Australian Energy Market Operator Ltd ABN 94 072 010 327 Request for Expression of Interest Network Support and Control Ancillary Services DETAILS Services: Network Support and Control Ancillary Services (NSCAS) AEMO NSCAS Manager: Dalibor Balicevic [email protected] (EOI submissions must not be made to this e-mail address, section C.1 explains lodgement requirements) Closing Date: 4:30PM on 16 August 2012

Transcript of NSCAS - EOI - aemo.com.au  · Web viewAEMO’s objective is to fill the VCAS requirements at the...

Page 1: NSCAS - EOI - aemo.com.au  · Web viewAEMO’s objective is to fill the VCAS requirements at the least cost possible. AEMO’s preference is to procure VCAS that will deliver a long

Australian Energy Market Operator LtdABN 94 072 010 327

Request for Expression of InterestNetwork Support and Control Ancillary Services

DETAILS

Australian Energy Market Operator LimitedLevel 22, 530 Collins StreetMELBOURNE VIC 3000TEL: 03 9609 8000FAX: 03 9609 8080

Services: Network Support and Control Ancillary Services (NSCAS)

AEMO NSCAS Manager: Dalibor Balicevic

[email protected](EOI submissions must not be made to this e-mail address, section C.1 explains lodgement requirements)

Closing Date: 4:30PM on 16 August 2012

Page 2: NSCAS - EOI - aemo.com.au  · Web viewAEMO’s objective is to fill the VCAS requirements at the least cost possible. AEMO’s preference is to procure VCAS that will deliver a long

Request for Expression of Interest

Table of Contents

SECTION A: REQUEST FOR EOI.................................................................................................2SECTION B: INFORMATION FOR RECIPIENTS..............................................................................3SECTION C: REQUEST FOR EOI CONDITIONS..............................................................................5SECTION D: EOI FORM..............................................................................................................9SCHEDULE 1.............................................................................................................................11SCHEDULE 2.............................................................................................................................12SCHEDULE 3.............................................................................................................................16SCHEDULE 4.............................................................................................................................18SCHEDULE 5.............................................................................................................................19

Page 1

Page 3: NSCAS - EOI - aemo.com.au  · Web viewAEMO’s objective is to fill the VCAS requirements at the least cost possible. AEMO’s preference is to procure VCAS that will deliver a long

Request for Expression of Interest

SECTION A: REQUEST FOR EOIA.1 Background

AEMO is a company limited by guarantee. Its functions include:

Market and system operator of the National Electricity Market (NEM) in accordance with the National Electricity Rules (NER);

Market operator of a number of retail gas markets and short term trading markets for gas in eastern and southern Australia in accordance with the National Gas Rules;

Market and system operator of the Victorian wholesale gas market in accordance with the National Gas Rules;

National transmission planning for electricity transmission networks.

With its broad national focus for the future, AEMO’s objectives are to promote efficient investment in and operation of Australia’s electricity and gas services for the long-term interests of consumers with respect to price, quality, safety, reliability and security of energy supply.

A.2 Request for EOI

AEMO is the independent market and system operator of the NEM. AEMO operates the NEM by balancing demand for, and supply of, electricity through a pool and spot market. AEMO is also responsible for maintaining power system security.

Ancillary services are services that are essential to the management of power system security and must be acquired by AEMO in accordance with Chapter 3 of the NER. In this instance, AEMO is proposing to acquire network support and control ancillary services (NSCAS).

EXPRESSIONS OF INTEREST ARE INVITED for the delivery of network support and control ancillary services being voltage control ancillary services (VCAS) in the New South Wales region of the NEM.

This Request for EOI comprises:

This document;

NSCAS Description;

NSCAS Quantity Procedure; and

Tender Guidelines for NSCAS.

The above documents are available from AEMO’s website located at http://www.aemo.com.au.

