Nuclear Program of IRAN
Plans and Development
International Nuclear ConferenceBulgarian Nuclear Energy-National, Regional
and World Energy Security15-17 June 2016
Riviera Holiday Club, Varna
name of ContractorsNominal Capacity, MWName of NPPNo.
KWU - GermanyBushehr NPP-11293Con.1
KWU - GermanyBushehr NPP-21293Con.2
Framatom - FranceKarun NPP-1953Con.3
Framatom - FranceKarun NPP-2953Con.4
KWU - GermanyEsfahan NPP-11293Agr.5
KWU - GermanyEsfahan NPP-21293Agr.6
KWU - GermanySaveh NPP-11293Agr.7
KWU - GermanySaveh NPP-21293Agr.8
BBC - GermanyAzerbaijan NPP-11300Agr.9
BBC - GermanyAzerbaijan NPP-21300Agr.10
Contracts and agreements between AEOI and Int. contractors to build NPP
before the Islamic Revolution in IRAN
History of Nuclear Energy in IRAN
Energy Planning in IRAN
History of Nuclear Energy in IRAN
• Studies of AEOI and the Council of Nuclear Energy of Iran
o Planning period: 2001-2021
o Forecasting for electricity demand: 47000-60000 MW
o Forecasting for nuclear power sharing: 4000-10000MW (%6-%13)
• Studies of Power Ministry Research Institute
o Planning period : 2006-2026
o Forecasting for electricity demand: 123000MW
o Forecasting for nuclear power sharing: 15000MW (%12)
Nuclear Power Production and Development Company (NPPD)
History of Nuclear Energy in IRAN
Background
• Nuclear Power Plant Division was part of the Atomic Energy
Organization of Iran (AEOI) since 1974,
• Since Nov. 2004 this division has been transferred to Nuclear Power
Production & Development Co. of Iran (NPPD).
Subject of Activity as per the Articles of Association
o Management of and supervision on the company's capital to perform
any types of activities in the field of production and development of
nuclear power.
o Management of and supervision on studies of site selection, design,
construction, supply of nuclear fuel, safe operation, decommissioning
of nuclear power plants and their installations.
o Conduction of all transactions related to nuclear power.
Bushehr Nuclear Power Plant (BNPP-1)
o Construction started in 1974,
KWU design, 2 PWR units each
1293 MWe,
o Construction stopped in 1980,
o In Jan. 1996 contract was
effective with RF to complete the
unit-1 based on VVER-1000 type
446 (modified version of V-320)
with most utilization of KWU
available buildings & equipment.
o First criticality achieved in May 2011
o Unit connected to the grid on Sep. 2011
o Unit provisional acceptance in Sep. 2013
o First refueling conducted, Feb. 2013
o Second refueling, Sep. 2015
Bushehr Nuclear Power Plant (BNPP-1)
What was gained in BNPP-1 project:
• Updating national nuclear standards,
• Competency building in National Companies for suitable contribution in the program,
• Engineering experience in Project Management,
• Sufficient training in new generation for Operation,
• Participation of trained operators in commissioning phase which enabled them prepared for proper repair & maintenance activities and refueling,
• Planning for development suitable Technical infrastructure,
• Involvement of universities and research institutes in appropriate subjects,
• Upgrading nuclear safety infrastructure including Regulatory Body, and;
• Public awareness and acceptance
Bushehr Nuclear Power Plant (BNPP-1)
Development of BNPP-1 Capabilities:
• Qualified man power,
• Updated Management system in line
with GS-R-3,
• Offsite Environmental Monitoring
Center, Laboratories and monitoring
stations,
• Comprehensive Training system,
including: Bushehr Nuclear Power
Plant Training Center (BTC), Full
Scope Simulator (FSS), Computer
Based Training (CBT) and
competence instructors.
• Establishment of specialized
companies in the field of TS, M&R.
Bushehr Nuclear Power Plant (BNPP-1)
9
Nuclear Power Production & Development Co.
