Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM...
Transcript of Northern Highways Program - Ontario Ministry of Transportation · NORTHERN HIGHWAYS PROGRAM...
Northern Highways Program
2017-2021
Ministry of Northern Development and Mines
TABLE OF CONTENTS
NORTHERN REGIONAL MAP ..................................................................................... 1
INTRODUCTION........................................................................................................ 2
NORTHERN EXPANSION 2017 – 2021 ....................................................................... 3
NORTHERN REHABILITATION 2017 – 2021 ............................................................... 5
NORTHERN REGIONAL MAP
1
NORTHERN HIGHWAYS PROGRAM 2017-2021
INTRODUCTION
Creating Jobs and Building a Stronger Ontario
In 2017/18, the Ontario government will be investing more than $2.5 billion to repair and expand provincial highways and bridges. This includes $630 million for Northern Ontario creating or sustaining 4,400 direct and indirect jobs. Improving Ontario's transportation network is part of the government’s plan to strengthen the economy.
2017/18 Planned Accomplishments Northern Ontario
Total New highways (lane kms) 22
Highways rehabilitated (centreline kms) 384
Bridges rehabilitated 23
The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
2
NORTHERN EXPANSION 2017 – 2021
NORTHEASTERN ONTARIO EXPANSION 2017-2021†
Hwy Status Location Type of Work
Target Completion
Date
17 Planned New commuter parking lot, Root River, Sault Ste. Marie New commuter parking 2017
66 Underway Highway realignment at Virginiatown Realignment 2017
69 Planned North of Hwy 559 northerly Four-laning widening Beyond 2021
69 Planned South of Hwy 7182 northerly 5 km Four-laning widening Beyond 2021
69 Planned North Hwy 7182 (Shebeshegong Rd.) northerly, north of Nobel Four-laning widening Beyond 2021
69 Planned South junction of Hwy 529 northerly, Pointe au Baril Four-laning widening Beyond 2021
69 Planned South of north junction of Hwy 529 northerly, Pointe au Baril Station
Four-laning widening Beyond 2021
69 Planned Hwy 526 northerly, Britt Four-laning widening / New four-lane highway Beyond 2021
69 Underway CNR realignment, south of Hwy 522
Four-laning widening / New four-lane highway 2017
69 Underway North of Hwy 522 northerly, French River Four-laning widening 2020
69 Planned Hwy 69 connection to Sudbury southeast bypass Four-laning widening Beyond 2021
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
3
NORTHWESTERN ONTARIO EXPANSION 2017-2021† Hwy Status Location Type of Work
Target Completion
Date
11/17 Underway 5.0 km west of Hwy 587 easterly, Thunder Bay to Nipigon Four-lane widening 2017
11/17 Planned Hwy 587 to Pearl Creek, Thunder Bay to Nipigon Four-lane widening 2020
11/17 Planned West of Ouimet CPR overhead to Dorion East Loop Road, Thunder Bay to Nipigon
Four-lane widening 2020
11/17 Planned Coughlin Rd. to East Junction of Hwy 582, Thunder Bay to Nipigon
Four-lane widening 2021
11/17 Planned Red Rock Rd. 9 to Coughlin Rd., Thunder Bay to Nipigon
Four-lane widening 2021
11/17 Underway Stillwater Creek to Red Rock Rd. 9, Thunder Bay to Nipigon Four-lane widening 2018
11/17 Underway Nipigon River Bridge and Approaches, Nipigon Four-lane widening 2018
17 Planned Manitoba/Ontario border easterly, west of Kenora Four-lane widening Beyond 2021
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
4
NORTHERN REHABILITATION 2017 – 2021
NORTHEASTERN ONTARIO REHABILITATION 2017†
Hwy Status Location Type of Work
Project Length (km)
Target Completion
Date
6 Planned North of Hwy 542 northerly to 10 Mile Point Lookout, Manitowaning Resurfacing 24 2017
6, 17 Underway West of Hwy 6 easterly to Nairn Centre
Resurfacing / bridge rehabilitations 22 2017
11 Planned North of south junction Hwy 592 interchange at Novar northerly Resurfacing 8 2017
11 Underway Northbound lanes, south of Hwy 534 interchange, Powassan
Resurfacing / new bridge / new culverts / culvert replacement and rehabilitation
5 2017
11 Underway Hwy 11B/Lakeshore Dr. interchange northerly to south junction Hwy 17 interchange, North Bay
Resurfacing 7 2017
11 Planned Whitney Creek Culvert, south of Latchford Culvert replacement n/a 2017
11 Planned ONR overhead at Earlton Bridge rehabilitation n/a 2017
11 Underway South of Hwy 579, south of Cochrane Resurfacing 19 2017
11 Underway Kapuskasing to Opasatika
Resurfacing / bridge rehabilitation / culvert rehabilitation / culvert replacement
32 2017
11 Planned Opasatika River Bridge westerly, Opasatika
