simplified procedure of foreign laboremployment
VAT on import0
CIT0
Land Tax0
Property Tax0
1 Investment project + 5 ____ ____ ____ +5 + ____ ____
2 Investment priority project
21 Construction of new industries
____ +10 +10 +8 +5 + ____ +
22 Expansion or modernization of existing industries
____ +3 ____ ____ +5 + ____ +
3 Special Economic Zone (benefits for the
entire period of SEZ operation)
+ + + + + Land plot (10 years)
+ +
INVESTMENT PREFERENCES IN COMPARISON
13
Investment project implementation stages by signing the INVESTMENT CONTRACT
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Receiving a preliminary letter of
land approval (Аkimat)
Preparation and approval of Act of land selection situational scheme
(local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
5wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning
Assignment technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution of mayoron the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
Conclusion of the Investment contract
(Committee for investments MIA)
35 wd
Independent land assessment
(Investor)
3wd
Formation of packageof documents
(Investor)
10wd
14
01Application in the form established by theauthorized body for investments
02Certificate of state registration (re-registration) of the legal entity
Сopy of the charter of the legal entity certified bythe signature of the Chief and the seal of the legalentity (if any)03
Business plan of investment project drawn up inaccordance with the requirements established bythe authorized body04
05Preliminary letter of approval from the Akimat forthe provision of land
06Assessment of the land from independentapprising company
07Documents confirming financial assurance (own or borrowed) The following types of financial assurance may be applied
711) Bank statement on the availability of funds on
the applicants account
722) Bank guarantee
733) Opening agreement line of credit
The list of documents required for the conclusion of an INVESTMENT CONTRACT
15
Investment project implementation stages by signing the agreement of SPECIAL ECONOMIC ZONE participant
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Preparation and approval of Act of land selection situational scheme(Local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
Construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
10wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning Assignment
Technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution ofmayor on the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
5wd
~
Formation of packageof documents
(Investor)
Conclusion of Contract on the activities carrying out as the SEZ
participant
(Management company)
Obtaining of a certificate of SEZ participant
(MIID РК)
16
01Applicantrsquos details form approved by
the Authorised Body
02Legal entity state registration (re-registration) certificate
03Copy of the identification document of the chiefexecutive officer of the Applicant
04Сopy of the legal entity charter
05
Сopy of the decision of the supreme body of the legalentity on performance of activity in the Special EconomicZone territory
06Сopy of financial reports as of the last reporting date
07Feasibility study of the project meeting therequirements imposed by the Authorised Body
08
Statements of the acquiring bank with regard to theApplicantrsquos bank accounts financial movement (on theabsence of the record) and credit report from the creditbureau
09
Statement from the tax administration at the place of theregistration record on availability or absence of taxes andother compulsory budgetary payments in arrears
10
Documents confirming the financial assurance of theapplicant are provided during the year (money bankguarantee guarantee pledge of property insurancecontract)
The list of documents required for the conclusion of contract on the activities carrying out as the SEZ participant
AKIMAT OF NUR-SULTAN
Indsustry Departments of Nur-Sultan city akimat
Development Instıtutıons(Astana Innovations SEC laquoAstanaraquo)
Regional Representatives ofKAZAKH INVEST
INVESTORCCID laquoASTANA INVESTraquo
Diplomatic corps
AssociationsSINGLE OPERATOR FOR ATTRACTING INVESTMENTS
Obtaınıng of investment preferences (investment contract SEZ status etc)
Consultations on state support measures Assistance in licensing procedures(land construction etc)
Visa and migration support permission for the Foreign Labor Workforce)
OUR SERVICES
Investors supportat all stages of the project
Regional Council on attracting investors and improving the investment climate in Nur-Sultan
MISSION promoting the development of the capital by attracting investments in priority areas of the economy including on the principles of partnership between the state and businessVISION an effective regional institution as a ldquoSingle Windowrdquo for investors in the capital
Investment portal of Nur-Sultan httpsinvestinastanakz
THE ROLE OF A SINGLE OPERATOR FOR ATTRACTING INVESTMENTS
wwwinvestinastanakz
httpswwwfacebookcomastanainvest
infoinvestastanakz
+7 (7172) 64-72-01
frac12 Koshkarbayev street 3-th floor
WE ARE READY FOR COOPERATION
- lrmD2019СайтПрезентации и публикацииАнглENG General presentation for investorspptxlrm
-
10
1-st BENEFITS PACKAGEAcceptance criteria
