NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
METALS INDUSTRIAL CLUSTER AND ASSOCIATED INFRASTRUCTURE NEAR
KURUMAN, NORTHERN CAPE PROVINCE
Project Name:
» Metals Industrial Cluster near Kuruman
Applicant:
» Northern Cape Department of Economic Development and Tourism
Location: The cluster is planned on ERF 6253 (Portion of ERF 1), ~2km south east from the
town of Kuruman. The proposed site falls within the Ga-Segonyana Local Municipality and the
greater John Taolo Gaetsewe District Municipality
Proposed Activity: The construction of a Metals Industrial Cluster. Steel manufacturing will
be the main focus while it allows for other metals related industries to locate in the cluster.
The cluster will focus on the manufacturing component of the minerals beneficiation value
chain. The proposed cluster will start as a developmental initiative, driven strongly by a
Cluster Management Company (CMC). The proposed development will extend over 20 years
and will transition into 4 phases.
Application for Environmental Authorisation: In terms of Sections 24 and 24D of the
National Environmental Management Act (No 107 of 1998), as read with Government Notice
R982 - R985, a Scoping and EIA is required to be undertaken for the proposed project. The
competent authority for the proposed project is the Northern Cape Department of
Environment and Nature Conservation.
Public Involvement Process: Savannah Environmental is undertaking the required
environmental assessment and public participation process. To obtain further information and
register on the project database, please submit your name, contact information and interest in
the project, in writing, to Savannah Environmental:
December 2015
Gabriele Wood of Savannah Environmental
Post: PO Box 148, Sunninghill, 2157
Johannesburg
Tel: 011 656 3237
Fax: 086 684 0547
Email: [email protected]
Website: www.savannahsa.com
KENNISGEWING VAN ’N OMGEWINGSIMPAKEVALUERINGSPROSES
OPENBARE DEELNAMEPROSES
METAALNYWERHEIDSKORF EN GEPAARDGAANDE INFRASTRUKTUUR
NABY KURUMAN, NOORD-KAAPPROVINSIE
Projeknaam:
» Metaalnywerheidskorf naby Kuruman
Applikant:
» Noord-Kaapse Departement van Ekonomiese Ontwikkeling en Toerisme
Ligging: Die korf word beplan op Erf 6253 (Gedeelte van Erf 1), ~2 km suidoos van die dorp
Kuruman. Die beoogde terrein is in die Ga-Segonyana Plaaslike Munisipaliteit en die John
Taolo Gaetsewe Distriksmunisipaliteit en omstreke geleë.
Beoogde Aktiwiteit: Die oprigting van ’n Metaalnywerheidskorf. Staalvervaardiging sal die
hooffokus wees, terwyl dit voorsiening sal maak dat ander metaalverwante nywerhede in die
korf kan wees. Die korf sal fokus op die vervaardigingskomponent van die
mineraalveredelingswaardeketting. Die beoogde korf sal begin as ’n ontwikkelingsinisiatief,
sterk gedrewe deur ’n korfbestuursmaatskappy (KBM). Die beoogde ontwikkeling sal oor 20
jaar strek en in 4 fases oorgaan.
Aansoek om Omgewingsmagtiging: Ingevolge Artikel 24 en 24D van die Nasionale Wet op
Omgewingsbestuur (Wet 107 van 1998), saamgelees met Staatskennisgewing R982 tot R985,
moet ’n Bestekopname en ’n OIE vir die beoogde projek onderneem word. Die bevoegde
owerheid vir die projek is die Noord-Kaapse Departement van Omgewingsake en
Natuurbewaring.
Openbare Deelnameproses: Savannah Environmental onderneem die nodige
omgewingsevaluering en openbare deelnameproses. Ten einde meer inligting te bekom en
om op die projek se databasis te registreer, verstrek asseblief u naam, kontakbesonderhede
en belang by die projek skriftelik aan Savannah Environmental:
Desember 2015
Gabriele Wood van Savannah Environmental
Posadres: Posbus 148, Sunninghill, 2157
Johannesburg
Tel: 011 656 3237
Faks: 086 684 0547
E-pos: [email protected]
Webwerf: www.savannahsa.com
PROPOSED METALS INDUSTRIAL CLUSTER NEAR KURUMAN, NORTHERN CAPE PROVINCEDraft EIA Report November 2016
Appendix C2: Site Notices and Advertisements Page 1
PROOF OF SITE NOTICES (Date placed: 11-12-2015)
Figure 1: Site notices (English and Afrikaans) placed on the fence of the westernboundary of the affected property: 26° 57' 22.4"S ; 24° 43' 33.5"E
PROPOSED METALS INDUSTRIAL CLUSTER NEAR KURUMAN, NORTHERN CAPE PROVINCEDraft EIA Report November 2016
Appendix C2: Site Notices and Advertisements Page 2
Figure 2: Site notices (English and Afrikaans) placed along the N14 located to the
north of the affected property: 27° 27' 35.7"S ; 23° 26' 50.3"E
PROPOSED METALS INDUSTRIAL CLUSTER NEAR KURUMAN, NORTHERN CAPE PROVINCEDraft EIA Report November 2016
Appendix C2: Site Notices and Advertisements Page 3
Figure 3: Site notices (English and Afrikaans) placed in the municipal offices of theGa-Segonyana Local Municipality: 26° 57' 22.4"S ; 24° 43' 33.5"E
NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
METALS INDUSTRIAL CLUSTER AND ASSOCIATED INFRASTRUCTURE NEAR
KURUMAN, NORTHERN CAPE PROVINCE
Project Name: Metals Industrial Cluster near Kuruman
Applicant: Northern Cape Department of Economic Development and Tourism
Location: Portion 6253 of Erf 1 located ~2km south east of the town of Kuruman and ~1km south
west of Wrenchville.
Proposed Activity: The establishment of a Metals Industrial Cluster to provide a node for semi-
industrial and industrial developments in the Kuruman area. The Cluster is expected to be
developed in four development phases and is expected to operate for a minimum of 20 years (first
three phases). Phase 4 is intended to cater for the expansion of the Cluster beyond the 20-year
timeframe.
Application for Environmental Authorisation: In terms of Sections 24 and 24D of the National
Environmental Management Act (No 107 of 1998), as read with Government Notice R982 - R985, a
Scoping and EIA is required to be undertaken for the proposed project. The competent authority
for the proposed project is the Northern Cape Department of Environment and Nature
Conservation.
Environmental Impact Assessment Report Available for Review: An Environmental Impact
Assessment Report is available for review and comment at the Kuruman Public Library, School
Street, Kuruman, from 02 November 2016 – 02 December 2016. The report is also available
for download on www.savannahsa.com/projects. The due date for written comment is 02
December 2016.
To obtain further information and register on the project database, please submit your name,
contact information and interest in the project, in writing, to Savannah Environmental:
Gabriele Wood of Savannah Environmental
Post: PO Box 148, Sunninghill, 2157,
Johannesburg
Tel: 011 656 3237 | Fax: 086 684 0547
Email: [email protected]
Website: www.savannahsa.com