Resurfacing / culvert replacements 30 2017
11 Underway Nagagami River and Shekak River, west of Calstock Bridge replacements n/a 2018
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
5
NORTHEASTERN ONTARIO REHABILITATION 2017†
Hwy Status Location Type of Work
Project Length (km)
Target Completion
Date
17, 101 Underway South of Hwy 101 northerly, Wawa
Resurfacing / culvert rehabilitation 33 2017
17 Underway North of Harmony Lake Bridge northerly, Sault Ste. Marie
Resurfacing / bridge rehabilitations / culvert rehabilitation
27 2018
17, 546 Planned Hwy 546 easterly, Iron Bridge to Blind River
Resurfacing /culvert replacements 24 2018
17 Underway Serpent River easterly to Cutler Resurfacing 11 2017
17 Underway West of Hwy 17/Municipal Rd. 55 interchange at Sudbury westerly
Resurfacing / bridge rehabilitations / culvert replacement
22 2019
17 Planned East junction Municipal Rd. 55 easterly to Hwy 535, Sudbury to Hagar
Resurfacing / bridge rehabilitations 39 2019
60 Underway Station Rd. easterly, Algonquin Park Resurfacing 14 2017
60 Underway Hwy 127 easterly, east of Whitney
Resurfacing / bridge and culvert rehabilitation / culvert replacements
19 2017
64 Planned Hwy 539 northerly, Field Resurfacing 12 2017
67 Planned North junction Hwy 11 easterly, Iroquois Falls Resurfacing 10 2018
69, 526, 529
Planned
Still River Bridge, north of Hwy 529, and Hwy 69 westerly, Britt and Naiscott River Bridge, CPR overhead, north of Pointe au Baril
Resurfacing / bridge rehabilitations 4 2018
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
6
NORTHEASTERN ONTARIO REHABILITATION 2017†
Hwy Status Location Type of Work
Project Length (km)
Target Completion
Date
112, 650 Planned Blanche River Bridge, north Hwy
11, south of Kirkland Lake Bridge rehabilitation / culvert replacements n/a 2018
112 Planned Unnamed creek culvert, north of Tarzwell Culvert replacement n/a 2017
129 Underway South junction Hwy 101 southerly, south of Chapleau
Resurfacing / culvert replacements 27 2017
144, 7044 Underway
Whitson Creek, Vermillion River, CPR overhead, Chelmsford northerly
Bridge rehabilitation / bridge replacement / culvert replacements
n/a 2018
144 Underway Regional Rd. 12 northerly, Dowling
Resurfacing / culvert replacement 12 2017
144 Underway Kenetogami Creek, north of Hwy 661, Gogama Culvert replacement n/a 2017
144 Planned Hwy 101 southerly, west of Timmins Resurfacing 14 2017
400 Planned Healey Lake Rd. underpass northerly to north of Hwy 141 interchange, north of MacTier
Resurfacing 17 2017
519 Underway Hwy 17 easterly, Dubreuilville Resurfacing / culvert replacement 31 2017
540, 540B Underway West of Hwy 551, Kagawong
westerly
Resurfacing / bridge replacement / culvert replacements / culvert rehabilitations
18 2017
540 Planned Little Current westerly Resurfacing 18 2017
547 Underway Hawk Creek and McVeigh Creek Bridges, east of Wawa Bridge rehabilitations n/a 2017
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
7
NORTHEASTERN ONTARIO REHABILITATION 2017†
Hwy Status Location Type of Work
Project Length (km)
Target Completion
Date
551 Underway Mindemoya Creek Bridge at Providence Bay Bridge replacement n/a 2017
560 Underway Opikinimika River Bridge, east of Hwy 560A, Westree Bridge replacement n/a 2017
634 Planned Hog Creek and three unnamed creeks, north of Hwy 11, north of Smooth Rock Falls
Culvert rehabilitations n/a 2017
637 Underway East of Killarney easterly to Massey Creek, west of Hwy 69
Reconstruction / culvert replacement 42 2017
639 Underway Christian Creek and Boland Creek Bridge, north of Elliot Lake
Bridge rehabilitation / culvert replacement n/a 2017
654 Underway Hwy 534 easterly to Hwy 11, Nipissing
Resurfacing / bridge rehabilitations 23 2017
7289, 7290 Planned Silver Lake and Blackstone River,
south of Horseshoe Lake Culvert rehabilitations n/a 2017
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
8
NORTHWESTERN ONTARIO REHABILITATION 2017†
Hwy Status Location Type of Work
Project Length (km)
Target Completion
Date
11 Underway West of Barwick westerly including Bunting and Rainy River Culverts
Resurfacing / culvert replacements
26 2017
11 Underway Westovers, Dilke #1 and Ramsdale Creek Culverts, west of Fort Frances
Culvert replacements n/a 2018
11 Underway Noden Causeway, east of Fort Frances
Bridge rehabilitation n/a 2017
11 Underway Mine Centre easterly Resurfacing 21 2017
11 Underway Kemuel and Lerome Lakes, and Jackfish Creek Culverts, west of Atikokan
Culvert replacements n/a 2017
11 Underway Flood Creek West and East, Mills Creek, Caribus and Gagne Lake Culverts, near Atikokan
Culvert replacements n/a 2018
