November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden,...

27
Meeting Date: November 13 th , 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020 Water, Wastewater and Stormwater Rate Proposal Recommendation: THAT Council approve the 2020 water and wastewater rates for Middlesex Centre as recommended by BMA Management Consulting Inc. Purpose: To request Council’s approval of the 2020 water, wastewater, and stormwater rates for Middlesex Centre. Background: Under Ontario Regulation 453/07, all municipalities are required to prepare a minimum 6 year Water Financial Plan for all municipal drinking water systems. The Financial Plan must be submitted to the Ministry of Municipal Affairs and Housing and made available to the public. This regulation is part of the Province’s long term strategy to ensure that all municipal drinking water systems are financially viable. In 2015, BMA Management Consulting Inc. was engaged to undertake a Long Range Financial Plan and a Water/Wastewater Rate Study. These two reports were approved by Council on December 2, 2015 and January 20, 2016 respectively from which new rates were established for 2016. Additionally, in 2016, departmental administration staff prepared and tabled a report before Council on April 20, 2016 recommending and ultimately leading to the Municipality making the decision to terminate its servicing contract with American Water Canada and electing to bring the operations of the Municipality’s water and wastewater systems inhouse on November 1, 2016. This new approach was endorsed by Council. In 2016, BMA Management Consulting Inc. was again engaged by departmental administration staff to undertake a stormwater financial review to fund its stormwater management program and to make recommendations in the recovery of stormwater management costs based on best practice research. BMA was also tasked with calculating a proposed rate using the 2016 Operating and Capital Budget provided by the November 13, 2019 Page 1 of 27

Transcript of November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden,...

Page 1: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Meeting Date: November 13th, 2019

Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering

Report No: PWE 34-2019

Subject: 2020 Water, Wastewater and Stormwater Rate Proposal

Recommendation:

THAT Council approve the 2020 water and wastewater rates for Middlesex Centre as recommended by BMA Management Consulting Inc.

Purpose:

To request Council’s approval of the 2020 water, wastewater, and stormwater rates for Middlesex Centre.

Background:

Under Ontario Regulation 453/07, all municipalities are required to prepare a minimum 6 year Water Financial Plan for all municipal drinking water systems. The Financial Plan must be submitted to the Ministry of Municipal Affairs and Housing and made available to the public. This regulation is part of the Province’s long term strategy to ensure that all municipal drinking water systems are financially viable.

In 2015, BMA Management Consulting Inc. was engaged to undertake a Long Range Financial Plan and a Water/Wastewater Rate Study. These two reports were approved by Council on December 2, 2015 and January 20, 2016 respectively from which new rates were established for 2016. Additionally, in 2016, departmental administration staff prepared and tabled a report before Council on April 20, 2016 recommending and ultimately leading to the Municipality making the decision to terminate its servicing contract with American Water Canada and electing to bring the operations of the Municipality’s water and wastewater systems in‐house on November 1, 2016. This new approach was endorsed by Council.

In 2016, BMA Management Consulting Inc. was again engaged by departmental administration staff to undertake a stormwater financial review to fund its stormwater management program and to make recommendations in the recovery of stormwater management costs based on best practice research. BMA was also tasked with calculating a proposed rate using the 2016 Operating and Capital Budget provided by the

November 13, 2019 Page 1 of 27

Page 2: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Municipality. At such time, the recommended and Council endorsed funding approach for stormwater management operating and infrastructure lifecycle costs as detailed in BMA’s report was a flat rate per property. It was further recommended and endorsed that a threshold be established at 0.4 hectares (1 acre) for industrial, commercial and institutional properties whereby a flat monthly rate is charged to all properties, consistent with the flat rate for the residential class plus an incremental per hectare rate for hectares exceeding the threshold. The 2016 rate was based on current operating costs with an annual contribution to reserves for lifecycle infrastructure funding.

The Municipality's existing rate structure includes a uniform volumetric rate structure, a minimum by-monthly fee, a seasonal water rate for residential customers and a fixed infrastructure lifecycle rate. The Municipality’s water, wastewater, and stormwater rates have been frozen since 2016. The following summarizes the existing water and wastewater rates:

2019 Water Wastewater Total Fixed Monthly Charge $22.76 $29.30 Water Usage Charge (Volumetric) 0-8 m3 No additional charge Water Usage Charge per m3 for consumption exceeding 8 m3

$2.84 $3.66

Infrastructure Lifecycle Reserve Fund Charge based on Meter Size - Monthly

5/8” $18.00 $17.32 3/4” $27.00 $25.98 1” $45.00 $43.30

1.5” $90.00 $86.61 2” $144.00 $138.57

The following summarizes the existing stormwater rates:

2019 Rate Monthly rate for all customers $14.88 For Industrial, Commercial and Institutional Customer with properties larger than 0.4 hectares an additional monthly charge applies Monthly ICI Land area above 0.4 hectares per hectare

$42.18

BMA Management Consulting Inc., hereinafter referred to as BMA, was retained by administration staff to undertake a review of the existing water and wastewater rate structure for 2020.

November 13, 2019 Page 2 of 27

Page 3: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Analysis:

BMA Management Consulting Inc. was engaged by the Municipality of Middlesex Centre to review and update the existing water, wastewater and storm rates for 2020. This report is not intended to provide a long range financial plan but has been undertaken to calculate the rates using the 2020 Operating and Capital Budget. Over the next year, municipal staff will undertake a long term view of the future financial requirements to ensure revenue stability and financial sustainability.

The existing rate structure supports the goals and objectives of the Municipality and a detailed review of the rate structure was undertaken several years ago. As such, consideration of alternative rate structures was not undertaken for the calculation of 2020 rates.

The aforementioned analysis was undertaken using the most current information available to the Municipality including:

Customer account information by meter size; Current 3-year consumption trend information; 2020 Draft Operating Budgets; and, 5-year Capital Budget and Asset Management Plan

The following table provides the respective 2019/2020 opening and projected ending reserve balances:

2019 Opening Balance

2019 Projected Ending Balance

2020 Projected Ending Balance

Wastewater Reserve $1,806,189 $1,375,459 $1,260,978 Water Reserve $2,261,267 $504,523 ($2,511,131) Stormwater Reserve $1,372,687 $1,435,693 $904,771

Water, wastewater and stormwater fees have not been increased in four years as there were efficiencies created in the operations which helped absorb inflationary increases. However, it is important, at this time, to ensure that financial sustainability goals are maintained in terms of adequate contributions to reserves in relation to the future capital program to ensure the timely replacement of assets as they come due for replacement as well as the need to fund the growth‐related costs that are not recoverable from DCs.

