INDIANAMICHIGANPOWEROA unit of American Electric Power
Indiana Michigan PowerCook Nuclear PlantOne Cook PlaceBridgman, MI 49106Indiana Michigan Power.com
November 11, 2013 AEP-NRC-2013-9010 CFR 50.4
Docket No.: 50-315
U. S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, DC 20555-0001
Donald C. Cook Nuclear Plant Unit 1
2013 STEAM GENERATOR TUBE INSPECTION REPORT
Technical Specification (TS) 5.6.7 of Appendix A, to the Donald C. Cook Nuclear Plant (CNP) Unit 1Operating License requires a report to be submitted within 180 days after initial entry into Mode 4following the completion of an inspection performed in accordance with TS 5.5.7, Steam Generator(SG) Program. CNP Unit 1 entered Mode 4 on May 15, 2013. This report .details specific attributesof the inspection in accordance with TS 5.6.7. Consistent with these requirements,Indiana Michigan Power Company, the licensee for CNP Unit 1, is submitting the Unit 1 2013 SGTube Inspection Report as an enclosure to this letter.
There are no new regulatory commitments made in this submittal. Should you have any questions,please contact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.
Sincerely,
Joel P. GebbieSite Vice President
TLC/amp
Enclosure: Unit 1 2013 Steam Generator Tube Inspection Report
c: J.T. King - MPSCS. M. Krawec, AEP Ft. Wayne, w/o enclosuresMDEQ - RMD/RPSNRC Resident InspectorC. D. Pederson - NRC Region IIIT. J. Wengert - NRC Washington DC ,INUC) ý
ýAAL
Page 1
Enclosure to AEP-NRC-2013-90
Unit 1 2013 Steam Generator Tube Inspection Report
Introduction
In April of 2013, steam generator (SG) inservice inspections were conducted at theDonald C. Cook Nuclear Plant (CNP) Unit 1. Mode 4 was entered on May 15, 2013, and inaccordance with the 180-day reporting requirements of Technical Specification (TS) 5.6.7, theresults of the inspection are provided herein.
Unit 1 SG Description
The four replacement Babcock & Wilcox model 51R SGs were initially placed in service inDecember of 2000.
Each of the replacement SGs contains 3496 thermally treated alloy 690 tubes with an outsidediameter of 0.875 inches and a nominal wall thickness of 0.049 inches. The tubes are arrangedin a triangular pitch pattern of 85 rows and 107 columns.
The tube support structure consists of eight stainless steel (SA-240-410S-modified) lattice gridassemblies and four sets of fan bar (also called flat bar) restraints. Each lattice grid consists ofinterlocking high and low bars that form a lattice pattern to provide lateral restraint in the straightportion of the tubes. The fan bar restraints are made of the same stainless steel material andoffer support in the U-bend area.
The tubesheet is a nominal 21.25 inches thick and is made of ASME SA-508 Class 3a low alloysteel forging material with Alloy 82 cladding on the primary side. All tubes are hydraulicallyexpanded into the tubesheet holes and flush seal welded at the primary face. The expansionincludes the entire depth of the tubesheet for both the hot and cold leg sides.
The Unit 1 SGs have accumulated 116.86 effective full power months of operation since beingplaced in service and 102.30 effective full power months of operation in the first sequentialinspection period as defined in the TS 5.5.7.d.2. The SGs operated 16.67 effective full powermonths since they were all last inspected.
The next planned inspection of these SGs will occur at the end of the current cycle (Fall 2014).
Enclosure to AEP-NRC-2013-90 Page 2
A. The scope of inspections performed on each SG
Primary Side Eddy Current Inspection Scope
* A 100% bobbin coil probe examination, encompassing the full tube length of all in-servicetubes, was completed in all four SGs.
* A 20% (nominal) array probe hot and cold leg top of tubesheet examination, extending fromthe tube end to the first support, was performed in all four SGs.
. Special interest +PointTM probe examinations were performed in each SG. Theseinspections included:
Historical and new dings/dents > 2 volts' Historical and new bobbin wear indications > 20%
) Select historical bobbin wear indications < 20%) Historical and new possible loose part indications and bounding tubes) All indication codes (i.e., I-codes)
) All proximity indications
) Any bulge indications - none reported) Any lack of expansion indications (no hydraulic expansion [NHE]) - none reported) Any permeability indications (permeability variation [PVN]) - none reported
The following table provides the applicable tube or locations counts for the above inspections:
EDDY CURRENT EXAMINATION SUMMMARY
Scope Probe SG 11 SG 12 SG 13 SG 14Tube Tube Tube TubeCount Count Count Count
Full Length Bobbin 3486 3495 3473 3488Hot Leg Top of Tubesheet Array 741 760* 752* 742Cold Leg Top of Tubesheet Array 741 743* 736* 742n
rloticoia ieg aeita in examination counts in SG -L ana -,3 is aue to adnering numoer ofhistorical possible loose part/bounding locations that were included in these examinationpopulations.
Special Interest SG 11 SG 12 SG 13 SG 14Special Interest
ProbeSG 11
LocationsExamined
SG 12LocationsExamined
SG 13LocationsExamined
SG 14LocationsExamined
Historical Possible Loose Part +PointTM 8 28 71and Bounding Tubes ____8_8_1_
New Possible Loose Parts and +PointTM 69 25 159 20Bounding TubesHot Leg Indications +PointTM 6 7 17 10Cold Leg Indications +PointTM 6 11 19 5U-bend Indications +PointTM 77 52 29 38
Enclosure to AEP-NRC-2013-90 Page 3
In addition to the tubing examinations, the following SG inspection related activities were alsoperformed:
* Visual Plug Examination - 100% of the installed tube plugs were inspected using aremote camera to confirm plug location and condition. No abnormal conditions wereidentified during this examination.
* Visual Channel Head Examination - Remote visual inspections were performed ineach of the hot and cold leg channel heads to monitor the integrity of the dividerplate and divider plate attachment welds, tubesheet/bowl cladding and the nozzledam rings. No abnormal conditions were identified during this examination.
* Secondary Side Inspections/Foreign Object Search and Retrieval - Visualinspections were completed on each SG at the top of the tubesheet. Areasexamined included the divider lane (i.e., no-tube lane) and bundle annulus. Noabnormal conditions were identified.
In addition, foreign object search and retrieval efforts were employed to remove asmany objects from the SGs as possible. Where foreign objects could not beremoved and there was a potential for wear, the tubes were plugged orstabilized/plugged, depending on the flow region and wear risk.
B. Degradation mechanisms found
The only degradation mechanism detected during the inspection was wear. The source of thedegradation was support structures (fan bars and lattice grids) and a foreign object.
The table below summarizes the number of wear indications recorded in each SG during theinspection for the various mechanisms. The specific indications and their associated percentthroughwall (% TW) depths are discussed in Section D of this report.
INDICATION COUNT
Wear Mechanism SG 11 SG 12 SG 13 SG 14 TotalsFan Bar 659 480 429 794 2,362Lattice Grid 15 20 24 18 77Foreiqn Obiect 0 0 1 0 1
Enclosure to AEP-NRC-2013-90 Page 4
Fan Bar WearThe number of new fan bar wear indications showed a significant decrease over the previousexamination. During the previous (2011) examination, a total of 2,013 fan bar wear indicationswere reported. During the follow-up 2013 inspection, a total of 453 new fan bar wear indicationswere reported. Taking into account the new indications and that some of the 2011 indicationswere previously removed from service, the overall inservice population for fan bar indicationamong the four SGs is 2,362.
The maximum depth of fan bar wear reported was 32% TW. The following table summarizesthe fan bar wear depths recorded.
FAN BAR WEARNo. of Tubes/No. of Indications -
Depth SG 11 SG 12 SG 13 SG 14
<20% TW 218/599 157/438 179/408 293/767
>20% TW 37/60 23/42 13/21 20/27
Growth rates were essentially the same for all four generators with a maximum growth rate of7.92% TW/effective full power year (EFPY). The maximum average growth rate was 2.19%TW/EFPY. The largest upper 95% growth rate among the four SGs was 5.76% TW/EFPY.
None of the fan bar indications exceeded the TS plugging limit or the condition monitoring limit.No tubes were plugged for fan bar wear.
Lattice Grid WearLattice grid wear showed a slight increase in the number of indications from the previousinspection. The 2011 examination reported 33 lattice grid wear indications, of which 32remained in service. During the 2013 inspection, an additional 45 lattice grid wear indicationswere reported.
The maximum depth of lattice grid wear was 18% TW. The following table summarizes thelattice grid wear depths recorded:
LATTICE GRID WEARNo. of Tubes/ No. of Indications
Enclosure to AEP-NRC-2013-90 Page 5
For the population of lattice grid wear indications, the maximum growth was 1.44% TW/EFPYand the maximum average growth rate was 0.24% TW/EFPY. The largest upper 95% growthrate was 1.44% TW/EFPY.
None of the lattice grid indications exceeded the TS plugging limit or the condition monitoringlimit. No tubes were plugged for lattice grid wear.
Foreigqn Object WearOne indication of foreign object related wear was detected during the inspection. SG 13 hadprobable foreign object wear within the second hot leg support (02H) lattice intersection withtube R31/C37. The wear indication was sized at 5% TW.
This indication did not exceed the TS plugging limit or condition monitoring limit. This tube wasplugged and stabilized as the object could not be removed and continued wear was consideredlikely.
Enclosure to AEP-NRC-2013-90 Page 6
C. Nondestructive examination techniques utilized for each degradation mechanism
The table below summarizes the nondestructive examination techniques for each degradation mechanism, potential degradationmechanism and also those degradation mechanisms judged as improbable (i.e., outside diameter stress corrosion cracking [ODSCC],primary water stress corrosion cracking [PWSCC]):
SUMMARY OF INSPECTION TECHNIQUES
Bobbin 96004.1 (R13)
Wear at Tube Supports,Anti-Vibration Bars,
Vertical and DiagonalStraps
Freespan Volumetric WearBobbin/Differential Mix Amplitude AnalysiDetectionSizing for service for wear at lattice gridsor fan bars
Tube Wear at Lattice +PointTa/Differential Mix AmplitudeGrids/Fan Bars (confirm not Analysis
+Point'm 10908.4 (RI) Detection of Anti-Vibration crack-like) DetectionBar Wear Indications
*Foreign part wear with part Sizing for information
presentSingle Frequency Amplitude Analysis
+PointM 21998.1 (R4) Volumetric Indications N/A DetectionSizing for information
+Point'a 27901.1 - Volumetric Indication of Single Frequency Amplitude Analysis27907.1 Various Geometries Sizing for service
(R1)21409.1 (R7) Axial ODSCC at Tube Axial ODSCC in the +PointTM Single Frequency Phase
+PointTM 128425 (R3) Support Plates, Freespan, presence of Fan Bars, Analysis128432 (R2) Sludge Pile, Tubesheet Lattice Grid Supports Detection
Crevice Sizing for informationCircumferential ODSCC in +PointTM Single Frequency Phase
+PointTM Circumferential ODSCC at Expanded Tubesheet, Analysis21410.1 (R6) Expansion Transitions Sludge Pile, Lattice Grids, DetectionFan Bars, U-bends & Sizing for information
_________ ____________ ____________________Denting ___________________
Enclosure to AEP-NRC-2013-90 Page 7
+PointTM 20510.1 (R7) Circumferential PWSCCat Expansion Transitions N/A
+Point'. Single FreqLAnalysisDetectionSizing for information+PointTM Single Frequency Phase
+PointTm 20511.1 (R8) Axial PWSCC at N/A AnalysisExpansion Transitions Detection
Sizing for informationX-Probe 20402.1 (R5) Axial ODSCC at Supports N/A Detection
Axial ODSCC at FreespanX-Probe 20403.1 (R5) not Associated with N/A Detection
DepositsCircumferential ODSCC at Foreign object wear
X-Probe 20400.1 (R5) the top of tubesheet and detection Detectionexpansion transitions
X-Probe 20500.1 (R4) Circumferential PWSCC N/A Detection_-Probe_ 20500.1 (R4) at expansion transitions N/ADetection
Axial PWSCC atX-Probe 20501.1 (R4) expansion transitions N/A Detection
Axial PWSCC at supportsX-Probe 20502.1 (R4) with dents no greater than N/A Detection
2 volts
EPRI - Electric Power Research InstituteETSS - Examination Technique Specification Sheet
Enclosure to AEP-NRC-2013-90 Page 8
D. Location, orientation (if linear), and measured sizes (if available) of service inducedindications
Please refer to the following attachments for the inspection records of service inducedindications arising from tube support structures.
Attachment 1: SG 11 Fan Bar/Lattice Grid Wear Percent Throughwall Indications
Attachment 2: SG 12 Fan Bar/Lattice Grid Wear Percent Throughwall Indications
Attachment 3: SG 13 Fan Bar/Lattice Grid Wear Percent Throughwall Indications
Attachment 4: SG 14 Fan Bar/Lattice Grid Wear Percent Throughwall Indications
Foreign object wear was reported in SG 13 only and affected a single tube. The sizinginformation related to that indication is provided below:
SG 13 FOREIGN OBJECT SIZING
SGI13 31 1 37 1 0.26 0. 24 5%
E. Number of tubes plugged during the inspection outage for each degradationmechanism
During the inspection, a total of ten tubes were plugged, five of which were also stabilized. Thetable below provides the distribution of the tubes removed from service during the 2013inspection based on the associated damage mechanism. "Foreign Object Bounding" refers totubes administratively removed from service to ensure continued tube integrity due to the nearbypresence of a non-retrievable foreign object(s).
TUBES PLUGGED BY DEGRADATION MECHANISM
Enclosure to AEP-NRC-2013-90 Page 9
Stabilization was performed on select tubes based upon the assessed wear risk presented fromnon-retrievable objects. The following table provides details on the specific tubes removed fromservice:
TUBES REMOVED FROM SERVICE
- -13 31 37 5% max depth foreign object wear at the 2 nd hot leg support - foreign
object could not be removed (plugged and stabilized)13 55 15 Bounding foreign object which could not be removed (plugged/stabilized)13 54 16 Bounding foreign object which could not be removed (plugged/stabilized)13 56 16 Bounding foreign object which could not be removed (plugged/stabilized)13 55 17 Bounding foreign object which could not be removed (plugged/stabilized)13 12 40 Bounding foreign object which could not be removed (plugged)13 11 41 Bounding foreign object which could not be removed (plugged)13 13 41 Bounding foreign object which could not be removed (plugged)13 10 42 Bounding foreign object which could not be removed (plugged)13 12 42 Bounding foreign object which could not be removed (plugged)
F. The number and percentage of tubes plugged to date, and the effective pluggingpercentage in each SG
The following table identifies the current total number and the percentage of tubes plugged foreach SG:
Total 13,984 52 0.372
Enclosure to AEP-NRC-2013-90 Page 10
G. The results of condition monitoring, including the results of tube pulls and in-situtesting
Evaluation of the indications found during the 2013 inspection indicated that the conditionmonitoring requirements for structural and leakage integrity, as specified in Unit 1 TS 5.5.7, weresatisfied.
Degradation specific condition monitoring limits were applied to each degradation mode.degradation exceeded the TS plugging limit of 40% TW or the condition monitoring limits.
No
AVERAGE DEPTH FAN BAR WEARCONDITION MONITORING LIMIT
Fan Bar Condition Monitoring Limit 96004.1
100
90
80
70
~60£50
40
30
20
10
00 0.5 1.5 2 2.5 3 3.5 4
Inches
AVERAGE DEPTH LATTICE GRID WEARCONDITION MONITORING LIMIT
-C
C
100
90
80
70
60
50
40
30
20
10
0
Lattice Grid Condition Monitoring Limit 96004.1
IXI, - • ' - . {
_ _ _ _ L
_ _ _ iA0 (Q5 1 L5 2
Inches
2.5 3 &5 4
Enclosure to AEP-NRC-2013-90 Page 11
FOREIGN OBJECTCONDITION MONITORING LIMIT
Foreign Object Wear Condition Monitoring Limit10908.4
100
90
80
70
~60. 50
40O
30
20
10
00 0.5 1 1.5 2 2.5 3 3.5 4
Inches
No detectable primary-to-secondary leakage was detected during thepostulated to occur during the current operating interval.
previous cycle or is
The inspection found no indications that met the criteria for in-situ pressure testing and no tubepulls were performed.
Attachment I to Enclosure to AEP-NRC-2013-90Unit 1 2013 Steam Generator Tube Inspection Report
SG 11 Fan Bar/Lattice Grid Wear Percent Throughwall Indications
AREVA NP Inc 04/15/13 11:53:37Customer Name: DC COOK Unit 1 Component: S/G 11 Page 1 of 16
TWD Indications
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
1 73 0.13 118 P2 TWD 6 FB5 +1.21 08C TEH LOCOK LAR 36 HOT 720CL BOBBIN
1 77 0.13 75 P2 TWD 6 08H +0.54 08C TEH LAR 36 HOT 720CL BOBBIN
1 89 0.09 86 P2 TWD 4 07C -1.50 TEC TEH LAR 27 HOT 720CL BOBBIN
1 99 0.10 103 P2 TWD 5 08C +0.73 TEC TEH LAR 27 HOT 720CL BOBBIN
2 70 0.10 90 P2 TWD 4 07C -1.49 08C TEC LAR 6 COLD 720UL BOBBIN
3 33 0.15 113 P2 TWO 7 OSC +1.27 08C TEC LAR 7 COLD 720CL BOBBIN
3 51 0.16 107 P2 TWD 7 06C -1.62 08C TEC LAR 7 COLD 720CL BOBBIN
3 79 0.20 74 P2 TWD 9 05C -1.62 08C TEC LAR 7 COLD 720CL BOBBIN
13 31 0.09 110 P2 TWD 4 06N +0.56 TEC TEN LAR 33 NOT 720CL BOBBIN
29 49 0.13 93 P2 TWD 6 07N +0.53 TEC TEN LAR 15 NOT 720UL BOBBIN
32 24 0.14 91 P2 TWD 5 03H +0.55 TEC TEH LAR 20 HOT 720UL BOBBIN
34 36 0.46 122 P2 TWO 18 04N -1.45 TEC TEN LAR 17 NOT 720UL BOBBIN
34 48 0.09 92 P2 TWD 4 03H -1.09 TEC TEH LAR 15 HOT 720UL BOBBIN
38 54 0.10 67 P2 TWD 4 FB4 +0.00 TEC TEN 9 NOT 720UL BOBBIN
41 17 0.16 130 P2 TWD 7 03H +47.84 TEC TEH LAR 22 HOT 720UL BOBBIN
41 45 0.13 89 P2 TWO 6 FB4 -1.09 TEC TEN 17 NOT 720UL BOBBIN
42 10 0.27 132 P2 TWD 10 03H -1.70 TEC TEH LAR 21 HOT 720UL BOBBIN
43 17 0.19 130 P2 TWD 8 04H -1.68 TEC TEH LAR 21 HOT 720UL BOBBIN
44 50 0.08 143 P2 TWD 3 FB3 +1.60 TEC TEH 15 HOT 720UL BOBBIN
45 63 0.14 134 P2 TWD 6 FB4 -1.22 TEC TEH 15 HOT 720UL BOBBIN
46 66 0.14 84 P2 TWD 6 FB4 -1.01 TEC TEH 3 HOT 720UL BOBBIN
47 79 0.06 119 P2 TWO 3 FB6 -0.83 TEC TEN 14 NOT 720UL BOBBIN
50 54 0.12 80 P2 TWO 5 FBS -0.13 TEC TEN 10 NOT 720UL BOBBIN
52 52 0.13 85 P2 TWO 5 FB4 +0.52 TEC TEN 6 NOT 720UL BOBBIN
42 60 0.2O 109 P2 TWD 16 FB3 -2.03 TEC TEH 6 HOT 720UL BOBBIN
53 49 0.16 95 P2 TWO 7 FB5 -1.17 TEC TEN 5 NOT 720UL BOBBIN0.21 114 P2 TWD 9 FB4 +1.14 TEC TEH 5 HOT 720UL BOBBIN
54 56 0.09 73 P2 TWD 4 FB4 -0.97 TEC TEH 5 HOT 720UL BOBBIN0.12 116 P2 TWD 5 FBS +1.45 TEC TEH 5 HOT 720UL BOBBIN0.11 74 P2 TWD 5 FB6 -1.19 TEC TEH 5 HOT 720UL BOBBIN
47 47 0.09 120 P2 TWD 4 FB2 -2.24 TEC TEH 6 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 11:53:37Component: S/G 11 Page 2 of 16
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
57 51 0.14 38 P2 TWD 6 FB5 +1.57 TEC TEH 6 HOT 720UL BOBBIN
58 42 0.13 62 P2 TWD 5 FB4 -1.09 TEC TEH 6 HOT 720UL BOBBIN
58 48 0.18 115 P2 TWD 7 FB4 -1.14 TEC TEH 5 HOT 720UL BOBBIN0.14 138 P2 TWD 6 FB7 +2.46 TEC TEH 5 HOT 720UL BOBBIN
58 52 0.12 114 P2 TWO 5 FB4 -1.12 TEC TEN 5 NOT 720UL BOBBIN
58 72 0.11 106 P2 TWD 5 FB4 -1.08 TEC TEH 3 HOT 720UL BOBBIN
59 47 0.12 117 P2 TWD 5 FB3 +1.30 TEC TEH 3 HOT 720UL BOBBIN
59 51 0.11 78 P2 TWO 5 PBS +1.34 TEC TEN 5 NOT 720UL BOBBIN
59 57 0.19 126 P2 TWD 8 FB4 +1.14 TEC TEH 5 HOT 720UL BOBBIN0.18 99 P2 TWO 8 FB5 +0.97 TEC TEH 5 HOT 720UL BOBBIN
59 59 0.12 139 P2 TWO 5 FB5 -1.10 TEC TEH 5 HOT 720UL BOBBIN
59 61
59 69
0.13 123 P2 TWD 6
0.26 116 P2 TWD 10
FB5 +1.08 TEC TEH
FB4 +1.06 TEC TEH
60 54 0.47 122 P2 TWD 17 FB4 +0.00 TEC TEH0.34 129 P2 TWD 13 FB5 +0.00 TEC TEH0.16 112 P2 TWD 7 FB6 +0.00 TEC TEH
60 56 0.32 117 P2 TWD 11 FB5 +1.09 TEC TEH0.16 113 P2 TWD 6 FB4 -1.09 TEC TEH0.14 130 P2 TWD 5 FB3 -1.09 TEC TEH
60 58 0.17 91 P2 TWD 6 FBI -2.13 TEC TEH
60 62 0.12 132 P2 TWD 5 FB4 -1.09 TEC TEH
61 53 0.20 76 P2 TWD 8 FB4 +0.99 TEC TEH0.12 118 P2 TWD 5 FB5 +1.45 TEC TEH
61 55 0.13 119 P2 TWD 5 FB6 +1.84 TEC TEH
61 57 0.11 84 P2 TWD 5 FB5 +0.70 TEC TEH0.15 90 P2 TWO 6 FB4 -1.09 TEC TEH
61 61 0.12 128 P2 TWD 5 FB6 -1.09 TEC TEH0.19 113 P2 TWD 7 FB5 +1.14 TEC TEH0.20 123 P2 TWD 8 FB5 -1.09 TEC TEH0.41 117 P2 TWD 14 FB4 +1.11 TEC TEH0.19 89 P2 TWD 7 FB4 -1.09 TEC TEH0.11 132 P2 TWD 4 FB3 +1.11 TEC TEH0.09 156 P2 TWD 4 FB3 -1.09 TEC TEH
61 63 0.12 98 P2 TWO 5 FB4 -0.99 TEC TEH
5 HOT 720UL BOBBIN
3 NOT 720UL BOBBIN
10 HOT 720UL BOBBIN10 NOT 720UL BOBBIN10 HOT 720UL BOBBIN
6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN
6 HOT
----------------
----------------
4 HOT
5 NOT5 HOT
9 HOT
6 NOT6 NOT
6 NOT6 NOT6 NOT6 HOT6 NOT6 HOT6 NOT
3 HOT
720UL BOBBIN
720UL BOBBIN
720UL BOBBIN7200L BOBBIN
720UL BOBBIN
720UL BOBBIN720UL BOBBIN
720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
720UL BOBBIN---------------
61 79 0.10 69 P2 TWD 4 FB4 +0.94 TEC TEH
62 42 0.12 101 P2 TWO 5 FB6 -1.07 TEC TEH0.18 88 P2 TWD 7 FB5 +1.13 TEC TEH0.20 113 P2 TWO 8 FB4 -1.09 TEC TEH
13 HOT 720UL BOBBIN
6 NOT 720UL6 HOT 720UL6 HOT 720UL
BOBBINBOBBINBOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 11:53:37Component: S/G 11 Page 3 of 16
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW
---------------------------------
LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
-- -- -= = -= = = = -- -- - -. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..-- - -
62 44 0.14 133 P2 TWD 5 FB5 +1.05 TEC TEH0.24 96 P2 TWD 9 FB4 -1.09 TEC TEH0.12 124 P2 TWD 5 FB3 -1.09 TEC TEH
..................................................................................
62 48 0.19 108 P2 TWD 8 FB5 +1.21 TEC TEH0.12 132 P2 TWD 5 FB5 -1.10 TEC TEH0.27 120 P2 TWD 11 FB4 -1.08 TEC TEH0.12 120 P2 TWD 5 FB3 -1.23 TEC TEH
62 54 0.11 59 P2 TWD 5 FB6 -0.24 TEC TEH0.13 75 P2 TWD 6 FB5 +0.00 TEC TEH0.19 121 P2 TWD 8 FB4 +0.00 TEC TEH
62 56 0.07 105 P2 TWD 3 FB4 -1.01 TEC TEH0.21 131 P2 TWD 9 FB4 +1.17 TEC TEH0.22 132 P2 TWD 9 FB5 -1.08 TEC TEH0.19 128 P2 TWD 8 FB5 +1.14 TEC TEH0.26 111 P2 TWD 10 FB6 -1.08 TEC TEH0.12 92 P2 TWD 5 FB3 -1.23 TEC TEH
6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN5----NOT------------------BOBBIN-------
5 HOT 720UL BOBBIN5 HOT 720UL BOBBIN5 HOT 720UL BOBBIN5 HOT 720UL BOBBIN
9 NOT 720UL BOBBIN9 HOT 720UL BOBBIN9 HOT 720UL BOBBIN
5 HOT 720UL BOBBINS NOT 720UL BOBBIN5 HOT 720UL BOBBIN5 HOT 720UL BOBBIN5 HOT 720UL BOBBIN5 HOT 720UL BOBBIN
-------------
-------------
62 60 0.20 113 P2 TWD 8 FB5 -1.10 TEC TEH 5 HOT 720UL BOBBIN
62 68 0.11 119 P2 TWD 5 FB4 +1.41 TEC TEH 3 HOT 720UL BOBBIN
63 45 0.29 97 P2 TWD 11 FB4 +1.16 TEC TEH 6 HOT 720UL BOBBIN0.14 119 P2 TWD 5 FB3 +1.23 TEC TEH 6 HOT 720UL BOBBIN
63 53 0.24 107 P2 TWD 10 FB4 -1.10 TEC TEH 5 HOT 720UL BOBBIN
63 69 0.14 127 P2 TWD 6 FB4 +1.04 TEC TEH 3 HOT 720UL BOBBIN
64 46 0.15 110 P2 TWD 6 FB4 -1.05 TEC TEH 5 HOT 720UL BOBBIN0.16 84 P2 TWD 7 FB5 +1.19 TEC TEH 5 HOT 720UL BOBBIN
64 50 0.23 72 P2 TWD 9 FB5 +1.16 TEC TEH 6 HOT 720UL BOBBIN0.14 121 P2 TWD 5 FB4 -1.10 TEC TEH 6 HOT 720UL BOBBIN
64 52 0.12 75 P2 TWD 5 FB4 -1.03 TEC TEH 6 HOT 720UL BOBBIN
64 54 0.08 142 P2 TWD 4 FB5 -0.44 TEC TEH 10 HOT 720UL BOBBIN
64 60 0.13 72 P2 TWD 5
64 66 0.16 128 P2 TWD 7
65 45 0.30 129 P2 TWD 120.31 119 P2 TWD 120.39 117 P2 TWD 140.16 136 P2 TWD 70.17 141 P2 TWD 7
FB5 +1.05 TEC TEH 6 HOT 720UL BOBBIN
FB4 +1.08 TEC TEH 4 HOT 720UL BOBBIN
FB6 -1.36 TEC TEH 5 HOT 720UL BOBBINFB5 -1.21 TEC TEH 5 HOT 720UL BOBBINFB4 +1.12 TEC TEH 5 HOT 720UL BOBBINFB4 -1.14 TEC TEH 5 HOT 720UL BOBBINFB3 +1.23 TEC TEH 5 HOT 720UL BOBBIN
65 49 0.17 98 P20.16 151 P20.11 107 P20.38 106 P20.11 92 P2
TWDTWDTWDTWDTWD
775145
FB6 +1.25 TEC TEHFB5 +1.14 TEC TEHFB5 -1.21 TEC TEHFB4 +1.14 TEC TEHFB3 +1.25 TEC TEH
S NOT 720UL BOBBIN5 HOT 720UL BOBBIN5 HOT 720UL BOBBIN5 HOT 720UL BOBBIN5 HOT 720UL BOBBIN
65 51 0.30 99 P2 TWD 11 FB6 +1.01 TEC TEH 6 HOT 720UL---------------
BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 11:53:37Component: S/G 11 Page 4 of 16
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
0.25 100 P2 TWD 9 FB5 +1.03 TEC TEH 6 HOT 720UL BOBBIN
65 55 0.10 127 P2 TWD 4 FB5 +0.90 TEC TEH 9 HOT 720UL BOBBIN
65 57 0.14 124 P2 TWD 5 FB3 -1.07 TEC TEH 6 HOT 720UL BOBBIN0.35 106 P2 TWD 12 FB4 -1.09 TEC TEH 6 HOT 720UL BOBBIN0.49 111 P2 TWD 16 FB4 +1.07 TEC TEH 6 HOT 720UL BOBBIN0.66 108 P2 TWD 20 FB5 -1.09 TEC TEH 6 HOT 720UL BOBBIN0.13 115 P2 TWD 5 FB6 -1.09 TEC TEN 6 HOT 720UL BOBBIN0.21 135 P2 TWD 8 FB6 +1.07 TEC TEH 6 HOT 720UL BOBBIN0.09 135 P2 TWD 4 FB5 +0.70 TEC TEH 6 HOT 720UL BOBBIN
65 59 0.200.28
130 P2 TWD 8 FB6114 P2 TWD 10 FB4
-1.09+1.05
TEC TEHTEC TEH
6 HOT6 HOT
720UL BOBBIN720UL BOBBIN
65 61 0.33 121 P2 TWD 13 FB6 -1.10 TEC TEH 4 HOT 720UL BOBBIN0.18 135 P2 TWD 8 FB5 +1.14 TEC TEH 4 HOT 720UL BOBBIN0.28 115 P2 TWD 11 FB5 -1.10 TEC TEH 4 HOT 720UL BOBBIN0.35 116 P2 TWD 14 FB4 +1.03 TEC TEH 4 HOT 720UL BOBBIN0.18 114 P2 TWD 8 FB4 -1.10 TEC TEH 4 HOT 720UL BOBBIN0.39 127 P2 TWD 15 FB3 +1.38 TEC TEH 4 HOT 720UL BOBBIN
65 63 0.18 107 P2 TWO 8 FB6 +1.09 TEC TEN 23 NOT 720UL BOBBIN0.21 113 P2 TWD 9 FB5 +1.09 TEC TEH 23 HOT 720UL BOBBIN0.10 141 P2 TWD 9 FB3 +1.37 TEC TEH 23 HOT 720UL BOBBIN
65 65 0.14 113 P2 TWO 6 FB5 -1.09 TEC TEN 23 NOT 720UL BOBBIN0.16 124 P2 TWO 7 FB4 +0.96 TEC TEN 23 NOT 720UL BOBBIN0.11 109 P2 TWD 5 FB3 +0.89 TEC TEH 23 HOT 720UL BOBBIN
65 67 0.12 100 P2 TWD 6 FB3 +1.03 TEC TEH 3 HOT 720UL BOBBIN0.10 61 P2 TWD 4 FB5 +1.03 TEC TEH 3 HOT 720UL BOBBIN0.09 69 P2 TWD 4 FB6 +1.03 TEC TEH 3 HOT 720UL BOBBIN
66 38 0.12 117 P2 TWO 5 FB3 -1.09 TEC TEN 6 NOT 720UL BOBBIN
66 46 0.17 116 P2 TWD 7 FB36 +1.13 TEC TEH 6 HOT 720UL BOBBIN
0.79 110 P2 TWO 22 FBS +1.11 TEC TEN 6 HOT 720UL BOBBIN0.18 106 P2 TWD 7 FB5 -1.00 TEC TEH 6 HOT 720UL BOBBIN0.31 97 P2 TWD 11 FB4 +1.05 TEC TEH 6 HOT 720UL BOBBIN0.35 112 P2 TWO 12 FB4 -1.09 TEC TEN 6 NOT 720UL BOBBIN0.22 135 P2 TWD 8 FB3 -1.09 TEC TEH 6 HOT 720UL BOBBIN
66 48 0.22 121 P2 TWD 9 FB4 -1.10 TEC TEH 5 HOT 720UL BOBBIN0.19 86 P2 TWD 8 FB5 +1.12 TEC TEH 5 HOT 720UL BOBBIN0.15 90 P2 TWD 6 FB3 -1.28 TEC TEH 5 HOT 720UL BOBBIN
66 52 0.27 108 P2 TWD 11 FB5 -1.03 TEC TEH 5 HOT0.19 134 P2 TWD 8 FB6 -1.10 TEC TEH 5 HOT
66 54 0.31 125 P2 TWD 12 FB6 +0.00 TEC TEH 9 HOT0.70 123 P2 TWD 21 FB5 +0.00 TEC TEH 9 HOT0.78 124 P2 TWD 23 FB4 +0.00 TEC TEH 9 HOT0.14 90 P2 TWD 6 FB3 +0.00 TEC TEH 9 HOT
720UL720UL
720UL720UL720UL720UL
720UL720UL720UL720UL
BOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBIN
66 56 0.170.170.220.22
107 P2 TWO 7 FB3 +1.-14 TEC TEN107 P2 TWD 7 FB4 +1.06 TEC TEH126 P2 TWD 9 FB5 -1.08 TEC TEH127 P2 TWD 9 FB5 +1.17 TEC TEH
5 NOT5 HOT5 HOT5 HOT
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 11:53:37Component: S/G 11 Page 5 of 16
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT
0.13 107 P2 TWD 6 FB7 +1.38 TEC
66 58 0.120.110.290.150.110.17
122126124102103135
P2P2P2P2P2P2
TWDTWDTWDTWDTWDTWD
5511657
FB3FB4FB4FB5FB5FB6
-1.01-1.01+1.08-1.01+1.01+1.12
-1.05-0.66+0.64
TECTECTEC
TECTEC
TEC
TECTECTEC
EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
TEH 5 HOT 720UL BOBBIN
TEH 5 HOT 720UL BOBBINTEH 5 HOT 720UL BOBBINTEH 5 HOT 720UL BOBBINTEH 5 HOT 720UL BOBBINTEH 5 HOT 720UL BOBBINTEH 5 HOT 720UL BOBBIN
TEN S NOT 720UL BOBBINTEH 5 HOT 720UL BOBBINTEH 5 HOT 720UL BOBBIN
66 60 0.10 79 P2 TWD 4 FB40.09 98 P2 TWD 4 FB50.09 111 P2 TWD 4 FB5
66 62 0.34 131 P2 TWD 13 FB3 -1.01 TEC TEH 3 HOT 720UL BOBBIN0.43 131 P2 TWD 15 FB4 -1.06 TEC TEH 3 HOT 720UL BOBBIN0.48 125 P2 TWD 16 FB5 +1.03 TEC TEH 3 HOT 720UL BOBBIN0.24 122 P2 TWD 10 FB6 +1.17 TEC TEH 3 HOT 720UL BOBBIN
66 64 0.25 125 P2 TWD 10 FB4 -1.03 TEC TEH 3 HOT 720UL BOBBIN0.19 125 P2 TWD 8 FB5 +1.06 TEC TEH 3 HOT 720UL BOBBIN0.19 110 P2 TWD 8 FB6 +1.10 TEC TEH 3 HOT 720UL BOBBIN
66 66 0.12 100 P2 TWD 5 FB5 +0.96 TEC TEH 23 HOT 720UL BOBBIN0.24 133 P2 TWD 10 FB4 -1.09 TEC TEH 23 HOT 720UL BOBBIN
66 72 0.12 120 P2 TWD 5 FB4 -1.06 TEC TEH 3 HOT 720UL BOBBIN
67 43 0.11 95 P2 TWD 5 FB5 -1.06 TEC TEH 23 HOT 720UL BOBBIN0.14 137 P2 TWD 6 FB4 +0.98 TEC TEH 23 HOT 720UL BOBBIN0.11 102 P2 TWD 5 FB3 +1.15 TEC TEH 23 HOT 720UL BOBBIN
67 45 0.14 93 P2 TWD 5 FB6 -1.09 TEC TEH 6 HOT 720UL BOBBIN0.16 91 P2 TWD 6 FB5 -1.07 TEC TEH 6 HOT 720UL BOBBIN0.14 72 P2 TWD 6 FB4 +1.01 TEC TEH 6 HOT 720UL BOBBIN0.18 126 P2 TWD 7 FB3 -1.09 TEC TEH 6 HOT 720UL BOBBIN
67 47 0.16 132 P2 TWD 7 FB4 +1.03 TEC TEH 5 HOT 720UL BOBBIN
67 49 0.15 84 P2 TWD 6 FB5 -1.09 TEC TEH 6 HOT 720UL BOBBIN
67 51 0.14 133 P2 TWD 6 FB4 +1.06 TEC TEH 5 HOT 720UL BOBBIN
67 55 0.12 108 P2 TWD 5 FB6 -1.07 TEC TEH 10 HOT 720UL BOBBIN0.20 109 P2 TWD 9 FB4 -1.09 TEC TEH 10 HOT 720UL BOBBIN
67 57 0.12 133 P2 TWD 5 FB5 +0.92 TEC TEH 5 HOT 720UL BOBBIN
67 59 0.16 133 P2 TWD 7 FB3 +1.21 TEC TEH 5 HOT 720UL BOBBIN0.50 128 P2 TWD 17 FB4 +1.17 TEC TEH 5 HOT 720UL BOBBIN0.18 117 P2 TWD 7 FB5 -1.06 TEC TEH 5 HOT 720UL BOBBIN
67 61 0.19 132 P2 TWD 8 FB3 +1.19 TEC TEH 3 HOT 720UL BOBBIN0.57 124 P2 TWD 19 FB4 -1.01 TEC TEH 3 HOT 720UL BOBBIN0.50 124 P2 TWD 17 FB5 -1.08 TEC TEH 3 HOT 720UL BOBBIN0.23 118 P2 TWD 9 FB6 -1.01 TEC TEH 3 HOT 720UL BOBBIN
67 63 0.37 123 P2 TWD 14 FB6 +1.120.39 120 P2 TWD 15 FB5 +1.030.12 119 P2 TWD 6 FB4 -1.10
TEC TEN 4TEC TEH 4TEC TEH 4
NOT 720ULHOT 720ULHOT 720UL
BOBBINBOBBINBOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 11:53:38Component: S/G 11 Page 6 of 16
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
67 67 0.08 150 P2 TWD 4 FB3 +1.21 TEC TEH 4 HOT 720UL BOBBIN
67 69 0.12 133 P2 TWD 5 FB5 +1.06 TEC TEH 3 HOT 720UL BOBBIN
68 40 0.14 140 P2 TWD 6 FB6 +1.23 TEC TEH 5 HOT 720UL BOBBIN0.20 106 P2 TWD 8 FB4 -1.16 TEC TEH 5 HOT 720UL BOBBIN0.12 140 P2 TWD 5 FB3 -1.27 TEC TEH 5 HOT 720UL BOBBIN
68 42 0.12 102 P2 TWD 5 FB3 -1.10 TEC TEH 5 HOT 720UL BOBBIN
68 44 0.31 108 P2 TWD 12 FB6 +1.270.36 113 P2 TWD 13 FB5 +1.210.18 91 P2 TWD 8 FB5 -1.190.80 125 P2 TWO 23 FB4 -1.160.50 128 P2 TWD 17 FB3 -1.30
68 50 0.21 110 P2 TWD 8 FB6 +1.250.19 136 P2 TWD 7 FB6 -1.100.21 129 P2 TWD 8 FB5 +1.140.58 118 P2 TWD 18 FB5 -1.10
0.37 95 P2 TWD 13 FB4 +1.010.36 106 P2 TWD 13 FB4 -1.100.30 112 P2 TWD 11 FB3 -1.10
TEC TEH 5TEC TEH 5TEC TEH 5TEC TEH 5TEC TEH 5
TEC TEN 6TEC TEH 6TEC TEH 6TEC TEH 6TEC TEH 6TEC TEH 6TEC TEH 6
HOT 720ULHOT 720ULHOT 720ULHOT 720ULHOT 720UL
NOT 720ULHOT 720ULHOT 720ULHOT 720UL•HOT 720ULHOT 720ULHOT 720UL
BOBBINBOBBINBOBBINBOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBINBOBBINBOBBINBOBBIN
68 52 0.21 103 P2 TWD 8 FB4 -1.09 TEC TEH
68 54 0.31 131 P2 TWD 12 FB6 -0.07 TEC TEH0.37 119 P2 TWD 14 FB5 -0.07 TEC TEH0.88 126 P2 TWD 25 FB4 -0.07 TEC TEH0.19 129 P2 TWD 8 FB3 +0.00 TEC TEH
68 56 0.15 121 P2 TWD 6 FB5 +1.27 TEC TEH0.21 110 P2 TWD 8 FB5 -1.09 TEC TEH0.14 133 P2 TWD 5 FB4 +1.07 TEC TEH0.09 137 P2 TWD 4 FB3 -1.09 TEC TEH
68 60 0.18 121 P2 TWO 7 FB5 +1.21 TEC TEH0.28 116 P2 TWD 10 FB5 -1.10 TEC TEH0.12 126 P2 TWD 5 FB3 -1.10 TEC TEH
68 62 0.28 125 P2 TWD 11 FB6 +1.23 TEC TEH0.33 117 P2 TWD 13 FB5 +1.09 TEC TEH0.23 122 P2 TWD 9 FB5 -1.09 TEC TEH0.24 111 P2 TWD 10 FB4 +1.09 TEC TEH0.15 138 P2 TWD 6 FB3 -1.07 TEC TEH
68 68 0.21 116 P2 TWD 9 FB6 +1.12 TEC TEH0.13 105 P2 TWD 6 FB5 +1.07 TEC TEH0.13 96 P2 TWD 6 FB4 -1.10 TEC TEH
6 HOT
10 NOT10 HOT10 HOT10 HOT
720UL
720UL720UL720UL720UL
BOBBIN
BOBBINBOBBINBOBBINBOBBIN
6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN
6 NOT 720UL BOBBIN6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN
4 HOT 720UL BOBBIN4 NOT 720UL BOBBIN4 HOT 720UL BOBBIN4 HOT 720UL BOBBIN4 HOT 720UL BOBBIN
4 HOT 720UL BOBBIN4 HOT 720UL BOBBIN4 NOT 720UL BOBBIN
6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN
69 43 0.16 131 P2 TWD 6 FB5 -1.070.16 107 P2 TWD 6 FB4 +1.110.14 111 P2 TWD 5 FB3 +1.14
69 45 0.18 118 P2 TWD 7 FB4 +1.050.18 121 P2 TWD 7 FB6 +1.08
TEC TENTEC TEHTEC TEH
TEC TEN S NOT 720UL BOBBINTEC TEH 5 HOT 720UL BOBBIN
69 47 0.13 92 P2 TWD 5 FB5 -1.10 TEC TEH-----------------------------------------------------------------
6 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 11:53:38Component: S/G 11 Page 7 of 16
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION
0.19 89 P2 TWD 7 FB4 +1.05
69 53 0.140.300.710.230.130.27
129 P2 TWD 6 FB6 +1.23101 P2 TWD 11 FB6 -1.09109 P2 TWD 21 FB5 +0.9691 P2 TWD 9 FB4 +0.9671 P2 TWD 5 FB4 -1.03124 P2 TWD 10 FB2 -2.13
EXT EXT UTIL 1 UTIL 2 CAL # LEG
TEC TEH 6 HOT
TEC TEN 6 NOTTEC TEH 6 HOTTEC TEH 6 HOTTEC TEH 6 HOTTEC TEH 6 HOTTEC TEH 6 HOT
PROBE
720UL
720UL720UL720UL720UL720UL720UL
SCOPE
BOBBIN
BOBBINBOBBINBOBBINBOBBINBOBBINBOBBIN
69 55 0.12 125 P2 TWD 5 FB5 -1.16 TEC TEH 9 HOT 720UL BO0.15 124 P2 TWD 6 FB4 +1.12 TEC TEH 9 HOT 720UL BO0.09 96 P2 TWD 4 FB4 -1.16 TEC TEH 9 HOT 720UL BO
69 57 0.15 89 P2 TWD 6 FB5 -1.09 TEC TEH 6 HOT 720UL BO0.13 62 P2 TWD 5 FB4 +1.03 TEC TEH 6 HOT 720UL BO
69 59 0.42 118 P2 TWO 14 FB6 +1.09 TEC TEN 6 NOT 720UL BC0.35 132 P2 TWD 12 FB5 +1.01 TEC TEH 6 HOT 720UL BO
0.29 108 P2 TWD 10 FB5 -1.09 TEC TEH 6 HOT 720UL BO0.68 112 P2 TWD 20 FB4 +1.12 TEC TEH 6 HOT 720UL BO0.14 93 P2 TWD 6 FB4 -1.09 TEC TEH 6 HOT 720UL BO0.23 124 P2 TWD 9 FB3 +1.25 TEC TEH 6 HOT 720UL BC0.15 138 P2 TWD 6 FB3 -1.07 TEC TEH 6 HOT 720UL BO
69 61 0.13 115 P2 TWD 6 FB4 +1.03 TEC TEH 4 HOT 720UL BO
69 65 0.18 137 P2 TWD 7 FB3 +1.12 TEC TEH 3 HOT 720UL BO0.39 129 P2 TWD 14 FB4 +1.08 TEC TEH 3 HOT 720UL BO0.19 128 P2 TWD 8 FB5 -1.08 TEC TEH 3 HOT 720UL BO0.16 120 P2 TWD 7 FB6 -1.08 TEC TEH 3 HOT 720UL BO
69 67 0.11 117 P2 TWD 5 FB4 +1.00 TEC TEH 23 HOT 720UL BO0.12 121 P2 TWD 5 FB3 +1.09 TEC TEH 23 HOT 720UL BO
69 69 0.38 124 P2 TWD 14 FB4 +1.05 TEC TEH 4 HOT 720UL BO
70 42 0.14 129 P2 TWD 5 FB4 -1.03 TEC TEH 6 HOT 720UL BO
70 46 0.31 135 P2 TWD 11 FB5 +1.01 TEC TEH 6 HOT 720UL BO0.27 124 P2 TWD 10 FB4 -1.09 TEC TEH 6 HOT 720UL BO
BBINBBIN'BBIN
)BBIN)BBIN
'BBIN'BBINBBINBBIN'BBIN'BBINBBIN
'BBIN
'BBIN*BBIN'BBIN'BBIN
'BBIN'BBIN
'OBIN
*BBIN
'BBIN'OBIN
70 48 0.14 107 P2 TWD 6 FB4 -1.12 TEC TEH 5 HOT 720UL BOBBIN
70 54 0.21 83 P2 TWD 9 FB6 +0.00 TEC TEH 9 HOT 720UL BOBBIN0.33 97 P2 TWD 13 FB5 +0.00 TEC TEH 9 HOT 720UL BOBBIN0.21 93 P2 TWD 8 FB4 +0.00 TEC TEH 9 HOT 720UL BOBBIN
70 56 0.17 133 P2 TWD 7 FB3 -1.08 TEC TEH 5 HOT 720UL BOBBIN0.20 134 P2 TWD 8 FB4 +1.06 TEC TEH 5 HOT 720UL BOBBIN0.62 131 P2 TWD 20 FB5 -1.03 TEC TEH 5 HOT 720UL BOBBIN0.13 76 P2 TWD 6 FB6 -1.10 TEC TEH HOT 720UL
70 60 0.10 122 P2 TWD 4 FB3 -1.10 TEC TEH 5 HOT 720UL0.16 132 P2 TWD 7 FB5 -1.03 TEC TEH 5 HOT 720UL0.14 141 P2 TWD 6 FB5 +1.01 TEC TEH 5 HOT 720UL
70 62 0.26 133 P2 TWD 10 FB3 -1.10 TEC TEH 3 HOT 720UL0.22 131 P2 TWO 9 FB4 -1.08 TEC TEH 3 HOT 720UL0.30 132 P2 TWD 11 FB4 +1.10 TEC TEH 3 HOT 720UL
BOBBIN
BOBBINBOBBINBOBBIN
BOBBINBOBBINBOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 11:53:38Component: S/G 11 Page 8 of 16
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL
0.15 113 P2 TWD 6 FB5 -1.08 TEC TEH0.37 127 P2 TWD 13 FB5 +1.01 TEC TEH0.34 124 P2 TWD 13 FB6 +1.03 TEC TEH
70 64 0.19 125 P2 TWD 8 FB5 +1.20 TEC TEH0.12 99 P2 TWD 5 FB4 -1.05 TEC TEH0.12 127 P2 TWD 5 FB3 +1.27 TEC TEH0.08 88 P2 TWD 4 FB6 +1.24 TEC TEH
2 CAL #
333
23232323
LEG
HOTHOTHOT
HOTHOTHOTHOT
PROBE
720UL720UL720UL
720UL720UL720UL720UL
SCOPE
BOBBINBOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBIN
70 66 0.11 117 P2 TWD 5 FB4 +1.06 TEC TEH
70 68 0.17 97 P2 TWD 7 FB4 -1.01 TEC TEH0.14 97 P2 TWD 6 FB6 +1.10 TEC TEH
71 39 0.14 126 P2 TWD 6 FB3 +1.19 TEC TEH
71 49 0.18 115 P2 TWD 7 FB5 +1.00 TEC TEH0.17 101 P2 TWD 7 FB5 -1.09 TEC TEH0.23 80 P2 TWD 9 FB4 +1.18 TEC TEH0.18 94 P2 TWD 7 FB4 -1.09 TEC TEH0.14 123 P2 TWD 6 FB3 +1.26 TEC TEH
3 HOT 720UL BOBBIN
3 HOT 720UL3 HOT 720UL
5 HOT 720UL
6 NOT 720UL6 HOT 720UL6 HOT 720UL6 HOT 720UL6 HOT 720UL
BOBBINBOBBIN
BOBBIN
BOBBINBOBBINBOBBINBOBBINBOBBIN
71 51 0.390.390.580.54
71 55 0.300.330.740.18
135 P2 TWD 14 FB6 +1.23138 P2 TWD 14 FB5 +1.10135 P2 TWD 19 FB4 +1.14124 P2 TWD 18 FB3 +1.23
129 P2 TWD 12 FB6 -1.01134 P2 TWD 13 FB5 +1.07122 P2 TWD 23 FB4 -1.09140 P2 TWO 8 FB3 -1.24
TEC TEH 5 HOT 720UL BOBBINTEC TEH 5 HOT 720UL BOBBINTEC TEH 5 HOT 720UL BOBBINTEC TEH 5 HOT 720UL BOBBIN
TEC TEN 10 NOT 720UL BOBBINTEC TEH 10 HOT 720UL BOBBINTEC TEH 10 HOT 720UL BOBBINTEC TEH 10 HOT 720UL BOBBIN
71 61
71 63
71 67
71 71
71 79
0.44 135 P2 TWD 15 FB3 +1.01 TEC TEH 3 HOT 720UL BOBBIN0.38 130 P2 TWD 14 FB4 -1.08 TEC TEH 3 HOT 720UL BOBBIN0.86 123 P2 TWD 24 FB4 +1.12 TEC TEH 3 HOT 720UL BOBBIN0.59 132 P2 TWD 19 FB5 -1.06 TEC TEH 3 HOT 720UL BOBBIN0.38 129 P2 TWD 14 FB5 +1.10 TEC TEH 3 HOT 720UL BOBBIN0.54 127 P2 TWD 18 FB6 -1.08 TEC TEH 3 HOT 720UL BOBBIN0.17 111 P2 TWO 7 FB6 +1.21 TEC TEH 3 HOT 720UL BOBBIN0.14 133 P2 TWD 6 FB7 -0.70 TEC TEH 3 HOT 720UL BOBBIN
0.24 135 P2 TWO 10 PB6 -1.10 TEC TEN 4 NOT 720UL BOBBIN0.36 110 P2 TWD 14 FBS -1.03 TEC TEH 4 HOT 720UL BOBBIN0.18 92 P2 TWD 8 FB4 +1.14 TEC TEH 4 HOT 720UL BOBBIN0.17 113 P2 TWD 8 FB3 +1.18 TEC TEH 4 HOT 720UL BOBBIN
0.10 131 P2 TWD 5 FB6 -1.10 TEC TEH 4 HOT 720UL BOBBIN0.13 95 P2 TWO 6 PBS -1.1I0 TEC TEN 4 NOT 720UL BOBBIN0.16 119 P2 TWD 7 FB4 +1.12 TEC TEH 4 HOT 720UL BOBBIN0.13 110 P2 TWD 6 FB3 +1.23 TEC TEH 4 HOT 720UL BOBBIN
0.15 116 P2 TWD 6 FB4 +1.06 TEC TEH 3 HOT 720UL BOBBIN
0.07 131 P2 TWD 3 FB7 -0.72 TEC TEH 14 HOT 720UL BOBBIN
72 38 0.14 107 P2 TWD 6 FB3 -1.10 TEC TEH 5 HOT 720UL BOBBIN0.20 118 P2 TWD 8 FB4 -1.05 TEC TEH 5 HOT 720UL BOBBIN
72 44 0.15 136 P2 TWD 7 FB3 -1.10 TEC TEH 5 HOT 720UL BOBBIN
AREVA NP Inc 04/15/13 11:53:38Customer Name: DC COOK Unit 1 Component: S/G 11 Page 9 of 16
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
0.57 124 P2 TWD 19 FB4 -1.08 TEC TEH 5 HOT 720UL BOBBIN0.26 136 P2 TWD 10 FB5 +1.19 TEC TEH 5 HOT 720UL BOBBIN0.16 135 P2 TWD 7 FB6 +1.14 TEC TEH 5 HOT 720UL BOBBIN
......................................................................................................................................
72 46 0.20 110 P2 TWD 8 FB6 +1.32 TEC TEH 5 HOT 720UL BOBBIN0.19 124 P2 TWD 8 FB6 -1.25 TEC TEH 5 HOT 720UL BOBBIN0.68 119 P2 TWD 21 FB5 +1.10 TEC TEH 5 HOT 720UL BOBBIN0.14 90 P2 TWD 6 FB5 -1.19 TEC TEH 5 HOT 720UL BOBBIN0.61 121 P2 TWD 20 FB4 -1.08 TEC TEH 5 HOT 720UL BOBBIN0.21 102 P2 TWD 9 FB3 -1.25 TEC TEH 5 HOT 720UL BOBBIN
......................................................................................................................................
72 50 0.14 83 P2 TWD 6 FB6 +1.03 TEC TEH 6 HOT 720UL BOBBIN0.22 108 P2 TWD 8 FB5 +0.85 TEC TEH 6 HOT 720UL BOBBIN0.14 103 P2 TWD 6 FB4 -1.07 TEC TEH 6 HOT 720UL BOBBIN
......................................................................................................................................
72 54 0.15 122 P2 TWD 6 FB5 +0.00 TEC TEH 10 HOT 720UL BOBBIN0.56 125 P2 TWD 19 FB4 +0.00 TEC TEH 10 HOT 720UL BOBBIN0.18 135 P2 TWD 8 FB3 +0.00 TEC TEH 10 HOT 720UL BOBBIN
......................................................................................................................................
72 56 0.32 106 P2 TWD 11 FB6 -1.10 TEC TEH 6 HOT 720UL BOBBIN0.83 i1i P2 TWD 23 FB5 -1.10 TEC TEH 6 HOT 720UL BOBBIN0.09 63 P2 TWD 4 FB4 -1.10 TEC TEH 6 HOT 720uL BOBBIN0.13 123 P2 TWD 5 FB3 -1.10 TEC TEH 6 HOT 720UL BOBBIN
......................................................................................................................................
72 58 0.22 132 P2 TWD 8 FB6 -1.10 TEC TEH 6 HOT 720UL BOBBIN0.61 109 P2 TWD 19 FB5 -1.10 TEC TEH 6 HOT 720UL BOBBIN0.22 82 P2 TWD 8 FB4 -1.10 TEC TEH 6 HOT 720UL BOBBIN0.19 129 P2 TWD 7 FB3 -1.10 TEC TEH 6 HOT 720UL BOBBIN
......................................................................................................................................
72 60 0.14 102 P2 TWD 6 FB4 +1.49 TEC TEH 6 HOT 720UL BOBBIN0.17 91 P2 TWD 7 FB4 -1.10 TEC TEH 6 HOT 720UL BOBBIN
......................................................................................................................................
72 62 0.53 114 P2 TWD 18 FB6 +1.12 TEC TEH 4 HOT 720UL BOBBIN0.24 133 P2 TWD 10 FB5 +1.16 TEC TEH 4 HOT 720UL BOBBIN0.10 146 P2 TWD 5 FB5 -1.09 TEC TEH 4 HOT 720UL BOBBIN0.27 117 P2 TWD 11 FB4 +1.14 TEC TEH 4 HOT 720UL BOBBIN0.15 115 P2 TWD 6 FB4 -1.09 TEC TEH 4 HOT 720UL BOBBIN0.25 131 P2 TWD 10 FB3 -1.09 TEC TEH 4 HOT 720UL BOBBIN
......................................................................................................................................
72 64 0.13 93 P2 TWD 6 FB6 +1.10 TEC TEH 4 HOT 720UL BOBBIN0.11 86 P2 TWD 5 FB4 -1.10 TEC TEH 4 HOT 720UL BOBBIN0.12 124 P2 TWD 5 FB3 -1.10 TEC TEH 4 HOT 720UL BOBBIN
......................................................................................................................................
72 66 0.16 129 P2 TWD 7 FB5 +1.05 TEC TEH 4 HOT 720UL BOBBIN0.54 114 P2 TWD 18 FB4 -1.08 TEC TEH 4 HOT 720UL BOBBIN
......................................................................................................................................
72 70 0.15 124 P2 TWD 7 FB4 -1.10 TEC TEH 4 HOT 720UL BOBBIN......................................................................................................................................
73 41 0.37 122 P2 TWD 14 FB3 +1.14 TEC TEH 5 HOT 720UL BOBBIN0.23 129 P2 TWD 9 FB4 +1.08 TEC TEH 5 HOT 720UL BOBBIN0.19 137 P2 TWD 8 FB5 -1.06 TEC TEH 5 HOT 720UL BOBBIN
73 61 0.29 120 P2 TWD 12 FB6 -1.10 TEC TEH 4 HOT 720UL BOBBIN0.43 123 P2 TWD 16 FB5 -1.10 TEC TEH 4 HOT 720UL BOBBIN0.52 120 P2 TWD 18 FB4 +1.10 TEC TEH 4 HOT 720UL BOBBIN
73 63 0.13 100 P2 TWD 5 FB3 -1.10 TEC TEH 3 HOT 720UL BOBBIN0.24 115 P2 TWD 10 FB3 +1.23 TEC TEH 3 HOT 720UL BOBBIN0.12 70 P2 TWD 5 FB4 +1.17 TEC TEH 3 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 11:53:38Component: S/G 11 Page 10 of 16
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION
0.30 117 P2 TWD 11 FB50.24 130 P2 TWD 9 FB6
73 65 0.14 139 P2 TWD 6 FB50.22 145 P2 TWD 9 FB40.18 122 P2 TWD 8 FB3
73 67 0.14 83 P2 TWD 6 FB40.11 132 P2 TWD 5 FB30.09 25 P2 TWD 4 FB7
EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
-0.97 TEC TEH 3 HOT 720UL BOBBIN-1.06 TEC TEH 3 HOT 720UL BOBBIN
-1.03 TEC TEN 23 NOT 720UL BOBBIN+0.98 TEC TEH 23 HOT 720UL BOBBIN+1.13 TEC TEH 23 HOT 720UL BOBBIN
+1.18 TEC TEH 23 HOT 720UL BOBBIN+1.02 TEC TEN 23 NOT 720UL BOBBIN-1.09 TEC TEH 23 HOT 720UL BOBBIN
73 69 0.19 90 P2 TWD 8 FB4
74 40 0.18 61 P2 TWD 7 FB50.17 74 P2 TWD 7 FB40.19 78 P2 TWD 7 FB3
74 42 0.22 63 P2 TWD 8 FB4
+1.01 TEC TEH 4 HOT 720UL BOBBIN
+1.16 TEC TEN 6 NOT 720UL BOBBIN-1.09 TEC TEH 6 HOT 720UL BOBBIN-1.09 TEC TEH 6 HOT 720UL BOBBIN
-1.09 TEC TEH 6 HOT 720UL BOBBIN
74 44 0.37 99 P2 TWD 13 FB5 +1.12 TEC TEH 6 HOT 720UL BOBBIN0.57 94 P2 TWD 18 FB4 -1.09 TEC TEH 6 HOT 720UL BOBBIN0.15 90 P2 TWD 6 FB3 -1.01 TEC TEH 6 HOT 720UL BOBBIN
74 50 0.12 114 P2 TWD 5 FB4 -1.08 TEC TEH 5 HOT 720UL BOBBIN0.12 81 P2 TWD 5 FB5 +1.12 TEC TEH 5 HOT 720UL BOBBIN
74 56 0.11 90 P2 TWD 5 FB4 -1.10 TEC TEH 5 HOT 720UL BOBBIN
74 58 0.20 105 P2 TWD 8 FB3 -1.05 TEC TEH 5 HOT 720UL BOBBIN0.51 121 P2 TWD 17 FB4 -1.03 TEC TEH 5 HOT 720UL BOBBIN0.25 109 P2 TWD 10 FB5 -1.01 TEC TEH 5 HOT 720UL BOBBIN0.24 123 P2 TWD 10 FB5 +1.16 TEC TEH 5 HOT 720UL BOBBIN0.13 129 P2 TWD 6 FB6 +1.10 TEC TEH 5 HOT 720UL BOBBIN
74 60 0.15 100 P2 TWD 7 FB3 +1.12 TEC TEH 5 HOT 720UL BOBBIN0.32 138 P2 TWD 12 FB4 -1.05 TEC TEH 5 HOT 720UL BOBBIN0.14 86 P2 TWD 6 FB4 +1.08 TEC TEH 5 HOT 720UL BOBBIN1.11 125 P2 TWD 28 FB5 +1.03 TEC TEH 5 HOT 720UL BOBBIN0.24 108 P2 TWD 10 FB6 +1.08 TEC TEH 5 HOT 720UL BOBBIN
74 62 0.12 88 P2 TWD 5 FB5 +1.01 TEC TEH 3 HOT 720UL BOBBIN
74 64 0.18 135 P2 TWD 8 FB3 -1.08 TEC TEH 3 HOT 720UL BOBBIN0.40 130 P2 TWD 14 FB4 -1.10 TEC TEH 3 HOT 720UL BOBBIN0.26 114 P2 TWD 10 FB5 +1.03 TEC TEH 3 HOT 720UL BOBBIN0.24 114 P2 TWD 10 FB6 +1.03 TEC TEH 3 HOT 720UL BOBBIN
74 66 0.18 117 P2 TWD 8 FB6 +1.09 TEC TEH 23 HOT 720UL BOBBIN0.19 126 P2 TWD 8 FB5 +1.07 TEC TEH 23 HOT 720UL BOBBIN0.43 136 P2 TWD 16 FB4 -1.09 TEC TEH 23 HOT 720UL BOBBIN
74 68 0.20 132 P2 TWO 8 FB4 -1.06 TEC TEN 3 NOT 720UL BOBBIN
74 72 0.12 87 P2 TWD 5 FB4 -1.08 TEC TEH 3 HOT 720UL BOBBIN
75 39 0.13 143 P2 TWD 6 FB6 -1.10 TEC TEH 5 HOT 720UL BOBBIN
75 43 0.30 135 P2 TWD 12 FB6 -1.09 TEC TEH 23 HOT 720UL BOBBIN0.11 83 P2 TWD 5 FB5 +1.13 TEC TEH 23 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 11:53:38Component: S/G 11 Page 11 of 16Component: S/C 11 Page 11 of 16
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCAT
0.29 141 P2 TWD 11 FB50.28 138 P2 TWD 11 FB40.24 131 P2 TWD 10 FB3
75 45 0.13 106 P2 TWD 5 FB60.12 122 P2 TWD 5 FB60.60 104 P2 TWD 18 FB50.15 77 P2 TWD 6 FB50.18 129 P2 TWD 7 FB40.39 95 P2 TWD 13 FB4
ION
-1.09+1.11+1.13
EXT EXT UTIL 1 UTIL 2 CAL # LEG
TEC TEN 23 HOTTEC TEH 23 HOTTEC TEH 23 HOT
PROBE
720UL720UL720UL
SCOPE
BOBBINBOBBINBOBBIN
+1.02 TEC TEH-1.07 TEC TEH+1.00 TEC TEH-1.07 TEC TEH+1.11 TEC TEH-1.09 TEC TEH
75 47 0.18 140 P2 TWD 8 FB6 -1.25 TEC TEH0.31 132 P2 TWD 12 FB5 -1.14 TEC TEH0.36 131 P2 TWD 13 FB4 +1.21 TEC TEH0.12 128 P2 TWD 5 FB3 +1.32 TEC TEH
75 49 0.18 143 P2 TWD 7 FB6 +1.09 TEC TEH0.77 I11 P2 TWD 22 FB5 -1.09 TEC TEH1.07 99 P2 TWD 26 FB4 +1.01 TEC TEH0.49 120 P2 TWD 16 FB3 +1.20 TEC TEH
75 51 0.38 106 P2 TWD 14 FB6 +1.21 TEC TEH0.35 131 P2 TWD 13 FB5 +1.14 TEC TEH0.21 125 P2 TWD 9 FB4 +1.14 TEC TEH0.13 100 P2 TWD 6 FB4 -1.10 TEC TEH0.13 104 P2 TWD 6 FB3 +1.23 TEC TEH
75 53 0.14 93 P2 TWD 6 FB3 +1.17 TEC TEH0.20 119 P2 TWD 8 FB5 -1.08 TEC TEH0.20 105 P2 TWD 8 FB5 +1.14 TEC TEH
75 57 0.27 119 P2 TWD 11 FB3 -1.08 TEC TEH0.64 121 P2 TWD 20 FB4 -1.05 TEC TEH0.22 109 P2 TWD 9 FB5 -0.92 TEC TEH0.13 78 P2 TWD 6 FB5 +1.16 TEC TEH0.16 96 P2 TWD 7 FB6 +1.19 TEC TEH
75 61 0.56 121 P2 TWD 18 FB3 +1.08 TEC TEH0.71 128 P2 TWD 21 FB4 +1.03 TEC TEH0.66 123 P2 TWD 21 FB5 -1.03 TEC TEH0.24 126 P2 TWD 10 FB6 -1.06 TEC TEH
75 63 0.13 147 P2 TWD 6 FB7 -1.10 TEC TEH0.67 130 P2 TWD 21 FB6 -1.10 TEC TEH0.47 125 P2 TWD 17 FB5 -1.10 TEC TEH0.24 122 P2 TWD 10 FB4 +1.05 TEC TEH0.25 115 P2 TWO 10 FB3 -1.10 TEC TEH
75 65 0.10 80 P2 TWD 5 FB4 +1.08 TEC TEH
6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN
5 NOT 720UL BOBBIN5 HOT 720UL BOBBIN5 HOT 720UL BOBBIN5 HOT 720UL BOBBIN
6 HOT 720UL BOBBIN6 NOT 720UL BOBBIN6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN
5 HOT 720UL BOBBIN5 HOT 720UL BOBBIN5 NOT 720UL BOBBIN5 HOT 720UL BOBBIN5 HOT 720UL BOBBIN
5 HOT 720UL BOBBIN5 HOT 720UL BOBBIN5 HOT 720UL BOBBIN
5 NOT5 HOT5 HOT5 HOT5 HOT
3 HOT3 NOT3 HOT3 HOT
4 HOT4 HOT4 HOT4 HOT4 HOT
720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
720UL720UL720UL720UL
720UL720UL720UL720UL720UL
BOBBINBOBBINBOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBINBOBBIN
75 67 0.12 74 P2 TWD 6 FB50.16 129 P2 TWO 7 FB4
-1.10 TEC TEH+1.05 TEC TEH
-----------
4 NOT 720UL BOBBIN
4 HOT 720UL BOBBIN4 HOT 720UL BOBBIN
75 69 0.12 137 P2 TWD 5 FB3 +1.08 TEC TEH 3 HOT0.23 135 P2 TWD 9 FB4 +1.06 TEC TEH 3 HOT0.10 96 P2 TWO 4 FB5 -1.08 TEC TEH 3 HOT
75 71 0.12 108 P2 TWD 5 FB4 +1.08 TEC TEH 3 HOT0.15 125 P2 TWD 6 FB6 -1.08 TEC TEH 3 HOT
720UL720UL720UL
72DUL720UL
BOBBINBOBBINBOBBIN
BOBBINBOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 11:53:38Component: S/G 11 Page 12 of 16
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
76 44 0.180.720.940.430.11
76 46 0.540.880.170.950.36
76 48 0.130.180.290.400.14
149 P2 TWD 8 FB6 +1.17 TEC TEH 5 HOT 720UL BOBBIN122 P2 TWD 22 FB5 +1.14 TEC TEH 5 HOT 720UL BOBBIN127 P2 TWD 26 FB4 -1.10 TEC TEH 5 HOT 720UL BOBBIN132 P2 TWD 15 FB3 -1.17 TEC TEH 5 HOT 720UL BOBBIN97 P2 TWD 5 FB4 +1.25 TEC TEH 5 HOT 720UL BOBBIN
116 P2 TWD 18 FB6 +1.23 TEC TEH 5 HOT 720UL BOBBIN118 P2 TWD 25 FB5 +1.17 TEC TEH 5 HOT 720UL BOBBIN149 P2 TWD 7 FB5 -1.21 TEC TEH 5 HOT 720UL BOBBIN127 P2 TWD 26 FB4 -1.08 TEC TEH 5 HOT 720UL BOBBIN118 P2 TWD 13 FB3 -1.25 TEC TEH 5 HOT 720UL BOBBIN