Employment of foreign labor withoutquota and permission for a period upto one year after objectcommissioning both for the owner ofthe priority project and for thecontracting companies
Employment offoreign labor
Defined by the Resolution of Kazakhstan Government No 13 ldquoOn some issues of the implementation of state support for investmentsrdquo dated January 14 2016 In 2019 1 MCI = 2525 KZTAccording to the exchange rate of the National Bank of Kazakhstan on 15042019 $1 = 37959 KZT euro 1 = 42943 KZT
Compliance with the list of PRIORITY ACTIVITIES
The participation of the statesubject of the quasi-state sector - as a
foundershareholder is not more than 26 and such participation is not more
than 5 years from the date of registration of the investment contract
Compliance with the list of PRIORITY ACTIVITIES
If creating new productions ndashthe volume of investments
should be at least 2 million MCI
If expansion and modernization - at least 5 million MCI
Сustom benefits State in-kind grantsTax benefits
Customs duties 0 up to 5 years on
import ofbull equipment and its componentsbull spare partsbull raw materials and supplies
Land plots buildings machinery and equipment in property
0 VAT on import of raw
materials and equipment
2-nd BENEFITS PACKAGEAcceptance criteria 1-st BENEFITS
PACKAGE
Except VAT on import Corporate Income Tax (up to 10 years up to 3 years forexpansion and modernization of projects)
Land Tax(up to 10 years)
Property Tax(up to 8 years)
0
Tax benefits
STATE SUPPORT OF INVESTMENT PROJECTS(INVESTMENT COTRACTS)
11
TAX INCENTIVES
Corporate Income Tax - 0
Land Tax - 0
Property Tax - 0
CUSTOMSI NCENTIVESCustoms Exemption from import on raw materials and equipment
(it is necessary to conclude a Special Investment Contract up to 15 years subject to the sale of final products
in the territory of the EEU)
LAND WITH INFRASTRUCTURE
Free cost land for the entire period of SEZ operation
Available infrastructure (electricitysewage heat and water supplyrailway automobile
roads)
EMPLOYMENT OF FOREIGN LABOR
Simplified paperwork procedure for hiring foreign employees
Permits and quotas exemption for projects which investments exceed 1 million MCI for period during construction and installation work and 1 year after commissioningIn 2019 1 MCI = 2525 KZT
SEZ laquoАSTANA ndash NEW CITYraquo
SEZ laquoАSTANA-ТЕCHNOPOLUSraquo
The above-mentioned benefits are provided regardless of the amount of investment and are issued for the entire period of SEZ operation
PERIOD 2002-2027
AREA 763471 hectares (Administrative and business center Industrial Park 1- 598 hectares)
PRIORITYACTIVITIES
Mixed (construction industry engineeringaviation light industry food etc)
Webhttpsinvestinastanakzenpage-sezhttpsmapinvestgovkzmapzone_filter=5B25D (map)
PERIOD 2017-2042 гг
AREA 58442 hectares (ıncludıng Nazarbayev Unıversıty-15132 hectares)
PRIORITY ACTIVITIES
Mixed (innovations RampD high technologies mechanical engineering food industry metallurgy pharmaceuticals etc)
Webhttpsinvestinastanakzenpage-sezhttptechnopoliskzru
SPECIAL ECONOMIC ZONES PREFERENCES
12
Type of ProjectTax benefits
Term
Custombenefits
Term
State in-kind grants
(land plots buildings
equipment)
Engineering infrastructure (utilities auto and railway)
Simplified procedure of foreign laboremployment
VAT on import0
CIT0
Land Tax0
Property Tax0
1 Investment project + 5 ____ ____ ____ +5 + ____ ____
2 Investment priority project
21 Construction of new industries
____ +10 +10 +8 +5 + ____ +
22 Expansion or modernization of existing industries
____ +3 ____ ____ +5 + ____ +
3 Special Economic Zone (benefits for the
entire period of SEZ operation)
+ + + + + Land plot (10 years)
+ +
INVESTMENT PREFERENCES IN COMPARISON
13
Investment project implementation stages by signing the INVESTMENT CONTRACT
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Receiving a preliminary letter of
land approval (Аkimat)
Preparation and approval of Act of land selection situational scheme
(local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
5wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning
Assignment technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution of mayoron the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
Conclusion of the Investment contract
(Committee for investments MIA)
35 wd
Independent land assessment
(Investor)
3wd
Formation of packageof documents
(Investor)
10wd
14
01Application in the form established by theauthorized body for investments
02Certificate of state registration (re-registration) of the legal entity
Сopy of the charter of the legal entity certified bythe signature of the Chief and the seal of the legalentity (if any)03
Business plan of investment project drawn up inaccordance with the requirements established bythe authorized body04
05Preliminary letter of approval from the Akimat forthe provision of land
06Assessment of the land from independentapprising company
07Documents confirming financial assurance (own or borrowed) The following types of financial assurance may be applied
711) Bank statement on the availability of funds on
the applicants account
722) Bank guarantee
733) Opening agreement line of credit
The list of documents required for the conclusion of an INVESTMENT CONTRACT
15
Investment project implementation stages by signing the agreement of SPECIAL ECONOMIC ZONE participant
