Nov. 2005 Calorimeter Commissioning R. Teuscher 1
Calorimeter Commissioning in 2006
2005 2006 2007 2008
1: Testbeam
2: Installation, Cosmic Ray Commissioning
3: Single beam
4: First LHC collisions
5: First Physics
Nov. 2005 Calorimeter Commissioning R. Teuscher 2
Nov. 2005 Calorimeter Commissioning R. Teuscher 3
TileCal Phase 1 Work packages: Now – Feb ‘06• Services (WP 2)
– Trigger cables, fibres, etc. installed on detector
– Full cooling, etc.• Front-end electronics (WP 4)
– 128 superdrawers– 128 LVPS produced, installed & QC’d– Repairs to dead channels etc.
• Back-end electronics (WP 7)– ROD system readout for 2 partitions
• Connections verified, no fibres swapped– Module # ROD fragment ID
• DSP in passthrough or simple calc.• Racks completed (WP3)
– HV supplies– 200V LV supplies + AUX board + LV -
CAN– ADC + HV CANbus– TTC
• Calibration (WP 13)– CIS, Cs, laser timing
• DCS (WP 11)– Monitoring LV, HV, temperature– Automated warnings
• Trigger (WP 6)– 4 coincidence boards installed in
USA15-Level 2• 9U VME crate in reserved rack• 4 final transition boards
– LVL1-Calo patch panels– 48 short cables from patch panels to
coincidence boards– Trigger menu:
• Back-to-back: 48 SD – (12*2 top + 12*2 bottom)
• Single tower: 24 SD– 12*2 on bottom
• Trigger / noise thresholds OK• Monitoring for data quality
– GNAM / online– Athena / HLT– Event display
• Offline analysis with Athena as now
Nov. 2005 Calorimeter Commissioning R. Teuscher 4
TileCal commissioning schedule (ATLAS schedule 26Oct link ), start is delayed ~ 1 week
Sectors (Link to sectors assignments)
Fingers(16finge
rs/sector)
Trigger cable
installation by TC
SD repairs/tests with MobiDICK (previous MobiDICK results shown in GREEN MobiDAQ results shown in
BLUE)
Services Routing
(TC)+connection
s + LV
MobiDAQ / ROD Commissioning
TILE TEAM 1 TILE TEAM 2 TILE
TEAM 3 TILE TEAM 4
Sectors LB# (A+C)
(2 days / 16
fingers) To be done before Team 3 starts + new failures/repairs during Team 3 activity
TOTAL = 37 or (23+20)(~25%)
(3 days / 16 fingers)
(Initial 6 days / 16 Fingers)
(Official 6 days / 16 Fingers;
after this there is no services
access)
Sector 5 13 – 20 8 – 9 Nov (Insert LBA15 + LBC15), LBA17, LBC16*(MobiDICK, MobiDAQ); LBC17
5 or (4+2)
10 – 14 Nov
15 – 22 Nov 16 – 23 Jan
Sector 3 5 – 1222 – 23
Nov LBA05, LBC10*(MobiDICK, MobiDAQ), LBC12; LBC05
4 or (3+2)
24 – 28 Nov 29 Nov – 6 Dec
Sector 7 21 – 2824 – 25
Nov LBC23 129 Nov – 1
Dec 2 – 6 Dec 7 – 14 Dec