1301il12199135
P2P2P2P2P2
TWDTWD
TWO
TWDTWD
5711146
FB6FB6FB5FB4FB3
+1.16-1.09+1.05-1.09-1.09
TEC TEH 6TEC TEH 6TEC TEH 6TEC TEH 6TEC TEH 6
HOTHOTHOTHOTHOT
720UL720UL720UL720UL720UL
BOBBINBOBBINBOBBINBOBBINBOBBIN
76 50 0.11 113 P2 TWD 5 FB6 -1.07 TEC TEH 6 HOT 720UL BOBBIN0.16 81 P2 TWD 6 FB5 -1.09 TEC TEH 6 HOT 720UL BOBBIN0.12 104 P2 TWD 5 FB4 -1.03 TEC TEH 6 HOT 720UL BOBBIN
76 52 0.12 Il1 P2 TWD 5 FB6 +1.23 TEC TEH 6 HOT 720UL BOBBIN0.26 108 P2 TWD 10 FB5 +1.18 TEC TEH 6 HOT 720UL BOBBIN0.15 133 P2 TWD 6 FB4 +1.03 TEC TEH 6 HOT 720UL BOBBIN0.23 122 P2 TWD 8 FB4 -1.09 TEC TEH 6 HOT 720UL BOBBIN
76 58 0.14 96 P2 TWO 6 FB6 +1.14 TEC TEH 6 HOT 720UL BOBBIN0.23 143 P2 TWO 9 FB5 -1.10 TEC TEH 6 HOT 720UL BOBBIN
76 62 0.25 138 P2 TWO 10 FB6 +1.18 TEC TEH 4 HOT 720UL BOBBIN0.18 105 P2 TWD 8 FB6 -1.09 TEC TEH 4 HOT 720UL BOBBIN0.20 110 P2 TWO 9 FB5 +1.01 TEC TEH 4 HOT 720UL BOBBIN0.10 70 P2 TWD 5 FB4 +1.22 TEC TEH 4 HOT 720UL BOBBIN0.33 122 P2 TWD 13 FB4 -1.09 TEC TEH 4 HOT 720UL BOBBIN0.13 131 P2 TWD 6 FB3 -1.09 TEC TEH 4 HOT 720UL BOBBIN
76 68 0.12 78 P2 TWD 5 FB6 -1.10 TEC TEH 4 HOT 720UL BOBBIN0.29 110 P2 TWD 12 FB4 -1.10 TEC TEH 4 HOT 720UL BOBBIN
76 70 0.19 131 P2 TWD 8 FB4 -1.10 TEC TEH 4 HOT 720UL BOBBIN
77 45 0.18 141 P2 TWD 8 FB6 +1.21 TEC TEH 5 HOT 720UL BOBBIN0.36 115 P2 TWD 13 FB5 -1.17 TEC TEH 5 HOT 720UL BOBBIN0.42 126 P2 TWD 15 FB4 +1.12 TEC TEH 5 HOT 720UL BOBBIN0.17 87 P2 TWD 7 FB3 +1.21 TEC TEH 5 HOT 720UL BOBBIN
77 47 0.13 101 P2 TWD 5 FB4 +1.07 TEC TEH 6 HOT 720UL BOBBIN0.10 88 P2 TWD 4 FB5 -1.10 TEC TEH 6 HOT 720UL BOBBIN
77 49 0.18 133 P2 TWD 7 FB3 +1.17 TEC TEH 5 HOT 720UL BOBBIN0.52 129 P2 TWD 17 FB4 +1.14 TEC TEH 5 HOT 720UL BOBBIN0.50 123 P2 TWD 17 FB5 -1.10 TEC TEH 5 HOT 720UL BOBBIN0.23 79 P2 TWD 9 FB6 -1.10 TEC TEH 5 HOT 720UL BOBBIN
77 51 0.23 143 P2 TWD 8 FB6 -1.10 TEC TEH 6 HOT 720UL BOBBIN0.44 115 P2 TWD 15 FB5 -1.10 TEC TEH 6 HOT 720UL BOBBIN0.92 111 P2 TWD 24 FB4 +1.01 TEC TEH 6 HOT 720UL BOBBIN
AREVA NP Inc 04/15/13 11:53:38Customer Name: DC COOK Unit 1 Component: S/G 11 Page 13 of 16
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
0.17 116 P2 TWD 6 FB3 +1.14 TEC TEH 6 HOT 720UL BOBBIN
77 55 0.16 97 P2 TWD 7 FB7 -1.45 TEC TEH 9 HOT 720UL BOBBIN0.63 126 P2 TWD 20 FB6 -1.31 TEC TEH 9 HOT 720UL BOBBIN0.23 110 P2 TWD 9 FB5 +1.05 TEC TEH 9 HOT 720UL BOBBIN0.66 125 P2 TWD 21 FB5 -1.29 TEC TEH 9 HOT 720UL BOBBIN1.03 119 P2 TWD 27 FB4 +1.05 TEC TEH 9 HOT 720UL BOBBIN0.36 129 P2 TWD 13 FB3 +1.12 TEC TEH 9 HOT 720UL BOBBIN0.24 130 P2 TWD 10 FB2 -1.29 TEC TEH 9 HOT 720UL BOBBIN
77 57 0.13 110 P2 TWD 5 FB7 +1.25 TEC TEH 6 HOT 720UL BOBBIN0.19 78 P2 TWD 7 FB6 +1.05 TEC TEH 6 HOT 720UL BOBBIN0.38 106 P2 TWD 13 FB6 -1.10 TEC TEH 6 HOT 720UL BOBBIN0.60 101 P2 TWD 18 FB5 +0.92 TEC TEH 6 HOT 720UL BOBBIN0.13 143 P2 TWD 5 FB5 -1.10 TEC TEH 6 HOT 720UL BOBBIN0.50 101 P2 TWD 16 FB4 +1.01 TEC TEH 6 HOT 720UL BOBBIN0.29 129 P2 TWD 10 FBI +0.59 TEC TEH 6 HOT 720UL BOBBIN
77 63 0.12 57 P2 TWO 5 FB7 -1.09 TEC TEN 23 NOT 720UL BOBBIN0.87 114 P2 TWD 25 FB6 -1.09 TEC TEH 23 HOT 720UL BOBBIN0.79 115 P2 TWD 24 FBS -1.09 TEC TEH 23 HOT 720UL BOBBIN0.79 118 P2 TWD 23 FB4 +1.09 TEC TEH 23 HOT 720UL BOBBIN
0.33 122 P2 TWD 13 FB3 +1.22 TEC TEH 23 HOT 720UL BOBBIN0.21 131 P2 TWD 9 FB3 -1.09 TEC TEH 23 HOT 720UL BOBBIN0.16 112 P2 TWD 7 FB2 +1.50 TEC TEH 23 HOT 720UL BOBBIN
77 65 0.19 120 P2 TWD 8 FB4 +1.06 TEC TEH 3 HOT 720UL BOBBIN0.15 112 P2 TWD 6 FB5 -1.01 TEC TEH 3 HOT 720UL BOBBIN
77 67 0.23 102 P2 TWD 10 FB5 -1.09 TEC TEH 23 HOT 720UL BOBBIN0.50 112 P2 TWD 17 FB4 +0.98 TEC TEH 23 HOT 720UL BOBBIN0.19 120 P2 TWD 8 FB3 +1.20 TEC TEH 23 HOT 720UL BOBBIN0.10 112 P2 TWD 4 FB6 -1.31 TEC TEH 23 HOT 720UL BOBBIN
78 46 0.21 132 P2 TWD 9 FB7 +1.32 TEC TEH 5 HOT 720UL BOBBIN0.20 140 P2 TWD 8 FB6 +1.25 TEC TEH 5 HOT 720UL BOBBIN0.12 117 P2 TWD 5 FB6 -1.08 TEC TEH 5 HOT 720UL BOBBIN0.40 101 P2 TWD 14 FB5 +1.17 TEC TEH 5 HOT 720UL BOBBIN0.72 125 P2 TWD 22 FB5 -1.12 TEC TEH 5 HOT 720UL BOBBIN0.35 117 P2 TWD 13 FB4 +1.17 TEC TEH 5 HOT 720UL BOBBIN0.52 128 P2 TWD 17 FB4 -1.14 TEC TEH 5 HOT 720UL BOBBIN0.30 130 P2 TWD 12 FB3 +1.23 TEC TEH 5 HOT 720UL BOBBIN0.18 100 P2 TWD 7 FB3 -1.19 TEC TEH 5 HOT 720UL BOBBIN0.12 122 P2 TWD 5 FB2 -1.38 TEC TEH 5 HOT 720UL BOBBIN
78 56 0.10 65 P2 TWD 4 FB5 +1.03 TEC TEH 5 HOT 720UL BOBBIN
78 60 0.08 113 P2 TWD 3 FB3 +1.16 TEC TEH 5 HOT 720UL BOBBIN0.11 90 P2 TWD 5 FB5 +1.03 TEC TEH 5 HOT 720UL BOBBIN
78 62 0.48 128 P2 TWD 16 FB3 -1.03 TEC TEH 3 HOT 720UL BOBBIN0.18 136 P2 TWD 8 FB3 +1.19 TEC TEH 3 HOT 720UL BOBBIN1.41 127 P2 TWD 32 FB4 -1.08 TEC TEH 3 HOT 720UL BOBBIN0.87 118 P2 TWD 24 FB5 +1.06 TEC TEH 3 HOT 720UL BOBBIN0.13 118 P2 TWD 5 FB6 -1.08 TEC TEH 3 HOT 720UL BOBBIN0.32 145 P2 TWD 12 FB6 +1.03 TEC TEH 3 HOT 720UL BOBBIN
78 66 0.17 115 P2 TWD 7 FB3 +1.12 TEC TEH 3 HOT 720UL BOBBIN0.20 108 P2 TWD 8 FB4 -1.01 TEC TEH 3 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 11:53:38Component: S/G 11 Page 14 of 16Component: S/C 11 Page 14 of 16
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT
0.25 123 P2 TWD 10 FB4 +1.06 TEC TEH0.31 136 P2 TWD 12 FB5 +1.03 TEC TEH0.18 98 P2 TWD 7 FB6 +1.10 TEC TEH
78 68 0.43 111 P2 TWD 15 FB4 -1.04 TEC TEH0.17 112 P2 TWD 7 FB5 +1.08 TEC TEH
78 70 0.12 149 P2 TWD 5 FB4 -1.01 TEC TEH
UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
3 NOT 720UL BOBBIN
3 HOT 720UL BOBBIN3 HOT 720UL BOBBIN3 NOT 720UL BOBBIN
3 HOT 720UL BOBBIN3 HOT 720UL BOBBIN
--- -- --- -- -- ----3 ---NOT - ---720UL-- -- --BOBBIN-- --
3 NOT 720UL BOBBIN78 72 0.15 86 P2 TWD 6 FB4 -1.08
79 39 0.15 125 P2 TWD 6 FB6 -1.230.21 128 P2 TWD 9 FB5 -1.230.17 128 P2 TWD 7 FB4 +1.120.21 120 P2 TWD 9 FB3 +1.19
TEC TEH
TEC TENTEC TEHTEC TEHTEC TEH
5 HOT 720UL5 HOT 720UL5 HOT 720UL5 HOT 720UL
BOBBINBOBBINBOBBINBOBBIN
79 43 0.28 125 P2 TWD 11 FB3 +1.14 TEC TEH 5 HOT 720UL BOBBIN0.44 125 P2 TWD 16 FB4 +1.10 TEC TEH 5 HOT 720UL BOBBIN0.60 121 P2 TWD 19 FB5 -1.06 TEC TEH 5 HOT 720UL BOBBIN0.39 125 P2 TWD 14 FB6 -1.10 TEC TEH 5 HOT 720UL BOBBIN
79 47 0.15 102 P2 TWD 7 FB4 +1.10 TEC TEH 5 HOT 720UL BOBBIN
79 49 0.09 51 P2 TWD 4 FB4 +1.09 TEC TEH 6 HOT 720UL BOBBIN
79 51 0.18 108 P2 TWD 7 FB7 +1.25 TEC TEH 5 HOT 720UL BOBBIN0.33 136 P2 TWD 13 FB6 +1.21 TEC TEH 5 HOT 720UL BOBBIN0.22 121 P2 TWD 9 FB6 -1.25 TEC TEH 5 HOT 720UL BOBBIN0.12 109 P2 TWD 5 FB5 +1.14 TEC TEH 5 HOT 720UL BOBBIN0.56 119 P2 TWD 18 FB5 -1.12 TEC TEH 5 HOT 720UL BOBBIN0.83 129 P2 TWD 24 FB4 +1.03 TEC TEH 5 HOT 720UL BOBBIN0.79 119 P2 TWD 23 FB3 +1.21 TEC TEH 5 HOT 720UL BOBBIN
79 59 0.32 135 P2 TWD 12 FB3 +1.03 TEC TEH 5 HOT 720UL BOBBIN0.95 119 P2 TWD 26 FB4 +1.10 TEC TEH 5 HOT 720UL BOBBIN0.54 124 P2 TWD 18 FB5 -1.01 TEC TEH 5 HOT 720UL BOBBIN0.17 131 P2 TWD 7 FB6 -1.10 TEC TEH 5 HOT 720UL BOBBIN
79 61 0.23 134 P2 TWD 9 FB3 +1.12 TEC TEH 3 HOT 720UL BOBBIN0.60 123 P2 TWD 19 FB4 +1.01 TEC TEH 3 HOT 720UL BOBBIN0.78 124 P2 TWD 23 FB5 -1.08 TEC TEH 3 HOT 720UL BOBBIN
79 63 0.08 128
79 65 0.17 1270.17 1230.33 1100.24 116
P2 TWD 4 FB4 +0.96 TEC TEH
P2 TWD 7 FB6 -1.10 TEC TEHP2 TWD 7 FB5 -1.10 TEC TEHP2 TWD 13 FB4 +1.03 TEC TEHP2 TWD 10 FB3 +1.12 TEC TEH
4 NOT 720UL
4 HOT 720UL4 NOT 720UL4 HOT 720UL4 HOT 720UL
BOBBIN
BOBBINBOBBINBOBBINBOBBIN
79 71 0.10 131 P2 TWD 4 FB4 +0.99 TEC TEH 3 HOT 720UL BOBBIN
80 42 0.44 105 P2 TWD 16 FB6 +1.19 TEC TEH 5 HOT 720UL BOBBIN0.90 121 P2 TWD 25 FB5 +1.17 TEC TEH 5 HOT 720UL BOBBIN0.12 83 P2 TWD 5 FB5 -1.06 TEC TEH 5 HOT 720UL BOBBIN1.13 129 P2 TWD 28 FB4 -1.03 TEC TEH 5 HOT 720UL BOBBIN1.01 123 P2 TWD 27 FB3 -1.14 TEC TEH 5 HOT 720UL BOBBIN
80 44 0.25 125 P2 TWD 10 FB3 -1.10 TEC TEH 5 HOT 720UL BOBBIN0.73 121 P2 TWD 22 FB4 -1.10 TEC TEH 5 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 11:53:38Component: S/G 11 Page 15 of 16Component: S/G 11 Page 15 of 16
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION
0.22 107 P2 TWD 9 FB5 +1.10
80 48 0.24 99 P2 TWD 9 FB7 -1.090.17 111 P2 TWD 6 FB6 +1.180.87 112 P2 TWD 23 FB6 -1.090.30 125 P2 TWD 11 FB5 +1.070.26 127 P2 TWD 10 FB5 -1.091.39 106 P2 TWD 30 FB4 -1.050.55 112 P2 TWD 17 FB3 -1.07
EXT
TEC
TECTECTECTECTECTECTEC
EXT UTIL 1 UTIL 2 CAL # LEG
TEH 5 HOT
TEN 6 NOTTEH 6 HOTTEH 6 HOTTEH 6 HOTTEH 6 HOTTEH 6 HOTTEH 6 HOT
PROBE SCOPE
720UL BOBBIN720UL BOBBIN
720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
80 54 0.17 91 P2 TWD 7 FB5 +0.00 TEC TEH 9 HOT 720UL BOBBIN0.10 121 P2 TWD 5 FB6 +0.13 TEC TEH 9 HOT 720UL BOBBIN0.08 66 P2 TWD 4 FB4 +0.09 TEC TEH 9 HOT 720UL BOBBIN
80 60 0.14 126 P2 TWD 5 FB7 +1.12 TEC TEH 6 HOT 720UL BOBBIN0.63 117 P2 TWD 19 FB6 +0.99 TEC TEH 6 HOT 720UL BOBBIN0.67 I11 P2 TWD 20 FB5 +0.96 TEC TEH 6 HOT 720UL BOBBIN0.13 115 P2 TWD 5 FB5 -1.10 TEC TEH 6 HOT 720UL BOBBIN0.41 104 P2 TWD 14 FB4 +1.21 TEC TEH 6 HOT 720UL BOBBIN0.64 105 P2 TWD 19 FB4 -1.10 TEC TEH 6 HOT 720UL BOBBIN0.20 117 P2 TWD 8 FB3 +1.16 TEC TEH 6 HOT 720UL BOBBIN
81 55 0.14 142 P2 TWD 6 FB5 +1.05 TEC TEH 9 HOT 720UL BOBBIN
81 57 0.200.350.510.790.540.810.330.950.15
81 61 0.190.110.110.350.830.20
81 63 0.271.070.300.520.810.36
86 P2 TWD 8 FB7 -1.07 TEC TEH98 P2 TWD 12 FB6 +1.03 TEC TEH107 P2 TWD 16 FB6 -1.09 TEC TEH112 P2 TWD 22 FB5 +1.03 TEC TEH99 P2 TWD 17 FB5 -1.09 TEC TEH98 P2 TWD 22 FB4 +1.07 TEC TEH124 P2 TWD 12 FB4 -1.09 TEC TEH107 P2 TWO 25 FB3 -1.09 TEC TEH131 P2 TWD 6 FB2 +1.34 TEC TEH
145 P2 TWD 8 FB7 -1.09 TEC TEH154 P2 TWD 5 FB6 +1.20 TEC TEH119 P2 TWD 5 FB6 -1.09 TEC TEH142 P2 TWD 13 FB5 -1.09 TEC TEH107 P2 TWD 24 FB4 +1.09 TEC TEH106 P2 TWD 8 FB3 +1.09 TEC TEH
134 P2 TWD 11 FB7 -1.09 TEC TEH112 P2 TWD 28 FB6 -1.09 TEC TEH118 P2 TWD 12 FB5 +1.24 TEC TEH138 P2 TWD 18 FB5 -1.09 TEC TEH111 P2 TWD 24 FB4 +1.11 TEC TEH143 P2 TWD 14 FB3 -1.09 TEC TEH
6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN6 HOT 720UL BOBBIN
4 NOT 720UL BOBBIN4 HOT 720UL BOBBIN4 HOT 720UL BOBBIN4 HOT 720UL BOBBIN4 HOT 720UL BOBBIN4 HOT 720UL BOBBIN
23 HOT 720UL BOBBIN23 NOT 720UL BOBBIN23 HOT 720UL BOBBIN23 HOT 720UL BOBBIN23 HOT 720UL BOBBIN23 HOT 720UL BOBBIN
82 46 0.20 151 P2 TWD 8 FB70.33 116 P2 TWD 12 FB60.20 148 P2 TWD 8 FB60.94 108 P2 TWD 26 FB50.24 80 P2 TWD 10 FB51.20 120 P2 TWD 29 FB40.48 125 P2 TWD 17 FB30.10 164 P2 TWD 5 FB4
82 50 0.23 103 P2 TWD 9 FB70.53 130 P2 TWD 18 FB6
+1.32+1.32-1.21+1.12-1.17-1.12-1.19+1.19
TECTECTECTECTECTECTECTEC
TEHTEHTEHTEHTEHTEHTEHTEH
55555555
HOTHOTHOTHOTHOTHOTHOTHOT
720UL720UL720UL720UL720UL720UL720UL720UL
BOBBINBOBBINBOBBINBOBBINBOBBINBOBBINBOBBINBOBBIN
BOBBINBOBBIN
+1.36 TEC TEN+1.21 TEC TEH 5 HOT 720UL
5 HOT 720UL
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 11:53:39Component: S/G 11 Page 16 of 16
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE
0.20 84 P2 TWD 8 FB6 -1.301.20 127 P2 TWD 29 FB5 +1.170.25 148 P2 TWD 10 FB5 -1.190.19 72 P2 TWD 8 FB4 +1.231.04 117 P2 TWD 27 FB4 -1.170.63 106 P2 TWD 20 FB3 -1.19
82 52 0.40 131 P2 TWD 14 FB7 -1.270.20 76 P2 TWD 8 FB6 +1.320.52 126 P2 TWD 18 FB6 -1.231.07 121 P2 TWD 28 FB5 +1.120.28 97 P2 TWD 11 FB5 -1.160.14 145 P2 TWD 6 FB4 +1.141.03 131 P2 TWD 27 FB4 -1.010.88 125 P2 TWD 25 FB3 -1.19
82 60 0.23 137 P2 TWD 9 FB4 -1.01
TEC TEH 5 HOT 720ULTEC TEH 5 HOT 720ULTEC TEH 5 HOT 720ULTEC TEH 5 HOT 720ULTEC TEH 5 HOT 720ULTEC TEH 5 HOT 720UL
TEC TEH 5 HOT 720ULTEC TEH 5 HOT 720ULTEC TEH 5 HOT 720ULTEC TEH 5 HOT 720UL
SCOPE
BOBBINBOBBINBOBBINBOBBINBOBBINBOBBINBOBBINBOBBINBOBBINBOBBINBOBBINBOBBINBOBBINBOBBINBOBBIN
BOBBINBOBBINBOBBIN
BOBBIN
TEC TEHTEC TEHTEC TEHTEC TEH
TEC TEH
5555
HOTHOTHOTHOT
720UL720UL720UL720UL
720UL720UL720UL
720UL
0.19 93 P2 TWD 8 FB5 +1.01 TEC TEH0.25 104 P2 TWD 10 FB6 +1.03 TEC TEH
83 49 0.12 93 P2 TWD 5 FB6 +1.14 TEC TEH
5 HOT5 HOT5 HOT
6 HOT
Total Tubes : 233Total Records: 674
Attachment 2 to Enclosure to AEP-NRC-2013-90Unit 1 2013 Steam Generator Tube Inspection Report
SG 12 Fan Bar/Lattice Grid Wear Percent Throughwall Indications
AREVA NP Inc 04/15/13 10:37:25Customer Name: DC COOK Unit 1 Component: S/G 12 Page 1 of 12
TWD Indications
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
1 47 0.15 53 P2 TWD 7 07C -0.93 TEC TEH LAR 36 HOT 720CL BOBBIN0.06 103 P2 TWD 3 07C +1.13 TEC TEH LAR 36 HOT 720CL BOBBIN
1 63 0.20 136 P2 TWD 7 06C +1.05 08C TEC LAR 5 COLD 720UL BOBBIN
1 67 0.20 97 P2 TWD 7 07C -1.61 08C TEC LAR 5 COLD 720UL BOBBIN......................................................................................................................................
1 87 0.23 109 P2 TWD 9 07C -1.01 08C TEC LAR 4 COLD 720UL BOBBIN
2 50 0.13 50 P2 TWD 7 07C -1.43 TEC TEN LAR 42 NOT 720CL BOBBIN......................................................................................................................................
3 77 0.10 78 P2 TWD 4 06C +1.25 TEC TEH LAR 34 HOT 720CL BOBBIN
24 10 0.11 74 P2 TWD 6 EB5 +1.65 TEC TEN 29 NOT 720UL BOBBIN......................................................................................................................................
29 57 0.17 71 P2 TWD 7 016 +0.77 TEC TEH LAR 24 HOT 720UL BOBBIN
31 21 0.12 147 P2 TWD 6 FB6 -1.01 TEC TEH 29 HOT 720UL BOBBIN
31 35 0.20 133 P2 TWD 9 03H -0.61 TEC TEN LAR 21 HOT 720UL BOBBIN
34 58 0.11 141 P2 TWD 7 04H -0.80 TEC TEH LAR 24 HOT 720UL BOBBIN
......................................................................................................................................
37 51 0.09 153 P2 TWD 4 05W +0.57 TEC TEH LAR 21 HOT 720UL BOBBIN0.11 143 P2 TWD 9 07H +0.59 TEC TEH LAR 21 HOT 720UL BOBBIN
37 61 0.11 39 P2 TWO 6 FB4 +1.08 TEC TEN 23 HOT 720UL BOBBIN
38 52 0.11 51 P2 TWD 5 FB4 -1.07 TEC TEH 22 HOT 720UL BOBBIN
39 45 0.21 126 P2 TWD 9 FB3 +0.65 TEC TEH 22 HOT 720UL BOBBIN
42 64 0.18 102 P2 TWD 7 03H +0.59 TEC TEH LAR 24 HOT 720UL BOBBIN
42 74 0.07 84 P2 TWO 3 FB6 -0.79 TEC TEN 24 NOT 720UL BOBBIN
43 63 0.16 108 P2 TWO 7 FB3 -1.99 TEC TEN 24 NOT 720UL BOBBIN
45 51 0.20 163 P2 TWO 9 FB4 +0.99 TEC TEN 21 NOT 720UL BOBBIN
46 48 0.13 29 P2 TWD 6 FB5 +1.06 TEC TEH 8 HOT 720UL BOBBIN0.17 35 P2 TWD 7 FB4 -1.21 TEC TEH 8 HOT 720UL BOBBIN
46 64 0.16 128 P2 TWD 6 FB3 +0.84 TEC TEH 21 HOT 720UL BOBBIN
46 66 0.15 107 P2 TWD 6 FB5 +1.08 TEC TEH 11 HOT 720UL BOBBIN
46 68 0.13 25 P2 TWD 5 FB4 -1.12 TEC TEH 11 HOT 720UL BOBBIN
47 67 0.12 40 P2 TWD 5 FB5 -1.2S TEC TEH 11 HOT 720UL BOBBIN0.12 30 P2 TWD S FB4 +1.08 TEC TEH 21 HOT 720UL BOBBIN
48 48 0.09 136 P2 TWO 4 04N +0.42 TEC TEN LAR 7 NOT 720UL BOBBIN
49 51 0.19 49 P2 TWD 8 FB5 -1.04 TEC TEH 7 HOT 720UL BOBBIN0.18 91 P2 TWD 8 FB4 +0.95 TEC TEH 7 HOT 720UL BOBBIN
49 71 0.22 126 P2 TWD 9 FB4 +1.10 TEC TEH 11 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 10:37:25Component: S/G 12 Page 2 of 12Component: SIG 12 Page 2 of 12
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG
50 24 0.16 154 P2 TWD 8 04H +0.53 TEC TEH LAR 29 HOT
53 67 0.14 141 P2 TWD 6 03H -1.65 TEC TEH LAR 11 HOT
54 54 0.09 60 P2 TWD 4 FB5 +0.00 TEC TEH 20 HOT...............................................................................................
54 60 0.07 156 P2 TWD 3 FB4 +0.51 TEC TEH 9 HOT...............................................................................................
55 47 0.11 35 P2 TWD 5 FB4 +1.17 TEC TEH 8 HOT55..87.0.17...99..P2...T.....7.....N...0.46......TEC.......TEN........LAR.......26......NOT....55 87 0.17 99 P2 TWD 7 03H .+0.46 TEC TEH LAR 26 HOT
PROBE SCOPE
720UL BOBBIN.. . . . . . . . . . . . . . . . . .BOBBIN . . . . . . . . . . . .
720UL BOBBIN720UL BOBBIN720UL BOBBIN
720UL BOBBIN
720UL BOBBIN
720UL BOBBIN
56 56 0.23 45 P2 TWD 9 FB6 -1.42 TEC TEH 10 HOT0.21 128 P2 TWD 8 FB5 +1.16 TEC TEH 10 HOT0.16 137 P2 TWD 7 FB5 -1.12 TEC TEH 10 HOT0.34 142 P2 TWD 12 FB4 +1.18 TEC TEH 10 HOT0.28 136 P2 TWD 11 FB4 -1.16 TEC TEH 10 HOT0.23 79 P2 TWO 9 FB3 +1.25 TEC TEH 10 HOT
56 86 0.40 123 P2 TWO 14 03H +0.90 TEC TEH LAR 25 HOT
57 53 0.46 117 P2 TWD 16 FB4 -1.37 TEC TEH 7 HOT
720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
720UL BOBBIN
720UL BOBBIN
57 55 0.29 119 P2 TWD 11 FB4 +1.46 TEC TEH 20 HOT 720UL BOBBIN
57 59 0.18 121 P2 TWD 7 FB5 +1.07 TEC TEH 10 HOT 720UL BOBBIN0.23 67 P2 TWD 9 FB4 -1.23 TEC TEH 10 HOT 720UL BOBBIN
58 46 0.11 37 P2 TWD 5 FB4 -1.19 TEC TEH 8 HOT 720UL BOBBIN
58 48 0.11 42 P2 TWD 4 FB5 +0.64 TEC TEH 8 HOT 720UL BOBBIN
58 52 0.140.190.130.14
58 54 0.320.680.590.29
59 45 0.130.110.160.110.17
95 P2 TWO 6 FB592 P2 TW 8 FB4130 P2 TWD 6 FB4119 P2 TWD 6 FB3
87 P2 TWD 12 FB6108 P2 TWD 21 FB5101 P2 TWD 19 FB4106 P2 TWD 11 FB3
+1.02 TEC+0.93 TEC-1.30 TEC+1.13 TEC
-0.04 TEC-0.04 TEC-0.07 TEC-0.07 TEC
TEHTEHTEHTEH
TEHTEHTEHTEH
7 HOT 720UL7 HOT 720UL7 HOT 720UL7 HOT 720UL
20 NOT 720UL20 HOT 720UL20 HOT 720UL20 HOT 720UL
BOBBINBOBBINBOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBIN
11255815496
P2 TWD 6 FB6 -1.39P2 TWD 5 FB5 +1.02P2 TWD 7 FB5 -1.37P2 TWD 5 FB4 +1.08P2 TWD 7 FB4 -1.39
TEC TENTEC TEHTEC TEHTEC TEHTEC TEH
7 NOT7 HOT7 HOT7 HOT7 HOT
720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
59 63 0.11 76 P2 TWD 5 FB6 -1.41 TEC TEH 9 HOT 720UL BOBBIN0.32 108 P2 TWD 13 FB5 -1.24 TEC TEH 9 HOT 720UL BOBBIN0.20 76 P2 TWD 9 FB4 +1.04 TEC TEH 9 HOT 720UL BOBBIN0.12 126 P2 TWD 6 FB3 +1.08 TEC TEH 9 HOT 720UL BOBBIN
60 48 0.22 115 P2 TWO 9 FB4 -1.13 TEC TEH 7 HOT 720UL BOBBIN0.10 43 P2 TWD 5 FB3 -1.24 TEC TEH 7 HOT 720UL BOBBIN
60 54 0.08 20 P2 TWD 4 FB3 -0.70 TEC TEH 19 HOT 720UL BOBBIN----------------------------------------------
60 60 0.08 52 P2 TWI) 4 FB5 -1.12 TEC TEH 10 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 10:37:25Component: S/G 12 Page 3 of 12
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
0.14 155 P2 TWD 6 FB4 +1.25 TEC TEH 10 HOT 720UL BOBBIN
60 66 0.13 125 P2 TWD 6 03H -1.73 TEC TEH LAR 12 HOT 720UL BOBBIN
61 47 0.13 127 P2 TWD 6 FB4 +1.15 TEC TEH 7 HOT 720UL BOBBIN
61 49 0.10 88 P2 TWD 5 FB5 -1.22 TEC TEH 7 HOT 720UL BOBBIN
61 51 0.31 116 P2 TWD 12 FB6 +1.08 TEC TEH0.26 107 P2 TWD 10 FB5 +1.08 TEC TEH0.31 115 P2 TWD 12 FB5 -1.24 TEC TEH0.36 97 P2 TWD 13 FB4 +1.06 TEC TEH0.29 120 P2 TWD 11 FB4 -1.22 TEC TEH0.21 116 P2 TWD 9 FB3 +1.24 TEC TEH0.12 128 P2 TWD 5 FB3 -1.30 TEC TEH
61 55 0.21 127 P2 TWD 9 FB6 -1.33 TEC TEH0.25 132 P2 TWD 10 FB5 -1.22 TEC TEH0.15 117 P2 TWD 7 FB4 +1.02 TEC TEH0.41 92 P2 TWD 15 FB4 -1.22 TEC TEH
62 46 0.23 90 P2 TWD 9 FB6 +1.19 TEC TEH0.35 99 P2 TWD 12 FB5 +1.19 TEC TEH0.14 73 P2 TWD 5 FB5 -1.16 TEC TEH0.58 103 P2 TWD 18 FB4 +1.16 TEC TEH0.32 79 P2 TWD 12 FB4 -1.16 TEC TEH0.37 102 P2 TWD 13 FB3 -1.32 TEC TEH
62 50 0.43 126 P2 TWD 15 FB6 +1.08 TEC TEH0.53 120 P2 TWD 18 FB5 +0.91 TEC TEH0.13 128 P2 TWD 6 FB5 -1.22 TEC TEH0.43 108 P2 TWD 15 FB4 +1.06 TEC TEH0.48 117 P2 TWD 16 FB4 -1.28 TEC TEH0.21 90 P2 TWD 9 FB3 +1.24 TEC TEH
62 52 0.59 118 P2 TWD 19 FB4 -1.17 TEC TEH0.19 92 P2 TWD 8 FB3 -1.35 TEC TEH0.21 128 P2 TWO 9 FB6 +1.15 TEC TEH0.27 97 P2 TWD 11 FB6 -1.39 TEC TEH0.34 103 P2 TWD 13 FB5 +1.08 TEC TEH0.80 126 P2 TWD 23 FB5 -1.28 TEC TEH0.56 115 P2 TWD 18 FB4 +0.97 TEC TEH
7 HOT 720UL BOBBIN7 HOT 720UL BOBBIN7 HOT 720UL BOBBIN7 HOT 720UL BOBBIN7 HOT 720UL BOBBIN7 HOT 720UL BOBBIN7 HOT 720UL BOBBIN
20 NOT 720UL BOBBIN20 HOT 720UL BOBBIN20 HOT 720UL BOBBIN20 HOT 720UL BOBBIN
B HOT 720UL BOBBIN8 NOT 720UL BOBBIN8 HOT 720UL BOBBIN8 HOT 720UL BOBBIN8 HOT 720UL BOBBIN8 HOT 720UL BOBBIN
7 HOT 720UL BOBBIN7 HOT 720UL BOBBIN7 NOT 720UL BOBBIN7 HOT 720UL BOBBIN7 HOT 720UL BOBBIN7 HOT 720UL BOBBIN
7 HOT 720UL BOBBIN7 HOT 720UL BOBBIN7 HOT 720UL BOBBIN7 NOT 720UL BOBBIN7 HOT 720UL BOBBIN7 HOT 720UL BOBBIN7 HOT 720UL BOBBIN
62 66 0.32 129 P2 TWD 12 03H -1.70 TEC TEH LAR
63 43 0.12 40 P2 TWD 5 FB4 +1.19 TEC TEH
63 47 0.13 Il1 P2 TWD 5 FB6 +1.21 TEC TEH0.13 102 P2 TWD 5 FB5 +1.30 TEC TEH0.28 95 P2 TWD 10 FB5 -1.12 TEC TEH0.47 92 P2 TWD 15 FB4 +1.16 TEC TEH0.15 127 P2 TWD 6 FB3 +1.27 TEC TEH
63 53 0.13 124 P2 TWD 5 FB6 +1.16 TEC TEH0.38 88 P2 TWD 13 FB6 -1.05 TEC TEH0.75 95 P2 TWD 21 FB5 -1.01 TEC TEH0.34 79 P2 TWD 12 FB4 +1.14 TEC TEH0.54 93 P2 TWD 17 FB4 -1.01 TEC TEH0.15 133 P2 TWD 6 FB3 +1.27 TEC TEH
11 HOT 720UL BOBBIN
7 HOT 720UL BOBBIN
------------
88888
888888
HOTHOTHOTHOTHOT
HOTHOTHOTHOTHOTHOT
720UL720UL720UL720UL720UL
720UL720UL720UL720UL720UL720UL
BOBBINBOBBINBOBBINBOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBINBOBBINBOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 10:37:25Component: S/G 12 Page 4 of 12Component: S/C 12 Page 4 of 12
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG
0.37 108 P2 TWD 13 FB3 -1.05 TEC TEH 8 HOT
PROBE SCOPE
720UL BOBBIN
63 55 0.10 69 P2 TWD 5 FB4 +1.56
64 38 0.12 79 P2 TWD 5 FB4 -1.13
64 44 0.33 119 P2 TWD 12 FB5 +1.100.46 119 P2 TWD 16 FB4 -1.190.12 108 P2 TWD 5 FB3 -1.39
64 48 0.17 77 P2 TWD 7 FB4 -1.10
64 52 0.15 63 P2 TWD 6 FB5 +1.120.44 68 P2 TWD 15 FB4 +1.10
TEC TEH 19 HOT 720UL BOBBIN
TEC TEN 7 NOT 720UL BOBBIN
TEC TEH 7 HOT 720UL BOBBINTEC TEN 7 NOT 720UL BOBBINTEC TEH 7 HOT 720UL BOBBIN
TEC TEH 7 HOT 720UL BOBBIN
TEC TEH 8 HOT 720UL BOBBINTEC TEH 8 HOT 720UL BOBBIN
64 54 0.14 590.82 1070.55 90
64 56 0.15 660.59 ii0.20 1341.09 1160.36 1020.73 1040.47 1270.14 1330.14 86
P2 TWD 7 FB6P2 TWD 24 FB5P2 TWD 19 FB4
P2 TWD 6 FB7P2 TWD 18 FB6P2 TWD 8 FB6P2 TWD 26 FB5P2 TWD 13 FB5P2 TWD 21 FB4P2 TWD 16 FB4P2 TWD 6 FB3P2 TWD 6 FB3
+0.00+0.00+0.00
+1.49+1.09-1.23+1.05-1.12+1.16-1.07+1.09-1.16
TEC TEHTEC TEHTEC TEH
19 HOT 720UL19 HOT 720UL19 HOT 720UL
TECTECTECTECTECTECTECTECTEC
TEHTEHTEHTEHTEHTEHTEHTEHTEH
10 HOT10 HOT10 HOT10 HOT10 HOT10 HOT10 HOT10 HOT10 HOT
720UL720UL720UL720UL720UL720UL720UL720UL720UL
BOBBINBOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBINBOBBINBOBBINBOBBINBOBBINBOBBIN
64 66 0.14 157 P2 TWD 6 FB4 -1.29 TEC TEH 12 HOT 720UL BOBBIN
65 41 0.17 89 P2 TWD 7 FB4 +1.21 TEC TEH 8 HOT 720UL BOBBIN
65 47 0.15 91 P2 TWD 6 FB6 -1.26 TEC TEH0.17 100 P2 TWD 7 FB5 +1.06 TEC TEH0.18 98 P2 TWD 8 FB5 -1.33 TEC TEH0.24 102 P2 TWD 10 FB4 +1.08 TEC TEH0.17 107 P2 TWD 7 FB4 -1.17 TEC TEH0.15 134 P2 TWD 7 FB3 +1.17 TEC TEH
65 51 0.28 100 P2 TWD 11 FB5 +0.95 TEC TEH0.11 58 P2 TWD 5 FB4 +1.04 TEC TEH0.15 90 P2 TWD 6 FB4 -1.15 TEC TEH
65 61 0.08 63 P2 TWD 4 FB2 -1.99 TEC TEH
66 40 0.20 91 P2 TWD 8 FB6 +1.23 TEC TEH0.54 95 P2 TWD 17 FB5 +1.16 TEC TEH0.33 79 P2 TWD 12 FB4 -1.16 TEC TEH0.17 102 P2 TWD 7 FB3 -1.27 TEC TEH
777777
HOTHOTHOTHOTHOTHOT
720UL720UL720UL720UL720UL720UL
BOBBINBOBBINBOBBINBOBBINBOBBINBOBBIN
7 HOT 720UL7 HOT 720UL7 HOT 720UL
10 HOT 720UL
8 HOT 720UL8 HOT 720UL8 HOT 720UL8 HOT 720UL
BOBBINBOBBINBOBBIN
BOBBIN
BOBBINBOBBINBOBBINBOBBIN
66 44 0.14 46 P2 TWD 5 FB4 -1.10 TEC TEH 8 HOT 720UL BOBBIN
66 58 0.11 137 P2 TWD 5 FB5 -1.30 TEC TEH 9 HOT 720UL BOBBIN0.19 97 P2 TWD 8 FB4 +0.99 TEC TEH 9 HOT 720UL BOBBIN
66 60 0.10 127 P2 TWD 5 FB6 -1.28 TEC TEH 9 HOT 720UL BOBBIN0.19 136 P2 TWD 8 FB5 +1.08 TEC TEH 9 HOT 720UL BOBBIN0.30 130 P2 TWD 12 FB5 -1.28 TEC TEH 9 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 10:37:25Component: S/G 12 Page 5 of 12Component: SIG 12 Page 5 of 12
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION
0.50 134 P2 TWD 18 FB4 +0.990.26 139 P2 TWD 11 FB3 +0.97
--------------------------------------------------
66 66 0.21 52 P2 TWD 8 FB5 -1.210.14 56 P2 TWD 6 FB4 +1.10
--------------------------------------------------
66 74 0.13 58 P2 TWD 7 FB4 -1.23--------------------------------------------------
67 39 0.15 72 P2 TWD 6 FB4 +1.18--------------------------------------------------
67 41 0.17 80 P2 TWD 7 FB5 -1.260.17 87 P2 TWD 7 FB4 +1.170.18 86 P2 TWD 8 FB4 -1.19
--------------------------------------------------
67 43 0.11 59 P2 TWD 5 FB6 -1.210.30 100 P2 TWD 12 FB5 -1.190.23 96 P2 TWD 9 FB4 +1.080.14 73 P2 TWD 6 FB3 +1.17
EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
TEC TEH 9 HOT 720UL BOBBINTEC TEH 9 HOT 720UL BOBBIN
.................. TEC.......TEN.......11.....HOT......................BOBBIN........TEC TEH 11 HOT 720UL BOBBINTEC TEH 11 HOT 720UL BOBBIN
TEC TEH 13 HOT...............................................
