NORTH ELMORE CHEVRON - adem.state.al.us North Elmore Chevron facility is located at 1200 Alabama...
Transcript of NORTH ELMORE CHEVRON - adem.state.al.us North Elmore Chevron facility is located at 1200 Alabama...
NORTH ELMORE CHEVRON MODIFIED CAP REPORT
ATTF CP-25
PREPARED FOR Interstate Oil Company, Inc. P.O. Box 967 Montgomery, AL 36101
DATE December 14, 2017
PREPARED BY CDG Engineers & Associates, Inc. 1840 E. Three Notch St. Andalusia, AL 36420
North Elmore Chevron 1200 AL Hwy 143 Elmore, Elmore Co., AL Fac ID 12530-051-004599 UST 11-06-10
1
INTRODUCTION The North Elmore Chevron facility is located at 1200 Alabama Highway 14 in Elmore, Alabama.
Topographically the site is an area of moderate relief in southwestern Elmore County. The site is
in the northeast ¼ of the southeastern ¼ of the southwestern ¼ of Section 12, Township 18 North,
Range 17 East. The geographical coordinates are Latitude 32° 33’ 26.42” North, Longitude 86°
19’ 8.21” West (Figures, Appendix B).
SITE HISTORY The North Elmore Chevron has served as a convenience store and filling station in Elmore,
Alabama since its construction in 1969. The site contains two 6,000 gallon and two 4,000 gallon
Underground Storage Tanks (USTs). Interstate Oil Company is the owner of the USTs and is the
responsible party for the release incident number UST11-06-10.
In May 2011, Interstate Oil Company, Inc. had a Limited Phase II Environmental Site Assessment
(ESA) performed at the North Elmore Chevron as required for a pending real estate transaction. The soil and groundwater samples collected during the Limited Phase II ESA indicated soil and
groundwater constituent concentrations that were above ADEM’s Initial Screening Levels (ISLs).
ADEM was notified of the findings from the Limited Phase II Environmental Site Assessment. On
July 19, 2011, ADEM responded with a letter requiring Interstate Oil Company to Conduct
Investigative and Corrective Actions. In a second letter, ADEM stated that the North Elmore Chevron was eligible under the Alabama Tank Trust Fund (ATTF). In a third letter, ADEM issued
a Pre-approval for a Preliminary Investigation activity requiring that a Preliminary Investigation
be conducted at the site.
SUMMARY OF PREVIOUS SITE ACTIVITIES The Preliminary, Secondary, and Supplemental Secondary Investigations, and Well Installations
have included installing a network of nineteen Type II monitoring wells, one Type III vertical
delineation well, and three 4” recovery wells. An ARBCA Tier I/Tier II Evaluation was prepared
and submitted to ADEM in October 2012 and was approved by ADEM on December 5, 2012. A
Corrective Action Plan (CAP) was prepared in June 2013 for Remediation by Natural Attenuation
(RNA) with MEME events and was approved by ADEM on February 11, 2013.
2
To date, twenty groundwater monitoring events have been conducted at the site between
August 2011 and October 2017. Additionally, three 24-hour Mobile Enhanced Multiphase
Extraction (MEME) events were conducted between April 2013 and October 2013 and thirty-six
8-hour MEME events were conducted between February 2014 and September 2017.
The effectiveness of the MEME events at the North Elmore Chevron site was discussed during a
meeting with ADEM on September 6, 2017. Due to the accumulating costs and disruptions to
the business, CDG recommended that an available Multi-phase Extraction (MPE) system,
currently in operation at an Interstate Oil Company, Inc. ATTF site in Montgomery, be relocated
to the North Elmore site. The MPE system owned by Interstate Oil Company, Inc. was recently
shut down at their Atlanta Highway site (UST11-06-11). This system could be relocated to the
North Elmore site at a significant cost savings as compared to purchasing a new one. The benefits of a dedicated system include increased remediation effort, less impact to the site’s business,
and significant long-term cost benefits.
Upon review, ADEM requested that a Modified CAP be completed for the relocation and
installation the dedicated MPE system at the North Elmore Chevron site.
PURPOSE The purpose of this report is to modify the existing CAP to enhance the remedial efforts at the site. As discussed in a meeting with ADEM on September 6, 2017, a more aggressive remediation
approach is warranted due to the persistence of COC concentrations at the site. The general
objectives of this modified corrective action plan and the proposed remedial efforts for the facility are as follows:
• Ensure that the health and safety of all project personnel is maintained during
remediation activities.
• Enhance the reduction of absorbed phase petroleum hydrocarbons from soils within the
vadose and saturated zone to below the accepted SSTLs.
• Enhance the reduction of dissolved phase petroleum hydrocarbons from groundwater to
below the accepted SSTLs.
• Accomplish these objectives within the proposed period of operation.
3
REMEDIATION RECOMMENDATION PLAN The proposed corrective action includes:
• The installation of four additional recovery wells that will be used in conjunction with the
existing recovery wells for full time MPE recovery efforts;
• A MPE system that is currently in present at the Interstate Oil Company ATTF site, Atlanta
Highway (UST11-06-11), which will be relocated to the North Elmore Chevron site;
• All recovery wells will be connected to the MPE system via underground piping;
• Application for NPDES permit and Air permit.
Well Installation CDG recommends installing four recovery wells. The borings will be completed with a truck
mounted drill rig using hollow stem auger drilling and sampling techniques to depths of approximately 25 feet bgl. As the borings are advanced, soil samples will be collected using
continuous sampling techniques to accurately describe the encountered sediments. The borings
will be sampled using 5-foot split spoon samplers advanced through the augers. The samplers
and augers will be decontaminated between borings.
Based on field head space screening, using a Photo Ionization Detector (PID), two (2) soil samples
will be selected from each boring and placed in two 4 oz. jars with Teflon lids, packed on ice, and shipped under chain-of-custody protocol, to an analytical laboratory for
BTEX/MTBE/Naphthalene analysis using EPA Method 8260B.
The soil borings will be completed as Recovery wells RW-4 through RW-7 as shown in the Figures
in Appendix B. The Type II recovery wells will be emplaced to a depth of approximately 25 feet
bgl. The wells will be constructed of 4-inch PVC pipe with 15 feet of 0.020-inch slotted PVC screen. Graded filter sand (10/20) will be emplaced around the screen, and a bentonite pellet
seal will be emplaced above the sand pack. The remainder of the annulus will be sealed with a
cement grout mixture. A locking watertight cap will be placed in the top of each well, and a
protective casing with a bolt down cover will be installed over the casing in a flush mounted
concrete pad. A typical Type II recovery well construction is shown in the figures (Appendix B).
Following completion, each of the newly installed recovery wells will be developed using a new,
clean plastic bailer until clear, silt free water was being produced. Purge water will be placed into
4
the MPE system for treatment and discharged under the NPDES permit. The proposed locations
of the wells are shown in the figures (Appendix B).
System Detail and Installation The proposed MPE system will utilize a single 40-HP oil-sealed liquid ring vacuum pump (LRVP)
to produce high vacuums and airflows in an effort to remove petroleum constituents from the
impacted subsurface. The LRVP will be connected to a total of six recovery wells (RW-1, RW-2,
RW-4, RW-5, RW-6, and RW-7). All system components, excluding air treatment operations, will
be enclosed in an insulated building with removable panels. Above ground system components
will be enclosed in a wooden privacy fence complete with locking gates in an effort to prevent
unauthorized personnel from entering the immediate area. The fence will be placarded with a
sign listing CDG’s emergency contact information.
Extracted fluids will travel from the extraction wells to a primary Air/Water Separator (AWS),
utilized to separate vapors and groundwater. Vapors will subsequently pass through the LRVP to
two 1,000-pound granular activated carbon vessels, connected in series. Groundwater will flow
from the AWS through an oil-water separator (OWS) to an air stripper (AS) for treatment. The AS is capable of decreasing hydrocarbon concentrations to below permit requirements at flows up
to thirty gallons per minute (gpm). The treated effluent will be discharged under the terms of the
general National Pollutant Discharge Elimination System (NPDES) permit to the surface drainage along Highway 143. A 2-inch diameter discharge line will be installed from the system compound
to the discharge point. The discharge will be sampled monthly and the discharge monitoring
reports (DMRs) submitted to ADEM in accordance with the permit requirements.
An illustration of the locations of the recovery wells, flow lines, effluent discharge and proposed
system location is shown in the figures (Appendix B). Equipment specifications and cut sheets
are provided in Appendix D.
Additionally, the system will be outfitted with an intrinsically safe alarm sensor such that should
an alarm condition occur, the system will automatically shut down until the alarm can be relieved
and the system reset. These sensors are included in an effort to maintain effective operation of
the system and reduce the potential for untreated discharges. The alarms will be integrated with
a telemetry system to notify CDG of a system fault, so that it can be restarted as soon as possible.
The telemetry system will allow CDG to remotely restart the system, depending on the type of
5
alarm. In addition, remote shut down capabilities will be available. A run time (hour) meter will
be installed on the system and the system will be equipped with applicable gauges and meters
to allow for measurements as required for monthly and/or quarterly reporting.