Middlesex Centre continues to be faced with the challenge of costly water and wastewater systems to operate with relatively fewer customers to support these costs. The Long Range Financial Plan recommended eliminating the annual funding gap in water by approximately 2025 and 2027 in wastewater.

Based on the recommendations as detailed in BMA's 2015 Long Range Financial Plan, the annual rate increases for water and wastewater were projected at 3.5% and 4% respectively. Compounding these rates over 4 years from 2016 to 2020 would

November 13, 2019 Page 3 of 27

Page 4: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

result in rates 2020 water and wastewater rates which would be 14.8% and 17.0%, respectively, higher than the 2016 rates.

The proposed rate changes for 2020 include a 5.5% rate increase in water fixed monthly and volumetric, with no increase in the Infrastructure Lifecycle Reserve. Based on the existing assumptions, the wastewater rates can remain at the 2019 levels but a rate increase may be warranted in future years. A 3.3% rate increase is recommended for Stormwater based on the assumptions included in BMA’s report.

Although a 5.5% increase in the water rate is significant it is far less than the 14.8% originally projected over the 4-year period. The blended increase across water, wastewater and storm water will generally be in the range of 1.7% to 2.0% depending upon consumption.

Accordingly, the proposed 2020 water and wastewater rates are as follows:

2020 Water Wastewater Total Fixed Monthly Charge $24.01 $29.30 Water Usage Charge (Volumetric) 0-8 m3 No additional charge Water Usage Charge per m3 for consumption exceeding 8 m3

$3.00 $3.66

Infrastructure Lifecycle Reserve Fund Charge based on Meter Size - Monthly

5/8” $18.00 $17.32 3/4” $27.00 $25.98 1” $45.00 $43.30

1.5” $90.00 $86.61 2” $144.00 $138.57

The following summarizes the proposed stormwater rates:

2020 Rate Monthly rate for all customers $15.37 For Industrial, Commercial and Institutional Customer with properties larger than 0.4 hectares an additional monthly charge applies Monthly ICI Land area above 0.4 hectares per hectare

$43.57/ha

There are a number of sources which are used in the industry to establish a benchmark upon which affordability is measured. The most common approach is water/wastewater costs as a percentage of average household income. Based on the analysis undertaken, the Municipality of Middlesex Centre is below the affordability threshold. Depending on the source used, the range typically is from 1.5% to 3.0% of household income, beyond which, affordability is questionable.

The water/wastewater costs in Middlesex Centre as a percentage of household

November 13, 2019 Page 4 of 27

Page 5: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

income in 2019 is 1.2%, below the 1.3% average of peer municipal comparators in Southwest Ontario (range 0.8% to 1.9%).

Financial Implications:

The residential rate for water will increase from $2.84/m3 to $3.00/m3, however, the rate for wastewater will remain unchanged. The rate for stormwater will increase from $14.88/lot to $15.37/lot.

Water and Wastewater Rates

Based on the budget and the number of customers, the water rate for 2020 would be increased by 5.5% and would result in an estimated $1,545,245 contribution to the water reserve fund balance as proposed in the draft 2020 Operating budget. This reflects an approximate 5% increase in contribution to the reserve fund over the 2019 projection. The wastewater rate for 2020 will be held at the 2016 rate but due to growth and a reduction in interest payments, the forecast 2020 contribution to the wastewater reserve fund is $1,202,447 (a 3% increase of the 2019 projection). This growth in reserve funds is the minimum required to adequately support future capital requirements.

It is noted that the contributions to the reserve funds have increased significantly since 2015. The 2020 projection for water reserve contribution is nearing the recommended contribution of $1,592,000 (in 2015 $) identified in the existing Asset Management Plan. After correction due to inflation, it is estimated that the water reserve fund transfer will be about 90% of the recommended value in 2020. However, the 2020 projection for wastewater reserve contribution amount is only about 50% (inflation corrected) of the recommended contribution of $2,229,000 (in 2015 $) identified in the existing Asset Management Plan. BMA had projected the contributions for wastewater would take longer to reach the intended targets (est. 2027) and the 2020 contribution level is on target to meet that goal.

Maintaining the existing water rates would decrease the projected transfer to the water reserve fund by about $110,000 in 2020.

Stormwater Rates

Based on the budget and the number of customers, the stormwater rate for 2020 would be slightly increased and would result in a $429,743 contribution to the stormwater reserve fund balance as proposed in the draft 2020 Operating budget. This reflects an approximate 20% increase in contribution to the reserve fund over the 2019 projection. This is in order to adequately support the capital requirements which are expected to increase over the next four years.

Maintaining the existing stormwater rates would decrease the projected transfer to reserve fund by about $26,000 in 2020.

Conclusion

November 13, 2019 Page 5 of 27

Page 6: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Based upon the aforementioned analysis undertaken by BMA Management Consulting Inc., departmental administrative staff are supportive of freezing the wastewater rates for 2020 (to the 2016 rate) but increasing the water and stormwater rates for 2020 as identified.

Strategic Plan:

The aforementioned recommendation will ensure the Municipality’s continued delivery of safe potable drinking water, wastewater, and stormwater services to residents, the ongoing approach to reduce cost of service, and its goal of delivering affordable sustainable services for generations to come.

Middlesex Centre`s 2012 - 2017 Strategic Plan, identified four applicable strategic themes as Maintain Financial Integrity, Manage Costs, Manage Reserves, and Environmental Sustainability.

