November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III...
Transcript of November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III...
![Page 1: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/1.jpg)
Community MeetingNovember 15, 2016
![Page 2: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/2.jpg)
Welcome!
Overview Agenda:
> 6:00 pm – 6:30 pm: Welcome, Sign-In, Open House
> 6:30 pm – 7:00 pm: Link US Presentation
> 7:00 pm – 8:00 pm: Open House
2
![Page 3: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/3.jpg)
3
Welcome!The purpose of this Community Meeting is to discuss the Link US project alternatives and
share the latest updates.
![Page 4: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/4.jpg)
Project Overview
> New expanded passenger concourse with retail and passenger amenities
> Reconfiguration of the “throat” (station entry tracks), elevation of the rail yard, run-through tracks and loop track
> Accommodation of California High-Speed Rail
> New environmental process (DEIS/DEIR)
4
![Page 5: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/5.jpg)
Project History
5
![Page 6: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/6.jpg)
Project NeedWhy Do We Need Link US?
6
![Page 7: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/7.jpg)
> LA Union Station (LAUS) is approaching operational capacity
> Ridership to grow from 110,000 to 200,000 passenger trips by 2040
> Current “stub-end” (dead end) tracks limit efficiency and station capacity
> Critical transportation needs due to increase in forecasted ridership
Project NeedWhy Do We Need Link US?
7
![Page 8: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/8.jpg)
Project LocationWhere Is Link US?
8
![Page 9: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/9.jpg)
Project BenefitsWhat Will Link US Provide?
9
![Page 10: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/10.jpg)
Project BenefitsWhat Will Link US Provide?
10
![Page 11: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/11.jpg)
Project Site Constraints
11
![Page 12: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/12.jpg)
Concept for Further Consideration Alternative 1
1214
![Page 13: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/13.jpg)
Concept for Further Consideration Alternative 2
13
![Page 14: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/14.jpg)
Concept for Further Consideration Alternative 3
14
![Page 15: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/15.jpg)
Concept for Further Consideration Alternative 4
15
![Page 16: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/16.jpg)
Environmental Process (Alternatives Analysis)How Did We Get Here?
16
Initial Screening Evaluation CriteriaMinimum Rail Operations Capacity
• Minimum number of Regional Rail tracks• Accommodation of HSR
Engineering Geometric Screening• Optimal track geometry - layout and grades• Vertical clearances over US-101 and roads• Platform lengths for Regional Rail and HSR
Environmental Screening• Consideration of historic properties• Conflicts with existing and proposed transportation facilities
Architectural Screening• Accommodation of a new passenger concourse beneath the
station
![Page 17: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/17.jpg)
Environmental Process (Alternatives Analysis)How Did We Get Here?
17
Secondary Screening Evaluation Criteria (In Progress)Structural Considerations
• Building structure in least obstructive manner• Flexibility for future expansion
Constructability Considerations• Maintain operations at LAUS during construction
Utility Impacts
Local Traffic Circulation• Parking• Consideration of other projects
Property Impacts
Additional Environmental Considerations• Environmental justice (including air quality and noise/vibration)
Project Cost
![Page 18: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/18.jpg)
World Class Transit Station
18
Preliminary Canopy Concepts (Sample Images)
DRAFT IMAGES
![Page 19: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/19.jpg)
World Class Transit StationSize Comparison: Dodger Stadium vs. LA Union Station
19
![Page 20: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/20.jpg)
Potential World Class Transit Station Opportunities
20
Conceptual Images of New and Expanded Passenger Concourse
Conceptual Images
![Page 21: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/21.jpg)
New Passenger Concourse Opportunities
21
Conceptual Key Features of New and Expanded Concourse
21
1
3
4
5
6
2
CURRENT PASSAGEWAY
NEW PASSENGER CONCOURSE
1 PASSENGER CONCOURSE & WAITING AREA
2 SIGNAGE/WAYFINDING
