![Page 1: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/1.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A
NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON
Russell Neal, SCE
![Page 2: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/2.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A
SCE SPVP has 84 MW of projects completed and interconnected. One additional 7 MW rooftop in construction Total of 24 sites – 23 rooftops and 1 ground-mount (1 to 10
MW in size) One project, Dexus in Perris, is a 10 MW rooftop Largest single solar rooftop in the US Interconnected onto one 12 kV customer circuit.
Future plans call for 2 additional rooftops (12 MW) and 2 ground mounts (18 MW)
Program to complete by YE 2014
SCE SPVP Program Status
![Page 3: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/3.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A 3
Completed SCE SPVP Projects
SPVP 005 - PLD Redlands 1
3.39 MWdc - 10,680
Sunpower Modules
468,000 Square ft.
5 Satcon Inverters
SPVP 042 – Porterville
6.77 MWdc - 29,428
Trina Modules
33 acres
10 Satcon Inverters
SPVP 007 - PLD Redlands 3
3.20 MWdc - 10,840
SunPower Modules
446,000 Square ft.
5 Satcon Inverters
![Page 4: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/4.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A 4
SPVP 006 - PLD Ontario 2
2.55 MWdc
11,088 Trina Modules
562,000 Square ft.
4 Satcon Inverters
SPVP 009 - PLD Ontario 3
1.41 MWdc
8,131 Trina Modules
369,000 Square ft.
2 Satcon Inverters
SPVP 008 - PLD Ontario 4
2.85 MWdc
12,376 Trina Modules
681,000 Square ft.
4 Satcon Inverters
SPVP 012 - PLD Ontario 5
.77 MWdc
3,360 Trina Modules
241,000 Square ft.
1 Satcon Inverter
Completed SCE SPVP Projects
![Page 5: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/5.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A 5
NREL Project Study impacts and mitigations Combined DOE and CPUC/CSI funding Model three circuits with SPVP impacts Develop active inverter mitigations Field test and measurements Guidebook for deploying HPPV on distribution circuits
![Page 6: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/6.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A 6
Approach and Tasks
DOE Funding SCE Cost Share
NREL – Project Management
Distribution System AnalysisSCE, NREL, EDD, CPR, Satcon
Results Publications and Information DisseminationSCE, NREL, EDD, CPR, Satcon
Field Testing SCE, NREL and Satcon
Lab Testing NREL and Satcon
ModelingEDD, CPR, NREL,
Satcon, SCE
CPUC Funding
![Page 7: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/7.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A 7
State of the Project
Circuits selected > Fontana 12 kV, 3.5 MW PV > Porterville 12kV, 5 MW PV > Palmdale 12 kV, 3 MW PV (3rd party)
Supplemental instruments being deployed Inverter modification options investigated
> Issue: Satcon bankruptcy > Alternatives: PF switching, Other controls
![Page 8: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/8.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A 8
Thank You!
![Page 9: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/9.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A
MODELING, SIMULATION, TESTING AND DEMONSTRATION OF A 500KW COMMERCIAL ROOF-TOP PV SYSTEM ON SCE’S DISTRIBUTION SYSTEM
Barry Mather Ph.D., NREL
![Page 10: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/10.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A 10
Project Sponsors and Team Members
Project Team Members:
Project Sponsors:
![Page 11: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/11.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A 11
Focus Areas Distribution system modeling and simulation for high-
penetration PV scenarios Identifying the effects of high-penetration PV and developing
methods to mitigate these effects Advanced inverter functionality development and testing High-penetration PV demonstration
![Page 12: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/12.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A 12
Key Project Deliverables and Activities Modeling of High-Penetration PV Distribution Circuits (x3)
> Report on Methods for Hi-Pen PV Integration Studies > Report on Recommended Mitigation Methods for Hi-Pen
Circuits > Verification of Circuit Models/PV Impacts Using Collected
Data > Report on Quasi-Static Time-Series Modeling for Hi-Pen PV
Demonstration of Advanced PV Inverter Functionality to Mitigate PV Impacts > Development of Advanced Functionality Specifications > Laboratory Testing of Adv. PV Inverters > Demonstration of Adv. PV Inverters in SCE system
![Page 13: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/13.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A 13
Key Project Deliverables and Activities Cont. Publish a Handbook on Distribution Interconnected High-
Penetration PV Integration
![Page 14: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/14.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A 14
Fontana, CA Study Circuit
12 kV circuit, 7.8 miles, commercial/warehouse loads PV AC rating: 4.5 MW, reverse power flow conditions possible Circuit voltage regulation by switched capacitors
Substation
3 MW
PV
Auto-Cap1.8 MVAr
PSAuto-Cap1.8 MVAr
Auto-Cap1.2 MVAr
Adjacent Feeders