Page 2

Page 4: NSCAS - EOI - aemo.com.au  · Web viewAEMO’s objective is to fill the VCAS requirements at the least cost possible. AEMO’s preference is to procure VCAS that will deliver a long

Request for Expression of Interest

SECTION B: INFORMATION FOR RECIPIENTSB.1 Recipients Must Inform Themselves

Prior to submitting an EOI, Recipients represent to AEMO that they have conducted all necessary investigations and have informed themselves fully concerning the nature, extent and requirements of this Request for EOI and the Services to be delivered, and made all examinations, investigations, interpretations, deductions and conclusions as to the costs, procedure and any difficulties in doing so.

B.2 Queries

Recipients must address any queries to the AEMO NSCAS Manager in writing.

B.3 Conditions of submitting an Expression of Interest

Recipients must comply with Section C.

B.4 Nature of Request for Expression of Interest

This Request for EOI is not intended to have any contractual effect. Short-listed Recipients may be invited to submit tenders for the delivery of the Services at the conclusion of the EOI process.

B.5 Confidentiality

This Request for EOI contains confidential information about AEMO and its activities. It is provided to enable Recipients to submit EOIs. Recipients are not permitted to use any information contained in this Request for EOI for any other purpose. Recipients must take all reasonable steps (both physically and electronically) to protect the confidentiality of this Request for EOI and all communications arising out of it, or the Recipient’s submission of an EOI.

B.6 Glossary

In this Request for EOI:

A capitalised word or phrase has the meaning set out opposite that word or phrase below, or the meaning set out in the Details;

A word or phrase in this style has the same meaning as given to that term in the National Electricity Rules (NER);

Unless the context otherwise requires, this document will be interpreted in accordance with Schedule 2 of the National Electricity Law.

Addendum Any document issued after the date of this Request for EOI and labelled as an “Addendum” to this Request for EOI; collectively known as “Addenda”.

AEMO Australian Energy Market Operator Limited ABN 94 072 010 327. References to AEMO include, where the context requires, AEMO’s employees, officers, contractors, consultants, advisers and other persons authorised to act for AEMO.

Business Days A day other than Saturday, Sunday and any other day not taken to be a public holiday in Victoria.

EOI or Expression of Interest The submission lodged by the Recipient in response to AEMO’s Request for EOI for NSCAS.

EOI Form The document contained in Section D.

NSCAS Description The description referred to in clause 3.11.4(a) of the NER.

Page 3

Page 5: NSCAS - EOI - aemo.com.au  · Web viewAEMO’s objective is to fill the VCAS requirements at the least cost possible. AEMO’s preference is to procure VCAS that will deliver a long

Request for Expression of Interest

VCAS Equipment The equipment nominated in Schedule 2 of the EOI Form by the Recipient for the delivery of the Services.

NSCAS Quantity Procedure The procedure referred to in clause 3.11.4(b) of the NER.

NEM National Electricity Market.

NSCAS network support and control ancillary services

NSP Network Service Provider

Reactive Plant Plant which is normally specifically provided to be capable of providing or absorbing reactive power as defined in the NER.

Recipient A person in receipt of this EOI.

Request for EOI Is the collection of documents incorporating: Section A: Request for EOI Section B: Information for Recipients Section C: Request for EOI Conditions Section D: EOI Form

and all schedules, attachments and appendices to those documents together with the NSCAS Description, the NSCAS Quantity Procedure, and the Tender Guidelines for NSCAS.

Services The services more particularly described in Schedule 2 of the EOI Form.

Statement of Compliance The document contained in Schedule 1 of the EOI Form.

Tender Guidelines for NSCAS The tender guidelines for network support and control ancillary services published by AEMO on its website following its determination under clause 3.11.5(b) of the NER.

VCAS or Voltage Control Ancillary Services

As defined in the NSCAS Description.

Page 4

Page 6: NSCAS - EOI - aemo.com.au  · Web viewAEMO’s objective is to fill the VCAS requirements at the least cost possible. AEMO’s preference is to procure VCAS that will deliver a long

Request for Expression of Interest

SECTION C: REQUEST FOR EOI CONDITIONSC.1 Submitting an EOI

(a) Lodgement Requirements

A Recipient must submit an EOI that meets the following requirements:

The EOI must be completed (that is, Section D: EOI Form and all relevant schedules are completed) and signed (in the case of a body corporate, by a duly authorised officer), and all pages of the EOI initialled.

