Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM...

38
Northern Highways Program 2017-2021 Ministry of Northern Development and Mines

Transcript of Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM...

Page 1: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

Northern Highways Program

2017-2021

Ministry of Northern Development and Mines

Page 2: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

TABLE OF CONTENTS

NORTHERN REGIONAL MAP ..................................................................................... 1

INTRODUCTION........................................................................................................ 2

NORTHERN EXPANSION 2017 – 2021 ....................................................................... 3

NORTHERN REHABILITATION 2017 – 2021 ............................................................... 5

Page 3: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHERN REGIONAL MAP

1

Page 4: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHERN HIGHWAYS PROGRAM 2017-2021

INTRODUCTION

Creating Jobs and Building a Stronger Ontario

In 2017/18, the Ontario government will be investing more than $2.5 billion to repair and expand provincial highways and bridges. This includes $630 million for Northern Ontario creating or sustaining 4,400 direct and indirect jobs. Improving Ontario's transportation network is part of the government’s plan to strengthen the economy.

2017/18 Planned Accomplishments Northern Ontario

Total New highways (lane kms) 22

Highways rehabilitated (centreline kms) 384

Bridges rehabilitated 23

The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

2

Page 5: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHERN EXPANSION 2017 – 2021

NORTHEASTERN ONTARIO EXPANSION 2017-2021†

Hwy Status Location Type of Work

Target Completion

Date

17 Planned New commuter parking lot, Root River, Sault Ste. Marie New commuter parking 2017

66 Underway Highway realignment at Virginiatown Realignment 2017

69 Planned North of Hwy 559 northerly Four-laning widening Beyond 2021

69 Planned South of Hwy 7182 northerly 5 km Four-laning widening Beyond 2021

69 Planned North Hwy 7182 (Shebeshegong Rd.) northerly, north of Nobel Four-laning widening Beyond 2021

69 Planned South junction of Hwy 529 northerly, Pointe au Baril Four-laning widening Beyond 2021

69 Planned South of north junction of Hwy 529 northerly, Pointe au Baril Station

Four-laning widening Beyond 2021

69 Planned Hwy 526 northerly, Britt Four-laning widening / New four-lane highway Beyond 2021

69 Underway CNR realignment, south of Hwy 522

Four-laning widening / New four-lane highway 2017

69 Underway North of Hwy 522 northerly, French River Four-laning widening 2020

69 Planned Hwy 69 connection to Sudbury southeast bypass Four-laning widening Beyond 2021

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

3

Page 6: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHWESTERN ONTARIO EXPANSION 2017-2021† Hwy Status Location Type of Work

Target Completion

Date

11/17 Underway 5.0 km west of Hwy 587 easterly, Thunder Bay to Nipigon Four-lane widening 2017

11/17 Planned Hwy 587 to Pearl Creek, Thunder Bay to Nipigon Four-lane widening 2020

11/17 Planned West of Ouimet CPR overhead to Dorion East Loop Road, Thunder Bay to Nipigon

Four-lane widening 2020

11/17 Planned Coughlin Rd. to East Junction of Hwy 582, Thunder Bay to Nipigon

Four-lane widening 2021

11/17 Planned Red Rock Rd. 9 to Coughlin Rd., Thunder Bay to Nipigon

Four-lane widening 2021

11/17 Underway Stillwater Creek to Red Rock Rd. 9, Thunder Bay to Nipigon Four-lane widening 2018

11/17 Underway Nipigon River Bridge and Approaches, Nipigon Four-lane widening 2018

17 Planned Manitoba/Ontario border easterly, west of Kenora Four-lane widening Beyond 2021

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

4

Page 7: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHERN REHABILITATION 2017 – 2021

NORTHEASTERN ONTARIO REHABILITATION 2017†

Hwy Status Location Type of Work

Project Length (km)

Target Completion

Date

6 Planned North of Hwy 542 northerly to 10 Mile Point Lookout, Manitowaning Resurfacing 24 2017

6, 17 Underway West of Hwy 6 easterly to Nairn Centre

Resurfacing / bridge rehabilitations 22 2017

11 Planned North of south junction Hwy 592 interchange at Novar northerly Resurfacing 8 2017

11 Underway Northbound lanes, south of Hwy 534 interchange, Powassan

Resurfacing / new bridge / new culverts / culvert replacement and rehabilitation

5 2017

11 Underway Hwy 11B/Lakeshore Dr. interchange northerly to south junction Hwy 17 interchange, North Bay

Resurfacing 7 2017

11 Planned Whitney Creek Culvert, south of Latchford Culvert replacement n/a 2017

11 Planned ONR overhead at Earlton Bridge rehabilitation n/a 2017

11 Underway South of Hwy 579, south of Cochrane Resurfacing 19 2017

11 Underway Kapuskasing to Opasatika

Resurfacing / bridge rehabilitation / culvert rehabilitation / culvert replacement

32 2017

11 Planned Opasatika River Bridge westerly, Opasatika

Resurfacing / culvert replacements 30 2017

11 Underway Nagagami River and Shekak River, west of Calstock Bridge replacements n/a 2018

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

5

Page 8: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHEASTERN ONTARIO REHABILITATION 2017†

Hwy Status Location Type of Work

Project Length (km)

