North Head Wastewater Treatment Plant June Pollution Monitoring Summary Air Quality Licensee: Sydney Water PO Box 399 EPL 378 Summary period: 01-06-2018 to 30-06-2018 Date obtained: 20-07-18 Date published: 27-07-18 PARRAMATTA NSW 2124 EPA Point 33 pollutant unit of measure sampling frequency number of samples minimum result maximum result maximum limit within limits* hydrogen sulphide gas mg/m 3 30 minutes 1346 <0.004 0.006 5 yes EPA Point 34 pollutant unit of measure sampling frequency number of samples minimum result maximum result maximum limit within limits* hydrogen sulphide gas mg/m 3 30 minutes 1440 <0.004 5 yes EPA Point 35 pollutant unit of measure sampling frequency number of samples minimum result maximum result maximum limit within limits* hydrogen sulphide gas mg/m 3 30 minutes 1440 <0.01 0.73 5 yes EPA Point 43 pollutant unit of measure sampling frequency number of samples minimum result maximum result maximum limit within limits* chlorine gas mg/m 3 30 minutes 1440 <0.03 <0.03 200 yes hydrogen sulphide gas mg/m 3 30 minutes 1440 <0.01 <0.01 5 yes EPA Point 63 pollutant unit of measure sampling frequency number of samples minimum result maximum result maximum limit within limits* chlorine gas mg/m 3 30 minutes 1440 <0.15 3.25 200 yes hydrogen sulphide gas mg/m 3 30 minutes 1440 <0.075 0.664 5 yes Point description: Ventilation outlet at Scotts Creek Point description: Ventilation outlet at Lane Cove River West *Maximum limits for air quality are based on the Protection of the Environment Operations (Clean Air) Regulation 2010 - Schedule 4 Standards of concentration for scheduled premises: general activities and plant. Point description: Ventilation outlet at North Head STP for Northside Storage Tunnel Point description: NSOOS Scrubber outlet at the North Head STP Point description: Central scrubber outlet at North Head STP 0.058

Transcript of North Head Wastewater Treatment Plant June Pollution … · 2020. 8. 11. · North Head Wastewater...

Page 1: North Head Wastewater Treatment Plant June Pollution … · 2020. 8. 11. · North Head Wastewater Treatment Plant June Pollution Monitoring Summary Air Quality. Licensee: Sydney

North Head Wastewater Treatment Plant June Pollution Monitoring Summary Air Quality

Licensee: Sydney Water

PO Box 399

EPL 378Summary period: 01-06-2018 to 30-06-2018 Date obtained: 20-07-18Date published: 27-07-18 PARRAMATTA NSW 2124

EPA Point 33

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1346 <0.004 0.006 5 yes

EPA Point 34

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1440 <0.004 5 yes

EPA Point 35

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1440 <0.01 0.73 5 yes

EPA Point 43

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1440 <0.03 <0.03 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1440 <0.01 <0.01 5 yes

EPA Point 63

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1440 <0.15 3.25 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1440 <0.075 0.664 5 yes

Point description: Ventilation outlet at Scotts Creek

Point description: Ventilation outlet at Lane Cove River West

*Maximum limits for air quality are based on the Protection of the Environment Operations (Clean Air) Regulation 2010 - Schedule 4 Standards of concentration for scheduledpremises: general activities and plant.

Point description: Ventilation outlet at North Head STP for Northside Storage Tunnel

Point description: NSOOS Scrubber outlet at the North Head STP

Point description: Central scrubber outlet at North Head STP

0.058

Page 2: North Head Wastewater Treatment Plant June Pollution … · 2020. 8. 11. · North Head Wastewater Treatment Plant June Pollution Monitoring Summary Air Quality. Licensee: Sydney

North Head Wastewater Treatment Plant May Pollution Monitoring Summary Air Quality

Licensee: Sydney Water

PO Box 399

EPL 378Summary period: 01-05-2018 to 31-05-2018 Date obtained: 20-07-18Date published: 27-07-18 PARRAMATTA NSW 2124

EPA Point 33

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1487 <0.004 <0.004 5 yes

EPA Point 34

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1487 <0.004 5 yes

EPA Point 35

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.01 4.89 5 yes

EPA Point 43

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1488 <0.03 <0.03 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.01 <0.01 5 yes

EPA Point 63

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1488 <0.15 1.74 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.075 1.384 5 yes

Point description: Ventilation outlet at Scotts Creek

Point description: Ventilation outlet at Lane Cove River West

*

Maximum limits for air quality are based on the Protection of the Environment Operations (Clean Air) Regulation 2010 - Schedule 4 Standards of concentration for scheduled

premises: general activities and plant.