A Recipient must lodge a separate EOI Form for each Service offered.

A Recipient can submit their EOIs by selecting from two options below:

(1) Delivery by Post or Courier Recipient must submit one original and one copy of all EOIs (in hard copy) and one electronic copy (CD or USB) in Word or Excel in a sealed envelope to be placed in the EOI Box at the following address by 4:30 pm (EST) on the Closing Date:

TENDER BOXNetwork Support and Control Ancillary ServicesAEMOLevel 22530 Collins StreetMELBOURNE VIC 3000

The Recipient must ensure the hard and electronic copy of its EOI are identical and agrees that AEMO may rely on either version when evaluating this EOI.

OR

(2) Submission via E-mail Recipient must submit one electronic copy to [email protected] by 4:30 pm (EST) on the Closing Date.

Additional documentation may be submitted by Recipient with their EOI if, in the Recipients’ opinion, it is necessary for a proper understanding of their EOI.

(b) Statement of Compliance

The EOI Form and schedules have been developed to enable AEMO to evaluate EOIs in accordance with the evaluation criteria detailed in Section C.9.

If a Recipient cannot comply with any element of the EOI Form or schedules, the Recipient must specify in the Statement of Compliance the nature of, and reasons for, the non-compliance.

Recipients should note that a failure to comply with any of the lodgement requirements may lead to rejection of their EOI.

C.2 Facsimile EOIs not Acceptable

EOIs submitted by facsimile will not be accepted.

C.3 Information Provided by AEMO

Upon submission of their EOI, Recipients are taken to have:

carefully examined and satisfied themselves of the requirements of this Request for EOI;

examined all information relevant to the risks, contingencies and other circumstances relevant to the Services, as may be available by making reasonable enquiries; and

Page 5

Page 7: NSCAS - EOI - aemo.com.au  · Web viewAEMO’s objective is to fill the VCAS requirements at the least cost possible. AEMO’s preference is to procure VCAS that will deliver a long

Request for Expression of Interest

satisfied themselves as to the correctness and sufficiency of their EOI.

C.4 Disclaimer

Except to the extent required by law, AEMO does not accept any responsibility to Recipients or third parties, under the law of contract, tort (including negligence) or otherwise, for any loss or damage whatsoever that may arise from any information provided by AEMO.

AEMO accepts no responsibility for any interpretation that may be placed on this Request for EOI.

The information contained in this Request for EOI is furnished for the convenience of Recipients. Any information provided by AEMO is not guaranteed and EOIs must be based on Recipients’ own investigations and determinations. AEMO makes no warranties or representations on the contents, or adequacy, of any information provided to Recipients.

C.5 No Liability

Except where it would be illegal to do so, AEMO is not liable in any way for the accuracy or completeness of this Request for EOI, or liable for any loss or damage of whatever kind (whether foreseeable or not) however arising, suffered or incurred by any person in connection with this Request for EOI (including by reason of any negligence, default or lack of care).

C.6 Queries, Discrepancies or Errors

If Recipients find any discrepancy, error, or have any doubt as to the meaning or completeness of this Request for EOI and they wish to clarify the discrepancy, error or doubt, they should notify the AEMO NSCAS Manager in writing at least 7 days before the Closing Date, whereupon AEMO may issue an Addendum clarifying the discrepancy, error, or query (as the case may be) in accordance with Section C.7.

C.7 Addenda

No representation or explanation to Recipients as to the meaning of this Request for EOI will be taken to be included in this Request for EOI unless it is contained in an Addendum.

C.8 EOIs Commercial-in-Confidence

EOIs will be treated as confidential and will not be disclosed outside AEMO unless it is:

for the purpose of assessing the feasibility of any proposed services;

required by law, or in the course of legal proceedings;

requested by any regulatory or other government authority having jurisdiction over AEMO, or its activities; or

to AEMO’s external advisers, consultants or insurers,

in which case the Recipient is deemed to have consented to this disclosure by providing the EOI.