11 Underway Kaministiquia River Bridge at Kakabeka Falls
Bridge rehabilitation n/a 2017
11 Underway Watson and Norami Creek, and Postagoni River Culverts, near Beardmore
Culvert replacements n/a 2017
11 Underway Chowder and Sandlink Creek Culverts, near Longlac
Culvert replacements n/a 2017
11 Underway Flynne East and Chowder Creek East Culverts, east of Longlac
Culvert replacements n/a 2017
17 Underway Hwy 665 near Dryden westerly Resurfacing 19 2017
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
9
NORTHWESTERN ONTARIO REHABILITATION 2017†
Hwy Status Location Type of Work
Project Length (km)
Target Completion
Date
17 Underway CPR overhead, west of Upsala Bridge rehabilitation n/a 2017
17 Underway
Raith and Sisson Creek and Savanne River Tributary Culverts, west of Shabaqua Corners
Culvert replacements n/a 2017
17 Underway Brule Creek and Oskondaga River Culverts, west of Thunder Bay
Culvert replacements n/a 2017
17 Underway Gravel River Bridge, east of Nipigon
Bridge replacement n/a 2017
17 Underway Pays Plat River Bridges, east of Nipigon
Bridge replacements n/a 2017
17 Underway Schreiber westerly Reconstruction 19 2018
17 Underway Sawmill Creek Culvert, east of Terrace Bay
Culvert replacement n/a 2017
17 Underway McKellar and Ripple Creek Culverts, Phase 1, west of Marathon
Culvert rehabilitations n/a 2017
17 Underway Little Pic River Bridge, west of Marathon
Bridge Rehabilitation n/a 2019
17 Underway Pic River Bridge, east of Marathon
Bridge replacement n/a 2017
61 Underway Jarvis and Slate River Culverts, south of Thunder Bay
Culvert replacements n/a 2017
71 Underway North of Sioux Narrows southerly Resurfacing 25 2017
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
10
NORTHWESTERN ONTARIO REHABILITATION 2017†
Hwy Status Location Type of Work
Project Length (km)
Target Completion
Date
72 Underway Moose Creek Bridge, south of Sioux Lookout
Bridge replacement n/a 2018
105, 17 Underway Vermilion Bay northerly and Hwy 17, east of Vermilion Bay Resurfacing 32 2017
130 Underway Hwy 61 northerly, west of Thunder Bay Resurfacing 16 2017
502 Underway 66 km north of Hwy 11 northerly, south of Dryden Resurfacing 39 2018
516 Underway Mills Creek Culvert, east of Sioux Lookout
Culvert replacement n/a 2017
516, 642 Underway Deception Lake and Minnikau River Culverts, north and east of Sioux Lookout
Culvert replacements n/a 2017
527, 811 Planned
Eaglehead River, Trans Canada Pipeline and Little Max Creek Culverts on Highway 527, Heaven and Grew Creek Culverts on Highway 811, north of Thunder Bay
Culvert replacements n/a 2018
588, 590 Underway
Hwy 590, Cedar, Whitewood, and Pitch Creek Culverts and Hwy 588, south of Kakabeka Falls
Reconstruction / culvert replacements
30 2018
595 Underway Sitch and Cedar Creek Culverts, west of Thunder Bay
Culvert replacements n/a 2017
596 Underway Alice Creek Culvert, south of Minaki
Culvert replacement n/a 2017
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
11
NORTHWESTERN ONTARIO REHABILITATION 2017†
Hwy Status Location Type of Work
Project Length (km)
Target Completion
Date
599 Underway
Albany River (Osnaburgh, Mainflow, Overflow) Bridges, south of Pickle Lake, at Mishkeegogamang First Nation
Bridge rehabilitation n/a 2018
599 Planned
Asinn Creek, Graystone Lake, Savant Lake, Wiggle Creek, Little Pashkokogan River Culverts, north of Ignace
Culvert replacements n/a 2018
602 Underway Rainy River Tributary Culvert #2, west of Fort Frances
Culvert replacement n/a 2017
603 Underway Melgund Creek Culvert, north of Hwy 17 near Dryden
Culvert replacement n/a 2017
614 Underway Black River Bridge, north of Hwy 17, Manitouwadge
Bridge rehabilitation n/a 2017
614 Underway Chicken Farm Creek Culvert, south of Manitouwadge
Culvert replacement n/a 2017
618 Underway Hwy 105 near Red Lake southerly Reconstruction 12 2017
619, 621 Underway Gerhard, Peterson and Brusvine Creek Culverts, north of Rainy River
Culvert replacements n/a 2017
622 Underway Moose Creek Culvert, north of Atikokan
Culvert replacement n/a 2017
627 Underway Camp Creek Culvert, north of Heron Bay
Culvert replacement n/a 2017
642 Underway Sturgeon River Bridge, east of Sioux Lookout
Bridge rehabilitation n/a 2018
658 Underway Hwy 17A northerly, north of Kenora Reconstruction 25 2017
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
12
NORTHWESTERN ONTARIO REHABILITATION 2017†
Hwy Status Location Type of Work
Project Length (km)
Target Completion
Date
11, 602 Underway Kitchen, Turner and Lyon Creek Culverts, west of Fort Frances
Culvert replacements n/a 2017
11, 71, 617 Planned