Point description: Ventilation outlet at North Head STP for Northside Storage Tunnel

Point description: NSOOS Scrubber outlet at the North Head STP

Point description: Central scrubber outlet at North Head STP

0.010

Page 3: North Head Wastewater Treatment Plant June Pollution … · 2020. 8. 11. · North Head Wastewater Treatment Plant June Pollution Monitoring Summary Air Quality. Licensee: Sydney

North Head Wastewater Treatment Plant April Pollution Monitoring Summary Air Quality

Licensee: Sydney Water

PO Box 399

EPL 378Summary period: 01-04-2018 to 30-04-2018 Date obtained: 20-07-18Date published: 27-07-18 PARRAMATTA NSW 2124

EPA Point 33

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1440 <0.004 <0.004 5 yes

EPA Point 34

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1439 <0.004 5 yes

EPA Point 35

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1442 <0.01 4.80 5 yes

EPA Point 43

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1442 <0.03 <0.03 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1442 <0.01 <0.01 5 yes

EPA Point 63

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1442 <0.15 1.05 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1442 <0.075 1.882 5 yes

Point description: Ventilation outlet at Scotts Creek

Point description: Ventilation outlet at Lane Cove River West

*Maximum limits for air quality are based on the Protection of the Environment Operations (Clean Air) Regulation 2010 - Schedule 4 Standards of concentration for scheduledpremises: general activities and plant.

Point description: Ventilation outlet at North Head STP for Northside Storage Tunnel

Point description: NSOOS Scrubber outlet at the North Head STP

Point description: Central scrubber outlet at North Head STP

<0.004

Page 4: North Head Wastewater Treatment Plant June Pollution … · 2020. 8. 11. · North Head Wastewater Treatment Plant June Pollution Monitoring Summary Air Quality. Licensee: Sydney

North Head Wastewater Treatment Plant March Pollution Monitoring Summary Air Quality

Licensee: Sydney Water

PO Box 399

EPL 378Summary period: 01-03-2018 to 31-03-2018 Date obtained: 20-07-18Date published: 27-07-18 PARRAMATTA NSW 2124

EPA Point 33

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1486 <0.004 <0.004 5 yes

EPA Point 34

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.004 5 yes

EPA Point 35

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.01 1.57 5 yes

EPA Point 43

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1488 <0.03 1.07 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.01 1.41 5 yes

EPA Point 63

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1488 <0.15 1.79 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.075 1.685 5 yes

Point description: Ventilation outlet at Scotts Creek

Point description: Ventilation outlet at Lane Cove River West

*Maximum limits for air quality are based on the Protection of the Environment Operations (Clean Air) Regulation 2010 - Schedule 4 Standards of concentration for scheduledpremises: general activities and plant.

Point description: Ventilation outlet at North Head STP for Northside Storage Tunnel

Point description: NSOOS Scrubber outlet at the North Head STP

Point description: Central scrubber outlet at North Head STP

0.042

Page 5: North Head Wastewater Treatment Plant June Pollution … · 2020. 8. 11. · North Head Wastewater Treatment Plant June Pollution Monitoring Summary Air Quality. Licensee: Sydney

North Head Wastewater Treatment Plant February Pollution Monitoring Summary Air Quality

Licensee: Sydney Water

PO Box 399

EPL 378Summary period: 01-02-2018 to 28-02-2018 Date obtained: 20-07-18Date published: 27-07-18 PARRAMATTA NSW 2124

EPA Point 33

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1344 <0.004 <0.004 5 yes

EPA Point 34

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1344 <0.004 5 yes

EPA Point 35

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1344 <0.01 1.25 5 yes

EPA Point 43

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1344 <0.03 0.06 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1344 <0.01 <0.01 5 yes

EPA Point 63

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1344 0.050 1.09 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1344 <0.075 1.389 5 yes

Point description: Ventilation outlet at Scotts Creek

Point description: Ventilation outlet at Lane Cove River West

*Maximum limits for air quality are based on the Protection of the Environment Operations (Clean Air) Regulation 2010 - Schedule 4 Standards of concentration for scheduledpremises: general activities and plant.