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Preparation and approval of Act of land selection situational scheme(Local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
Construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
10wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning Assignment
Technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution ofmayor on the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
5wd
~
Formation of packageof documents
(Investor)
Conclusion of Contract on the activities carrying out as the SEZ
participant
(Management company)
Obtaining of a certificate of SEZ participant
(MIID РК)
16
01Applicantrsquos details form approved by
the Authorised Body
02Legal entity state registration (re-registration) certificate
03Copy of the identification document of the chiefexecutive officer of the Applicant
04Сopy of the legal entity charter
05
Сopy of the decision of the supreme body of the legalentity on performance of activity in the Special EconomicZone territory
06Сopy of financial reports as of the last reporting date
07Feasibility study of the project meeting therequirements imposed by the Authorised Body
08
Statements of the acquiring bank with regard to theApplicantrsquos bank accounts financial movement (on theabsence of the record) and credit report from the creditbureau
09
Statement from the tax administration at the place of theregistration record on availability or absence of taxes andother compulsory budgetary payments in arrears
10
Documents confirming the financial assurance of theapplicant are provided during the year (money bankguarantee guarantee pledge of property insurancecontract)
The list of documents required for the conclusion of contract on the activities carrying out as the SEZ participant
AKIMAT OF NUR-SULTAN
Indsustry Departments of Nur-Sultan city akimat
Development Instıtutıons(Astana Innovations SEC laquoAstanaraquo)
Regional Representatives ofKAZAKH INVEST
INVESTORCCID laquoASTANA INVESTraquo
Diplomatic corps
AssociationsSINGLE OPERATOR FOR ATTRACTING INVESTMENTS
Obtaınıng of investment preferences (investment contract SEZ status etc)
Consultations on state support measures Assistance in licensing procedures(land construction etc)
Visa and migration support permission for the Foreign Labor Workforce)
OUR SERVICES
Investors supportat all stages of the project
Regional Council on attracting investors and improving the investment climate in Nur-Sultan
MISSION promoting the development of the capital by attracting investments in priority areas of the economy including on the principles of partnership between the state and businessVISION an effective regional institution as a ldquoSingle Windowrdquo for investors in the capital
Investment portal of Nur-Sultan httpsinvestinastanakz
THE ROLE OF A SINGLE OPERATOR FOR ATTRACTING INVESTMENTS
wwwinvestinastanakz
httpswwwfacebookcomastanainvest
infoinvestastanakz
+7 (7172) 64-72-01
frac12 Koshkarbayev street 3-th floor
WE ARE READY FOR COOPERATION
- lrmD2019СайтПрезентации и публикацииАнглENG General presentation for investorspptxlrm
-
11
TAX INCENTIVES
Corporate Income Tax - 0
Land Tax - 0
Property Tax - 0
CUSTOMSI NCENTIVESCustoms Exemption from import on raw materials and equipment
(it is necessary to conclude a Special Investment Contract up to 15 years subject to the sale of final products
in the territory of the EEU)
LAND WITH INFRASTRUCTURE
Free cost land for the entire period of SEZ operation
Available infrastructure (electricitysewage heat and water supplyrailway automobile
roads)
EMPLOYMENT OF FOREIGN LABOR
Simplified paperwork procedure for hiring foreign employees
Permits and quotas exemption for projects which investments exceed 1 million MCI for period during construction and installation work and 1 year after commissioningIn 2019 1 MCI = 2525 KZT
SEZ laquoАSTANA ndash NEW CITYraquo
SEZ laquoАSTANA-ТЕCHNOPOLUSraquo
The above-mentioned benefits are provided regardless of the amount of investment and are issued for the entire period of SEZ operation
PERIOD 2002-2027
AREA 763471 hectares (Administrative and business center Industrial Park 1- 598 hectares)
PRIORITYACTIVITIES
Mixed (construction industry engineeringaviation light industry food etc)
Webhttpsinvestinastanakzenpage-sezhttpsmapinvestgovkzmapzone_filter=5B25D (map)
PERIOD 2017-2042 гг
AREA 58442 hectares (ıncludıng Nazarbayev Unıversıty-15132 hectares)
PRIORITY ACTIVITIES
Mixed (innovations RampD high technologies mechanical engineering food industry metallurgy pharmaceuticals etc)
Webhttpsinvestinastanakzenpage-sezhttptechnopoliskzru
SPECIAL ECONOMIC ZONES PREFERENCES
12
Type of ProjectTax benefits
Term
Custombenefits
Term
State in-kind grants
(land plots buildings
equipment)
Engineering infrastructure (utilities auto and railway)
Simplified procedure of foreign laboremployment
VAT on import0
CIT0
Land Tax0
Property Tax0
1 Investment project + 5 ____ ____ ____ +5 + ____ ____
2 Investment priority project
21 Construction of new industries
____ +10 +10 +8 +5 + ____ +
22 Expansion or modernization of existing industries
____ +3 ____ ____ +5 + ____ +
3 Special Economic Zone (benefits for the
entire period of SEZ operation)
+ + + + + Land plot (10 years)
+ +
INVESTMENT PREFERENCES IN COMPARISON
13
Investment project implementation stages by signing the INVESTMENT CONTRACT
