NOVEMBER 1 ST , 2018 EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID(S). 441462-1-32-01 DISTRICT FOUR BROWARD COUNTY

Transcript of NOVEMBER 1ST , 2018 EXHIBIT A

Scope of Services Template2.7 Signalization (Activities 21 & 22) __________________________________37 2.8 Lighting (Activities 23 & 24) (Not applicable to this project)_____________38 2.9 Landscape Architecture (Activities 25 & 26) (Not applicable to this project) 38 2.10 Survey (Activity 27) (optional services) _____________________________38 2.11 Photogrammetry (Activity 28) (Not applicable to this project) ____________38
2.12 Mapping (Activity 29) (optional services) ____________________________38 2.13 Terrestrial Mobile LiDAR (Activity 30) (Not applicable to this project) ____38
2.14 Architecture (Activity 31) ________________________________________38 2.15 Noise Barriers (Activity 32) (Not applicable to this project) ______________39
2.16 Intelligent Transportation Systems (Activities 33 & 34) (Not applicable for this
project) _______________________________________________________39 2.18 3D Modeling (Activity 36) (Not applicable to this project) ______________39
2. 21 Provisions for Work _____________________________________________40 2. 22 Services to be Performed by the DEPARTMENT When appropriate and /or
available, the DEPARTMENT will provide project data including: ________46
3 PROJECT COMMON AND PROJECT GENERAL TASKS _______________47
Project Common Tasks ________________________________________________47 Project General Tasks _________________________________________________49 3.1 Public Involvement _____________________________________________50
3.1.1 Community Awareness Plan ______________________________________50 3.1.2 Notifications ___________________________________________________50 3.1.3 Preparing Mailing Lists __________________________________________50
3.1.4 Median Modification Letters (Not applicable to this project) _____________50 3.1.5 Driveway Modification Letters (Not applicable to this project) ___________50 3.1.6 Newsletters (Not applicable to this project) ___________________________50 3.1.7 Renderings and Fly-Throughs _____________________________________50 3.1.8 PowerPoint Presentations _________________________________________51
3.1.9 Public Meeting Preparations ______________________________________51
3.1.10 Public Meeting Attendance and Follow-up ___________________________51
3.1.11 Other Agency Meetings __________________________________________51 3.1.12 Web Site (Not applicable to this project) _____________________________51 3.2 Joint Project Agreements (optional services) _________________________51 3.3 Specifications Package Preparation (optional services) _________________51 3.4 Contract Maintenance and Project Documentation _____________________52 3.5 Value Engineering (Multi-Discipline Team) Review (Not applicable to this
project) _______________________________________________________52
A-3
3.6 Prime Consultant Project Manager Meetings (Not applicable to this project) 52
3.7 Plans Update __________________________________________________52
3.12 Landscape and Existing Vegetation Coordination (optional services) ______53 3.13 Other Project General Tasks ______________________________________53
4 ROADWAY ANALYSIS ______________________________________________53 4.1 Typical Section Package (optional services) __________________________53 4.2 Pavement Type Selection Report (Not applicable to this project) __________54
4.3 Pavement Design Package (optional services) ________________________54 4.4 Cross-Slope Correction (Not applicable to this project) _________________54
4.5 Horizontal/Vertical Master Design Files _____________________________54 4.6 Access Management (Not applicable to this project) ___________________54
4.7 Roundabout Evaluation (Not applicable to this project) _________________54 4.8 Roundabout Final Design Analysis (Not applicable to this project) ________54 4.9 Cross Section Design Files (Not applicable to this project) ______________54
4.10 Traffic Control Analysis _________________________________________54 4.11 Master TCP Design Files (optional services) _________________________55
4.12 Selective Clearing and Grubbing (Not applicable to this project) __________55 4.13 Tree Disposition Plans (Not applicable to this project) __________________55 4.14 Design Variations and Exceptions (optional services) __________________55
4.15 Design Report (Not applicable to this project) ________________________55
4.16 Quantities _____________________________________________________55 4.17 Cost Estimate __________________________________________________55 4.18 Technical Special Provisions and Modified Special Provisions ___________55
4.19 Other Roadway Analyses (Not applicable to this project) ________________55 4.20 Field Reviews __________________________________________________55
4.21 Monitor Existing Structures (Not applicable to this project) ______________56
4.22 Technical Meetings _____________________________________________56 4.23 Quality Assurance/Quality Control _________________________________56 4.24 Independent Peer Review (Not applicable to this project)________________56 4.25 Supervision ____________________________________________________56 4.26 Coordination ___________________________________________________56
5 ROADWAY PLANS _________________________________________________56
5.2 Summary of Pay Items Including Quantity Input ______________________56 5.3 Typical Section Sheets (optional services) ___________________________56 5.4 General Notes/Pay Item Notes (optional services) _____________________56 5.5 Summary of Quantities Sheets (optional services) _____________________56 5.6 Project Layout (Not applicable to this project) ________________________56 5.7 Plan/Profile Sheet (Not applicable to this project) ______________________56 5.8 Profile Sheet (Not applicable to this project) __________________________56
A-4
5.10 Special Profile (Not applicable to this project) ________________________56
5.11 Back-of-Sidewalk Profile Sheet (Not applicable to this project) ___________56 5.12 Interchange Layout Sheet (Not applicable to this project)________________56 5.13 Ramp Terminal Details (Plan View) (Not applicable to this project) _______56 5.14 Intersection Layout Details (Not applicable to this project) ______________56 5.15 Special Details (Not applicable to this project) ________________________57
5.16 Cross-Section Pattern Sheet(s) (Not applicable to this project) ____________57 5.17 Roadway Soil Survey Sheet(s) (Not applicable to this project) ____________57 5.18 Cross Sections (Not applicable to this project) ________________________57 5.19 Temporary Traffic Control Plan Sheets (optional services) ______________57 5.20 Temporary Traffic Control Cross Section Sheets (optional services) _______57
5.21 Temporary Traffic Control Detail Sheets (optional services) _____________57
5.22 Utility Adjustment Sheets (optional services) _________________________57 5.23 Selective Clearing and Grubbing Sheet(s) (Not applicable to this project) ___57
5.24 Tree Disposition Plan Sheet(s) (Not applicable to this project) ____________57
5.25 Project Network Control Sheet(s) (optional services) ___________________57 5.26 Environmental Detail Sheets (Not applicable to this project) _____________57 5.27 Utility Verification Sheet(s) (SUE Data) (optional services) _____________57
5.28 Quality Assurance/Quality Control _________________________________57 5.29 Supervision ____________________________________________________57
6a DRAINAGE ANALYSIS and tasks 6a.1 – 6a.25 are not applicable for this
project._____________________________________________________________57 6a.1 Drainage Map Hydrology ________________________________________57
6a.3 Pond Siting Analysis and Report ___________________________________58 6a.4 Design of Cross Drains __________________________________________58 6a.5 Design of Ditches _______________________________________________58
6a.6 Design of Stormwater Management Facility (Offsite or Infield Pond) ______58 6a.7 Design of Stormwater Management Facility (Roadside Treatment Swales and
Linear Ponds) __________________________________________________58
6a.12 Drainage Wells _________________________________________________59
A-5
6b DRAINAGE PLANS and tasks 6b.1 – 6b.14 are not applicable for this project. 60 6b.1 Drainage Map (Including Interchanges) _____________________________60 6b.2 Bridge Hydraulics Recommendation Sheets __________________________60 6b.3 Summary of Drainage Structures ___________________________________60 6b.4 Optional Pipe/Culvert Material ____________________________________61
6b.5 Drainage Structure Sheet(s) (Per Structure) ___________________________61 6b.6 Miscellaneous Drainage Detail Sheets _______________________________61
6b.7 Lateral Ditch Plan/Profile ________________________________________61 6b.8 Lateral Ditch Cross Sections ______________________________________61
6b.9 Retention/Detention Pond Detail Sheet(s) ____________________________61 6b.10 Retention Pond Cross Sections ____________________________________61 6b.11 Erosion Control Plan Sheet(s) _____________________________________61
6b.12 SWPPP Sheet(s) ________________________________________________61 6b.13 Quality Assurance/Quality Control _________________________________61
6b.14 Supervision ____________________________________________________61
7.2 Identify Existing Utility Agency Owner(s) (optional services) ____________61
7.3 Make Utility Contacts (optional services) ____________________________61 7.4 Exception Processing (Not applicable for this project) __________________62 7.5 Preliminary Utility Meeting _______________________________________62
7.6 Individual/Field Meetings ________________________________________62 7.7 Collect and Review Plans and Data from UAO(s) _____________________62 7.8 Subordination of Easements Coordination (Not applicable for this project) _63
7.9 Utility Design Meeting ___________________________________________63 7.10 Review Utility Markups & Work Schedules and Processing of Schedules &
Agreements ___________________________________________________63 7.11 Utility Coordination/Follow-up ____________________________________63 7.12 Utility Constructability Review ____________________________________63
7.13 Additional Utility Services (Not applicable for this project) ______________64
7.14 Processing Utility Work by Highway Contractor (UWHC) (Not applicable for
this project)____________________________________________________64 7.15 Contract Plans to UAO(s) ________________________________________64 7.16 Certification/Close-Out __________________________________________64 7.17 Other Utilities (Not applicable for this project) ________________________64
A-6
CLEARANCES _____________________________________________________64