Sector 9 29 – 36 3 – 4 Nov LBA34, LBA35*(MobiDICK, MobiDAQ), LBC36;
3 or (3+1) 2 – 6 Dec
6 – 14 Dec 15– 21 Dec
Sector 13 45 – 52 2 – 5 Dec
LBA45*(MobiDICK, MobiDAQ), LBA52*(MobiDICK, MobiDAQ), LBC47, LBC48, LBC49, LBC50, LBC51, LBC52; LBA48
9 or (8+3) 7 – 9 Dec
15 – 22 Dec 6 – 13 Jan
Sector 1 61 – 4 7 – 18 JanLBA61; LBA62, LBA64, LBA04, LBC61, LBC01
6 or (1+5) 19 – 23 Jan
24 – 31 Jan 1 – 7 Feb
Sector 15 53 – 60 19 – 20 Jan LBC55, LBC58; 2 24 – 25 Jan 26 – 31 Jan
Sector 11 37 – 44 25 – 26 JanLBA40*(MobiDICK, MobiDAQ), LBC39; LBA37, LBA39, LBA42, LBA43, LBC44
7 or (2+6) 27 – 31 Jan
1 – 8 Feb 22 Feb – 1 Mar
TileCal teams working by sectors (8 phi sections) together with teams from LAr + Inner detector + muon system. Also Team 5 (offline data quality)
Nov. 2005 Calorimeter Commissioning R. Teuscher 5
Combined Calorimeter Milestones for 2006Date in ‘06 TileCal LArNow – Mar. Barrel Phase 1 Barrel Phase 1Jan. – Mar. EB Phase 1 Barrel coldApr. Phase 2: integration
+ Field MapPhase 2: integration+ Field Map
May - Dec Phase 2-3: Barrel cosmic runsJune Endcap C coldJul. – Dec Phase 2-3: Endcap C cosmic runsAug. Endcap A coldOct – Dec Phase 2-3: Endcap A cosmic runs
As in 2004, Expert weeks followed by stable running.Dates not written in stone, but provide milestones to judge our progress.
Nov. 2005 Calorimeter Commissioning R. Teuscher 6
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
ID B
ID A
Pixe
l
ID C
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
EO, side A
JF
VJ
Nov '06Apr '06Dec '05 Jan '06 Feb '06
Oct '06Apr '06 Jul '06May '06 Jun '06 Aug '06 Sep '06
Chi
mne
y
Muon services
Jan '06Dec '05
Che
ck ra
ils
ID services along Barrel
Cable chains
Side C
Barrel
Side A
Sep '05 Nov '05
Feb '06 Mar '06Sep '05 Oct '05 Nov '05
Oct '05
Services 1st fix
Mar '06
JF
EO, side C
Apr '07
glob
al te
sts,
pum
p do
wn
& b
ake
out
VJ
Pixel connection and testing
VT
Glo
bal C
omm
issi
onin
g
VTVA
BMS
Rel
ease
of
jack
s
HS arches
May '07
Full
mag
net t
est?
Feb '07 Mar '07Oct '06 Jan '07Dec '06
Muon Barrel C
JD
JD
Sole
noid
Endcap Calo ASmall
Wheel A
JF
HS arches preparation JF
LAr
JT
Big Wheel A, (TGC1)
Big Wheels A (MDT+TGC2+TGC3)
JN
Endcap Toroid AEndcap Toroid A
cooldown & testing
JT?
Barrel Calo testing and commissioning
LAr
May '07Nov '06 Jan '07 Apr '07Mar '07Feb '07Dec '06
Big Wheels C (MDT+TGC2+TGC3)Endcap Toroid C
Endcap Toroid C cooldown & testing
Small Wheel C
Barrel Toroid Coils 7-8
Muon brackets & rails
Platf. Remov.
ID services through Muons
Endcap cryo lines.