Target Completion

Date

17, 101 Underway South of Hwy 101 northerly, Wawa

Resurfacing / culvert rehabilitation 33 2017

17 Underway North of Harmony Lake Bridge northerly, Sault Ste. Marie

Resurfacing / bridge rehabilitations / culvert rehabilitation

27 2018

17, 546 Planned Hwy 546 easterly, Iron Bridge to Blind River

Resurfacing /culvert replacements 24 2018

17 Underway Serpent River easterly to Cutler Resurfacing 11 2017

17 Underway West of Hwy 17/Municipal Rd. 55 interchange at Sudbury westerly

Resurfacing / bridge rehabilitations / culvert replacement

22 2019

17 Planned East junction Municipal Rd. 55 easterly to Hwy 535, Sudbury to Hagar

Resurfacing / bridge rehabilitations 39 2019

60 Underway Station Rd. easterly, Algonquin Park Resurfacing 14 2017

60 Underway Hwy 127 easterly, east of Whitney

Resurfacing / bridge and culvert rehabilitation / culvert replacements

19 2017

64 Planned Hwy 539 northerly, Field Resurfacing 12 2017

67 Planned North junction Hwy 11 easterly, Iroquois Falls Resurfacing 10 2018

69, 526, 529

Planned

Still River Bridge, north of Hwy 529, and Hwy 69 westerly, Britt and Naiscott River Bridge, CPR overhead, north of Pointe au Baril

Resurfacing / bridge rehabilitations 4 2018

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

6

Page 9: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHEASTERN ONTARIO REHABILITATION 2017†

Hwy Status Location Type of Work

Project Length (km)

Target Completion

Date

112, 650 Planned Blanche River Bridge, north Hwy

11, south of Kirkland Lake Bridge rehabilitation / culvert replacements n/a 2018

112 Planned Unnamed creek culvert, north of Tarzwell Culvert replacement n/a 2017

129 Underway South junction Hwy 101 southerly, south of Chapleau

Resurfacing / culvert replacements 27 2017

144, 7044 Underway

Whitson Creek, Vermillion River, CPR overhead, Chelmsford northerly

Bridge rehabilitation / bridge replacement / culvert replacements

n/a 2018

144 Underway Regional Rd. 12 northerly, Dowling

Resurfacing / culvert replacement 12 2017

144 Underway Kenetogami Creek, north of Hwy 661, Gogama Culvert replacement n/a 2017

144 Planned Hwy 101 southerly, west of Timmins Resurfacing 14 2017

400 Planned Healey Lake Rd. underpass northerly to north of Hwy 141 interchange, north of MacTier

Resurfacing 17 2017

519 Underway Hwy 17 easterly, Dubreuilville Resurfacing / culvert replacement 31 2017

540, 540B Underway West of Hwy 551, Kagawong

westerly

Resurfacing / bridge replacement / culvert replacements / culvert rehabilitations

18 2017

540 Planned Little Current westerly Resurfacing 18 2017

547 Underway Hawk Creek and McVeigh Creek Bridges, east of Wawa Bridge rehabilitations n/a 2017

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

7

Page 10: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHEASTERN ONTARIO REHABILITATION 2017†

Hwy Status Location Type of Work

Project Length (km)

Target Completion

Date

551 Underway Mindemoya Creek Bridge at Providence Bay Bridge replacement n/a 2017

560 Underway Opikinimika River Bridge, east of Hwy 560A, Westree Bridge replacement n/a 2017

634 Planned Hog Creek and three unnamed creeks, north of Hwy 11, north of Smooth Rock Falls

Culvert rehabilitations n/a 2017

637 Underway East of Killarney easterly to Massey Creek, west of Hwy 69

Reconstruction / culvert replacement 42 2017

639 Underway Christian Creek and Boland Creek Bridge, north of Elliot Lake

Bridge rehabilitation / culvert replacement n/a 2017

654 Underway Hwy 534 easterly to Hwy 11, Nipissing

Resurfacing / bridge rehabilitations 23 2017

7289, 7290 Planned Silver Lake and Blackstone River,

south of Horseshoe Lake Culvert rehabilitations n/a 2017

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

8

Page 11: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHWESTERN ONTARIO REHABILITATION 2017†

Hwy Status Location Type of Work

Project Length (km)

Target Completion

Date

11 Underway West of Barwick westerly including Bunting and Rainy River Culverts

Resurfacing / culvert replacements

26 2017

11 Underway Westovers, Dilke #1 and Ramsdale Creek Culverts, west of Fort Frances

Culvert replacements n/a 2018

11 Underway Noden Causeway, east of Fort Frances

Bridge rehabilitation n/a 2017

11 Underway Mine Centre easterly Resurfacing 21 2017

11 Underway Kemuel and Lerome Lakes, and Jackfish Creek Culverts, west of Atikokan

Culvert replacements n/a 2017

11 Underway Flood Creek West and East, Mills Creek, Caribus and Gagne Lake Culverts, near Atikokan

Culvert replacements n/a 2018

11 Underway Kaministiquia River Bridge at Kakabeka Falls

Bridge rehabilitation n/a 2017

11 Underway Watson and Norami Creek, and Postagoni River Culverts, near Beardmore

Culvert replacements n/a 2017

11 Underway Chowder and Sandlink Creek Culverts, near Longlac

Culvert replacements n/a 2017

11 Underway Flynne East and Chowder Creek East Culverts, east of Longlac

Culvert replacements n/a 2017

17 Underway Hwy 665 near Dryden westerly Resurfacing 19 2017

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

9

Page 12: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHWESTERN ONTARIO REHABILITATION 2017†