8.1 Preliminary Project Research (Not applicable for this project) ____________65 8.2 Field Work (Not applicable for this project) __________________________65 8.3 Agency Verification of Wetland Data (Not applicable for this project) _____65 8.4 Complete and Submit All Required Permit Applications ________________65 8.4.1 Complete and Submit all Required Wetland Permit Applications (Not
applicable for this project) ________________________________________65 8.4.2 Complete and Submit all Required Species Permit Applications __________65 8.5 Coordinate and Review Dredge and Fill Sketches (Not applicable for this
project) _______________________________________________________65 8.6 Prepare USCG Permit Application _________________________________65
8.7 Prepare Water Management District or Local Water Control District Right of
Way Occupancy Permit Application ________________________________65 8.8 Prepare Coastal Construction Control Line (CCCL) Permit Application (Not
applicable for this project) ________________________________________66
8.9 Prepare Tree Permit Information (Not applicable for this project) _________66 8.10 Compensatory Mitigation Plan (Not applicable for this project) ___________66 8.11 Mitigation Coordination and Meetings (Not applicable for this project) ____66
8.12 Other Environmental Permits (Not applicable for this project) ____________66 8.13 Technical Support to the DEPARTMENT for Environmental Clearances, and
Re-evaluations (Not applicable for this project) _______________________66 8.14 Preparation of Environmental Clearances and Reevaluations (Not applicable
for this project) _________________________________________________67
8.17 Technical Meetings _____________________________________________68 8.18 Quality Assurance/Quality Control _________________________________68
8.19 Supervision ____________________________________________________68 8.20 Coordination ___________________________________________________68
9 STRUCTURES - SUMMARY AND MISCELLANEOUS TASKS AND
DRAWINGS ________________________________________________________68 9.1 Key Sheet and Index of Drawings __________________________________68 9.2 Project Layout (Not applicable for this project) _______________________68 9.3 General Notes and Bid Item Notes__________________________________68 9.4 Miscellaneous Common Details (Not applicable for this project) __________69
9.5 Incorporate Report of Core Borings (Not applicable for this project) _______69
9.6 Standard Plans- Bridges __________________________________________69
9.7 Existing Bridge Plans ____________________________________________69 9.8 Assemble Plan Summary Boxes and Quantities _______________________69 9.9 Cost Estimate __________________________________________________69 9.10 Technical Special Provisions and Modified Special Provisions ___________69 9.11 Field Reviews __________________________________________________69
9.12 Technical Meetings _____________________________________________69 9.13 Quality Assurance/Quality Control _________________________________69
A-7
9.14 Independent Peer Review (Not applicable for this project) _______________69
9.15 Supervision ____________________________________________________69
9.16 Coordination ___________________________________________________69
10.3 Ship Impact Criteria (Not applicable for this project) ___________________69 Superstructure Alternatives _____________________________________________69 10.4 Short Span Concrete (Not applicable for this project) ___________________69 10.5 Medium-Span Concrete __________________________________________69 10.6 Long Span Concrete (Not applicable for this project) ___________________69
10.7 Structural Steel _________________________________________________69 Foundation and Substructure Alternatives and tasks 10.8 – 10.10 are not applicable for
this project. ____________________________________________________70 10.8 Pier/Bent (Not applicable for this project) ____________________________70
10.9 Shallow Foundations / GRS Abutments (Not applicable for this project) ____70 10.10 Deep Foundations (Not applicable for this project) _____________________70 Movable Span _______________________________________________________70
10.11 Data Collection and Design Criteria (Not applicable for this project)_______70 10.12 Movable Span Geometrics and Clearances ___________________________70
10.13 Deck System Evaluation (Not applicable for this project)________________70 10.14 Framing Plan Development (Not applicable for this project) _____________70 10.15 Main Girder Preliminary Design (Not applicable for this project) _________70
10.16 Conceptual Span Balance/Counterweight (Not applicable for this project) __70
10.17 Support System Development (Not applicable for this project) ___________70 10.18 Drive Power Calculations ________________________________________70 10.19 Drive System Development _______________________________________70
10.20 Power and Control Development ___________________________________70 10.21 Conceptual Pier Design (Not applicable for this project) ________________70
10.22 Foundation Analysis (FL PIER) (Not applicable for this project) __________70
10.23 Tender Visibility Study __________________________________________70 Other BDR Issues _____________________________________________________70 10.24 Aesthetics _____________________________________________________70 10.25 TCP/Staged Construction Requirements _____________________________70 10.26 Constructability Requirements _____________________________________70
10.27 Load Rating for Damaged/Widened Structures ________________________70
10.28 Quantity and Cost Estimates ______________________________________70
10.29 Quantity and Cost Estimates - Movable Span _________________________71 10.30 Wall Type Justification (Not applicable for this project)_________________71 Report Preparation ____________________________________________________71 10.31 Exhibits ______________________________________________________71 10.32 Exhibits - Movable Span _________________________________________71
10.33 Report Preparation ______________________________________________71 10.34 Report Preparation - Movable Span _________________________________71
A-8
11 STRUCTURES - TEMPORARY BRIDGE and tasks 11.1 – 11.8 are not
applicable for this project. _____________________________________________71 General Layout Design and Plans ________________________________________71 11.1 Overall Bridge Final Geometry ____________________________________71 11.2 General Plan and Elevation _______________________________________71 11.3 Miscellaneous Details ___________________________________________71
End Bent Design and Plans _____________________________________________71 11.4 End Bent Structural Design _______________________________________71 11.5 End Bent Details _______________________________________________71 Intermediate Bent Design and Plans and tasks 11.6 – 11.7 are not applicable for this
project. _______________________________________________________71
Miscellaneous Substructure Design and Plans _______________________________71 11.8 Foundation Layout ______________________________________________72
12 STRUCTURES - SHORT SPAN CONCRETE BRIDGE and tasks 12.1 – 12.28
are not applicable for this project. ______________________________________72 General Layout Design and Plans ________________________________________72
12.1 Overall Bridge Final Geometry ____________________________________72 12.2 Expansion/Contraction Analysis (Not applicable for this project) _________72
12.3 General Plan and Elevation _______________________________________72 12.4 Construction Staging ____________________________________________72 12.5 Approach Slab Plan and Details ____________________________________72
12.6 Miscellaneous Details ___________________________________________72
12.9 End Bent Plan and Elevation ______________________________________72 12.10 End Bent Details _______________________________________________72 Intermediate Bent Design and Plans ______________________________________72
12.11 Bent Geometry _________________________________________________72 12.12 Bent Stability Analysis ___________________________________________72 12.13 Bent Structural Design ___________________________________________72 12.14 Bent Plan and Elevation __________________________________________72 12.15 Bent Details ___________________________________________________72
Miscellaneous Substructure Design and Plans and task 12.16 is not applicable for this
project. _______________________________________________________72
A-9
Prestressed Slab Unit Bridges ___________________________________________73
12.22 Prestressed Slab Unit Design ______________________________________73 12.23 Prestressed Slab Unit Layout ______________________________________73 12.24 Prestressed Slab Unit Details and Schedule ___________________________73 12.25 Deck Topping Reinforcing Layout _________________________________73 12.26 Superstructure Sections and Details _________________________________73
Reinforcing Bar Lists __________________________________________________73 12.27 Preparation of Reinforcing Bar List _________________________________73 Load Rating _________________________________________________________73 12.28 Load Rating ___________________________________________________73
13 STRUCTURES - MEDIUM SPAN CONCRETE BRIDGE (optional services) __73
General Layout Design and Plans ________________________________________73 13.1 Overall Bridge Final Geometry (Not applicable for this project) __________73
13.2 Expansion/Contraction Analysis (Not applicable for this project) _________73 13.3 General Plan and Elevation (optional services) ________________________73
13.4 Construction Staging (Not applicable for this project) __________________73 13.5 Approach Slab Plan and Details (optional services) ____________________73 13.6 Miscellaneous Details (optional services) ____________________________73
End Bent Design and Plans and tasks 13.7 – 13.11 are not applicable for this project.73 13.7 End Bent Geometry _____________________________________________74
13.8 Wingwall Design and Geometry ___________________________________74 13.9 End Bent Structural Design _______________________________________74 13.10 End Bent Plan and Elevation ______________________________________74
13.11 End Bent Details _______________________________________________74
Intermediate Bent Design and Plans and tasks 13.12 – 13.16 are not applicable for this
project. _______________________________________________________74 13.12 Bent Geometry _________________________________________________74
13.15 Bent Plan and Elevation __________________________________________74