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Receiving a preliminary letter of
land approval (Аkimat)
Preparation and approval of Act of land selection situational scheme
(local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
5wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning
Assignment technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution of mayoron the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
Conclusion of the Investment contract
(Committee for investments MIA)
35 wd
Independent land assessment
(Investor)
3wd
Formation of packageof documents
(Investor)
10wd
14
01Application in the form established by theauthorized body for investments
02Certificate of state registration (re-registration) of the legal entity
Сopy of the charter of the legal entity certified bythe signature of the Chief and the seal of the legalentity (if any)03
Business plan of investment project drawn up inaccordance with the requirements established bythe authorized body04
05Preliminary letter of approval from the Akimat forthe provision of land
06Assessment of the land from independentapprising company
07Documents confirming financial assurance (own or borrowed) The following types of financial assurance may be applied
711) Bank statement on the availability of funds on
the applicants account
722) Bank guarantee
733) Opening agreement line of credit
The list of documents required for the conclusion of an INVESTMENT CONTRACT
15
Investment project implementation stages by signing the agreement of SPECIAL ECONOMIC ZONE participant
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Preparation and approval of Act of land selection situational scheme(Local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
Construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
10wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning Assignment
Technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution ofmayor on the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
5wd
~
Formation of packageof documents
(Investor)
Conclusion of Contract on the activities carrying out as the SEZ
participant
(Management company)
Obtaining of a certificate of SEZ participant
(MIID РК)
16
01Applicantrsquos details form approved by
the Authorised Body
02Legal entity state registration (re-registration) certificate
03Copy of the identification document of the chiefexecutive officer of the Applicant
04Сopy of the legal entity charter
05
Сopy of the decision of the supreme body of the legalentity on performance of activity in the Special EconomicZone territory
06Сopy of financial reports as of the last reporting date
07Feasibility study of the project meeting therequirements imposed by the Authorised Body
08
Statements of the acquiring bank with regard to theApplicantrsquos bank accounts financial movement (on theabsence of the record) and credit report from the creditbureau
09
Statement from the tax administration at the place of theregistration record on availability or absence of taxes andother compulsory budgetary payments in arrears
10
Documents confirming the financial assurance of theapplicant are provided during the year (money bankguarantee guarantee pledge of property insurancecontract)
The list of documents required for the conclusion of contract on the activities carrying out as the SEZ participant
AKIMAT OF NUR-SULTAN
Indsustry Departments of Nur-Sultan city akimat
Development Instıtutıons(Astana Innovations SEC laquoAstanaraquo)
Regional Representatives ofKAZAKH INVEST
INVESTORCCID laquoASTANA INVESTraquo
Diplomatic corps
AssociationsSINGLE OPERATOR FOR ATTRACTING INVESTMENTS
Obtaınıng of investment preferences (investment contract SEZ status etc)
Consultations on state support measures Assistance in licensing procedures(land construction etc)
Visa and migration support permission for the Foreign Labor Workforce)
OUR SERVICES
Investors supportat all stages of the project
Regional Council on attracting investors and improving the investment climate in Nur-Sultan
MISSION promoting the development of the capital by attracting investments in priority areas of the economy including on the principles of partnership between the state and businessVISION an effective regional institution as a ldquoSingle Windowrdquo for investors in the capital
Investment portal of Nur-Sultan httpsinvestinastanakz
THE ROLE OF A SINGLE OPERATOR FOR ATTRACTING INVESTMENTS
wwwinvestinastanakz
httpswwwfacebookcomastanainvest
infoinvestastanakz
+7 (7172) 64-72-01
frac12 Koshkarbayev street 3-th floor
WE ARE READY FOR COOPERATION
- lrmD2019СайтПрезентации и публикацииАнглENG General presentation for investorspptxlrm
-
12
Type of ProjectTax benefits
Term
Custombenefits
Term
State in-kind grants
(land plots buildings
equipment)
Engineering infrastructure (utilities auto and railway)
Simplified procedure of foreign laboremployment
VAT on import0
CIT0
Land Tax0
Property Tax0
1 Investment project + 5 ____ ____ ____ +5 + ____ ____
2 Investment priority project
21 Construction of new industries
____ +10 +10 +8 +5 + ____ +
22 Expansion or modernization of existing industries
____ +3 ____ ____ +5 + ____ +
3 Special Economic Zone (benefits for the
entire period of SEZ operation)
+ + + + + Land plot (10 years)
+ +
INVESTMENT PREFERENCES IN COMPARISON