TEC TEH
TEC TENTEC TEHTEC TEH
TEC TEHTEC TENTEC TEHTEC TEH
8 HOT
7 NOT7 HOT7 HOT
7 HOT7 NOT7 HOT7 HOT
720UL BOBBIN.................. BOBBIN...........
720UL BOBBIN.................. BOBBIN...........
720UL BOBBIN720UL BOBBIN720UL BOBBIN
.................. BOBBIN...........
720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
67 45 0.12 76 P2 TWD 5 FB4 +1.08 TEC
67 47 0.20 85 P2 TWD 8 FB7 -1.47 TEC0.12 78 P2 TWD 5 FB6 +1.28 TEC0.38 92 P2 TWD 13 FB6 -1.28 TEC0.62 98 P2 TWD 19 FB5 +1.17 TEC0.27 98 P2 TWD 10 FB5 -1.17 TEC0.53 93 P2 TWD 17 FB4 +1.28 TEC0.23 99 P2 TWD 9 FB3 +1.28 TEC
...............................................................
TEH 7 HOT 720UL BOBBIN
TEH 8 HOT 720UL BOBBINTEH 8 HOT 720UL BOBBINTEH 8 HOT 720UL BOBBINTEH 8 HOT 720UL BOBBINTEH 8 HOT 720UL BOBBINTEH 8 HOT 720UL BOBBINTEH 8 HOT 720UL BOBBIN........................................................................
67 49 0.20 105 P2 TWD 8 FB6 +1.17 TEC TEH 8 HOT 720UL BOBBIN0.13 80 P2 TWD 5 FB6 -1.25 TEC TEH 8 HOT 720UL BOBBIN0.15 77 P2 TWD 6 FB5 +1.17 TEC TEH 8 HOT 720UL BOBBIN0.62 98 P2 TWD 18 FB5 -1.21 TEC TEH 8 HOT 720UL BOBBIN0.36 74 P2 TWD 13 FB4 +1.17 TEC TEH 8 HOT 720UL BOBBIN0.20 65 P2 TWD 8 FB4 -1.19 TEC TEH 8 HOT 720UL BOBBIN0.21 121 P2 TWD 8 FB3 +1.23 TEC TEH 8 HOT 720UL BOBBIN
67 53 0.19 118 P2 TWD 7 FB6 +1.25 TEC TEH 8 HOT 720UL BOBBIN0.32 117 P2 TWD 11 FB6 -1.08 TEC TEH 8 HOT 720UL BOBBIN0.77 97 P2 TWD 21 FB5 -1.06 TEC TEH 8 HOT 720UL BOBBIN0.67 77 P2 TWD 19 FB4 +1.08 TEC TEH 8 HOT 720UL BOBBIN0.46 98 P2 TWD 15 FB4 -1.08 TEC TEH 8 HOT 720UL BOBBIN0.36 85 P2 TWD 13 FB3 +1.34 TEC TEH 8 HOT 720UL BOBBIN
..........................................................................................................................
67 55 0.20 76 P2 TWD 9 FB6 +1.05 TEC TEH 19 HOT 720UL BOBBIN0.32 118 P2 TWD 13 FB6 -1.32 TEC TEH 19 HOT 720UL BOBBIN0.29 109 P2 TWD 12 FB5 +1.19 TEC TEH 19 HOT 720UL BOBBIN0.74 109 P2 TWD 23 FB5 -1.10 TEC TEH 19 HOT 720UL BOBBIN0.50 123 P2 TWD 18 FB4 +1.05 TEC TEH 19 HOT 720UL BOBBIN0.49 101 P2 TWD 17 FB4 -1.21 TEC TEH 19 HOT 720UL BOBBIN0.21 131 P2 TWD 9 FB3 -1.25 TEC TEH 19 HOT 720UL BOBBIN
67 57 0.22 120 P2 TWD 9 FB6 -1.28 TEC TEH 9 HOT 720UL BOBBIN0.12 80 P2 TWD 6 FB5 +1.03 TEC TEH 9 HOT 720UL BOBBIN0.23 141 P2 TWD 10 FB5 -1.21 TEC TEH 9 HOT 720UL BOBBIN0.17 88 P2 TWD 8 FB4 +0.99 TEC TEH 9 HOT 720UL BOBBIN0.18 106 P2 TWD 8 FB4 -1.23 TEC TEH 9 HOT 720UL BOBBIN
-----------------------------------------------
67 59 0.10 50 P2 TWD 5 FB6 +1.26
----------------------------------------------
TEC TEH 9 HOT
--------------------------
720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 10:37:25Component: S/G 12 Page 6 of 12
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG
0.11 98 P2 TWD 5 FB5 -0.97 TEC TEH 9 HOT0.23 114 P2 TWD 10 FB4 +1.08 TEC TEH 9 HOT
67 61 0.28 127 P2 TWD 12 FB6 +1.28 TEC TEH 9 HOT0.11 108 P2 TWD 5 FB6 -1.43 TEC TEH 9 HOT1.10 122 P2 TWD 28 FB5 -1.10 TEC TEH 9 HOT0.44 105 P2 TWD 16 FB4 +1.01 TEC TEH 9 HOT0.26 118 P2 TWD 11 FB4 -1.17 TEC TEH 9 HOT0.19 142 P2 TWD 8 FB3 -1.36 TEC TEH 9 HOT
67 63 0.48 133 P2 TWD 17 FB6 -1.32 TEC TEH 9 HOT0.11 77 P2 TWD 5 FB5 +1.06 TEC TEH 9 HOT0.70 120 P2 TWD 22 FB5 -1.21 TEC TEH 9 HOT0.25 141 P2 TWD 11 FB4 +1.10 TEC TEH 9 HOT0.26 121 P2 TWD 11 FB4 -1.23 TEC TEH 9 HOT0.27 129 P2 TWD 11 FB3 -1.26 TEC TEH 9 HOT
67 65 0.15 141 P2 TWD 6 FB6 -1.36 TEC TEH 12 HOT0.43 96 P2 TWD 15 FB5 -1.18 TEC TEH 12 HOT0.33 115 P2 TWD 12 FB4 +0.98 TEC TEH 12 HOT0.14 52 P2 TWD 6 FB3 +1.16 TEC TEH 12 HOT
PROBE SCOPE
720UL BOBBIN720UL BOBBIN
720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
67 67 0.16 153 P2 TWD 7 FB4 +1.09 TEC TEH 12 HOT 720UL BOBBIN0.12 42 P2 TWD 5 FB5 -1.09 TEC TEH 12 HOT 720UL BOBBIN
67 69 0.18 57 P2 TWD 7 FB5 -1.14 TEC TEH 11 HOT 720UL BOBBIN0.18 109 P2 TWD 7 FB4 +1.08 TEC TEH 11 HOT 720UL BOBBIN
67 77 0.11 114 P2 TWD 5 FB7 -0.88 TEC TEH 14 HOT 720UL BOBBIN
68 40 0.32 109 P2 TWD 12 FB5 +1.06 TEC TEH 7 HOT 720UL BOBBIN0.44 114 P2 TWD 15 FB4 -1.21 TEC TEH 7 HOT 720UL BOBBIN
68 42 0.10 61 P2 TWD 5 FB6 -1.35 TEC TEH 7 HOT 720UL BOBBIN0.19 105 P2 TWD 8 FB5 +1.17 TEC TEH 7 HOT 720UL BOBBIN0.37 119 P2 TWD 14 FB4 -1.11 TEC TEH 7 HOT 720UL BOBBIN
68 44 0.26 122 P2 TWO 10 FB6 +i.Ii TEC TEH 7 HOT 720UL BOBBIN0.09 42 P2 TWD 4 FB6 -1.28 TEC TEH 7 HOT 720UL BOBBIN0.70 121 P2 TWD 21 FB5 +1.06 TEC TEH 7 HOT 720UL BOBBIN0.22 113 P2 TWD 9 FB5 -1.26 TEC TEH 7 HOT 720UL BOBBIN0.22 I1i P2 TWD 9 FB4 +1.04 TEC TEH 7 HOT 720UL BOBBIN0.90 112 P2 TWD 24 FB4 -1.22 TEC TEH 7 HOT 720UL BOBBIN0.11 42 P2 TWD 5 FB3 +1.22 TEC TEH 7 HOT 720UL BOBBIN0.27 97 P2 TWO 11 FB3 -1.46 TEC TEH 7 HOT 720UL BOBBIN
68 56 0.15 29 P2 TWD 6 FB4 +1.03 TEC TEH 10 HOT 720UL BOBBIN
68 64 0.270.110.160.12
68 66 0.20
68 68 0.170.160.14
105 P2 TWD 10 FB5 -1.08 TEC TEH 11 HOT 720UL BOBBIN42 P2 TWO 5 FB4 +1.04 TEC TEH 11 HOT 720UL BOBBIN107 P2 TWO 7 FB4 -1.21 TEC TEH 11 HOT 720UL BOBBIN142 P2 TWD 5 FB3 +1.19 TEC TEH 11 HOT 720UL BOBBIN
75 P2 TWD 8 FB5 -1.18 TEC TEH 12 HOT 720UL BOBBIN
46 P2 TWD 7 FB5 +0.79 TEC TEH 12 HOT 720UL BOBBIN118 P2 TWO 7 FB4 -1.33 TEC TEH 12 HOT 720UL BOBBIN139 P2 TWD 6 FB3 +1.36 TEC TEH 12 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 10:37:26Component: S/G 12 Page 7 of 12
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
68 70 0.13 53 P2 TWD 5 FB6 +1.15 TEC TEH 11 HOT 720UL BOBBIN0.20 69 P2 TWD 8 FB5 +1.01 TEC TEH 11 HOT 720UL BOBBIN0.13 53 P2 TWD 5 FB4 +1.10 TEC TEH 11 HOT 720UL BOBBIN0.18 38 P2 TWD 7 FB4 -1.34 TEC TEH 11 HOT 720UL BOBBIN
68 76 0.10 121 P2 TWD 4 FB6 -0.66 TEC TEH 14 HOT 720UL BOBBIN
69 39 0.10 94 P2 TWD 5 FB4 +0.99 TEC TEH 7 HOT 720UL BOBBIN
69 41 0.11 107 P2 TWD 4 FB5 -1.10 TEC TEH 8 HOT 720UL BOBBIN0.18 73 P2 TWD 7 FB4 +1.10 TEC TEH 8 HOT 720UL BOBBIN0.14 59 P2 TWD 5 FB3 +1.25
-1.17+1.02
TEC TEH HOT 720UL BOBBIN
69 49 0.26 100 P2 TWD 10 FB50.16 75 P2 TWD 7 FB4
69 51 0.380.110.460.130.320.300.11
69 53 0.140.230.510.910.710.770.730.130.13
109 P2 TWD 14 FB6 -1.24124 P2 TWD 5 FB5 +1.08116 P2 TWD 16 FB5 -1.2283 P2 TWD 6 FB4 +1.08114 P2 TWD 12 FB4 -1.28102 P2 TWD 12 FB3 +1.0271 P2 TWD 5 FB7 -1.37
91 P2 TWD 6 FB7 -1.55113 P2 TWD 9 FB6 +1.13118 P2 TWD 17 FB6 -1.26120 P2 TWD 25 FB5 -1.22116 P2 TWD 21 FB4 +1.02123 P2 TWD 22 FB4 -1.33119 P2 TWD 22 FB3 +1.08101 P2 TWD 6 FB3 -1.46142 P2 TWD 6 FB2 -1.52
TEC TEH 7 HOT 720UL BOBBINTEC TEH 7 HOT 720UL BOBBIN
TEC TEN 7 NOT 720UL BOBBINTEC TEH 7 HOT 720UL BOBBINTEC TEH 7 HOT 720UL BOBBINTEC TEH 7 HOT 720UL BOBBINTEC TEH 7 HOT 720UL BOBBINTEC TEH 7 HOT 720UL BOBBINTEC TEH 7 HOT 720UL BOBBIN
TEC TEH 7 HOT 720UL BOBBINTEC TEN 7 NOT 720UL BOBBINTEC TEH 7 HOT 720UL BOBBINTEC TEH 7 HOT 720UL BOBBINTEC TEH 7 HOT 720UL BOBBINTEC TEH 7 HOT 720UL BOBBINTEC TEH 7 HOT 720UL BOBBINTEC TEH 7 HOT 720UL BOBBINTEC TEH 7 HOT 720UL BOBBIN
TEC TEH 10 HOT 720UL BOBBIN
TEC TEH 12 HOT 720UL BOBBINTEC TEN 12 NOT 720UL BOBBINTEC TEH 12 HOT 720UL BOBBINTEC TEN 12 NOT 720UL BOBBIN
TEC TEH 12 HOT 720UL BOBBIN
69 59 0.21 109 P2 TWD 8 FB5 -1.10
69 69 0.290.140.260.15
69 71 0.20
124 P2 TWD 11 FB5 +0.96134 P2 TWD 6 FB4 +1.05126 P2 TWD 10 FB4 -1.2380 P2 TWD 6 FB3 +1.31
52 P2 TWD 8 FB4 +1.06
69 73 0.12 63 P2 TWD 6 FB4 +0.99 TEC TEH 13 HOT 720UL BOBBIN
70 48 0.170.15
70 52 0.180.120.180.850.130.11
53 P2 TWD 7 FB5 +1.1048 P2 TWD 6 FB4 +1.10
110 P2 TWD 8 FB6 +1.02104 P2 TWD 5 FB5 +1.22117 P2 TWD 8 FB5 -1.15110 P2 TWD 23 FB4 +1.0671 P2 TWD 6 FB3 +1.15102 P2 TWD 5 FB3 -1.31
TEC TEHTEC TEH
TEC TENTEC TEHTEC TEHTEC TEHTEC TEHTEC TEH
8 HOT8 HOT
7 NOT7 HOT7 HOT7 HOT7 HOT7 HOT
20 HOT20 HOT20 HOT20 HOT
720UL720UL
720UL720UL720UL720UL720UL720UL
720UL720UL720UL720UL
BOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBINBOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBIN
70 54 0.22 89 P2 TWD 9 FB70.70 93 P2 TWD 21 FB61.23 101 P2 TWD 29 FB50.84 80 P2 TWD 24 FB4
-0.07 TEC TEN-0.13 TEC TEH-0.09 TEC TEH-0.09 TEC TEH
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 10:37:26Component: S/G 12 Page 8 of 12
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
0.26 82 P2 TWD 11 FB3 +0.00 TEC TEH 20 HOT 720UL BOBBIN
70 60 0.17 138 P2 TWD 8 FB6 -1.25 TEC TEH 9 HOT 720UL BOBBIN0.54 120 P2 TWD 19 FB5 +0.99 TEC TEH 9 HOT 720UL BOBBIN0.54 128 P2 TWD 19 FB4 -1.08 TEC TEH 9 HOT 720UL BOBBIN
70 62 0.320.570.080.540.26
105121ill117146
P2P2P2P2P2
TWD 1TWD 1TWD 4TWD 1TWD 1
TWD 1TWD 2TWD 2TWD 7TWD 7
70 64 0.41 105 P20.81 113 P20.84 129 P20.16 101 P20.16 37 P2
2 FB6 +1.21 TEC TEH 10 HOT 720UL BOBBIN8 FB5 +1.18 TEC TEH 10 HOT 720UL BOBBIN
FB5 -1.16 TEC TEH 10 HOT 720UL BOBBIN7 FB4 -1.16 TEC TEH 10 HOT 720UL BOBBIN0 FB3 -1.36 TEC TEH 10 HOT 720UL BOBBIN
4 PB6 +1.03 TEC TEN 12 NOT 720UL BOBBIN2 FBS +1.01 TEC TEH 12 HOT 720UL BOBBIN3 FB4 -1.25 TEC TEH 12 HOT 720UL BOBBIN
FB3 -1.40 TEC TEH 12 HOT 720UL BOBBINFB3 +1.16 TEC TEH 12 HOT 720UL BOBBIN
FB5 +0.99 TEC TEH 12 HOT 720UL BOBBINFB4 -1.18 TEC TEH 12 HOT 720UL BOBBIN
70 70 0.18 123 P2 TWD 70.22 92 P2 TWD 9
70 74 0.09 86 P2 TWD 5 FB6 -0.79 TEC TEH 13 HOT 720UL BOBBIN
71 53 0.20 115 P2 TWD 8 FB4 +1.41 TEC TEH 8 HOT 720UL BOBBIN
71 71 0.12 73 P2 TWD 50.18 97 P2 TWD 70.14 86 P2 TWD 6
FB5FB4FB3
71 75 0.090.15
58 P2 TWD 5 FB5113 P2 TWD 8 FB4
-1.25 TEC TEH 12 HOT 720UL BOBBIN+1.07 TEC TEH 12 HOT 720UL BOBBIN-1.25 TEC TEH 12 HOT 720UL BOBBIN
-1.17 TEC TEN 13 NOT 720UL BOBBIN+0.90 TEC TEH 13 HOT 720UL BOBBIN
+1.04 TEC TEH 7 HOT 720UL BOBBIN-1.26 TEC TEH 7 HOT 720UL BOBBIN-1.30 TEC TEH 7 HOT 720UL BOBBIN
72 40 0.36 119 P2 TWD 13 FB50.48 115 P2 TWD 16 FB40.12 70 P2 TWD 5 FB3
72 44 0.11 109 P2 TWD 5 FB6 +1.15 TEC0.31 115 P2 TWD 12 FB5 +0.97 TEC0.38 118 P2 TWD 14 FB4 -1.24 TEC0.17 104 P2 TWD 7 FB3 -1.37 TEC
72 46 0.10 149 P2 TWD 4 FB2 +0.64 TEC
72 50 0.15 75 P2 TWD 6 FB6 -1.25 TEC0.42 87 P2 TWD 14 FB5 +1.08 TEC0.27 74 P2 TWD 10 FB4 +1.12 TEC0.41 86 P2 TWD 14 FB4 -1.10 TEC0.12 114 P2 TWD 5 FB3 +1.21 TEC
TEHTEHTEHTEH
TEN
TENTENTEHTEHTEH
7 HOT7 HOT7 HOT7 HOT
7 HOT
8 NOT8 HOT8 HOT8 HOT8 HOT
720UL720UL720UL720UL
720UL
720UL720UL720UL720UL720UL
BOBBINBOBBINBOBBINBOBBIN
BOBBIN
BOBBINBOBBINBOBBINBOBBINBOBBIN
72 52 0.630.690.581.310.210.470.780.710.30
979494929610810299103
P2P2P2P2P2P2P2P2P2
TWD 19TWD 20TWD 18TWD 28TWD 8TWD 15TWD 21TWD 20TWD 11
FB6FB5FB4FB4FB7FB6FB5FB3FB2
+1.19+1.12+1.19-1.10-1.45-1.28-1.21-1.23+1.45
TECTECTECTECTECTECTECTECTEC
TEHTEHTEHTEHTEHTEHTEHTEHTEH
888888888
HOTHOTHOTHOTHOTHOTHOTHOTHOT
720UL720UL720UL720UL720UL720UL720UL720UL720UL
BOBBINBOBBINBOBBINBOBBINBOBBINBOBBINBOBBINBOBBINBOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 10:37:26Component: S/G 12 Page 9 of 12
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
72 66 0.11 49 P2 TWD 5 FB5 -1.21 TEC TEH 11 HOT 720UL BOBBIN0.11 27 P2 TWD 4 FB4 +1.01 TEC TEH 11 HOT 720UL BOBBIN
73 43 0.13 45 P2 TWD S FB4 +1.12 TEC TEN 8 NOT 720UL BOBBIN
73 45 0.11 125 P2 TWD 5 FB6 -1.32 TEC TEH 8 HOT 720UL BOBBIN
0.18 113 P2 TWD 7 FB5 -1.12 TEC TEH 8 HOT 720UL BOBBIN0.13 95 P2 TWD 5 FB4 +1.12 TEC TEH 8 HOT 720UL BOBBIN0.17 89 P2 TWD 7 FB3 +1.21 TEC TEH 8 HOT 720UL BOBBIN
73 47 0.21 93 P2 TWD 9 FB6 -1.280.11 31 P2 TWD 5 FB5 +1.170.17 59 P2 TWD 7 FB5 -1.150.16 53 P2 TWD 7 FB3 +1.24
73 51 0.20 ' 56 P2 TWD 8 FB6 -1.110.45 106 P2 TWD 16 FB5 -1.060.14 48 P2 TWD 6 FB4 +1.190.41 114 P2 TWD 15 FB4 -1.240.11 55 P2 TWD 5 FB3 +1.300.33 114 P2 TWD 13 FB3 -1.30
73 57 0.13 70 P2 TWD 5 FB6 +1.250.47 107 P2 TWD 16 FB6 -1.200.15 70 P2 TWD 6 FB5 +1.110.59 114 P2 TWD 18 FB5 -1.090.28 94 P2 TWD 11 FB4 +1.110.32 112 P2 TWD 12 FB4 -1.310.12 123 P2 TWD 5 FB3 -1.27
TEC TEH 7 HOTTEC TEH 7 HOTTEC TEH 7 HOTTEC TEH 7 HOT
TEC TEN 7 NOTTEC TEH 7 HOTTEC TEH 7 HOTTEC TEH 7 HOTTEC TEH 7 HOTTEC TEH 7 HOT
TEC TEH 10 HOTTEC TEH 10 HOTTEC TEH 10 HOTTEC TEH 10 HOTTEC TEH 10 HOTTEC TEH 10 HOTTEC TEH 10 HOT
720UL720UL720UL720UL
720UL720UL720UL720UL720UL720UL
720UL720OUt720UL720UL720UL720UL720UL
BOBBINBOBBINBOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBINBOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBINBOBBINBOBBINBOBBIN
73 61 0.10 64 P2 TWD 4 FB5 -1.14 TEC TEH 10 HOT 720UL BOBBIN0.13 87 P2 TWD 5 FB4 +1.10 TEC TEH 10 HOT 720UL BOBBIN
73 63 0.24 116 P2 TWD 9 FB5 -1.25 TEC TEH 10 HOT 720UL BOBBIN0.20 124 P2 TWD 8 FB4 +1.07 TEC TEH 10 HOT 720UL BOBBIN
73 65 0.30 93 P2 TWO 11 FB6 -1.23 TEC TEN 11 NOT 720UL BOBBIN0.38 94 P2 TWD 13 FBS -1.23 TEC TEH 11 HOT 720UL BOBBIN0.37 91 P2 TWD 13 FB4 +1.06 TEC TEH 11 HOT 720UL BOBBIN
0.19 27 P2 TWD 7 FB3 +1.17 TEC TEH 11 HOT 720UL BOBBIN
73 67 0.14 52 P2 TWD 6 FB6 -1.40 TEC TEH 11 HOT 720UL BOBBIN0.25 104 P2 TWD 10 FB5 +1.03 TEC TEH 11 HOT 720UL BOBBIN0.34 103 P2 TWD 12 FB5 -1.21 TEC TEH 11 HOT 720UL BOBBIN0.38 118 P2 TWD 13 FB4 +0.97 TEC TEH 11 HOT 720UL BOBBIN0.36 74 P2 TWD 13 FB4 -1.16 TEC TEH 11 HOT 720UL BOBBIN0.28 75 P2 TWD 11 FB3 -1.34 TEC TEH 11 HOT 720UL BOBBIN
73 69 0.20 86 P2 TWD 8 FB5 -1.18 TEC TEH 12 HOT 720UL BOBBIN0.27 102 P2 TWD 10 FB4 +1.05 TEC TEH 12 HOT 720UL BOBBIN
74 44 0.29 124 P2 TWD 11 FB5 +0.97 TEC TEH 8 HOT 720UL BOBBIN0.53 85 P2 TWD 17 FB4 -1.12 TEC TEH 8 HOT 720UL BOBBIN
74 46 0.11 50 P2 TWD 5 FB6 +1.19 TEC TEH 8 HOT 720UL BOBBIN0.44 89 P2 TWD 15 FB5 +1.17 TEC TEH 8 HOT 720UL BOBBIN0.21 59 P2 TWD 8 FB4 -1.08 TEC TEH 8 HOT 720UL BOBBIN
74 58 0.22 116 P2 TWD 9 FB5 -1.14 TEC TEH 9 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 10:37:26Component: S/G 12 Page 10 of 12
QUERY: QueryMl
ROW COL VOLTS DEG
0.18 87
74 60 0.20 1290.29 1290.27 1130.52 1360.36 1310.38 1140.26 118
CHN IND %TW LOCATION EXT EXT UT
P2 TWD 8 FB4 -1.17 TEC TEH
P2 TWD 9 FB6 +1.14 TEC TEHP2 TWD 12 FB6 -1.28 TEC TEHP2 TWD 11 FB5 +1.12 TEC TEHP2 TWD 18 FB5 -1.19 TEC TEHP2 TWD 14 FB4 +1.03 TEC TEHP2 TWD 15 FB4 -1.30 TEC TEHP2 TWD 11 FB3 +1.14 TEC TEH
IL 1 UITIL 2 CAL # LEG PROBE
9 HOT 720UL
9 HOT 720UL9 HOT 720UL9 HOT 720UL9 HOT 720UL9 HOT 720UL9 HOT 720UL9 HOT 720UL
SCOPE
BOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBINBOBBINBOBBINBOBBIN
74 62 0.14 80 P2 TWD 6 FB4 -1.400.12 92 P2 TWD 5 FB5 +0.96
74 68 0.17 48 P2 TWD 7 FB4 -1.14
75 37 0.16 134 P2 TWD 6 FB5 -1.160.18 103 P2 TWD 7 FB4 +1.080.14 88 P2 TWD 6 FB3 +1.14
TEC TEN 10 NOT 720UL BOBBINTEC TEH 10 HOT 720UL BOBBIN
TEC TEH 11 HOT 720UL BOBBIN
TEC TEN 8 NOT 720UL BOBBINTEC TEH 8 HOT 720UL BOBBINTEC TEH 8 HOT 720UL BOBBIN
75 39 0.11 101 P2 TWD 5 FB4 +1.10 TEC TEH 8 HOT 720UL BOBBIN
75 53 0.42 93 P2 TWD 14 FB6 +1.14 TEC TEH 8 HOT 720UL BOBBIN0.21 63 P2 TWO 8 FB6 -1.05 TEC TEH 8 HOT 720UL BOBBIN0.64 90 P2 TWD 19 FB5 -1.08 TEC TEH 8 HOT 720UL BOBBIN0.87 108 P2 TWD 23 FB4 -1.08 TEC TEH 8 HOT 720UL BOBBIN0.77 94 P2 TWD 21 FB3 -1.08 TEC TEH 8 HOT 720UL BOBBIN
75 67 0.17 115 P2 TWD 7 FB6 -1.37 TEC TEH 12 HOT 720UL BOBBIN0.46 126 P2 TWD 16 FB5 -1.13 TEC TEH 12 HOT 720UL BOBBIN0.68 121 P2 TWD 20 FB4 +1.09 TEC TEH 12 HOT 720UL BOBBIN0.18 88 P2 TWD 7 FB3 -1.35 TEC TEH 12 HOT 720UL BOBBIN
75 69 0.20 94 P2 TWD 8 FB4 +1.08 TEC TEH 11 HOT 720UL BOBBIN
76 38 0.11 76 P2 TWD 5 FB4 -1.10 TEC TEH 7 HOT 720UL BOBBIN
76 40 0.24 111 P2 TWD 10 FB5 +1.04 TEC TEH
76 60 0.18 102 P2 TWD 7 FB5 +1.12 TEC TEH0.20 62 P2 TWD 8 FB4 -1.09 TEC TEH
76 62 0.12 44 P2 TWD 6 FB4 -1.10 TEC TEH
7 NOT 720UL BOBBIN
10 HOT 720UL BOBBIN10 NOT 720UL BOBBIN
9 HOT 720UL BOBBIN
76 64 0.16 890.56 1150.11 1011.44 1041.49 1160.13 1250.22 58
76 66 0.09 720.15 56
76 68 0.09 1400.50 1330.53 1370.12 138
P2 TWD 7 FB7 +1.28P2 TWD 18 FB6 +0.88P2 TWD 5 FB6 -1.19P2 TWD 30 FB5 +0.99P2 TWD 30 FB4 -1.10P2 TWD 5 FB3 +1.34P2 TWD 9 FB3 -1.32
P2 TWD 4 FB5 +1.08P2 TWD 6 FB4 +1.03
P2 TWD 4 FB6 +1.09P2 TWD 16 FB5 +1.07P2 TWD 17 FB4 -1.16P2 TWD 5 FB3 +1.16
TEC TEH 11 HOT 720ULTEC TEH 11 HOT 720ULTEC TEH 11 HOT 720ULTEC TEH 11 HOT 720ULTEC TEH 11 HOT 720ULTEC TEH 11 HOT 720ULTEC TEH 11 HOT 720UL
TEC TEN 11 NOT 720ULTEC TEN 11 NOT 720UL
TEC TEN 12 NOT 720ULTEC TEH 12 HOT 720ULTEC TEH 12 HOT 720ULTEC TEH 12 HOT 720UL
BOBBINBOBBINBOBBINBOBBINBOBBINBOBBINBOBBIN
BOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 10:37:26Component: S/G 12 Page 11 of 12Component: S/G 12 Page 11 of 12
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION
76 70 0.13 119 P2 TWD 5 FB4 -1.10
76 72 0.12 97 P2 TWD 5 FB5 +1.030.23 92 P2 TWD 9 FB4 -1.27
EXT EXT UTIL 1 UTIL 2
TEC TEH
CAL # LEG PROBE SCOPE
11 HOT 720UL BOBBIN
14 HOT 720UL BOBBIN14 HOT 720UL BOBBIN
TEC TEHTEC TEH
-------------------
77 37 0.17 108 P2 TWD 7 FB5 -1.13 TEC TEH 7 HOT 720UL BOBBIN0.11 72 P2 TWD 5 FB4 +1.00 TEC TEH 7 HOT 720UL BOBBIN
......................................................................................................................................
77 39 0.15 125 P2 TWD 6 FB5 -1.28 TEC TEH 7 HOT 720UL BOBBIN0.13 88 P2 TWD 6 FB4 +1.00 TEC TEH 7 HOT 720UL BOBBIN
......................................................................................................................................
77 43 0.17 90 P2 TWD 7 FB7 -1.45 TEC TEH 8 HOT 720UL BOBBIN0.53 103 P2 TWD 17 FB6 -1.16 TEC TEH 8 HOT 720UL BOBBIN1.43 93 P2 TWD 29 FB5 -1.14 TEC TEH 8 HOT 720UL BOBBIN0.93 83 P2 TWD 24 FB4 +1.12 TEC TEH 8 HOT 720UL BOBBIN0.64 97 P2 TWD 19 FB3 +1.21 TEC TEH 8 HOT 720UL BOBBIN0.11 139 P2 TWD 5 FB2 +1.45 TEC TEH 8 HOT 720UL BOBBIN
......................................................................................................................................
77 57 0.24 88 P2 TWO 9 FB6 +1.16 TEC TEH 10 HOT 720UL BOBBIN0.55 114 P2 TWD 17 FB5 +1.12 TEC TEH 10 HOT 720UL BOBBIN0.25 103 P2 TWD 10 FB5 -1.07 TEC TEH 10 HOT 720UL BOBBIN0.25 118 P2 TWD 10 FB4 +1.18 TEC TEH 10 HOT 720UL BOBBIN0.46 103 P2 TWD 15 FB4 -1.16 TEC TEH 10 HOT 720UL BOBBIN0.34 98 P2 TWD 12 FB3 -1.20 TEC TEH 10 HOT 720UL BOBBIN
77 61 0.45 119 P2 TWD 15 FB6 -1.31 TEC TEH 10 HOT 720UL BOBBIN0.70 102 P2 TWD 20 FB5 +0.99 TEC TEH 10 HOT 720UL BOBBIN0.25 126 P2 TWD 10 FB5 -1.18 TEC TEH 10 HOT 720UL BOBBIN0.24 110 P2 TWD 9 FB4 +1.09 TEC TEH 10 HOT 720UL BOBBIN0.49 100 P2 TWD 16 FB4 -1.14 TEC TEH 10 HOT 720UL BOBBIN0.86 116 P2 TWD 23 FB3 +1.20 TEC TEH 10 HOT 720UL BOBBIN
......................................................................................................................................
77 63 0.12 120 P2 TWD 5 FB4 +1.18 TEC TEH 10 HOT 720UL BOBBIN......................................................................................................................................
77 65 0.14 122 P2 TWD 6 FB6 -1.17 TEC TEH 11 HOT 720UL BOBBIN0.23 52 P2 TWD 9 FB5 -1.12 TEC TEH 11 HOT 720UL BOBBIN0.17 77 P2 TWD 7 FB4 +1.03 TEC TEH 11 HOT 720UL BOBBIN
......................................................................................................................................
77 67 0.210.550.960.490.700.12
78 44 0.210.231.480.230.840.280.29
78 54 0.220.180.11
78 64 0.210.17
95 P2 TWD 8 FB7 -1.41 TEC TEH 11 HOT 720UL BOBBIN113 P2 TWD 17 FB6 -1.36 TEC TEH 11 HOT 720UL BOBBINi11 P2 TWD 24 FB5 -1.21 TEC TEH 11 HOT 720UL BOBBIN109 P2 TWD 16 FB4 +1.12 TEC TEH 11 HOT 720UL BOBBIN115 P2 TWD 20 FB3 -1.32 TEC TEH 11 HOT 720UL BOBBIN59 P2 TWD 5 FB2 -1.49 TEC TEH 11 HOT 720UL BOBBIN94.. P2.. TWD...8 .... 6 .. +1. 12........TEC.........TEN .......... 8.....NOT.. ........................... BOBBIN ............
94 P2 TWD 8 FB6 +1.12 TEC TEH 8 HOT 720UL BOBBIN55 P2 TWD 9 FB6 -1.10 TEC TEH 8 HOT 720UL BOBBIN
95 P2 TWD 30 FB5 +1.05 TEC TEH 8 HOT 720UL BOBBIN49 P2 TWD 9 FB4 +0.97 TEC TEH 8 HOT 720UL BOBBIN91 P2 TWD 22 FB4 -1.23 TEC TEH 8 HOT 720UL BOBBIN69 P2 TWD 10 FB3 +1.25 TEC TEH 8 HOT 720UL BOBBIN118 P2 TWD 11 FB3 -1.32 TEC TEH 8 HOT 720UL BOBBIN60.. P2.. TWO...9 .... 6 ... 0. 0.....TEC........ . TEN.........19.......NOT... .............. .......... BOBBIN ............