13.16 Bent Details ___________________________________________________74 Pier Design and Plans and tasks 13.17 – 13.21 are not applicable for this project. ___74 13.17 Pier Geometry _________________________________________________74 13.18 Pier Stability Analysis ___________________________________________74 13.19 Pier Structural Design ___________________________________________74
13.20 Pier Plan and Elevation __________________________________________74
13.21 Pier Details ____________________________________________________74
Miscellaneous Substructure Design and Plans and task 13.22 are not applicable for this
project. _______________________________________________________74 13.22 Foundation Layout ______________________________________________74 Superstructure Deck Design and Plans (optional services) _____________________74 13.23 Finish Grade Elevation (FGE) Calculation ___________________________74
13.24 Finish Grade Elevations __________________________________________74 13.25 Bridge Deck Design (optional services) _____________________________74
A-10
13.27 Diaphragm Design ______________________________________________75
13.28 Superstructure Plan (optional services) ______________________________75 13.29 Superstructure Section (optional services)____________________________75 13.30 Miscellaneous Superstructure Details (optional services) ________________75 Reinforcing Bar Lists (optional services) __________________________________75 13.31 Preparation of Reinforcing Bar List (optional services) _________________75
Continuous Concrete Girder Design and tasks 13.32 – 13.48 are not applicable for this
project. _______________________________________________________75 13.32 Section Properties_______________________________________________75 13.33 Material Properties ______________________________________________75 13.34 Construction Sequence ___________________________________________75
13.38 Time Dependent Analysis ________________________________________75
13.39 Stress Summary ________________________________________________75 13.40 Ultimate Moments ______________________________________________75 13.41 Ultimate Shear _________________________________________________75
13.42 Construction Loading ____________________________________________75 13.43 Framing Plan __________________________________________________75
13.44 Girder Elevation, including Grouting Plan and Vent Locations ___________75 13.45 Girder Details __________________________________________________75 13.46 Erection Sequence ______________________________________________75
13.47 Splice Details __________________________________________________75 13.48 Girder Deflections and Camber ____________________________________75
Simple Span Concrete Design and tasks 13.49 – 13.51 are not applicable for this
project. _______________________________________________________76
13.51 Framing Plan __________________________________________________76 Beam Stability and task 13.52 is not applicable for this project. _________________76 13.52 Beam/Girder Stability ___________________________________________76
Bearing and tasks 13.53 – 13.54 are not applicable for this project. ______________76 13.53 Bearing Pad and Bearing Plate Design ______________________________76 13.54 Bearing Pad and Bearing Plate Details ______________________________76
Load Rating _________________________________________________________76 13.55 Load Ratings __________________________________________________76
14.4 Construction Staging(optional services) _____________________________76 14.5 Approach Slab Plan and Details(optional services) _____________________76
A-11
14.6 Miscellaneous Details(optional services) ____________________________76
End Bent Design and Plans and tasks 14.7 – 14.11 are not applicable for this project.76
14.7 End Bent Geometry (Not applicable for this project) ___________________76 14.8 Wingwall Design and Geometry (Not applicable for this project) _________76 14.9 End Bent Structural Design (Not applicable for this project) _____________77 14.10 End Bent Plan and Elevation (Not applicable for this project) ____________77 14.11 End Bent Details (Not applicable for this project) ______________________77
Intermediate Bent Design and Plans and tasks 14.12 – 14.16 are not applicable for this
project. _______________________________________________________77 14.12 Bent Geometry (Not applicable for this project) _______________________77 14.13 Bent Stability Analysis (Not applicable for this project) _________________77 14.14 Bent Structural Design (Not applicable for this project) _________________77
14.15 Bent Plan and Elevation (Not applicable for this project) ________________77
14.16 Bent Details (Not applicable for this project) _________________________77 Pier Design and Plans and tasks 14.17 – 14.21 are not applicable for this project. ___77
14.17 Pier Geometry (Not applicable for this project) ________________________77
14.18 Pier Stability Analysis (Not applicable for this project) _________________77 14.19 Pier Structural Design (Not applicable for this project)__________________77 14.20 Pier Plan and Elevation (Not applicable for this project) ________________77
14.21 Pier Details (Not applicable for this project) __________________________77 Miscellaneous Substructure Design and Plans and task 14.22 are not applicable for this
project. _______________________________________________________77 14.22 Foundation Layout (Not applicable for this project) ____________________77 Superstructure Deck Design and Plans (optional services) _____________________77
14.23 Finish Grade Elevation (FGE) Calculation (optional services) ____________77 14.24 Finish Grade Elevations (optional services) __________________________77
14.25 Bridge Deck Design (optional services) _____________________________77 14.26 Bridge Deck Reinforcing and Concrete Quantities (optional services) ______77
14.27 Superstructure Plan (optional services) ______________________________77 14.28 Superstructure Section (optional services)____________________________77
14.29 Miscellaneous Bridge Deck Details (optional services) _________________78 Reinforcing Bar Lists (optional services) __________________________________78 14.30 Preparation of Reinforcing Bar List (optional services) _________________78
Structural Steel Plate Girder Design and tasks 14.31 – 14.44 are not applicable for this
project. _______________________________________________________78 14.31 Unit Modeling _________________________________________________78
14.34 Cross-frame Design _____________________________________________78 14.35 Connections ___________________________________________________78 14.36 Bearing Assembly Design and Detailing (With Jacking Analysis) _________78 14.37 Splice Design __________________________________________________78 14.38 Shear Stud Connectors ___________________________________________78
14.39 Deflection Analysis _____________________________________________78 14.40 Framing Plan __________________________________________________78 14.41 Girder Elevation ________________________________________________78
A-12
14.43 Splice Details __________________________________________________78
14.44 Girder Deflections and Camber ____________________________________78 Structural Steel Box Girder Design and tasks 14.45 – 14.59 are not applicable for this
project. _______________________________________________________78 14.45 Unit Modeling _________________________________________________78 14.46 Section Design _________________________________________________78
14.52 Splice Design __________________________________________________79
14.55 Framing Plan __________________________________________________79
14.59 Girder Deflections and Camber ____________________________________79 Erection Scheme and tasks 14.60 – 14.61 are not applicable for this project. _______79
14.60 Erection Scheme Analysis ________________________________________79 14.61 Erection Scheme________________________________________________79 Load Rating _________________________________________________________79
14.62 Load Rating ___________________________________________________79
are not applicable for this project. ______________________________________79 General Layout Design and Plans ________________________________________79
15.1 Final Bridge Geometry ___________________________________________79 15.2 Casting Geometry Calculation _____________________________________79
15.3 Finish Grade Geometry Calculation_________________________________79
15.4 Finish Grade Elevations __________________________________________79 15.5 Construction Schedule ___________________________________________79 15.6 General Plan and Elevation _______________________________________79 15.7 Approach Slab Plan and Details ____________________________________79 15.8 Miscellaneous Details ___________________________________________80
15.9 Existing Bridge Plans ____________________________________________80
End Bent Design and Plans _____________________________________________80
15.10 End Bent Geometry _____________________________________________80 15.11 Wingwall Geometry and Design ___________________________________80 15.12 End Bent Structural Design _______________________________________80 15.13 End Bent Plan and Elevation ______________________________________80 15.14 End Bent Details _______________________________________________80
Pier Design and Plans _________________________________________________80 15.15 Pier Geometry _________________________________________________80
A-13
15.18 Pier Structural Design ___________________________________________80 15.19 Pier Plan and Elevation __________________________________________80 15.20 Pier Details ____________________________________________________80 Miscellaneous Substructure Design and Plans _______________________________80 15.21 Foundation Layout ______________________________________________80
Longitudinal Analysis _________________________________________________80 15.22 Section Properties_______________________________________________80 15.23 Material Properties ______________________________________________80 15.24 Superimposed Dead Loads ________________________________________80 15.25 Construction Sequence ___________________________________________80
15.26 Tendon Layouts ________________________________________________80
15.29 Time Dependent Analysis ________________________________________81
15.30 Stress Summary ________________________________________________81 15.31 Ultimate Moments ______________________________________________81 15.32 Ultimate Shear _________________________________________________81
15.33 Construction Loading ____________________________________________81 Transverse Analysis ___________________________________________________81
15.37 Stress Summary ________________________________________________81 15.38 Ultimate Moments ______________________________________________81