Dilke, Sims, Maximillian, Toby Creeks and Pinewood River Tributary Culverts, west of Fort Frances
Culvert rehabilitations / replacements
n/a 2019
7047 Planned Hewitson Creek Bridge, east of Rossport
Bridge replacement n/a 2017
Nungesser Rd. Underway Pinder and South Berens Creek
Culverts, north of Red lake Culvert replacements n/a 2017
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
13
NORTHEASTERN ONTARIO REHABILITATION 2018†
Hwy Location Type of Work
Project Length (km)
Target Completion
Date
6 South Baymouth ferry northerly north of Hwy 542 Resurfacing 24 2018
6 Little Current southerly Resurfacing / culvert rehabilitation 20 2018
11 Wildlife detection system, south of Callander
Wildlife detection system 4 2018
11, 654 South of Hwy 654 interchange northerly to Hwy 11B/Lakeshore Dr. interchange, Callander northerly
Resurfacing 11 2018
11 Calamity Creek Culvert, north of Hwy 11B, New Liskeard Culvert replacement n/a 2019
11 Groundhog River Bridge, Fauquier Bridge and culvert replacement n/a 2020
11, 581 East Lilly Creek Bridge and Culvert, west and north of Moonbeam
Bridge replacement / culvert replacement n/a 2018
11 West of Hwy 631, west of Calstock Culvert replacements n/a 2019
17 Hwy 631 easterly, White River Resurfacing 59 2018
17 East of Hwy 6 easterly, Nairn Centre easterly
Reconstruction / culvert replacement 20 2018
17 CPR overhead, west of Hwy 537, Coniston Bridge rehabilitation n/a 2019
17 Corsol Rd. easterly, Sturgeon Falls Resurfacing 0.4 2018
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
14
NORTHEASTERN ONTARIO REHABILITATION 2018†
Hwy Location Type of Work
Project Length (km)
Target Completion
Date
17 West of Hwy 17B, west of North Bay Culvert replacement n/a 2018
17 Hwy 17 and Hwy 94, Corbeil Intersection improvement 4 2018
17, 533 Roundabout repairs at Hwy 17/533, Mattawa Resurfacing 0.2 2018
17B Bar River Rd. to Sault Ste. Marie southeast limits Resurfacing 21 2018
17B Duchesnay Creek Bridge, CNR overhead, North Bay
Resurfacing / bridge replacement / bridge removal
1 2019
60 Hwy 127 westerly, Whitney Resurfacing 27 2018
64 Hwy 69 easterly to Hwy 528, west of Noelville
Reconstruction / culvert replacements / culvert rehabilitation
18 2018
65 Makobe River Bridge, east of Elk Lake Bridge replacement n/a 2019
94 Hwy 654 westerly, south CNR overhead, Hwy 94/CNR underpass, Burford Creek, Callander
Resurfacing / bridge rehabilitation / bridge removal/culvert rehabilitation
3 2018
129, 556
Hwy 129 Wenebegon River Culvert, north of Hwy 556 and Hwy 556 Structures at Ranger Lake
Bridge rehabilitations / culvert rehabilitations / culvert replacement
n/a 2018
141 Shadow River Bridge, west of Hwy 632, west of Rosseau Bridge replacement n/a 2019
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
15
NORTHEASTERN ONTARIO REHABILITATION 2018†
Hwy Location Type of Work
Project Length (km)
Target Completion
Date
144 Municipal Rds. 35 and 15 northerly, Chelmsford Resurfacing 5 2018
520, 7162, 7188
Ontario St. westerly, Burk's Falls Resurfacing / culvert replacements 7 2018
522, 522B
Hwy 11 and McFadden Line interchange westerly, Trout Creek
Resurfacing / bridge replacement 5 2018
537 Jumbo Creek, south of Hwy 17, south of Wahnapitae
Reconstruction / culvert replacement 1 2018
542 Bluejay Creek, south of Sandfield Culvert replacements n/a 2018
560 Michiwakenda Lake Culvert, east of Shinning Tree Culvert replacement n/a 2018
577 Driftwood River Bridge, north of Shillington Bridge replacement n/a 2019
592 Little East River Bridges, north of Hwy 11, Novar Bridge replacements n/a 2020
652 Five bridge replacements, north of Cochrane Bridge replacements n/a 2019
7300 Sagamok Access Rd., south of Massey Reconstruction 5 2018
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
16
NORTHWESTERN ONTARIO REHABILITATION 2018†
Hwy Location Type of Work
Project Length (km)
Target Completion
Date
11 Rainy River International Bridge between Rainy River, Ontario and Baudette, Minnesota
Bridge replacement n/a 2020
11 Shabaqua Corners westerly Resurfacing 58 2018
11 Shamrock Centre Culvert, north of Nipigon Culvert rehabilitation n/a 2019
11 Keemle Lake Culvert, north of Nipigon Culvert rehabilitation n/a 2018
11 Mignet Creek, Indian Bay and Mission Bay Culverts, north of Nipigon
Culvert replacements n/a 2018
11 Geraldton easterly to Longlac Resurfacing 33 2018
17 East of Manitoba/Ontario Boundary, Rest Area
Rest Area Improvements n/a 2018
17
McKenzie Creek, Moose Creek and Dinorwic Lake Culverts near Dryden and Chadwick Lake Culvert, east of Kenora
Culvert replacements n/a 2019
17 Hwy 72 at Dinorwic easterly Resurfacing 25 2018