Each recovery well will be connected to the DPE system via underground piping consisting of 2-
inch ID Schedule 40 PVC pipe. A one-inch diameter flexible Spiralite® drop tube, extending to
approximately one foot below the static groundwater level, will be installed in each extraction
well to accomplish soil vapor and groundwater recovery. A dedicated flow line will be
constructed to each well and will be terminated at the system within a well control gallery
consisting of a ball-valve, vacuum gage, and site glass to allow for control and monitoring of the
flow from each well. The proposed recovery well locations and piping network, along with a
typical recovery well detail and an illustration of the well control gallery construction is shown in the Figures (Appendix B).
Local Permitting CDG and any subcontractors engaged to work on this project will obtain all necessary permits
from the City of Elmore for the required construction activities. The anticipated cost for obtaining these permits has been factored into the proposed cost for the system installation phase of this
project.
Groundwater Monitoring Groundwater samples will continue to be collected quarterly from all site monitoring wells. The
groundwater samples will be collected from the monitoring wells using new clean plastic bailers
and transferred to 40 milliliter (mL) glass volatile organic analysis (VOA) vials preserved with
hydrochloric acid (HCl) for BTEX, MTBE, and Naphthalene analysis using EPA Method 8260B.
During each groundwater sampling event, all monitoring wells will also be monitored for natural
attenuation parameters (DO, pH, and ORP).
PROPOSED REPORTING REQUIREMENTS CDG will submit reports in accordance with ADEM requirements. These reports will include the
following:
6
System Installation Report - This report will include the recovery well installation details, system
installation details, and application/approval of the NPDES permit.
Reporting of Quarterly Operation and Maintenance Events Effectiveness - CDG proposes to
submit quarterly CASEMR reports, which will summarize system and field activities and the
progress of site groundwater constituent concentrations towards achieving approved corrective
action levels. The following data will be included in each report: field activities performed,
groundwater elevations, groundwater analytical results as compared to target levels,
potentiometric surface maps, BTEX/MTBE contour maps, pounds of hydrocarbons removed in
the vapor and liquid phase, and gallons of water treated. The reports will also include
remediation effectiveness and recommendations concerning additional measures deemed
necessary.
Request for Closure Evaluation of Corrective Action - This report will include data that
demonstrates that remediation goals have been achieved and will request a status of No Further Action (NFA) for the site. Methods for abandonment of monitoring and recovery wells will be
described.
Site Closure Report - This report will describe in detail the closure of the site and removal of all
monitoring wells.
SCHEDULE OF IMPLEMENTATION It is anticipated that the proposed corrective action plan will begin with the first groundwater
monitoring event following the approval of the CAP. The following schedule indicates the
timetable for major project events to be completed as part of this corrective action plan:
Time Following Cap Approval (months)
Project Event Project Event Length
0-3 Recovery Well Installation and MPE System Installation 3 Weeks 3 – 24 Quarterly operation and maintenance events,
evaluation of performance, and recommendations for further corrective action if required
2 Years
25-36 Rebound Monitoring 12 Months
7
37 Well abandonment; completion and submittal of final report contingent upon ADEM’s concurrence with NFA recommendation.
2 Months
PROPOSED SAMPLING AND MONITORING ACTIVITIES Following the approval of the CAP, operation and maintenance (O&M) activities of the corrective
action system bi-monthly and groundwater sampling of all monitoring wells will be conducted
quarterly. A summary of the scheduled sampling points is presented below:
Sample Location
and Medium Sample Frequency Sample Parameters
MW-1 through MW-19, VW-1, and RW-1 through RW-7
Quarterly BTEX/MTBE/Naphthalene (EPA Method 8260B)
MW-1 through MW-19, VW-1, and RW-1 through RW-7
Quarterly DO, pH, Redox
Based on the results of the groundwater monitoring, CDG will make adjustments to the system
as necessary to ensure that it continues to perform optimally.
Tables …………………………………………………………………………………………… A
Figures …………………………………………………………………………………………… BSite Location USGS Topographic MapSite Map with Utility and Well LocationsSite Map with Proposed System Location, Well Location, and Piping LocationSystem Effluent Discharge Location MapRemediation Compound LayoutPiping Cross Section and Manifold DetailRecovery Well Construction Detail
ADEM Forms …………………………………………………………………………………… CUST Release Fact SheetUST Site Classification System Checklist
System Details………………………………………………………………………………… D
Tasks Performance Summary ………………………………………………………… E
APPENDICES
Appendices
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
SAMPLE ID SAMPLE DATE DEPTH (FT) MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
MW-1 08/17/11 12.5 - 17.5 <0.0056 <0.0056 <0.0056 0.0126 0.1097 0.1223 0.3170MW-1 08/17/11 17.5 - 22.5 0.4010 2.2220 30.2075 12.1695 80.1608 124.7598 2.1100
9,680 28.7 352 152 186 - 138
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
08/18/11 21.82 201.86 - - 08/18/11 1.95 5.6 18601/30/12 21.50 202.18 - - 01/30/1205/08/12 18.84 204.84 - - 05/08/1208/16/12 20.68 203.00 - - 08/16/1211/05/12 21.48 202.20 - - 11/05/1204/01/13 17.17 206.51 - - 04/01/1304/24/13 16.32 207.36 - - 04/24/1307/08/13 18.57 205.11 - - 07/08/1310/01/13 18.66 205.02 - - 10/01/1301/22/14 17.49 206.19 - - 01/22/1405/21/14 13.79 209.89 - - 05/21/1406/05/14 14.94 208.74 - - 06/05/1407/01/14 15.66 208.02 - - 07/01/1408/06/14 16.70 206.98 - - 08/06/1409/15/14 18.76 204.92 - - 09/15/1410/08/14 20.15 203.53 - - 10/08/1411/06/14 20.69 202.99 - - 11/06/1401/28/15 20.00 203.68 - - 01/28/1505/14/15 17.74 205.94 - - 05/14/15 2.47 5.3 14409/16/15 20.30 203.38 - 4.0 09/16/15 - 5.2 22702/04/16 17.42 206.27 0.01 2.0 02/04/1606/07/16 17.17 206.51 - 4.0 06/07/1610/19/16 21.41 202.27 - 2.0 10/19/1602/28/17 19.78 203.90 - 3.0 02/28/1706/08/17 17.24 206.44 - 4.0 06/08/17
PCW GALLONS CONTAINERIZED
SOIL ANALYTICAL SUMMARY (mg/Kg)
Onsite Indoor Air Inhalation SSTLs:
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT) SAMPLE DATE
DISSOLVED OXYGEN (mg/L) pH
REDOX POTENTIAL (mV)
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
NOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLED
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
Monitoring Point Data Summary TableNorth Elmore Chevron MW-1
08/17/11 28.5 13.5 - 28.5 223.68
NOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLED
NOT SAMPLED
NOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLEDNOT SAMPLED
FREE PRODUCT (0.01 FT)NOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
Monitoring Point Data Summary TableNorth Elmore Chevron MW-1
08/17/11 28.5 13.5 - 28.5 223.68
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
10/18/17 18.64 205.04 - 3.0 10/18/17 2.97 5.8 121
REDOX POTENTIAL (mV)
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L) pH
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