Hwy Status Location Type of Work

Project Length (km)

Target Completion

Date

17 Underway CPR overhead, west of Upsala Bridge rehabilitation n/a 2017

17 Underway

Raith and Sisson Creek and Savanne River Tributary Culverts, west of Shabaqua Corners

Culvert replacements n/a 2017

17 Underway Brule Creek and Oskondaga River Culverts, west of Thunder Bay

Culvert replacements n/a 2017

17 Underway Gravel River Bridge, east of Nipigon

Bridge replacement n/a 2017

17 Underway Pays Plat River Bridges, east of Nipigon

Bridge replacements n/a 2017

17 Underway Schreiber westerly Reconstruction 19 2018

17 Underway Sawmill Creek Culvert, east of Terrace Bay

Culvert replacement n/a 2017

17 Underway McKellar and Ripple Creek Culverts, Phase 1, west of Marathon

Culvert rehabilitations n/a 2017

17 Underway Little Pic River Bridge, west of Marathon

Bridge Rehabilitation n/a 2019

17 Underway Pic River Bridge, east of Marathon

Bridge replacement n/a 2017

61 Underway Jarvis and Slate River Culverts, south of Thunder Bay

Culvert replacements n/a 2017

71 Underway North of Sioux Narrows southerly Resurfacing 25 2017

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

10

Page 13: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHWESTERN ONTARIO REHABILITATION 2017†

Hwy Status Location Type of Work

Project Length (km)

Target Completion

Date

72 Underway Moose Creek Bridge, south of Sioux Lookout

Bridge replacement n/a 2018

105, 17 Underway Vermilion Bay northerly and Hwy 17, east of Vermilion Bay Resurfacing 32 2017

130 Underway Hwy 61 northerly, west of Thunder Bay Resurfacing 16 2017

502 Underway 66 km north of Hwy 11 northerly, south of Dryden Resurfacing 39 2018

516 Underway Mills Creek Culvert, east of Sioux Lookout

Culvert replacement n/a 2017

516, 642 Underway Deception Lake and Minnikau River Culverts, north and east of Sioux Lookout

Culvert replacements n/a 2017

527, 811 Planned

Eaglehead River, Trans Canada Pipeline and Little Max Creek Culverts on Highway 527, Heaven and Grew Creek Culverts on Highway 811, north of Thunder Bay

Culvert replacements n/a 2018

588, 590 Underway

Hwy 590, Cedar, Whitewood, and Pitch Creek Culverts and Hwy 588, south of Kakabeka Falls

Reconstruction / culvert replacements

30 2018

595 Underway Sitch and Cedar Creek Culverts, west of Thunder Bay

Culvert replacements n/a 2017

596 Underway Alice Creek Culvert, south of Minaki

Culvert replacement n/a 2017

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

11

Page 14: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHWESTERN ONTARIO REHABILITATION 2017†

Hwy Status Location Type of Work

Project Length (km)

Target Completion

Date

599 Underway

Albany River (Osnaburgh, Mainflow, Overflow) Bridges, south of Pickle Lake, at Mishkeegogamang First Nation

Bridge rehabilitation n/a 2018

599 Planned

Asinn Creek, Graystone Lake, Savant Lake, Wiggle Creek, Little Pashkokogan River Culverts, north of Ignace

Culvert replacements n/a 2018

602 Underway Rainy River Tributary Culvert #2, west of Fort Frances

Culvert replacement n/a 2017

603 Underway Melgund Creek Culvert, north of Hwy 17 near Dryden

Culvert replacement n/a 2017

614 Underway Black River Bridge, north of Hwy 17, Manitouwadge

Bridge rehabilitation n/a 2017

614 Underway Chicken Farm Creek Culvert, south of Manitouwadge

Culvert replacement n/a 2017

618 Underway Hwy 105 near Red Lake southerly Reconstruction 12 2017

619, 621 Underway Gerhard, Peterson and Brusvine Creek Culverts, north of Rainy River

Culvert replacements n/a 2017

622 Underway Moose Creek Culvert, north of Atikokan

Culvert replacement n/a 2017

627 Underway Camp Creek Culvert, north of Heron Bay

Culvert replacement n/a 2017

642 Underway Sturgeon River Bridge, east of Sioux Lookout

Bridge rehabilitation n/a 2018

658 Underway Hwy 17A northerly, north of Kenora Reconstruction 25 2017

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

12

Page 15: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHWESTERN ONTARIO REHABILITATION 2017†

Hwy Status Location Type of Work

Project Length (km)

Target Completion

Date

11, 602 Underway Kitchen, Turner and Lyon Creek Culverts, west of Fort Frances

Culvert replacements n/a 2017

11, 71, 617 Planned

Dilke, Sims, Maximillian, Toby Creeks and Pinewood River Tributary Culverts, west of Fort Frances

Culvert rehabilitations / replacements

n/a 2019

7047 Planned Hewitson Creek Bridge, east of Rossport

Bridge replacement n/a 2017

Nungesser Rd. Underway Pinder and South Berens Creek

Culverts, north of Red lake Culvert replacements n/a 2017

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

13

Page 16: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHEASTERN ONTARIO REHABILITATION 2018†