Attachments:

BMA Water, Wastewater and Storm – 2020 Rate Review

November 13, 2019 Page 6 of 27

Page 7: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Water, Wastewater and Storm 2020 Rate Review

Municipality of Middlesex Centre

Management Consulting Inc.BMA

November 13, 2019 Page 7 of 27

Page 8: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Water and Wastewater Rate Structure Report 

20

Table of Contents 

 

 

Introduction—Water, Wastewater and Storm Rate Structure Report 1

Establishing the Municipality’s Water and Wastewater Rates 1

Water, Wastewater and Storm Rate and Financial Plan Goals and Objectives 2

Sources of Data Used to Calculate Rates 3

2016‐2019 Water and Wastewater Rates  5

2019 Existing Water and Wastewater Rate Structure  6

2016‐2019 Stormwater Rates  7

Affordability 8

Reserve Strategies 9

2020 Water Operating Budget 11

2020 Wastewater Operating Budget 12

2020 Storm Water Operating Budget 13

2020‐2022 Water Capital Budget 14

2020‐2021 Wastewater Capital Budget 15

2020‐2022 Storm Water Capital Budget 16

Key Challenges and Opportunities 17

Proposed 2020 Water, Wastewater and Storm Rates  18

Residential Impact Analysis 19

November 13, 2019 Page 8 of 27

Page 9: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Water and Wastewater Rate Structure Report 

1

Introduction—Water, Wastewater and Storm Rate Structure Report 

BMA Management Consulting  Inc. was engaged by  the Municipality of  Middlesex  Centre  to  review  and  update  the  existing  water, wastewater and storm rates for 2020.  This report is not intended to provide  a  long  range  financial  plan  but  has  been  undertaken  to calculate the rates using the 2020 Operating and Capital Budget.  As will be discussed in this report, there is a need over the next year to undertake a  long  term view of  the  future  financial  requirements  to ensure revenue stability and financial sustainability.   

As will be discussed in this report, the existing rate structure supports the goals and objectives of the Municipality and a detailed review of the  rate  structure  was  undertaken  several  years  ago.    As  such, consideration  of  alternative  rate  structures was  not  undertaken  for the calculation of 2020 rates. 

The  2020  rates  have  been  calculated  using  the  most  current information available to the Municipality including: 

Customer account information by meter size 

3‐year consumption trend information 

2020 Draft Operating Budget 

2020 Capital Budget  

Establishing the Municipality’s Water and Wastewater Rates 

Despite industry trends in water, wastewater and storm rates, as stated by the Canadian Water and Wastewater Association (CWWA), there is, and always will be, a lot of variation in rate setting  practices  given  that  there  is  no  single  rate  setting approach or rate structure.   

The approach undertaken by each municipality is to establish goals  and  objectives  and  examine  various  rate  structures  in relation to these goals and objectives.  

Goals and objectives have been included on the next page to reflect  key  considerations  that municipalities  use  to  develop their  respective  rate  structure.    This  is  consistent  with information  presented  to Middlesex  Centre  in  previous  rate and long range financial planning reviews. 

 

November 13, 2019 Page 9 of 27

Page 10: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Water and Wastewater Rate Structure Report 

2

Goal and Objective  

Description 

Financial Sustainability  

Revenues collected for the provision of services will be used to meet the needs of these services.  Life‐cycle planning and asset management  planning  are  key  inputs  to  the  development  of  the  Financial  Plan  and will  ensure  that  sustainable  levels  of revenue are available to meet or exceed environmental protection standards, while providing sufficient resources for future rehabilitation and replacement needs. 

Revenue Stability  

The  rate  structure  and  financial  plan  should  provide  for  a  steady  and  predictable  stream  of  revenues  such  that  the Municipality is capable of meeting its current financial requirements.  To the extent possible, cash flows should be matched with  expenditures.    Any  rate  setting  practice  employed  or  financial  plan  developed  will  consider  the  impact  on  revenue stability and take the appropriate actions to maintain/improve revenue stability. 

Fairness and Equity  

The rate structure and financial plan should ensure that customers are contributing equitably towards revenue requirements.  Equity should be based on the user pay principle.     Fair sharing in the distribution of resources between current and future ratepayers will be employed. 

Affordability   The  rate  structure  should  incorporate  policies  that  support  affordable water  services  for  all  customers while,  at  the  same time, ensuring that the full cost of service is being recovered.   

Conservation   The rate structure should encourage the efficient and justifiable use of water as well as assist  in managing system demand.  Programs that promote efficient water usage may reduce operating costs and capital investment needs over time.  Less water consumed will result in deferral of plant expansions, thereby avoiding capital expenditures for all customers.  

Practical   The rate structure should support principles of fairness and equity but, at the same time, it should be simple to understand, rational and easy to update and administer.    

Water, Wastewater and Storm Rate and Financial Plan Goals and Objectives 

 

November 13, 2019 Page 10 of 27

Page 11: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Water and Wastewater Rate Structure Report 

3

Sources of Data Used to Calculate Rates 

Reserves—Water/WW  and  Stormwater  Reserve  year  end balances  were  provided  from  2011‐2018  and  projected  closing 2019 balances which  takes  into consideration any commitments from previous years.  This will be shown later in the report. 

Operating  Budget—The  Municipality’s  2020  Draft  Operating Budgets  for  Water,  Wastewater  and  Stormwater.    Details  are provided later in the report. 

Capital  Budget—The  proposed  2020  Capital  Budget  included sources of  financing.   A summary of the Capital Budget over 2‐4 years, based on service has been included in the report to provide an  understanding of the future capital requirements.  

Historical Rates—A review was undertaken of the historical rates to gain perspective into the strategies that have been deployed to support  financial  sustainability.   A  four  year historical  rate  table has  been  included  for  each  service  which  reflects  0%  increases during this timeframe.  

 

 

Water Consumption—Consumption trends were provided for 2016‐2018 as well as a forecast consumption for 2019 by the Municipality  to  determine  an  appropriate  assumption  with respect  to  rate  setting.    This  is  important  to  consider  in establishing  future  rates  and  revenue  stability.    As  shown below,  the  consumption  varies  annually  due  to  changes  in weather  conditions as well  as  growth.    The approach was  to use a three year average to establish the base consumption. 

 

 

 

 400,000

 450,000

 500,000

 550,000

 600,000

 650,000

 700,000

2016 2017 2018 2019

Billable Consumption  (m3)

November 13, 2019 Page 11 of 27

Page 12: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Water and Wastewater Rate Structure Report 

4

Customer  Accounts  and  Meters  by  Size—The  Municipality provided customer account information by meter size for 2019.  A 1% increase  in the number of residential customers was used to calculate the 2020 rates.  