60 P2 TWD 9 FB6 +0.00 TEC TEH 19 HOT 720UL BOBBIN57 P2 TWD 8 FB5 +0.00 TEC TEH 19 HOT 720UL BOBBIN33 P2 TWD 5 FB4 +0.00 TEC TEH 19 HOT 720UL BOBBIN
106 P2 TWD 8 FB4 -1.16 TEC TEH 12 HOT 720UL BOBBIN116 P2 TWD 7 FB3 +1.36 TEC TEH 12 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 10:37:26Component: S/G 12 Page 12 of 12
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION
0.12 55 P2 TWD 5 FB60.22 112 P2 TWD 9 FB5
78 66 0.34 119 P2 TWD 12 FB50.50 111 P2 TWD 17 FB4
79 49 0.12 70 P2 TWD 5 FB50.12 26 P2 TWD 5 FB4
79 51 0.59 85 P2 TWD 18 FB40.30 95 P2 TWD 11 FB60.44 90 P2 TWD 14 FB5
EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE
+1.10 TEC TEH 12 HOT 720UL+1.10 TEC TEH 12 HOT 720UL
+1.00 TEC TEH 12 HOT 720UL-1.26 TEC TEH 12 HOT 720UL
+1.19 TEC TENH. 8 NOT 720UL+1.03 TEC TEH 8 HOT 720UL
+1.10 TEC TEH 8 HOT 720UL-1.21 TEC TEN 8 NOT 720UL-1.16 TEC TEH 8 HOT 720UL
SCOPE
BOBBINBOBBIN
BOBBINBOBBIN
BOBBINBOBBIN
BOBBINBOBBINBOBBIN
79 55 0.09 83 P2 TWD 5 FB4 +1.52 TEC TEH 19 HOT 720UL BOBBIN
79 61 0.73 133 P2 TWD 22 FB6 -1.190.96 124 P2 TWD 26 FB5 -1.170.66 124 P2 TWD 21 FB4 +0.970.07 157 P2 TWD 3 FB4 -1.260.37 126 P2. TWD 14 FB3 -1.34
80 50 0.16 123 P2 TWD 6 FB6 +1.190.12 75 P2 TWD 5 FB6 -1.470.13 45 P2 TWD 5 FB5 +1.060.14 27 P2 TWD 6 FB4 -1.25
TECTECTECTECTEC
TECTECTECTEC
TEHTEHTEHTEHTEH
TEHTEHTEHTEH
9 HOT 720UL BOBBIN9 HOT 720UL BOBBIN9 HOT 720UL BOBBIN9 HOT 720UL BOBBIN9 HOT 720UL BOBBIN
8 NOT 720UL BOBBIN8 HOT 720UL BOBBIN8 HOT 720UL BOBBIN8 HOT 720UL BOBBIN
Total Tubes : 175Total Records: 500
Attachment 3 to Enclosure to AEP-NRC-2013-90Unit 1 2013 Steam Generator Tube Inspection Report
SG 13 Fan Bar/Lattice Grid Wear Percent Throughwall Indications
AREVA NP Inc 04/16/13 18:15:24Customer Name: DC COOK Unit 1 Component: S/G 13 Page 1 of 12
TWD Indications
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
1 35 0.19 0 P2 TWD 8 05C +1.20 08C TEC LAR 2 COLD 720UL BOBBIN
1 59 0.14 0 P2 TWD 7 05C +1.11 08C TEC LAR 1 COLD 720UL BOBBIN0.14 0 P2 TWD 6 06C +1.15 08C TEC LAR 1 COLD 720UL BOBBIN0.15 0 P2 TWD 7 06C -1.54 08C TEC LAR 1 COLD 720UL BOBBIN
1 69 0.17 116 P2 TWD 9 08H +1.35 08C TEH LAR 36 HOT 720CL BOBBIN
1 71 0.15 102 P2 TWD 8 FB8 +1.34 08C TEH 36 HOT 720CL BOBBIN0.18 137 P2 TWD 9 08C +1.30 08C TEH LAR 36 HOT 720CL BOBBIN0.20 0 P2 TWD 9 05C -1.37 08C TEC 1 COLD 720UL BOBBIN0.12 0 P2 TWD 5 06C +1.04 08C TEC LAR 1 COLD 720UL BOBBIN0.14 0 P2 TWD 6 06C -1.39 08C TEC LAR 1 COLD 720UL BOBBIN
1 81 0.08 129 P2 TWD 4 FBI +0.75 08C TEH 36 HOT 720CL BOBBIN
1 103 0.12 132 P2 TWD 6 08H +0.40 08C TEH LAR 40 HOT 720CL BOBBIN
2 74 0.14 87 P2 TWD 7 07C -1.55 TEC TEH LAR 31 HOT 720CL BOBBIN
2 86 0.12 95 P2 TWO 6 06C -1.51 TEC TEN LAR 35 NOT 720CL BOBBIN
2 88 0.09 146 P2 TWD 4 07C -1.51 TEC TEH LAR 35 HOT 720CL BOBBIN
3 31 0.14 0 P2 TWD 6 05C +0.89 08C TEC LAR 1 COLD 720UL BOBBIN0 20 0 P2 TWD 9 06C +0.89 08C TEC LAR 1 COLD 720UL BOBBIN
3 67 0.12 85 P2 TWO 6 08C -1.42 TEC TEN LAR 29 NOT 720CL BOBBIN
3 69 0.14 122 P2 TWD 7 04C +1.34 TEC TEN LAR 31 NOT 720CL BOBBIN
3 79 0.15 89 P2 TWO 7 07C -1.49 TEC TEN LAR 31 NOT 720CL BOBBIN
3 83 0.13 107 P2 TWD 6 07C -1.58 TEC TEH LAR 31 HOT 720CL BOBBIN
3 89 0.11 126 P2 TWD 5 07C -1.47 TEC TEH LAR 34 HOT 720CL BOBBIN
4 78 0.19 55 P2 TWD 9 08C -1.53 TEC TEH LAR 31 HOT 720CL BOBBIN
12 92 0.10 101 P2 TWO 5 EBB -0.70 TEC TEN 33 NOT 720CL BOBBIN
27 101 0.13 129 P2 TWD 7 F06 -1.23 TEC TEH 17 HOT 720CL BOBBIN
30 70 0.23 71 P2 TWO 11 FBS +1.05 TEC TEN 25 NOT 720UL BOBBIN
33 65 0.08 98 P2 TWD 5 FB4 -1.51 TEC TEH 24 HOT 720UL BOBBIN
37 43 0.11 124 P2 TWO 6 FB4 +1.43 TEC TEN 23 NOT 720UL BOBBIN
38 54 0.14 17 P2 TWO 7 FB4 +0.00 TEC TEN 12 NOT 720UL BOBBIN
42 42 0.21 123 P2 TWD 10 0H -1.64 TEC TEH LAR 23 HOT 720UL BOBBIN
43 69 0.09 160 P2 TWD 5 FB4 +1.31 TEC TEH 2S HOT 720UL BOBBIN
44 48 0.12 142 P2 TWD 5 FB6 +1.99 TEC TEH 22 HOT 720UL BOBBIN
44 S6 0.11 144 P2 TWD 5 04N -1.82 TEC TEH LAR 23 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/16/13 18:15:24Component: S/G 13 Page 2 of 12
QUERY: QueryMl
ROW COL VOLTS
44 66 0.11
46 74 0.13
48 54 0.11
DEG CHN IND %TW LOCATION
141 P2 TWD 5 FB4 +1.25
116 P2 TWD 5 FB6 +1.86
33 P2 TWD 5 FB4 +0.00
EXT EXT UTIL 1 UTIL 2
TEC TEH
TEC TEH
TEC TEH
CAL # LEG
22 HOT
10 HOT
12 HOT
PROBE SCOPE
720UL BOBBIN
7200L BOBBIN
720UL BOBBIN
48 56 0.13 50 P2 TWD 6 FB4
48 62 0.08 85 P2 TWD 5 FB4
48 66 0.10 161 P2 TWD 4 FB4
49 63 0.26 86 P2 TWD 12 FB50.17 45 P2 TWD 9 FBS0.14 143 P2 TWD 8 FB40.26 122 P2 TWD 13 FB4
50 66 0.07 137 P2 TWD 4 FB6
+1.12 TEC TEH 8 HOT 720UL BOBBIN
-1.39 TEC TEH
-1.24 TEC TEN
+1.04 TEC TEH-1.28 TEC TEN+1.17 TEC TEH-1.35 TEC TEH
9 HOT
8 HOT
9 HOT9 HOT9 HOT9 HOT
720UL BOBBIN
720UL BOBBIN
720UL BOBBIN
720UL BOBBIN720UL BOBBIN720UL BOBBIN
-0.82
52 44 0.23 131 P2 TWD 11 FB3 +0.60
52 92 0.11 124 P2 TWD 6 FB6 +1.12
53 49 0.22 114 P2 TWD 11 FB5 -1.17
53 51 0.13 50 P2 TWD 7 FB4 +1.08
53 61 0.13 129 P2 TWD 7 03H -1.82
TEC TEN 9 NOT 720UL BOBBIN
TEC TEH 7 HOT 720UL BOBBIN
TEC TEH 15 HOT 720UL BOBBIN
TEC TEN 7 NOT
TEC TEH 7 HOT
TEC TEH LAR 9 HOT
720UL BOBBIN
720UL BOBBIN
720UL BOBBIN
53 63 0.20 152 P2 TWD 100.11 43 P2 TWD 60.14 145 P2 TWD 7
FB5FB4FB4
+0.90 TEC TEN 9 NOT 720UL BOBBIN+1.04 TEC TEH 9 HOT 720UL BOBBIN-1.30 TEC TEH 9 HOT 720UL BOBBIN
54 52 0.350.21
54 60 0.140.24
54 72 0.120.12
55 41 0.120.19
81 P2 TWD 13 FB5 +1.10 TEC TEH 8 HOT 720UL BOBBIN51 P2 TWD 9 FB4 -1.12 TEC TEH 8 HOT 720UL BOBBIN
142 P2 TWD 6 FB5 +1.10 TEC TEH 8 HOT 720UL BOBBIN129 P2 TWD 10 FB4 -1.24 TEC TEH 8 HOT 720UL BOBBIN
36 P2 TWD 5 FB6 -0.87 TEC TEH 10 HOT 720UL BOBBIN27 P2 TWD 5 FB4 -1.08 TEC TEH 10 HOT 720UL BOBBIN
76 P2 TWD 6 FB6 +1.77 TEC TEH 6 HOT 720UL BOBBIN48 P2 TWD 8 FB4 +1.03 TEC TEH 6 HOT 720UL BOBBIN
55 55 0.11 30 P2 TWD 5 FB4 +0.98 TEC TEH 12 HOT 720UL BOBBIN
55 63 0.10 80 P2 TWD 4 FB5 +1.17 TEC TEH 8 HOT 720UL BOBBIN0.22 134 P2 TWD 9 FB4 +1.19 TEC TEH 8 HOT 720UL BOBBIN0.13 46 P2 TWD 6 FB4 -1.21 TEC TEH 8 HOT 720UL BOBBIN
56 56 0.09 97 P2 TWD 4 FB4 -0.64 TEC TEH 8 HOT 720UL BOBBIN
56 70 0.09 94 P2 TWD 5 FB4 -1.19 TEC TEH 9 HOT 720UL BOBBIN
56 72 0.13 59 P2 TWD 7 FB6 -0.84 TEC TEH 11 HOT 720UL BOBBIN
57 41 0.23 143 P2 TWD 11 FB7 +2.26 TEC TEH 7 HOT 720UL BOBBIN0.16 147 P2 TWD 9 FB5 -1.20 TEC TEH 7 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/16/13 18:15:24Component: S/G 13 Page 3 of 12
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
0.11 153 P2 TWD 6 FB4 +1.11 TEC TEH 7 HOT 720UL BOBBIN
57 57 0.10 144 P2 TWD 5 FB5 +0.93 TEC TEH 9 HOT 720UL BOBBIN0.09 82 P2 TWD 5 FB4 -1.17 TEC TEH 9 HOT 720UL BOBBIN0.08 159 P2 TWD 4 FB4 +1.10 TEC TEH 9 HOT 720UL BOBBIN
57 59 0.15 56 P2 TWD 8 FB4 +1.17 TEC TEH 9 HOT 720UL BOBBIN
58 58 0.13 46 P2 TWD 5 FB4 +1.10 TEC TEH 8 HOT 720UL BOBBIN0.11 96 P2 TWD 5 FB3 -1.33 TEC TEH 8 HOT 720UL BOBBIN
58 62 0.10 84 P2 TWD 4 FB4 +1.17 TEC TEH 8 HOT 720UL BOBBIN
58 64 0.37 92 P2 TWD 13 FB5 +1.060.10 123 P2 TWD 4 FB5 -1.220.30 118 P2 TWD 11 FB4 -1.20
58 66 0.17 55 P2 TWD 9 FB4 -1.24
58 68 0.12 123 P2 TWD 7 FB4 -1.28
58 70 0.13 61 P2 TWD 6 FB4 -1.17
TEC TEN 8 NOT 720UL BOBBINTEC TEH 8 HOT 720UL BOBBINTEC TEH 8 HOT 720UL BOBBIN
TEC TEH 9 HOT 720UL BOBBIN
TEC TEN 9 NOT 720UL BOBBIN
TEC TEH 8 HOT 720UL BOBBIN
58 72 0.15 54 P2 TWD 6 FB4 -1.10 TEC TEH 10 HOT 720UL BOBBIN
59 51 0.11 142 P2 TWD 5 FB5 -1.15 TEC TEH 6 HOT 720UL BOBBIN
59 57 0.18 81 P2 TWD 7 FB5 +1.19 TEC TEH 8 HOT 720UL BOBBIN0.12 87 P2 TWD 5 FB5 -1.10 TEC TEH 8 HOT 720UL BOBBIN
59 65 0.09 67
59 67 0.08 550.08 1250.30 1420.12 139
P2 TWD 4 FB4 +1.01 TEC TEN 8 NOT 720UL BOBBIN
P2 TWD 4 FB6 +1.38 TEC TEH 8 HOT 720UL BOBBINP2 TWO 4 PBS -1.29 TEC TEN 8 NOT 720UL BOBBINP2 TWD 11 FB4 +1.08 TEC TEH 8 HOT 720UL BOBBINP2 TWD 5 FB3 +1.33 TEC TEH 8 HOT 720UL BOBBIN
59 69 0.12 160 P2 TWD 5 FB4 +1.10 TEC TEH 8 HOT 720UL BOBBIN
60 54 0.12 61 P2 TWD 6 FB6 +0.00 TEC TEH 12 HOT 720UL BOBBIN0.23 119 P2 TWD 10 FB5 +0.00 TEC TEH 12 HOT 720UL BOBBIN0.23 37 P2 TWD 10 FB4 +0.00 TEC TEH 12 HOT 720UL BOBBIN0.16 56 P2 TWD 7 FB3 +0.00 TEC TEH 12 HOT 720UL BOBBIN
60 56 0.09 65 P2 TWD 4 FB6 -1.38 TEC TEH 8 HOT 720UL BOBBIN0.12 125 P2 TWD 5 FB4 -1.17 TEC TEH 8 HOT 720UL BOBBIN
60 62 0.09 102 P2 TWD 5 FB5 -1.19 TEC TEH 9 HOT 720UL BOBBIN0.22 147 P2 TWD 11 FB5 +1.08 TEC TEH 9 HOT 720UL BOBBIN0.29 101 P2 TWD 13 FB4 -1.15 TEC TEH 9 HOT 720UL BOBBIN
60 68 0.13 143 P2 TWD 6 FB4 -1.13 TEC TEH 8 HOT 720UL BOBBIN
61 41 0.11 150 P2 TWO 6 FB4 +1.04 TEC TEN 7 NOT 720UL BOBBIN
61 51 0.12 143 P2 TWD 7 FB4 +1.11 TEC TEH 7 HOT 720UL BOBBIN
61 59 0.20 130 P2 TWD 10 FB6 +1.15 TEC TEH 9 HOT 720UL BOBBIN0.34 115 P2 TWD 15 FB5 +1.04 TEC TEH 9 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/16/13 18:15:24Component: S/G 13 Page 4 of 12
QUERY: QueryMl
ROW COL VOLTS
0.140.240.240.110.11
DEG
144139ill14180
CHN
P2P2P2P2P2
IND
TWDTWDTWDTWDTWD
%TW
7121266
LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE
FB5 -1.30 TECFB4 +1.15 TECFB4 -1.17 TECFB3 +1.30 TECFB3 -1.37 TEC
FO6 +1.28 TECFB5 +1.06 TEC
FB5 -1.30 TECFB4 +1.02 TEC
TEHTEHTEHTEHTEH
9 HOT 720UL9 HOT 720UL9 HOT 720UL9 HOT 720UL9 HOT 720UL
9 NOT 720UL9 HOT 720UL9 HOT 720UL9 HOT 720UL
9 HOT 720UL
SCOPE
BOBBINBOBBINBOBBINBOBBINBOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBIN
BOBBIN
61 63 0.10 60 P2 TWD 60.18 60 P2 TWD 90.12 93 P2 TWD 70.20 69 P2 TWD 10
TEHTEHTEHTEH
61 69 0.18 80 P2 TWD 9 FB4 +0.95 TEC TEH
61 71 0.08 156 P2 TWD 5 FB4 +1.08 TEC TEH 9 HOT 720UL BOBBIN
62 50 0.11 34 P2 TWD 5 FB5 +0.97 TEC TEH 6 HOT 720UL BOBBIN0.11 69 P2 TWD 5 FB4 -1.15 TEC TEH 6 HOT 720UL BOBBIN
62 52 0.28 63 P2 TWD 11 FB4 -1.19 TEC TEH 8 HOT 720UL BOBBIN
62 54 0.17 42 P2 TWD 8 FB4 +0.00 TEC TEH 13 HOT 720UL BOBBIN
62 56 0.11 152 P2 TWD 6 FB6 -1.30 TEC TEH 9 HOT 720UL BOBBIN0.18 125 P2 TWD 9 FB5 +0.99 TEC TEH 9 HOT 720UL BOBBIN0.19 70 P2 TWD 10 FB4 -1.17 TEC TEH 9 HOT 720UL BOBBIN
62 58 0.14 46 P2 TWD 6 FB5 -1.12 TEC TEH 8 HOT 720UL BOBBIN0.29 112 P2 TWD 11 FB4 +1.19 TEC TEH 8 HOT 720UL BOBBIN
62 62 0.13 125 P2 TWD 5 FB4 -1.08 TEC TEH 8 HOT 720UL BOBBIN
62 64 0.18 95 P2 TWD 7 FB6 +1.12 TEC TEH 8 HOT 720UL BOBBIN0.62 118 P2 TWD 19 FB5 +1.14 TEC TEH 8 HOT 720UL BOBBIN0.24 80 P2 TWD 9 FB4 -1.19 TEC TEH 8 HOT 720UL BOBBIN0.20 95 P2 TWD 8 FB3 -1.37 TEC TEH 8 HOT 720UL BOBBIN
62 66 0.11 116 P2 TWD 6 FB6 +1.26 TEC TEH 9 HOT 720UL BOBBIN0.21 117 P2 TWD 11 FB6 -1.28 TEC TEH 9 HOT 720UL BOBBIN0.19 139 P2 TWD 10 FB5 +1.12 TEC TEH 9 HOT 720UL BOBBIN0.26 130 P2 TWD 13 FB5 -1.21 TEC TEH 9 HOT 720UL BOBBIN0.17 99 P2 TWD 9 FB4 +1.12 TEC TEH 9 HOT 720UL BOBBIN0.47 117 P2 TWD 19 FB4 -1.19 TEC TEH 9 HOT 720UL BOBBIN0.18 142 P2 TWD 9 FB3 +1.19 TEC TEH 9 HOT 720UL BOBBIN
62 68 0.09 156 P2 TWO 5 FB4 -1.15 TEC TEN 9 NOT 720UL BOBBIN
62 70 0.11 138 P2 TWD 5 FB4 -1.17 TEC TEH 8 HOT 720UL BOBBIN
62 72 0.12 59 P2 TWD 5 FBS +0.96 TEC TEH 10 HOT 720UL BOBBIN
62 74 0.08 59 P2 TWD 4 FB7 -0.95 TEC TEH 10 HOT 720UL BOBBIN0.07 138 P2 TWD 4 FB6 -0.86 TEC TEH 11 HOT 720UL BOBBIN
63 45 0.13 81 P2 TWD 6 FB3 +1.22 TEC TEH 6 HOT 720UL BOBBIN
63 51 0.10 82 P2 TWD 5 FB5 -1.13 TEC TEH 6 HOT 720UL BOBBIN
63 55 0.53 118 P2 TWD 18 FB5 +1.18 TEC TEH0.17 49 P2 TWD 8 FB5 -1.11 TEC TEH
12 NOT 720UL BOBBIN12 HOT 720UL BOBBIN
AREVA NP Inc 04/16/13 18:15:24Customer Name: DC COOK Unit 1 Component: S/G 13 Page 5 of 12
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE.====== === === === 1 == === ==== ======T=E= TEN- = 12 HOT-- -------- BOBBIN- -=---- - - -- --
0.39 142 P2 TWD 15 FB4 -1.09 TEC TEH 12 HOT 720UL BOBBIN0.10 141 P2 TWD 5 FB3 -1.42 TEC TEH 12 HOT 720UL BOBBIN
63 57 0.23 101 P2 TWD 9 FB5 +1.15 TEC TEH 8 HOT 720UL BOBBIN0.33 93 P2 TWD 12 FB4 -1.19 TEC TEH 8 HOT 720UL BOBBIN
63 59 0.11 33 P2 TWD 5 FB6 +1.30 TEC TEH 8 HOT 720UL BOBBIN0.32 86 P2 TWD 12 FB5 +1.07 TEC TEH 8 HOT 720UL BOBBIN0.34 89 P2 TWD 13 FB5 -1.14 TEC TEH 8 HOT 720UL BOBBIN0.32 131 P2 TWD 12 FB4 +1.17 TEC TEH 8 HOT 720UL BOBBIN0.29 130 P2 TWD 11 FB4 -1.17 TEC TEH 8 HOT 720UL BOBBIN0.11 123 P2 TWD 5 FB3 +1.21 TEC TEH 8 HOT 720UL BOBBIN0.13 137 P2 TWO 5 FB3 -1.28 TEC TEH 8 HOT 720UL BOBBIN
63 61 0.35 136 P2 TWD 13 FB6 -1.38 TEC TEH 8 HOT 720UL BOBBIN0.58 124 P2 TWD 18 FB5 -1.15 TEC TEH 8 HOT 720UL BOBBIN0.78 114 P2 TWD 22 FB4 +1.08 TEC TEH 8 HOT 720UL BOBBIN0.18 121 P2 TWD 8 FB3 +1.31 TEC TEH 8 HOT 720UL BOBBIN
63 63 0.16 139 P2 TWD 7 FB6 -1.49 TEC TEH 8 HOT 720UL BOBBIN0.24 134 P2 TWD 9 FB5 -1.17 TEC TEH 8 HOT 720UL BOBBIN0.11 43 P2 TWD 5 FB4 +1.10 TEC TEH 8 HOT 720UL BOBBIN0.27 84 P2 TWD 10 FB4 -1.19 TEC TEH 8 HOT 720UL BOBBIN0.10 121 P2 TWD 4 FB3 -1.24 TEC TEH 8 HOT 720UL BOBBIN
63 65 0.11 126 P2 TWO 5 PB4 +1.17 TEC TEN 8 NOT 720UL BOBBIN
63 69 0.13 128 P2 TWD 5 FB4 +1.06 TEC TEH 8 HOT 720UL BOBBIN
63 73 0.10 31 P2 TWO 4 PB6 -0.80 TEC TEN 10 NOT 720UL BOBBIN0.11 46 P2 TWO 5 PB4 +0.99 TEC TEN 10 NOT 720UL BOBBIN
64 50 0.14 121 P2 TWD 7 FB4 -1.22 TEC TEH 7 HOT 720UL BOBBIN
64 58 0.12 57 P2 TWD 7 FB4 -1.19 TEC TEH 9 HOT 720UL BOBBIN0.11 147 P2 TWO 6 PFB -1.21 TEC TEH 9 HOT 720UL BOBBIN
64 64 0.07 103 P2 TWO 4 PB4 -1.23 TEC TEN 9 NOT 720UL BOBBIN
64 68 0.19 102 P2 TWD 8 FB4 -1.20 TEC TEH 8 HOT 720UL BOBBIN
64 70 0.18 141 P2 TWO 9 PB4 -1.10 TEC TEN 9 NOT 720UL BOBBIN
64 72 0.15 55 P2 TWD 7 FB4 -1.21 TEC TEH 11 HOT 720UL BOBBIN
0.09 92 P2 TWO 5 FB6 -0.73 TEC TEN 11 NOT 720UL BOBBIN
65 45 0.20 82 P2 TWO 10 PB6 -1.31 TEC TEN 7 NOT 720UL BOBBIN0.17 50 P2 TWO 9 FB5 -1.28 TEC TEH 7 HOT 720UL BOBBIN0.10 145 P2 TWD 6 FB4 +1.13 TEC TEH 7 HOT 720UL BOBBIN
65 47 0.12 145 P2 TWO 7 PB4 +1.11 TEC TEN 7 NOT 720UL BOBBIN
65 55 0.86 120 P2 TWO 25 PB5 +0.90 TEC TEN 13 NOT 720UL BOBBIN0.25 87 P2 TWD 11 FB4 -1.31 TEC TEH 13 HOT 720UL BOBBIN0.11 143 P2 TWO 5 PB4 +1.03 TEC TEN 13 NOT 720UL BOBBIN
65 57 0.18 56 P2 TWD 9 FB4 -1.33 TEC TEH 9 HOT 720UL BOBBIN0.10 32 P2 TWD 6 FB5 -1.28 TEC TEH 9 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/16/13 18:15:24Component: S/G 13 Page 6 of 12
QUERY: QueryMl
ROW COL VOLTS
65 59 0.280.530.510.13
65 63 0.220.140.220.10
DEG
89106131102
CHN
P2P2P2P2
IND
TWDTWDTWDTWD
TWDTWDTWDTWD
%TW
1320207
LOCATION
FB6 +1.24FB5 +1.04FB4 +1.08FB3 +1.26
EXT EXT UTIL 1 UTIL 2 CAL # LEG
TEC TEH 9 HOTTEC TEH 9 HOTTEC TEH 9 HOTTEC TEH 9 HOT
PROBE
720UL7200L720UL720UL
SCOPE
BOBBINBOBBINBOBBINBOBBIN
154 P246 P2108 P272 P2
118116
65 67 0.11 127 P2 TWD 60.28 65 P2 TWD 13
65 69 0.12 76 P2 TWD 7
FB5FB4FB4FB3
FP4FB5
FB4
+1.06 TEC TEH+1.15 TEC TEH-1.32 TEC TEH+1.19 TEC TEH
+1.17 TEC TEH-1.21 TEC TEH
+1.13 TEC TEH
9 HOT9 HOT9 HOT9 HOT
9 NOT9 HOT
9 HOT
720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
720UL BOBBIN720UL BOBBIN
720UL BOBBIN
65 71 0.15 126 P2 TWD 8 FB4 +1.21 TEC TEH 9 HOT 720UL BOBBIN0.06 130 P2 TWD 3 FB3 +1.28 TEC TEH 9 HOT 720UL BOBBIN
66 48 0.20 149 P2 TWD 9 FB4 -1.08 TEC TEH 6 HOT 720UL BOBBIN0.12 68 P2 TWD 6 FB3 -1.10 TEC TEH 6 HOT 720UL BOBBIN
66 52 0.14 52 P2 TWD 6 FB6 +1.24 TEC TEH 8 HOT 720UL BOBBIN0.37 110 P2 TWD 13 FB5 +1.08 TEC TEH 8 HOT 720UL BOBBIN0.53 106 P2 TWD 17 FB4 -1.17 TEC TEH 8 HOT 720UL BOBBIN
66 56 0.11 43 P2 TWD 60.14 104 P2 TWD 80.81 119 P2 TWD 260.66 103 P2 TWD 230.28 111 P2 TWD 13
66 60 0.14 59 P2 TWD 60.22 85 P2 TWD 90.12 120 P2 TWD 5
FB6FB6FB5FB4FB4
FB6FB5FB1
+1.19 TEC TEH 9 HOT-1.33 TEC TEH 9 HOT-1.24 TEC TEH 9 HOT+1.10 TEC TEH 9 HOT-1.24 TEC TEH 9 HOT
-1.37 TEC TEH 8 HOT+1.17 TEC TEH 8 HOT-1.83 TEC TEH 8 HOT
720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
720UL BOBBIN720UL BOBBIN720UL BOBBIN
66 62 0.13 106 P2 TWD 5 FB6 +1.510.12 104 P2 TWD 5 FB5 +1.150.44 84 P2 TWD 15 FB5 -1.100.13 100 P2 TWD 6 FB4 +1.100.26 124 P2 TWD 10 FB4 -1.080.12 107 P2 TWD 5 FB3 -1.21
66 66 0.19 112 P2 TWD 10 FB4 -1.17
66 68 0.13 80 P2 TWD 7 FB5 +1.170.15 145 P2 TWD 8 FB4 -1.150.11 151 P2 TWD 6 FB3 -1.32
TECTECTECTECTECTEC
TEHTEHTEHTEHTEHTEH
888888
HOTHOTHOTHOTHOTHOT
720UL720UL720UL720UL720UL720UL
BOBBINBOBBINBOBBINBOBBINBOBBINBOBBIN
TEC TEN
TEC TEHTEC TENTEC TEH
9 NOT 720UL BOBBIN
9 HOT 720UL BOBBIN9 NOT 720UL BOBBIN9 HOT 720UL BOBBIN
66 70 0.15 153 P2 TWD 6 FB5 +1.18 TEC TEH 8 HOT0.21 138 P2 TWD 8 FB4 -1.11 TEC TEH 8 HOT
66 72 0.22 36 P2 TWD 9 FB4 -1.14 TEC TEH 10 HOT
66 74 0.08 151 P2 TWD 4 FB4 -1.28 TEC TEH 11 HOT
67 43 0.25 92 P2 TWD 10 FB6 -1.40 TEC TEH 6 HOT0.16 131 P2 TWD 7 FB5 -1.13 TEC TEH 6 HOT0.23 65 P2 TWD 10 FB4 +1.24 TEC TEH 6 HOT0.13 147 P2 TWD 6 FB3 +1.15 TEC TEH 6 HOT
720OUL BOBBIN720UL BOBBIN
720UL BOBBIN
720UL BOBBIN
720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/16/13 18:15:25Component: S/G 13 Page 7 of 12
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
67 53 0.11 49 P2
67 57 0.12 29 P20.12 72 P2
67 65 0.11 35 P20.26 138 P20.19 128 P20.10 155 P2
67 67 0.11 155 P20.14 134 P20.19 74 P2
68 40 0.27 97 P20.12 93 P2
68 42 0.13 85 P20.20 57 P20.14 71 P2
68 58 0.13 147 P20.13 76 P20.19 128 P20.11 137 P2
68 62 0.12 37 P20.15 64 P2
68 64 0.10 88 P2
TWD 5 FB4 +1.01
TWD 5 FB5 +1.01TWD 5 FB4 -1.19
TEC TEH 8 HOT 720UL
TEC TEN 8 NOT 720ULTEC TEH 8 HOT 720UL
BOBBIN
BOBBINBOBBIN
TWD 5 FB6 -1.36 TEC TEH 8 HOT 720UL BOBBINTWD 10 FBS +1.08 TEC TEH 8 HOT 720UL BOBBINTWD 8 FB4 +1.19 TEC TEH 8 HOT 720UL BOBBINTWD 4 FB3 +1.29 TEC TEH 8 HOT 720UL BOBBIN
TWO 5 FB6 +1.19 TEC TEN 8 NOT 720UL BOBBINTWD 6 FB5 +1.17 TEC TEH 8 HOT 720UL BOBBINTWD 8 FB4 +1.03 TEC TEH 8 HOT 720UL BOBBIN
TWD 11 FB4 -1.06 TEC TEH 6 HOT 720UL BOBBINTWO 6 FB3 -1.10 TEC TEN 6 NOT 720UL BOBBIN
TWD 6 FBS +1.20 TEC TEH 6 HOT 720UL BOBBINTWD 9 FB4 -1.17 TEC TEH 6 HOT 720UL BOBBIN
TWD 6 FB3 -1.36 TEC TEH 6 HOT 720UL BOBBIN
TWD 7 FB5 -1.17TWD 7 FB4 +1.19TWD 10 FB4 -1.28TWD 6 FB3 +1.15
TWD 7 FB5 +1.08TWD 8 FB4 -1.17
TWD 6 FB4 -1.19
TEC TEN 9 NOT 720UL BOBBINTEC TEH 9 HOT 720UL BOBBINTEC TEH 9 HOT 720UL BOBBINTEC TEH 9 HOT 720UL BOBBIN
TEC TEH 9 HOT 720UL BOBBINTEC TEN 9 NOT 720UL BOBBIN
TEC TEH 9 HOT 720UL BOBBIN
68 70 0.09 115 P2 TWD 50.10 114 P2 TWD 6
FB4FB3
69 45 0.12 47 P2 TWD 7 FB4
69 51 0.07 102 P2 TWD 4 FB70.12 90 P2 TWD 7 FB50.13 39 P2 TWD 7 FB4
69 55 0.17 98 P2 TWD 8 FB60.26 122 P2 TWD 11 FB50.18 97 P2 TWD 8 FB40.39 118 P2 TWD 15 FB40.29 87 P2 TWD 12 FB3
69 57 0.09 108 P2 TWD 5 FBI0.11 50 P2 TWD 6 FB4
69 59 0.33 104 P2 TWD 15 FB60.67 117 P2 TWD 23 FB50.26 110 P2 TWD 13 FB50.37 120 P2 TWD 16 FB40.27 126 P2 TWD 13 FB3
-1.17 TEC TEH 9 HOT 720UL BOBBIN-1.19 TEC TEH 9 HOT 720UL BOBBIN
+1.06 TEC TEN 7 NOT 720UL BOBBIN
-0.33 TEC TEH 7 HOT 720UL BOBBIN-1.26 TEC TEN 7 NOT 720UL BOBBIN+1.33 TEC TEH 7 HOT 720UL BOBBIN
+1.14 TEC TEH 13 HOT 720UL BOBBIN+0.90 TEC TEH 13 HOT 720UL BOBBIN+1.14 TEC TEH 13 HOT 720UL BOBBIN-1.21 TEC TEH 13 HOT 720UL BOBBIN-1.34 TEC TEH 13 HOT 720UL BOBBIN
-1.97 TEC TEH 9 HOT 720UL BOBBIN-1.28 TEC TEH 9 HOT 720UL BOBBIN
+1.19 TEC TEN 9 NOT 720UL BOBBIN+1.06 TEC TEH 9 HOT 720UL BOBBIN-1.26 TEC TEH 9 HOT 720UL BOBBIN-1.24 TEC TEN 9 NOT 720UL BOBBIN+1.19 TEC TEH 9 HOT 720UL BOBBIN
69 61 0.10 33 P2 TWD 4 FB4 +1.10 TEC TEH 8 HOT 720UL BOBBIN
69 63 0.20 95 P2 TWD 10 FB6 +1.19 TEC TEH 9 HOT 720UL BOBBIN
AREVA NP Inc 04/16/13 18:15:25Customer Name: DC COOK Unit 1 Component: S/G 13 Page 8 of 12
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
0.47 136 P2 TWD 19 FB5 +1.08 TEC TEH 9 HOT 720UL BOBBIN0.31 120 P2 TWD 14 FB4 +1.06 TEC TEH 9 HOT 720UL BOBBIN0.20 93 P2 TWD 10 FB4 -1.30 TEC TEH 9 HOT 720UL BOBBIN0.16 134 P2 TWD 8 FB3 +1.24 TEC TEH 9 HOT 720UL BOBBIN
69 65 0.24 143 P2 TWD 12 FB7 -0.82 TEC TEH 9 HOT 720UL BOBBIN
69 67 0.08 99 P2 TWD 5 FB6 +1.19 TEC TEH 9 HOT 720UL BOBBIN0.18 108 P2 TWD 9 FB5 +1.04 TEC TEH 9 HOT 720UL BOBBIN0.13 119 P2 TWD 7 FB3 +1.21 TEC TEH 9 HOT 720UL BOBBIN
69 69 0.15 83 P2 TWO 8 FB4 +1.13 TEC TEN 9 NOT 720UL BOBBIN
69 71 0.11 129 P2 TWD 6 FB4 +1.12 TEC TEH 9 HOT 720UL BOBBIN
0.09 110 P2 TWD 5 FB3 +1.30 TEC TEH 9 HOT 720UL BOBBIN
70 50 0.24 87 P2 TWO 10 FB5 +1.08 TEC TEH 6 HOT 720UL BOBBIN0.22 147 P2 TWO 10 FB4 -1.10 TEC TEH 6 HOT 720UL BOBBIN
70 54 0.49 110 P2 TWD 17 FB6 +0.00 TEC TEH 12 HOT 720UL BOBBIN0.85 109 P2 TWO 24 FB5 +0.00 TEC TEH 12 HOT 720UL BOBBIN0.29 113 P2 TWD 12 FB3 +0.00 TEC TEH 12 HOT 720UL BOBBIN1.27 117 P2 TWO 30 FB4 -0.02 TEC TEH 12 HOT 720UL BOBBIN
70 56 0.16 120 P2 TWD 9 FB6 -1.26 TEC TEH 9 HOT 720UL BOBBIN0.30 142 P2 TWO 14 FB5 -1.19 TEC TEH 9 HOT 720UL BOBBIN0.14 139 P2 TWD 7 FB4 +1.04 TEC TEH 9 HOT 720UL BOBBIN0.15 137 P2 TWD 8 FB4 -1.24 TEC TEH 9 HOT 720UL BOBBIN0.10 67 P2 TWO 5 FB3 +1.17 TEC TEH 9 HOT 720UL BOBBIN0.10 146 P2 TWO 6 FB3 -1.33 TEC TEH 9 HOT 720UL BOBBIN
70 64 0.35 93 P2 TWO 13 FB6 +1.26 TEC TEH 8 HOT 720UL BOBBIN0.17 143 P2 TWO 7 FB6 -1.28 TEC TEH 8 HOT 720UL BOBBIN0.70 117 P2 TWO 21 FB5 +1.05 TEC TEH 8 HOT 720UL BOBBIN0.10 61 P2 TWO 4 FB5 -1.08 TEC TEH 8 HOT 720UL BOBBIN0.29 81 P2 TWD 11 FB4 +1.19 TEC TEH 8 HOT 720UL BOBBIN0.46 131 P2 TWD 16 FB4 -1.17 TEC TEH 8 HOT 720UL BOBBIN0.14 69 P2 TWD 6 PB3 +1.24 TEC TEH 8 HOT 720UL BOBBIN0.16 126 P2 TWD 7 FB3 -1.19 TEC TEH 8 HOT 720UL BOBBIN
70 66 0.10 99 P2 TWO 5 FB4 -1.19 TEC TEH 9 HOT 720UL BOBBIN
70 68 0.13 106 P2 TWD 7 FB4 -1.32 TEC TEH 9 HOT 720UL BOBBIN0.12 88 P2 TWD 6 FB6 +1.21 TEC TEH 9 HOT 720UL BOBBIN
70 74 0.15 78 P2 TWD 8 FB4 -1.26 TEC TEH 11 HOT 720UL BOBBIN
71 43 0.11 60 P2 TWD 5 FP4 +1.10 TEC TEH 6 HOT 720UL BOBBIN
71 47 0.12 83 P2 TWD 5 FB5 -0.99 TEC TEH 6 HOT 720UL BOBBIN0.11 49 P2 TWD 5 FB4 +1.13 TEC TEH 6 HOT 720UL BOBBIN
71 53 0.14 125 P2 TWD 6 FB5 -1.15 TEC TEH 8 HOT 720UL BOBBIN0.15 102 P2 TWD 6 FB4 +1.12 TEC TEH 8 HOT 720UL BOBBIN
71 55 0.12 57 P2 TWD 6 FB6 +1.19 TEC TEH 12 HOT 720UL BOBBIN
71 57 0.38 132 P2 TWD 14 FB5 +1.03 TEC TEH 8 HOT 720UL BOBBIN0.41 99 P2 TWD 14 FB4 -1.24 TEC TEH 8 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/16/13 18:15:25Component: S/G 13 Page 9 of 12
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION
0.19 108 P2 TWO 8 FB3 -1.26
EXT EXT UTIL 1 UTIL 2 CAL # LEG
TEC TEH 8 HOT
PROBE
720UL
SCOPE
BOBBIN
71 59 0.170.250.11
71 63 0.230.200.340.220.13
113 P2 TWD 7 FB5103 P2 TWD 10 FB486 P2 TWD 5 FB3
75 P2 TWD 9 FB654 P2 TWD 8 FB589 P2 TWO 13 FB5108 P2 TWD 9 FB490 P2 TWD 5 FB3
+1.17-1.12-1.35
-1.26+1.15-1.12+1.19+1.24
TEC TEH 8 HOT 720UL BOBBINTEC TEH 8 HOT 720UL BOBBINTEC TEH 8 HOT 720UL BOBBIN
TEC TEN 8 NOT 720UL BOBBINTEC TEH 8 HOT 720UL BOBBINTEC TEH 8 HOT 720UL BOBBINTEC TEH 8 HOT 720UL BOBBINTEC TEH 8 HOT 720UL BOBBIN
71 65 0.14 113 P2 TWO 6 FB4
71 67 0.20 120 P2 TWD 8 FB60.26 105 P2 TWD 10 FB50.09 40 P2 TWO 4 FB50.20 65 P2 TWD 8 FB40.20 115 P2 TWD 8 FB3
+1.10 TEC TEH 8 HOT 720UL BOBBIN
-1.19 TEC TEH 8+1.10 TEC TEH 8-1.22 TEC TEH 8+1.15 TEC TEH 8+1.22 TEC TEH 8
HOTHOTHOTHOTHOT
720UL720UL720UL720UL720UL
BOBBINBOBBINBOBBINBOBBINBOBBIN
71 69 0.11 111 P2 TWO 5 FB6 -1.22 TEC TEH 8 HOT 720UL BOBBIN0.11 32 P2 TWO 5 FB5 +1.01 TEC TEH 8 HOT 720UL BOBBIN0.11 72 P2 TWD 5 FB4 +1.15 TEC TEH 8 HOT 720UL BOBBIN
71 71 0.11 101 P2 TWO 5 FB6 -1.18 TEC TEH 8 HOT 720UL BOBBIN0.12 159 P2 TWO 5 FB3 +1.20 TEC TEH 8 HOT 720UL BOBBIN
71 73 0.11 147 P2 TWD 5 FB5 -1.10 TEC TEH 10 HOT 720UL BOBBIN0.15 130 P2 TWO 6 FB4 +0.92 TEC TEH 10 HOT 720UL BOBBIN
72 42 0.12 32 P2 TWD 6 FB5 +1.19 TEC TEH 6 HOT 720UL BOBBIN0.14 153 P2 TWD 6 FB4 -1.12 TEC TEH 6 HOT 720UL BOBBIN0.11 145 P2 TWD 5 FB3 -1.22 TEC TEH 6 HOT 720UL BOBBIN
72 50 0.12 97 P2 TWO 7 FB4 -1.17 TEC TEH 7 HOT 720UL BOBBIN
72 58 0.31 118 P2 TWO 14 FB6 -1.35 TEC TEH 9 HOT 720UL BOBBIN0.85 121 P2 TWD 27 FB5 -1.10 TEC TEH 9 HOT 720UL BOBBIN0.58 119 P2 TWD 22 FB4 +1.06 TEC TEH 9 HOT 720UL BOBBIN0.30 124 P2 TWO 14 FB3 +1.22 TEC TEH 9 HOT 720UL BOBBIN0.06 130 P2 TWO 3 FB2 +1.39 TEC TEH 9 HOT 720UL BOBBIN
72 60 0.14 72 P2 TWO 7 FB4 +1.15 TEC TEH 9 HOT 720UL BOBBIN0.07 120 P2 TWD 4 FB3 -1.28 TEC TEH 9 HOT 720UL BOBBIN
72 62 0.13
72 64 0.14
72 66 0.23
0.10
72 72 0.08
73 45 0.160.110.11
61 P2 TWD 7 FB5
131 P2 TWD 8 FB4
-1.13 TEC TEN
-1.15 TEC TEH
9 NOT 720UL BOBBIN
9 HOT 720UL BOBBIN
99 P2 TWD 9 FB5 -1.15 TEC TEH 8 HOT 720UL BOBBIN147 P2 TWD 4 FB4 -1.19 TEC TEH 8 HOT 720UL BOBBIN
130 P2 TWO 5 FB4 -1.17 TEC TEH 11 HOT 720UL BOBBIN
96 P2 TWD 8 FB5 -1.11 TEC TEH 7 HOT 720UL BOBBIN113 P2 TWO 6 FB4 +1.00 TEC TEH 7 HOT 720UL BOBBIN61 P2 TWO 6 FB3 +1.24 TEC TEH 7 HOT 720UL BOBBIN
-----------------------------------------------
73 51 0.08 97 P2 TWD 5 FB5 +1.08 TEC TEH 9 HOT 720UL BOBBIN
AREVA NP Inc 04/16/13 18:15:25Customer Name: DC COOK Unit I Component: S/G 13 Page 10 of 12
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE0.=15 •16 0. . P2. TWO. -1 -- ======.19 TEC TEN. 9=.. . . . . HOT.. . . . 72.. . BOBBIN---. . . .. . . .. . . .