Hwy Location Type of Work

Project Length (km)

Target Completion

Date

6 South Baymouth ferry northerly north of Hwy 542 Resurfacing 24 2018

6 Little Current southerly Resurfacing / culvert rehabilitation 20 2018

11 Wildlife detection system, south of Callander

Wildlife detection system 4 2018

11, 654 South of Hwy 654 interchange northerly to Hwy 11B/Lakeshore Dr. interchange, Callander northerly

Resurfacing 11 2018

11 Calamity Creek Culvert, north of Hwy 11B, New Liskeard Culvert replacement n/a 2019

11 Groundhog River Bridge, Fauquier Bridge and culvert replacement n/a 2020

11, 581 East Lilly Creek Bridge and Culvert, west and north of Moonbeam

Bridge replacement / culvert replacement n/a 2018

11 West of Hwy 631, west of Calstock Culvert replacements n/a 2019

17 Hwy 631 easterly, White River Resurfacing 59 2018

17 East of Hwy 6 easterly, Nairn Centre easterly

Reconstruction / culvert replacement 20 2018

17 CPR overhead, west of Hwy 537, Coniston Bridge rehabilitation n/a 2019

17 Corsol Rd. easterly, Sturgeon Falls Resurfacing 0.4 2018

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

14

Page 17: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHEASTERN ONTARIO REHABILITATION 2018†

Hwy Location Type of Work

Project Length (km)

Target Completion

Date

17 West of Hwy 17B, west of North Bay Culvert replacement n/a 2018

17 Hwy 17 and Hwy 94, Corbeil Intersection improvement 4 2018

17, 533 Roundabout repairs at Hwy 17/533, Mattawa Resurfacing 0.2 2018

17B Bar River Rd. to Sault Ste. Marie southeast limits Resurfacing 21 2018

17B Duchesnay Creek Bridge, CNR overhead, North Bay

Resurfacing / bridge replacement / bridge removal

1 2019

60 Hwy 127 westerly, Whitney Resurfacing 27 2018

64 Hwy 69 easterly to Hwy 528, west of Noelville

Reconstruction / culvert replacements / culvert rehabilitation

18 2018

65 Makobe River Bridge, east of Elk Lake Bridge replacement n/a 2019

94 Hwy 654 westerly, south CNR overhead, Hwy 94/CNR underpass, Burford Creek, Callander

Resurfacing / bridge rehabilitation / bridge removal/culvert rehabilitation

3 2018

129, 556

Hwy 129 Wenebegon River Culvert, north of Hwy 556 and Hwy 556 Structures at Ranger Lake

Bridge rehabilitations / culvert rehabilitations / culvert replacement

n/a 2018

141 Shadow River Bridge, west of Hwy 632, west of Rosseau Bridge replacement n/a 2019

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

15

Page 18: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHEASTERN ONTARIO REHABILITATION 2018†

Hwy Location Type of Work

Project Length (km)

Target Completion

Date

144 Municipal Rds. 35 and 15 northerly, Chelmsford Resurfacing 5 2018

520, 7162, 7188

Ontario St. westerly, Burk's Falls Resurfacing / culvert replacements 7 2018

522, 522B

Hwy 11 and McFadden Line interchange westerly, Trout Creek

Resurfacing / bridge replacement 5 2018

537 Jumbo Creek, south of Hwy 17, south of Wahnapitae

Reconstruction / culvert replacement 1 2018

542 Bluejay Creek, south of Sandfield Culvert replacements n/a 2018

560 Michiwakenda Lake Culvert, east of Shinning Tree Culvert replacement n/a 2018

577 Driftwood River Bridge, north of Shillington Bridge replacement n/a 2019

592 Little East River Bridges, north of Hwy 11, Novar Bridge replacements n/a 2020

652 Five bridge replacements, north of Cochrane Bridge replacements n/a 2019

7300 Sagamok Access Rd., south of Massey Reconstruction 5 2018

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

16

Page 19: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHWESTERN ONTARIO REHABILITATION 2018†

Hwy Location Type of Work

Project Length (km)

Target Completion

Date

11 Rainy River International Bridge between Rainy River, Ontario and Baudette, Minnesota

Bridge replacement n/a 2020

11 Shabaqua Corners westerly Resurfacing 58 2018

11 Shamrock Centre Culvert, north of Nipigon Culvert rehabilitation n/a 2019

11 Keemle Lake Culvert, north of Nipigon Culvert rehabilitation n/a 2018

11 Mignet Creek, Indian Bay and Mission Bay Culverts, north of Nipigon

Culvert replacements n/a 2018

11 Geraldton easterly to Longlac Resurfacing 33 2018

17 East of Manitoba/Ontario Boundary, Rest Area

Rest Area Improvements n/a 2018

17

McKenzie Creek, Moose Creek and Dinorwic Lake Culverts near Dryden and Chadwick Lake Culvert, east of Kenora

Culvert replacements n/a 2019

17 Hwy 72 at Dinorwic easterly Resurfacing 25 2018

17 Revell River curve realignment, west of Ignace Realignment 4 2019

17 McKellar and Ripple Creek Culverts, Phase 2, west of Marathon

Culvert rehabilitations n/a 2018

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

17

Page 20: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHWESTERN ONTARIO REHABILITATION 2018†

