![Page 1: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/1.jpg)
Northwest Arm Drive BridgeLong-Term Rehabilitation
NEBPP Meeting, September 10, 2019Christopher Dyck, M.Sc., P.Eng.Nova Scotia Transportation and Infrastructre Renewal (NSTIR)
![Page 2: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/2.jpg)
Northwest Arm Drive BridgesHFX244A & HFX244B
• Built in 1975
• 5 span concrete AASHTO girders (‘I’ shaped Girders)
• 6 girders per span
• Each span approximately 16.6m long
• 83.2m total length
• Supported on concrete hammerhead piers on spread footings
• Pier height ranges from 6m to 10m tall
![Page 3: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/3.jpg)
Chain of Lakes Trail
HFX244B (NB)
HFX244A (SB)
First Chain Lake (Halifax Water Backup Supply)
Crown DriveHalifax Water Access Rd (gated – goes under bridges)
Halifax Water Spillway (under bridges)
St. Margaret’s Bay Rd
Walter Havill Dr.Northwest Arm Drive
Access to Trail
![Page 4: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/4.jpg)
HFX244A & HFX244B
![Page 5: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/5.jpg)
EXISTING GIRDER CONDITIONS
![Page 6: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/6.jpg)
EXISTING GIRDER CONDITIONS
![Page 7: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/7.jpg)
EXISTING GIRDER CONDITIONS
![Page 8: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/8.jpg)
EXISTING PIER CONDITION
![Page 9: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/9.jpg)
EXISTING PIER CONDITION
![Page 10: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/10.jpg)
EXISTING DECK & BARRIER
![Page 11: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/11.jpg)
Northwest Arm Drive Bridges HFX244A & HFX244B
Rehabilitation Approach
![Page 12: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/12.jpg)
TRADITIONAL REHABILITATION
• Traditional Method and Typical Longevity:
• Bearing Repairs / Replacement (15-20 years?)
• Girder End Repairs (7-10 years?)*
• Diaphragm Repairs (10- 15 years?) *governs
• Deck End Repair (20 years?) life of repairs
• Joint Replacement (5-10 years?)*
• Depends on Multitude of Factors Both During Construction and Afterwards.
![Page 13: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/13.jpg)
TRADITIONAL REHABILITATION
• 5-10 years maximum before rehabilitation required again.
• Additional traffic delays
• Additional expenditure
• Poor Performance
![Page 14: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/14.jpg)
PROJECT GOALS• Long Lasting Rehabilitation
• Cost Effective
• Addresses all Concerns with Bridge Condition
• Minimize Traffic Disruption
• Prevent Future Water Damage
![Page 15: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/15.jpg)
NEW BRIDGE DESIGN MEASURES FOR LONGEVITY
• Integral or Semi-Integral Abutments
• Continuous Girders and deck
• Improved materials and construction practices
![Page 16: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/16.jpg)
REHABILITATION APPROACH• Trial a new approach to rehabilitating concrete bridges that have
multiple simple spans and expansion joints
• Eliminate all joints in bridge through engineering design
• Integrate all piers with the bridge girders and deck
• Convert abutments to semi-integral
• First application of this approach in Nova Scotia
![Page 17: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/17.jpg)
PIER INTEGRATION
FROM THIS TO THIS
![Page 18: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/18.jpg)
SEMI-INTEGRAL ABUTMENTS
FROM THIS
![Page 19: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/19.jpg)
SEMI-INTEGRAL ABUTMENTS
TO THIS
![Page 20: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/20.jpg)
PIER INTEGRATION & SEMI-INTEGRAL ABUTMENTS
• Eliminates need to jack and support girders during rehab
• Eliminates the need to replace existing bridge bearings
• Reduces quantity of girder repairs
• Eliminates LEAKING JOINTS
• Improves surface smoothness
![Page 21: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/21.jpg)
PIER INTEGRATION & SEMI-INTEGRAL ABUTMENTS
• Will lead to a longer lasting repair (perhaps 40 years + with minimal maintenance)
• Minimal increase in cost
![Page 22: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/22.jpg)
Northwest Arm Drive Bridges HFX244A & HFX244B
Analysis
![Page 23: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/23.jpg)
Analysis Approach
• Analysis Scope
• To assess the feasibility of joining (integrating) the pier cap with the girders to form a fully continuous bridge
• 16.3 m becomes 83 m+
• Temperature effects become very important
• To determine the load effects on all structures in the bridge as well as their resistances upon integration
![Page 24: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/24.jpg)
Analysis Approach• Finite Element (FE) Model: Simple vs Continuous Span
![Page 25: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/25.jpg)
Analysis Approach
• Finite Element (FE) Models:
• Beam and shell models in SFrame
• Simple span model
• Uncracked properties, Dead Loads
• Continuous span model
• Uncracked properties, SLS Cracking check
• Continuous span model
• Cracked properties over pier, Full assessment of load effects
• Pier and footing models – shell models
• Capture settlement effects and new shear and bending effects