0.15 160 P2 TWD 8 FB5 -1.19 TEC TEH 9 HOT 720UL BOBBIN0.17 124 P2 TWD 9 FB4 +1.19 TEC TEH 9 HOT 720UL BOBBIN0.10 134 P2 TWD 6 FB3 +1.19 TEC TEH 9 HOT 720UL BOBBIN
73 53 0.07 40 P2 TWD 4 FB7 -0.88 TEC TEH 9 HOT 720UL BOBBIN
73 57 0.15 123 P2 TWD 8 FB6 -1.30 TEC TEH 9 HOT 720UL BOBBIN0.12 126 P2 TWD 7 FB5 +1.13 TEC TEH 9 HOT 720UL BOBBIN0.23 143 P2 TWD 11 FB5 -1.17 TEC TEH 9 HOT 720UL BOBBIN0.27 72 P2 TWD 13 FB4 -1.13 TEC TEH 9 HOT 720UL BOBBIN
73 61 0.18 77 P2 TWD 7 FB6 -1.21 TEC TEH 8 HOT 720UL BOBBIN0.26 127 P2 TWO 10 FB5 +1.05 TEC TEH 8 HOT 720UL BOBBIN0.13 149 P2 TWD 5 FB5 -1.19 TEC TEH 8 HOT 720UL BOBBIN0.28 92 P2 TWD 11 FB4 +1.19 TEC TEH 8 HOT 720UL BOBBIN0.51 127 P2 TWD 17 FB4 -1.15 TEC TEH 8 HOT 720UL BOBBIN0.14 104 P2 TWD 6 FB3 +1.28 TEC TEH 8 HOT 720UL BOBBIN0.14 149 P2 TWD 6 FB3 -1.28 TEC TEH 8 HOT 720UL BOBBIN
73 63 0.12 66 P2 TWO 6 FB6 +1.21 TEC TEN 9 NOT 720UL BOBBIN0.13 104 P2 TWD 7 FB6 -1.26 TEC TEH 9 HOT 720UL BOBBIN0.21 117 P2 TWD 10 FBS +1.13 TEC TEH 9 HOT 720UL BOBBIN0.33 117 P2 TWD 15 FB5 -1.19 TEC TEH 9 HOT 720UL BOBBIN
0.11 83 P2 TWD 6 FB4 +1.17 TEC TEH 9 HOT 720UL BOBBIN0.16 114 P2 TWD 9 FB4 -1.24 TEC TEH 9 HOT 720UL BOBBIN0.11 97 P2 TWD 6 FB3 -1.35 TEC TEH 9 HOT 720UL BOBBIN
73 65 0.13 96 P2 TWD 7 FB6 -1.24 TEC TEH 9 HOT 720UL BOBBIN0.10 130 P2 TWD 5 FB5 +0.90 TEC TEH 9 HOT 720UL BOBBIN0.20 88 P2 TWD 10 FB4 -1.19 TEC TEH 9 HOT 720UL BOBBIN
74 50 0.12 76 P2 TWD 6 FB5 +0.92 TEC TEH 6 HOT 720UL BOBBIN0.17 49 P2 TWD 7 FB4 -1.15 TEC TEH 6 HOT 720UL BOBBIN0.10 57 P2 TWD 5 FB3 -1.13 TEC TEH 6 HOT 720UL BOBBIN
74 52 0.13 45 P2 TWD 6 FB6 +1.26 TEC TEH 8 HOT 720UL BOBBIN0.48 97 P2 TWD 16 FB5 +1.08 TEC TEH 8 HOT 720UL BOBBIN0.55 103 P2 TWD 18 FB4 -1.17 TEC TEH 8 HOT 720UL BOBBIN0.24 80 P2 TWD 10 FB3 -1.33 TEC TEH 8 HOT 720UL BOBBIN
74 64 0.10 105 P2 TWD 4 FB6 +1.17 TEC TEH 8 HOT 720UL BOBBIN0.29 118 P2 TWD 11 FB6 -1.22 TEC TEH 8 HOT 720UL BOBBIN0.43 93 P2 TWD 15 FB5 -1.12 TEC TEH 8 HOT 720UL BOBBIN0.37 115 P2 TWD 13 FB4 +1.22 TEC TEH 8 HOT 720UL BOBBIN0.64 133 P2 TWD 20 FB4 -1.12 TEC TEH 8 HOT 720UL BOBBIN0.28 107 P2 TWD 11 FB3 +1.19 TEC TEH 8 HOT 720UL BOBBIN0.39 135 P2 TWD 14 FB3 -1.31 TEC TEH 8 HOT 720UL BOBBIN0.15 121 P2 TWD 6 FB2 -1.38 TEC TEH 8 HOT 720UL BOBBIN
74 66 0.12 117 P2 TWD 7 FB5 -1.21 TEC TEH 9 HOT 720UL BOBBIN
75 43 0.11 76 P2 TWD 5 FB5 -0.73 TEC TEH 6 HOT 720UL BOBBIN0.11 132 P2 TWD 5 FB4 +1.12 TEC TEH 6 HOT 720UL BOBBIN
75 47 0.16 137 P2 TWD 7 FB5 -1.24 TEC TEH 6 HOT 720UL BOBBIN0.16 122 P2 TWD 7 FB4 +1.08 TEC TEH 6 HOT 720UL BOBBIN0.10 108 P2 TWD 5 FB3 +1.13 TEC TEH 6 HOT 720UL BOBBIN
75 49 0.09 88 P2 TWD 4 FB7 +1.97 TEC TEH 6 HOT 720UL BOBBIN
AREVA NP Inc 04/16/13 18:15:25Customer Name: DC COOK Unit 1 Component: S/G 13 Page 11 of 12
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE==== ==== ====== === === === === == == == ==_ ....... .. ... .. . ...... . ...... . ..... . ...... . ... .... ... .... .. -----.......
75 61 0.36 137 P2 TWD 16 FB6 +1.08 TEC TEH 9 HOT 720UL BOBBIN0.58 127 P2 TWD 22 FB5 +0.97 TEC TEH 9 HOT 720UL BOBBIN0.28 91 P2 TWD 13 FB4 +1.13 TEC TEH 9 HOT 720UL BOBBIN0.42 128 P2 TWD 18 FB4 -1.19 TEC TEH 9 HOT 720UL BOBBIN0.58 124 P2 TWD 22 FB3 +1.19 TEC TEH 9 HOT 720UL BOBBIN
75 65 0.09 135 P2 TWD 4 FB4 -1.24 TEC TEH 8 HOT 720UL BOBBIN
75 73 0.10 30 P2 TWD 4 FB4 +1.12 TEC TEH 10 HOT 720UL BOBBIN
76 46 0.15 77 P2 TWD 8 FB6 +1.20 TEC TEH 7 HOT 720UL BOBBIN0.19 57 P2 TWD 10 FB5 +1.06 TEC TEH 7 HOT 720UL BOBBIN0.18 143 P2 TWD 9 FB4 -1.15 TEC TEH 7 HOT 720UL BOBBIN0.13 60 P2 TWD 7 FB3 -1.35 TEC TEH 7 HOT 720UL BOBBIN
76 62 0.11 63 P2 TWD 6 FB5 +1.12 TEC TEH 9 HOT 720UL BOBBIN0.15 58 P2 TWD 8 FB5 -1.17 TEC TEH 9 HOT 720UL BOBBIN0.11 80 P2 TWD 6 FB4 -1.19 TEC TEH 9 HOT 720UL BOBBIN
78 58 0.22 55 P2 TWD 9 FB6 -1.24 TEC TEH 8 HOT 720UL BOBBIN0.37 100 P2 TWD 13 FB5 +1.24 TEC TEH 8 HOT 720UL BOBBIN0.42 133 P2 TWD 15 FB5 -1.12 TEC TEH 8 HOT 720UL BOBBIN0.77 109 P2 TWD 22 FB4 +1.21 TEC TEH 8 HOT 720UL BOBBIN0.10 49 P2 TWD 4 FB4 -1.24 TEC TEH 8 HOT 720UL BOBBIN0.26 116 P2 TWD 10 FB3 +1.21 TEC TEH 8 HOT 720UL BOBBIN0.15 134 P2 TWD 6 FB3 -1.24 TEC TEH 8 HOT 720UL BOBBIN0.11 67 P2 TWD 5 FB6 +1.17 TEC TEH 8 HOT 720UL BOBBIN
78 60 0.12 78 P2 TWD 5 FB6 +1.17 TEC TEH 8 HOT 720UL BOBBIN0.48 122 P2 TWD 16 FB6 -1.19 TEC TEH 8 HOT 720UL BOBBIN0.93 112 P2 TWD 25 FB5 -1.17 TEC TEH 8 HOT 720UL BOBBIN0.95 111 P2 TWD 25 FB4 +1.19 TEC TEH 8 HOT 720UL BOBBIN0.28 130 P2 TWD 11 FB3 +1.24 TEC TEH 8 HOT 720UL BOBBIN0.22 114 P2 TWD 9 FB3 -1.19 TEC TEH 8 HOT 720UL BOBBIN
78 66 0.23 99 P2 TWD 11 FB6 -1.23 TEC TEH 9 HOT 720UL BOBBIN0.18 91 P2 TWD 9 FB5 +1.17 TEC TEH 9 HOT 720UL BOBBIN0.46 123 P2 TWD 19 FB5 -1.15 TEC TEH 9 HOT 720UL BOBBIN0.17 124 P2 TWD 9 FB4 +1.12 TEC TEH 9 HOT 720UL BOBBIN0.16 92 P2 TWD 8 FB3 -1.23 TEC TEH 9 HOT 720UL BOBBIN
79 49 0.12 38 P2 TWD 5 FB6 +1.08 TEC TEH 6 HOT 720UL BOBBIN
79 65 0.12 129 P2 TWD 5 FB7 -1.40 TEC TEH 8 HOT 720UL BOBBIN0.93 103 P2 TWD 25 FB6 -1.29 TEC TEH 8 HOT 720UL BOBBIN0.61 108 P2 TWD 19 FB5 +1.13 TEC TEH 8 HOT 720UL BOBBIN0.24 120 P2 TWD 10 FB5 -1.19 TEC TEH 8 HOT 720UL BOBBIN0.36 105 P2 TWD 13 FB4 +1.19 TEC TEH 8 HOT 720UL BOBBIN0.82 104 P2 TWD 23 FB4 -1.10 TEC TEH 8 HOT 720UL BOBBIN0.66 125 P2 TWD 20 FB3 +1.22 TEC TEH 8 HOT 720UL BOBBIN0.21 144 P2 TWD 9 FB3 -1.31 TEC TEH 8 HOT 720UL BOBBIN0.27 127 P2 TWD 10 FB2 +1.38 TEC TEH 8 HOT 720UL BOBBIN
81 43 0.09 103 P2 TWD 5 FB2 -2.00 TEC TEH 7 HOT 720UL BOBBIN
82 54 0.16 85 P2 TWD 7 FB6 +0.50 TEC TEH 12 HOT 720UL BOBBIN0.10 53 P2 TWD 5 FB5 -0.09 TEC TEH 12 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/16/13 18:15:25Component: S/G 13 Page 12 of 12
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
Total Tubes : 196Total Records: 453
Attachment 4 to Enclosure to AEP-NRC-2013-90Unit 1 2013 Steam Generator Tube Inspection Report
SG 14 Fan Bar/Lattice Grid Wear Percent Throughwall Indications
AREVA NP Inc 04/15/13 12:41:51Customer Name: DC COOK Unit 1 Component: S/G 14 Page 1 of 20
TWD Indications
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
1 37 0.11 115 P2 TWD 5 FB8 +1.19 08C TEH 30 HOT 720CL BOBBIN
1 47 0.19 105 P2 TWO 8 07C -1.02 08C TEC 7 COLD 720UL BOBBIN
1 51 0.17 70 P2 TWD 7 06C +1.04 08C TEC LAR 7 COLD 720UL BOBBIN
3 19 0.09 94 P2 TWD 4 08C -1.64 08C TEN 30 NOT 720CL BOBBIN
3 95 0.15 154 P2 TWD 6 FB5 -1.30 08C TEH 30 HOT 720CL BOBBIN
8 44 0.12 132 P2 TWD 5 04C +0.47 TEC TEH LAR 29 HOT 720CL BOBBIN
19 105 0.08 147 P2 TWD 3 08C -1.52 TEC TEH LAR 25 HOT 720UL BOBBIN
26 6 0.11 87 P2 TWD 4 FB5 +1.70 TEC TEN 20 NOT 720UL BOBBIN
31 9 0.11 59 P2 TWD 4 FB5 -0.76 TEC TEH 20 HOT 720UL BOBBIN
36 46 0.20 92 P2 TWO 7 OSM +0.53 TEC TEN LAR 16 NOT 720UL BOBBIN
36 54 0.12 50 P2 TWD 5 FB5 +0.37 TEC TEH 23 HOT 720UL BOBBIN
37 67 0.08 90 P2 TWD 3 FBI -1.39 TEC TEH 19 HOT 720UL BOBBIN
39 65 0.10 76 P2 TWD 4 FB4 -1.20 TEC TEH 18 HOT 720UL BOBBIN
40 64 0.08 126 P2 TWD 3 FB4 -0.78 TEC TEH 19 HOT 720UL BOBBIN
41 69 0.09 106 P2 TWO 3 FB4 +1.16 TEC TEN 19 NOT 720UL BOBBIN
42 50 0.10 137 P2 TWD 4 FB4 -1.26 TEC TEH 17 HOT 720UL BOBBIN
44 62 0.57 123 P2 TWD 16 FB3 -2.40 TEC TEH 19 HOT 720UL BOBBIN
45 27 0.09 92 P2 TWD 3 FB6 -0.82 TEC TEH 19 HOT 720UL BOBBIN
46 54 0.10 43 P2 TWO 4 FB4 +0.00 TEC TEN 23 NOT 720UL BOBBIN
0.09 63 P2 TWO 3 EB5 +0.42 TEC TEN 23 NOT 720UL BOBBIN
47 53 0.13 57 P2 TWD 5 FBS +0.66 TEC TEH 12 HOT 720UL BOBBIN
47 65 0.12 120 P2 TWD 5 1 FB -1.23 TEC TEH 10 HOT 720UL BOBBIN
47 69 0.08 68 P2 TWO 4 FB4 +1.21 TEC TEN 11 NOT 720UL BOBBIN
47 71 0.09 76 P2 TWD 4 FB4 +1.26 TEC TEH 11 HOT 720UL BOBBIN
48 14 0.09 146 P2 TWO 4 02N +47.99 TEC TEN LAR 21 NOT 720UL BOBBIN
48 48 0.11 134 P2 TWO S FB4 +1.24 TEC TEN 13 NOT 720UL BOBBIN
48 54 0.19 82 P2 TWD 6 FBS +0.37 TEC TEH 22 HOT 720UL BOBBIN0.19 106 P2 TWD 6 FB4 +0.48 TEC TEH 22 HOT 720UL BOBBIN
48 60 0.08 127 P2 TWD 3 FB4 -1.19 TEC TEH 13 HOT 720UL BOBBIN
48 92 0.09 110 P2 TWD 4 FBS +1.67 TEC TEH 23 HOT 720UL BOBBIN
49 67 0.11 134 P2 TWD 5 FB4 -1.26 TEC TEH 11 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 12:41:51Component: S/G 14 Page 2 of 20
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
50 54 0.15 79 P2 TWD 5 FB5 +0.44 TEC TEH 23 HOT 720UL BOBBIN0.10 97 P2 TWD 4 FB4 +0.34 TEC TEH 23 HOT 720UL BOBBIN
......................................................................................................................................
50 64 0.22 86 P2 TWD 8 FB5 +1.10 TEC TEH 10 HOT 720UL BOBBIN0.14 147 P2 TWD 5 FB4 -1.25 TEC TEH 10 HOT 720UL BOBBIN
50 66 0.08 117 P2 TWD 3 FB4 -1.26 TEC TEH 11 HOT 720UL BOBBIN......................................................................................................................................
51 53 0.12 35 P2 TWD 5 FB4 -1.62 TEC TEH 12 HOT 720UL BOBBIN
51 55 0.12 136 P2 TWD 4 FB4 +1.31 TEC TEH 23 HOT 720UL BOBBIN51.57.0.09...102..P2...TWO..4..FBS...+1.57........TEC.........TEN..........13.......NOT............................BOBBIN............51 57 0.09 102 P2 TWD 4 FB5 +1.57 TEC TEH 13 HOT 720UL BOBBIN
51 61 0.10 117 P2 TWD 4 FB5 +1.10 TEC TEH 10 HOT 720UL BOBBIN
0.10 69 P2 TWD 4 FB5 -1.16 TEC TEH 10 HOT 720UL BOBBIN0.24 57 P2 TWD 9 FB4 -1.27 TEC TEH 10 HOT 720UL BOBBIN
52 54 0.13 59 P2 TWD 4 FB4 +0.44 TEC TEH 22 HOT 720UL BOBBIN
52 66 0.19 74 P2 TWD 7 FB5 -1.16 TEC TEH 10 HOT 720UL BOBBIN
53 53 0.24 93 P2 TWD 10 FB5 +0.57 TEC TEH 13 HOT 720UL BOBBIN0.07 151 P2 TWD 3 FB4 -1.46 TEC TEH 13 HOT 720UL BOBBIN
53 59 0.09 92 P2 TWD 4 FB4 +1.19 TEC TEH..................................................................
54 16 0.10 144 P2 TWD 3 08H +0.55 TEC TEH
54 50 0.25 65 P2 TWD 10 FB5 +1.05 TEC TEH
54 66 0.09 62 P2 TWD 4 FB4 -1.17 TEC TEH
55 43 0.22 123 P2 TWD 9 FB4 +1.01 TEC TEH
55 53 0.19 105 P2 TWD 7 FB5 +0.61 TEC TEH
55 61 0.15 71 P2 TWD 6 FB4 -1.23 TEC TEH
55 63 0.13 152 P2 TWD 5 FB5 +0.98 TEC TEH0.18 134 P2 TWD 7 FB4 -1.18 TEC TEH
55 65 0.32 125 P2 TWD 12 FB5 -1.14 TEC TEH0.19 100 P2 TWD 8 FB4 +1.07 TEC TEH0.10 138 P2 TWD 4 FB4 -1.23 TEC TEH0.10 123 P2 TWD 4 FB3 +1.28 TEC TEH
55 67 0.13 40 P2 TWD 5 FB6 -1.27 TEC TEH
56 54 0.31 103 P2 TWD 9 FB5 +0.48 TEC TEH0.10 34 P2 TWD 3 FB4 +0.46 TEC TEH
56 60 0.15 138 P2 TWD 6 FB5 +1.10 TEC TEH0.09 149 P2 TWD 4 FB4 +0.97 TEC TEH
56 62 0.17 98 P2 TWD 7 FB5 +1.03 TEC TEH0.28 104 P2 TWD 11 FB4 -1.12 TEC TEH
13 HOT 720UL BOBBIN....................................................................
LAR 20 HOT 720UL BOBBIN
12 NOT 720UL BOBBIN
11 HOT 720UL BOBBIN
15 NOT 720UL BOBBIN
12 HOT 720UL BOBBIN
10 HOT 720UL BOBBIN
11 NOT 720UL11 HOT 720UL
BOBBINBOBBIN
11 HOT 720UL BOBBIN11 HOT 720UL BOBBIN11 HOT 720UL BOBBIN11 HOT 720UL BOBBIN
10 NOT 720UL BOBBIN
22 HOT 720UL BOBBIN22 HOT 720UL BOBBIN
------------------
------------------
13 NOT 720UL BOBBIN13 HOT 720UL BOBBIN
11 HOT 720UL BOBBIN11 HOT 720UL BOBBIN
AREVA NP Inc 04/15/13 12:41:51Customer Name: DC COOK Unit 1 Component: S/G 14 Page 3 of 20
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
56 64 0.09 82 P2 TWD 4 FB5 +0.91 TEC TEH 11 HOT 720UL BOBBIN0.11 114 P2 TWD 5 FB4 +1.07 TEC TEH 11 HOT 720UL BOBBIN
56 66 0.15 66 P2 TWD 6 FB5 +1.10 TEC TEH 10 HOT 720UL BOBBIN0.10 53 P2 TWO 4 FB4 -1.16 TEC TEH 10 HOT 720UL BOBBIN
57 45 0.26 136 P2 TWD 10 03H -1.64 TEC TEH LAR 14 HOT 720UL BOBBIN......................................................................................................................................
57 53 0.10 122 P2 TWD 4 FB4 -1.62 TEC TEH 13 HOT 720UL BOBBIN......................................................................................................................................
58 36 0.17 129 P2 TWD 7 07H -1.63 TEC TEH LAR 14 HOT 720UL BOBBIN
58 44 0.11 141 P2 TWD 5 FB4 -1.12 TEC TEH 14 HOT 720UL BOBBIN......................................................................................................................................
58 54 0.20 127 P2 TWD 7 FB5 +0.00 TEC TEH 23 HOT 720UL BOBBIN0.31 103 P2 TWO 10 FB4 -0.05 TEC TEH 23 HOT 720UL BOBBIN
58 60 0.13 100 P2 TWD 5 FB5 +1.10 TEC TEH 12 HOT 720UL BOBBIN0.16 97 P2 TWD 7 FB4 +1.03 TEC TEH 12 HOT 720UL BOBBIN
58 62 0.17 90 P2 TWD 7 FB5 +1.07 TEC TEH 10 HOT 720UL BOBBIN0.15 152 P2 TWD 6 FB4 -1.23 TEC TEH 10 HOT 720UL BOBBIN
58 64 0.10 67 P2 TWO 4 FB5 +1.05 TEC TEN 10 NOT 720UL BOBBIN0.10 49 P2 TWD 4 FB4 +1.12 TEC TEH 10 HOT 720UL BOBBIN
58 66 0.15 123 P2 TWD 6 FB5 -1.21 TEC TEH 11 HOT 720UL BOBBIN0.10 130 P2 TWD 5 FB4 -1.15 TEC TEH 11 HOT 720UL BOBBIN
58 68 0.10 79 P2 TWD 4 FB4 -1.10 TEC TEH 11 HOT 720UL BOBBIN
59 45 0.11 144 P2 TWD 5 03H -1.67 TEC TEH LAR 15 HOT 720UL BOBBIN
59 47 0.13 83 P2 TWD 6 FB4 +0.99 TEC TEH 14 HOT 720UL BOBBIN
59 51 0.14 136 P2 TWD 6 FB5 +0.96 TEC TEH 12 HOT 720UL BOBBIN0.15 41 P2 TWD 6 FB4 -1.21 TEC TEH 12 HOT 720UL BOBBIN
59 55 0.12 130 P2 TWD 5 FB5 +1.51 TEC TEH 23 HOT 720UL BOBBIN0.15 54 P2 TWD 5 FB4 -1.17 TEC TEH 23 HOT 720UL BOBBIN
59 57 0.13 140 P2 TWD 6 FB4 -1.07 TEC TEH 13 HOT 720UL BOBBIN0.16 77 P2 TWD 7 FB5 +1.44 TEC TEH 13 HOT 720UL BOBBIN
59 61 0.10 43 P2 TWD 4 FB5 +1.36 TEC TEH 10 HOT 720UL BOBBIN
59 63 0.15 105 P2 TWD 6 FB6 -1.35 TEC TEH 11 HOT 720UL BOBBIN0.18 72 P2 TWD 7 FB5 +1.07 TEC TEH 11 HOT 720UL BOBBIN0.20 129 P2 TWD 8 FB5 -1.14 TEC TEH 11 HOT 720UL BOBBIN0.36 116 P2 TWD 13 FB4 -1.14 TEC TEH 11 HOT 720UL BOBBIN
59 65 0.22 111 P2 TWO 9 FB6 -1.24 TEC TEH 11 HOT 720UL BOBBIN0.33 110 P2 TWD 12 FB5 +1.04 TEC TEH 11 HOT 720UL BOBBIN0.18 108 P2 TWD 7 FB5 -1.22 TEC TEH 11 HOT 720UL BOBBIN0.39 118 P2 TWO 14 FB4 +1.08 TEC TEH 11 HOT 720UL BOBBIN0.13 136 P2 TWD 6 FB4 -1.17 TEC TEH 11 HOT 720UL BOBBIN0.13 115 P2 TWD 6 FB3 +1.33 TEC TEH 11 HOT 720UL BOBBIN
59 67 0.13 112 P2 TWO 5 FB6 -1.23 TEC TEH 10 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 12:41:51Component: S/G 14 Page 4 of 20
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
0.12 90 P2 TWD 5 FB5 -1.05 TEC TEH 10 HOT 720UL BOBBIN0.22 126 P2 TWD 8 FB4 +1.05 TEC TEH 10 HOT 720UL BOBBIN
59..69.0.11...92..P2...TED............+1.10........TEC.........TEN.............1.....NOT............20..............BOBBIN............
59 69 0.11 92 P2 TWD 5 FB4 +1.10 TEC TEH 10 HOT 720UL BOBBIN
59 73 0.12 49 P2 TWD 5 FB4 +1.18 TEC TEH 10 HOT 720UL BOBBIN60.44.0.13..113..P2.TED....FB4.-1.......12........TEC.........TEN..........15.......NOT.........720................BOBBIN............
60 44 0.13 113 P2 TWD 5 FB4 -1.12 TEC TEH 15 HOT 720UL BOBBIN......................................................................................................................................60 46 0.13 53 P2 TWD 5 FB5 +i.i0 TEC TEH 15 HOT 720UL BOBBIN......................................................................................................................................
60 52 0.17 110 P2 TWD 7 FB5 +0.96 TEC TEH0.12 38 P2 TWD 5 FB4 -1.16 TEC TEH
................................................................................
60 54 0.16 116 P2 TWD 5 FB5 +0.02 TEC TEH0.24 58 P2 TWD 7 FB4 +0.09 TEC TEH
................................................................................
60 56 0.11 128 P2 TWD 5 FB6 -1.28 TEC TEH0.16 99 P2 TWD 7 FB4 +1.07 TEC TEH
13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN22----NOT-----------------BOBBIN-----
22 HOT 720UL BOBBIN22 HOT 720UL BOBBIN
13 NOT13 HOT 720UL
720UL
BOBBINBOBBIN
BOBBIN---------------------------60 60 0.10 45 P2 TWD 4 FB5 +1.09 TEC TEH
..................................................................13 HOT 720UL
....................................
60 62 0.11 98 P2 TWD 5 FB6 +1.19 TEC TEH 11 HOT 720UL BOBBIN0.43 121 P2 TWD 15 FB5 +1.07 TEC TEH 11 HOT 720UL BOBBIN0.33 139 P2 TWD 12 FB4 -1.19 TEC TEH 11 HOT 720UL BOBBIN0.12 107 P2 TWD 5 FB3 -1.32 TEC TEH 11 HOT 720UL BOBBIN
60 64 0.19 105 P2 TWD 8 FB5 +1.09 TEC TEH 11 HOT 720UL BOBBIN0.14 148 P2 TWD 6 FB4 +0.98 TEC TEH 11 HOT 720UL BOBBIN
......................................................................................................................................
60 66 0.10 140 P2 TWD 4 FB6 -1.38 TEC TEH 10 HOT 720UL BOBBIN0.16 105 P2 TWD 6 FB5 +1.01 TEC TEH 10 HOT 720UL BOBBIN0.14 89 P2 TWD 6 FB4 -1.18 TEC TEH 10 HOT 720UL BOBBIN
60 70 0.09 43 P2 TWD 4 FB5 +1.08 TEC TEH 10 HOT 720UL BOBBIN0.09 133 P2 TWD 4 FB4 -1.14 TEC TEH 10 HOT 720UL BOBBIN
61 39 0.09 143 P2 TWD 4 FB4 +1.12 TEC TEH 15 HOT 720UL BOBBIN
61 43 0.15 119 P2 TWD 6 FB4 +1.10 TEC TEH 14 HOT 720UL BOBBIN0.14 121 P2 TWD 6 FB3 +1.29 TEC TEH 14 HOT 720UL BOBBIN
.........................................................................................................................