Monitoring Point Data Summary TableNorth Elmore Chevron MW-1
08/17/11 28.5 13.5 - 28.5 223.68
SAMPLE DATE MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
08/18/11 0.3894 4.3451 10.5381 1.1124 6.4555 22.4511 0.230501/30/12 0.2090 1.1502 1.9907 0.1702 1.2153 4.5264 0.074605/08/12 0.2323 1.1724 2.1780 0.2779 1.6450 5.2733 0.361808/16/12 0.2027 0.6539 1.0601 0.1445 0.8390 2.6975 0.034611/05/12 0.4332 1.2542 1.6475 0.1733 1.0076 4.0826 0.032204/01/13 0.0418 0.1902 0.4757 0.0887 0.7654 1.5200 0.142504/23/1307/08/13 0.0935 0.3388 0.5771 0.1059 0.8282 1.8500 0.068210/01/13 0.0508 0.3391 0.5003 0.0685 0.4147 1.3226 0.014201/22/14 0.0434 0.1465 0.2749 0.0249 0.3108 0.7571 0.073405/21/14 0.0913 0.2231 0.2116 0.0354 0.5179 0.9880 0.076709/15/14 0.1504 0.9988 1.1339 0.1986 1.0107 3.3420 0.098601/28/15 0.0166 0.2354 1.0286 0.0849 0.5829 1.9318 0.050405/14/15 0.0058 0.0531 0.0570 0.0033 0.0559 0.1693 0.003609/16/15 0.0440 0.3744 0.5719 0.0374 0.4603 1.4440 0.043102/04/16 0.0149 0.1930 0.2360 0.0125 0.2620 0.7035 0.043406/07/16 0.2375 3.5377 5.2060 0.5103 3.6418 12.8958 0.846610/19/16 <0.0500 0.9362 1.5364 0.1111 1.0135 3.5972 0.110002/28/17 0.0050 0.2445 0.4095 0.0237 0.3530 1.0307 0.021306/08/17 0.0015 0.0383 0.0421 0.0042 0.1055 0.1901 0.010010/18/17 0.0025 0.2896 0.2871 0.0422 0.5077 1.1266 0.0343
GRP SSTLs: 0.818 0.204 40.9 28.6 175 - 0.818Inhalation SSTLs: 48,000 89.6 526 169 175 - 31
GROUNDWATER ANALYTICAL SUMMARY (mg/L)
CORRECTIVE ACTION STARTED: MEME EVENTS
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
SAMPLE ID SAMPLE DATE DEPTH (FT) MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
MW-2 08/16/11 12.5 - 17.5 0.0068 <0.00505 <0.00505 <0.00505 <0.00505 BDL <0.0660MW-2 08/16/11 17.5 - 22.5 0.3655 0.9766 2.1894 3.9517 22.6253 29.7430 0.4910
9,680 28.7 352 152 186 - 138
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
08/18/11 21.02 202.37 - - 08/18/11 2.43 5.3 19901/30/12 20.47 202.92 - - 01/30/1205/08/12 18.79 204.60 - - 05/08/1208/16/12 20.62 202.77 - - 08/16/1211/05/12 21.60 201.79 - - 11/05/1204/01/13 17.02 206.37 - - 04/01/13 3.24 5.4 19204/24/13 16.23 207.16 - - 04/24/1307/08/13 18.50 204.89 - - 07/08/1307/29/13 17.72 205.67 - - 07/29/1310/01/13 18.60 204.79 - - 10/01/1301/22/14 17.53 205.86 - - 01/22/1405/21/14 13.64 209.75 - - 05/21/1406/05/14 14.55 208.84 - - 06/05/1407/01/14 15.53 207.86 - - 07/01/1408/06/14 16.67 206.72 - - 08/06/1409/15/14 18.63 204.76 - - 09/15/1410/08/14 19.10 204.29 - - 10/08/1411/06/14 19.42 203.97 - - 11/06/1401/28/15 19.66 203.73 - - 01/28/1505/14/15 17.79 205.60 - - 05/14/15 2.14 5.1 15309/16/15 20.33 203.06 - 4.0 09/16/15 - 5.3 22102/04/16 17.50 205.89 - 2.0 02/04/16 2.69 6.1 19806/07/16 16.89 206.50 - 4.0 06/07/16 2.68 6.4 14210/19/16 21.32 202.07 - 2.0 10/19/1602/28/17 19.24 204.15 - 2.0 02/28/17 3.49 6.3 171
Monitoring Point Data Summary TableNorth Elmore Chevron MW-2
08/16/11 28.5 13.5 - 28.5 223.39
NOT SAMPLED
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SOIL ANALYTICAL SUMMARY (mg/Kg)
Onsite Indoor Air Inhalation SSTLs:
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L) pH
REDOX POTENTIAL (mV)
NOT SAMPLEDNOT SAMPLEDNOT SAMPLED
NOT SAMPLED
NOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLED
NOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Monitoring Point Data Summary TableNorth Elmore Chevron MW-2
08/16/11 28.5 13.5 - 28.5 223.39
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
06/08/17 17.39 206.00 - 3.0 06/08/1710/18/17 18.79 204.60 - 3.0 10/18/17 2.51 5.7 39
NOT SAMPLED
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L) pH
REDOX POTENTIAL (mV)
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Monitoring Point Data Summary TableNorth Elmore Chevron MW-2
08/16/11 28.5 13.5 - 28.5 223.39
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SAMPLE DATE MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
08/18/11 0.0384 0.2055 0.1991 0.1185 0.6216 1.1447 0.004401/30/12 0.0289 0.2000 0.1584 0.0631 0.3291 0.7506 0.011605/08/12 1.0377 1.6973 0.6369 0.1802 1.8898 4.4042 0.229008/16/12 0.0443 0.0109 0.0012 <0.0010 0.0071 0.0192 0.001411/05/12 0.0169 0.0586 0.0206 0.0151 0.0937 0.1880 0.003404/01/13 0.0341 0.0047 0.0027 <0.0010 0.0100 0.0174 0.001504/23/1307/08/13 0.6625 1.0908 0.9540 0.2620 1.6841 3.9909 0.081910/01/13 0.8892 0.9424 0.3917 0.0468 1.1687 2.5496 0.102601/22/14 0.0301 0.0234 0.0042 0.0015 0.0266 0.0557 0.002605/21/14 1.2437 1.0533 0.0368 0.2044 1.0425 2.3370 0.122809/15/14 0.1649 0.7952 0.0309 0.1176 0.4935 1.4372 0.088201/28/15 0.0053 0.0144 0.0027 0.0053 0.0245 0.0469 <0.001005/14/15 0.1876 0.3084 0.0742 0.0709 0.5337 0.9872 0.085409/16/15 0.0094 0.0028 <0.0010 <0.0010 <0.0010 0.0028 <0.001002/04/16 0.0041 <0.0010 <0.0050 <0.0010 <0.0010 BDL <0.005006/07/16 0.4167 0.5320 0.0270 0.1573 0.9441 1.6604 0.186110/19/16 0.0039 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001002/28/17 0.0012 0.0257 0.0059 0.0197 0.1468 0.1981 <0.001006/08/17 0.0027 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001010/18/17 0.1958 0.6546 0.0236 0.1408 1.1499 1.9689 0.0773
GRP SSTLs: 0.818 0.204 40.9 28.6 175 - 0.818Inhalation SSTLs: 48,000 89.6 526 169 175 - 31
GROUNDWATER ANALYTICAL SUMMARY (mg/L)
CORRECTIVE ACTION STARTED: MEME EVENTS
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
SAMPLE ID SAMPLE DATE DEPTH (FT) MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
MW-3 08/16/11 7.5 - 12.5 <0.1133 0.2718 12.0894 14.8743 102.7677 130.0032 10.7000MW-3 08/16/11 12.5 - 17.5 <0.6351 1.5336 32.7437 18.4938 129.1865 181.9576 10.3000
9,680 28.7 352 152 186 - 138
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
08/18/11 19.00 203.79 - - 08/18/11 1.54 5.8 13501/30/12 17.70 205.09 - - 01/30/1205/08/12 16.30 206.49 - - 05/08/1208/16/12 18.63 204.16 - - 08/16/1211/05/12 19.65 203.14 - - 11/05/1204/01/13 14.17 208.62 - - 04/01/1304/24/13 13.53 209.26 - - 04/24/1307/08/13 16.37 206.47 0.06 - 07/08/1307/29/13 15.20 207.59 - - 07/29/1310/01/13 15.47 207.33 0.01 - 10/01/1310/30/13 17.88 204.96 0.06 - 10/30/1301/22/14 14.65 208.14 - - 01/22/1402/06/14 14.95 207.85 0.01 - 02/06/1405/21/14 11.73 211.06 - - 05/21/1406/05/14 12.75 210.04 - - 06/05/1407/01/14 13.59 209.20 - - 07/01/1408/06/14 14.47 208.32 - - 08/06/1409/15/14 16.79 206.01 0.01 - 09/15/1410/08/14 17.58 205.21 - - 10/08/1411/06/14 18.10 204.69 - - 11/06/1401/28/15 17.05 205.74 - - 01/28/1505/14/15 15.38 207.41 - - 05/14/15 1.89 5.5 14809/16/15 18.30 204.49 - 5.0 09/16/15 - 5.4 15702/04/16 14.35 208.45 0.01 2.0 02/04/1606/07/16 15.24 207.55 - 5.0 06/07/16
Monitoring Point Data Summary TableNorth Elmore Chevron MW-3
08/16/11 29 14 - 29 222.79
NOT SAMPLEDNOT SAMPLED
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SOIL ANALYTICAL SUMMARY (mg/Kg)
Onsite Indoor Air Inhalation SSTLs:
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L) pH
REDOX POTENTIAL (mV)
NOT SAMPLEDNOT SAMPLEDNOT SAMPLED
NOT SAMPLED
FREE PRODUCT (0.01 FT)NOT SAMPLED
FREE PRODUCT (0.06 FT)NOT SAMPLED
FREE PRODUCT (0.01 FT)
NOT SAMPLEDFREE PRODUCT (0.06 FT)
NOT SAMPLEDFREE PRODUCT (0.01 FT)
FREE PRODUCT (0.01 FT)NOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Monitoring Point Data Summary TableNorth Elmore Chevron MW-3
08/16/11 29 14 - 29 222.79
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
10/19/16 19.54 203.25 - 3.0 10/19/1602/28/17 16.21 206.58 - 4.0 02/28/1706/08/17 14.53 208.26 - 5.0 06/08/1710/18/17 16.75 206.04 - 4.0 10/18/17 2.57 5.9 142