 

 

 

 

 

 

Storm Sewer Accounts 

The following summarizes the 2019 customers which includes the  storm customers with no water meter.  This table also reflects the number of customers to align with the existing rate structure.  

Debt    ‐ Middlesex  Centre    has  existing  debt  associated with Water and Wastewater operations,  some of which  is  related to growth and will be repaid  from the DC Reserve Funds.    In 2020,  the  following  summarizes  the  total  debt  charges,  the amount to be recovered from DC Reserve Funds and the Debt Charges as a percentage of Own Source Revenues. 

As shown above, the 2020 net debt charges as a percentage of own source revenues is 5.3% on a consolidated basis which is reasonable.   

There is currently no debt associated with Storm operations.   

The  majority  of  the  existing  debt  charges  in  wastewater  is attributed to growth and recovered from DCs. 

2020 Debt Charges

Debt Recovered from DC 

Reserve Fund

Net Debt Charges from 

RatesDebt Charges as a % of OSR

Water 322,803$        (161,402)$     161,402$       5.2%

WW 675,709$        (468,954)$     206,755$       6.8%

Storm ‐$                 ‐$               ‐$               ‐$                

Total 998,512$        (630,356)$     368,157$       5.3%

2019 2020Water Accounts5/8" 3,599       3,636      3/4" 4               4              1" 26            26           1.5" 22            22           2" 20            20           Total 3,671      3,708     

2019 2020Wastewater Accounts5/8" 2,820       2,850      3/4" 4               4              1" 20            20           1.5" 17            17           2" 15            15           Total 2,876      2,906     

2019 # customers# of 

hectaresless than .4 h 4,474           customers greater than 0.4 57                 over .4 h 93               

November 13, 2019 Page 12 of 27

Page 13: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Water and Wastewater Rate Structure Report 

5

2016‐2019 Water and Wastewater Rates  

The following table summarizes Middlesex Centre’s 2016‐2019 water and wastewater rates.  

 Water 2016 2017 2018 2019Total Fixed Monthly Water Charge 22.76$            22.76$          22.76$         22.76$        

Water Usage Charge (Volumetric) 0‐8 m3

 no additional charge 

 no additional charge 

 no additional charge 

 no additional charge 

Water Usage Charge (Volumetric) per m3 for consumption exceeding  2.84$                2.84$            2.84$            2.84$           

05/8" 18.00$             18.00$          18.00$          18.00$         3/4" 27.00$             27.00$          27.00$          27.00$         1" 45.00$             45.00$          45.00$          45.00$         1.5" 90.00$             90.00$          90.00$          90.00$         2" 144.00$           144.00$        144.00$        144.00$       

Water Infrastructure Lifecycle Reserve Fund Charge based on 

Meter Size ‐ Monthly

Wastewater 2016 2017 2018 2019Total Fixed Monthly Wastewater Charge 29.30$             29.30$          29.30$          29.30$         

Wastewater Usage Charge (Volumetric) 0‐8 m3

 no additional charge 

 no additional charge 

 no additional charge 

 no additional charge 

Wastewater Usage Charge (Volumetric) per m3 for consumption exceeding 8 m3 3.66$                3.66$            3.66$            3.66$           

5/8" 17.32$             17.32$          17.32$          17.32$         3/4" 25.98$             25.98$          25.98$          25.98$         1" 43.30$             43.30$          43.30$          43.30$         1.5" 86.61$             86.61$          86.61$          86.61$         2" 138.57$           138.57$        138.57$        138.57$       

Wastewater Infrastructure Lifecycle Reserve Fund Charge based on 

Meter Size ‐ Monthly

November 13, 2019 Page 13 of 27

Page 14: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Water and Wastewater Rate Structure Report 

6

2019 Existing Water and Wastewater Rate Structure  

The Municipality has a three part rate structure;  

Minimum Monthly  Fee—Consumers  are  charged  a minimum of  $22.76 monthly  for water  and  $29.30 monthly  for wastewater  (this  is equivalent to a usage of 8 m3  every month).  This threshold approximately reflects a minimum level to support basic indoor water usage.  This ensures that all customers are contributing toward the fixed costs of the system.  It also provides a revenue cushion that is unaffected by variations in use.   

Uniform Water and Wastewater Volumetric Rates—Middlesex Centre employs a uniform rate structure whereby all customers pay the same amount per m3 .  This is the most common approach employed across Ontario and supports fairness and equity.   

Infrastructure  Lifecycle Reserve  Fund Fixed  Fee—Consistent with the experience across Ontario, Middlesex Centre has an infrastructure deficit in water and wastewater operations.  To help address this challenge and to move toward financial sustainability, Middlesex Centre instituted  a  dedicated  fixed  charge  for  infrastructure  lifecycle  funding  of  $18 monthly  for water  and  an  additional  $17.32 monthly  for wastewater (these vary based on size of meter).   

 

It  should be noted  that  the  fees have not  been  increased  in  four  years  as  there were efficiencies created  in  the operations which helped absorb  inflationary  increases.   However,  it  is  important, at this time, to ensure that financial sustainability goals are maintained  in terms of adequate contributions to reserves in relation to the future capital program to ensure the timely replacement of assets as they come due for replacement as well as the need to fund the growth‐related costs that are not recoverable from DCs.  

The analysis  contained  in  this  report  includes  a  review of  the operating  costs,  reserve position,  future  capital  requirements  and growth  in customers to calculate the 2020 recommended rates. 

November 13, 2019 Page 14 of 27

Page 15: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Water and Wastewater Rate Structure Report 

7

2016‐2019 Stormwater Rates  

In 2016 a storm utility rate structure was established, consistent with the practices in many municipalities to ensure sufficient funding for this capital infrastructure. 

The rate structure is a flat monthly rate for all customers. 

For customer in the ICI sector with properties exceeding 0.4 hectares, an additional incremental per hectare rate is charged. 

Note that the rate structure has not been changed since it was implemented in 2016 as extensive analysis was undertaken at that time to determine the most appropriate rate structure. 

Note also, consistent with the water and wastewater rates, no  increases have been made to the Stormwater rates over the past  four years. 