Hwy Location Type of Work

Project Length (km)

Target Completion

Date

17 West of Rossport westerly Reconstruction / truck climbing lane 21 2019

17 Prairie River Bridge, east of Terrace Bay Bridge rehabilitation n/a 2018

17 White Lake Narrows Bridge, east of Marathon Bridge rehabilitation n/a 2019

61 Rosslyn Road and CPR overheads and CNR subways (North and South), Thunder Bay

Bridge rehabilitations n/a 2018

105 Ear Falls northerly Resurfacing 30 2018

527 North and South Current River Culverts, north of Thunder Bay Culvert replacements n/a 2018

584 Murky Creek Bridge, north of Geraldton Bridge replacement n/a 2018

599 Kekwanzik Lake, Agimac and Pratt Creek Culverts, north of Ignace Culvert replacements n/a 2018

599 Cobb Bay, Tug and Mile Creek Culverts, north of Ignace Culvert replacements n/a 2018

617 Pinewood River Bridge, north of Stratton Bridge replacement n/a 2018

643 Hwy 584 westerly to Aroland First Nation Reconstruction 20 2018

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

18

Page 21: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHWESTERN ONTARIO REHABILITATION 2018†

Hwy Location Type of Work

Project Length (km)

Target Completion

Date

11, 622, 623

East of Atikokan easterly including Niobe Lake Culvert and Hwy 622 and Hwy 623

Resurfacing / culvert replacement 43 2019

72, 642, 664

Finlayson Creek, Sam and Aubrey Lake Culverts, south of Sioux Lookout

Culvert replacements n/a 2019

588, 595 Sitch, Sitch #1 and Whitewood Creek Culverts, south of Kakabeka Falls

Culvert replacements n/a 2019

NORT Rd. Central Patricia northerly including the Badesdawa River Bridge

Reconstruction / bridge replacement 63 2019

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

19

Page 22: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHEASTERN ONTARIO REHABILITATION 2019-2021†

Hwy Location Type of Work

Project Length (km)

6, 7041

Little Current Swing Bridge northerly, Little Current Resurfacing 17

11 North of Station Rd. northerly to north of Hwy 518 interchange, Scotia Resurfacing 6

11, 124 South River to Trout Creek Resurfacing / culvert

rehabilitation 12

11 Hwy 522 interchange northerly Hwy 522B interchange, Trout Creek Resurfacing 6

11, 17 North Bay Bypass, North Bay Resurfacing 4

11 North junction Hwy 17/11B northerly, North Bay

Resurfacing / culvert replacement 7

11 North of north junction Hwy 17/11B northerly, north of North Bay Resurfacing 10

11 Montreal River Bridge at Latchford, Phase 2 Bridge rehabilitation n/a

11 North junction of Hwy 65 northerly to Hwy 569, north of New Liskeard Reconstruction 11

11 Crooked Creek Bridge, south of Kenogami Lake Bridge rehabilitation n/a

11 North of Hwy 570 to east junction Hwy 101, Ramore

Resurfacing / culvert rehabilitation and replacement

24

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

20

Page 23: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHEASTERN ONTARIO REHABILITATION 2019-2021†

Hwy Location Type of Work

Project Length (km)

11, 101 West of Matheson easterly to Hwy 572

Resurfacing / bridge rehabilitations / culvert rehabilitation

21

11 West junction Hwy 101 northerly, Nellie Lake southerly Resurfacing 34

11, 655

Hwy 11 west of Cochrane easterly and Hwy 655 south of Hwy 11 southerly, south of Driftwood

Resurfacing 17

11, 652 Cochrane to Driftwood Resurfacing / culvert

replacements 30

11 Mattagami River Bridge at Smooth Rock Falls and Moonbeam Creek Culvert, east of Moonbeam

Bridge rehabilitation / culvert replacement n/a

11, 583, 663

East of Hwy 631 to Hwy 663, Calstock and Ste. Therese Creek north and south, unnamed creek, north of Hearst

Resurfacing / culvert rehabilitations / culvert replacements

5

11 Fraser River Bridge and various culverts, west Hwy 631, west of Hearst

Bridge rehabilitations / culvert rehabilitation / culvert replacements

n/a

17 Coldwater River Bridge, north of Montreal River Bridge steel coating n/a

17 Sand River and Barrett River Bridges south of Wawa and Alona Bay Culvert, south of Montreal River

Bridge rehabilitations / culvert rehabilitation n/a

17, 552 Sault Ste. Marie to Heyden Resurfacing / culvert

rehabilitations 8

17 Garden River to Echo Bay Resurfacing 13

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

21

Page 24: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHEASTERN ONTARIO REHABILITATION 2019-2021†

Hwy Location Type of Work

Project Length (km)

17 Echo River Rd. easterly to Bar River Rd., Echo Bay Resurfacing 12

17, 548, 638

Hwy 17 Bruce Mines easterly, Hwy 638 Thessalon River Bridge, north of Hwy 670, Ophir and Hwy 548 at Richards Landing