Atomic Energy Organization Of IRAN
(AEOI)
Nuclear Power Plant Infrastructure
Technical requirements related to the construction of the new units
Nuclear New Units- BNPP 2&3
Technical requirements
• GEN 3+, PWR reactors, 60 years life-time
• Standardization ⇒ shorter licensing and construction
time
• Shorter maintenance period
• Longer fuel cycles (extend to 18 months)
• Less radioactive waste
• More than 90 % LF (in base load operation mode)
• Combined with the desalination plant
Main Technical Specification
Nuclear New Units- BNPP 2&3
o Reactor type: AES-92 (According to feedback & Operation
Experiences of KudanKulam NPP as well as Post Fukushima
requirements )
o Thermal power, 3012 MWe
o Electric power, 1057 MWe
o Efficiency , > 35 %
o Power consumption, 83 MWe
o Total availability factor, 93 %
o Plant design service life, 60 years
NPPs Safety Development
& Improvement Company(TAVANA)
NPP’s Safety Development & Improvement
Company (TAVANA) is responsible for Scientific
and Technical Support of the BNPP-1.
The company was established by the NPPD in 2013.
12
Technical Support Organization
General Director
Technical &
Engineering
Department
Office of General
Director
Electrical & I&C
Management
Fuel Management
Department
Nuclear Engineering
Department
Material & Corrosion
Management
Civil & Structures
Management
Mechanical & Piping
Management
Probabilistic Safety
Analysis Management
(PSA)
Thermal Hydraulic &
Accident Analysis
Management
Radiation Protection
and Emergency
Planning Management
Waste Management
In-Core Fuel
Management & Reactor
Physic Management
Fuel Procurement
Management
Fuel Engineering
Services & Accounting
Management
Planning & Projects
Department
Technical Coordination
Department at BNPP-1
Planning & Project
Control Management
Documents &
Information Technology
Management(IT)
knowledge
Management
Electrical Management
Instrumentation &
Control Management
Mechanical
Management
Administrative,
Financial & Supporting
Department
Administrative Section
Financial Section
Supporting Section
OPEX Management
Nuclear Management
Legal & Contractual
Management
Quality & Permits
Management
NPPs Safety Development
& Improvement Co.
Board of
Directorate
Organizational Structure
13
Management of
Technological Processes
Chemical & Process
Management
Nuclear Engineering Department
Thermal Hydraulic and Accident Analysis
Probabilistic Safety Analysis (PSA)
14
15
Development of the Comprehensive TH model for Deterministic
Safety Analysis of BNPP-1.
Design solution for implementation of mobile Diesel Generator and
mobile Pump for Stress Test of BNPP-1.
Establishment of Configuration Management for BNPP-1.
Development of PSA
Design of Radioactive Waste Container.
Current Activities of Nuclear Engineering Department
Nuclear Fuel Department
In-Core Fuel Management and Reactor Physics
16
Current Activities of Nuclear Fuel Department
Calculation of Neutron Physics Parameters for the Third Fuel
Cycle of BNPP-1;
Calculation of Residual Heat Released from the Spent Fuel
Assemblies;
Software Design for Analyzing of Physical Operational Data;
Software Design for Annual Refueling Process;
Providing Consultancy Services to Equip the Refueling Machine
of BNPP-1 by Sipping System.
17
Mechanical and Piping engineering
Material and corrosion
Chemical and Process
Electrical and Instrumentation/control
Engineering and Technical Department
18
Development of an effective ageing management
program for BNPP-1.
Feasibility study for establishing the laboratory for the
reactor surveillance specimens test .
Development of a software program for
Corrosion/Erosion management /prediction for BNPP-1.
Development of a software model for vibration analysis
of BNPP-1 generator.
Current Activities of Engineering and Technical Department
19
20
In order to enhance technical support services to BNPP1 and also
to use capabilities of other companies in the international arena
and in line with safe and reliable operation of Bushehr Nuclear
Power Plant, NPPD/TAVANA Company has attempted to make
contact with many companies. Some of them are as follows:
RosEnergoAtom Consortium(REA) -----Russia
Risk Engineering Company-----Bulgaria
AREVA Company-----France
NINE Company-----Italy
VUJE Company-----Slovakia
Spain Nuclear Group Consortium-----Spain