15.39 Construction Loading ____________________________________________81 Superstructure Design _________________________________________________81
15.40 Typical Segment________________________________________________81 15.41 Pier Segment __________________________________________________81
15.45 Bearings ______________________________________________________81 15.46 Expansion Joints _______________________________________________81 15.47 Special Analysis ________________________________________________81
Superstructure Plans ___________________________________________________81 15.48 Typical Sections ________________________________________________81
15.54 Expansion Joint Segments ________________________________________82 15.55 CIP Closure Joint Details _________________________________________82 15.56 Casting Geometry_______________________________________________82
A-14
Post-Tensioning Details ________________________________________________82
15.67 Erection Sequence and Details _____________________________________82
15.68 Access Opening Details __________________________________________82 15.69 Bearings ______________________________________________________82
15.70 Expansion Joints _______________________________________________82
Reinforcing Bar Lists __________________________________________________83 15.76 Preparation of Reinforcing Bar Lists ________________________________83 Load Rating _________________________________________________________83
15.77 Load Rating (LRFR) ____________________________________________83
16 STRUCTURES - MOVABLE SPAN (optional services) ____________________83 Final Design Bascule Pier (optional services) _______________________________83 16.1 Pier Deck (Not applicable for this project) ___________________________83
16.2 Leaf/Pier Clearance Diagrams (Not applicable for this project) ___________83 16.3 Load Shoe Columns (Not applicable for this project) ___________________83
16.4 Trunnion Columns (Not applicable for this project) ____________________83
16.5 Foundations (optional services) ____________________________________83 16.6 Footing (Not applicable for this project) _____________________________83 16.7 Seal (Not applicable for this project) ________________________________83 16.8 Back Wall (Approach Span Bearings) Closed Piers only (Not applicable for
this project)____________________________________________________83
16.9 Bascule Pier Deck Elevations (Not applicable for this project) ____________83
Bascule Pier Dimensions – Detailing (optional services) ______________________83
16.10 Pier Plan Views (optional services) _________________________________83 16.11 Pier Elevations Views (optional services) ____________________________83 16.12 Pier Sections (optional services) ___________________________________83 Bascule Pier Reinforcing Details (optional services) _________________________83 16.13 Pier Reinforcing (optional services) ________________________________84
Bascule Pier Miscellaneous Details (optional services) _______________________84 16.14 Pier Barrier Details (optional services) ______________________________84
A-15
16.16 Handrail Details (optional services)_________________________________84
16.17 Ladder and Hatch Details (Not applicable for this project) _______________84 16.18 Pier Equipment (optional services) _________________________________84 16.19 Bascule Pier Notes and Summary of Quantities (Not applicable for this project)84 16.20 Miscellaneous Details (optional services) ____________________________84 Bascule Leaf Design (optional services) ___________________________________84
16.21 Deck Design (Not applicable for this project) _________________________84 16.22 Sidewalk Design (optional services) ________________________________84 16.23 Stringer Design (optional services) _________________________________84 16.24 Typical Floorbeam Design (Not applicable for this project) ______________84 16.25 End Floorbeam Design (Not applicable for this project) _________________84
16.26 Deep Floorbeam Design (Not applicable for this project) ________________84
16.27 Sidewalk Bracket Design (optional services) _________________________84 16.28 Roadway Bracket Design (Not applicable for this project) _______________84
16.29 Main Girder Influence Lines (Not applicable for this project) ____________84
16.30 Main Girder Design (Not applicable for this project) ___________________84 16.31 Trunnion Girder Design (optional services) __________________________84 16.32 Main Girder Camber Data (Not applicable for this project) ______________84
16.33 Leaf Lateral Bracing Design (Not applicable for this project) ____________84 16.34 Counterweight Design (optional services) ____________________________84
16.35 Live Load Shoe Design (optional services) ___________________________84 16.36 Barrier Design (optional services) __________________________________85 16.37 Deck Elevations (Not applicable for this project) ______________________85
16.38 Balance Calculations (optional services) _____________________________85 Bascule Leaf Detailing (optional services) _________________________________85
16.39 Bascule GP&E (optional services)__________________________________85 16.40 Bascule Leaf Notes (optional services) ______________________________85
16.41 Framing Plan (optional services) ___________________________________85 16.42 Flooring Plan and Details (optional services) _________________________85
16.43 Typical Section and Finish Grade Elevations (optional services) __________85 16.44 Girder Elevation (Not applicable for this project) ______________________85 16.45 Girder Details (Not applicable for this project) ________________________85
16.46 Camber Layout (Not applicable for this project) _______________________85 16.47 Floor Beams (Not applicable for this project) _________________________85 16.48 Counterweight Girder/Box (optional services) ________________________85
16.49 Trunnion Girder (Not applicable for this project) ______________________85 16.50 Cylinder Girder (Not applicable for this project) _______________________85
16.51 Lateral Bracing Details (Not applicable for this project) _________________85 16.52 Counterweight Bracing Details (optional services) _____________________85 16.53 Joint Details (optional services) ____________________________________85 16.54 Traffic Barrier Details (optional services) ____________________________85 16.55 Pedestrian Rail and Support Details (optional services) _________________85
16.56 Curb and Sidewalk Details (optional services) ________________________85 16.57 Barrier and Sidewalk Bracket Details (optional services) ________________85 16.58 Counterweight Details (optional services) ____________________________85
A-16
16.59 Stress Table or Influence Lines (Not applicable for this project) __________85
Mechanical Design and tasks 16.60 – 16.63 are not applicable for this project. _____86
16.60 Final Power Requirements ________________________________________86 16.61 Trunnion Assembly (Not applicable for this project) ___________________86 16.62 Span Locks ____________________________________________________86 16.63 Sump Pumps (Not applicable for this project) _________________________86 Mechanical Drive Design and tasks 16.64 – 16.67 are not applicable for this project. 86
16.64 Drive Shafts, Couplings, Keys, Bearings and Supports __________________86 16.65 Rack and Pinion, Bearings and Supports _____________________________86 16.66 Drive Train ____________________________________________________86 16.67 Motor Brakes and Machinery Brakes _______________________________86 Hydraulic Drive Design ________________________________________________86
16.68 Hydraulic Drive ________________________________________________86
16.70 Machinery Elevation (Not applicable for this project) __________________86
16.71 Machinery Section (Not applicable for this project) ____________________86 16.72 Trunnion Assembly (Not applicable for this project) ___________________86 16.73 Drive Details (Not applicable for this project) _________________________86
16.74 Span Locks (optional services) ____________________________________86 Electrical Design (optional services) ______________________________________86
16.75 Load Analysis (optional services) __________________________________86 16.76 Power Distribution (optional services) ______________________________86 16.77 Drive Equipment (optional services) ________________________________86
16.78 Bridge Controls (optional services) _________________________________86 16.79 Grounding (optional services) _____________________________________86
16.80 Lightning and Surge Suppression (optional services) ___________________87 16.81 Pier Lighting (optional services) ___________________________________87
Electrical Detailing (optional services) ____________________________________87 16.82 Electrical Plan and Elevation (optional services) ______________________87
16.83 Electrical Symbols and Abbreviations (optional services) _______________87 16.84 Single/Three Line Diagram (optional services) ________________________87 16.85 Panel Board and Light Fixture Schedules (optional services) _____________87
16.86 Wire and Conduit Schedules and Diagrams (optional services) ___________87 16.87 Control Desk/Panel Layout (optional services) ________________________87 16.88 Control Schematics (optional services) ______________________________87
16.89 PLC Logic (optional services) _____________________________________87 16.90 Communication System (Not applicable for this project) ________________87
16.91 Navigation Lighting Details (optional services) _______________________87 16.92 Pedestrian Gate, Traffic Gate, and Barrier Details (optional services) ______87 16.93 Submarine Cable (optional services) ________________________________87 16.94 Miscellaneous Details (optional services) ____________________________87 Control House (optional services) ________________________________________87
16.95 Architectural Design (optional services) _____________________________87 16.96 Architectural Details (optional services) _____________________________87 16.97 Structural Design (optional services) ________________________________87
A-17
16.99 HVAC/Plumbing Design (optional services)__________________________87
16.100 HVAC/Plumbing/Electrical Cables (optional services)__________________87 Reinforcing Bar Lists (optional services) __________________________________87 16.101 Preparation of Reinforcing Bar List (optional services) _________________87 Load Rating (optional services) __________________________________________88 16.102 Load Rating (optional services) ____________________________________88
17 STRUCTURES - RETAINING WALLS and tasks 17.1 – 17.21 are not applicable