Resurfacing / bridge rehabilitation / culvert replacement

18

17, 546 Thessalon to Iron Bridge Resurfacing / culvert

replacements 34

17, 538

CPR subway and Lauzon Creek, east of Blind River

Bridge rehabilitation / culvert replacement n/a

17 4 km west of Hwy 553, west of Massey Culvert replacement n/a

17 Hwy 553 easterly, Massey easterly Resurfacing / culvert rehabilitation 22

17 Hwy 69 interchange westerly, Sudbury Resurfacing / bridge rehabilitation 12

17 Junction Creek Bridge, east of Municipal Rd. 55 interchange, Sudbury Bridge rehabilitation n/a

17 West of north junction of Hwy 11/17 westerly, west of North Bay

Resurfacing / bridge replacement / bridge rehabilitation / culvert rehabilitation

18

63 North of Hwy 533 northerly to Ontario/Quebec Boundary

Resurfacing / bridge rehabilitations / culvert rehabilitation

23

64, 535 North of Hwy 64 northerly, north of Noelville Resurfacing / culvert

rehabilitation 6

64 North of Hwy 535, Lavigne southerly Resurfacing / bridge rehabilitation 17

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

22

Page 25: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHEASTERN ONTARIO REHABILITATION 2019-2021†

Hwy Location Type of Work

Project Length (km)

64 North of Hwy 539 to Hwy 11, Marten River southerly

Resurfacing / bridge rehabilitations / culvert rehabilitation

23

65, 566

Montreal River Bridges, west and east of Matachewan

Bridge rehabilitation / bridge replacement n/a

65, 560

East junction Hwy 560 Elk Lake to east of Hwy 562 Resurfacing 48

65 Blanche River and Wright Creek Bridges, west of Ontario/Quebec Boundary Bridge steel coating n/a

66 Hwy 566 easterly, east of Matachewan Resurfacing 16

66 Kirkland Lake easterly to west of Hwy 624 Resurfacing / bridge rehabilitations 23

69 Naiscoot Lake and Harris River, north of Pointe au Baril Station

Bridge replacement / culvert rehabilitation n/a

69 Magnetawan River Bridge, Byng Inlet Bridge rehabilitation n/a

69 North of Estaire Rd. interchange northerly, Sudbury Resurfacing 6

101, 651

Hwy 651 Ogasiwi River and Windermere River Bridges south of Dalton and Hwy 101 Big Pine Lake Culvert, west of Chapleau

Bridge rehabilitations / culvert replacement n/a

101, 129

Sideburned, Nemegosenda, Nebskawashi Bridges, Chapleau

Bridge rehabilitation / bridge replacements n/a

101, 7172 West of Hwy 144 easterly, east of Foleyet Resurfacing / bridge and

culvert replacement 11

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

23

Page 26: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHEASTERN ONTARIO REHABILITATION 2019-2021†

Hwy Location Type of Work

Project Length (km)

101 Nat River Bridge, east of Foleyet Bridge rehabilitation n/a

101 ONR crossing easterly, Timmins Resurfacing 23

101 Anthony Creek, Unknown Creek, Shillington Creek, west of Hwy 11, Shillington Culvert replacements n/a

124 Hwy 400 easterly, Parry Sound to McKellar Resurfacing / culvert rehabilitation 20

127 Hwy 60 southerly, Whitney southerly Resurfacing 22

129, 546, 554

Hwy 546, Hwy 554 and Hwy 129 northerly, Iron Bridge northerly

Resurfacing / culvert rehabilitations / culvert replacement

27

129 Gravel River, Snowshoe Creek and Missisagi River Bridges, east of Ranger Lake Bridge rehabilitations n/a

129 South of Hwy 667 southerly, south of Chapleau

Resurfacing / culvert replacements 22

141, 518 Hwy 400 easterly to west of Orrville

Resurfacing / bridge rehabilitation / culvert replacement

14

144 Hwy 144 and Municipal Rds. 15 and 35, Chelmsford Intersection improvement n/a

144 Windy Creek Culvert, west of Hwy 144 north of Onaping Falls Culvert rehabilitation n/a

144 North of Hwy 560 northerly to Hwy 661, Gogama Resurfacing 22

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

24

Page 27: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHEASTERN ONTARIO REHABILITATION 2019-2021†

Hwy Location Type of Work

Project Length (km)

144 North of Hwy 661 northerly, Gogama northerly Resurfacing 21

144 North of Hwy 661 northerly, north of Gogama Resurfacing 28

400 North of Hwy 141 interchange northerly, south of Parry Sound

Resurfacing / culvert rehabilitations 15

522 ESS Narrows Bridge, east of Hwy 69, west of Loring Bridge rehabilitation n/a

523 Moore Creek Bridge, south of Madawaska Bridge rehabilitation / culvert replacement n/a

524 Commanda Creek Bridge, northwest of Commanda Bridge replacement n/a

532, 556

Achigan Creek, Beaver Creek, Silver Creek, Atkinson Creek and Dam Creek, Searchmont

Bridge replacement / culvert replacement / culvert rehabilitations

n/a

539, 539A

Hwy 539 Warren to Field and Hwy 539A River Valley northerly

Resurfacing / culvert replacements 42

540, 542

Indian Point Bridge, Manitou River Bridge, Manitoulin Island Bridge rehabilitations n/a