Point description: Ventilation outlet at North Head STP for Northside Storage Tunnel

Point description: NSOOS Scrubber outlet at the North Head STP

Point description: Central scrubber outlet at North Head STP

<0.004

Page 6: North Head Wastewater Treatment Plant June Pollution … · 2020. 8. 11. · North Head Wastewater Treatment Plant June Pollution Monitoring Summary Air Quality. Licensee: Sydney

North Head Wastewater Treatment Plant January Pollution Monitoring Summary Air Quality

Licensee: Sydney Water

PO Box 399

EPL 378Summary period: 01-01-2018 to 31-01-2018 Date obtained: 02-02-18Date published: 09-02-18 PARRAMATTA NSW 2124

EPA Point 33

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.004 <0.004 5 yes

EPA Point 34

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.004 5 yes

EPA Point 35

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.01 2.76 5 yes

EPA Point 43

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1488 <0.03 4.12 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.01 3.71 5 yes

EPA Point 63

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1488 <0.15 1.09 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.075 1.389 5 yes

Point description: Ventilation outlet at Scotts Creek

Point description: Ventilation outlet at Lane Cove River West

*Maximum limits for air quality are based on the Protection of the Environment Operations (Clean Air) Regulation 2010 - Schedule 4 Standards of concentration for scheduledpremises: general activities and plant.

Point description: Ventilation outlet at North Head STP for Northside Storage Tunnel

Point description: NSOOS Scrubber outlet at the North Head STP

Point description: Central scrubber outlet at North Head STP

0.128

Page 7: North Head Wastewater Treatment Plant June Pollution … · 2020. 8. 11. · North Head Wastewater Treatment Plant June Pollution Monitoring Summary Air Quality. Licensee: Sydney

North Head Wastewater Treatment Plant December Pollution Monitoring Summary Air Quality

Licensee: Sydney Water

PO Box 399

EPL 378Summary period: 01-12-2017 to 31-12-2017 Date obtained: 20-07-18Date published: 27-07-18 PARRAMATTA NSW 2124

EPA Point 33

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.004 <0.004 5 yes

EPA Point 34

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1487 <0.004 5 yes

EPA Point 35

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.01 4.65 5 yes

EPA Point 43

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1488 <0.03 4.06 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.01 0.23 5 yes

EPA Point 63

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1488 <0.15 1.04 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.075 1.718 5 yes

Point description: Ventilation outlet at Scotts Creek

Point description: Ventilation outlet at Lane Cove River West

*Maximum limits for air quality are based on the Protection of the Environment Operations (Clean Air) Regulation 2010 - Schedule 4 Standards of concentration for scheduledpremises: general activities and plant.

Point description: Ventilation outlet at North Head STP for Northside Storage Tunnel

Point description: NSOOS Scrubber outlet at the North Head STP

Point description: Central scrubber outlet at North Head STP

0.031

Page 8: North Head Wastewater Treatment Plant June Pollution … · 2020. 8. 11. · North Head Wastewater Treatment Plant June Pollution Monitoring Summary Air Quality. Licensee: Sydney

North Head Wastewater Treatment Plant November Pollution Monitoring Summary Air Quality

Licensee: Sydney Water

PO Box 399

EPL 378Summary period: 01-11-2017 to 30-11-2017 Date obtained: 20-07-18Date published: 27-07-18 PARRAMATTA NSW 2124

EPA Point 33

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1440 <0.004 <0.004 5 yes

EPA Point 34

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1437 <0.004 5 yes

EPA Point 35

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1440 <0.01 3.42 5 yes

EPA Point 43

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1440 <0.03 3.51 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1440 <0.01 0.44 5 yes

EPA Point 63

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1440 <0.15 0.96 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1440 <0.075 0.538 5 yes

Point description: Ventilation outlet at Scotts Creek

Point description: Ventilation outlet at Lane Cove River West

*Maximum limits for air quality are based on the Protection of the Environment Operations (Clean Air) Regulation 2010 - Schedule 4 Standards of concentration for scheduledpremises: general activities and plant.

Point description: Ventilation outlet at North Head STP for Northside Storage Tunnel

Point description: NSOOS Scrubber outlet at the North Head STP

Point description: Central scrubber outlet at North Head STP

0.013

Page 9: North Head Wastewater Treatment Plant June Pollution … · 2020. 8. 11. · North Head Wastewater Treatment Plant June Pollution Monitoring Summary Air Quality. Licensee: Sydney

North Head Wastewater Treatment Plant October Pollution Monitoring Summary Air Quality

Licensee: Sydney Water

PO Box 399

EPL 378Summary period: 01-10-2017 to 31-10-2017 Date obtained: 06-11-17Date published: 11-11-17 PARRAMATTA NSW 2124