Barrel Calo services
Barrel Cryo lines
Barrel Toroid servicesBT testing &
commissioningPlatforms removal
Barrel Calorimeter
services, 1st fix on truck
Big Wheels C (TGC1)
JNEndcap Calorimeter C Services
1st fix
Jun '07
Chains
Endcap Cal. A services connection, test & commissioning
Muon Barrel A
Side A closed
Endcap Cal. C servicesFi
eld
map
ping
Endcap Cal. C testing & commissioning
VA
ID Barrel connection and testing IDC connection and
testing
Global Commissioning
Jun '07
ID A connection and testing
Aug '06 Sep '06Jul '06May '06 Jun '06
Full magnet test
ATLAS Installation Schedule Peter Jenni, ATLAS Overview Week, Paris, October 2005
Barrel cosmicsEndcaps
April ’07: Global ATLAS cosmic run
Nov. 2005 Calorimeter Commissioning R. Teuscher 7
Reminder: Cosmic Trigger (WP 6.1) • 4 Chicago coincidence trigger board constructed
– (LAr also interested in building additional boards if needed for endcaps)– With 4 boards in hand: 4 * 12 = 48 superdrawers (8 towers / SD)– Connection now via transition board to temporary TileCal trigger cables in
USA15, Level -1 racks– Permanent rack location reserved in USA15 Level -2 racks next to LVL1-Calo
Patch panels– Need to construct intermediate cables from Patch panels (time + manpower)
• Also split LB + EB signals to 2 coincidence boards– Second set of 4 transition boards being constructed for outputs from LVL1-
Calo Patch panels / Receivers
Nature 14 July2005
Nov. 2005 Calorimeter Commissioning R. Teuscher 8
1. Back to back towers (barrel) 2. Single tower (exbarrel or barrel)
Two Trigger Modes
Nov. 2005 Calorimeter Commissioning R. Teuscher 9
Configuration for 4 Trigger boards24 SuperDrawer (SD) top x 24 SD bottom, Single-tower trigger
A B
CD
1
2
3
4)()()(
)(
DBCBDA
CA
A: 12 SD
B: 12 SD
D: 12 SD
C: 12 SD
FourCoinc.Boards
Nov. 2005 Calorimeter Commissioning R. Teuscher 10
LTP (Local Trigger Processor)• For final ATLAS CTP (Central Trigger Processor) chain to subdetectors• For cosmics: Chain TileCal trigger to LAr • Needs master / slave unit being designed for 2 partitions, ready early ‘06
LTP LTP LTP LTP
TTC partitions of Sub-system 1
LTP LTP LTP LTP
TTC partitions of Sub-system 2
P.Farthouat / T.Pauly
Nov. 2005 Calorimeter Commissioning R. Teuscher 11
Start Finished LAr DAQ needs TileCal DAQ needs
LAr Barrel Warm
01/01/06 28/02/06 1 + 1 partition19 ROS, 75 ROBIN, 1 Event Builder PC
ROS: 2x2 = 4ROBIN: 3x4 = 12
LAr Barrel Cold calib
01/03/06 30/04/06 same
LAr Barrel + Tiles cosmics
01/05/06 Up to 2007
same + LTP master/slave board
LAr ECC Warm
01/03/06 30/04/06 3 partition, 8 ROS, 31 ROBIN, 1 EB PC
ECC Cold 01/05/06 30/06/06 same
Barrel + ECC 01/07/06
ECA warm 01/05/06 30/06/06 3 partition, 8 ROS, 31 ROBIN, 1 ROS PC
ECA cold 01/08/06 30/09/06
Barrel + 2 EC 01/10/06 33 ROS*, 130 ROBIN ROS: 2x4 = 8ROBIN: 3x8 = 24
DAQ Milestones in 2006
* 50 ROS PC’s planned by TDAQ for January ’06 OK
Nov. 2005 Calorimeter Commissioning R. Teuscher 12
Discussion• Informal TileCal + LAr Meeting held at CERN
~month ago– TileCal: Phase 2 + 3 coordinators + subsystem
experts + …– LAr: Phase 3 Barrel + Endcap coordinators +
subsystem experts + PL + ...• Learned that external scintillators at IP are not
an attractive option for LAr– At most 2-3 weeks available in Fall ’06
• Outcome: LAr will produce a document to be reviewed by TileCal + Institute Board– See attached document + questions at end of this talk
Nov. 2005 Calorimeter Commissioning R. Teuscher 13
• First of all the clear goal of the barrel phase 3 commissioning is to demonstrate that the detector can operate in a stable mode during months.