for this project. ______________________________________________________88 General Requirements _________________________________________________88 17.1 Key Sheet _____________________________________________________88 17.2 Horizontal Wall Geometry ________________________________________88
17.6 Details _______________________________________________________88 Temporary Proprietary Walls ____________________________________________88 17.7 Vertical Wall Geometry __________________________________________88
17.8 Semi-Standard Drawings _________________________________________88 17.9 Wall Plan and Elevations (Control Drawings) _________________________88
17.10 Details _______________________________________________________88 Cast-In-Place Retaining Walls ___________________________________________88 17.11 Design _______________________________________________________88
17.13 General Notes __________________________________________________88 17.14 Wall Plan and Elevations (Control Drawings) _________________________88 17.15 Sections and Details _____________________________________________88
17.16 Reinforcing Bar List _____________________________________________88 Other Retaining Walls and Bulkheads _____________________________________88
17.17 Design _______________________________________________________89
18 STRUCTURES - MISCELLANEOUS __________________________________89
Concrete Box Culverts and tasks 18.1 – 18.2 are not applicable for this project. ____89
18.1 Concrete Box Culverts ___________________________________________89
18.2 Concrete Box Culverts Extensions _________________________________89 18.3 Concrete Box Culvert Data Table Plan Sheets ________________________89 18.4 Concrete Box Culvert Special Details Plan Sheets _____________________89 Strain Poles and tasks 18.3 – 18.4 are not applicable for this project. _____________89 18.5 Steel Strain Poles _______________________________________________89 18.6 Concrete Strain Poles ____________________________________________89 18.7 Strain Pole Data Table Plan Sheets _________________________________89
A-18
18.8 Strain Pole Special Details Plan Sheets ______________________________89
Mast Arms and task 18.5 are not applicable for this project. ____________________89
18.9 Mast Arms ____________________________________________________89 18.10 Mast Arms Data Table Plan Sheets _________________________________89 18.11 Mast Arms Special Details Plan Sheets ______________________________89 Overhead/Cantilever Sign Structure and tasks 18.6 – 18.10 are not applicable for this
project. _______________________________________________________89
18.17 Overhead/Cantilever Sign Structures Data Table Plan Sheets _____________90
18.18 Overhead/Cantilever Sign Structures Special Details Plan Sheets _________90 High Mast Lighting and task 18.11 are not applicable for this project. ____________90
18.19 Non-Standard High Mast Lighting Structures _________________________90
18.20 High Mast Lighting Special Details Plan Sheets _______________________90 Noise Barrier Walls (Ground Mount) and tasks 18.12 – 18.18 are not applicable for
this project. ____________________________________________________90
18.23 Summary of Quantities – Aesthetic Requirements _____________________90 18.24 Control Drawings _______________________________________________90 18.25 Design of Noise Barrier Walls Covered by Standards ___________________90
18.26 Design of Noise Barrier Walls not Covered by Standards ________________90 18.27 Aesthetic Details _______________________________________________90
Special Structures and tasks 18.19 – 18.22 are not applicable for this project. ______90 18.28 Fender System _________________________________________________90
18.29 Fender System Access ___________________________________________90 18.30 Special Structures _______________________________________________90
18.31 Other Structures ________________________________________________90 18.32 Condition Evaluation of Signal and Sign Structures, and High Mast Light
Poles _________________________________________________________90
18.33 Condition Evaluation of Signal and Sign Structures, and High Mast Light
Poles (No As built or Design Plans Available) ________________________90 18.34 Analytical Evaluation of Signal and Sign Structures, and High Mast Light
Poles _________________________________________________________91 18.35 Ancillary Structures Report _______________________________________91
19.5 Sign Panel Design Analysis (optional services) _______________________91 19.6 Sign Lighting/Electrical Calculations (optional services) ________________91
A-19
19.9 Technical Special Provisions and Modified Special Provisions (optional
services) ______________________________________________________92 19.10 Other Signing and Pavement Marking Analysis N/A ___________________92 19.11 Field Reviews (optional services) __________________________________92 19.12 Technical Meetings N/A _________________________________________92
19.13 Quality Assurance/Quality Control _________________________________92 19.14 Independent Peer Review N/A _____________________________________92 19.15 Supervision (optional services) ____________________________________92 19.16 Coordination (optional services) ___________________________________92
20 SIGNING AND PAVEMENT MARKING PLANS ________________________92
20.1 Key Sheet N/A _________________________________________________92 20.2 Summary of Pay Items Including Quantity Input (optional services) _______92
20.3 Tabulation of Quantities (optional services) __________________________92 20.4 General Notes/Pay Item Notes (optional services) _____________________92
20.5 Project Layout (Not applicable for this project) _______________________92 20.6 Plan Sheet (optional services) _____________________________________92 20.7 Typical Details (Not applicable for this project) _______________________92
20.8 Guide Sign Work Sheet(s) (optional services)_________________________92 20.9 Traffic Monitoring Site (Not applicable for this project)_________________92
20.10 Cross Sections (Not applicable for this project) _______________________92 20.11 Special Service Point Details (Not applicable for this project) ____________93 20.12 Special Details (optional services) __________________________________93
20.13 Interim Standards (Not applicable for this project) _____________________93
20.14 Quality Assurance/Quality Control _________________________________93 20.15 Supervision ____________________________________________________93
21 SIGNALIZATION ANALYSIS and tasks 21.1 – 21.19 are not applicable for this
project._____________________________________________________________93 21.1 Traffic Data Collection __________________________________________93 21.2 Traffic Data Analysis ____________________________________________93
21.8 Pole Elevation Analysis __________________________________________94
21.9 Traffic Signal Operation Report____________________________________94
21.10 Quantities _____________________________________________________94 21.11 Cost Estimate __________________________________________________94 21.12 Technical Special Provisions and Modified Special Provisions ___________94 21.13 Other Signalization Analysis ______________________________________94 21.14 Field Reviews __________________________________________________94 21.15 Technical Meetings _____________________________________________94 21.16 Quality Assurance/Quality Control _________________________________94
A-20
21.18 Supervision ____________________________________________________95
21.19 Coordination ___________________________________________________95
22 SIGNALIZATION PLANS and tasks 22.1 – 22.18 are not applicable for this
project._____________________________________________________________95 22.1 Key Sheet _____________________________________________________95 22.2 Summary of Pay Items Including Designer Interface Quantity Input _______95
22.8 Guide Sign Worksheet ___________________________________________95 22.9 Special Details _________________________________________________95
22.10 Special Service Point Details ______________________________________95 22.11 Mast Arm/Monotube Tabulation Sheet ______________________________95
22.12 Strain Pole Schedule ____________________________________________95 22.13 TCP Signal (Temporary) _________________________________________95 22.14 Temporary Detection Sheet _______________________________________95
22.15 Utility Conflict Sheet ____________________________________________95 22.16 Interim Standards _______________________________________________95
22.17 Quality Assurance/Quality Control _________________________________95 22.18 Supervision ____________________________________________________96
23 LIGHTING ANALYSIS and tasks 23.1 – 23.18 are not applicable for this
project._____________________________________________________________96
23.4 FDEP Coordination and Report ____________________________________97 23.5 Reference and Master Design Files _________________________________97 23.6 Temporary Lighting _____________________________________________97
23.7 Design Documentation ___________________________________________97 23.8 Quantities _____________________________________________________97 23.9 Cost Estimate __________________________________________________97 23.10 Technical Special Provisions and Modified Special Provisions ___________97 23.11 Other Lighting Analysis __________________________________________97
23.12 Field Reviews __________________________________________________98
23.13 Technical Meetings _____________________________________________98
23.14 Quality Assurance/Quality Control _________________________________98 23.15 Independent Peer Review _________________________________________98 23.16 Supervision ____________________________________________________98 23.17 Coordination ___________________________________________________98
24 LIGHTING PLANS and tasks 24.1 – 24.14 are not applicable for this project. _98 24.1 Key Sheet _____________________________________________________98
A-21
24.2 Summary of Pay Item Sheet Including Designer Interface Quantity Input ___98
24.3 Tabulation of Quantities __________________________________________98
24.4 General Notes/Pay Item Notes _____________________________________98 24.5 Pole Data, Legend & Criteria ______________________________________98 24.6 Service Point Details ____________________________________________98 24.7 Project Layout _________________________________________________98 24.8 Plan Sheet _____________________________________________________98
24.9 Special Details _________________________________________________98 24.10 Temporary Lighting Data and Details _______________________________98 24.11 Traffic Control Plan Sheets _______________________________________98 24.12 Interim Standards _______________________________________________98 24.13 Quality Assurance/Quality Control _________________________________98