C.9 EOI Evaluation

Without prejudice to AEMO’s right to reject non-conforming EOIs, during the EOI evaluation process, AEMO may seek clarification from Recipients of matters raised and rectification or resolution of errors or omissions in EOIs. Recipients may be invited to attend meetings with AEMO to review and discuss any such matters.

The criteria to be used in the EOI evaluation process may include, but will not be limited to:

the Recipient must be or intend to register as a Registered Participant;

compliance of the offered Service with the NSCAS Description;

Page 6

Page 8: NSCAS - EOI - aemo.com.au  · Web viewAEMO’s objective is to fill the VCAS requirements at the least cost possible. AEMO’s preference is to procure VCAS that will deliver a long

Request for Expression of Interest

application of the NSCAS Quantity Procedure;

the expected reliability and availability of the offered Service;

compliance with the NER;

effectiveness of Services to fill NSCAS gap;

Occupational Health and Safety; and

any other factors AEMO considers to be relevant.

AEMO may, in its absolute discretion, evaluate and accept EOIs that do not meet the lodgement requirements in Section C.1, but AEMO is not obliged to do so.

C.10 AEMO not Bound to Proceed

AEMO is under no obligation to complete the process outlined in this Request for EOI, invite any Recipient to submit a tender, or ultimately purchase any goods or services that comprise any part of the Services.

C.11 No Obligation to Debrief

AEMO is under no obligation to debrief any Recipient as to AEMO’s evaluation of EOIs, or give any reason for the acceptance of or non-acceptance of any EOI.

C.12 No Reimbursement for Costs of submitting an EOI

No Recipient is entitled to be reimbursed for any expense or loss incurred in the preparation and submission of its EOI or for any costs incurred in attending meetings with AEMO during the EOI evaluation process.

C.13 Ownership of EOIs

AEMO will retain and own all EOIs lodged as a result of this Request for EOI. Apart from AEMO’s right to copy EOIs for the purposes of evaluation, Recipients’ intellectual property rights in their EOIs are not affected by AEMO’s rights under this Section C13.

C.14 No Publicity

Recipients must not make any public or media announcement about this Request for EOI or the outcome of this Request for EOI without AEMO’s prior permission.

C.15 No Collusion or Dealings with Competitors

Recipients must ensure that they (and their principals, employees, agents and contractors) do not:

(a) discuss this Request for EOI with any other person they know has received this Request for EOI or might reasonably be expected to have received this Request for EOI; or

(b) engage in any conduct that is designed to, or might have the effect of, lessening competition in the supply to AEMO of the Services.

Recipients who wish to engage in legitimate teaming or sub-contracting discussions with persons who might deliver the Services must gain AEMO’s prior approval to do so.

Page 7

Page 9: NSCAS - EOI - aemo.com.au  · Web viewAEMO’s objective is to fill the VCAS requirements at the least cost possible. AEMO’s preference is to procure VCAS that will deliver a long

Request for Expression of Interest

SECTION D: EOI FORM

To: Australian Energy Market Operator LtdLevel 22, 530 Collins StreetMELBOURNE VIC 3000

(AEMO)

Expression of Interest

From:

Recipient:

ABN:

Address:

Contact Person: Name:

Title:

Telephone No:

Facsimile No:

E-mail:

1. OfferThe Recipient hereby submits its EOI in proposing the Services in accordance with the requirements of the Request for EOI as specified in the Statement of Compliance in Schedule 1.

2. Agency/Joint EOIThe Recipient is/is not1 acting as agent or trustee for another person, or lodging an EOI jointly with other persons.

(If the Recipient is acting as an agent or trustee, full details must be provided in this section)

3. Services The Recipient provides the supporting information required by Schedules 2 & 3 for each of the Services proposed to be provided.

4. Experience in the Delivery of the ServicesThe Recipient provides in Schedule 4 details of its experience in the delivery of services that are similar to the Services.