The analysis contained in this report includes a review of the operating costs, reserve position, future capital requirements and growth in customers to calculate the 2020 recommended rates. 

Stormwater 2016 2017 2018 2019

Base monthly rate for all properties within settlement areas.14.88$                               14.88$                               14.88$                               14.88$                              

Industrial, Commercial and Institutional ( ICI) customers defined using the property code classification system provided by the Municipal Property Assessment Corporation with properties larger property than 0.4 hectares an additional monthly charge applies

$14.88 per property + $42.18 per hectare above threshold

$14.88 per property + $42.18 per hectare above threshold

$14.88 per property + $42.18 per hectare above threshold

$14.88 per property + $42.18 per hectare above threshold

November 13, 2019 Page 15 of 27

Page 16: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Water and Wastewater Rate Structure Report 

8

Affordability 

Ratepayer  affordability  has  been  taken  into  consideration.    This compares the cost of water/ww services in relation to household income for 2019.   

There are a number of sources which are used in the industry to establish a benchmark upon which affordability is measured.  The most  common  approach  is  water/wastewater  costs  as  a percentage  of  average  income.    The  threshold  value,  which  is expressed  as  a  percent,  is  applied  to  a  measure  of  income  to determine  the  point  at  which  the  cost  of  water/wastewater becomes unaffordable.   

There  is  no  one  benchmark  percentage  established  in  the industry.    Depending  on  the  source  used,  the  range  typically  is from  1.5%‐3.0%  of  household  income,  beyond  which, affordability is questionable. 

While  the  total water/ww cost of  service  in Middlesex Centre  is amongst the highest in the survey, the income levels are also high resulting in an affordability metric below the survey average. 

As shown in the graph, using this affordability metric, Middlesex Centre’s  at  1.2%  is  the  below  the  survey  of  peer  municipal comparators  (1.3%)  in  Southwest  Ontario  reflecting  a  greater affordability.   

 

 

 

 

0.0% 0.2% 0.4% 0.6% 0.8% 1.0% 1.2% 1.4% 1.6% 1.8% 2.0%

Waterloo

Saugeen Shores

Guelph

Guelph‐Eramosa

Strathroy‐Caradoc

London

Sarnia

Haldimand

Brantford

North Perth

Cambridge

Centre Wellington

Kitchener

Middlesex Centre

Grey Highlands

Brant

North Middlesex

Mapleton

St. Thomas

Ingersoll

Norfolk

Chatham‐Kent

Wellington North

Central Elgin

Lambton Shores

Windsor

Owen Sound

Minto

West Grey

Meaford

2019 Affordability

Affordability

November 13, 2019 Page 16 of 27

Page 17: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Water and Wastewater Rate Structure Report 

9

Reserve Strategies 

Adequate  reserves  are  important  to  mitigate  the  Municipality’s financial risk and to strengthen the Municipality’s ability to withstand negative  impacts  on  revenues  from  economic  fluctuations  and unforeseen expenditure  requirements.    Reserves  and  reserve  funds are  accumulated  net  revenues  which  are  set  aside  for  future expenditures.  Reserves and reserve funds are a critical component of a  municipality’s  long‐term  financing  plan.    The  importance  of maintaining reserves is to: 

Provide  stability of  rates and user  fees  in  the  face of  variable and uncontrollable  factors  (e.g.  interest  rates,  changes  in  subsidies, increase in fuel prices, weather); 

Provide financing for one‐time or short‐term requirements without permanently impacting the utility rates; 

Make  provisions  for  acquisition  and  replacement  of  assets  and infrastructure that are currently being consumed and depreciated; 

Avoid  spikes  in  funding  requirements  of  the  capital  budget  by reducing reliance on long‐term debt borrowing; 

Provide a source of internal financing; 

Ensure adequate cash flows; 

Provide  flexibility  to  manage  debt  levels  and  protect  the municipality’s financial position; and 

 

As shown on the next page, through planned contributions to the  Capital  Reserves,  the  consolidated  Water,  Wastewater and Storm Capital Reserves were negative $1.7 million in 2011 compared with a year end balance of $5.4 million in 2018.   

Taking  into  consideration  the  2019  Capital  Budget  and  prior year commitments,  the 2019 projected consolidated Reserve balance  is $3.3 million.  

As  will  be  discussed  in  the  Capital  Budget  section  of  the report, with large capital projects pending in 2020‐2022, there will  be  a  significant  draw on  the  combined Capital  Reserves.  This will  require  the  issuance of debt as early as 2020 which will impact future water/ww and storm rates.  

As shown earlier, there is sufficient flexibility to  issue debt  in future years but  this needs  to be  taken  into consideration  in the establishment of future rates.   

 

 

 

November 13, 2019 Page 17 of 27

Page 18: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Water and Wastewater Rate Structure Report 

10

Year End Reserve Trend Analysis 

 

 

 

 

 

 

 

 

 

 

 

 

 

As shown above, after years of building the Capital Reserves, it is anticipated that the combined Capital Reserves will be in a negative cash flow position by the end of 2020.  This will require the issuance of future debt. 

 $(3,000,000)

 $(2,000,000)

 $(1,000,000)

 $‐

 $1,000,000

 $2,000,000

 $3,000,000

 $4,000,000

 $5,000,000

 $6,000,000

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Water Capital Reserves WW Capital Reserves Storm Water Capital Reserves Total

November 13, 2019 Page 18 of 27

Page 19: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Water and Wastewater Rate Structure Report 

11

2020 Water Operating Budget 

 

 

 

 

 

 

 

 

 

 

 

The 2020 Water Operating Budget reflects a 5.5% increase in rate revenue requirements compared to 2019. 

Contributions to capital reserves and debt charges accounts for 48% and 10% respectively of the 2020 Operating expenditures. 

Contributions to reserves is budgeted to increase 5% over the 2019 budget.  This is required, as a minimum in order to adequately support the future capital requirements. 