13
Investment project implementation stages by signing the INVESTMENT CONTRACT
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Receiving a preliminary letter of
land approval (Аkimat)
Preparation and approval of Act of land selection situational scheme
(local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
5wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning
Assignment technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution of mayoron the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
Conclusion of the Investment contract
(Committee for investments MIA)
35 wd
Independent land assessment
(Investor)
3wd
Formation of packageof documents
(Investor)
10wd
14
01Application in the form established by theauthorized body for investments
02Certificate of state registration (re-registration) of the legal entity
Сopy of the charter of the legal entity certified bythe signature of the Chief and the seal of the legalentity (if any)03
Business plan of investment project drawn up inaccordance with the requirements established bythe authorized body04
05Preliminary letter of approval from the Akimat forthe provision of land
06Assessment of the land from independentapprising company
07Documents confirming financial assurance (own or borrowed) The following types of financial assurance may be applied
711) Bank statement on the availability of funds on
the applicants account
722) Bank guarantee
733) Opening agreement line of credit
The list of documents required for the conclusion of an INVESTMENT CONTRACT
15
Investment project implementation stages by signing the agreement of SPECIAL ECONOMIC ZONE participant
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Preparation and approval of Act of land selection situational scheme(Local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
Construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
10wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning Assignment
Technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution ofmayor on the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
5wd
~
Formation of packageof documents
(Investor)
Conclusion of Contract on the activities carrying out as the SEZ
participant
(Management company)
Obtaining of a certificate of SEZ participant
(MIID РК)
16
01Applicantrsquos details form approved by
the Authorised Body
02Legal entity state registration (re-registration) certificate
03Copy of the identification document of the chiefexecutive officer of the Applicant
04Сopy of the legal entity charter
05
Сopy of the decision of the supreme body of the legalentity on performance of activity in the Special EconomicZone territory
06Сopy of financial reports as of the last reporting date
07Feasibility study of the project meeting therequirements imposed by the Authorised Body
08
Statements of the acquiring bank with regard to theApplicantrsquos bank accounts financial movement (on theabsence of the record) and credit report from the creditbureau
09
Statement from the tax administration at the place of theregistration record on availability or absence of taxes andother compulsory budgetary payments in arrears
10
Documents confirming the financial assurance of theapplicant are provided during the year (money bankguarantee guarantee pledge of property insurancecontract)
The list of documents required for the conclusion of contract on the activities carrying out as the SEZ participant
AKIMAT OF NUR-SULTAN
Indsustry Departments of Nur-Sultan city akimat
Development Instıtutıons(Astana Innovations SEC laquoAstanaraquo)
Regional Representatives ofKAZAKH INVEST
INVESTORCCID laquoASTANA INVESTraquo
Diplomatic corps
AssociationsSINGLE OPERATOR FOR ATTRACTING INVESTMENTS
Obtaınıng of investment preferences (investment contract SEZ status etc)
Consultations on state support measures Assistance in licensing procedures(land construction etc)
Visa and migration support permission for the Foreign Labor Workforce)
OUR SERVICES
Investors supportat all stages of the project
Regional Council on attracting investors and improving the investment climate in Nur-Sultan
MISSION promoting the development of the capital by attracting investments in priority areas of the economy including on the principles of partnership between the state and businessVISION an effective regional institution as a ldquoSingle Windowrdquo for investors in the capital
Investment portal of Nur-Sultan httpsinvestinastanakz
THE ROLE OF A SINGLE OPERATOR FOR ATTRACTING INVESTMENTS
wwwinvestinastanakz
httpswwwfacebookcomastanainvest
infoinvestastanakz
+7 (7172) 64-72-01
frac12 Koshkarbayev street 3-th floor
WE ARE READY FOR COOPERATION
- lrmD2019СайтПрезентации и публикацииАнглENG General presentation for investorspptxlrm
-
13
Investment project implementation stages by signing the INVESTMENT CONTRACT
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Receiving a preliminary letter of
land approval (Аkimat)
Preparation and approval of Act of land selection situational scheme
(local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
5wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning
Assignment technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution of mayoron the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
Conclusion of the Investment contract