24.14 Supervision ____________________________________________________99
25 LANDSCAPE ARCHITECTURE ANALYSIS and tasks 25.1 – 25.16 are not
applicable for this project. _____________________________________________99 25.1 Data Collection_________________________________________________99
25.2 Site Inventory and Analysis for Proposed Landscape ___________________99 25.3 Planting Design ________________________________________________99 25.4 Irrigation Design _______________________________________________99
25.5 Hardscape Design______________________________________________100 25.6 Plan Summary Boxes ___________________________________________100
25.7 Cost Estimates ________________________________________________100 25.8 Technical Special Provisions and Modified Special Provisions __________100 25.9 Other Landscape Architecture ____________________________________100
25.10 Outdoor Advertising ___________________________________________100
25.14 Independent Peer Review ________________________________________100 25.15 Supervision ___________________________________________________100
25.16 Project Coordination ___________________________________________100
25.17 Interdisciplinary Coordination ____________________________________100
26 LANDSCAPE ARCHITECTURE PLANS and tasks 26.1 – 26.16 are not
applicable for this project. ____________________________________________100 26.1 Key Sheet ____________________________________________________100 26.2 Tabulation of Quantities _________________________________________100
26.3 General Notes _________________________________________________100
26.4 Tree and Vegetation Inventory, Protection and Relocation Plans _________100
26.5 Planting Plans for Linear Roadway Projects _________________________101 26.6 Planting Plans (Interchanges and Toll Plazas) ________________________101 26.7 Planting Details and Notes _______________________________________101 26.8 Irrigation Plans for Linear Roadway Project _________________________101 26.9 Irrigation Plans for Interchange and Toll Plazas ______________________101 26.10 Irrigation Details and Notes ______________________________________101 26.11 Hardscape Plans _______________________________________________101
A-22
26.13 Landscape Maintenance Plan _____________________________________101
26.14 Cost Estimate _________________________________________________101 26.15 Quality Assurance/Quality Control ________________________________101 26.16 Supervision ___________________________________________________101
27 SURVEY (optional services) __________________________________________101 27.1 Horizontal Project Control (HPC) _________________________________102
27.2 Vertical Project Control (VPC) ___________________________________102 27.3 Alignment and/or Existing Right of Way (R/W) Lines (Not applicable for this
project) ______________________________________________________102 27.4 Aerial Targets (Not applicable for this project) _______________________102 27.5 Reference Points (Not applicable for this project) _____________________102
27.6 Topography/Digital Terrain Model (DTM) (3D) (optional services) ______102 27.7 Planimetric (2D) (optional services) _______________________________102
27.8 Roadway Cross Sections/Profiles (Not applicable for this project) ________102 27.9 Side Street Surveys (Not applicable for this project) ___________________102
27.10 Underground Utilities (optional services) ___________________________102 27.11 Outfall Survey (Not applicable for this project) ______________________103 27.12 Drainage Survey (Not applicable for this project) _____________________103
27.13 Bridge Survey (Minor/Major) (Not applicable for this project) __________103 27.14 Channel Survey (optional services) ________________________________103
27.15 Pond Site Survey (Not applicable for this project) ____________________103 27.16 Mitigation Survey (Not applicable for this project) ____________________103 27.17 Jurisdiction Line Survey (Not applicable for this project) _______________103
27.18 Geotechnical Support (Not applicable for this project) _________________103
27.19 Sectional/Grant Survey (Not applicable for this project) ________________103 27.20 Subdivision Location (Not applicable for this project) _________________103 27.21 Maintained R/W (Not applicable for this project) _____________________103
27.22 Boundary Survey (Not applicable for this project) ____________________103 27.23 Water Boundary Survey (Not applicable for this project) _______________103
27.24 Right of Way Staking, Parcel / Right of Way Line (Not applicable for this
project) ______________________________________________________103 27.25 Right of Way Monumentation (Not applicable for this project) __________103 27.26 Line Cutting (Not applicable for this project) ________________________103 27.27 Work Zone Safety _____________________________________________103 27.28 Miscellaneous Surveys N/A ______________________________________103
27.29 Supplemental Surveys (optional services) ___________________________104
27.30 Document Research (Not applicable for this project) __________________104
27.31 Field Review (optional services) __________________________________104 27.32 Technical Meetings N/A _________________________________________104 27.33 Quality Assurance/Quality Control (QA/QC) ________________________104 27.34 Supervision ___________________________________________________104 27.35 Coordination __________________________________________________104
A-23
28 PHOTOGRAMMETRY and tasks 28.1 – 28.25 are not applicable for this
project.____________________________________________________________104
28.6 Photo Products ________________________________________________105 28.7 Scanning _____________________________________________________105 28.8 LiDAR ______________________________________________________105 28.9 Aerial Triangulation ____________________________________________105 28.10 Surfaces _____________________________________________________105
28.11 Ortho Generation ______________________________________________105
28.14 Sheet Clipping ________________________________________________105
28.18 CADD Edit ___________________________________________________106 28.19 Data Merging _________________________________________________106
28.20 Miscellaneous _________________________________________________106 28.21 Field Review _________________________________________________106 28.22 Technical Meetings ____________________________________________106
28.25 Coordination __________________________________________________106
29 MAPPING (optional services) _________________________________________106
Master CADD File ___________________________________________________107 29.1 Alignment (Not applicable for this project) __________________________107
29.2 Section and 1/4 Section Lines (Not applicable for this project) __________107
29.3 Subdivisions / Property Lines (Not applicable for this project) ___________107 29.4 Existing Right of Way (Not applicable for this project) ________________107 29.5 Topography (Not applicable for this project)_________________________107 29.6 Parent Tract Properties and Existing Easements (Not applicable for this
project) ______________________________________________________107
29.7 Proposed Right of Way Requirements (Not applicable for this project) ____107
29.8 Limits of Construction (Not applicable for this project) ________________107
29.9 Jurisdictional/Agency Lines (Not applicable for this project) ____________107 Sheet Files and tasks 29.10 – 29.21 are not applicable for this project. __________107 29.10 Control Survey Cover Sheet (Not applicable for this project) ____________107 29.11 Control Survey Key Sheet (Not applicable for this project) _____________107 29.12 Control Survey Detail Sheet (Not applicable for this project) ____________107
29.13 Right of Way Map Cover Sheet (Not applicable for this project) _________107 29.14 Right of Way Map Key Sheet (Not applicable for this project) __________107
A-24
29.15 Right of Way Map Detail Sheet (Not applicable for this project) _________107
29.16 Maintenance Map Cover Sheet (Not applicable for this project) _________107
29.17 Maintenance Map Key Sheet (Not applicable for this project) ___________107 29.18 Maintenance Map Detail Sheet (Not applicable for this project) _________107 29.19 Reference Point Sheet (Not applicable for this project)_________________107 29.20 Project Network Control Sheet (optional services) ____________________108 29.21 Table of Ownerships Sheet (Not applicable for this project) _____________108
Miscellaneous Surveys and Sketches and tasks 29.22 – 29.36 are not applicable for
this project. ___________________________________________________108 29.22 Parcel Sketches________________________________________________108 29.23 TIITF Sketches ________________________________________________108 29.24 Other Specific Purpose Survey(s) _________________________________108
29.26 Right of Way Monumentation Map ________________________________108 29.27 Title Search Map ______________________________________________108
29.28 Title Search Report ____________________________________________108
29.29 Legal Descriptions _____________________________________________108 29.30 Final Map/Plans Comparison _____________________________________108 29.31 Field Reviews _________________________________________________108
29.32 Technical Meetings ____________________________________________108 29.33 Quality Assurance/Quality Control ________________________________108
29.34 Supervision ___________________________________________________108 29.35 Coordination __________________________________________________108 29.36 Supplemental Mapping _________________________________________108
30 TERRESTRIAL MOBILE LiDAR and tasks 30.1 – 30.19 are not applicable for
this project. ________________________________________________________109 30.1 Terrestrial Mobile LiDAR Mission Planning ________________________109 30.2 Project Control Point Coordination ________________________________109
30.3 Terrestrial Mobile LiDAR Mobilization ____________________________109 30.4 Terrestrial Mobile LiDAR Mission ________________________________109
30.5 Terrestrial Mobile LiDAR Processing ______________________________109
30.6 Terrestrial Mobile Photography Processing __________________________109 30.7 Transformation / Adjustment _____________________________________109 30.8 Classification / Editing __________________________________________110 30.9 Specific Surface Reporting ______________________________________110 30.10 Topographic (3D) Mapping ______________________________________110
30.11 Topographic (2D) Planimetric Mapping ____________________________110
30.12 CADD Edits __________________________________________________110