Water Operating 2019 2020ExpendituresOperating Expenditures

Salaries, Wages & Benefits 346,786$           393,180$          Water Purchase 456,000$           465,120$          Hydro 152,424$           156,157$          Contracts ‐$                   ‐$                  Other Expenses 323,518$           358,497$          

Total Operating Expenses 1,278,728$        1,372,955$       Financial Expenditures

Debt Charges ‐ Interest Payments ‐ Existing 106,436$           98,361$            Debt Charges ‐ Principal Payments ‐ Existing 224,442$           224,442$          Transfer to Reserves 1,472,447$        1,545,245$       

Total Financial Expenses 1,803,325$        1,868,048$       Total Expenses 3,082,053$        3,241,003$       RevenuesOperating Revenues

Metered Water Revenue (1,984,996)$      (2,098,194)$     Infrastructure Lifecycle Reserve (820,000)$          (860,687)$         Transfer from DC Reserves ‐ Debt (165,439)$          (161,402)$         Other Service Charges (111,618)$          (120,721)$         

Total Operating Revenues (3,082,053)$      (3,241,003)$     Total Revenues (3,082,053)$      (3,241,003)$     

November 13, 2019 Page 19 of 27

Page 20: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Water and Wastewater Rate Structure Report 

12

2020 Wastewater Operating Budget 

 

 

 

 

 

 

 

 

 

 

The 2020 Wastewater Operating Budget reflects a 2.1% increase in rate revenue requirements compared to 2019. 

Contributions to capital reserves and debt charges accounts respectively for 39% and 22% of the 2020 Operating expenditures. 

Contributions to reserves is budgeted to increase 3% over the 2019 budget.  This is required, as a minimum, in order to adequately support the capital requirements over the next several years. 

Wastewater 2019 2020ExpendituresOperating Expenditures

Salaries, Wages & Benefits 346,786$          393,180$         Hydro 153,176$          151,745$         Contracts ‐$                  ‐$                 Other Expenses 569,820$          622,364$         

Total Operating Expenses 1,069,782$      1,167,289$     Financial Expenditures

Debt Charges ‐ Interest Payments ‐ Existing 282,553$          267,736$         Debt Charges ‐ Principal Payments ‐ Existing 536,311$          407,972$         Transfer to Reserves 1,168,029$      1,202,447$     

Total Financial Expenses 1,986,894$      1,878,156$     Total Expenses 3,056,675$      3,045,445$     RevenuesOperating Revenues

Metered WW Revenue (1,800,000)$     (1,817,333)$    Infrastructure Lifecycle Reserve (618,747)$        (652,462)$       Transfer from DC Reserves ‐ Debt (556,407)$        (468,954)$       Other Service Charges (81,521)$           (106,696)$       

Total Operating Revenues (3,056,675)$     (3,045,445)$    Total Revenues (3,056,675)$     (3,045,445)$    

November 13, 2019 Page 20 of 27

Page 21: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Water and Wastewater Rate Structure Report 

13

2020 Storm Water Operating Budget 

 

 

 

 

 

 

 

 

 

 

The 2020 Storm Water Operating Budget reflects a 7.5% increase in rate revenue requirements over the 2019 budget. 

Contributions to capital reserves and maintenance accounts for 48% and 47% of the 2020 Operating expenditures respectively. 

Contributions to reserves  is budgeted to  increase 20% over the 2019 budget.   This  is  required  in order to adequately support the capital requirements which are expected to increase over the next four years. 

Storm Water 2019 2020ExpendituresOperating Expenditures

Salaries, Wages & Benefits 25,969$          16,626$       Consulting 27,000$          27,000$       Storm Water System Maintenance 410,000$        425,000$     Other Expenses 500$                ‐$              

Total Operating Expenses 463,469$        468,626$     Financial Expenditures

Debt Charges ‐ Interest Payments ‐ Existing ‐$                ‐$              Debt Charges ‐ Principal Payments ‐ Existing ‐$                ‐$              Transfer to Reserves 359,611$        429,743$     

Total Financial Expenses 359,611$        429,743$     Total Expenses 823,080$        898,369$     RevenuesOperating Revenues

Stormwater Surcharge (822,480)$       (884,368)$    New Service Connections (600)$              (14,000)$      Transfer from DC Reserves ‐ Debt ‐$                ‐$              Other Service Charges ‐$                ‐$              

Total Operating Revenues (823,080)$       (898,368)$    Total Revenues (823,080)$       (898,368)$    

November 13, 2019 Page 21 of 27

Page 22: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Water and Wastewater Rate Structure Report 

14

2020‐2022 Water Capital Budget 

Note that the Water Capital Budget provided is for 2020‐2022 in water which poses some challenges in terms of planning for the future rate requirements.  The Water Capital Budget includes the following: 

$3.5 million in 2020 for the Water Supply Interconnection Phase 2 of which 90% is estimated to be recovered from rates with the remaining 10% from DC revenues. 

$1.495 million for the Lake Huron Primary Water Supply Connection in 2021‐2022. 

Over  the next  three years, 95% of  the $7.4 million  is  related  to existing assets  that will be  funded  from rates, either  through the Capital  Reserve  or  debt  financing.    Based  on  the  analysis  from  2020‐2022,  in  consideration  of  the  total  consolidated  reserves available and existing rates, there will be a need to issue some debt to support the plan. 

 

System Water Capital Projects2020 + 

Carryover2021 2022 Total 3 years

Reserves Financing

DC Financing $ Other

DELAWARE Water Supply Interconnection Phase 2 3,500,000$      ‐$                  ‐$                3,500,000$            3,143,000$     357,000$            ‐$            

ARVA Water main replacement & twinning  913,050$          ‐$                  ‐$                913,050$               913,050$        ‐$                     ‐$            

ILDERTON Watermain Replacement Program ‐$                  ‐$                  500,000$        500,000$               500,000$        ‐$                     ‐$            

KOMOKA Servicing of Tunks Lane 150,000$          ‐$                  ‐$                150,000$               150,000$        ‐$                     ‐$            

KILWORTH Glendon Drive Water main Extension ‐$                  440,000$          ‐$                440,000$               440,000$        ‐$                     ‐$            

MELROSE Lake Huron Primary Water Supply Connection ‐$                  495,000$          1,000,000$     1,495,000$            1,495,000$     ‐$                     ‐$            

MELROSE Facility Condition Assessment  98,010$            ‐$                  ‐$                98,010$                 98,010$          ‐$                     ‐$            

BIRR Facility Condition Assessment  63,840$            ‐$                  ‐$                63,840$                 63,840$          ‐$                     ‐$            

