NORTHSIDE DRIVE STUDIO [West-Downtown]northsidedrvision.gatech.edu/wp-content/uploads/... ·...
Transcript of NORTHSIDE DRIVE STUDIO [West-Downtown]northsidedrvision.gatech.edu/wp-content/uploads/... ·...
NORTHSIDE DRIVE STUDIO
Georgia Institute of Technology | Northside Drive Studio Professor Michael Dobbins Student Team:
[West-Downtown]
[Joel Anders, Lauren Cardoni, Rachel Cox, Amy Ingles]
Context
Better map?
Plan Year Comments Castleberry Hill
Master Plan 2000 Envisions Northside Dr. as a key boulevard, as well as a potential entrance to the neighborhood; strive to be a gateway to Downtown
Vine City Redevelopment
Plan 2004 Emphasis on streetscaping, pedestrian improvements, and economic
development
Northside Drive Corridor Study 2005 Evaluation of existing infrastructure and recommendations for future
development
Green Line 2007 Improves Downtown connectivity and attractiveness
Connect Atlanta 2008 Emphasis on expanding and improving transit and bicycle and pedestrian facilities in the City, but does not focus on Northside Dr.
Imagine Downtown 2009 [update]
Increase density along eastside of Northside Dr. and infill development in Castleberry Hill.
Washington Park/Vine City LCI
Plan 2009 Internal neighborhood connections and plans for community greenspace
Various On-going Park Pride’s Proctor Creek-North Avenue Watershed, PATH’s Connectivity, GWCC/Falcons & MMPT Choices of Concept, Vine City ‘s HUD “Choice Neighborhoods” Grant
Summary of Existing Studies
• Ensure community benefits from MMPT & New Falcons Stadium projects
• Reconnecting AUC and Castleberry Hill to Downtown and surrounding areas
• Improve stability of Westside neighborhoods
Issues
Key Connectivity Issues
Critical Intersections
Missing Connections
Land Use
Connection from Vine City across GWCC Campus
Redevelopment of MLK @ Northside
Redevelopment of COP @ MLK
Creation of “gateway” to AUC at Fair St & Northside
Scope of Alternatives
A
D
C
A
B
B
C
D
A. Vine City Station
A. Vine City Station Road Design
A. Vine City Station Redevelopment Concept
A. Vine City Station Redevelopment Concept
Image Decatur MARTA?
Image Stormwater catchment
B. MLK @ Northside
B. MLK @ Northside Intersection Design
B. MLK @ Northside Redevelopment Concept
B. MLK @ Northside Redevelopment Concept
Image Dome?
Image Tech Square?
C. COP @ MLK
C. COP @ MLK Intersection Design
C. COP @ MLK Redevelopment Concept
C. COP @ MLK Redevelopment Concept
Image
Image
D. Fair Street
D. Fair Street Intersection Design
D. Fair Street Redevelopment Concept
D. Fair Street Redevelopment Concept
Image Streetcar?
Image University Center?
• Connections to: – Attractions
• Dome • Philips Arena • Centennial
Park – Schools
• AUC • GA Tech • Woodruff
Library – Transportation
• New MMPT • MARTA Rail • Edgewood
Streetcar
Streetcar Concept
Phasing and/or Cost Timeline
1 to 3 years 3 to 7 years 7 to 10 years
Site A Vine City Station
Vine City Promenade, sidewalk & streetscape enhancements, build
stormwater infrastructure
New Dome: new streets connecting through
GWCC campus to Downtown
Develop Vine City Station TOD, continue developing
GWCC campus?
Site B MLK & Northside
Infill development, streetscape
enhancements, greenspace
New Dome: new streets connecting the N-S grid
to MLK
Extend Streetcar down MLK to Northside?
Site C COP & MLK Jr Dr
Sidewalk & streetscape enhancements, viaduct
improvements
New Dome & MMPT: new streets connecting
east into Downtown, capping the Gulch
Development over the newly capped Gulch,
Streetcar
Site D Fair Street
Sidewalk & streetscape enhancements, infill
development
Redevelopment of vacant land for AUC
housing/hotel/conference center
Extension of streetcar down Fair St
What’s in the ConnectAtlanta plan that remains to be done??
Questions/Discussion