I IPS
I I
1.5 MW
PV
XX
Auto-Cap1.2 MVAr
I I
PS
RCS
R
![Page 15: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/15.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A 15
Substation
3 MW
PV
Auto-Cap1.8 MVAr
PSAuto-Cap1.8 MVAr
Auto-Cap1.2 MVAr
Adjacent Feeders
I IPS
I I
1.5 MW
PV
XX
Auto-Cap1.2 MVAr
I I
PS
RCS
R
Fontana, CA Study Circuit – Circuit Power Flow
Jan 3rd, 2013
![Page 16: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/16.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A 16
Fontana, CA Study Circuit – Substation Power Flow
Reverse power flow through the “express” part of the circuit is likely common on clear shoulder season days
![Page 17: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/17.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A 17
Porterville, CA Study Circuit 12 kV circuit,
47.2 miles, rural, lightly loaded/ water pumping loads
PV AC rating: 5 MW
Reverse power flow common
Voltage regulation via switched capacitor banks
Substation
PS
5 MW
PV
Auto-Cap0.6 MVAr
RCS
Adjacent Feeders
R
X
X
RCS
I IAuto-Cap0.6 MVAr
X I I
I I
X
X
PS
PS
X PS
XPS
X
I I
Auto-Cap0.6 MVAr
Auto-Cap0.6 MVAr
I II I
X
X PS
RCS
PSPS
PS
PS
PS
PS
PS
I IPS
![Page 18: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/18.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A 18
Palmdale, CA Study Circuit
12kV circuit, less than 5 miles of total circuit length, very lightly loaded, nearly an “express circuit”
PV AC rating: 3 MW Reverse power flow
conditions present during daylight hours (when clear)
Current voltage regulation issues may prompt operating the PV inverters at a lagging power factor
Substation
1.5 MW
Adjacent Feeders
R
XPSX
PS
XI I
PS
PS
I I
PV
PV
1.5 MW
XX
PSPS
![Page 19: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/19.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A 19
500kW PV Inverter Testing – Collaboration
The SCE Hi-Pen PV Integration Project teamed with FSU CAPS – SUNGRIN Team to complete this Power Hardware-in-Loop (PHIL) evaluation of a 500kW Satcon PV Inverter operating in advanced functionality modes
![Page 20: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/20.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A 20
500kW PV Inverter Testing - Setup
Each testing period consisted of 16 minute long evaluations of the PV inverter realizing advanced functionality (non-unity PF operation and constant VAr operation) as if the inverter were connected to the Fontana, CA Study Circuit
PV Profiles
PV Inverter (DUT) VVS (AC Grid Emulation)
VVS (PV Array Emulation)
480:4160
RTDS Simulation SpacePV Array Model
I dc,in
V dc,
in
V dc,
ref
I dc,re
f
Distribution Sys. Model
I ac,in
j
V ac,
pcc
Substation
3 MW
PV
Auto-Cap1.8 MVAr
PSAuto-Cap1.8 MVAr
Auto-Cap1.2 MVAr
Adjacent Feeders
I IPS
I I
1.5 MW
PV
XX
Auto-Cap1.2 MVAr
I I
PS
RCS
R
Fontana Study Circuit
![Page 21: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/21.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A 21
500kW PV Inverter Testing - Results
Conclusion: the PV inverter tracked a PF set point very well over highly variable solar resource profiles.
PV inverter power output for various PF set points
P-Q plot of PV inverter output for various PF set points
![Page 22: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/22.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A 22
500kW PV Inverter Testing - Results
Conclusion: the PV inverter tracked a constant VAr set point very well over highly variable solar resource profiles. Some modifications to “foldback” algorithm need to be addressed
PV inverter real and reactive power output for various PF
set points
P-Q plot of PV inverter output for various PF set points
![Page 23: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/23.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A 23
500kW PV Inverter Testing - Results
Fontana, CA circuit model, 2MW PV system consisting of 4 x 500kW Satcon PowerGate Plus Inverters
Results shown for “high-variability” resource
Constant PF operation at 0.95 lagging reduces voltage profile impact due to PV
![Page 24: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/24.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A 24
Comparison: Time-Series vs. Transient Simulations
Tests Quasi-Static Time-Series Analysis at multiple time steps
Follow-on study is being completed for volt/VAr controls
PSCAD OpenDSS
5s 10s 15s 30s 40s 50s
Load tap changer
Max 5 6 5 5 6 5 5 Min 4 5 5 5 5 5 5
# of actions 1 1 0 0 1 0 0
Reg. #3
A Max 7 6 6 6 6 6 7 Min 4 3 3 3 3 4 4
# of actions 7 6 7 5 8 2 7
B Max 4 4 4 4 4 4 4 Min 1 2 1 1 1 2 1
# of actions 8 5 6 5 6 2 7
C Max 2 2 1 1 1 1 1 Min -1 -1 -1 -1 -1 0 0
# of actions 8 6 6 4 8 1 4 Cap. #1 Opening time (s) 489 495 - - 470 - 150
![Page 25: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/25.jpg)
Solar Forum 2013 High Penetration
F e b 1 3 - 1 4 , S a n D i e g o , C A
Q &A AND DISCUSSION
Please contact: Barry Mather – [email protected] (303)-275-4378
![Page 26: NREL High Penetration PV Project at Southern California Edison€¦ · NREL HIGH PENETRATION PV PROJECT AT SOUTHERN CALIFORNIA EDISON Russell Neal, SCE . Solar Forum 2013 High Penetration](https://reader035.fdocuments.us/reader035/viewer/2022070708/5eacdd5b13bbdc7d5c10b81a/html5/thumbnails/26.jpg)