17 Revell River curve realignment, west of Ignace Realignment 4 2019
17 McKellar and Ripple Creek Culverts, Phase 2, west of Marathon
Culvert rehabilitations n/a 2018
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
17
NORTHWESTERN ONTARIO REHABILITATION 2018†
Hwy Location Type of Work
Project Length (km)
Target Completion
Date
17 West of Rossport westerly Reconstruction / truck climbing lane 21 2019
17 Prairie River Bridge, east of Terrace Bay Bridge rehabilitation n/a 2018
17 White Lake Narrows Bridge, east of Marathon Bridge rehabilitation n/a 2019
61 Rosslyn Road and CPR overheads and CNR subways (North and South), Thunder Bay
Bridge rehabilitations n/a 2018
105 Ear Falls northerly Resurfacing 30 2018
527 North and South Current River Culverts, north of Thunder Bay Culvert replacements n/a 2018
584 Murky Creek Bridge, north of Geraldton Bridge replacement n/a 2018
599 Kekwanzik Lake, Agimac and Pratt Creek Culverts, north of Ignace Culvert replacements n/a 2018
599 Cobb Bay, Tug and Mile Creek Culverts, north of Ignace Culvert replacements n/a 2018
617 Pinewood River Bridge, north of Stratton Bridge replacement n/a 2018
643 Hwy 584 westerly to Aroland First Nation Reconstruction 20 2018
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
18
NORTHWESTERN ONTARIO REHABILITATION 2018†
Hwy Location Type of Work
Project Length (km)
Target Completion
Date
11, 622, 623
East of Atikokan easterly including Niobe Lake Culvert and Hwy 622 and Hwy 623
Resurfacing / culvert replacement 43 2019
72, 642, 664
Finlayson Creek, Sam and Aubrey Lake Culverts, south of Sioux Lookout
Culvert replacements n/a 2019
588, 595 Sitch, Sitch #1 and Whitewood Creek Culverts, south of Kakabeka Falls
Culvert replacements n/a 2019
NORT Rd. Central Patricia northerly including the Badesdawa River Bridge
Reconstruction / bridge replacement 63 2019
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
19
NORTHEASTERN ONTARIO REHABILITATION 2019-2021†
Hwy Location Type of Work
Project Length (km)
6, 7041
Little Current Swing Bridge northerly, Little Current Resurfacing 17
11 North of Station Rd. northerly to north of Hwy 518 interchange, Scotia Resurfacing 6
11, 124 South River to Trout Creek Resurfacing / culvert
rehabilitation 12
11 Hwy 522 interchange northerly Hwy 522B interchange, Trout Creek Resurfacing 6
11, 17 North Bay Bypass, North Bay Resurfacing 4
11 North junction Hwy 17/11B northerly, North Bay
Resurfacing / culvert replacement 7
11 North of north junction Hwy 17/11B northerly, north of North Bay Resurfacing 10
11 Montreal River Bridge at Latchford, Phase 2 Bridge rehabilitation n/a
11 North junction of Hwy 65 northerly to Hwy 569, north of New Liskeard Reconstruction 11
11 Crooked Creek Bridge, south of Kenogami Lake Bridge rehabilitation n/a
11 North of Hwy 570 to east junction Hwy 101, Ramore
Resurfacing / culvert rehabilitation and replacement
24
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
20
NORTHEASTERN ONTARIO REHABILITATION 2019-2021†
Hwy Location Type of Work
Project Length (km)
11, 101 West of Matheson easterly to Hwy 572
Resurfacing / bridge rehabilitations / culvert rehabilitation
21
11 West junction Hwy 101 northerly, Nellie Lake southerly Resurfacing 34
11, 655
Hwy 11 west of Cochrane easterly and Hwy 655 south of Hwy 11 southerly, south of Driftwood
Resurfacing 17
11, 652 Cochrane to Driftwood Resurfacing / culvert
replacements 30
11 Mattagami River Bridge at Smooth Rock Falls and Moonbeam Creek Culvert, east of Moonbeam
Bridge rehabilitation / culvert replacement n/a
11, 583, 663
East of Hwy 631 to Hwy 663, Calstock and Ste. Therese Creek north and south, unnamed creek, north of Hearst
Resurfacing / culvert rehabilitations / culvert replacements
5
11 Fraser River Bridge and various culverts, west Hwy 631, west of Hearst
Bridge rehabilitations / culvert rehabilitation / culvert replacements
n/a
17 Coldwater River Bridge, north of Montreal River Bridge steel coating n/a
17 Sand River and Barrett River Bridges south of Wawa and Alona Bay Culvert, south of Montreal River
Bridge rehabilitations / culvert rehabilitation n/a
17, 552 Sault Ste. Marie to Heyden Resurfacing / culvert
rehabilitations 8
17 Garden River to Echo Bay Resurfacing 13
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
21
NORTHEASTERN ONTARIO REHABILITATION 2019-2021†
Hwy Location Type of Work
Project Length (km)
17 Echo River Rd. easterly to Bar River Rd., Echo Bay Resurfacing 12
17, 548, 638
Hwy 17 Bruce Mines easterly, Hwy 638 Thessalon River Bridge, north of Hwy 670, Ophir and Hwy 548 at Richards Landing