EPA Point 33

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1486 <0.004 <0.004 5 yes

EPA Point 34

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1486 <0.004 5 yes

EPA Point 35

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1486 <0.01 3.55 5 yes

EPA Point 43

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1486 <0.03 5.13 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1486 <0.01 4.27 5 yes

EPA Point 63

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1486 <0.15 0.42 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1486 <0.075 1.314 5 yes

Point description: Ventilation outlet at Scotts Creek

Point description: Ventilation outlet at Lane Cove River West

*Maximum limits for air quality are based on the Protection of the Environment Operations (Clean Air) Regulation 2010 - Schedule 4 Standards of concentration for scheduledpremises: general activities and plant.

Point description: Ventilation outlet at North Head STP for Northside Storage Tunnel

Point description: NSOOS Scrubber outlet at the North Head STP

Point description: Central scrubber outlet at North Head STP

0.070

Page 10: North Head Wastewater Treatment Plant June Pollution … · 2020. 8. 11. · North Head Wastewater Treatment Plant June Pollution Monitoring Summary Air Quality. Licensee: Sydney

North Head Wastewater Treatment Plant September Pollution Monitoring Summary Air Quality

Licensee: Sydney Water

PO Box 399

EPL 378Summary period: 01-09-2017 to 30-09-2017 Date obtained: 20-07-18Date published: 27-07-18 PARRAMATTA NSW 2124

EPA Point 33

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1440 <0.004 <0.004 5 yes

EPA Point 34

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1439 <0.004 5 yes

EPA Point 35

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1440 <0.01 2.17 5 yes

EPA Point 43

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1440 <0.03 13.13 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1440 <0.01 0.47 5 yes

EPA Point 63

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1440 <0.15 0.87 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1440 <0.075 1.854 5 yes

Point description: Ventilation outlet at Scotts Creek

Point description: Ventilation outlet at Lane Cove River West

*Maximum limits for air quality are based on the Protection of the Environment Operations (Clean Air) Regulation 2010 - Schedule 4 Standards of concentration for scheduledpremises: general activities and plant.

Point description: Ventilation outlet at North Head STP for Northside Storage Tunnel

Point description: NSOOS Scrubber outlet at the North Head STP

Point description: Central scrubber outlet at North Head STP

0.105

Page 11: North Head Wastewater Treatment Plant June Pollution … · 2020. 8. 11. · North Head Wastewater Treatment Plant June Pollution Monitoring Summary Air Quality. Licensee: Sydney

North Head Wastewater Treatment Plant August Pollution Monitoring Summary Air Quality

Licensee: Sydney Water

PO Box 399

EPL 378Summary period: 01-08-2017 to 31-08-2017 Date obtained: 20-07-18Date published: 27-07-18 PARRAMATTA NSW 2124

EPA Point 33

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.004 <0.004 5 yes

EPA Point 34

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1486 <0.004 5 yes

EPA Point 35

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.01 4.69 5 yes

EPA Point 43

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1488 <0.03 8.17 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.01 1.15 5 yes

EPA Point 63

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1488 <0.15 <0.15 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.075 1.885 5 yes

Point description: Ventilation outlet at Scotts Creek

Point description: Ventilation outlet at Lane Cove River West

*Maximum limits for air quality are based on the Protection of the Environment Operations (Clean Air) Regulation 2010 - Schedule 4 Standards of concentration for scheduledpremises: general activities and plant.

Point description: Ventilation outlet at North Head STP for Northside Storage Tunnel

Point description: NSOOS Scrubber outlet at the North Head STP

Point description: Central scrubber outlet at North Head STP

0.128

Page 12: North Head Wastewater Treatment Plant June Pollution … · 2020. 8. 11. · North Head Wastewater Treatment Plant June Pollution Monitoring Summary Air Quality. Licensee: Sydney

North Head Wastewater Treatment Plant July Pollution Monitoring Summary Air Quality

Licensee: Sydney Water

PO Box 399

EPL 378Summary period: 01-07-2017 to 31-07-2017 Date obtained: 20-07-18Date published: 27-07-18 PARRAMATTA NSW 2124

EPA Point 33

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.004 <0.004 5 yes

EPA Point 34

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1487 <0.004 5 yes

EPA Point 35

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.01 2.26 5 yes

EPA Point 43

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1488 <0.03 0.28 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.01 0.16 5 yes

EPA Point 63

pollutantunit of

measuresampling frequency

number of samples

minimum result

maximum result

maximum limit

within limits*

chlorine gas mg/m3 30 minutes 1488 <0.15 <0.15 200 yes

hydrogen sulphide gas mg/m3 30 minutes 1488 <0.075 1.505 5 yes

Point description: Ventilation outlet at Scotts Creek

Point description: Ventilation outlet at Lane Cove River West

*Maximum limits for air quality are based on the Protection of the Environment Operations (Clean Air) Regulation 2010 - Schedule 4 Standards of concentration for scheduledpremises: general activities and plant.