5. Addenda to Request for EOI (only if Addenda received)In the preparation of its EOI, the Recipient acknowledges having received the following Addenda, if any, to the Request for EOI:

Addendum No. 1 Dated

Addendum No. 2 Dated

Addendum No. 3 Dated

1 Delete as appropriate.

Page 8

Page 10: NSCAS - EOI - aemo.com.au  · Web viewAEMO’s objective is to fill the VCAS requirements at the least cost possible. AEMO’s preference is to procure VCAS that will deliver a long

Request for Expression of Interest

NOTE: Capitalised terms in this EOI Form and Schedules are defined in the Request for EOI; italicised terms are defined in the National Electricity Rules.

Dated this day of 201

EXECUTED by [NAME OF RECIPIENT] by its duly appointed representative in the presence of:

)))

..............................................................……..Witness

..............................................................……..Name of witness (print)

..............................................................……..Authorised Officer

..............................................................……..Name of Authorised Officer (print)

..............................................................……..Title of Authorised Officer (print)

Page 9

Page 11: NSCAS - EOI - aemo.com.au  · Web viewAEMO’s objective is to fill the VCAS requirements at the least cost possible. AEMO’s preference is to procure VCAS that will deliver a long

Request for Expression of Interest

SCHEDULE 1

STATEMENT OF COMPLIANCE

I [Recipient] confirm that this EOI conforms in every respect with the Request for EOI.

OR

I [Recipient] confirm that this EOI does not conform with the Request for EOI in the following ways:

1.

Recipient's name _________________________________

Recipient's signature _________________________________

Date _________________________________

Page 10

Page 12: NSCAS - EOI - aemo.com.au  · Web viewAEMO’s objective is to fill the VCAS requirements at the least cost possible. AEMO’s preference is to procure VCAS that will deliver a long

Request for Expression of Interest

SCHEDULE 2

DESCRIPTION OF PROPOSED SERVICES

AEMO is calling for submissions in response to this EOI for delivery of voltage control ancillary services as detailed in Schedule 5.

The Recipient proposes the following Services:

Service proposed to be provided is:□

Short term solution - VCAS Equipment with ability to provide reactive power absorption capability from 30 June 2013 for the period of up to 12 months with an option to extend the Service for a further 12 months.

□Long term solution – VCAS Equipment which has ability to provide reactive power absorption capability for a period of 5 years or longer, for example installation of new or utilisation of existing reactive plant.

□Combination of short term and long term solutions –Existing VCAS Equipment will provide reactive power absorption capability from 30 June 2013 until long term VCAS Equipment such as reactive plant is constructed to deliver a long term capability for a period of 5 years or longer.

Please note that each individual short term or long term proposal can be independently accepted or rejected.

Depending on the type of Service, Recipients must complete the relevant part(s) of the remainder of this Schedule 2 and provide the relevant supporting documentation requested in Schedule 3.

Page 11

Page 13: NSCAS - EOI - aemo.com.au  · Web viewAEMO’s objective is to fill the VCAS requirements at the least cost possible. AEMO’s preference is to procure VCAS that will deliver a long

Request for Expression of Interest

1. Short Term Solution - VCAS Equipment

1.1 Description of Proposed Services

The Recipient proposes that the Services be provided for AEMO to utilise as outlined in items 1.2 and 1.3.

1.2 Details of VCAS Equipment The Recipient provides the following short term VCAS facilities:

Facilities used to provide the Service Include details of any equipment or connecting facilities

Service Commencement Date Indicate the date, or a range of dates, by which the VCAS equipment would be available to provide Service.

Minimum and maximum period for which service is available from 30 June 2013.

Include details of service availability and maintenance schedules (see also Schedule 3, section 1.2)

For example: Service is available from [date], each day to be utilized for up to [x] consecutive hours;

specify any maintenance periods; and

any relevant operational, power system or market conditions affecting availability.

Measuring Device used to measure the level of Service

Is metering equipment capable of transmitting active and reactive power quantities to AEMO control room?