Resurfacing / bridge rehabilitation / culvert replacement
18
17, 546 Thessalon to Iron Bridge Resurfacing / culvert
replacements 34
17, 538
CPR subway and Lauzon Creek, east of Blind River
Bridge rehabilitation / culvert replacement n/a
17 4 km west of Hwy 553, west of Massey Culvert replacement n/a
17 Hwy 553 easterly, Massey easterly Resurfacing / culvert rehabilitation 22
17 Hwy 69 interchange westerly, Sudbury Resurfacing / bridge rehabilitation 12
17 Junction Creek Bridge, east of Municipal Rd. 55 interchange, Sudbury Bridge rehabilitation n/a
17 West of north junction of Hwy 11/17 westerly, west of North Bay
Resurfacing / bridge replacement / bridge rehabilitation / culvert rehabilitation
18
63 North of Hwy 533 northerly to Ontario/Quebec Boundary
Resurfacing / bridge rehabilitations / culvert rehabilitation
23
64, 535 North of Hwy 64 northerly, north of Noelville Resurfacing / culvert
rehabilitation 6
64 North of Hwy 535, Lavigne southerly Resurfacing / bridge rehabilitation 17
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
22
NORTHEASTERN ONTARIO REHABILITATION 2019-2021†
Hwy Location Type of Work
Project Length (km)
64 North of Hwy 539 to Hwy 11, Marten River southerly
Resurfacing / bridge rehabilitations / culvert rehabilitation
23
65, 566
Montreal River Bridges, west and east of Matachewan
Bridge rehabilitation / bridge replacement n/a
65, 560
East junction Hwy 560 Elk Lake to east of Hwy 562 Resurfacing 48
65 Blanche River and Wright Creek Bridges, west of Ontario/Quebec Boundary Bridge steel coating n/a
66 Hwy 566 easterly, east of Matachewan Resurfacing 16
66 Kirkland Lake easterly to west of Hwy 624 Resurfacing / bridge rehabilitations 23
69 Naiscoot Lake and Harris River, north of Pointe au Baril Station
Bridge replacement / culvert rehabilitation n/a
69 Magnetawan River Bridge, Byng Inlet Bridge rehabilitation n/a
69 North of Estaire Rd. interchange northerly, Sudbury Resurfacing 6
101, 651
Hwy 651 Ogasiwi River and Windermere River Bridges south of Dalton and Hwy 101 Big Pine Lake Culvert, west of Chapleau
Bridge rehabilitations / culvert replacement n/a
101, 129
Sideburned, Nemegosenda, Nebskawashi Bridges, Chapleau
Bridge rehabilitation / bridge replacements n/a
101, 7172 West of Hwy 144 easterly, east of Foleyet Resurfacing / bridge and
culvert replacement 11
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
23
NORTHEASTERN ONTARIO REHABILITATION 2019-2021†
Hwy Location Type of Work
Project Length (km)
101 Nat River Bridge, east of Foleyet Bridge rehabilitation n/a
101 ONR crossing easterly, Timmins Resurfacing 23
101 Anthony Creek, Unknown Creek, Shillington Creek, west of Hwy 11, Shillington Culvert replacements n/a
124 Hwy 400 easterly, Parry Sound to McKellar Resurfacing / culvert rehabilitation 20
127 Hwy 60 southerly, Whitney southerly Resurfacing 22
129, 546, 554
Hwy 546, Hwy 554 and Hwy 129 northerly, Iron Bridge northerly
Resurfacing / culvert rehabilitations / culvert replacement
27
129 Gravel River, Snowshoe Creek and Missisagi River Bridges, east of Ranger Lake Bridge rehabilitations n/a
129 South of Hwy 667 southerly, south of Chapleau
Resurfacing / culvert replacements 22
141, 518 Hwy 400 easterly to west of Orrville
Resurfacing / bridge rehabilitation / culvert replacement
14
144 Hwy 144 and Municipal Rds. 15 and 35, Chelmsford Intersection improvement n/a
144 Windy Creek Culvert, west of Hwy 144 north of Onaping Falls Culvert rehabilitation n/a
144 North of Hwy 560 northerly to Hwy 661, Gogama Resurfacing 22
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
24
NORTHEASTERN ONTARIO REHABILITATION 2019-2021†
Hwy Location Type of Work
Project Length (km)
144 North of Hwy 661 northerly, Gogama northerly Resurfacing 21
144 North of Hwy 661 northerly, north of Gogama Resurfacing 28
400 North of Hwy 141 interchange northerly, south of Parry Sound
Resurfacing / culvert rehabilitations 15
522 ESS Narrows Bridge, east of Hwy 69, west of Loring Bridge rehabilitation n/a
523 Moore Creek Bridge, south of Madawaska Bridge rehabilitation / culvert replacement n/a
524 Commanda Creek Bridge, northwest of Commanda Bridge replacement n/a
532, 556
Achigan Creek, Beaver Creek, Silver Creek, Atkinson Creek and Dam Creek, Searchmont
Bridge replacement / culvert replacement / culvert rehabilitations
n/a
539, 539A
Hwy 539 Warren to Field and Hwy 539A River Valley northerly
Resurfacing / culvert replacements 42
540, 542
Indian Point Bridge, Manitou River Bridge, Manitoulin Island Bridge rehabilitations n/a
540 West of Hwy 551 easterly, Kagawong easterly Resurfacing 27