• Tangent girders with curved deck
![Page 26: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/26.jpg)
Analysis Approach• Finite Element (FE) Model:
![Page 27: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/27.jpg)
Analysis Approach• Finite Element (FE) Model: Concrete Dead Load (Continuous)
![Page 28: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/28.jpg)
Analysis Approach• Finite Element (FE) Model: Live Load Truck
![Page 29: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/29.jpg)
Analysis Approach• Finite Element (FE) Model: Transverse Wind Load Bending
![Page 30: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/30.jpg)
Analysis Approach• Finite Element (FE) Model: Forced Settlement of Piers on
Different Soils
![Page 31: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/31.jpg)
Northwest Arm Drive Bridges HFX244A & HFX244B
Tendering
![Page 32: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/32.jpg)
Tendering
• Major effort was put into defining the scope of the work and detailing it:
• 23 detailed drawings
• Full procedures for all repairs
• Extents and boundaries for all key repairs
• First application, so contractors not familiar with new approach
![Page 33: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/33.jpg)
Tendering• Example of Girder End Repair level of detail:
![Page 34: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/34.jpg)
Tendering• Example of Girder End Repairs outside integration
![Page 35: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/35.jpg)
Northwest Arm Drive Bridges HFX244A & HFX244B
Construction
![Page 36: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/36.jpg)
Crossovers
![Page 37: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/37.jpg)
Concrete Removal
![Page 38: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/38.jpg)
Concrete Removal
![Page 39: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/39.jpg)
Concrete Removal
![Page 40: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/40.jpg)
Barrier Refacing
![Page 41: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/41.jpg)
Barrier Refacing
![Page 42: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/42.jpg)
Barrier Refacing
![Page 43: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/43.jpg)
Deck Repairs
![Page 44: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/44.jpg)
Crack Injection
![Page 45: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/45.jpg)
PIER INTEGRATION
![Page 46: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/46.jpg)
PIER INTEGRATION
![Page 47: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/47.jpg)
PIER INTEGRATION
![Page 48: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/48.jpg)
PIER INTEGRATION
![Page 49: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/49.jpg)
PIER INTEGRATION
![Page 50: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/50.jpg)
PIER INTEGRATION
![Page 51: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/51.jpg)
PIER INTEGRATION
![Page 52: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/52.jpg)
SEMI-INTEGRAL ABUTMENTS
![Page 53: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/53.jpg)
SEMI-INTEGRAL ABUTMENTS
![Page 54: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/54.jpg)
SEMI-INTEGRAL ABUTMENTS
![Page 55: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/55.jpg)
SEMI-INTEGRAL ABUTMENTS
![Page 56: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/56.jpg)
SEMI-INTEGRAL ABUTMENTS
![Page 57: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/57.jpg)
Girder Repairs
![Page 58: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/58.jpg)
Girder Repairs
![Page 59: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/59.jpg)
Girder Repairs
FRP
![Page 60: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/60.jpg)
Northwest Arm Drive Bridges HFX244A & HFX244B
Finished Condition Comparison December 2018
![Page 61: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/61.jpg)
Girder Repairs + Wrapping
From This:
To This:
![Page 62: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/62.jpg)
Pier Repairs
From This:
To This:
![Page 63: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/63.jpg)
Semi-Integral Abutments
From This:
To This:
![Page 64: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/64.jpg)
Barrier Repairs
From This:
To This:
![Page 65: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/65.jpg)
Resurfacing
From This:
To This:
![Page 66: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/66.jpg)
So why not use this everywhere?• This procedure is broadly applicable
• Applications will need to be carefully chosen
• Traffic maintained in workzone?
• Continuous conversion does not favour lane-by-lane construction
• Design effort is more extensive and complex
![Page 67: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/67.jpg)
Summary - Life Cycle Cost
• Low bid was Cdn$2.1Million (US$1.6Million) for both bridges
• Significant life cycle cost savings
• Significantly less impact on the public over the remaining life of the structure
![Page 68: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked](https://reader033.fdocuments.us/reader033/viewer/2022052800/5f0f699c7e708231d44408c2/html5/thumbnails/68.jpg)