Method of enabling VCAS Equipment Identify steps required to be taken to enable VCAS Equipment to commence absorption of reactive power

Connection point to the transmission network*

If VCAS Equipment is not directly connected to the transmission network VCAS Equipment capability must be nominated at the nearest transmission network connection point

1.3 Levels of Performance

The Recipient must outline the expected levels of performance as follows:

Performance Requirement Expected level of performance

VCAS Equipment reactive power absorption capability at the connection point nominated in section 1.2 above

MVAR

Maximum time period to enable the VCAS Equipment, if required Seconds

Response Time Seconds

VCAS Equipment is capable of delivering sustained reactive power absorption capability for at least 30 minutes.

YES/NO

Page 12

Page 14: NSCAS - EOI - aemo.com.au  · Web viewAEMO’s objective is to fill the VCAS requirements at the least cost possible. AEMO’s preference is to procure VCAS that will deliver a long

Request for Expression of Interest

2. Long Term Solution - VCAS Equipment

2.1 Description of Proposed Services

The Recipient proposes that the Services be provided for AEMO to utilise as outlined in items 2.2 and 2.3

2.2 VCAS Equipment

The Recipient provides the following VCAS Equipment for long term management of the power system voltage: Facilities used to provide the Service Include details of any equipment or connecting facilities

Service Commencement Date Indicate the date, or a range of dates, by which the VCAS equipment would be available to provide Service.

Minimum and maximum period for which Service is available from the commencement date

Include details of service availability and maintenance schedules (see also Schedule 3, section 1.2)

For example: Service is available from [date], each day to be utilized for up to [x] consecutive hours;

specify any maintenance periods; and

any relevant operational, power system or market conditions affecting availability.

Measuring device to be used to measure the level of Service

Is metering equipment capable of transmitting active and reactive power quantities to AEMO control room?

Method of enabling VCAS Equipment Identify steps required to be taken to enable VCAS Equipment to commence absorption of reactive power

Connection point to the transmission network **

If VCAS Equipment is not directly connected to the transmission network VCAS Equipment capability must be nominated at the nearest transmission network connection point

2.3 Levels of Performance

The Recipient must outline the expected levels of performance as follows:

Performance Requirement Expected level of performance

Reactive power absorption capability at the connection point nominated in section 2.2 above

MVAR

Maximum time period to enable reactive plant, if required Seconds

Response Time Seconds

Reactive Plant is capable of delivering sustained reactive power absorption capability for at least 30 minutes

YES/NO

Page 13

Page 15: NSCAS - EOI - aemo.com.au  · Web viewAEMO’s objective is to fill the VCAS requirements at the least cost possible. AEMO’s preference is to procure VCAS that will deliver a long

Request for Expression of Interest

Recipient's Name _________________________________

Recipient's Signature _________________________________

Date _________________________________

Page 14

Page 16: NSCAS - EOI - aemo.com.au  · Web viewAEMO’s objective is to fill the VCAS requirements at the least cost possible. AEMO’s preference is to procure VCAS that will deliver a long

Request for Expression of Interest

SCHEDULE 3

SUPPORTING DOCUMENTATION

In support of its EOI, the Recipient must provide the following information:

1. Existing VCAS Equipment 1.1 Test Procedure

The Recipient must provide a copy of the test procedure that proposes the method to test and prove:

the reactive power absorption capability of the VCAS Equipment as specified in Schedule 2;

the accuracy of the remote indicators to be used to transmit reactive power measurements to AEMO in order to measure the quantity of reactive power absorbed at the nominated connection point;

steps requires to enable VCAS Equipment;

the time taken to enable VCAS Equipment:

that VCAS Equipment can deliver sustained reactive power absorption for the duration stated in the levels of performance referred to in items 1.3 and 2.3 of Schedule 2.

