Transcript of Norwegian Oil for development in SaoTomeandPrincipe
-
8/14/2019 Norwegian Oil for development in SaoTomeandPrincipe
1/3
Nowgan Pou Dcoa
O i l f O r D e v e l O P m e N t
2006-2007
51
6.11
S A O T O M E A N D P R I N c I P E
Project:
Under disussion
Cooperating institution:
Agenia National do Petroleo (ANP)
Contact:
Luis Prazeres, ANP, [email protected]
ystein Kristiansen, NPD, [email protected]
Jan Bygdevoll, NPD, [email protected]
cOUNTRY FAcTS:Ofcial Name:
Republia Demoratiade Sao Tome e Prinipe
Capital:
Sao Tome
Chie o state:
President Fradique de Menezes
(sine 3 September 2001)
Head o Government:
Prime Minister Tome Soares da
Vera cruz (sine 21 April 2006)
Population:
193 413 (July 2006 est.)
Petroleum sector, key fgures:
Average oil prodution: 0
Annual gas prodution: 0
Organisation o the sector:
Ministerio dos Reursos
Naturais e Meio Ambiente
Agenia Naional do Petroleo
(National Petroleum Regulator)
Autoridade comjunta Nigeria
- Sao Tome e Prinipe
(Responsibility for Jointly
Operated Zone with Nigeria)
ure: PetroView
-
8/14/2019 Norwegian Oil for development in SaoTomeandPrincipe
2/3
Nowgan Pou Dcoa
O i l f O r D e v e l O P m e N t
2006-2007
52
6.11
Brie history o the projet
Ministerio dos Reursos Naturais e Meio Ambiente applied or support
rom Norway in 2004 and 2005 within the ollowing three areas:
Training Sharing o experiene and expertise within petroleum resoure management Inreased transpareny and elimination o orruptionA at fnding mission to Sao Tome and Prinipe was onduted in July 2005
and a new vist was made in Otober. A study tour was then arranged in
Norway or 8 parliamentarians rom Sao Tome and Prinipe at the end o
November / beginning o Deember 2005.
Ativities in 2006A delegation o 6 persons rom ANP or visited NPD 18th and 22nd
September 2006 to learn more about petroleum setor supervision and
governane. At the same time the elements o a long term support to
Sao Tome and Prinipe were disussed.
Based on the disussions a ull request doument was prepared and sent
to the Embassy in Angola and to NORAD. During the EITI onerene in Oslo
ANP and NPD ompleted the request douments. The appliation was
presented to Minister or Development Assistane Erik Solheim on 17th Otober.
The response was positive.
Several donors are supporting the petroleum setor in Sao Tome e Prinipe.
A long term support will have to be oordinated between the main donors.
Mr Teixeira o ANP ollowed the Petrad 8 week ourse in Stavanger this all.
Plans 2007The plans are depending on the fnal deision regarding support to
Sao Tome and Prinipe under the OD initiative.
The deision will very muh depend on whih support is given by other
donors and meetings with other donors are planned.
-