61 53 0.23 130 P2 TWD 10 FB5 - +0.67 TEC TEH 13 HOT 720UL BOBBIN0.11 32 P2 TWD 5 FB5 -1.17 TEC TEH 13 HOT 720UL BOBBIN0.09 68 P2 TWD 4 FB4 +1.10 TEC TEH 13 HOT 720UL BOBBIN0.13 144 P2 TWD 6 FB4 -1.65 TEC TEH 13 HOT 720UL BOBBIN
61 55 0.24 90 P2 TWD 7 FB5 +1.15 TEC TEH 22 HOT 720UL BOBBIN0.17 146 P2 TWD 5 FB4 -1.15 TEC TEH 22 HOT 720UL BOBBIN
-------------
61 57
61 59
0.16 86 P2 TWD 7 FB4 -1.16 TEC TEH
0.14 124 P2 TWD 6 FB6 -1.26 TEC TEH0.11 88 P2 TWD 5 FB5 -1.14 TEC TEH0.21 97 P2 TWD 9 FB4 -1.21 TEC TEH0.10 145 P2 TWD 5 FB3 -1.37 TEC TEH
12
13131313
NOT 720OULt BOBBIN
HOT 720UL BOBBIN
HOT 720UL BOBBINHOT 720UL BOBBINHOT 720UL BOBBIN
61 61 0.13 115 P2 TWD 50.12 88 P2 TWD 5
FB6 +1.16FB6 -1.30
TEC TENTEC TEH
11 NOT 720UL BOBBIN11 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 12:41:52Component: S/G 14 Page 5 of 20
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATI
0.42 119 P2 TWD 15 FB50.12 60 P2 TWD 5 FB50.13 94 P2 TWD 6 FB40.21 147 P2 TWD 9 FB40.13 144 P2 TWD 5 FB3
61 63 0.20 128 P2 TWD 8 FB60.26 122 P2 TWD 10 FB60.48 125 P2 TWD 15 FB50.26 128 P2 TWD 9 FB51.09 111 P2 TWD 26 FB40.15 100 P2 TWD 6 FB3
61 65 0.17 141 P2 TWD 7 FB60.15 90 P2 TWD 6 FB60.25 130 P2 TWD 9 FB50.27 91 P2 TWD 10 FB50.42 113 P2 TWD 14 FB40.24 124 P2 TWD 9 FB3
61 67 0.14 134 P2 TWD 6 FB60.10 138 P2 TWD 4 FB50.23 96 P2 TWD 9 FB50.25 132 P2 TWD 10 FB40.15 78 P2 TWD 6 FB40.14 118 P2 TWD 6 FB3
61 69 0.24 142 P2 TWD 9 FB4
ON EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
+1.27 TEC TEH 11 HOT 720UL BOBBIN-1.32 TEC TEH 11 HOT 720UL BOBBIN+1.07 TEC TEH 11 HOT 720UL BOBBIN-1.14 TEC TEH 11 HOT 720UL BOBBIN+1.32 TEC TEH 11 HOT 720UL BOBBIN
+1.12 TEC TEN 10 NOT 720UL BOBBIN-1.40 TEC TEH 10 HOT 720UL BOBBIN+1.01 TEC TEH 10 HOT 720UL BOBBIN-1.18 TEC TEH 10 HOT 720UL BOBBIN-1.27. TEC TEH 10 HOT 720UL BOBBIN-1.47 TEC TEH 10 HOT 720UL BOBBIN
+1.14 TEC TEH 10 HOT 720UL BOBBIN-1.32 TEC TEN 10 NOT 720UL BOBBIN+0.99 TEC TEH 10 HOT 720UL BOBBIN-1.14 TEC TEH 10 HOT 720UL BOBBIN+1.05 TEC TEH 10 HOT 720UL BOBBIN+1.32 TEC TEH 10 HOT 720UL BOBBIN
-1.07 TEC TEH 11 HOT 720UL BOBBIN+1.03 TEC TEH 11 HOT 720UL BOBBIN-1.19 TEC TEN 11 NOT 720UL BOBBIN+1.07 TEC TEH 11 HOT 720UL BOBBIN-1.21 TEC TEH 11 HOT 720UL BOBBIN-1.23 TEC TEH 11 HOT 720UL BOBBIN
+1.12 TEC TEH10 NOT 720UL BOBBIN
10 HOT 720UL BOBBIN61 71 0.14 142 P2 TWD 5 FB4 +1.01 TEC TEH
62 54 0.34 133 P2 TWD 11 FB6 +0.00 TEC TEH0.39 112 P2 TWD 12 FB5 +0.00 TEC TEH0.45 127 P2 TWD 14 FB4 +0.00 TEC TEH
23 NOT 720UL23 HOT 720UL23 HOT 720UL
BOBBINBOBBINBOBBIN
62 60 0.14 94 P2 TWD 6 FB6 +1.14 TEC TEH 12 HOT 720UL BOBBIN0.30 129 P2 TWD 11 FB5 +1.10 TEC TEH 12 HOT 720UL BOBBIN0.13 137 P2 TWD 5 06H -1.80 TEC TEH LAR 12 HOT 720UL BOBBIN
62 62 0.10 49 P2 TWD 4 FB5 +1.01 TEC TEH 10 HOT 720UL BOBBIN0.12 76 P2 TWD 5 FB4 +1.23 TEC TEH 10 HOT 720UL BOBBIN
62 64 0.09 86 P2 TWD 4 FB6 +1.18 TEC TEH 10 HOT 720UL BOBBIN0.21 120 P2 TWD 8 FB5 +1.10 TEC TEH 10 HOT 720UL BOBBIN0.21 135 P2 TWD 8 FB4 +1.12 TEC TEH 10 HOT 720UL BOBBIN0.20 95 P2 TWD 8 FB4 -1.10 TEC TEH 10 HOT 720UL BOBBIN
62 68 0.14 58 P2 TWD 6 FB4 -0.98 TEC TEH 11 HOT 720UL BOBBIN
62 70 0.25 140 P2 TWD 10 FB5 +1.10 TEC TEH 11 HOT 720UL BOBBIN0.22 93 P2 TWD 9 FB4 -1.19 TEC TEH 11 HOT 720UL BOBBIN
62 72 0.11 84 P2 TWD 5 FB4 -1.10 TEC TEH 11 HOT 720UL
62 74 0.09 132 P2 TWD 4 FB4 -0.64 TEC TEH 11 HOT 720UL
63 43 0.13 109 P2 TWD 5 FB4 +1.01 TEC TEH 15 HOT 720UL
63 45 0.12 120 P2 TWD 5 FB6 -1.28 TEC TEH 15 HOT 720UL
BOBBIN
BOBBIN
BOBBIN
BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 12:41:52Component: S/G 14 Page 6 of 20
QUERY: QueryMl
ROW COL VOLTS
0.420.150.150.20
DEG
129914362
CHN
P2P2P2P2
IND %
TWD 1TWD 6TWO 6TWD 8
63 47 0.12 117 P2 TWD 50.22 110 P2 TWD 90.11 68 P2 TWD 50.12 43 P2 TWD 5
TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
4 FB5 -1.12 TEC TEH 15 HOT 720UL BOBBINFB4 +1.17 TEC TEH 15 HOT 720UL BOBBINFB4 -1.17 TEC TEH 15 HOT 720UL BOBBINFB3 +1.24 TEC TEH 15 HOT 720UL BOBBIN
FB6 -1.58 TEC TEN 14 NOT 720UL BOBBINFBS -1.27 TEC TEH 14 HOT 720UL BOBBINFB4 +1.16 TEC TEH 14 HOT 720UL BOBBINFB4 -1.10 TEC TEH 14 HOT 720UL BOBBIN
FB5 -1.27 TEC TEH 12 HOT 720UL BOBBINFB5 +1.07 TEC TEH 12 HOT 720UL BOBBINFB4 +1.12 TEC TEH 12 HOT 720UL BOBBIN
2 FB4 -1.16 TEC TEH 12 HOT 720UL BOBBIN
FB3 +1.20 TEC TEH 12 HOT 720UL BOBBIN
63 51 0.23 70 P2 TWD0.11 92 P2 TWD0.14 52 P2 TWD0.34 142 P2 TWD0.19 153 P2 TWD
63 53 0.11 52 P2 TWD0.26 126 P2 TWD0.64 109 P2 TWD0.29 116 P2 TWD0.31 107 P2 TWD
95618
510191111
FB6 -1.27 TECFB5 +0.90 TECFB5 -1.16 TECFB4 +1.10 TECFB4 -1.18 TEC
TEHTEHTEHTEHTEH
63 55 0.13 130 P2 TWD 5 FB5 +1.15 TEC TEH
63 57 0.21 115 P2 TWD 9 FB5 -1.13 TEC TEH0.17 58 P2 TWD 7 FB4 +1.10 TEC TEH
63 59 0.10 118 P2 TWD 4 FB6 +1.12 TEC TEH0.12 96 P2 TWD 5 FB5 -1.18 TEC TEH0.16 83 P2 TWD 6 FB4 +1.05 TEC TEH
63 61 0.13 89 P2 TWD 5 FB6 +1.23 TEC TEH0.13 120 P2 TWD 5 FB5 +0.81 TEC TEH0.25 92 P2 TWD 9 FB4 +1.10 TEC TEH
63 63 0.15 83 P2 TWD 6 FB5 -1.05 TEC TEH
63 65 0.14 135 P2 TWD 6 FB5 -1.16 TEC TEH0.12 104 P2 TWD 5 FB4 +1.09 TEC TEH0.10 116 P2 TWD 4 FB3 +1.28 TEC TEH
63 67 0.11 147 P2 TWD 5 FB4 +1.14 TEC TEH
63 69 0.14 89 P2 TWD 6 FB4 +1.17 TEC TEH
63 73 0.11 42 P2 TWD 4 FB4 +1.05 TEC TEH
64 42 0.14 122 P2 TWD 6 FB4 -1.19 TEC TEH
12 HOT 720UL BOBBIN12 HOT 720UL BOBBIN12 HOT 720UL BOBBIN12 HOT 720UL BOBBIN12 HOT 720UL BOBBIN
23 HOT 720UL BOBBIN
13 NOT 720UL BOBBIN13 HOT 720UL BOBBIN
12 NOT 720UL BOBBIN12 HOT 720UL BOBBIN12 HOT 720UL BOBBIN
10 NOT 720UL BOBBIN10 HOT 720UL BOBBIN10 HOT 720UL BOBBIN
11 HOT 720UL BOBBIN
11 NOT 720UL BOBBIN10 HOT 720UL BOBBIN10 HOT 720UL BOBBIN
10 HOT 720UL BOBBIN
11 NOT 720UL BOBBIN
10 HOT 720UL BOBBIN
15 HOT 720UL BOBBIN
64 44 0.14 78 P2 TWO 6 FB4 -1.17 TEC TEH 15 HOT 720UL BOBBIN
64 48 0.11 55 P2 TWD 5 FB4 -1.24 TEC TEH 13 HOT 720UL BOBBIN
64 50 0.14 46 P2 TWD 6 FB5 +1.06 TEC TEH 13 HOT 720UL BOBBIN0.14 59 P2 TWD 6 FB4 -1.17 TEC TEH 13 HOT 720UL BOBBIN
64 52 0.19 67 P2 TWD 8 FB5 -1.14 TEC TEH 13 HOT 720UL BOBBIN0.13 103 P2 TWD 6 03H -1.68 TEC TEH LAR 13 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 12:41:52Component: S/G 14 Page 7 of 20
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL
64 58 0.24 113 P2 TWD 10 FB5 +1.04 TEC TEH0.13 125 P2 TWD 6 FB4 -1.13 TEC TEH
64 60 0.12 121 P2 TWD 5 FB6 -1.21 TEC TEH0.27 102 P2 TWD 11 FB5 -1.14 TEC TEH0.14 129 P2 TWD 6 FB4 +1.07 TEC TEH0.06 133 P2 TWD 3 FB3 +1.26 TEC TEH
64 62 0.17 93 P2 TWD 7 FB5 -1.18 TEC TEH0.14 124 P2 TWD 6 FB4 +1.25 TEC TEH
64 64 0.20 124 P2 TWD 8 FB6 +1.14 TEC TEH0.26 143 P2 TWD 10 FB5 +1.03 TEC TEH0.18 142 P2 TWD 7 FB5 -1.14 TEC TEH0.23 129 P2 TWD 9 FB4 +1.12 TEC TEH0.38 106 P2 TWD 14 FB4 -1.23 TEC TEH0.14 142 P2 TWD 6 FB3 -1.34 TEC TEH
64 66 0.12 145 P2 TWD 5 FB6 +1.19 TEC TEH0.24 115 P2 TWD 9 FB5 +1.12 TEC TEH0.15 87 P2 TWD 6 FB5 -1.08 TEC TEH0.18 138 P2 TWD 7 FB4 +1.16 TEC TEH0.38 133 P2 TWD 13 FB4 -1.21 TEC TEH0.31 134 P2 TWD 11 FB3 +1.30 TEC TEH
2 CAL # LEG
13 HOT13 HOT
13 NOT13 HOT13 HOT13 HOT
11 HOT
11 NOT
11 NOT11 NOT11 HOT11 HOT11 HOT11 HOT
PROBE
720UL720UL
SCOPE
BOBBINBOBBIN
720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
720UL BOBBIN720UL BOBBIN
720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
720UL BOBBIN720UL BOBBIN
10 HOT10 HOT10 HOT10 HOT10 HOT10 HOT
64 68 0.100.24
64 70 0.12
64 72 0.14
64 74 0.12
65 55 0.280.14
148 P2 TWD 4 FB6 +1.16115 P2 TWD 9 FB4 -1.16
52 P2 TWD 5 FB6 +1.21
104 P2 TWD 6 FB4 -1.10
119 P2 TWD 5 FB4 -1.14
89 P2 TWD 8 FB5 +1.0464 P2 TWD 4 FB4 -1.20
TEC TEN 10 NOTTEC TEH 10 HOT
TEC TEN 10 NOT 720UL BOBBIN
TEC TEH 10 HOT 720UL BOBBIN
TEC TEN 10 NOT 720UL BOBBIN
TEC TEH 22 HOT 720UL BOBBINTEC TEH 22 HOT 720UL BOBBIN
65 57 0.13 92 P2 TWD 5 FB4 -1.20 TEC TEH 12 HOT 720UL
65 59 0.29 119 P2 TWD 12 FB6 +1.05 TEC TEH 13 HOT 720UL0.22 123 P2 TWD 9 FB5 +1.10 TEC TEH 13 HOT 720UL0.29 114 P2 TWD 11 FB4 -1.19 TEC TEH 13 HOT 720UL0.07 61 P2 TWD 3 FB4 +0.96 TEC TEH 13 HOT 720UL0.12 151 P2 TWD 5 FB3 -1.42 TEC TEH 13 HOT 720UL
65 61 0.24 138 P2 TWD 10 FB5 +1.14 TEC TEH 11 HOT 720UL0.28 94 P2 TWD 11 FB4 -1.35 TEC TEH 11 HOT 720UL
65 63 0.15 95 P2 TWD 6 FB6 +1.27 TEC TEH 10 HOT 720UL0.10 96 P2 TWD 4 FB6 -1.25 TEC TEH 10 HOT 720UL0.26 144 P2 TWD 9 FB5 +0.99 TEC TEH 10 HOT 720UL0.25 125 P2 TWD 9 FB5 -1.12 TEC TEH 10 HOT 720UL0.57 110 P2 TWD 17 FB4 -1.23 TEC TEH 10 HOT 720UL0.20 152 P2 TWD 8 FB3 -1.40 TEC TEH 10 HOT 720UL
BOBBIN
BOBBINBOBBINBOBBINBOBBINBOBBIN
BOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBINBOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBIN
65 65 0.17 144 P2 TWD 7 FB60.18 131 P2 TWD 7 FB50.30 69 P2 TWD 11 FB50.49 103 P2 TWD 16 FB4
-1.32 TEC TEH 10 HOT+1.05 TEC TEH 10 HOT-1.10 TEC TEH 10 HOT+1.12 TEC TEH 10 HOT
720UL720UL720UL720UL
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 12:41:52Component: S/G 14 Page 8 of 20
QUERY: QueryMl
ROW COL VOLTS
0.360.35
DEG CHN IND
140 P2 TWD144 P2 TWO
%TW LOCATION
12 FB4 -1.1612 FB3 +1.30
EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
TEC TEH 10 HOT 720UL BOBBINTEC TEH 10 HOT 720UL BOBBIN
TEC TEH 11 HOT 720UL BOBBINTEC TEH 11 HOT 720UL BOBBINTEC TEH 11 HOT 720UL BOBBIN
65 67 0.10 111 P2 TWD 4 FB6 -1.320.15 108 P2 TWD 7 FB5 -1.340.37 107 P2 TWD 13 FB4 +0.93
65 69 0.18 148 P2 TWD 7 FB6 -1.320.16 73 P2 TWD 6 FB5 -1.210.37 109 P2 TWD 13 FB4 +1.12
65 71 0.12 79 P2 TWD 5 FB4 +1.10
66 54 0.30 111 P2 TWD 10 FB6 +0.000.43 125 P2 TWD 13 FB5 +0.000.56 108 P2 TWD 16 FB4 +0.000.21 70 P2 TWD 7 FB3 +0.00
66 58 0.15 147 P2 TWD 6 FB6 -1.180.58 119 P2 TWD 18 FB5 +1.160.15 152 P2 TWD 6 FB4 -1.03
66 60 0.53 113 P2 TWD 17 FB5 +1.100.21 106 P2 TWD 8 FB4 -1.160.36 137 P2 TWO 13 FB3 -1.230.09 120 P2 TWD 4 FB6 -1.29
66 62 0.14 151 P2 TWD 6 FB6 +1.180.53 117 P2 TWD 16 FB5 +1.070.13 68 P2 TWO 5 FB5 -1.230.26 117 P2 TWD 9 FB4 +1.120.35 114 P2 TWD 12 FB4 -1.180.13 136 P2 TWD 5 FB3 +1.160.14 146 P2 TWD 5 FB3 -1.27
66 64 0.21 69 P2 TWD 8 FB5 +1.10
66 66 0.11 61 P2 TWD 5 FB5 +1.080.12 91 P2 TWO 5 FB4 -1.17
TEC TEH 10 HOT 720UL BOBBINTEC TEH 10 HOT 720UL BOBBINTEC TEH 10 HOT 720UL BOBBIN
TEC TEH 10 HOT 720UL BOBBIN
TEC TEN 23 NOT 720UL BOBBINTEC TEH 23 HOT 720UL BOBBINTEC TEN 23 NOT 720UL BOBBINTEC TEH 23 HOT 720UL BOBBIN
TEC TEH 12 HOT 720UL BOBBINTEC TEH 12 HOT 720UL BOBBINTEC TEH 12 HOT 720UL BOBBIN
TEC TEN 12 NOT 720UL BOBBINTEC TEH 12 HOT 720UL BOBBINTEC TEH 12 HOT 720UL BOBBIN
TEC TEH 12 HOT 720UL BOBBIN
TEC TEN 10 NOT 720UL BOBBINTEC TEH 10 HOT 720UL BOBBINTEC TEH 10 HOT 720UL BOBBINTEC TEH 10 HOT 720UL BOBBINTEC TEH 10 HOT 720UL BOBBINTEC TEH 10 HOT 720UL BOBBINTEC TEH 10 HOT 720UL BOBBIN
TEC TEN
TEC TEHTEC TEH
10 HOT 720UL BOBBIN
11 NOT 720UL BOBBIN11 HOT 720UL BOBBIN
66 68 0.13 70 P2 TWD 6 FB5 +1.10 TEC TEH 11 HOT 720UL BOBBIN0.21 91 P2 TWD 8 FB4 -1.15 TEC TEH 11 HOT 720UL BOBBIN
66 70 0.21 138 P2 TWD 8 FB4 -1.10 TEC TEH 11 HOT 720UL BOBBIN
66 72 0.11 92 P2 TWD 5 FB4 -1.17 TEC TEH 11 HOT 720UL BOBBIN
67 47 0.11 122 P2 TWO 5 FB6 -1.71 TEC TEH 14 HOT 720UL BOBBIN0.19 134 P2 TWD 8 FB5 +1.01 TEC TEH 14 HOT 720UL BOBBIN0.20 62 P2 TWD 8 FB4 +1.09 TEC TEH 14 HOT 720UL BOBBIN
67 49 0.17 101 P2 TWO 7 FB5 +1.01 TEC TEH 12 HOT 720UL BOBBIN
67 53 0.20 95 P2 TWD 8 FB5 +0.99 TEC TEH 12 HOT 720UL BOBBIN
67 55 0.08 77 P2 TWD 3 FB5 +1.03 TEC TEH 23 HOT 720UL BOBBIN0.19 88 P2 TWO 7 FB4 -1.14 TEC TEH 23 HOT 720UL BOBBIN
67 57 0.23 107 P2 TWD 9 FB6 -1.22 TEC TEH 13 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 12:41:52Component: S/G 14 Page 9 of 20
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND
0.18 120 ?2 TWO0.19 140 P2 TWD
67 59 0.29 121 P2 TWD0.25 132 P2 TWD0.18 138 P2 TWD0.24 92 P2 TWD0.11 88 P2 TWD
%TW
88
10794
LOCATION EXT EXT
EBS -1.08 TEC TEN
FB4 -1.15 TEC TEH
FB6 +1.18 TEC TEHFBS +1.03 TEC TEHFB4 -1.16 TEC TEHFB3 -1.34 TEC TEHFB4 +1.12 TEC TEH
UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
13 NOT 720UL BOBBIN
13 HOT 720UL BOBBIN
12 HOT 720UL BOBBIN12 HOT 720UL BOBBIN12 HOT 720UL BOBBIN12 HOT 720UL BOBBIN12 HOT 720UL BOBBIN12 HOT 720UL BOBBIN--- -- -- - -- -- -- -- - -- -- -- -
67 61 0.32 118 P2 TWD 11 FB6 -1.34 TEC TEH 10 HOT0.19 143 P2 TWD 7 FB5 +0.99 TEC TEH 10 HOT0.22 126 P2 TWD 8 FB5 -1.12 TEC TEH 10 HOT0.24 69 P2 TWD 9 FB4 +1.10 TEC TEH 10 HOT0.24 131 P2 TWD 9 FB4 -1.29 TEC TEH 10 HOT
...................................................................................................
67 63 0.21 114 P2 TWD 8 FBS +1.07 TEC TEH 11 HOT0.77 119 P2 TWD 22 FB4 -1.30 TEC TEH 11 HOT0.12 115 P2 TWD 5 FB3 -1.19 TEC TEH 11 HOT0.18 120 P2 TWD 8 FB6 -1.33 TEC TEH LAR 11 HOT
67 65 0.12 108 P2 TWD 5 FB6 -1.28 TEC TEH 11 HOT0.13 138 P2 TWD 6 FB5 +1.12 TEC TEH 11 HOT0.11 54 P2 TWD 5 FB5 -1.21 TEC TEH 11 HOT0.34 125 P2 TWD 13 FB4 -1.23 TEC TEH 11 HOT0.16 117 P2 TWD 7 FB3 +1.30 TEC TEH 11 HOT
...................................................................................................
67 67 0.14 136 P2 TWD 5 FB6 -1.25 TEC TEH 10 HOT0.10 94 P2 TWD 4 FB5 -1.08 TEC TEH 10 HOT0.30 119 P2 TWD 11 FB4 -1.21 TEC TEH 10 HOT0.16 82 P2 TWD 6 FB3 -1.34 TEC TEH 10 HOT0.20 123 P2 TWD 8 08H -1.56 TEC TEH LAR 10 HOT
720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
.................. BOBBIN...........720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
.................. BOBBIN...........720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
.................. BOBBIN...........720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
67 69 0.130.150.250.17
143 P2 TWD 6 FB6 -1.34 TEC TEH 11 HOT115 P2 TWD 6 FB5 +1.15 TEC TEH 11 HOT131 P2 TWD 10 FB4 +1.15 TEC TEH 11 HOT123 P2 TWD 7 FB4 -1.24 TEC TEH 11 HOT
67 71 0.14 87 P2 TWD 6 FB4 +1.53 TEC TEH 11 HOT 720UL BOBBIN......................................................................................................................................
68 48 0.10 133 P2 TWD 4 FB4 -1.20 TEC TEH 15 HOT 720UL BOBBIN......................................................................................................................................
68 52 0.10 97 P2 TWD 5 FB5 +1.09 TEC TEH 13 HOT 720UL BOBBIN0.12 146 P2 TWD 5 FB4 -1.09 TEC TEH 13 HOT 720UL BOBBIN
......................................................................................................................................
68 54 0.28 54 P2 TWD 8 FB5 +0.41 TEC TEH 22 HOT 720UL BOBBIN0.31 82 P2 TWD 9 FB4 +0.07 TEC TEH 22 HOT 720UL BOBBIN
......................................................................................................................................
68 56 0.20 142 P2 TWD 8 FB5 -1.12 TEC TEH 13 HOT 720UL BOBBIN0.29 111 P2 TWD 12 FB4 +1.17 TEC TEH 13 HOT 720UL BOBBIN
68 58 0.13 105 P2 TWD 6 FB5 +1.15 TEC TEH 13 HOT 720UL BOBBIN0.22 83 P2 TWD 9 FB5 -1.12 TEC TEH 13 HOT 720UL BOBBIN0.09 149 P2 TWD 4 FB4 +1.10 TEC TEH 13 HOT 720UL BOBBIN0.14 93 P2 TWD 6 FB4 -1.19 TEC TEH 13 HOT 720UL BOBBIN
68 60 0.11 153 P2 TWD 5 FB6 +1.17 TEC TEH 130.23 136 P2 TWD 9 FB5 -1.19 TEC TEH 130.17 65 P2 TWD 7 FB4 +1.05 TEC TEH 13
.........................................................................................
NOT 720UL BOBBINHOT 720UL BOBBIN
HOT 720UL BOBBIN
H O T. . . . . . . . . . . . . . . . . . . . . . . . . . . .
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 12:41:52Component: S/G 14 Page 10 of 20
QUERY: QueryMl
ROW COL VOLTS DEG C
68 62 0.09 104 P0.09 86 P
HN IND %TW LOCATION
2 TWD 4 FB6 -0.722 TWD 4 FB5 +1.21
EXT
TECTEC
EXT UTIL 1
TEHTEH LAR
UTIL 2 CAL # LEG PROBE SCOPE
11 HOT 720UL BOBBIN11 HOT 720UL BOBBIN
68 64 0.10 104 P2 TWD 4 FB6 +1.170.16 131 P2 TWD 7 FB6 -1.300.19 132 P2 TWD 8 FB4 +1.030.35 114 P2 TWD 13 FB4 -1.260.13 138 P2 TWD 6 FB3 -1.350.49 124 P2 TWD 17 FB5 +1.14
68 66 0.15 95 P2 TWD 6 FB6 +1.100.13 55 P2 TWD 5 FB5 +1.010.19 73 P2 TWD 7 FB5 -1.210.25 133 P2 TWD 9 FB4 +0.99
68 68 0.13 93 P2 TWD 5 FB6 +1.100.20 122 P2 TWD 7 FB4 -1.18
68 70 0.18 74 P2 TWD 7 FB4 -1.05
TECTECTECTECTECTEC
TEHTEHTEHTEHTEHTEH LAR
11ii111111ii
HOTHOTHOTHOTHOTHOT
720UL720UL720UL720UL720UL720UL
BOBBINBOBBINBOBBINBOBBINBOBBINBOBBIN
TEC TEN 10 NOTTEC TEH 10 HOTTEC TEH 10 HOTTEC TEH 10 HOT
TEC TEH 10 HOTTEC TEH 10 HOT
720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
720UL BOBBIN720UL BOBBIN
TEC TEH 10 HOT 720UL BOBBIN
68 72 0.13 126 P2 TWD 5 FB4 -1.21 TEC
68 78 0.09 67 P2 TWO 4 FB4 -0.63 TEC
69 53 0.09 38 P2 TWD 4 FB6 -1.26 TEC0.12 115 P2 TWO 5 FB5 +1.12 TEC0.14 114 P2 TWD 6 FB4 -1.14 TEC
69 55 0.11 109 P2 TWD 3 FB6 -1.26 TEC0.26 81 P2 TWD 7 FB5 +1.09 TEC0.52 102 P2 TWD 13 FB4 -1.15 TEC0.24 132 P2 TWD 7 FB3 -1.31 TEC
TE
TE
H 10 HOT 720UL BOBBIN
H 25 HOT 720UL BOBBIN
TEHTEHTEH
TEHTEHTEHTEH
13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN
22 NOT 720UL BOBBIN22 HOT 720UL BOBBIN22 HOT 720UL BOBBIN22 HOT 720UL BOBBIN
69 57 0.11 33 P2 TWD 5 FB5 -1.18 TEC TEH 12 HOT 720UL BOBBIN
69 59 0.32 125 P2 TWO 12 FB6 +1.17 TEC TEN 13 NOT 720UL BOBBIN0.29 118 P2 TWD 12 FB6 -1.19 TEC TEH 13 HOT 720UL BOBBIN
0.47 125 P2 TWD 16 FB5 +1.03 TEC TEH 13 HOT 720UL BOBBIN0.17 63 P2 TWD 7 FB5 -1.31 TEC TEH 13 HOT 720UL BOBBIN0.78 123 P2 TWD 23 FB4 -1.05 TEC TEH 13 HOT 720UL BOBBIN0.22 143 P2 TWD 9 FB3 -1.40 TEC TEH 13 HOT 720UL BOBBIN
69 61 0.54 133 P2 TWD 18 FB6 -1.21 TEC TEH 11 HOT 720UL BOBBIN0.19 107 P2 TWD 8 FB5 +1.21 TEC TEH 11 HOT 720UL BOBBIN0.23 106 P2 TWD 9 FB5 -1.33 TEC TEH 11 HOT 720UL BOBBIN0.12 93 P2 TWD 5 FB4 +1.03 TEC TEH 11 HOT 720UL BOBBIN0.60 125 P2 TWD 19 FB4 -1.17 TEC TEH 11 HOT 720UL BOBBIN0.17 136 P2 TWD 7 FB3 +1.33 TEC TEH 11 HOT 720UL BOBBIN0.09 92 P2 TWD 4 FB3 -1.35 TEC TEH 11 HOT 720UL BOBBIN
69 67 0.15 99 P2 TWD 7 FB6 -1.23 TEC TEH 11 HOT 720UL BOBBIN0.13 139 P2 TWD 6 FB5 -1.07 TEC TEH 11 HOT 720UL BOBBIN0.26 118 P2 TWD 10 FB4 +1.10 TEC TEH 11 HOT 720UL BOBBIN0.08 139 P2 TWD 3 FB3 +1.32 TEC TEH 11 HOT 720UL BOBBIN
69 69 0.18 147 P2 TWD 7 FB6 -1.27 TEC TEH 10 HOT 720UL BOBBIN0.40 114 P2 TWD 13 FB5 -1.16 TEC TEH 10 HOT 720UL BOBBIN0.59 114 P2 TWD 18 FB4 +1.18 TEC TEH 10 HOT 720UL BOBBIN0.10 40 P2 TWD 4 FB4 -1.08 TEC TEH 10 HOT 720UL BOBBIN
AREVA NP Inc 04/15/13 12:41:52Customer Name: DC COOK Unit 1 Component: SG 14 Page 11 of 20
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE.... .- == ====== === === === === == = = = = = = = = = = = === ==== ======== .... ... ... ... ==== . ............. ...................-----
0.24 142 P2 TWD 9 FB3 +1.36 TEC TEH 10 HOT 720UL BOBBIN
70 38 0.10 33 P2 TWO 4 PB4 -1.18 TEC TEN 14 NOT 720UL BOBBIN
70 46 0.14 42 P2 TWD 6 FB3 -1.40 TEC TEH 14 HOT 720UL BOBBIN0.18 110 P2 TWD 7 PB4 -1.16 TEC TEN LAR 14 HOT 720UL BOBBIN
70 50 0.13 53 P2 TWD 6 FB6 -1.23 TEC TEH 12 HOT 720UL BOBBIN
0.22 69 P2 TWO 9 PBS -1.18 TEC TEN 12 HOT 720UL BOBBIN0.22 119 P2 TWD 8 FB4 -1.16 TEC TEH 12 HOT 720UL BOBBIN
70 52 0.17 131 P2 TWD 7 FB5 +1.09 TEC TEH 12 HOT 720UL BOBBIN0.28 131 P2 TWD 10 FB4 -1.14 TEC TEH 12 HOT 720UL BOBBIN0.15 119 P2 TWD 6 FB3 -1.29 TEC TEH 12 HOT 720UL BOBBIN
70 54 0.15 88 P2 TWO S PB5 +0.00 TEC TEN 23 NOT 720UL BOBBIN0.18 115 P2 TWO 6 FB4 +0.00 TEC TEN 23 NOT 720UL BOBBIN
70 58 0.26 129 P2 TWD 10 FB6 -1.23 TEC TEH 12 HOT 720UL BOBBIN0.41 116 P2 TWD 14 FBS +1.05 TEC TEH 12 HOT 720UL BOBBIN0.27 121 P2 TWD 10 FB5 -1.23 TEC TEH 12 HOT 720UL BOBBIN0.16 90 P2 TWD 6 FB4 +1.07 TEC TEH 12 HOT 720UL BOBBIN0.23 98 P2 TWD 9 FB4 -1.14 TEC TEH 12 HOT 720UL BOBBIN0.11 35 P2 TWD 5 PB3 +1.16 TEC TEN 12 NOT 720UL BOBBIN
70 60 0.19 114 P2 TWD 8 FB6 +1.14 TEC TEH 12 HOT 720UL BOBBIN0.18 88 P2 TWD 7 FB5 -1.12 TEC TEH 12 HOT 720UL BOBBIN0.24 120 P2 TWD 9 P0 4 +1.OS TEC TEH 12 HOT 720UL BOBBIN0.11 114 P2 TWD 4 FB3 +1.14 TEC TEH 12 HOT 720UL BOBBIN
70 62 0.50 119 P2 TWO 16 PBS +1.12 TEC TEN 10 NOT 720UL BOBBIN0.20 130 P2 TWD 7 PFB -1.16 TEC TEH 10 HOT 720UL BOBBIN0.56 108 P2 TWD 17 FB4 +1.12 TEC TEH 10 HOT 720UL BOBBIN0.40 113 P2 TWO 13 P04 -1.09 TEC TEN 10 NOT 720UL BOBBIN0.34 87 P2 TWD 12 FB3 +1.25 TEC TEH 10 HOT 720UL BOBBIN0.18 86 P2 TWD 6 FB3 -1.27 TEC TEH 10 HOT 720UL BOBBIN0.18 134 P2 TWD 7 FB6 +1.20 TEC TEH LAR 10 HOT 720UL BOBBIN
70 66 0.10 146 P2 TWD 5 FB6 +1.17 TEC TEH 11 HOT 720UL BOBBIN0.19 122 P2 TWD 8 FB5 +1.12 TEC TEH 11 HOT 720UL BOBBIN0.13 61 P2 TWD 6 FB4 +1.14 TEC TEH 11 HOT 720UL BOBBIN0.15 115 P2 TWD 6 FB4 -1.21 TEC TEH 10 HOT 720UL BOBBIN0.13 126 P2 TWD 5 3FB -1.3S TEC TEH 11 HOT 720UL BOBBIN
70 68 0.11 lOS P2 TWD 5 6FB +1.21 TEC TEH 11 HOT 720UL BOBBIN0.27 104 P2 TWD 11 FB4 -1.13 TEC TEH 10 HOT 720UL BOBBIN
70 70 0.18 133 P2 TWD 8 FB6 +1.31 TEC TEH 11 HOT 720UL BOBBIN0.10 128 P2 TWD 7 FBS +1.05 TEC TEH 11 HOT 720UL BOBBIN0.34 139 P2 TWD 13 FB4 -1.17 TEC TEH 11 HOT 720UL BOBBIN
70 72 0.08 148 P2 TWD 4 FB6 +1.38 TEC TEH 11 HOT 720UL BOBBIN0.15 124 P2 TWD 7 FB4 -1.10 TEC TEH 11 HOT 720UL BOBBIN
70 76 0.12 139 P2 TWD 5 FB4 -1.05 TEC TEH 10 HOT 720UL BOBBIN
70 78 0.11 71 P2 TWD 4 FB4 -1.06 TEC TEH 2S HOT 720UL BOBBIN
71 37 0.11 117 P2 TWD 5 07H +0.46 TEC TEH LAR 14 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 12:41:52Component: S/G 14 Page 12 of 20
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT
-------------------------------------------------------------
71 45 0.16 144 P2 TWD 7 FB4 +1.14 TEC0.11 134 P2 TWD 5 FB3 +1.31 TEC0.12 85 P2 TWD 5 FB5 -1.18 TEC
..............................................................
71 47 0.23 88 P2 TWD 9 FB5 -1.23 TEC0.23 142 P2 TWD 9 FB4 +1.07 TEC
..............................................................
71 49 0.21 131 P2 TWD 8 FB5 -1.07 TEC0.18 124 P2 TWD 7 FB4 +1.01 TEC
EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
TEN 14 HOT 720UL BOBBINTEH 14 HOT 720UL BOBBINTEN LAR 14 HOT 720UL BOBBINTEN..........14........HOT............................BOBBIN.............
TEH 14 HOT 720UL BOBBINTEN 14 HOT 720UL BOBBINTEN..........12........NOT............................BOBBIN.............TEE 12 HOT 720UL BOBBINTEH 12 HOT 720UL BOBBIN
71 51 0.19 102 P2 TWD 8 FB4 +1.05 TEC TEN 12 HOT 720UL BOBBIN
71 53 0.13 53 P2 TWD 50.14 115 P2 TWD 6
FB5FB5
-1.07+0.07
TEC TENTEC TEN
TEC TENTEC TEN
71 55 0.15 130 P2 TWD 5 FB5 +1.100.17 151 P2 TWD 6 FB4 -1.12
--------------------------------------------------------
71 57 0.14 115 P2 TWD 6 FB6 -1.170.39 134 P2 TWD 14 FB5 +1.190.90 125 P2 TWD 25 FB4 -1.030.12 150 P2 TWD 5 FB3 -1.22
--------------------------------------------------------
71 59 0.26 120 P2 TWD 10 FB6 +1.120.12 132 P2 TWD 5 FB6 -1.250.13 102 P2 TWD 5 FB5 +1.070.21 128 P2 TWD 8 FB4 +1.07
--------------------------------------------------------
71 61 0.07 120 P2 TWD 3 FB6 -1.180.14 76 P2 TWD 5 FB5 +1.120.20 114 P2 TWD 7 FB4 -1.10
TECTECTECTEC
TENTENTEHTEN
TEC TEHTEC TEHTEC TENTEC TEN
TEC TENTEC TENTEC TEN
71 63 0.46 117 P2 TWD 15 FB5 +0.990.63 113 P2 TWD 19 FB5 -1.140.39 90 P2 TWD 13 FB4 +1.120.43 117 P2 TWD 14 FB4 -1.230.36 122 P2 TWD 12 FB3 +1.250.41 133 P2 TWD 14 FB6 -1.25
71 65 0.16 110 P2 TWD 6 FB6 -1.180.09 19 P2 TWD 4 FB5 +1.180.20 110 P2 TWD 8 FB5 -1.120.97 126 P2 TWD 24 FB4 -1.180.14 87 P2 TWD 6 FB3 +1.250.18 133 P2 TWD 7 FB3 -1.25
TEC TENTEC TENTEC TENTEC TENTEC TEN
TEC TEN LAR
TEC TENTEC TENTEC TENTEC TENTEC TENTEC TEN
TEC TENTEC TENTEC TENTEC TENTEC TEN
TEC TENTEC TEHTEC TEN
12 HOT 720UL BOBBIN12 HOT 720UL BOBBIN
............................ 23...NOT.................BOBBIN.....