30.18 Supervision ___________________________________________________110 30.19 Coordination __________________________________________________111
Architectural Plans ___________________________________________________120
31.6 Floor Plan(s) (small scale) _______________________________________120 31.7 Floor Plan(s) (large scale) _______________________________________120 31.8 Exterior Elevation(s) ___________________________________________120 31.9 Roof Plan(s) __________________________________________________120 31.10 Roof Details __________________________________________________120
31.11 Interior Elevation(s) ____________________________________________120
31.14 Building Section(s) ____________________________________________120
31.18 Door and Window Finish Schedule ________________________________121 31.19 Door Jamb Detail(s) and Window Details ___________________________121
31.20 Exterior Wall Section(s) _________________________________________121 31.21 Interior Wall Section(s) _________________________________________121 31.22 Overhead Door Detail(s) (Not applicable for this project) ______________121
31.23 Curtain Wall Detail(s) __________________________________________121 31.24 Fascia, Soffit and Parapet Details _________________________________121
31.25 Signage Detail(s) ______________________________________________121 31.26 Miscellaneous Detail(s) _________________________________________121
31.27 Repetitive Sheets (Not applicable for this project) ____________________121 31.28 Design Narrative Reports (Not applicable for this project) ______________121
31.29 Permitting ____________________________________________________121 31.30 Other Pertinent Project Documentation _____________________________121 31.31 Cost Estimate _________________________________________________121
31.32 Technical Special Provisions and Modified Special Provisions Packages __121 31.33 Field Reviews _________________________________________________121 31.34 Technical Meetings ____________________________________________121
31.35 Quality Assurance/Quality Control ________________________________121 31.36 Meeting with Independent Peer Review (Not applicable for this project)___122
31.37 Supervision ___________________________________________________122 Structural Plans _____________________________________________________122 31.38 General Notes, Abbreviations, Symbols, and Legend __________________122 31.39 Foundation Plan(s) (Small Scale)__________________________________122 31.40 Foundation Plan(s) (Large Scale) (Not applicable for this project) ________122
31.41 Slab Plan(s) (Small Scale) _______________________________________122 31.42 Slab Plan(s) (Large Scale) (Not applicable for this project) _____________122 31.43 Slab Placement Plan(s) __________________________________________122
A-26
31.45 Foundation Section(s) __________________________________________122
31.51 Roof Loading Plan(s) and Detail(s) ________________________________122 31.52 Roof Section(s) _______________________________________________122 31.53 Roof Detail(s) _________________________________________________122 31.54 Bearing Wall Section(s) _________________________________________122 31.55 Bearing Wall Detail(s) __________________________________________122
31.56 Column Section(s) (Not applicable for this project) ___________________122
31.57 Column Detail(s) (Not applicable for this project) ____________________122 31.58 Miscellaneous Sections (Not applicable for this project) _______________122
31.59 Repetitive Sheets (Not applicable for this project) ____________________122
31.60 Other Pertinent Project Documentation (Not applicable for this project) ___123 31.61 Cost Estimate _________________________________________________123 31.62 Technical Special Provisions and Modified Special Provisions Packages __123
31.63 Field Reviews _________________________________________________123 31.64 Technical Meetings ____________________________________________123
31.65 Quality Assurance/Quality Control ________________________________123 31.66 Independent Peer Review (Not applicable for this project) ______________123 31.67 Supervision ___________________________________________________123
Mechanical Plans ____________________________________________________123 31.68 General Notes, Abbreviations, Symbols, Legend, and Code Issues _______123
31.71 Detail(s) _____________________________________________________123 31.72 Section(s) ____________________________________________________123
31.76 HVAC Calculations ____________________________________________123 31.77 Life Cycle Cost Analysis ________________________________________123 31.78 Repetitive Sheets ______________________________________________124
31.79 Other Pertinent Project Documentation _____________________________124 31.80 Cost Estimate _________________________________________________124
31.81 Technical Special Provisions and Modified Special Provisions Packages __124 31.82 Field Reviews _________________________________________________124 31.83 Technical Meetings ____________________________________________124 31.84 Quality Assurance/Quality Control ________________________________124 31.85 Independent Peer Review ________________________________________124
31.86 Supervision ___________________________________________________124 Plumbing Plans _____________________________________________________124 31.87 General Notes, Abbreviations, Symbols, Legend, and Code Issues _______124
31.90 Isometric(s) (Large Scale) _______________________________________124 31.91 Riser Diagram(s) ______________________________________________124 31.92 Detail(s) _____________________________________________________124 31.93 Repetitive Sheets (Not applicable for this project) ____________________124 31.94 Other Pertinent Project Documentation (Not applicable for this project) ___124
31.95 Cost Estimate _________________________________________________124 31.96 Technical Special Provisions and Modified Special Provisions Packages __125 31.97 Field Reviews _________________________________________________125 31.98 Technical Meetings ____________________________________________125 31.99 Quality Assurance/Quality Control ________________________________125
31.100 Independent Peer Review (Not applicable for this project) ______________125
31.101 Supervision ___________________________________________________125 Fire Protection Plans and tasks 31.102 – 31.114 are not applicable for this project. 125
31.102 General Notes, Abbreviations, Symbols, Legend, and Code Issues _______125
31.103 Fire Protection Plan ____________________________________________125 31.104 Riser Diagram, Details, and Partial Plans ___________________________125 31.105 Hydraulic Calculation __________________________________________125
31.106 Repetitive Sheets ______________________________________________125 31.107 Other Pertinent Project Documentation _____________________________125
31.111 Technical Meetings ____________________________________________125 31.112 Quality Assurance/Quality Control ________________________________126
31.113 Independent Peer Review ________________________________________126 31.114 Supervision ___________________________________________________126
Electrical Plans ______________________________________________________126 31.115 General Notes, Abbreviations, Symbols, Legend, and Code Issues _______126
31.119 Lighting Fixtures Detail(s) _______________________________________126 31.120 Lightning Protection Plan(s) _____________________________________126 31.121 Lightning Protection Details _____________________________________126
31.122 Power Plan(s) _________________________________________________126 31.123 Power Distribution Riser Diagram(s)_______________________________126
31.124 Panel Board Schedule(s) ________________________________________126 31.125 Data Plan(s) __________________________________________________126 31.126 Data Detail(s) _________________________________________________126 31.127 Communication Plan(s) (Not applicable for this project) _______________126 31.128 Communication Detail(s) (Not applicable for this project) ______________126
31.129 Security Alarm System Plan(s) (Not applicable for this project) _________126 31.130 Miscellaneous Detail(s) (Not applicable for this project) _______________126 31.131 Repetitive Sheets (Not applicable for this project) ____________________126
A-28
31.133 Other Pertinent Project Documentation (Not applicable for this project) ___127
31.134 Cost Estimate _________________________________________________127 31.135 Technical Special Provisions and Modified Special Provisions Packages __127 31.136 Field Reviews _________________________________________________127 31.137 Technical Meetings ____________________________________________127 31.138 Quality Assurance/Quality Control ________________________________127
31.139 Independent Peer Review (Not applicable for this project) _____________127 31.140 Supervision __________________________________________________127 31.141 LEED Certification (Not applicable for this project) __________________127 31.142 Coordination __________________________________________________127 31.143 Building Information Modeling (BIM) (Not applicable for this project) ___127
32 NOISE BARRIERS IMPACT DESIGN ASSESSMENT IN THE DESIGN
PHASE and tasks 32.1 – 32.9 are not applicable for this project. ____________127
32.1 Noise Analysis ________________________________________________127 32.2 Noise Barrier Evaluation ________________________________________129
32.3 Public Involvement ____________________________________________130 32.4 Outdoor Advertising Identification ________________________________130 32.5 Noise Study Report (NSR) Addendum _____________________________131
32.6 Technical Meetings ____________________________________________131 32.7 Quality Assurance/Quality Control ________________________________131
32.8 Supervision ___________________________________________________131 32.9 Coordination __________________________________________________131
33.1 ITS Analysis __________________________________________________131 33.2 Communications Plan __________________________________________135 33.3 Lightning Protection Analysis ____________________________________136
33.4 Power Subsystem ______________________________________________136 33.5 Voltage Drop Calculations _______________________________________137 33.6 Design Documentation __________________________________________137
33.7 Existing ITS __________________________________________________137 33.8 Queue Analysis _______________________________________________137 33.9 Reference and Master ITS Design File _____________________________137 33.10 Reference and Master Communications Design File ___________________138 33.11 Pole Elevation Analysis _________________________________________138