546 Kindiogami River, Camp 8 Creek and Little White River Bridges, west and east of Hwy 639, north of Elliot Lake
Bridge rehabilitations / bridge replacement n/a
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
25
NORTHEASTERN ONTARIO REHABILITATION 2019-2021†
Hwy Location Type of Work
Project Length (km)
548 Richardson Creek Bridge, north of Kentville, St. Joseph Island Bridge replacement n/a
548 St. Joseph Island Skyway, St. Joseph Island Resurfacing / bridge rehabilitation 1
550, 565 Sault Ste. Marie westerly to Gros Cap Resurfacing 11
553, 810
River aux Sables Bridges and Cameron Creek Bridge, north Hwy 17, Massey Bridge replacements n/a
564 Boston Creek Bridge, Boston Creek Bridge replacement n/a
569 Blanche River Bridge at Hilliardton Bridge replacement n/a
572 Pike River Bridge, north of Holtyre Bridge replacement / culvert replacement n/a
577 Driftwood River Bridge, south of Monteith Bridge rehabilitation n/a
579, 668
Deception Creek, Smith Creek, Gilles Creek Bridges, north of Cochrane Bridge replacements n/a
592 CNR overhead Bridge and Ragged Creek Bridge, north of Novar Bridge replacements n/a
631
Negagamisis Narrows Bridge, West Beaton River Bridge and Shekak River Bridge, Hornepayne Creek Culvert, north and south of Hornepayne
Bridge rehabilitations / bridge replacement / culvert replacement
n/a
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
26
NORTHEASTERN ONTARIO REHABILITATION 2019-2021†
Hwy Location Type of Work
Project Length (km)
637 Nobel St. westerly, Killarney Reconstruction 1
637 Wanapitei River and Wolf Creek, east of Killarney Bridge rehabilitations n/a
638 Thessalon River Bridge at Rydal Bank Bridge replacement n/a
7300 Spanish River Bridge in Massey Bridge rehabilitation n/a
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
27
NORTHWESTERN ONTARIO REHABILITATION 2019-2021†
Hwy Location Type of Work
Project Length (km)
11 Sturgeon River Bridge, west of Emo Bridge replacement n/a
11 Windy Point Bridge, east of Fort Frances Bridge rehabilitation n/a
11 Hwy 502 easterly, east of Fort Frances Resurfacing 36
11 Bear Passage Bridge, east of Fort Frances Bridge replacement n/a
11 Manitou Creek Culvert, west of Emo Culvert replacement n/a
11 West of Atikokan westerly Resurfacing 22
11 Atikokan westerly Resurfacing 16
11 Seine River Bridge, west of Atikokan Bridge rehabilitation n/a
11 Rossmere and Wawiag Creek Culverts, west of Shebandowan Culvert replacements n/a
11 Kashabowie River Bridge, west of Shebandowan Bridge replacement n/a
11 Matawin River Bridge, west of Kakabeka Falls Bridge rehabilitation n/a
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
28
NORTHWESTERN ONTARIO REHABILITATION 2019-2021†
Hwy Location Type of Work
Project Length (km)
11 Kakabeka Falls westerly Resurfacing 17
11 Hwy 61 westerly, west of Thunder Bay Resurfacing 12
11 CNR overhead Paipoonge, west of Thunder Bay Bridge rehabilitation n/a
11 CPR overhead Shuniah, east of Thunder Bay Bridge rehabilitation n/a
11 Nipigon northerly Resurfacing 50
11 Camproad and Gorge Creek Culverts, north of Nipigon Culvert replacements n/a
11 East of Beardmore easterly Resurfacing 28
11 Nissiamkikan Creek Culverts, east of Beardmore Culvert replacements n/a
11 Kenogamisis Lake Bridge West Narrows, east of Geraldton Bridge rehabilitation n/a
11 Phipps Lake and Rockyshore Creek Culverts, east of Longlac Culvert replacements n/a
11 Hoiles Creek Bridge easterly, east of Longlac Rehabilitation 26
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
29
NORTHWESTERN ONTARIO REHABILITATION 2019-2021†
Hwy Location Type of Work
Project Length (km)
11 Hoiles Creek Bridge, east of Longlac Bridge rehabilitation n/a
11 North Pagwachuan River Bridge, east of Longlac Bridge rehabilitation n/a
11 Thunder Bay/Cochrane District boundary westerly, east of Longlac Resurfacing 20
17 CPR overhead at Dinorwic Bridge rehabilitation n/a
17 West of English River westerly Resurfacing 19
17 Revell River Bridge, west of Ignace Bridge rehabilitation n/a
17 West of Upsala westerly Resurfacing 19
17 West of Raith westerly Rehabilitation 19
17 West of Shabaqua Corners westerly Resurfacing 27
17 Dublin and Fire Hill Creek Culverts, east of Nipigon Culvert replacements n/a
17 Rossport westerly Reconstruction / truck climbing lanes 7
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
30
NORTHWESTERN ONTARIO REHABILITATION 2019-2021†
Hwy Location Type of Work
Project Length (km)
17 MacLean Creek Culvert, west of Schreiber Culvert replacement n/a
17 Aguasabon River Bridge, Terrace Bay Bridge rehabilitation n/a
