! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! " " " ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( Umiat Deadhorse Prudhoe Bay North Slope Oil and Gas Activity State of Alaska, Department of Natural Resources, Division of Oil and Gas, as of November 2015 The accuracy of this map is subject to pending decisions currently on appeal and other administrative actions. Please visit http://dog.dnr.alaska.gov/GIS/ActivityMaps.htm to see our most current maps. 0 10 20 Miles Wells Spud ! ( 2015 ! ( 2014 ! ( 2013 Units Major Road ! ! ! Trans Alaska Pipeline Alaska Seaward Boundary Map Location ¹ National Petroleum Reserve - Alaska Arctic National Wildlife Refuge TAPS Teshekpuk Lake Smith Bay Beaufort Sea Year-round development drilling and well work in producing fields CASSIN 6 QUGRUK 1 NUNA 2 (sfc) UMIAT 18 QUGRUK 6 QUGRUK 3 & 3A UMIAT 23H TUTTU 1 RENDEZVOUS 3 QUGRUK 7 QUGRUK 5 & 5A FLAT TOP1 QUGRUK 301 ALKAID 1 QUGRUK 9 QUGRUK 8 CASSIN 1 Badami Liberty Prudhoe Bay Northstar Beechey Point Milne Point Nikaitchuq Oooguruk Colville River Tofkat Placer S.Miluveach Greater Mooses Tooth Bear Tooth Kuparuk River Qugruk Point Thomson Dewline Duck Island Pikka BLM NPRA oil and gas lease sale scheduled for November 2015, encompassing 1.5 million acres and 143 tracts. Bid opening will be held on November 18th at 1 PM. Linc Energy Ltd. Outlined plan for 13-pad, 150 well Umiat development program. Drilling would begin ~2022. ConocoPhillips-Kuparuk River First development wells at Drill Site 2S (Sharks Tooth) are expected to come online by YE 2015. Twenty four wells planned with estimated peak production of ~8,000 BOPD. Sanctioned $450 mm West Sak expansion at Drill Site 1H. Expect to begin drilling in 2016 with a 19 well program. Estimated peak production ~8,000 BOPD. Caelus Energy Alaska Acquiring NordAq’s 75% working interest in Tulimaniq leases. Planning to drill 1-2 exploration wells this winter at Smith Bay. Eni US Operating Co. Inc. Planning to complete initial development program at Nikaitchuq Unit by 2016. Accumulate Energy Alaska Drilling Icewine 1 exploration well Fall 2015 from Franklin Bluffs pad. ASRC Planning to drill first solo exploration well at Placer. Caelus Energy Installed pad and access road at Nuna Drill Site 1. Repsol-Armstrong Deferring 2015-16 winter exploration drilling. Armstrong increasing working interest. Shell Ended Chukchi Sea exploration program after failing to find economic quantities of oil or gas in Burger-J well. SAExploration Conducting Ice Wine 3-D seismic survey south of Deadhorse, near Franklin Bluffs and Dalton Highway. BLM Completed clean-up of legacy wells at Cape Simpson. ConocoPhillips Development drilling in progress at CD-5. First oil expected late 2015. Current plan of development includes drilling 15 wells with expected peak production of 16,000 BOPD. Great Bear Petroleum Considering testing the Alkaid 1 well. Planning winter 2016 3-D seismic survey for leases south of Prudhoe and Kuparuk. SAExploration Planning 2016-2017 Akluq 3-D seismic survey. Division of Oil and Gas Northern Alaska areawide lease sales are scheduled for November 2015, encompassing 7.7 million acres in North Slope, Beaufort Sea, and North Foothills sales areas. Public bid opening will be held on November 18 at 9 AM. Hilcorp Alaska LLC Submitted plan of development for Liberty Unit that includes constructing man-made gravel island five miles from coast. BOEM intends to start EIS for Liberty Development plan. Hilcorp Alaska Planning to drill three development wells and three service wells at MPU. DOE-JOGMEC-USGS-SOA Advancing work to select site for long-term methane hydrate production test on North Slope. BLM Soliciting proposals for NPRA legacy well remediation efforts. AKLNG Project Special legislative session passed appropriations to fund state’s work through the end of FY15 and acquire TransCanada’s interest. Brooks Range Petroleum Corp. Southern Miluveach Unit first oil now expected late 2016, facilties construction on-going. ExxonMobil Gas processing modules barged to Point Thomson; Initial Production System gas cycling project start-up expected early 2016, expected to produce 10,000 barrels condensate per day. ConocoPhillips Staked seven Tinmiaq prospective well locations for possible exploration drilling program in 2015-2016. Postponing development activities at GMT for 2015.

Transcript of North Slope Oil and Gas Activity - DOG...BLM Completed clean-up of legacy wells at Cape Simpson....

  • !

    !!

    !

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !

    !!

    !!

    !!

    !!

    !!

    !!

    !

    !!

    !

    !

    !