(Committee for investments MIA)
35 wd
Independent land assessment
(Investor)
3wd
Formation of packageof documents
(Investor)
10wd
14
01Application in the form established by theauthorized body for investments
02Certificate of state registration (re-registration) of the legal entity
Сopy of the charter of the legal entity certified bythe signature of the Chief and the seal of the legalentity (if any)03
Business plan of investment project drawn up inaccordance with the requirements established bythe authorized body04
05Preliminary letter of approval from the Akimat forthe provision of land
06Assessment of the land from independentapprising company
07Documents confirming financial assurance (own or borrowed) The following types of financial assurance may be applied
711) Bank statement on the availability of funds on
the applicants account
722) Bank guarantee
733) Opening agreement line of credit
The list of documents required for the conclusion of an INVESTMENT CONTRACT
15
Investment project implementation stages by signing the agreement of SPECIAL ECONOMIC ZONE participant
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Preparation and approval of Act of land selection situational scheme(Local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
Construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
10wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning Assignment
Technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution ofmayor on the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
5wd
~
Formation of packageof documents
(Investor)
Conclusion of Contract on the activities carrying out as the SEZ
participant
(Management company)
Obtaining of a certificate of SEZ participant
(MIID РК)
16
01Applicantrsquos details form approved by
the Authorised Body
02Legal entity state registration (re-registration) certificate
03Copy of the identification document of the chiefexecutive officer of the Applicant
04Сopy of the legal entity charter
05
Сopy of the decision of the supreme body of the legalentity on performance of activity in the Special EconomicZone territory
06Сopy of financial reports as of the last reporting date
07Feasibility study of the project meeting therequirements imposed by the Authorised Body
08
Statements of the acquiring bank with regard to theApplicantrsquos bank accounts financial movement (on theabsence of the record) and credit report from the creditbureau
09
Statement from the tax administration at the place of theregistration record on availability or absence of taxes andother compulsory budgetary payments in arrears
10
Documents confirming the financial assurance of theapplicant are provided during the year (money bankguarantee guarantee pledge of property insurancecontract)
The list of documents required for the conclusion of contract on the activities carrying out as the SEZ participant
AKIMAT OF NUR-SULTAN
Indsustry Departments of Nur-Sultan city akimat
Development Instıtutıons(Astana Innovations SEC laquoAstanaraquo)
Regional Representatives ofKAZAKH INVEST
INVESTORCCID laquoASTANA INVESTraquo
Diplomatic corps
AssociationsSINGLE OPERATOR FOR ATTRACTING INVESTMENTS
Obtaınıng of investment preferences (investment contract SEZ status etc)
Consultations on state support measures Assistance in licensing procedures(land construction etc)
Visa and migration support permission for the Foreign Labor Workforce)
OUR SERVICES
Investors supportat all stages of the project
Regional Council on attracting investors and improving the investment climate in Nur-Sultan
MISSION promoting the development of the capital by attracting investments in priority areas of the economy including on the principles of partnership between the state and businessVISION an effective regional institution as a ldquoSingle Windowrdquo for investors in the capital
Investment portal of Nur-Sultan httpsinvestinastanakz
THE ROLE OF A SINGLE OPERATOR FOR ATTRACTING INVESTMENTS
wwwinvestinastanakz
httpswwwfacebookcomastanainvest
infoinvestastanakz
+7 (7172) 64-72-01
frac12 Koshkarbayev street 3-th floor
WE ARE READY FOR COOPERATION
- lrmD2019СайтПрезентации и публикацииАнглENG General presentation for investorspptxlrm
-
14
01Application in the form established by theauthorized body for investments
02Certificate of state registration (re-registration) of the legal entity
Сopy of the charter of the legal entity certified bythe signature of the Chief and the seal of the legalentity (if any)03
Business plan of investment project drawn up inaccordance with the requirements established bythe authorized body04
05Preliminary letter of approval from the Akimat forthe provision of land
06Assessment of the land from independentapprising company
07Documents confirming financial assurance (own or borrowed) The following types of financial assurance may be applied
711) Bank statement on the availability of funds on
the applicants account
722) Bank guarantee
733) Opening agreement line of credit
The list of documents required for the conclusion of an INVESTMENT CONTRACT
15
Investment project implementation stages by signing the agreement of SPECIAL ECONOMIC ZONE participant
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Preparation and approval of Act of land selection situational scheme(Local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
Construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
10wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning Assignment
Technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution ofmayor on the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
5wd
~
Formation of packageof documents
(Investor)
Conclusion of Contract on the activities carrying out as the SEZ
participant
(Management company)
Obtaining of a certificate of SEZ participant
(MIID РК)
16
01Applicantrsquos details form approved by
the Authorised Body
02Legal entity state registration (re-registration) certificate
03Copy of the identification document of the chiefexecutive officer of the Applicant
04Сopy of the legal entity charter
05
Сopy of the decision of the supreme body of the legalentity on performance of activity in the Special EconomicZone territory
06Сopy of financial reports as of the last reporting date
07Feasibility study of the project meeting therequirements imposed by the Authorised Body
08
Statements of the acquiring bank with regard to theApplicantrsquos bank accounts financial movement (on theabsence of the record) and credit report from the creditbureau
09
Statement from the tax administration at the place of theregistration record on availability or absence of taxes andother compulsory budgetary payments in arrears
10
Documents confirming the financial assurance of theapplicant are provided during the year (money bankguarantee guarantee pledge of property insurancecontract)
The list of documents required for the conclusion of contract on the activities carrying out as the SEZ participant
AKIMAT OF NUR-SULTAN
Indsustry Departments of Nur-Sultan city akimat
Development Instıtutıons(Astana Innovations SEC laquoAstanaraquo)
Regional Representatives ofKAZAKH INVEST
INVESTORCCID laquoASTANA INVESTraquo
Diplomatic corps
AssociationsSINGLE OPERATOR FOR ATTRACTING INVESTMENTS
Obtaınıng of investment preferences (investment contract SEZ status etc)
Consultations on state support measures Assistance in licensing procedures(land construction etc)
Visa and migration support permission for the Foreign Labor Workforce)
OUR SERVICES
Investors supportat all stages of the project
Regional Council on attracting investors and improving the investment climate in Nur-Sultan
MISSION promoting the development of the capital by attracting investments in priority areas of the economy including on the principles of partnership between the state and businessVISION an effective regional institution as a ldquoSingle Windowrdquo for investors in the capital
Investment portal of Nur-Sultan httpsinvestinastanakz
THE ROLE OF A SINGLE OPERATOR FOR ATTRACTING INVESTMENTS
wwwinvestinastanakz
httpswwwfacebookcomastanainvest
infoinvestastanakz
+7 (7172) 64-72-01
frac12 Koshkarbayev street 3-th floor
WE ARE READY FOR COOPERATION
- lrmD2019СайтПрезентации и публикацииАнглENG General presentation for investorspptxlrm
-
15
Investment project implementation stages by signing the agreement of SPECIAL ECONOMIC ZONE participant
(dates are approximate)
Development and approval of land use design
(Government for citizens)
Preparation and approval of Act of land selection situational scheme(Local state authorities)
Consideration and approval of reference design
(Akimat)
Development of working draft
(Project company)
Examination of the working draft withmaking conclusion
(PrivateState Expertise authorities)
Construction installation works(Investor)
Signing of a certificate of operationalacceptance
(Investor akimat)
10wd
~35 wd
45wd ~ 30
wd
40wd
35wd
15wd
Development of reference design (Project Company)
~20wd
Obtaining of initial materials (Architectural and Planning Assignment
Technic specifications)(Аkimat)
17wd
Signing of a contract for temporarynon-repayable land use
(Аkimat investor)
3wd
Issuance of the resolution ofmayor on the provision of land
(Аkimat)
10wd
Approval of land use design
(Аkimat)
3 wd
5wd
~
Formation of packageof documents
(Investor)
Conclusion of Contract on the activities carrying out as the SEZ
participant
(Management company)
Obtaining of a certificate of SEZ participant
(MIID РК)
16
01Applicantrsquos details form approved by
the Authorised Body
02Legal entity state registration (re-registration) certificate
03Copy of the identification document of the chiefexecutive officer of the Applicant
04Сopy of the legal entity charter
05
Сopy of the decision of the supreme body of the legalentity on performance of activity in the Special EconomicZone territory
06Сopy of financial reports as of the last reporting date
07Feasibility study of the project meeting therequirements imposed by the Authorised Body
08
Statements of the acquiring bank with regard to theApplicantrsquos bank accounts financial movement (on theabsence of the record) and credit report from the creditbureau
09
Statement from the tax administration at the place of theregistration record on availability or absence of taxes andother compulsory budgetary payments in arrears
10
Documents confirming the financial assurance of theapplicant are provided during the year (money bankguarantee guarantee pledge of property insurancecontract)
The list of documents required for the conclusion of contract on the activities carrying out as the SEZ participant
AKIMAT OF NUR-SULTAN