540 West of Hwy 551 easterly, Kagawong easterly Resurfacing 27

546 Kindiogami River, Camp 8 Creek and Little White River Bridges, west and east of Hwy 639, north of Elliot Lake

Bridge rehabilitations / bridge replacement n/a

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

25

Page 28: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHEASTERN ONTARIO REHABILITATION 2019-2021†

Hwy Location Type of Work

Project Length (km)

548 Richardson Creek Bridge, north of Kentville, St. Joseph Island Bridge replacement n/a

548 St. Joseph Island Skyway, St. Joseph Island Resurfacing / bridge rehabilitation 1

550, 565 Sault Ste. Marie westerly to Gros Cap Resurfacing 11

553, 810

River aux Sables Bridges and Cameron Creek Bridge, north Hwy 17, Massey Bridge replacements n/a

564 Boston Creek Bridge, Boston Creek Bridge replacement n/a

569 Blanche River Bridge at Hilliardton Bridge replacement n/a

572 Pike River Bridge, north of Holtyre Bridge replacement / culvert replacement n/a

577 Driftwood River Bridge, south of Monteith Bridge rehabilitation n/a

579, 668

Deception Creek, Smith Creek, Gilles Creek Bridges, north of Cochrane Bridge replacements n/a

592 CNR overhead Bridge and Ragged Creek Bridge, north of Novar Bridge replacements n/a

631

Negagamisis Narrows Bridge, West Beaton River Bridge and Shekak River Bridge, Hornepayne Creek Culvert, north and south of Hornepayne

Bridge rehabilitations / bridge replacement / culvert replacement

n/a

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

26

Page 29: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHEASTERN ONTARIO REHABILITATION 2019-2021†

Hwy Location Type of Work

Project Length (km)

637 Nobel St. westerly, Killarney Reconstruction 1

637 Wanapitei River and Wolf Creek, east of Killarney Bridge rehabilitations n/a

638 Thessalon River Bridge at Rydal Bank Bridge replacement n/a

7300 Spanish River Bridge in Massey Bridge rehabilitation n/a

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

27

Page 30: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHWESTERN ONTARIO REHABILITATION 2019-2021†

Hwy Location Type of Work

Project Length (km)

11 Sturgeon River Bridge, west of Emo Bridge replacement n/a

11 Windy Point Bridge, east of Fort Frances Bridge rehabilitation n/a

11 Hwy 502 easterly, east of Fort Frances Resurfacing 36

11 Bear Passage Bridge, east of Fort Frances Bridge replacement n/a

11 Manitou Creek Culvert, west of Emo Culvert replacement n/a

11 West of Atikokan westerly Resurfacing 22

11 Atikokan westerly Resurfacing 16

11 Seine River Bridge, west of Atikokan Bridge rehabilitation n/a

11 Rossmere and Wawiag Creek Culverts, west of Shebandowan Culvert replacements n/a

11 Kashabowie River Bridge, west of Shebandowan Bridge replacement n/a

11 Matawin River Bridge, west of Kakabeka Falls Bridge rehabilitation n/a

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

28

Page 31: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHWESTERN ONTARIO REHABILITATION 2019-2021†

Hwy Location Type of Work

Project Length (km)

11 Kakabeka Falls westerly Resurfacing 17

11 Hwy 61 westerly, west of Thunder Bay Resurfacing 12

11 CNR overhead Paipoonge, west of Thunder Bay Bridge rehabilitation n/a

11 CPR overhead Shuniah, east of Thunder Bay Bridge rehabilitation n/a

11 Nipigon northerly Resurfacing 50

11 Camproad and Gorge Creek Culverts, north of Nipigon Culvert replacements n/a

11 East of Beardmore easterly Resurfacing 28

11 Nissiamkikan Creek Culverts, east of Beardmore Culvert replacements n/a

11 Kenogamisis Lake Bridge West Narrows, east of Geraldton Bridge rehabilitation n/a

11 Phipps Lake and Rockyshore Creek Culverts, east of Longlac Culvert replacements n/a

11 Hoiles Creek Bridge easterly, east of Longlac Rehabilitation 26

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

29

Page 32: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHWESTERN ONTARIO REHABILITATION 2019-2021†

Hwy Location Type of Work

Project Length (km)

11 Hoiles Creek Bridge, east of Longlac Bridge rehabilitation n/a

11 North Pagwachuan River Bridge, east of Longlac Bridge rehabilitation n/a

11 Thunder Bay/Cochrane District boundary westerly, east of Longlac Resurfacing 20

17 CPR overhead at Dinorwic Bridge rehabilitation n/a

17 West of English River westerly Resurfacing 19

17 Revell River Bridge, west of Ignace Bridge rehabilitation n/a

17 West of Upsala westerly Resurfacing 19

17 West of Raith westerly Rehabilitation 19

17 West of Shabaqua Corners westerly Resurfacing 27

17 Dublin and Fire Hill Creek Culverts, east of Nipigon Culvert replacements n/a

17 Rossport westerly Reconstruction / truck climbing lanes 7

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

30

Page 33: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHWESTERN ONTARIO REHABILITATION 2019-2021†

Hwy Location Type of Work

Project Length (km)