33.12 Sign Panel Design Analysis ______________________________________138
33.13 Quantities ____________________________________________________138
A-29
are not applicable for this project. _____________________________________140 34.1 Key Sheet ____________________________________________________140 34.2 Summary of Pay Items Including Designer Interface Quantity Input ______140 34.3 Tabulation of Quantities _________________________________________140 34.4 General Notes / Pay Item Notes ___________________________________140
34.5 Project Layout ________________________________________________140 34.6 Typical and Special Details ______________________________________141 34.7 Plan Sheet ____________________________________________________141 34.8 ITS Communications Plans ______________________________________141 34.9 Fiber Optic Splice Diagrams _____________________________________141
34.10 Lightning Protection Plans _______________________________________142 34.11 Cross Sections ________________________________________________142
34.12 Guide Sign Work Sheet(s) _______________________________________142 34.13 Special Service Point Details _____________________________________142
34.14 Strain Pole Schedule ___________________________________________142 34.15 Overhead / Cantilever Sign Structure ______________________________142 34.16 Other Overhead Sign Structures (Long Span, Monotube, etc.) ___________143
34.17 Traffic Control Plans ___________________________________________143 34.18 Interim Standards ______________________________________________143
34.19 GIS Data and Asset Management Requirements ______________________143 34.20 Quality Assurance / Quality Control _______________________________144 34.21 Supervision ___________________________________________________144
35 GEOTECHNICAL (optional services) __________________________________144
35.1 Document Collection and Review (Not applicable for this project) _______145 Roadway and tasks 35.2 – 35.24 are not applicable for this project. _____________145 35.2 Develop Detailed Boring Location Plan ____________________________145
35.3 Stake Borings/Utility Clearance ___________________________________145 35.4 Muck Probing _________________________________________________145 35.5 Coordinate and Develop MOT Plans for Field Investigation ____________145
35.6 Drilling Access Permits _________________________________________145 35.7 Property Clearances ____________________________________________145 35.8 Groundwater Monitoring ________________________________________146 35.9 LBR / Resilient Modulus Sampling ________________________________146 35.10 Coordination of Field Work ______________________________________146
35.11 Soil and Rock Classification - Roadway ____________________________146
35.12 Design LBR __________________________________________________146
A-30
35.21 Geotechnical Recommendations __________________________________147
35.27 Develop Detailed Boring Location Plan (Not applicable for this project)___148 35.28 Stake Borings/Utility Clearance (Not applicable for this project) _________148 35.29 Coordinate and Develop MOT Plans for Field Investigation (Not applicable for
this project)___________________________________________________149 35.30 Drilling Access Permits (Not applicable for this project) _______________149
35.31 Property Clearances (Not applicable for this project) __________________149
35.32 Collection of Corrosion Samples (Not applicable for this project) ________149 35.33 Coordination of Field Work (Not applicable for this project) ____________149
35.34 Soil and Rock Classification - Structures (Not applicable for this project) __149
35.35 Tabulation of Laboratory Data (Not applicable for this project) __________149 35.36 Estimate Design Groundwater Level for Structures (Not applicable for this
project) ______________________________________________________149
35.37 Selection of Foundation Alternatives (BDR) (Not applicable for this project)149 35.38 Detailed Analysis of Selected Foundation Alternate(s) (Not applicable for this
project) ______________________________________________________149 35.39 Bridge Construction and Testing Recommendations (Not applicable for this
35.40 Lateral Load Analysis (Optional) (Not applicable for this project) ________149 35.41 Walls (Not applicable for this project) ______________________________149
35.42 Sheet Pile Wall Analysis (Optional) (Not applicable for this project) ______149 35.43 Design Soil Parameters for Signs, Signals, High Mast Lights, and Strain Poles
and Geotechnical Recommendations (Not applicable for this project) _____149 35.44 Box Culvert Analysis (Not applicable for this project) _________________149
35.45 Preliminary Report - BDR _______________________________________149 35.46 Final Report - Bridge and Associated Walls _________________________150 35.47 Final Reports - Signs, Signals, Box Culvert, Walls, and High Mast Lights (Not
applicable for this project) _______________________________________150 35.48 SPT Boring Drafting (Not applicable for this project) __________________150 35.49 Other Geotechnical (Not applicable for this project) ___________________150
35.50 Technical Special Provisions and Modified Special Provisions (Not applicable
for this project) ________________________________________________150
35.51 Field Reviews (Not applicable for this project) _______________________150 35.52 Technical Meetings (Not applicable for this project) __________________150 35.53 Quality Assurance/Quality Control ________________________________150 35.54 Supervision ___________________________________________________150 35.55 Coordination __________________________________________________151
36 3D Modeling and tasks 36.1 – 36.9 are not applicable for this project. _______151 36.1 Phase I 3D Design Model (30% Plans) _____________________________151
A-31
36.4 Final 3D Model Design (100% Plans) ______________________________151 36.5 Cross Section Design Files_______________________________________151 36.6 Template and Assembly Development (Optional) _____________________152 36.7 Quality Assurance/Quality Control ________________________________152 36.8 Supervision ___________________________________________________152
36.9 Coordination __________________________________________________152
37.4 Correspondence _______________________________________________153 37.5 Professional Endorsement _______________________________________153
37.8 Optional Services ______________________________________________153
38 INVOICING LIMITS _______________________________________________154
HIGHWAY AND BRIDGE/STRUCTURAL DESIGN
This Exhibit forms an integral part of the agreement between the State of Florida Department of
Transportation (hereinafter referred to as the DEPARTMENT or FDOT) and
___________________________ (hereinafter referred to as the CONSULTANT) relative to the
transportation facility described as follows:
Financial Project ID: 441462 1 32 01
Federal Aid Project No.: N/A
County Section No.: 86230
BRIDGE# 860043, Broward County
Context Classification: C3C
1 PURPOSE
The purpose of this Exhibit is to describe the scope of work and the responsibilities of the
CONSULTANT and the DEPARTMENT in connection with the design and preparation of a
complete set of construction contract documents and incidental engineering services, as
necessary, for improvements to the transportation facility described herein.
Major work mix includes: Bridge-Repair / Rehabilitation
Major work groups include: 4.4 Movable Span Bridge Design
Minor work groups include: 3.2 Major Highway Design, 4.1.1 Miscellaneous Structures,
5.4 Bridge Load Rating 7.1 Signing, Pavement Marking and Channelization, 7.3
Signalization, 8.1 Control Surveying, 8.2 Design, Right of Way and Construction
Surveying, and 8.3 Photogrammetric Mapping, 9.1 Soil Exploration, 9.2 Geotechnical
Classification Lab Testing, 14.0 Architect
Known alternative construction contracting methods include: N/A
The general objective is for the CONSULTANT to prepare a set of contract documents
including plans, specifications, supporting engineering analysis, calculations and other
technical documents in accordance with FDOT policy, procedures and requirements. These
Contract documents will be used by the contractor to build the project and test the project
STAGE I FPID(S): 441462-1-32-01
A-33
components. These Contract documents will be used by the DEPARTMENT or its
Construction Engineering Inspection (CEI) representatives for inspection and final
acceptance of the project. The CONSULTANT shall follow a systems engineering process
to ensure that all required project components are included in the development of the
Contract documents and the project can be built as designed and to specifications.
The Scope of Services establishes which items of work in the FDOT Design Manual and
other pertinent manuals are specifically prescribed to accomplish the work included in this
contract, and also indicate which items of work will be the responsibility of the
CONSULTANT and/or the DEPARTMENT.
The CONSULTANT shall be aware that as a project is developed, certain modifications
and/or improvements to the original concepts may be required. The CONSULTANT shall
incorporate these refinements into the design and consider such refinements to be an
anticipated and integral part of the work. This shall not be a basis for any supplemental fee
request(s).
The CONSULTANT shall demonstrate good project management practices while working
on this project. These include communication with the DEPARTMENT and others as
necessary, management of time and resources, and documentation. The CONSULTANT
shall set up and maintain throughout the design of the project a contract file in accordance
with DEPARTMENT procedures. CONSULTANTs are expected to know the laws and rules
governing their professions and are expected to provide services in accordance with current
regulations, codes and ordinances and recognized standards applicable to such professional
services. The Consultant shall provide qualified technical and professional personnel to
perform to Department standards and procedures, the duties and responsibilities assigned
under the terms of this agreement. The Consultant shall minimize to the maximum extent
possible the Department’s need to apply its own resources to assignments authorized by the
Department.
The DEPARTMENT will provide contract administration, management services, and
technical reviews of all work associated with the development and preparation of contract
documents, including Construction documents. The Department’s technical reviews are for
high-level conformance and are not meant to be comprehensive reviews. The
CONSULTANT shall be fully responsible for all work performed and work products
developed under this Scope of Services. The DE