• Full detector calibration– Demonstrate software calibration + db is working !– Will start in February 2006 (as soon as the barrel cryostat is cold)– Needs to be fully operational before cosmic muons run starts– Pedestal, Ramps, Calibration pulses + OFCs– COOL/POOL db integration– Monitoring + Bad cells at calibration level
• Bad physics signal shape– Define “bad” signals in Physics with seeking algorithms +
monitoring– Cross check calibration level results with results from the
installation, and cold commissioning in B180
LAr Goals for Cosmic Runs (1/2)(M. Aleksa)
Nov. 2005 Calorimeter Commissioning R. Teuscher 14
S()/N 7
Barrel middle compartment
Test-beam data
Muon signal in barrel EM calorimeterDue to Accordion geometry, muons are reconstructed in middle compartmentby summing two cells in .
Note : S/N ratio too small in strip and back compartments
central cell
With 10000 events, muon signal can be measured with ~ 0.3% precision
Nov. 2005 Calorimeter Commissioning R. Teuscher 15
LAr Endcap Dates (1/2)(E. Monnier)
Side C:1. Tile EBC assembly, 11/052. Lowering of ECC, 21/11/053. Completion of EBC mech. assembly, mid
01/064. ECC moved in, connection of services, full
access to Barrel and EBC, mid 02/065. ECC Warm test 03–04/06 (Coherent noise,
Daq)6. ECC Cold test 05-06/06 (Noise, Calib, Sig.
rec…)7. ECC + Barrel 07/06
Nov. 2005 Calorimeter Commissioning R. Teuscher 16
LAr Endcap Dates (2/2)(E. Monnier)
Side A:1. Tile EBA assembly, 01/062. Lowering of ECA, 02/063. Completion of EBA assembly, 03/064. ECA/C moved in, Solenoid field mapping,
04/065. Re-opening and full access for connection
of services, 05/066. ECA Warm test 05-06/067. ECA Cold test 08-09/068. ECA + Barrel + ECC 10/06
Nov. 2005 Calorimeter Commissioning R. Teuscher 17
ATLAS Commissioning View: Main steps up to spring cosmics
(G. Mornacchi + P. Perrodo – ATLAS Overview Week, Paris, October ‘05)
• Intermediate steps– Individual barrel calorimeter partitions
• Integration with DAQ (ROS system)• Event building and data recording• Individual DCS systems operational• Monitoring and analysis
– E.g. local (at P1) analysis of data from a run– Infrastructure for local analysis– Detector software for analysis
• Data bases: access• Surface proto-control room
– Combined calorimeters• Common trigger distribution (LTPs, CTP)• Common central DCS (e.g. alarms)• Surface proto-control room
• Combined barrel calorimeters, cosmic run (May 06)– Cosmic trigger– Analysis software
Nov. 2005 Calorimeter Commissioning R. Teuscher 18
ATLAS Commissioning Meetings(G. Mornacchi / P. Perrodo)
• Address Phase 2 issues
• Monday afternoons• Goals
– Single place where phase 2 issues are discussed
– Put different actors together, identify problems
– Define Phase 2 Work Packages
19/9/05 (TMB) ROS, trigger
26/09/05 DCS: CIC
10/10/05 DSS, interlocks
17/10/05 Data bases (?)
24/10/05(TMB) Proto control roomLocation and functionality
31/10/05 Detector requirements for R/O & monitoring
07/11/05 DAQ/ROS status
14/11/05 DAQ/EB options
21/11/05
28/11/05 (TMB)
05/12/05
12/12/05
19/12/05
Nov. 2005 Calorimeter Commissioning R. Teuscher 19
Integral to ATLAS Management Operation ModelPeriodic Cosmic Runs in Spring 2006Training of (proto-) Run Coordinators
(F. Gianotti)
Nov. 2005 Calorimeter Commissioning R. Teuscher 20
BACKUP
Nov. 2005 Calorimeter Commissioning R. Teuscher 21
• Amplitude inter-calibration in – Summing modules in
• Time inter-calibration– Energy/time rec. with OFC needs pulse vs 40 MHz clock phase– Cross-check relative timing of middle layer cell predicted at ~0.8 ns
(calibration pulses + cables lengths, systematics, t.o.f.)• The pulse versus 40MHz clock phase will be delivered by the TileCal time
reconstruction. We need an accuracy around 1.5ns.• This time phase (corrected for the time of flight of a muon from the IP) needs to
be independent on eta and phi (i.e. independent of the Tile trigger tower)– Intercalibration of the timing of different TileCal trigger towers is very important.– Will be checked with the data of the TileCal September expert week.