NOT SAMPLED
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L) pH
REDOX POTENTIAL (mV)
NOT SAMPLEDNOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Monitoring Point Data Summary TableNorth Elmore Chevron MW-3
08/16/11 29 14 - 29 222.79
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SAMPLE DATE MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
08/18/11 0.1088 1.0264 4.1600 0.6117 4.1437 9.9418 0.238401/30/12 0.0351 0.2861 0.7102 0.1396 1.5501 2.6860 0.127105/08/12 0.2659 1.7272 4.7063 0.6439 6.3392 13.4166 0.885608/16/12 0.0940 0.9765 3.2962 0.4650 4.7741 9.5118 0.317111/05/12 0.0476 0.3155 1.1184 0.2264 2.1567 3.8170 0.171604/01/13 0.5207 3.1475 9.5564 1.0636 8.4042 22.1717 0.686604/23/1307/08/13 0.1913 1.7259 6.8926 0.9955 8.4141 18.0281 0.685310/01/13 0.0669 1.0000 4.7269 0.4575 4.8383 11.0227 0.354501/22/14 0.5674 2.7447 6.8918 0.7785 6.6731 17.0881 1.084105/21/14 0.3074 1.4955 7.1824 0.9498 7.4505 17.0782 0.841809/15/14 0.0820 0.4993 2.1995 0.1733 4.1331 7.0052 0.376801/28/15 0.0460 0.0598 0.0884 0.0020 0.2035 0.3537 0.049805/14/15 0.1106 0.4081 1.7992 0.2635 3.5325 6.0033 0.334009/16/15 0.0105 0.0718 0.2050 0.0312 0.4561 0.7641 0.055802/04/16 0.2010 1.1600 4.6000 0.5190 4.9800 11.2590 0.725006/07/16 0.0699 0.4467 2.4718 0.3777 4.8276 8.1238 0.533310/19/16 0.0177 0.1243 0.3184 0.0960 2.0052 2.5439 0.445302/28/17 0.1915 1.0984 1.6743 0.1420 3.4160 6.3307 0.243706/08/17 0.1093 0.7684 3.4880 0.2668 5.7630 10.2862 0.872010/18/17 0.0159 0.2798 1.0705 0.1527 2.5866 4.0896 0.1448
GRP SSTLs: 0.818 0.204 40.9 28.6 175 - 0.818Inhalation SSTLs: 48,000 89.6 526 169 175 - 31
CORRECTIVE ACTION STARTED: MEME EVENTS
GROUNDWATER ANALYTICAL SUMMARY (mg/L)
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
SAMPLE ID SAMPLE DATE DEPTH (FT) MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
MW-4 08/17/11 12.5 - 17.5 0.3857 7.9204 237.1310 86.4872 463.7634 795.3020 9.4800MW-4 08/17/11 17.5 - 22.5 0.6238 4.2399 73.7883 20.8486 116.7287 215.6055 1.3700
0.297 0.142 49.3 46.5 186 6.549,680 28.7 352 152 186 138
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
08/18/11 19.64 204.25 - - 08/18/11 1.80 5.5 11201/30/12 18.42 205.47 - - 01/30/1205/08/12 17.20 206.97 0.35 - 05/08/1208/16/12 19.47 204.48 0.07 - 08/16/1211/05/12 20.51 203.64 0.32 - 11/05/1204/01/13 14.70 209.53 0.43 - 04/01/1304/24/13 14.77 209.75 0.79 - 04/24/1307/08/13 17.48 206.91 0.62 - 07/08/1307/29/13 16.13 208.02 0.33 - 07/29/1310/01/13 17.40 206.77 0.35 - 10/01/1310/30/13 18.58 205.68 0.46 - 10/30/1301/22/14 15.31 208.59 0.01 - 01/22/1403/05/14 14.54 209.53 0.22 - 02/06/1404/02/14 13.41 210.77 0.36 - 05/21/1405/21/14 12.75 211.69 0.69 - 06/05/1406/05/14 14.59 210.43 1.41 - 10/30/1307/01/14 14.29 209.66 0.08 - 01/22/1408/06/14 15.44 208.56 0.14 - 02/06/1409/15/14 17.47 206.49 0.09 - 05/21/1410/08/14 18.48 205.47 0.07 - 06/05/1411/06/14 18.86 205.03 - - 07/01/1401/28/15 17.74 206.15 - - 08/06/1405/14/15 16.01 207.88 - - 09/15/1409/16/15 18.91 204.98 - 5.0 10/08/1402/04/16 14.95 209.02 0.10 2.0 11/06/14
Monitoring Point Data Summary TableNorth Elmore Chevron MW-4
08/17/11 29 14 - 29 223.89
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L)
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SOIL ANALYTICAL SUMMARY (mg/Kg)
Onsite Indoor Air Inhalation SSTLs:
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
Allowable Source Soil SSTLs:
FREE PRODUCT (0.69 FT)
NOT SAMPLEDNOT SAMPLED
FREE PRODUCT (0.10 FT)
FREE PRODUCT (1.41 FT)FREE PRODUCT (0.08 FT)FREE PRODUCT (0.14 FT)FREE PRODUCT (0.09 FT)FREE PRODUCT (0.07 FT)
NOT SAMPLEDNOT SAMPLED
FREE PRODUCT (0.22 FT)FREE PRODUCT (0.36 FT)
FREE PRODUCT (0.43 FT)FREE PRODUCT (0.79 FT)FREE PRODUCT (0.62 FT)FREE PRODUCT (0.33 FT)FREE PRODUCT (0.35 FT)
pHREDOX POTENTIAL
(mV)
NOT SAMPLEDFREE PRODUCT (0.35 FT)FREE PRODUCT (0.07 FT)FREE PRODUCT (0.32 FT)
FREE PRODUCT (0.46 FT)FREE PRODUCT (0.01 FT)
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Monitoring Point Data Summary TableNorth Elmore Chevron MW-4
08/17/11 29 14 - 29 223.89
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
06/07/16 15.87 208.04 0.02 5.0 01/28/1507/08/16 17.87 206.36 0.42 - 05/14/15 1.74 5.3 14308/09/16 18.80 205.27 0.23 - 09/16/15 - 5.7 14810/19/16 20.16 203.73 - 3.0 02/04/1602/28/17 16.89 207.00 - 4.0 06/07/1604/05/17 15.88 208.02 0.01 - 10/19/1605/03/17 17.14 206.79 0.05 - 02/28/1706/08/17 15.20 208.69 - 5.0 06/08/1708/03/17 14.59 209.37 0.09 - 08/03/1709/07/17 15.95 208.11 0.21 - 09/07/1710/18/17 17.41 206.50 0.03 4.0 10/18/17 2.63 5.5 57
FREE PRODUCT (0.02 FT)
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L) pH
REDOX POTENTIAL (mV)
FREE PRODUCT (0.21 FT)FREE PRODUCT (0.95 FT)
NOT SAMPLED
NOT SAMPLEDNOT SAMPLED
FREE PRODUCT (0.01 FT)FREE PRODUCT (0.05 FT)
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Monitoring Point Data Summary TableNorth Elmore Chevron MW-4
08/17/11 29 14 - 29 223.89
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SAMPLE DATE MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
08/18/11 2.1580 10.2566 43.4445 3.8129 19.2912 76.8052 0.955001/30/12 0.2230 1.1213 4.0414 0.3706 2.3985 7.9318 0.131405/08/12 4.9458 14.1979 37.9733 2.5984 13.8900 68.6596 0.885608/16/12 6.1278 46.4491 73.8313 43.2599 221.3711 384.9114 15.470711/05/12 1.7331 5.3012 16.0191 1.6615 8.8722 31.8540 0.599004/01/13 2.1055 36.3008 148.6360 8.2185 48.2200 241.3753 4.962404/23/1307/08/1310/01/13 2.3577 21.0278 58.4374 3.5873 19.0872 102.1397 1.345501/22/14 2.8278 26.6125 65.4271 3.4698 19.5521 115.0615 0.880105/21/14 1.0107 20.5723 73.5263 7.1424 39.2796 140.5206 3.896709/15/14 0.6628 17.6971 49.6038 2.6430 15.0054 84.9493 7.874901/28/15 0.0863 2.0573 8.9383 0.7267 4.9326 16.6549 0.318705/14/15 1.0465 22.6946 59.5317 3.2625 18.8858 104.3746 1.046109/16/15 <0.5000 5.9807 24.3488 1.9309 10.3737 42.6341 0.808502/04/16 0.6810 22.2000 63.5000 2.9200 17.4000 106.0200 1.020006/07/16 0.3894 15.7062 61.9584 4.5483 29.8862 112.0991 4.383210/19/16 <0.100 2.6784 8.8244 0.6388 6.6297 18.7713 0.647102/28/17 0.4077 7.4440 17.4299 1.0721 15.4859 41.4319 1.345906/08/17 0.3435 15.0772 48.8194 4.8082 40.2998 109.0046 4.221110/18/17 <0.2500 9.9934 38.1238 3.0179 23.4623 74.5974 1.2906
GRP SSTLs: 0.818 0.204 40.9 28.6 175 - 0.818Inhalation SSTLs: 48,000 89.6 526 169 175 - 31
FREE PRODUCT (0.62 FT)CORRECTIVE ACTION STARTED: MEME EVENTS
GROUNDWATER ANALYTICAL SUMMARY (mg/L)
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
SAMPLE ID SAMPLE DATE DEPTH (FT) MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
MW-5 01/25/12 7.5 - 12.5 <0.0059 <0.0059 <0.0059 <0.0059 <0.0059 BDL <0.0059MW-5 01/25/12 12.5 - 17.5 <0.0059 <0.0059 <0.0059 <0.0059 <0.0059 BDL <0.0059
9,680 28.7 352 152 186 - 138
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
01/30/12 15.80 207.50 - - 01/30/12 3.37 6.2 19305/08/12 14.05 209.25 - - 05/08/12 2.38 6.5 27708/16/12 16.55 206.75 - - 08/16/12 2.36 6.1 17911/05/12 17.76 205.54 - - 11/05/12 1.55 5.7 25104/01/13 11.47 211.83 - - 04/01/13 1.74 6.1 25607/08/13 14.38 208.92 - - 07/08/13 3.86 5.9 31810/01/13 14.55 208.75 - - 10/01/13 2.17 4.8 22501/22/14 11.93 211.37 - - 01/22/14 1.26 4.8 28701/28/15 14.98 208.32 - - 01/28/15 4.87 5.4 23705/14/15 13.07 210.23 - - 05/14/1509/16/15 16.32 206.98 - - 09/16/1502/04/16 11.12 212.18 - 2.0 02/04/16 3.44 6.4 22906/07/16 13.71 209.59 - - 06/07/1610/19/16 17.17 206.13 - - 10/19/1602/28/17 13.43 209.87 - 3.0 02/28/17 2.73 5.8 15806/08/17 11.77 211.53 - - 06/08/1710/18/17 15.05 208.25 - - 10/18/17