17 Blackbird Creek Culvert #2, near Terrace Bay Culvert replacement n/a
17 Mink, Dead Horse and Hare Creek Culverts, west of Marathon Culvert replacement n/a
17 Wabikoba Creek Bridge, west of White River Bridge rehabilitation n/a
17 Dunc Lake, Alder Creek East and Angler Creek Culverts, east of Marathon
Culvert replacements n/a
17 Bertrand Creek and West White River Bridges, west of White River Bridge rehabilitations n/a
17 White River Bridge (Bremner), west of White River Bridge rehabilitation n/a
17A Winnipeg River East and West Bridges and Ritchie Road overhead, north of Kenora
Bridge rehabilitations n/a
17A North of Kenora Resurfacing 35
61 North of Canada/USA border northerly Resurfacing 19
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
31
NORTHWESTERN ONTARIO REHABILITATION 2019-2021†
Hwy Location Type of Work
Project Length (km)
71 Hwy 11 northerly, west of Emo Reconstruction 26
71 Rushing River, Reed Narrows, and Berry Creek Bridges, north of Sioux Narrows
Bridge replacement / rehabilitations n/a
72 South of Sioux Lookout southerly Resurfacing 25
72 CNR overhead, Sioux Lookout Bridge rehabilitation n/a
102 CNR and CPR overheads, west of Thunder Bay Bridge rehabilitations n/a
102 McIntyre and Shebandowan Creek Culverts, west of Thunder Bay Culvert replacements n/a
105 Sandy Creek Culvert, north of Ear Falls Culvert replacement n/a
125 Chukuni River Bridge, east of Red Lake Bridge rehabilitation n/a
130 Kaministiquia River Bridge, west of Thunder Bay Bridge rehabilitation n/a
502 Hwy 11 northerly, east of Fort Frances Resurfacing 29
502 Crowrock Inlet Bridge, east of Fort Frances Bridge rehabilitation n/a
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
32
NORTHWESTERN ONTARIO REHABILITATION 2019-2021†
Hwy Location Type of Work
Project Length (km)
502 South of Dryden southerly Resurfacing 37
516 Marchington River Bridge, east of Sioux Lookout Bridge rehabilitation n/a
527 Hwy 11/17 northerly, north of Thunder Bay Resurfacing 40
527 72 km north of Hwy 11/17 northerly, north of Thunder Bay Reconstruction 26
527 Wabikon Creek and Waweig Lake Culverts, north of Thunder Bay Culvert replacements n/a
527 Max Creek, Rousseau and Rinker Lake Culverts, north of Thunder Bay Culvert replacements n/a
584 North of Geraldton northerly Resurfacing 27
588 Kaministiquia River Bridges (north and south channel), west of Thunder Bay Bridge rehabilitation n/a
589 North of Hwy 102 northerly to north of Lappe Resurfacing 11
590 Cedar Creek Culvert #2, west of Kakabeka Falls Culvert replacement n/a
599 Hwy 17 northerly, north of Ignace Reconstruction 33
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
33
NORTHWESTERN ONTARIO REHABILITATION 2019-2021†
Hwy Location Type of Work
Project Length (km)
599 Hwy 642 northerly, north of Silver Dollar Reconstruction 41
599 English River Bridge, north of Ignace Bridge rehabilitation n/a
599 Crystal River Bridge, north of Ignace Bridge rehabilitation n/a
599 14 km north of Wiggle Creek Culvert northerly to Little Pashkokogan River Culvert, north of Savant Lake
Reconstruction 38
599 Little Pashkokogan River Culvert northerly to South Limits of Mishkeegogamang First Nation
Reconstruction 30
599 South Limits of Mishkeegogamang First Nation northerly Reconstruction 35
599 North Limits of Mishkeegogamang First Nation northerly to Central Patricia
Reconstruction 24
602 LaVallee River Bridge, south of Emo Bridge replacement n/a
622 Anderson Dam and Atikokan River Bridges, north of Atikokan Bridge rehabilitations n/a
622 Big Turtle and Little Turtle River Bridges, north of Atikokan Bridge rehabilitations n/a
627 Pic River Bridge, east of Marathon Bridge replacement n/a
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
34
NORTHWESTERN ONTARIO REHABILITATION 2019-2021†
Hwy Location Type of Work
Project Length (km)
641 Louise Lake Culvert, north of Hwy 17A, Kenora Culvert replacement n/a
658 Black Sturgeon River Bridge, north of Kenora Bridge rehabilitation n/a
72, 664 Sioux Lookout southerly and Hwy 664 to Hudson Resurfacing 23
811 Mooseland River Bridge, west of Hwy 527, north of Thunder Bay Bridge rehabilitation n/a
Flanders Rd. Namakan River Bridges, south of Hwy 11, south of Atikokan
Bridge rehabilitation / replacement n/a
Nungesser Rd. Bak Creek Bridge, north of Red Lake Bridge replacement n/a
Nungesser Rd. Alweli Creek Bridge, north of Red Lake Bridge rehabilitation n/a
NORT Rd. Crow River Bridge, north of Central Patricia Bridge rehabilitation n/a
NORT Rd. Otoskwin River Bridge, north of Central Patricia Bridge replacement n/a
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.