1.2 Other Test InformationThe Recipient must also provide:

results of any tests conducted during the past 12 months, and any additional supporting information to demonstrate the capabilities of the VCAS Equipment to provide the Services;

maintenance records for the past 12 months for the VCAS Equipment;

the Recipient’s schedule of planned works for the VCAS Equipment for the next two years, including anticipated repairs, maintenance and outages;

the Recipient’s proposed methodology for addressing any unplanned maintenance to the VCAS Equipment;

evidence establishing that a connection agreement is in place as between the Recipient and the relevant Network Service Provider to allow delivery of the proposed Services;

capability diagrams showing reactive power absorption limits, if applicable; and

maximum time that the reactive power absorption can be sustained, if applicable.

2. VCAS Equipment to be constructed

The Recipient must provide:

a high level construction and commissioning plan;

if possible, proposed operating arrangements for the VCAS Equipment; and

a description of how the VCAS Equipment will meet the levels of performance in Schedule 2

Page 15

Page 17: NSCAS - EOI - aemo.com.au  · Web viewAEMO’s objective is to fill the VCAS requirements at the least cost possible. AEMO’s preference is to procure VCAS that will deliver a long

Request for Expression of Interest

Recipient's Name _________________________________

Recipient's Signature _________________________________

Date _________________________________

Page 16

Page 18: NSCAS - EOI - aemo.com.au  · Web viewAEMO’s objective is to fill the VCAS requirements at the least cost possible. AEMO’s preference is to procure VCAS that will deliver a long

Request for Expression of Interest

SCHEDULE 4

DETAILS OF EXPERIENCE

Provide details of:

the Recipient’s general background;

corporate capacity;

commercial framework for provision of required goods/services;

the Recipient’s experience and records of past performance related to required goods/services;

management track record;

methodology and work plan for providing and or establishing required services and associated facilities;

key supplier personnel;

available resources – technical, managerial, physical and financial;

present commitments and approximate completion dates (for construction of new facilities);

quality assurance procedures; and

occupational health & safety procedures.

Recipient's name _________________________________

Recipient's signature _________________________________

Date _________________________________

Page 17

Page 19: NSCAS - EOI - aemo.com.au  · Web viewAEMO’s objective is to fill the VCAS requirements at the least cost possible. AEMO’s preference is to procure VCAS that will deliver a long

Request for Expression of Interest

SCHEDULE 5

NSCAS REQUIREMENTS

Requirement for VCAS

AEMO identified VCAS requirements for the next five years in the southern part of the New South Wales region. The VCAS is required to avoid overvoltage under lightly loaded power system conditions. The VCAS requirements were also published in the most recent National Transmission Network Development Plan2.

Currently overvoltage in southern NSW is being managed by utilising generating units operating in synchronous condenser mode under a network control ancillary services contract with AEMO. This contract will expire in June 2013.

The NSCAS gap for VCAS arises from 30 June 2013.

AEMO’s objective is to fill the VCAS requirements at the least cost possible. AEMO’s preference is to procure VCAS that will deliver a long term solution to resolve the overvoltage issues identified in this Schedule 5. AEMO understands that it may take some time to construct and commission any new infrastructure that may be required to deliver such a service, during which an interim solution may be required. AEMO is therefore inviting expressions of interest for delivery of VCAS capable of immediate reactive power regulation as well as proposals for the construction and installation of reactive plant to deliver more permanent solution for voltage control. Recipients may express interest in providing either the short term solution, the long term solution, or both.

Examples of short term VCAS (likely to be provided under an agreement for a one or two year term) include:

Unused reactive power capacities of generating units, including wind farms, solar power generating units and any other forms of electricity generating units. The typical modes of operation are as follows:

o Synchronous Condenser Mode: a mode of operation of a generating unit with the reactive power capability to supply or absorb reactive power without producing active energy; and

o Generation Mode: a mode of operation of a generating unit with the reactive power capability to supply or absorb reactive power in excess of its performance standard for reactive power while producing active energy in response to dispatch instructions. The reactive power capability of a generating unit for VCAS is the amount beyond the reactive power capability specified in the performance standards up to the limit specified in a capability diagram.

Using demand side management such as:o control of customer load in response to certain signals; ando installation of, or utilisation of, existing small scale generation.