MEASUREMENT DATE
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SOIL ANALYTICAL SUMMARY (mg/Kg)
Onsite Indoor Air Inhalation SSTLs:
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
Monitoring Point Data Summary TableNorth Elmore Chevron MW-5
01/25/12 23 13 - 23 223.30
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L)
NOT SAMPLED
pHREDOX POTENTIAL
(mV)
NOT SAMPLED
NOT SAMPLED
NOT SAMPLEDNOT SAMPLED
NOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
Monitoring Point Data Summary TableNorth Elmore Chevron MW-5
01/25/12 23 13 - 23 223.30
SAMPLE DATE MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
01/30/12 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001005/08/12 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001008/16/12 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001011/05/12 <0.0010 <0.0010 <0.0010 <0.0010 0.0013 0.0013 <0.001004/01/13 <0.0010 <0.0010 <0.0010 <0.0010 0.0013 0.0013 <0.001004/23/1307/08/13 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001010/01/13 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001001/22/14 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001005/21/1409/15/1401/28/15 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001005/14/1509/16/1502/04/16 <0.0010 <0.0010 <0.0050 <0.0010 <0.0010 BDL <0.005006/07/1610/19/1602/28/17 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001006/08/1710/18/17
Inhalation SSTLs: 48,000 89.6 526 169 175 - 31
NOT SAMPLED
NOT SAMPLED
NOT SAMPLEDNOT SAMPLED
GROUNDWATER ANALYTICAL SUMMARY (mg/L)
NOT SAMPLED
CORRECTIVE ACTION STARTED: MEME EVENTS
NOT SAMPLEDNOT SAMPLED
NOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
SAMPLE ID SAMPLE DATE DEPTH (FT) MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
MW-6 01/26/12 7.5 - 12.5 <0.0059 <0.0059 <0.0059 <0.0059 <0.0059 BDL <0.0059MW-6 01/26/12 12.5 - 17.5 <0.0056 <0.0056 <0.0056 <0.0056 <0.0056 BDL <0.0056
9,680 28.7 352 152 186 - 138
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
01/30/12 14.42 207.93 - - 01/30/12 2.81 6.5 24905/08/12 13.73 208.62 - - 05/08/12 3.12 6.2 24208/16/12 16.49 205.86 - - 08/16/12 2.59 6.3 26411/05/12 17.53 204.82 - - 11/05/12 1.55 5.9 14904/01/13 10.94 211.41 - - 04/01/13 0.96 5.5 30907/08/13 18.80 203.55 - - 07/08/13 2.78 5.6 23810/01/13 14.00 208.35 - - 10/01/13 1.97 4.4 23901/22/14 11.30 211.05 - - 01/22/14 2.12 5.3 30801/28/15 14.03 208.32 - - 01/28/15 3.05 5.7 24805/14/15 12.52 209.83 - - 05/14/1509/16/15 15.94 206.41 - - 09/16/1502/04/16 10.67 211.68 - 2.0 02/04/16 2.76 5.8 16406/07/16 13.03 209.32 - - 06/07/1610/19/16 17.52 204.83 - - 10/19/1602/28/17 12.72 209.63 - 3.0 02/28/17 2.92 6.1 16806/08/17 11.29 211.06 - - 06/08/1710/18/17 14.36 207.99 - - 10/18/17
NOT SAMPLED
Monitoring Point Data Summary TableNorth Elmore Chevron MW-6
01/26/12 23 13 - 23 222.35
NOT SAMPLED
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SOIL ANALYTICAL SUMMARY (mg/Kg)
Onsite Indoor Air Inhalation SSTLs:
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L) pH
REDOX POTENTIAL (mV)
NOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Monitoring Point Data Summary TableNorth Elmore Chevron MW-6
01/26/12 23 13 - 23 222.35
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SAMPLE DATE MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
01/30/12 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001005/08/12 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001008/16/12 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001011/05/12 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001004/01/13 <0.0010 <0.0010 <0.0010 <0.0010 0.0013 0.0013 <0.001004/23/1307/08/13 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001010/01/13 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001001/22/14 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001005/21/1409/15/1401/28/15 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001005/14/1509/16/1502/04/16 <0.0010 <0.0010 <0.0050 <0.0010 <0.0010 BDL <0.005006/07/1610/19/1602/28/17 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001006/08/1710/18/17
Inhalation SSTLs: 48,000 89.6 526 169 175 - 31
NOT SAMPLED
GROUNDWATER ANALYTICAL SUMMARY (mg/L)
CORRECTIVE ACTION STARTED: MEME EVENTS
NOT SAMPLEDNOT SAMPLED
NOT SAMPLED
NOT SAMPLED
NOT SAMPLEDNOT SAMPLED
NOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
SAMPLE ID SAMPLE DATE DEPTH (FT) MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
MW-7 01/25/12 7.5 - 12.5 <0.0059 <0.0059 <0.0059 <0.0059 <0.0059 BDL <0.0059MW-7 01/25/12 12.5 - 17.5 <0.0057 <0.0057 <0.0057 <0.0057 <0.0057 BDL <0.0057
5,150 4.39 352 152 186 - 138
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
01/30/12 15.48 207.26 - - 01/30/12 2.55 5.9 16005/08/12 13.76 208.98 - - 05/08/12 3.49 6.1 18808/16/12 16.27 206.47 - - 08/16/12 2.88 6.0 24211/05/12 17.55 205.19 - - 11/05/1204/01/13 11.03 211.71 - - 04/01/13 2.69 6.7 22907/08/13 13.95 208.79 - - 07/08/13 2.67 5.7 25910/01/13 14.22 208.52 - - 10/01/13 1.97 4.7 21301/22/14 11.68 211.06 - - 01/22/14 2.53 4.9 24705/21/14 9.36 213.38 - - 05/21/14 3.85 6.5 13909/15/14 14.62 208.12 - - 09/15/14 1.15 5.0 16501/28/15 14.61 208.13 - - 01/28/15 3.60 5.9 23905/14/15 12.77 209.97 - - 05/14/15 2.84 5.8 15309/16/15 16.00 206.74 - 4.0 09/16/15 NS 4.6 20702/04/16 11.61 211.13 - 2.0 02/04/16 2.58 6.1 24306/07/16 13.30 209.44 - 4.0 06/07/16 2.73 6.2 13410/19/16 17.61 205.13 - 2.0 10/19/16 2.78 6.1 18802/28/17 13.15 209.59 - 4.0 02/28/17 2.54 5.8 14506/08/17 11.54 211.20 - 5.0 06/08/17 2.53 6.1 14310/18/17 14.64 208.10 - 3.0 10/18/17 2.71 6.1 168
Monitoring Point Data Summary TableNorth Elmore Chevron MW-7
01/25/12 24.5 9.5 - 24.5 222.74
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L)
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SOIL ANALYTICAL SUMMARY (mg/Kg)
Offsite Indoor Air Inhalation SSTLs:
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
NOT SAMPLED
pHREDOX POTENTIAL
(mV)
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Monitoring Point Data Summary TableNorth Elmore Chevron MW-7
01/25/12 24.5 9.5 - 24.5 222.74
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SAMPLE DATE MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
01/30/12 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001005/08/12 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001008/16/12 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001011/05/12 <0.0010 <0.0010 <0.0010 <0.0010 0.0068 0.0068 0.005104/01/13 <0.0010 <0.0010 <0.0010 <0.0010 0.0013 0.0013 <0.001004/23/1307/08/13 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001010/01/13 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001001/22/14 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001005/21/14 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001009/15/14 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001001/28/15 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001005/14/15 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001009/16/15 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001002/04/16 <0.0010 <0.0010 <0.0050 <0.0010 <0.0010 BDL <0.005006/07/16 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001010/19/16 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001002/28/17 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001006/08/17 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL 0.001510/18/17 <0.0010 <0.0010 <0.0010 <0.0010 0.0019 0.0019 <0.0010