Indsustry Departments of Nur-Sultan city akimat
Development Instıtutıons(Astana Innovations SEC laquoAstanaraquo)
Regional Representatives ofKAZAKH INVEST
INVESTORCCID laquoASTANA INVESTraquo
Diplomatic corps
AssociationsSINGLE OPERATOR FOR ATTRACTING INVESTMENTS
Obtaınıng of investment preferences (investment contract SEZ status etc)
Consultations on state support measures Assistance in licensing procedures(land construction etc)
Visa and migration support permission for the Foreign Labor Workforce)
OUR SERVICES
Investors supportat all stages of the project
Regional Council on attracting investors and improving the investment climate in Nur-Sultan
MISSION promoting the development of the capital by attracting investments in priority areas of the economy including on the principles of partnership between the state and businessVISION an effective regional institution as a ldquoSingle Windowrdquo for investors in the capital
Investment portal of Nur-Sultan httpsinvestinastanakz
THE ROLE OF A SINGLE OPERATOR FOR ATTRACTING INVESTMENTS
wwwinvestinastanakz
httpswwwfacebookcomastanainvest
infoinvestastanakz
+7 (7172) 64-72-01
frac12 Koshkarbayev street 3-th floor
WE ARE READY FOR COOPERATION
- lrmD2019СайтПрезентации и публикацииАнглENG General presentation for investorspptxlrm
-
16
01Applicantrsquos details form approved by
the Authorised Body
02Legal entity state registration (re-registration) certificate
03Copy of the identification document of the chiefexecutive officer of the Applicant
04Сopy of the legal entity charter
05
Сopy of the decision of the supreme body of the legalentity on performance of activity in the Special EconomicZone territory
06Сopy of financial reports as of the last reporting date
07Feasibility study of the project meeting therequirements imposed by the Authorised Body
08
Statements of the acquiring bank with regard to theApplicantrsquos bank accounts financial movement (on theabsence of the record) and credit report from the creditbureau
09
Statement from the tax administration at the place of theregistration record on availability or absence of taxes andother compulsory budgetary payments in arrears
10
Documents confirming the financial assurance of theapplicant are provided during the year (money bankguarantee guarantee pledge of property insurancecontract)
The list of documents required for the conclusion of contract on the activities carrying out as the SEZ participant
AKIMAT OF NUR-SULTAN
Indsustry Departments of Nur-Sultan city akimat
Development Instıtutıons(Astana Innovations SEC laquoAstanaraquo)
Regional Representatives ofKAZAKH INVEST
INVESTORCCID laquoASTANA INVESTraquo
Diplomatic corps
AssociationsSINGLE OPERATOR FOR ATTRACTING INVESTMENTS
Obtaınıng of investment preferences (investment contract SEZ status etc)
Consultations on state support measures Assistance in licensing procedures(land construction etc)
Visa and migration support permission for the Foreign Labor Workforce)
OUR SERVICES
Investors supportat all stages of the project
Regional Council on attracting investors and improving the investment climate in Nur-Sultan
MISSION promoting the development of the capital by attracting investments in priority areas of the economy including on the principles of partnership between the state and businessVISION an effective regional institution as a ldquoSingle Windowrdquo for investors in the capital
Investment portal of Nur-Sultan httpsinvestinastanakz
THE ROLE OF A SINGLE OPERATOR FOR ATTRACTING INVESTMENTS
wwwinvestinastanakz
httpswwwfacebookcomastanainvest
infoinvestastanakz
+7 (7172) 64-72-01
frac12 Koshkarbayev street 3-th floor
WE ARE READY FOR COOPERATION
- lrmD2019СайтПрезентации и публикацииАнглENG General presentation for investorspptxlrm
-
AKIMAT OF NUR-SULTAN
Indsustry Departments of Nur-Sultan city akimat
Development Instıtutıons(Astana Innovations SEC laquoAstanaraquo)
Regional Representatives ofKAZAKH INVEST
INVESTORCCID laquoASTANA INVESTraquo
Diplomatic corps
AssociationsSINGLE OPERATOR FOR ATTRACTING INVESTMENTS
Obtaınıng of investment preferences (investment contract SEZ status etc)
Consultations on state support measures Assistance in licensing procedures(land construction etc)
Visa and migration support permission for the Foreign Labor Workforce)
OUR SERVICES
Investors supportat all stages of the project
Regional Council on attracting investors and improving the investment climate in Nur-Sultan
MISSION promoting the development of the capital by attracting investments in priority areas of the economy including on the principles of partnership between the state and businessVISION an effective regional institution as a ldquoSingle Windowrdquo for investors in the capital
Investment portal of Nur-Sultan httpsinvestinastanakz
THE ROLE OF A SINGLE OPERATOR FOR ATTRACTING INVESTMENTS
wwwinvestinastanakz
httpswwwfacebookcomastanainvest
infoinvestastanakz
+7 (7172) 64-72-01
frac12 Koshkarbayev street 3-th floor
WE ARE READY FOR COOPERATION
- lrmD2019СайтПрезентации и публикацииАнглENG General presentation for investorspptxlrm
-
wwwinvestinastanakz
httpswwwfacebookcomastanainvest
infoinvestastanakz
+7 (7172) 64-72-01
frac12 Koshkarbayev street 3-th floor
WE ARE READY FOR COOPERATION
- lrmD2019СайтПрезентации и публикацииАнглENG General presentation for investorspptxlrm
-