    "

    "

    "

    !(

    !(

    !(

    !(!(

    !(!(!(

    !(!(

    !(

    !(

    !(

    !(

    !(!(

    !(

    !(

    !(

    !(

    Umiat

    Deadhorse

    Prudhoe Bay

    North Slope Oil and Gas ActivityState of Alaska, Department of Natural Resources, Division of Oil and Gas, as of November 2015

    The accuracy of this map is subject to pending decisions currently on appeal and other administrative actions.

    Please visit http://dog.dnr.alaska.gov/GIS/ActivityMaps.htm to see our most current maps.

    0 10 20 Miles

    Wells Spud!( 2015

    !( 2014

    !( 2013

    Units

    Major Road

    !

    !! Trans Alaska Pipeline

    Alaska Seaward Boundary

    Map Location

    ¹

    National Petroleum Reserve - Alaska

    Arctic National Wildlife Refuge

    TAPS

    Teshekpuk Lake

    SmithBay

    Beaufort Sea

    Year-round development drilling

    and well work in producing fields

    CASSIN 6

    QUGRUK 1

    NUNA 2 (sfc)

    UMIAT 18

    QUGRUK 6

    QUGRUK 3 & 3A

    UMIAT 23H

    TUTTU 1

    RENDEZVOUS 3

    QUGRUK 7QUGRUK 5 & 5A

    FLAT TOP1

    QUGRUK 301

    ALKAID 1

    QUGRUK 9

    QUGRUK 8

    CASSIN 1

    Badami

    LibertyPrudhoeBay

    Northstar

    BeecheyPoint

    MilnePoint

    NikaitchuqOooguruk

    ColvilleRiver

    Tofkat

    Placer

    S.MiluveachGreaterMoosesTooth

    BearTooth

    KuparukRiver

    Qugruk

    Point Thomson

    Dewline

    Duck Island

    Pikka

    BLMNPRA oil and gas lease sale scheduled for November 2015, encompassing 1.5 million acres and 143 tracts. Bid opening will be held on November 18th at 1 PM.

    Linc Energy Ltd.Outlined plan for 13-pad, 150 well

    Umiat development program. Drilling would begin ~2022.

    ConocoPhillips-Kuparuk River

    First development wells at Drill Site 2S (Sharks Tooth) are expected to come online by YE 2015. Twenty four wells planned with estimated peak production of ~8,000 BOPD.

    Sanctioned $450 mm West Sak expansion at Drill Site 1H. Expect to begin drilling in 2016

    with a 19 well program. Estimated peak production ~8,000 BOPD.

    Caelus Energy AlaskaAcquiring NordAq’s 75% working interest in Tulimaniq leases. Planning to drill 1-2

    exploration wells this winter at Smith Bay.

    Eni US Operating Co. Inc.Planning to complete initial development

    program at Nikaitchuq Unit by 2016.

    Accumulate Energy AlaskaDrilling Icewine 1 exploration well Fall 2015 from Franklin Bluffs pad.

    ASRCPlanning to drill first solo exploration well at Placer.

    Caelus EnergyInstalled pad and access road at Nuna Drill Site 1.

    Repsol-ArmstrongDeferring 2015-16 winter

    exploration drilling. Armstrong increasing working interest.

    ShellEnded Chukchi Sea exploration

    program after failing to find economic quantities of oil or gas in Burger-J well.

    SAExplorationConducting Ice Wine 3-D seismic survey south of

    Deadhorse, near Franklin Bluffs and Dalton Highway.

    BLMCompleted clean-up of legacy wells at Cape

    Simpson.

    ConocoPhillipsDevelopment drilling in progress at CD-5. First

    oil expected late 2015. Current plan of development includes drilling 15 wells with expected peak production of 16,000 BOPD.

    Great Bear PetroleumConsidering testing the Alkaid 1 well.

    Planning winter 2016 3-D seismic survey for leases south of Prudhoe and Kuparuk.

    SAExplorationPlanning 2016-2017 Akluq 3-D seismic survey.

    Division of Oil and GasNorthern Alaska areawide lease sales are

    scheduled for November 2015, encompassing 7.7 million acres in North Slope, Beaufort Sea,

    and North Foothills sales areas. Public bid opening will be held on November 18 at 9 AM.

    Hilcorp Alaska LLCSubmitted plan of development for Liberty Unit

    that includes constructing man-made gravel island five miles from coast. BOEM intends to

    start EIS for Liberty Development plan.

    Hilcorp AlaskaPlanning to drill three

    development wells and three service wells at MPU.

    DOE-JOGMEC-USGS-SOAAdvancing work to select site for

    long-term methane hydrate production test on North Slope.

    BLMSoliciting proposals for NPRA

    legacy well remediation efforts.

    AKLNG ProjectSpecial legislative session passed appropriations to fund state’s work

    through the end of FY15 and acquire TransCanada’s interest.

    Brooks Range Petroleum Corp.Southern Miluveach Unit first oil now

    expected late 2016, facilties construction on-going.

    ExxonMobilGas processing modules barged to Point

    Thomson; Initial Production System gas cycling project start-up expected early 2016, expected to produce 10,000 barrels condensate per day.

    ConocoPhillipsStaked seven Tinmiaq prospective well locations for possible exploration drilling program in 2015-2016.

    Postponing development activities at GMT for 2015.