Inhalation SSTLs: 30,200 13.7 526 169 175 - 31
GROUNDWATER ANALYTICAL SUMMARY (mg/L)
CORRECTIVE ACTION STARTED: MEME EVENTS
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
SAMPLE ID SAMPLE DATE DEPTH (FT) MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
MW-8 01/26/12 7.5 - 12.5 <0.0057 <0.0057 <0.0057 <0.0057 <0.0057 BDL <0.0057MW-8 01/26/12 12.5 - 17.5 <0.0055 <0.0055 <0.0055 <0.0055 <0.0055 BDL <0.0055
5,150 4.39 352 152 186 - 138
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
01/30/12 17.48 204.88 - - 01/30/12 2.58 6.3 14405/08/12 16.14 206.22 - - 05/08/12 3.60 5.8 19308/16/12 18.48 203.88 - - 08/16/12 2.81 6.2 19811/05/12 19.51 202.85 - - 11/05/12 2.15 6.5 22004/01/13 14.03 208.33 - - 04/01/13 2.88 6.3 27607/08/13 15.12 207.24 - - 07/08/13 3.06 6.1 26310/01/13 16.28 206.08 - - 10/01/13 1.72 4.9 16701/22/14 14.59 207.77 - - 01/22/14 2.05 6.2 16805/21/14 11.37 210.99 - - 05/21/14 2.05 5.7 12806/05/14 12.35 210.01 - - 09/15/14 5.60 5.6 18407/01/14 13.26 209.10 - - 01/28/15 3.58 6.0 24408/06/14 14.42 207.94 - - 05/14/15 2.69 4.9 21109/15/14 16.50 205.86 - - 01/22/1410/08/14 18.23 204.13 - - 05/21/1411/06/14 18.70 203.66 - - 09/15/1401/28/15 16.84 205.52 - - 01/28/1505/14/15 15.22 207.14 - - 05/14/1509/16/15 18.16 204.20 - 5.0 09/16/15 NS 6.0 19302/04/16 14.27 208.09 - 2.0 02/04/16 2.62 6.0 21906/07/16 14.95 207.41 - 5.0 06/07/16 2.98 6.3 18610/19/16 19.36 203.00 - 3.0 10/19/16 2.69 5.9 15102/28/17 16.16 206.20 - 4.0 02/28/17 2.69 5.9 18306/08/17 14.44 207.92 - 5.0 06/08/17 3.41 6.2 16310/18/17 16.44 205.92 - 4.0 10/18/17 3.34 6.2 128
Monitoring Point Data Summary TableNorth Elmore Chevron MW-8
01/26/12 28 13 - 28 222.36
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L)
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SOIL ANALYTICAL SUMMARY (mg/Kg)
Offsite Indoor Air Inhalation SSTLs:
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
pHREDOX POTENTIAL
(mV)
NOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Monitoring Point Data Summary TableNorth Elmore Chevron MW-8
01/26/12 28 13 - 28 222.36
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SAMPLE DATE MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
01/30/12 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001005/08/12 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001008/16/12 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001011/05/12 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001004/01/13 0.0014 <0.0010 <0.0010 <0.0010 0.0012 0.0012 <0.001004/23/1307/08/13 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001010/01/13 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001001/22/14 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001005/21/14 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001009/15/14 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001001/28/15 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001005/14/15 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001009/16/15 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001002/04/16 0.0011 <0.0010 <0.0050 <0.0010 <0.0010 BDL <0.005006/07/16 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001010/19/16 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001002/28/17 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001006/08/17 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001010/18/17 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.0010
Inhalation SSTLs: 30,200 13.7 526 169 175 - 31
CORRECTIVE ACTION STARTED: MEME EVENTS
GROUNDWATER ANALYTICAL SUMMARY (mg/L)
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
SAMPLE ID SAMPLE DATE DEPTH (FT) MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
MW-9 01/27/12 12.5 - 17.5 <0.0055 <0.0055 <0.0055 <0.0055 <0.0055 BDL <0.0055MW-9 01/27/12 17.5 - 22.5 <0.0059 <0.0059 <0.0059 <0.0059 <0.0059 BDL <0.0059
9,680 28.7 352 152 186 - 138
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
01/30/12 22.05 199.96 - - 01/30/12 2.34 6.0 16905/08/12 19.60 202.41 - - 05/08/12 2.27 6.5 25108/16/12 21.03 200.98 - - 08/16/12 2.67 5.9 18311/05/12 22.02 199.99 - - 11/05/12 1.91 5.8 17604/01/13 18.43 203.58 - - 04/01/13 2.23 5.9 29207/08/13 19.13 202.88 - - 07/08/13 2.64 5.8 19710/01/13 19.25 202.76 - - 10/01/13 1.04 5.3 12501/22/14 19.12 202.89 - - 01/22/14 1.65 5.2 25405/21/14 14.18 207.83 - - 05/21/14 4.76 5.4 12609/15/14 19.18 202.83 - - 09/15/14 1.93 5.3 16201/28/15 20.94 201.07 - - 01/28/15 3.05 5.6 25205/14/15 18.94 203.07 - - 05/14/15 2.10 4.9 21509/16/15 20.83 201.18 - 3.0 09/16/15 NS 5.1 19802/04/16 19.38 202.63 - 1.0 02/04/16 3.29 6.3 18106/07/16 17.41 204.60 - - 06/07/1610/19/16 21.50 200.51 - - 10/19/1602/28/17 21.18 200.83 - 2.0 02/28/17 3.37 6.4 18106/08/17 18.97 203.04 - - 06/08/1710/18/17 19.23 202.78 - - 10/18/17 NOT SAMPLED
Monitoring Point Data Summary TableNorth Elmore Chevron MW-9
01/27/12 28 13 - 28 222.01
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L)
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SOIL ANALYTICAL SUMMARY (mg/Kg)
Onsite Indoor Air Inhalation SSTLs:
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
NOT SAMPLEDNOT SAMPLED
NOT SAMPLED
pHREDOX POTENTIAL
(mV)
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Monitoring Point Data Summary TableNorth Elmore Chevron MW-9
01/27/12 28 13 - 28 222.01
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SAMPLE DATE MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
01/30/12 <0.0010 0.0016 0.0014 <0.0010 <0.0010 0.0030 <0.001005/08/12 <0.0010 0.1505 0.0582 0.0214 0.0923 0.3224 <0.001008/16/12 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001011/05/12 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001004/01/13 0.0146 0.0062 <0.0010 <0.0010 0.0056 0.0118 <0.001004/23/1307/08/13 0.0122 0.0214 0.0023 0.0015 0.0060 0.0312 <0.001010/01/13 0.0066 0.0105 <0.0010 <0.0010 <0.0010 0.0105 <0.001001/22/14 0.0110 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001005/21/14 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001009/15/14 0.0013 0.0028 <0.0010 <0.0010 <0.0010 0.0028 <0.001001/28/15 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001005/14/15 <0.0010 0.0033 <0.0010 <0.0010 <0.0010 0.0033 <0.001009/16/15 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001002/04/16 <0.0010 <0.0010 <0.0050 <0.0010 0.0020 0.0020 <0.005006/07/1610/19/1602/28/17 <0.0010 0.0589 0.0374 0.0241 0.1278 0.2482 <0.001006/08/1710/18/17
GRP SSTLs: 0.559 0.14 28 19.6 175 - 0.559Inhalation SSTLs: 48,000 89.6 526 169 175 - 31
NOT SAMPLEDNOT SAMPLED
CORRECTIVE ACTION STARTED: MEME EVENTS
GROUNDWATER ANALYTICAL SUMMARY (mg/L)
NOT SAMPLEDNOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
SAMPLE ID SAMPLE DATE DEPTH (FT) MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
MW-10 01/25/12 12.5 - 17.5 <0.0056 <0.0056 <0.0056 <0.0056 <0.0056 BDL <0.0056MW-10 01/25/12 17.5 - 22.5 <0.0060 <0.0060 <0.0060 0.0401 0.1957 0.2358 0.2351
5,150 4.39 352 152 186 - 138
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