ALL SYSTEMS Half‐Ton Pickup ‐ Replace 2010 Econoline 4301 24,000$            ‐$                  ‐$                24,000$                 24,000$          ‐$                     ‐$            

ALL SYSTEMS SCADA Replacement 120,319$          ‐$                  ‐$                120,319$               120,319$        ‐$                     0$                

ALL SYSTEMS Reservoir Cleaning & Inspections 43,984$            ‐$                  ‐$                43,984$                 43,984$          ‐$                     ‐$            

TOTAL Total 4,913,203$     935,000$         1,500,000$    7,348,203$           6,991,203$    357,000$            0$               

November 13, 2019 Page 22 of 27

Page 23: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Water and Wastewater Rate Structure Report 

15

2020‐2021 Wastewater Capital Budget 

Note that the Capital Budget in wastewater is only a two year forecast which poses some challenges in terms of planning for the future rate requirements.  The Water Capital Budget includes the following: 

$3.4 million  in  2021  for  the WWTP Head Works  and  Tertiary  Filter  of which  40%  is  estimated  to  recovered  from  rates with  the remaining 60% from DC revenues. 

Over  the next  two  years,  80% of  the  $7.8 million  is  related  to  existing  assets  that will  be  funded  from  rates,  either  through  the Capital Reserve or debt  financing.   Based on  the analysis above,  in consideration of  the  total  consolidated  reserves available and existing rates, there will be a need to issue some debt to support the plan. 

System Project2020 + 

Carryover2021 Total 2 years

Reserves Financing

DC Financing $ Other

ARVA Arva WWTF ‐ New Facility 300,000$        ‐$                300,000$              ‐$                        300,000$                ‐$                       

ILDERTON Ilderton Wastewater Collection System Inspection  61,500$          ‐$                61,500$                 61,500$                  ‐$                        ‐$                       

ILDERTON Sewage Pump Station #4 ‐ Installation of new sewage pumps  19,867$          ‐$                19,867$                 19,867$                  ‐$                        0$                           

KILWORTH Demolishing of the Kilworth WPCP 1,070,000$     ‐$                1,070,000$           224,700$                845,300$                ‐$                       

KOMOKA Upgrade Pumping Station ‐$                400,000$        400,000$              228,800$                171,200$                ‐$                       

KOMOKA Komoka Road Forcemain Replacement ‐$                1,500,000$     1,500,000$           1,288,500$             211,500$                ‐$                       

KOMOKA Servicing of Tunks Lane 350,000$        ‐$                350,000$              350,000$                ‐$                        ‐$                       

KOMOKA Komoka Wastewater Collection System Inspection  41,750$          ‐$                41,750$                 41,750$                  ‐$                        ‐$                       

KOMOKA Evaluation of wastewater treatment plant and tertiary filters  148,020$        ‐$                148,020$              148,020$                ‐$                        ‐$                       

KOMOKA WWTP Head Works and Tertiary Filter ‐$                3,400,000$     3,400,000$           1,360,000$             2,040,000$             ‐$                       

KOMOKA Komoka WWTP Rotork Valve upgrade 25,000$          ‐$                25,000$                 25,000$                  ‐$                        ‐$                       

ALL SYSTEMS Half‐Ton Pickup ‐ Replace 2010 Economize 4301 24,000$          ‐$                24,000$                 24,000$                  ‐$                        ‐$                       

ALL SYSTEMS SCADA Replacement 120,319$        ‐$                120,319$              120,319$                ‐$                        ‐$                       

ALL SYSTEMS Elevated Tank Inspection (Sludge Storage & Equalization Tanks) 36,653$          ‐$                36,653$                 36,653$                  ‐$                        ‐$                       

ALL SYSTEMS Wastewater Collection System Flushing and Cleaning  266,369$        ‐$                266,369$              266,369$                ‐$                        ‐$                       

TOTAL Total 2,463,479$    5,300,000$    7,763,479$          4,195,479$            3,568,000$            0$                           

November 13, 2019 Page 23 of 27

Page 24: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Water and Wastewater Rate Structure Report 

16

2020‐2023 Storm Water Capital Budget 

Note that  the Capital Budget  in stormwater  is a  four year  forecast which poses some challenges  in  terms of planning  for  the  future rate requirements.  The Wastewater Capital Budget includes the following: 

$3.75 million in 2021‐2022 for the Stormwater Glendon Drive Reconstruction ($3 million in Komoka and $0.75 million in Kilworth) 

Over  the next  four years, 100% of  the $5.8 million  is  related  to existing assets  that will be  funded  from rates, either  through the Capital Reserve or debt  financing.   Based on  the analysis above,  in consideration of  the  total  consolidated  reserves available and existing rates, there will be a need to issue some debt to support the plan. 

 

 

Project2020 + 

Carryover2021 2022 2023 Total 4 years

Reserves Financing

DC Financing $ Other

Millcreek Lane STM Sewer Upgrade ‐$                  ‐$                  ‐$                  ‐$                  ‐$                  ‐$                       ‐$                       ‐$                      

Garden Avenue / John Street STM Sewer Upgrade 830,000$          ‐$                  ‐$                  ‐$                  830,000$          830,000$               ‐$                       ‐$                      

Longwoods Commercial STM Sewer Outlet ‐$                  ‐$                  750,000$          ‐$                  750,000$          750,000$               ‐$                       ‐$                      

Meadowcreek Storm Sewer Replacement ‐$                  130,000$          ‐$                  ‐$                  130,000$          130,000$               ‐$                       ‐$                      

King/George Street Reconstruction ‐$                  250,000$          ‐$                  ‐$                  250,000$          250,000$               ‐$                       ‐$                      

Glendon Drive Reconstruction ‐$                  ‐$                  750,000$          ‐$                  750,000$          750,000$               ‐$                       ‐$                      

Glendon Drive Reconstruction  ‐$                  ‐$                  2,000,000$      1,000,000$      3,000,000$      3,000,000$           ‐$                       ‐$                      

Settlement Community Storm water Master Plan ‐$                  ‐$                  ‐$                  ‐$                  ‐$                  ‐$                       ‐$                       ‐$                      

Storm water Catch Basin cleaning Program 130,665$          ‐$                  ‐$                  ‐$                  130,665$          130,665$               ‐$                       ‐$                      

Total 960,665$         380,000$         3,500,000$     1,000,000$     5,840,665$     5,840,665$          ‐$                       ‐$                      

November 13, 2019 Page 24 of 27

Page 25: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Water and Wastewater Rate Structure Report 

17

Key Challenges and Opportunities 

Capital Program and Availability of Reserves 

While  the  Capital  Reserves  are  relatively  healthy  at  the  end  of 2019, with  significant  capital  requirements  over  the  next  several years, there is a need to continue to gradually increase the capital reserve  contributions  to  support  the  replacement  and refurbishment of assets.   