Point description: Ventilation outlet at North Head STP for Northside Storage Tunnel

Point description: NSOOS Scrubber outlet at the North Head STP

Point description: Central scrubber outlet at North Head STP

0.034

Page 13: North Head Wastewater Treatment Plant June Pollution … · 2020. 8. 11. · North Head Wastewater Treatment Plant June Pollution Monitoring Summary Air Quality. Licensee: Sydney

North Head Wastewater Treatment Plant

Air Quality Correction Log EPL 378

Licensee: Sydney Water

PO Box 399

PARRAMATTA NSW 2124

EPA Point 33 Point description: Ventilation outlet at Scotts Creek

Pollutant

unit of

measure

Original data Corrected data Date

corrected

Date

originally

published

Reason number of samples

minimum maximum Number of samples

minimum maximum

hydrogen sulphide gas mg/m3 1488 1486 27-07-18 13-04-18 Incorrect number of samples reported

hydrogen sulphide gas mg/m3 1442 1440 27-07-18 11-05-18 Incorrect number of samples reported

hydrogen sulphide gas mg/m3 1488 1487 27-07-18 13-06-18 Incorrect number of samples reported

EPA Point 33 Point description: Ventilation outlet at Scotts Creek

Pollutant

unit of

measure

Original data Corrected data Date

corrected

Date

originally

published

Reason number of samples

minimum maximum Number of samples

minimum maximum

hydrogen sulphide gas mg/m3 1488 1487 27-07-18 11-08-17 Incorrect number of samples reported

hydrogen sulphide gas mg/m3 1488 1486 27-07-18 13-09-17 Incorrect number of samples reported

hydrogen sulphide gas mg/m3 1440 1439 27-07-18 11-10-17 Incorrect number of samples reported

hydrogen sulphide gas mg/m3 1440 1437 27-07-18 11-12-17 Incorrect number of samples reported

hydrogen sulphide gas mg/m3 1488 1487 27-07-18 09-01-18 Incorrect number of samples reported

hydrogen sulphide gas mg/m3 <0.004 0.006 <0.004 <0.004 27-07-18 13-03-18 Incorrect maximum value reported

hydrogen sulphide gas mg/m3 1440 1439 27-07-18 11-05-18 Incorrect number of samples reported

hydrogen sulphide gas mg/m3 1488 <0.04 0.014 1487 <0.004 0.010 27-07-18 13-06-18 Incorrect number of samples and maximum value

reported

EPA Point 35 Point description: Ventilation outlet at North Head STP for Northside Storage Tunnel

Pollutant

unit of

measure

Original data Corrected data Date corrected

Date originally

published Reason

minimum maximum minimum maximum

hydrogen sulphide gas mg/m3 <0.01 1.25 <0.01 0.15 1-06-18 15-03-18 Incorrect maximum value reported

EPA Point 43 Point description: NSOOS Scrubber outlet at the North Head STP

Pollutant

unit of

measure

Original data Corrected data Date corrected

Date originally

published Reason

minimum maximum minimum maximum

chlorine gas mg/m3 <0.03 0.06 <0.03 2.47 1-06-18 15-03-18 Incorrect maximum value reported

EPA Point 63 Point description: Central scrubber outlet at North Head STP

Pollutant

unit of

measure

Original data Corrected data Date corrected

Date originally

published Reason

minimum maximum minimum maximum

chlorine gas mg/m3 0.05 1.09 <0.15 2.80 1-06-18 15-03-18

Incorrect minimum detection limit and maximum value

reported

chlorine gas mg/m3 0.05 1.79 <0.15 1.79 1-06-18 13-04-18 Incorrect reporting of minimum detection limit

Page 14: North Head Wastewater Treatment Plant June Pollution … · 2020. 8. 11. · North Head Wastewater Treatment Plant June Pollution Monitoring Summary Air Quality. Licensee: Sydney

hydrogen sulphide gas mg/m3 <0.075 1.389 <0.075 1.528 1-06-18 15-03-18 Incorrect maximum value reported