01/30/12 22.72 199.53 - - 01/30/12 3.49 6.4 22705/08/12 19.77 202.48 - - 05/08/12 3.40 6.3 26808/16/12 21.30 200.95 - - 08/16/12 2.69 5.8 21211/05/12 22.42 199.83 - - 11/05/12 1.64 5.5 15404/01/13 18.64 203.61 - - 04/01/13 2.47 5.7 24004/24/13 17.54 204.71 - - 04/24/1307/08/13 19.44 202.81 - - 07/08/13 3.23 6.2 28207/29/13 18.96 203.29 - - 07/29/1310/01/13 19.46 202.79 - - 10/01/13 2.21 4.6 13601/22/14 19.28 202.97 - - 01/22/14 1.44 5.5 20605/21/14 14.27 207.98 - - 05/21/14 5.20 5.4 13406/05/14 15.21 207.04 - - 06/05/1407/01/14 16.30 205.95 - - 07/01/1408/06/14 17.36 204.89 - - 08/06/1409/15/14 19.29 202.96 - - 09/15/14 2.17 5.5 19210/08/14 19.11 203.14 - - 10/08/1411/06/14 19.45 202.80 - - 11/06/1401/28/15 21.26 200.99 - - 01/28/15 2.54 5.8 23405/14/15 19.01 203.24 - - 05/14/15 3.66 4.8 23909/16/15 21.03 201.22 - 4.0 09/16/15 - 4.9 23402/04/16 19.50 202.75 - 1.0 02/04/1606/07/16 17.33 204.92 - - 06/07/1610/19/16 21.88 200.37 - - 10/19/1602/28/17 21.81 200.44 - 2.0 02/28/1706/08/17 18.98 203.27 - - 06/08/17
Monitoring Point Data Summary TableNorth Elmore Chevron MW-10
01/25/12 29.5 14.5 - 29.5 222.25
pHREDOX POTENTIAL
(mV)
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SOIL ANALYTICAL SUMMARY (mg/Kg)
Offsite Indoor Air Inhalation SSTLs:
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L)
NOT SAMPLED
NOT SAMPLED
NOT SAMPLEDNOT SAMPLEDNOT SAMPLED
NOT SAMPLED
NOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLED
NOT SAMPLED
NOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Monitoring Point Data Summary TableNorth Elmore Chevron MW-10
01/25/12 29.5 14.5 - 29.5 222.25
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
10/18/17 19.50 202.75 - - 10/18/17 NOT SAMPLED
REDOX POTENTIAL (mV)
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L) pH
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
MEASUREMENT DATE
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Monitoring Point Data Summary TableNorth Elmore Chevron MW-10
01/25/12 29.5 14.5 - 29.5 222.25
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SAMPLE DATE MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
01/30/12 <0.0010 0.0018 0.0015 0.0281 0.1074 0.1388 0.016805/08/12 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001008/16/12 0.0107 0.0745 0.0302 0.1100 0.4537 0.6684 0.200811/05/12 0.0016 0.0117 0.0021 0.0480 0.0451 0.1069 0.127104/01/13 <0.0010 0.0023 <0.0010 <0.0010 0.0032 0.0055 0.001904/23/1307/08/13 <0.0010 0.0103 0.0054 0.0155 0.0736 0.1048 0.022110/01/13 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001001/22/14 <0.003 0.0101 0.0036 0.0429 0.0492 0.1058 0.203105/21/14 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001009/15/14 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001001/28/15 0.0012 0.0036 0.0016 0.0137 0.0757 0.0946 0.021005/14/15 <0.0010 <0.0010 <0.0010 <0.0010 0.0012 0.0012 <0.001009/16/15 <0.0010 0.0030 0.0012 0.0064 0.0878 0.0984 0.074202/04/16 <0.0010 0.0133 <0.0050 0.0370 0.1590 0.2093 0.079806/07/1610/19/1602/28/17 <0.0010 <0.0010 <0.0010 0.0017 0.0057 0.0074 0.006706/08/1710/18/17
GRP SSTLs: 0.599 0.15 30 21 175 - 0.599Inhalation SSTLs: 30,200 13.7 526 169 175 - 31
GROUNDWATER ANALYTICAL SUMMARY (mg/L)
NOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLED
CORRECTIVE ACTION STARTED: MEME EVENTS
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
SAMPLE ID SAMPLE DATE DEPTH (FT) MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
MW-11 01/25/12 12.5 - 17.5 <0.0056 <0.0056 <0.0056 <0.0056 <0.0056 BDL <0.0056MW-11 01/25/12 17.5 - 22.5 <0.0058 <0.0058 <0.0058 <0.0058 <0.0058 BDL 0.0650
9,680 28.7 352 152 186 - 138
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
01/30/12 18.50 204.72 - - 01/30/12 3.18 6.2 19805/08/12 17.93 205.29 - - 05/08/1208/16/12 19.18 204.06 0.03 - 08/16/1211/05/12 20.20 203.08 0.08 - 11/05/1204/01/13 14.86 208.36 - - 04/01/1304/24/13 14.78 208.44 - - 04/24/1307/08/13 16.98 206.24 - - 07/08/1307/29/13 15.90 207.32 - - 07/29/1310/01/13 17.10 206.12 - - 10/01/1301/22/14 15.36 207.86 - - 01/22/1405/21/14 12.38 210.84 - - 05/21/1409/15/14 17.40 205.82 - - 09/15/1401/28/15 17.83 205.39 - - 01/28/1505/14/15 16.06 207.16 - - 05/14/15 1.57 5.5 22309/16/15 18.86 204.36 - 4.0 09/16/15 - 5.3 19002/04/16 15.03 208.19 - 2.0 02/04/16 2.77 6.1 24606/07/16 15.90 207.32 - 4.0 06/07/1610/19/16 20.07 203.15 - 2.0 10/19/1602/28/17 16.92 206.30 - 4.0 02/28/1706/08/17 15.22 208.00 - 5.0 06/08/1710/18/17 17.39 205.83 - 3.0 10/18/17 2.46 5.4 64
Monitoring Point Data Summary TableNorth Elmore Chevron MW-11
01/25/12 28 13 - 28 223.22
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L)
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SOIL ANALYTICAL SUMMARY (mg/Kg)
Onsite Indoor Air Inhalation SSTLs:
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
pHREDOX POTENTIAL
(mV)
NOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLED
NOT SAMPLED
NOT SAMPLEDFREE PRODUCT (0.03 FT)FREE PRODUCT (0.08 FT)
NOT SAMPLEDNOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLEDNOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Monitoring Point Data Summary TableNorth Elmore Chevron MW-11
01/25/12 28 13 - 28 223.22
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SAMPLE DATE MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
01/30/12 <0.0130 <0.0130 <0.0130 0.1974 2.4162 2.6136 0.685505/08/12 <0.0130 <0.0130 0.0260 0.1324 2.0976 2.2560 0.614208/16/12 <0.0130 0.0137 0.1621 0.0902 1.6207 1.8867 0.322311/05/12 <0.0050 <0.0050 0.0067 0.1556 3.1781 3.3404 0.597904/01/13 <0.0050 <0.0050 0.0135 0.1964 2.5103 2.7202 0.597804/23/1307/08/13 <0.0200 <0.0200 <0.0200 0.1069 3.1686 3.2755 0.670210/01/13 <0.0040 <0.0040 <0.0040 0.0313 1.1217 1.1530 0.266701/22/14 <0.0100 <0.0100 <0.0100 0.0972 1.6117 1.7089 1.060505/21/14 <0.0100 <0.0100 <0.0100 0.1100 2.9220 3.0320 1.122009/15/14 <0.0010 <0.0010 <0.0010 0.0592 0.7766 0.8358 0.494601/28/15 <0.0050 <0.0050 <0.0050 0.0460 0.8467 0.8927 0.153505/14/15 <0.0010 <0.0010 <0.0010 0.0085 0.2434 0.2519 0.064809/16/15 <0.0010 <0.0010 0.0014 0.0364 0.5520 0.5898 0.188002/04/16 <0.0010 <0.0010 <0.0050 0.0432 0.8050 0.8482 0.163006/07/16 <0.0020 <0.0020 0.0023 0.0577 1.0188 1.0788 0.340010/19/16 <0.0020 <0.0020 <0.0020 0.0665 1.1961 1.2626 0.303202/28/17 <0.0100 <0.0100 <0.0100 0.0141 0.9075 0.9216 0.190506/08/17 <0.0050 <0.0050 <0.0050 0.0076 0.9538 0.9614 0.221310/18/17 <0.0050 <0.0050 <0.0050 0.0170 1.1217 1.1387 0.3033
GRP SSTLs: 0.818 0.204 40.9 28.6 175 - 0.818Inhalation SSTLs: 48,000 89.6 526 169 175 - 31
GROUNDWATER ANALYTICAL SUMMARY (mg/L)
CORRECTIVE ACTION STARTED: MEME EVENTS
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
SAMPLE ID SAMPLE DATE DEPTH (FT) MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
MW-12 10/29/12 12.5 - 17.5 <0.0055 <0.0055 <0.0055 <0.0055 <0.0055 BDL <0.0055MW-12 10/29/12 17.5 - 22.5 <0.0056 <0.0056 <0.0056 <0.0056 <0.0056 BDL <0.0056
5,150 4.39 352 152 186 - 138
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
11/05/12 23.13 198.76 - - 11/05/12 1.83 6.0 12304/01/13 18.75 203.14 - - 04/01/13 3.10 5.4 21907/08/13 19.32 202.57 - - 07/08/1310/01/13 19.42 202.47 - - 10/01/1301/22/14 19.26 202.63 - - 01/22/14 1.92 5.5 20905/21/14 14.19 207.70 - - 05/21/14 4.88 5.4 13909/15/14 19.20 202.69 - - 09/15/14 1.59 5.6 14301/28/15 21.39 200.50 - - 01/28/1505/14/15 19.07 202.82 - - 05/14/15 3.32 5.2 24009/16/15 20.95 200.94 - 4.0 09/16/15 - 5.8 17602/04/16 19.57 202.32 - 1.0 02/04/1606/07/16 17.22 204.67 - 4.0 06/07/16 3.42 5.9 15610/19/16 21.94 199.95 - 2.0 10/19/1602/28/17 21.61 200.28 - 2.0 02/28/1706/08/17 19.05 202.84 - 3.0 06/08/1710/18/17 19.42 202.47 - 3.0 10/18/17 2.82 5.9 124
Monitoring Point Data Summary TableNorth Elmore Chevron MW-12