Long term solutions could be delivered though installation of reactive plant, such as:

capacitors and reactors; synchronous condensers, static VAR compensators (SVCs), static compensators (STATCOMs); or HVAC and HVDC transmission lines.

These examples are not exhaustive and there may be other ways of providing the VCAS requirement.

2 http://www.aemo.com.au/en/Electricity/Planning/National-Transmission-Network-Development-Plan

Page 18

Page 20: NSCAS - EOI - aemo.com.au  · Web viewAEMO’s objective is to fill the VCAS requirements at the least cost possible. AEMO’s preference is to procure VCAS that will deliver a long

Request for Expression of Interest

VCAS capability required is set out in Table 5.1 below. The quantity could vary depending on the most optimum location and type of VCAS provided. In addition, for power system security, AEMO may achieve diversity in the locations from where the VCAS are sourced by limiting the amount to be sourced from any one location.

Table 5.1 – Total VCAS Requirements for both Kangaroo Valley and Upper Tumut

VCAS Requirement

Reactive power Absorption2013-14 and beyond

740 MVAr

Most optimum locations for delivery of reactive power absorption are Kangaroo Valley and Upper Tumut 330 kV substations. Power system simulations have indicated that a combination of reactive power absorption capability from both locations would be most effective, approximately 10% from Kangaroo Valley area and 90% from Upper Tumut area.

VCAS is most likely to be required during the times of low demand in Canberra area and low transfers on the Victoria to NSW interconnector. This typically occurs overnight (10PM – 7AM) and also during weekends and public holidays.

Table 5.2 provides the list of electrically closest locations to Kangaroo Valley and Upper Tumut on the transmission system from which reactive power absorption could be delivered. These locations are listed in order of locational effectiveness. Locational effectiveness refers to the ability of VCAS Equipment connected to one particular location to reduce the overall reactive power absorption requirement at both Kangaroo Valley and Upper Tumut.

For example if 100 MVAr of VCAS is connected into Canberra or Williamsdale substations the overall VCAS requirement at Kangaroo Valley and Upper Tumut is reduced by 97 MVAr, therefore this particular location is 97% effective at reducing overvoltage at both Kangaroo Valley and Upper Tumut.

Please note that locational effectiveness in Table 5.2 should be used as guidance only. Effectiveness in managing overvoltage on the power system will depend on combination of VCAS Equipment utilised at any one time and the prevailing power system conditions in southern part of the NSW region.

Table 5.2 - Most effective locations for VCAS Equipment for reducing overvoltage at Upper Tumut and Kangaroo Valley

VCAS Equipment locations (when connected at or near 330 kV substations)

Effectiveness at reducing overvoltage at both Kangaroo Valley and Upper Tumut (%)

Kangaroo Valley, Upper Tumut 100

Capital, Bendeela 97

Lower Tumut 93

Canberra, Williamsdale 90

Yass 76

Wagga 72

Page 19

Page 21: NSCAS - EOI - aemo.com.au  · Web viewAEMO’s objective is to fill the VCAS requirements at the least cost possible. AEMO’s preference is to procure VCAS that will deliver a long

Request for Expression of Interest

Jindera 59

Dapto, Marulan, Bannaby 50

AEMO will make an assessment of the optimum combination of VCAS based on the proposals received and ability of each proposal to meet evaluation criteria as specified in section C9. AEMO will then invite tenders to procure sufficient VCAS to fulfil the NSCAS gap in the NSW region.

Figure 5.1 below illustrates geographically the position of the Upper Tumut and Kangaroo Valley. Other surrounding locations from which nominated VCAS could be sourced (listed in tables above) are also shown on the map.

Page 20

Page 22: NSCAS - EOI - aemo.com.au  · Web viewAEMO’s objective is to fill the VCAS requirements at the least cost possible. AEMO’s preference is to procure VCAS that will deliver a long

Request for Expression of Interest

Figure 5.1 – Map of the NSW transmission system showing most effective locations for delivery of VCAS. T1 and T2 refers to Upper Tumut Power Stations; T3 refers to Lower Tumut Power Station

Page 27