23 HOT 720UL BOBBIN23 HOT 720UL BOBBIN
............................ 13...NOT.................BOBBIN.....
13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN
............................ 12...NOT.................BOBBIN.....
12 HOT 720UL BOBBIN12 HOT 720UL BOBBIN12 HOT 720UL BOBBIN12 HOT 720UL BOBBIN
............................. 10...NOT................BOBBIN.....
10 HOT 720UL BOBBIN10 HOT 720UL BOBBIN10 HOT 720UL BOBBIN10 NOT 720UL BOBBIN
10 HOT 720UL BOBBIN10 HOT 720UL BOBBIN10 HOT 720UL BOBBIN10 HOT 720UL BOBBIN10 HOT 720UL BOBBIN
10 HOT 720UL BOBBIN10 NOT 720UL BOBBIN10 HOT 720UL BOBBIN10 HOT 720UL BOBBIN10 HOT 720UL BOBBIN10 HOT 720UL BOBBIN
10 HOT 720UL BOBBIN10 HOT 720UL BOBBIN10 NOT 720UL BOBBIN10 HOT 720UL BOBBIN10 HOT 720UL BOBBIN
10 HOT 720UL BOBBIN10 HOT 720UL BOBBIN10 HOT 720UL BOBBIN
71 67 0.15 117 P2 TWD 6 FB60.16 105 P2 TWD 6 FB50.21 128 P2 TWD 8 FB40.15 113 P2 TWD 6 FB30.10 58 P2 TWD 4 FB3
71 69 0.10 154 P2 TWD 5 FB60.12 73 P2 TWD 5 FB50.37 117 P2 TWD 13 FB4
-1.32-1.14-1.21+1.29-1.25
-1.12+1.19-1.05
71 71 0.10 46 P2 TWD 5 FB5 -1.12 TEC TEN0.14 136 P2 TWD 6 FB4 +1.69 TEC TEN
11 NOT 720UL11 HOT 720UL
BOBBINBOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 12:41:52Component: S/G 14 Page 13 of 20
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION
71 75 0.08 133 P2 TWD 4 FB5 -1.100.12 104 P2 TWD 5 FB4 +1.26
--------------------------------------------------
72 46 0.10 154 P2 TWD 4 04H +0.41--------------------------------------------------
72 48 0.14 93 P2 TWD 6 FB5 +1.130.15 142 P2 TWD 6 FB3 -1.19
..................................................
EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
....... ... .... ....TEC. ....TEN. .....11....NOT......720... .......BOBBIN......
TEC TEH 11 HOT 720UL BOBBINTEC TEH 11 HOT 720UL BOBBIN
................ TEC......TEN......LAR.....15.....NOT...................BOBBIN.......
TEC TEH LAR 15 HOT 720UL BOBBIN....................TEC......TEN.......15.....NOT.......720...........BOBBIN........
TEC TEH 15 HOT 720UL BOBBINTEC TEH 15 HOT 720UL BOBBIN
....................................................................................
72 54 0.130.20
38 P2 TWD 447 P2 TWD 6
FB5 -0.04FB4 +0.00
TEC TEH 22 HOTTEC TEH 22 HOT
72 56 0.15 99 P20.37 125 P20.34 126 P20.16 153 P2
------------------------
72 58 0.16 107 P20.55 120 P20.29 140 P20.13 120 P2
TWD 7 FB6 -1.23TWD 14 FB5 -1.14TWD 13 FB4 +1.03TWD 7 FB3 +1.14
TWD 7 FB6 -1.23TWD 18 FB5 -1.07TWD 11 FB4 +1.05TWD 6 FB3 +1.12
TEC TEHTEC TEHTEC TEHTEC TEH
TEC TENTEC TEHTEC TEHTEC TEH
13 HOT13 HOT13 HOT13 HOT
-----------------------13-NOT
13 HOT13 HOT13 HOT13 HOT
13 NOT13 HOT13 HOT
720UL BOBBIN720UL BOBBIN
720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
720UL BOBBIN
720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
720UL BOBBIN720UL BOBBIN720UL BOBBIN72 60 0.21 132 P2 TWD 9 FB6 +1.03
0.22 119 P2 TWD 9 FB5 -1.170.22 139 P2 TWD 9 FB4 +1.05
72 62 0.08 150 P2 TWD 4 FB4 +1.10
72 64 0.21 142 P2 TWD 8 FB6 +1.120.17 144 P2 TWD 7 FB5 +0.960.73 133 P2 TWD 22 FB4 +1.030.23 146 P2 TWD 9 FB3 +1.19
72 66 0.13 101 P2 TWD 5 FB6 +1.180.31 84 P2 TWD 11 FB5 +1.100.44 104 P2 TWD 14 FB4 +1.030.12 87 P2 TWD 5 FB4 -1.230.10 82 P2 TWD 4 FB3 +1.160.29 116 P2 TWD 10 FB3 -1.32
72 68 0.09 36 P2 TWD 3 FB6 +1.16
72 72 0.22 90 P2 TWD 8 FB4 -1.16
72 74 0.13 52 P2 TWD 5 FB5 +1.050.11 63 P2 TWD 5 FB4 -1.12
73 41 0.12 72 P2 TWD 5 FB6 -1.050.14 105 P2 TWD 6 FB5 -1.210.34 118 P2 TWD 12 FB4 +0.990.17 82 P2 TWD 7 FB3 +1.23
TEC TEHTEC TEHTEC TEH
TEC TEH
TEC TENTEC TEHTEC TEHTEC TEH
TEC TEHTEC TENTEC TEHTEC TEHTEC TEHTEC TEH
TEC TEH
11 HOT 720UL BOBBIN
11 NOT 720UL BOBBIN11 HOT 720UL BOBBIN11 HOT 720UL BOBBIN11 HOT 720UL BOBBIN
10 HOT 720UL BOBBIN10 NOT 720UL BOBBIN10 HOT 720UL BOBBIN10 HOT 720UL BOBBIN10 HOT 720UL BOBBIN10 HOT 720UL BOBBIN
10 HOT 720UL BOBBIN
TEC TEH 10 HOT 720UL BOBBIN
TEC TEHTEC TEH
TEC TEHTEC TEHTEC TEHTEC TEH
TEC TEHTEC TEHTEC TEH
10 HOT 720UL10 HOT 720UL
14 NOT 720UL14 HOT 720UL14 HOT 720UL14 HOT 720UL
14 HOT 720UL14 NOT 720UL14 HOT 720UL
BOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBIN
BOBBINBOBBINBOBBIN
73 43 0.17 79 P2 TWD 7 FB60.17 90 P2 TWD 7 FB40.15 67 P2 TWD 6 FB3
73 45 0.18 106 P2 TWD 7 FB50.26 133 P2 TWD 10 FB40.26 113 P2 TWD 10 FB3
-1.18+1.01+1.23
+1.01 TEC+1.10 TEC+1.18 TEC
TEHTEHTEH
14 NOT 720UL BOBBIN14 HOT 720UL BOBBIN14 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 12:41:52Component: S/G 14 Page 14 of 20
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION
73 47 0.11 135 P2 TWD 5 FB60.23 145 P2 TWD 9 FB40.12 147 P2 TWD 5 FB3
EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE
-1.28+1.15+1.26
TECTECTEC
TEHTEHTEH
15 HOT15 HOT15 HOT
73 53 0.190.100.630.340.320.940.110.11
73 55 0.421.010.520.130.44
73 57 0.420.691.060.160.15
73 59 0.130.100.160.090.17
73 65 0.200.140.220.280.17
116 P2 TWD S FB672 P2 TWD 5 FB6
116 P2 TWD 20 FB5116 P2 TWD 13 FB5119 P2 TWD 12 FB4124 P2 TWD 26 FB480 P2 TWD 5 FB3150 P2 TWD 5 FB3
117 P2 TWD 11 FB6119 P2 TWD 21 FB5120 P2 TWD 13 FB481 P2 TWD 4 FB4124 P2 TWD 12 FB3
117 P2 TWD 14 FB6121 P2 TWD 20 FB5121 P2 TWD 26 FB4113 P2 TWD 6 FB3113 P2 TWD 6 FB3
139 P2 TWD 6 FB6144 P2 TWD 5 FB5123 P2 TWD 7 FB490 P2 TWD 4 FB4130 P2 TWD 7 FB3
101 P2 TWD 7 FB5101 P2 TWD 5 FB599 P2 TWD 8 FB4139 P2 TWD 10 FB467 P2 TWD 7 FB3
+1.12-1.26+1.10-1.08+1.01-1.19+1.12-1.26
TECTECTECTECTECTECTECTEC
TEH 13 HOTTEH 13 HOTTEH 13 HOTTEH 13 HOTTEH 13 HOTTEH 13 HOTTEH 13 HOTTEH 13 HOT
+1.10 TEC TEH+1.06 TEC TEH+1.10 TEC TEH-1.23 TEC TEH+1.17 TEC TEH
+1.10 TEC TEN+1.08 TEC TEH
+1.10 TEC TEH+1.10 TEC TEH-1.27 TEC TEH
22 HOT22 HOT
22 HOT22 HOT22 HOT
12 NOT12 HOT12 HOT12 HOT12 HOT
13 HOT13 HOT
13 HOT13 HOT
13 HOT
720UL720UL720UL
720UL720UL720UL720UL720UL720UL720UL720UL
720UL720UL720UL720UL720UL
720UL720UL720UL720UL72DUL
720UL720UL720UL720UL720UL
SCOPE
BOBBINBOBBINBOBBIN
BOBBINBOBBIN---------------
BOBBINBOBBINBOBBINBOBBIN
BOBBINBOBBIN
BOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBINBOBBIN
-1.28-1.07+1.30-1.17-1.46
+1.07-1.12+1.05-1.25+1.12
TEC TEHTEC TEHTEC TEHTEC TEHTEC TEH
TEC TEHTEC TEHTEC TEHTEC TEHTEC TEH
10 NOT 720UL10 HOT 720UL10 HOT 720UL10 HOT 720UL10 HOT 720UL
73 67 0.10 36 P2 TWD 5 FB3 +1.10
74 46 0.14 54 P2 TWD 6 FB5 +1.050.22 135 P2 TWD 9 FB4 -1.01
74 50 0.25 115 P2 TWD 9 FB6 +1.070.64 117 P2 TWD 19 FB5 +1.030.52 109 P2 TWD 17 FB4 -1.140.16 120 P2 TWD 7 FB3 -1.29
74 52 0.13 63 P2 TWD 5 FB3 +1.180.26 93 P2 TWD 10 FB3 -1.250.21 107 P2 TWD 8 FB7 +1.360.47 120 P2 TWD 16 FB6 +1.180.17 109 P2 TWD 7 FB6 -1.210.83 114 P2 TWD 23 FB5 +1.120.34 110 P2 TWD 12 FB5 -1.121.19 118 P2 TWD 28 FB4 -1.14
74 54 0.17 69 P2 TWD 5 FB5 +0.48
TEC TEN 11 NOT
TEC TEH 14 HOTTEC TEH 14 HOT
TEC TEH 12 HOTTEC TEN 12 NOTTEC TEH 12 HOTTEC TEH 12 HOT
TEC TEH 12 HOTTEC TEH 12 HOTTEC TEN 12 NOTTEC TEH 12 HOTTEC TEH 12 HOTTEC TEH 12 HOTTEC TEH 12 HOTTEC TEH 12 HOT
TEC TEH 22 HOT
720UL BOBBIN
720UL720UL
720UL720UL720UL720UL
720UL720UL720UL720UL720UL720UL720UL720UL
720UL
BOBBINBOBBIN
BOBBINBOBBIN
BOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBIN
BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 12:41:52Component: S/G 14 Page 15 of 20
QUERY: QueryMi
ROW COL VOLTS
74 58 0.610.540.460.190.59
74 60 0.140.170.12
74 62 0.12
DEG
12412411985119
CHN IND
P2 TWDP2 TWDP2 TWDP2 TWDP2 TWD
%TW LOCATION
19 FB5 +1.1817 FB5 -1.0715 FB4 +1.128 FB4 -1.1218 FB3 +1.23
EXT
TECTECTECTECTEC
EXT
TEHTEHTEHTEHTEH
UTIL 1 UTIL 2 CAL # LEG
12 HOT12 HOT12 HOT12 HOT12 HOT
PROBE
720UL720UL
720UL720UL720UL
SCOPE
BOBBINBOBBINBOBBINBOBBINBOBBIN
98 P2 TWD 6118 P2 TWD 7132 P2 TWD 5
66 P2 TWD 5
FB5 -1.10 TEC TEH 12FB4 +1.10 TEC TEH 12FB3 +1.23 TEC TEH 12
.. BS..-1.20..........TEC............TEN............10....FB5 -1.20 TEC TEH 10
74 64 0.21 112 P2 TWD 8 FB6 +1.20 TEC TEH 10
0.64 117 P2 TWD 19 FB5 +0.96 TEC TEH 100.23 96 P2 TWD 8 FB4 +1.03 TEC TEH 100.18 129 P2 TWD 7 FB4 -1.18 TEC TEH 100.16 96 P2 TWD 6 FB3 -1.16 TEC TEH 10
.........................................................................................
74 66 0.20 143 P2 TWD B FB6 +1.05 TEC TEH 110.24 108 P2 TWD 10 FB5 +1.08 TEC TEH 110.11 69 P2 TWD 5 FB4 +1.03 TEC TEH 110.14 81 P2 TWD 6 FB4 -1.21 TEC TEH 11
0.20 103 P2 TWD 8 FB3 -1.24 TEC TEH 11.........................................................................................
74 68 0.23 134 P2 TWD 9 FB6 +1.17 TEC TEE 110.13 102 P2 TWD 6 FB6 -1.17 TEC TEH 110.31 122 P2 TWD 12 FB5 +1.17 TEC TEH 110.84 122 P2 TWD 24 FB4 -1.17 TEC TEH 110.13 60 P2 TWD 6 FB3 -1.21 TEC TEH 11
HOT 720UL BOBBINHOT 720UL BOBBINHOT 720UL BOBBIN
---OT---------------U--------BOBBIN----------
HOT 720UL BOBBIN---OT------------------------BOBBIN----------
HOT 720UL BOBBINHOT 720UL BOBBINHOT 720UL BOBBINHOT 720UL BOBBINHOT 720UL BOBBIN
---OT------------------------BOBBIN----------
HOT 720UL BOBBINHOT 720UL BOBBINHOT 720UL BOBBINHOT 720UL BOBBINHOT 720UL BOBBIN
---OT---------------U--------BOBBIN----------
HOT 720UL BOBBINHOT 720UL BOBBINHOT 720UL BOBBINHOT 720UL BOBBINHOT 720UL BOBBIN
74 70 0.14 1260.15 118
P2 TWD 6 FB5 +1.17 TEC TEH 11P2 TWD 6 FB4 -1.17 TEC TEH 11
HOTHOT
720UL720UL
75 39 0.18 101 P2 TWD 7 FB6 -1.07 TEC TEH 14 HOT 720UL0.19 80 P2 TWD 8 FB4 +1.16 TEC TEH 14 HOT 720UL
75 47 0.14 84 P2 TWD 6 FB4 +1.07 TEC TEH 14 HOT 720UL
75 49 0.17 I11 P2 TWD 7 FB5 -1.18 TEC TEH 12 HOT 720UL0.20 103 P2 TWD 8 FB4 +1.07 TEC TEH 12 HOT 720UL
BOBBINBOBBIN
BOBBINBOBBIN
BOBBIN
BOBBINBOBBIN
75 51 0.21 126 P2 TWD 8 FB4 +1.08 TEC TEH
0.17 129 P2 TWD 7 FB3 +1.16 TEC TEH75..61..0.19...132...P2..T.....7..PB4..-1.18.......TEC........TEE.....75 61 0.19 132 P2 TWD 7 FB4 -1.18 TEC TEH......................................................................
12 HOT 720UL BOBBIN12 HOT 720UL BOBBIN
10 HOT 720UL BOBBIN
75 65 0.19 117 P2 TWD 8 FB5 +1.070.11 66 P2 TWD 5 FB4 +1.140.15 104 P2 TWD 6 FB4 -1.120.27 106 P2 TWD 11 FB3 +1.30
75 67 0.16 77 P2 TWD 6 FB6 +1.180.23 125 P2 TWD 9 FB5 -1.180.67 120 P2 TWD 19 FB4 +1.070.14 153 P2 TWD 6 FB3 +1.250.10 92 P2 TWD 4 FB3 -1.18
TEC TEH 11 HOT 720ULTECTECTEC
TECTECTECTECTEC
TEH 11 HOT 720ULTEH 11 HOT 720ULTEH 11 HOT 720UL
TEE 10 HOT 720ULTEH 10 HOT 720ULTEH 10 HOT 720ULTEH 10 HOT 720ULTEH 10 HOT 720UL
BOBBINBOBBINBOBBINBOBBIN
BOBBINBOBBINBOBBINBOBBINBOBBIN
75 69 0.11 124 P2 TWD 5 FB5 +1.08 TEC TEH 11 HOT 720UL BOBBIN. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .- - - - - - - -- -- - -- -- -- - -- - - - - - -- - - - - -- -- - -
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 12:41:53Component: S/G 14 Page 16 of 20
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
76 40 0.11 114 P2 TWD 4 FB4 -1.17 TEC TEH 15 HOT 720UL BOBBIN
76 44 0.11 129 P2 TWO 5 FB6 +1.15 TEC TEN 15 HOT 720UL BOBBIN0.14 95 P2 TWD 6 FB5 +1.08 TEC TEH 15 HOT 720UL BOBBIN0.26 124 P2 TWD 10 FB4 -1.11 TEC TEH 15 HOT 720UL BOBBIN
76 46 0.13 57 P2 TWD 5 FB4 -1.15 TEC TEH 15 HOT 720UL BOBBIN
76 48 0.24 95 P2 TWD 9 FB4 -1.04 TEC TEH 15 HOT 720UL BOBBIN0.20 125 P2 TWD B FB3 -1.27 TEC TEH 15 HOT 720UL BOBBIN
76 50 0.16 133 P2 TWD 7 FB6 +1.18 TEC TEH 13 HOT 720UL BOBBIN0.93 124 P2 TWD 25 FB5 +1.15 TEC TEH 13 HOT 720UL BOBBIN0.21 129 P2 TWD 9 FB4 -1.11 TEC TEH 13 HOT 720UL BOBBIN0.16 145 P2 TWD 7 FB3 -1.20 TEC TEH 13 HOT 720UL BOBBIN
76 52 1.000.700.17
76 66 0.10
125124142
122
P2 TWD 26 FB5 +1.08 TEC TEH 13 HOT 720UL BOBBINP2 TWD 21 FB4 -1.13 TEC TEH 13 HOT 720UL BOBBINP2 TWD 7 FB3 -1.19 TEC TEH 13 HOT 720UL BOBBIN
P2 TWO 4 FB2 +0.74 TEC TEN 10 NOT 720UL BOBBIN
P2 TWD 4 FB4 +1.13 TEC TEH 15 HOT 720UL BOBBINP2 TWD 5 FB3 +1.27 TEC TEH 15 HOT 720UL BOBBIN77 37 0.10 86
0.11 137
77 39 0.13 102 P2 TWO 5 FB4 +1.25 TEC TEN 15 NOT 720UL BOBBIN
77 49 0.13 118 P2 TWD 6 FB4 +1.04 TEC TEH 13 HOT 720UL BOBBIN
77 55 0.13 84 P2 TWO 4 OSN +1.48 TEC TEN LAR 22 NOT 720UL BOBBIN
77 59 0.19 123 P2 TWD 8 FB6 +1.09 TEC TEH 13 HOT 720UL BOBBIN
0.29 141 P2 TWO 11 FB5 +1.12 TEC TEN 13 NOT 720UL BOBBIN0.16 82 P2 TWD 7 FB4 +1.18 TEC TEH 13 HOT 720UL BOBBIN0.43 112 P2 TWD 16 FB4 -1.09 TEC TEH 13 HOT 720UL BOBBIN0.33 138 P2 TWD 13 FB3 -1.25 TEC TEH 13 HOT 720UL BOBBIN
77 61 0.51 126 P2 TWD 17 FB4 -1.26 TEC TEH 11 HOT 720UL BOBBIN0.40 131 P2 TWD 14 FB3 +1.15 TEC TEH 13 HOT 720UL BOBBIN0.09 118 P2 TWD 4 FB6 +1.08 TEC TEH 13 HOT 720UL BOBBIN0.17 108 P2 TWD 7 FB6 -1.24 TEC TEH 11 HOT 720UL BOBBIN0.48 115 P2 TWD 16 FB5 +1.12 TEC TEH 11 HOT 720UL BOBBIN0.22 133 P2 TWD 9 FB4 +1.08 TEC TEH 11 HOT 720UL BOBBIN
77 65 0.43 122 P2 TWD 14 FB6 -1.23 TEC TEH 10 HOT 720UL BOBBIN0.18 136 P2 TWD 7 FB5 +1.18 TEC TEH 10 HOT 720UL BOBBIN1.22 114 P2 TWD 27 FB5 -1.14 TEC TEH 10 HOT 720UL BOBBIN0.84 119 P2 TWD 22 FB4 +1.10 TEC TEH 10 HOT 720UL BOBBIN0.17 69 P2 TWD 7 FB4 -1.27 TEC TEH 10 HOT 720UL BOBBIN0.40 125 P2 TWD 13 FB3 +1.16 TEC TEH 10 HOT 720UL BOBBIN
0.11 49 P2 TWD 4 FB2 +1.42 TEC TEH 10 HOT 720UL BOBBIN
77 69 0.15 118 P2 TWD 6 FB6 -1.27 TEC TEH0.17 120 P2 TWD 7 FB5 +1.09 TEC TEH0.14 148 P2 TWD 5 FB5 -1.18 TEC TEH0.32 136 P2 TWD 11 FB4 +1.14 TEC TEH0.11 73 P2 TWD 5 FB4 -1.14 TEC TEH0.17 113 P2 TWD 7 FB3 +1.20 TEC TEH0.08 123 P2 TWD 3 FB2 +1.47 TEC TEH
10101010101010
HOTHOTHOTHOTHOTHOTHOT
720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 12:41:53Component: S/G 14 Page 17 of 20
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE
78 36 0.14 123 P2 TWD 6 FB4 -1.14 TEC TEH
78 44 0.13 147 P2 TWD 5 FB6 +1.29 TEC TEH0.15 142 P2 TWD 6 FB4 -1.16 TEC TEH
78 46 0.10 86 P2 TWD 4 FB6 +1.12 TEC TEH0.19 51 P2 TWD 8 FB5 +1.03 TEC TEH
14 NOT 720UL BOBBIN
14 HOT 720UL BOBBIN14 NOT 720UL BOBBIN
14 HOT 720UL BOBBIN14 HOT 720UL BOBBIN
78 48 0.18 95 P2 TWD 7 FB5 +0.85 TEC TEH 14 HOT 720UL BOBBIN0.22 90 P2 TWD 9 FB4 -1.16 TEC TEH 14 HOT 720UL BOBBIN0.14 127 P2 TWD 6 FB3 -1.05 TEC TEH 14 HOT 720UL BOBBIN
78 50 0.31 108 P2 TWD 11 FB5 +0.94 TEC TEH 12 HOT 720UL BOBBIN0.38 124 P2 TWD 13 FB4 -1.23 TEC TEH 12 HOT 720UL BOBBIN0.34 127 P2 TWD 12 FB3 -1.36 TEC TEH 12 HOT 720UL BOBBIN
78 54 0.13 66 P2 TWD S FB6 +0.00 TEC TEN 23 NOT 720UL BOBBIN0.14 93 P2 TWD 5 FB5 +0.00 TEC TEH 23 HOT 720UL BOBBIN0.22 80 P2 TWD 8 FB4 +0.00 TEC TEH 23 HOT 720UL BOBBIN
78 56 0.13 145 P2 TWD S FB6 +1.16 TEC TEN 12 NOT 720UL BOBBIN0.09 138 P2 TWO 4 PB5 -1.05 TEC TEN 12 NOT 720UL BOBBIN0.37 123 P2 TWD 13 FB4 -1.08 TEC TEH 12 HOT 720UL BOBBIN
78 58 0.09 108 P2 TWD 4 PB6 -1.21 TEC TEN 12 NOT 720UL BOBBIN0.23 93 P2 TWD 9 FBS +1.16 TEC TEH 12 HOT 720UL BOBBIN0.23 114 P2 TWD 9 FB5 -1.19 TEC TEH 12 HOT 720UL BOBBIN0.53 118 P2 TWD 17 FB4 -1.08 TEC TEH 12 HOT 720UL BOBBIN0.23 123 P2 TWO 9 FB3 -1.34 TEC TENH . 12 NOT 720UL BOBBIN
78 60 0.39 119 P2 TWD 13 FB6 +1.14 TEC TEH 12 HOT 720UL BOBBIN0.14 114 P2 TWD 6 FB5 +1.16 TEC TEH 12 HOT 720UL BOBBIN0.24 132 P2 TWD 9 FB5 -1.16 TEC TEH 12 HOT 720UL BOBBIN0.25 104 P2 TWD 10 FB4 +1.07 TEC TEH 12 HOT 720UL BOBBIN
0.16 67 P2 TWD 7 FB3 +1.14 TEC TEN 12 NOT 720UL BOBBIN0.23 137 P2 TWD 9 FB3 -1.25 TEC TEH 12 HOT 720UL BOBBIN
78 64 0.13 146 P2 TWD 5 FB6 +1.12 TEC TEH 10 HOT 720UL BOBBIN0.18 116 P2 TWD 7 FB5 +1.03 TEC TEH 10 HOT 720UL BOBBIN0.36 114 P2 TWD 12 FB4 -1.12 TEC TEH 10 HOT 720UL BOBBIN
78 66 0.43 132 P2 TWD 15 FBS +1.08 TEC TEH 11 HOT 720UL BOBBIN0.14 87 P2 TWD 6 FB4 +1.10 TEC TEH 11 HOT 720UL BOBBIN
0.09 56 P2 TWO 4 PB4 -1.19 TEC TEN 11 NOT 720UL BOBBIN0.08 130 P2 TWD 4 FB3 -1.31 TEC TEH 11 HOT 720UL BOBBIN
78 68 0.19 88 P2 TWD 8 FBS +1.08 TEC TEH 10 HOT 720UL BOBBIN
79 37 0.18 94 P2 TWD 7 FB4 +1.12 TEC TEH 14 HOT 720UL BOBBIN
79 43 0.17 129 P2 TWD 7 FB6 -1.17 TEC TEH 15 HOT 720UL BOBBIN0.24 93 P2 TWD 9 FB5 -S1.0 TEC TEH 15 HOT 720UL BOBBIN0.41 101 P2 TWD 14 FB4 +1.12 TEC TEH 15 HOT 720UL BOBBIN0.18 110 P2 TWD 7 FB3 +1.17 TEC TEH 15 HOT 720UL BOBBIN
79 45 0.11 138 P2 TWD 5 FB4 +1.08 TEC TEH 15 HOT 720UL BOBBIN
79 47 0.14 76 P2 TWD 6 FB6 -1.16 TEC TEH 14 HOT 720UL BOBBIN
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 12:41:53Component: S/G 14 Page 18 of 20
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE0.26 120 P2 TD 10 PBS -1...14 . . TEC. .... TEN..... 14... NOT.. 7-- BOBBIN-------
0.26 120 P2 TWD 10 FB5 -1.14 TEC TEH 14 HOT 720UL BOBBIN0.13 120 P2 TWD 6 FB4 +1.14 TEC TEH 14 HOT 720UL BOBBIN0.15 90 P2 TWD 6 FB3 +1.18 TEC TEH 14 HOT 720UL BOBBIN
79 49 0.54 125 P2 TWD 17 FB5 -1.05 TEC TEH 12 HOT 720UL BOBBIN0.75 119 P2 TWD 21 FB4 +1.05 TEC TEH. 12 HOT 720UL BOBBIN0.18 94 P2 TWD 7 FB3 +1.12 TEC TEH 12 HOT 720UL BOBBIN
79 51 0.27 99 P2 TWD 10 FB5 -1.04 TEC TEH 12 HOT 720UL BOBBIN0.43 133 P2 TWD 15 FB4 +1.12 TEC TEH 12 HOT 720UL BOBBIN0.30 117 P2 TWO 11 FB3 +1.12 TEC TEH 12 HOT 720UL BOBBIN0.24 100 P2 TWD 9 FB6 -1.25 TEC TEH 12 HOT 720UL BOBBIN0.13 100 P2 TWD 5 FB7 +1.34 TEC TEH 12 HOT 720UL BOBBIN
79 57 0.57 122 P2 TWD 18 PB5 +1.12 TEC TEN 12 NOT 720UL BOBBIN0.18 123 P2 TWD 7 FB5 -1.18 TEC TEH 12 HOT 720UL BOBBIN
0.77 109 P2 TWD 22 FB4 -1.14 TEC TEH 12 HOT 720UL BOBBIN0.25 128 P2 TWD 9 FB3 -1.25 TEC TEH 12 HOT 720UL BOBBIN
79 59 0.21 113 P2 TWD 8 FB6 +1.230.13 130 P2 TWD 5 FB6 -1.180.54 113 P2 TWD 17 FB5 +1.100.80 128 P2 TWD 22 FB4 -1.120.27 107 P2 TWD 10 FB3 -1.27
TEC TENTEC TEHTEC TEHTEC TEHTEC TEH
12 NOT 720UL BOBBIN12 HOT 720UL BOBBIN12 HOT 720UL BOBBIN12 HOT 720UL BOBBIN12 HOT 720UL BOBBIN
10 HOT 720UL BOBBIN79 61 0.16 107 P2 TWD 6 FB4 -1.20 TEC TEH
79 67 0.16 84 P2 TWD 6 FB6 +1.12 TEC TEH0.65 110 P2 TWD 19 FB5 -1.05 TEC TEH0.48 115 P2 TWD 15 FB4 +1.14 TEC TEH0.14 134 P2 TWD 6 FB4 -1.03 TEC TEH0.22 146 P2 TWD 8 FB3 +1.23 TEC TEH0.11 107 P2 TWD 4 FB2 +1.34 TEC TEH
79 71 0.39 123 P2 TWD 14 FB5 -1.08 TEC TEH0.16 122 P2 TWD 7 FB3 -1.22 TEC TEH
80 44 0.18 85 P2 TWD 7 FB5 +1.10 TEC TEH0.19 116 P2 TWD 7 FB4 -1.13 TEC TEH0.13 73 P2 TWD 5 FB3 -1.26 TEC TEH
10 HOT10 HOT10 HOT10 HOT10 HOT10 HOT
11 HOT11 HOT
15 NOT15 HOT15 NOT
720UL720UL720UL720UL720UL720UL
BOBBINBOBBINBOBBINBOBBINBOBBINBOBBIN
720UL BOBBIN720UL BOBBIN
720UL BOBBIN720UL BOBBIN720UL BOBBIN
80 46 0.16 112 P2 TWD 6 FB6 +1.13 T0.13 73 P2 TWD 5 FB5 +1.13 T0.21 81 P2 TWD 8 FB4 -1.13 T0.18 143 P2 TWD 7 FB3 -1i15
80 48 0.25 131 P2 TWD 9 FB6 -1.15 T0.40 104 P2 TWD 14 FB5 +1.10 T0.35 127 P2 TWD 12 FB4 -1.06 T0.19 89 P2 TWD 8 FB3 -1.17 T
-EC TEN'EC TEH'EC TEH'EC TEH
'EC'EC'EC'EC
TEHTEHTEHTEH
15 HOT 720UL BOBBIN15 HOT 720UL BOBBIN15 HOT 720UL BOBBIN15 HOT 720UL BOBBIN
15 NOT 720UL BOBBIN15 HOT 720UL BOBBIN15 HOT 720UL BOBBIN15 HOT 720UL BOBBIN
13 HOT 720UL BOBBIN13 NOT 720UL BOBBIN13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN
13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN
80 50 0.16 63 P2 TWD 7 FB30.17 133 P2 TWD 7 FB60.59 122 P2 TWD 19 FB50.76 133 P2 TWD 23 FB4
80 52 0.13 103 P2 TWD 6 FB60.20 142 P2 TWD 8 FB50.26 82 P2 TWD 11 FB4
-1.20 TEC TEN+1.20 TEC TEH+1.18 TEC TEH
-1.09 TEC TEH
+1.26 TEC TEH+1.12 TEC TEH-1.06 TEC TEH
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 12:41:53Component: S/G 14 Page 19 of 20Component: S/G 14 Page 19 of 20
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION
0.26 140 P2 TWD 10 FB3 -1.290.09 120 P2 TWD 4 FB6 -1.19
..........................................................
EXT
TECTEC
EXT UTIL 1 UTIL 2 CAL # LEG
TEN 13 NOTTEH 13 HOT-- -- -- -- -- -- -- -- -- -- --
PROBE SCOPE
720UL BOBBIN720UL BOBBIN
80 58 0.30 124 P2 TWD 12 FB6 +1.26 TEC TEH0.11 87 P2 TWD 5 FB6 -1.24 TEC TEH1.01 126 P2 TWD 27 FB5 +1.14 TEC TEH0.23 138 P2 TWD 10 FB5 -1.08 TEC TEH0.49 121 P2 TWD 17 FB4 +1.03 TEC TEH0.99 118 P2 TWD 26 FB4 -1.10 TEC TEH0.31 128 P2 TWD 12 FB3 +1.21 TEC TEH0.17 138 P2 TWD 7 FB3 -1.28 TEC TEH
................................................................................
81 49 0.16 127 P2 TWD 7 FB7 +1.36 TEC TEH0.32 134 P2 TWD 12 FB6 -1.24 TEC TEH0.69 122 P2 TWD 21 FB5 -1.03 TEC TEH0.66 119 P2 TWD 21 FB4 +1.10 TEC TEH0.19 108 P2 TWD 8 FB4 -1.15 TEC TEH0.33 135 P2 TWD 13 FB3 +1.08 TEC TEH0.13 69 P2 TWD 6 FB2 +1.31 TEC TEH
81 51 0.11 98 P2 TWD 5 FB6 -1.24 TEC TEH0.23 135 P2 TWD 9 FB5 -1.10 TEC TEH0.46 117 P2 TWD 16 FB4 +1.08 TEC TEH0.11 143 P2 TWD 5 FB3 +1.05 TEC TEH
81 53 0.09 137 P2 TWD 4 FB5 +1.12 TEC TEH
81 55 0.45 112 P2 TWD 12 FB6 -1.21 TEC TEH0.19 89 P2 TWD 6 FB5 +1.17 TEC TEH0.41 77 P2 TWD 11 FB4 +1.15 TEC TEH0.17 123 P2 TWD 5 FB3 +1.15 TEC TEH
13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN13------NOT-----------------------BOBBIN---------
13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN
13 NOT 720UL BOBBIN13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN
13 HOT 720UL BOBBIN
22------NOT-----------------------BOBBIN---------22 HOT 720UL BOBBIN22 NOT 720UL BOBBIN22 HOT 720UL BOBBIN22 HOT 720UL BOBBIN
13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN13 NOT 720UL BOBBIN13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN13 HOT 720UL BOBBIN
23 HOT 720UL BOBBIN
23 HOT 720UL BOBBIN23 HOT 720UL BOBBIN23 HOT 720UL BOBBIN23 HOT 720UL BOBBIN
81 59 0.550.250.290.160.450.120.410.11
131 P2 TWD 18 FB6 +1.14137 P2 TWD 10 FB5 +1.12126 P2 TWD 11 FB5 -1.1991 P2 TWD 7 FB4 +1.30127 P2 TWD 16 FB4 -1.1941 P2 TWD 5 FB3 +1.21131 P2 TWD 15 FB3 -1.3380 P2 TWD 5 FB2 -1.30
TEC TENTEC TEHTEC TEHTEC TEHTEC TEHTEC TEHTEC TEHTEC TEH
TEC TEH
TEC TEN
TEC TEHTEC TEHTEC TENTEC TEH
81 65 0.12 47 P2 TWD 5 FB5 +1.160.25 110 P2 TWD 9 FB4 -1.14
82 54 0.30 88 P2 TWD 10 FB6 +0.000.33 109 P2 TWD 11 FB5 +0.000.52 102 P2 TWD 15 FB4 +0.000.14 40 P2 TWOD 5 PF3 +0.00
82 56 0.15 150 P2 TWD 6 FB6 -1.16 TEC TEH 12 HOT 720UL BOBBIN0.18 120 P2 TWD 7 FB5 +1.10 TEC TEH 12 HOT 720UL BOBBIN0.44 110 P2 TWD 15 FB4 +1.14 TEC TEH 12 HOT 720UL BOBBIN0.12 60 P2 TWD 5 FB3 +1.18 TEC TEH 12 HOT 720UL BOBBIN0.10 129 P2 TWD 4 03H +0.48 TEC TEH LAR 12 HOT 720UL BOBBIN
82 58 0.22 104 P2 TWD 8 FB4 +1.10 TEC TEH 12 HOT 720UL BOBBIN
Total Tubes : 307
AREVA NP IncCustomer Name: DC COOK Unit 1
04/15/13 12:41:53Component: S/G 14 Page 20 of 20
QUERY: QueryMl
ROW COL VOLTS DEG CHN IND %TW LOCATION
Total Records: 812
EXT EXT UTIL 1 UTIL 2 CAL # LEG PROBE SCOPE