17 MacLean Creek Culvert, west of Schreiber Culvert replacement n/a

17 Aguasabon River Bridge, Terrace Bay Bridge rehabilitation n/a

17 Blackbird Creek Culvert #2, near Terrace Bay Culvert replacement n/a

17 Mink, Dead Horse and Hare Creek Culverts, west of Marathon Culvert replacement n/a

17 Wabikoba Creek Bridge, west of White River Bridge rehabilitation n/a

17 Dunc Lake, Alder Creek East and Angler Creek Culverts, east of Marathon

Culvert replacements n/a

17 Bertrand Creek and West White River Bridges, west of White River Bridge rehabilitations n/a

17 White River Bridge (Bremner), west of White River Bridge rehabilitation n/a

17A Winnipeg River East and West Bridges and Ritchie Road overhead, north of Kenora

Bridge rehabilitations n/a

17A North of Kenora Resurfacing 35

61 North of Canada/USA border northerly Resurfacing 19

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

31

Page 34: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHWESTERN ONTARIO REHABILITATION 2019-2021†

Hwy Location Type of Work

Project Length (km)

71 Hwy 11 northerly, west of Emo Reconstruction 26

71 Rushing River, Reed Narrows, and Berry Creek Bridges, north of Sioux Narrows

Bridge replacement / rehabilitations n/a

72 South of Sioux Lookout southerly Resurfacing 25

72 CNR overhead, Sioux Lookout Bridge rehabilitation n/a

102 CNR and CPR overheads, west of Thunder Bay Bridge rehabilitations n/a

102 McIntyre and Shebandowan Creek Culverts, west of Thunder Bay Culvert replacements n/a

105 Sandy Creek Culvert, north of Ear Falls Culvert replacement n/a

125 Chukuni River Bridge, east of Red Lake Bridge rehabilitation n/a

130 Kaministiquia River Bridge, west of Thunder Bay Bridge rehabilitation n/a

502 Hwy 11 northerly, east of Fort Frances Resurfacing 29

502 Crowrock Inlet Bridge, east of Fort Frances Bridge rehabilitation n/a

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

32

Page 35: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHWESTERN ONTARIO REHABILITATION 2019-2021†

Hwy Location Type of Work

Project Length (km)

502 South of Dryden southerly Resurfacing 37

516 Marchington River Bridge, east of Sioux Lookout Bridge rehabilitation n/a

527 Hwy 11/17 northerly, north of Thunder Bay Resurfacing 40

527 72 km north of Hwy 11/17 northerly, north of Thunder Bay Reconstruction 26

527 Wabikon Creek and Waweig Lake Culverts, north of Thunder Bay Culvert replacements n/a

527 Max Creek, Rousseau and Rinker Lake Culverts, north of Thunder Bay Culvert replacements n/a

584 North of Geraldton northerly Resurfacing 27

588 Kaministiquia River Bridges (north and south channel), west of Thunder Bay Bridge rehabilitation n/a

589 North of Hwy 102 northerly to north of Lappe Resurfacing 11

590 Cedar Creek Culvert #2, west of Kakabeka Falls Culvert replacement n/a

599 Hwy 17 northerly, north of Ignace Reconstruction 33

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

33

Page 36: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHWESTERN ONTARIO REHABILITATION 2019-2021†

Hwy Location Type of Work

Project Length (km)

599 Hwy 642 northerly, north of Silver Dollar Reconstruction 41

599 English River Bridge, north of Ignace Bridge rehabilitation n/a

599 Crystal River Bridge, north of Ignace Bridge rehabilitation n/a

599 14 km north of Wiggle Creek Culvert northerly to Little Pashkokogan River Culvert, north of Savant Lake

Reconstruction 38

599 Little Pashkokogan River Culvert northerly to South Limits of Mishkeegogamang First Nation

Reconstruction 30

599 South Limits of Mishkeegogamang First Nation northerly Reconstruction 35

599 North Limits of Mishkeegogamang First Nation northerly to Central Patricia

Reconstruction 24

602 LaVallee River Bridge, south of Emo Bridge replacement n/a

622 Anderson Dam and Atikokan River Bridges, north of Atikokan Bridge rehabilitations n/a

622 Big Turtle and Little Turtle River Bridges, north of Atikokan Bridge rehabilitations n/a

627 Pic River Bridge, east of Marathon Bridge replacement n/a

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

34

Page 37: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

NORTHWESTERN ONTARIO REHABILITATION 2019-2021†

Hwy Location Type of Work

Project Length (km)

641 Louise Lake Culvert, north of Hwy 17A, Kenora Culvert replacement n/a

658 Black Sturgeon River Bridge, north of Kenora Bridge rehabilitation n/a

72, 664 Sioux Lookout southerly and Hwy 664 to Hudson Resurfacing 23

811 Mooseland River Bridge, west of Hwy 527, north of Thunder Bay Bridge rehabilitation n/a

Flanders Rd. Namakan River Bridges, south of Hwy 11, south of Atikokan

Bridge rehabilitation / replacement n/a

Nungesser Rd. Bak Creek Bridge, north of Red Lake Bridge replacement n/a

Nungesser Rd. Alweli Creek Bridge, north of Red Lake Bridge rehabilitation n/a

NORT Rd. Crow River Bridge, north of Central Patricia Bridge rehabilitation n/a

NORT Rd. Otoskwin River Bridge, north of Central Patricia Bridge replacement n/a

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

35

Page 38: Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM 2017-2021 INTRODUCTION Creating Jobs and Building a Stronger Ontario . In 2017/18, the

Published 2017 ISSN 1913-4568