3 STAIRS/VERTICAL CIRCULATION
4 BAGGAGE HANDLING
5 RESTROOMS
6 SECURITY
DRAFT: Subject to Change
![Page 22: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/22.jpg)
Potential World Class Transit Station Opportunities
22Waiting Areas
Wayfinding
Vertical Circulation
Baggage Handling
Restrooms
Conceptual Key Features of New and Expanded Passenger Concourse
Sample Images
![Page 23: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/23.jpg)
Potential World Class Transit Station Opportunities
23
Public Art
Security
Retail and Food Services
Conceptual Key Features of New and Expanded Passenger Concourse
Sample Images
![Page 24: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/24.jpg)
Commercial Street CorridorExisting Conditions
24
View on Commercial Street facing west
View on Commercial Street facing east
Top-down view of Commercial Street
![Page 25: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/25.jpg)
Commercial Street CorridorPreliminary Concepts
25
Center Street facing north
View from Emergency Security Operations Center (ESOC) facing north
Conceptual Images
Commercial Street facing east
![Page 26: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/26.jpg)
Commercial Street Corridor
26
Potential Urban Design Opportunities
Underpass Park, Toronto, Canada
Sample Images
![Page 27: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/27.jpg)
Commercial Street Corridor
27
Potential Urban Design Opportunities
DRAFT - Conceptual DiagramCombination of options are being discussed with the City
![Page 28: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/28.jpg)
Commercial Street CorridorPotential Urban Design Opportunities
28Sample Images
Berlin, GermanyBerlin, Germany
![Page 29: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/29.jpg)
Planned Circulation & Active Transportation Bicycle/Pedestrian Crossing
29
> Connect US Plan
> LA River Revitalization Plan
> 2010 Bicycle Plan
> East Side Access Improvement Plan
> Civic Center Master Plan
![Page 30: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/30.jpg)
River AccessPotential Active Transportation Opportunities
30Sample Images
Rose Quarter East Bank Esplanade, Portland, OR
Bicycle Overpass, Gainesville, FL
![Page 31: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/31.jpg)
Agency CoordinationWho Is Involved?
31
California Environmental Quality Act (CEQA) Lead Agency:> Los Angeles County Metropolitan Transportation Authority (Metro)
National Environmental Policy Act (NEPA) Lead Agency: > Federal Railroad Administration (FRA)
Agency Partners (partial list):> Southern California Regional Rail Authority (SCRRA) – Metrolink> California Department of Transportation (Caltrans)> City of Los Angeles> California High-Speed Rail Authority (CHSRA)> Amtrak> Los Angeles – San Diego – San Luis Obispo Rail Corridor (LOSSAN)
LOSSAN
![Page 32: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/32.jpg)
Project Cost & Funding
32
1. Preliminary Total Project Cost: Up to $2.75 Billion
2. Status of Funding:> Environmental and Preliminary Engineering – Funded > Design and Construction – TBD
3. Potential Sources of Funding:> State and Federal Grants – TBD> High-Speed Rail – TBD> Measure M – TBD> Public-Private Partnership (P3) Opportunities – TBD
![Page 33: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/33.jpg)
Project TimelineWhat Is Next?
33
Public Involvement
Stage I
Notice of Intent/ Notice of Preparation Comment Period and
Scoping Meeting
Summer 2016
Stage II
Alternatives Analysis
Summer 2016 to Winter 2016
Stage III
Draft EIS/EIR Comment Period
Summer 2017
Stage IV
Final EIS/EIR and Record of Decision
Winter 2017
We Are Here
Tentative – Subject to Change
![Page 34: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/34.jpg)
34
Link US Community OutreachOutreach Efforts To Date
> Public Scoping Meeting: June 2, 2016
• 1 Community Meeting
> Community Organizations: May – November 2016
• 36 Community Briefings
> Next Steps
• Stakeholder Briefings: Spring/Summer 2017
• DEIS/DEIR Public Meeting: Summer 2017
![Page 35: November 15, 2016 - Link Union Station Community Meeting ......Summer 2016 to Winter 2016 Stage III Draft EIS/EIR Comment Period Summer 2017 Stage IV Final EIS/EIR and ... Spring/Summer](https://reader033.fdocuments.us/reader033/viewer/2022050114/5f4b6c56ba50cb2c4919ccf8/html5/thumbnails/35.jpg)
Thank You!
Link US Contact Information:
Jeanet Owens, Metro Senior Executive Officer – Project Management, Regional Rail
Danielle Valentino, Metro Community Relations Manager
35
213.922.2524
metro.net/linkus
facebook.com/regionalrail
Please Stay Involved!