NOTICE OF CONSTRUCTION PG&E DEEP-WELL ANODE AND RECTIFIER SYSTEM INSTALLATION ON TWIN CREEKS DRIVE Planned Construction Period: November to December 2021 Staff issued an Encroachment Permit to PG&E to install a deep-well Anode and Rectifier System that will restore cathodic protection in the surrounding area at Twin Creeks Drive, as shown on Exhibit A. The California Public Utility Commission (CPUC) mandates PG&E to apply cathodic protection to all gas distribution and transmission pipelines to maintain public safety and corrosion compliance standards. PG&E’s contractor, Underground Construction Company, Inc. (UCCI) is scheduled to begin work this month. The scope of work consists of the following: drilling an 8” x 200’ deep well, approximately 10 feet from the face of the curb; creating one 4’ x 4’ bell hole; and installing an ornamental cabinet rectifier system behind the sidewalk. UCCI anticipates completion of the project by December 2021, weather permitting. Contact Information: City of San Ramon Underground Construction Co., Inc. Gordon Despins – Engineering Inspector Jerome Christy – Superintendent Cell: (925) 325-7531 Cell: (303) 929-1810 Email: [email protected] Email: [email protected] Jesus Aguilar – Engineering Inspector Cell; (925) 967-3502 Email: [email protected] PG&E Andrew Wierda – Project Manager Cell: (925) 278-3235 Email: [email protected] Eric Ramos – Engineering Specialist Direct: (925) 973-2698 Email: [email protected]

Transcript of NOTICE OF CONSTRUCTION PG&E DEEP-WELL ANODE AND …

NOTICE OF CONSTRUCTION

PG&E DEEP-WELL ANODE AND RECTIFIER SYSTEM INSTALLATION ON TWIN CREEKS DRIVE

Planned Construction Period: November to December 2021

Staff issued an Encroachment Permit to PG&E to install a deep-well Anode and Rectifier System that will restore cathodic protection in the surrounding area at Twin Creeks Drive, as shown on Exhibit A. The California Public Utility Commission (CPUC) mandates PG&E to apply cathodic protection to all gas distribution and transmission pipelines to maintain public safety and corrosion compliance standards. PG&E’s contractor, Underground Construction Company, Inc. (UCCI) is scheduled to begin work this month. The scope of work consists of the following: drilling an 8” x 200’ deep well, approximately 10 feet from the face of the curb; creating one 4’ x 4’ bell hole; and installing an ornamental cabinet rectifier system behind the sidewalk. UCCI anticipates completion of the project by December 2021, weather permitting.

Contact Information:

City of San Ramon Underground Construction Co., Inc. Gordon Despins – Engineering Inspector Jerome Christy – Superintendent Cell: (925) 325-7531 Cell: (303) 929-1810 Email: [email protected] Email: [email protected] Jesus Aguilar – Engineering Inspector Cell; (925) 967-3502 Email: [email protected]

PG&E Andrew Wierda – Project Manager Cell: (925) 278-3235 Email: [email protected]

Eric Ramos – Engineering Specialist Direct: (925) 973-2698 Email: [email protected]

TWIN CREEKS DR

CROW CANYON RD

CANYON CREEK DR

LITTLE CREEK CT

COMPTON CIRCopyright nearmap 2015

PG&E DEEP WELL ANODE &RECTIFIER CABINET INSTALLATION ±

EXHIBIT A!( ANODE WELLÔ RECTIFIER CABINET

CITY OF SAN RAMON7000 Bollinger Canyon Rd, San Ramon, CA 94583

ENGINEERING SERVICES

DIABLO PLAZA

TWIN CREEKS DR

4'x4' BELL HOLEWORK AREALANE CLOSURE