The Municipality internally finances the capital program between Water,  Wastewater  and  Storm  Water  operations  which  is  a leading practice to reduce debt costs.  However, there  is a need to maintain a minimum level of reserves to address unforeseen events and avoid rate shocks.   

There  is  a  need  to  develop,    at  minimum,  a  5‐year  Capital Budget  for  each  program  in  order  to  effectively  plan  for  the future.    This  includes  the  need  to  review  reserve  and  debt requirements.  

Debt  

The existing debt is high in relation to the total operating budget for  water  and  wastewater,  however,  there  is  capacity  to  issue more debt to fund the capital program.  

 

 

Under  the  existing  economic  conditions,  interest  rates  have been  relatively  low.   While  the  existing  borrowing  rates  are favourable,  it  is  unknown  how  long  these  conditions  will continue.  This is a risk in terms of future debt financing 

Affordability 

Residential  Water  and  Wastewater  costs  in  the  Municipality  are  higher  than  the  survey  average  of  peer  municipalities surveyed  for  Residential  customers.    This  is  driven  in  part  by the  complexity  of  the  system.   However, with  higher  average incomes, affordability of water/ww services is considered to be well within industry standards.  

Relatively High Fixed Monthly Charge 

The Municipality has a relatively high proportion of the water/ww  bill  that  is  recovered  from  the  fixed  monthly  fee.    This provides good revenue stability and should be maintained.  

Growth 

With the majority of the costs being fixed in nature and with an estimated growth of 1% annually,  there  is an opportunity to reduce the rate increases. 

 

November 13, 2019 Page 25 of 27

Page 26: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Water and Wastewater Rate Structure Report 

18

Proposed 2020 Water, Wastewater and Storm Rates  

 

 

 

 

 

 

 

 

 

 

 

The proposed rate changes for 2020 include a 5.5% rate increase in water fixed monthly and volumetric, with no increase in the Infrastructure Lifecycle Reserve.  Based on the existing assumptions, the wastewater rates could remain at the 2019 levels however, it should be noted that future  capital  requirements,  as  identified  in  the  capital  budget  may  warrant  a  rate  increase.    A  3.3%  rate  increase  is  recommended  for Stormwater based on the assumptions included in this report. 

Water 2019 2020

Total Fixed Monthly Water Charge22.76$          24.01$         

Water Usage Charge (Volumetric) 0‐8 m3

 no additional charge 

 no additional charge 

Water Usage Charge (Volumetric) per m3 for consumption exceeding 8 m3

2.84$             3.00$            

5/8" 18.00$          18.00$         3/4" 27.00$          27.00$         1" 45.00$          45.00$         1.5" 90.00$          90.00$         2" 144.00$        144.00$       

Water Infrastructure Lifecycle Reserve Fund Charge based on Meter Size ‐ 

Monthly

Wastewater 2019 2020

Total Fixed Monthly Wastewater Charge 29.30$          29.30$         

Wastewater Usage Charge (Volumetric) 0‐8 m3

 no additional charge 

 no additional charge 

Wastewater Usage Charge (Volumetric) per m3 for consumption exceeding 8 m3 3.66$             3.66$            

5/8" 17.32$          17.32$         3/4" 25.98$          25.98$         1" 43.30$          43.30$         1.5" 86.61$          86.61$         2" 138.57$        138.57$       

Wastewater Infrastructure Lifecycle Reserve Fund Charge based on Meter 

Size ‐ Monthly

Stormwater 2019 2020

Base monthly rate for all properties within settlement areas.14.88$                               15.37$                        

Industrial, Commercial and Institutional ( ICI) customers defined using the property code classification system provided by the Municipal Property Assessment Corporation with properties larger property than 0.4 hectares an additional monthly charge applies

$14.88 per property + $42.18 per hectare above threshold

$15.37 per property + $43.57 per hectare above threshold

November 13, 2019 Page 26 of 27

Page 27: November 13, 2019 Page 1 of 27 · Meeting Date: November 13th, 2019 Submitted by: Rob Cascaden, P.Eng. – Director, Public Works and Engineering Report No: PWE 34-2019 Subject: 2020

Water and Wastewater Rate Structure Report 

19

Residential Impact Analysis 

 

 

An  analysis  was  undertaken  on  the  impact  to  a  typical residential  customer.    Three  customer  profiles were  used  to illustrate  the potential  impact  for customers consuming 100‐200 m3 annually.  

For  example,  a  customer  consuming  200 m3  annually would experience  an  increase  of  $37  annually,  or  $3.10  per month for water, wastewater and stormwater. 

As shown in the impact analysis, under the calculated rates in the table at the bottom, the combined impact to a residential customer  would  range  from  $1.79  per  month  to  $3.10  per month, depending on the level of consumption.  This equates to an overall increase of 1.7%‐2.0%.  

Water WW Storm Total

100 501$            574$           179$           1,253$       

150 643$            757$           179$           1,578$       

200 785$            940$           179$           1,904$       

Annual Consumption 

m3

2019

Water WW Storm Total

100 516$            574$           184$           1,275$       

150 666$            757$           184$           1,608$       

200 816$            940$           184$           1,941$       

Annual Consumption 

m3

2020

Water WW Storm Total

100 16$              ‐$            6$                22$            

150 23$              ‐$            6$                29$            

200 31$              ‐$            6$                37$            

Annual Difference

Difference

Water WW Storm Total

100 1.30$          ‐$            0.49$          1.79$         

150 1.96$          ‐$            0.49$          2.45$         

200 2.61$          ‐$            0.49$          3.10$         

Monthly Difference

Difference

November 13, 2019 Page 27 of 27