• LAr EM Positioning – ~ 0.025/8/12 in using strips– ~ 0.025/10 in with middle cells
• Study ‘high’ energy events (above ~2 GeV)• Extract drift time from 32 sample events
LAr Goals for Cosmic Runs (2/2)(M. Aleksa)
Nov. 2005 Calorimeter Commissioning R. Teuscher 22
• Amplitude inter-calibration in – Per cell: /N/290 MeV – Uniformity: /<E> ~ 0.5% with 40000 /cell– Group cells in (48) 1000 /cell
• Time inter-calibration– 100 /cell, can check physics timing at 0.6 ns
• LAr EM Positioning to be investigated• Events above ~2 GeV to be investigated• Drift time from 32 sample events to be
investigatedG3 results: projective 0.042±0.005 Hz, pseudo-projective 0.153±0.010 Hz
100 µ/cell 106 full days (29) with 1.0 GeV Tile threshold, =±0.1, =120.1
projective 0.027±0.004 Hz, pseudo-projective 0.098±0.008 Hz
165 full days (45) with 1.5 GeV Tile threshold (3840 top cells)
LAr Data taking(M. Aleksa)
• At least 100 days of data-taking necessary to obtain useful results• Our preferred trigger would be single-tower trigger (on bottom modules)• Then we could in principle take data with only 2 trigger board (sharing with EC possible)!
Nov. 2005 Calorimeter Commissioning R. Teuscher 23
Questions from LAr to TileCal1. Is it possible to trigger and read independently the Tile
barrel and extended barrel(s)?• Answer: Trigger: Yes, it is possible. A cable / splitter would be
needed to split the LB/EB signals from the LVL1-Calo patch panels to two separate Chicago transition modules. Readout: Yes. The ROD readout is grouped by TTC partitions, and LB/EB are separate partitions. Event building would be necessary.
2. It might be useful to trigger on the barrel in order to have projective muons in the LAr endcap.
• Answer: Could be difficult, required LB+EB to be in final position. During many periods in ’06 the EB’s are scheduled to be moved back and forth in z for muon big wheel installation etc. Some “quiet periods” should be checked.
Nov. 2005 Calorimeter Commissioning R. Teuscher 24
Questions from LAr to TileCal (cont.)
3. LAr plans to have 4 experts on call (Front End + cooling, Backend + Online, DCS + interlock, Monitoring + offline), can a similar effort be provided by the TileCal group over a long period while some work will have to be done on the extended barrels?
• Answer: Comments invited from all TileCal members + Institute Board
4. Should dedicated expert meetings / discussion start before the end of the year?
• Depends on positive answer from TileCal. Last dedicated meeting was very productive. Useful to coordinate with ATLAS weekly commissioning meetings.
• Question to LAr: Help with manufacture of 48 intermediate trigger cables + connectors in USA15 from LVL1-Calo Patch Panels to coincidence boards?
Nov. 2005 Calorimeter Commissioning R. Teuscher 25
Summary - Todo• Complete TileCal Phase 1 commissioning• Discuss Questions from LAr• Prepare reply• If positive, prepare plan with TileCal Work
Package Managers for status + needs for Spring 2006 cosmic ray run– Could be in form of short document– Include requirements for central services
• TDAQ, HLT, Central DCS, etc.
Nov. 2005 Calorimeter Commissioning R. Teuscher 26
ATLAS Experts• Build upon existing structures• Subdetector experts
– Commissioning Phase 2/3 coordinators – Front-end– ROD / DAQ / online tools– HV– DCS / interlock– HLT Monitoring
• Meeting last week with TileCal & HLT monitoring group– Offline software & database
• Central ATLAS systems– TDAQ– LTP (Local trigger processor)– Central DCS to collect warnings from subsystems– Basic Control room on surface– Network & Computing
• Run coordinators– Meetings
• Commissioning coordinators