10/29/12 28 13 - 28 221.89
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L)
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SOIL ANALYTICAL SUMMARY (mg/Kg)
Offsite Indoor Air Inhalation SSTLs:
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
NOT SAMPLED
pHREDOX POTENTIAL
(mV)
NOT SAMPLEDNOT SAMPLED
NOT SAMPLED
NOT SAMPLED
NOT SAMPLEDNOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Monitoring Point Data Summary TableNorth Elmore Chevron MW-12
10/29/12 28 13 - 28 221.89
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SAMPLE DATE MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
11/05/12 0.7141 1.1822 0.2904 0.2446 1.0934 2.8106 0.290604/01/13 0.5588 1.4002 0.9732 0.2241 1.4176 4.0151 0.230704/23/1307/08/13 0.0023 0.0046 <0.0010 <0.0010 <0.0010 0.0046 <0.001010/01/13 0.0056 0.0216 <0.0010 0.0027 <0.0010 0.0243 0.002401/22/14 <0.0010 0.0050 0.0013 0.0014 0.0045 0.0122 <0.001005/21/14 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001009/15/14 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001001/28/15 0.3221 1.3817 1.0618 0.2751 1.1497 3.8683 0.290305/14/15 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001009/16/15 0.1527 1.6587 0.2262 0.2859 0.5837 2.7545 0.241202/04/16 <0.0010 0.0037 <0.0050 0.0010 0.0024 0.0071 <0.005006/07/16 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001010/19/16 0.0779 1.4715 1.1579 0.4703 2.2041 5.3038 0.437002/28/17 0.1082 0.6972 1.6518 0.2769 2.0943 4.7202 0.207706/08/17 0.0244 0.1146 0.0222 0.0576 0.2260 0.4204 0.074410/18/17 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.0010
Inhalation SSTLs: 30,200 13.7 526 169 175 - 31
CORRECTIVE ACTION STARTED: MEME EVENTS
GROUNDWATER ANALYTICAL SUMMARY (mg/L)
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
SAMPLE ID SAMPLE DATE DEPTH (FT) MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
MW-13 10/29/12 12.5 - 17.5 <0.0056 <0.0056 <0.0056 <0.0056 <0.0056 <0.0224 <0.0056MW-13 10/29/12 17.5 - 22.5 <0.0066 <0.0066 <0.0066 <0.0066 <0.0066 <0.0264 <0.0066
5,150 4.39 352 152 186 - 138
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
11/05/12 21.19 200.31 - - 11/05/1204/01/13 18.10 203.40 - - 04/01/13 1.82 6.1 25607/08/13 18.85 202.65 - - 07/08/13 3.07 5.6 19010/01/13 18.92 202.58 - - 10/01/13 2.18 4.8 15801/22/14 18.74 202.76 - - 01/22/14 1.07 4.9 23305/21/14 13.25 208.25 - - 05/21/14 4.92 5.3 13809/15/14 17.79 203.71 - - 09/15/14 1.24 5.7 16901/28/15 20.71 200.79 - - 01/28/15 2.67 5.8 22905/14/15 17.33 204.17 - - 05/14/15 3.35 4.9 25909/16/15 20.56 200.94 - 3.0 09/16/15 - 5.0 24002/04/16 16.60 204.90 - 2.0 02/04/16 2.89 5.7 23906/07/16 16.07 205.43 - 4.0 06/07/16 3.84 5.9 17910/19/16 21.37 200.13 - 2.0 10/19/16 2.94 6.1 19802/28/17 20.80 200.70 - 2.0 02/28/17 2.88 6.2 13806/08/17 17.54 203.96 - 4.0 06/08/17 2.67 5.8 8410/18/17 18.93 202.57 - 3.0 10/18/17 2.62 5.7 79
Monitoring Point Data Summary TableNorth Elmore Chevron MW-13
10/29/12 28 13 - 28 221.50
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L)
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SOIL ANALYTICAL SUMMARY (mg/Kg)
Offsite Indoor Air Inhalation SSTLs:
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
NOT SAMPLED
pHREDOX POTENTIAL
(mV)
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Monitoring Point Data Summary TableNorth Elmore Chevron MW-13
10/29/12 28 13 - 28 221.50
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SAMPLE DATE MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
11/05/12 <0.0010 <0.0010 <0.0010 0.0014 0.0371 0.0385 0.026904/01/13 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001004/23/1307/08/13 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001010/01/13 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001001/22/14 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001005/21/14 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001009/15/14 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001001/28/15 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001005/14/15 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001009/16/15 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001002/04/16 <0.0010 <0.0010 <0.0050 <0.0010 <0.0010 BDL <0.005006/07/16 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001010/19/16 <0.0010 0.0014 0.0016 0.0112 0.1211 0.1353 0.102202/28/17 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001006/08/17 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001010/18/17 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.0010
Inhalation SSTLs: 30,200 13.7 526 169 175 - 31
GROUNDWATER ANALYTICAL SUMMARY (mg/L)
CORRECTIVE ACTION STARTED: MEME EVENTS
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
SAMPLE ID SAMPLE DATE DEPTH (FT) MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
MW-14 10/29/12 12.5 - 17.5 <0.0058 <0.0058 <0.0058 <0.0058 <0.0058 BDL <0.0058MW-14 10/29/12 17.5 - 22.5 <0.0060 <0.0060 <0.0060 <0.0060 <0.0060 BDL <0.0060
9,680 28.7 352 152 186 - 138
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
11/05/12 18.22 205.11 - - 11/05/12 1.56 5.4 25504/01/13 11.62 211.71 - - 04/01/13 2.27 5.6 34307/08/13 14.49 208.84 - - 07/08/13 5.40 5.8 25410/01/13 14.77 208.56 - - 10/01/13 2.06 4.4 22401/22/14 12.05 211.28 - - 01/22/14 1.75 5.1 28201/28/15 15.10 208.23 - - 01/28/15 4.48 5.6 26405/14/15 13.21 210.12 - - 05/14/1509/16/15 16.44 206.89 - - 09/16/1502/04/16 11.74 211.59 - 2.0 02/04/16 2.54 6.0 27106/07/16 14.05 209.28 - - 06/07/1610/19/16 18.16 205.17 - - 10/19/1602/28/17 14.10 209.23 - 5.0 02/28/17 2.48 5.7 14706/08/17 11.92 211.41 - - 06/08/1710/18/17 15.21 208.12 - - 10/18/17
Monitoring Point Data Summary TableNorth Elmore Chevron MW-14
10/29/12 28 13 - 28 223.33
pHREDOX POTENTIAL
(mV)
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SOIL ANALYTICAL SUMMARY (mg/Kg)
Onsite Indoor Air Inhalation SSTLs:
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L)
NOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Monitoring Point Data Summary TableNorth Elmore Chevron MW-14
10/29/12 28 13 - 28 223.33
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SAMPLE DATE MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
11/05/12 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001004/01/13 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001004/23/1307/08/13 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001010/01/13 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001001/22/14 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001005/21/1409/15/1401/28/15 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001005/14/1509/16/1502/04/16 <0.0010 <0.0010 <0.0050 <0.0010 <0.0010 BDL <0.005006/07/1610/19/1602/28/17 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001006/08/1710/18/17
Inhalation SSTLs: 48,000 89.6 526 169 175 - 31
GROUNDWATER ANALYTICAL SUMMARY (mg/L)
NOT SAMPLED
CORRECTIVE ACTION STARTED: MEME EVENTS
NOT SAMPLED
NOT SAMPLED
NOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLED
NOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
SAMPLE ID SAMPLE DATE DEPTH (FT) MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
MW-15 03/12/13 7.5 - 12.5 <0.0058 <0.0058 <0.0058 <0.0058 <0.0058 BDL <0.0058MW-15 03/12/13 12.5 - 17.5 <0.0056 <0.0056 <0.0056 <0.0056 <0.0056 BDL <0.0056
5,150 4.39 352 152 186 - 138
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
04/01/13 18.71 202.85 - - 04/01/13 3.29 5.3 25807/08/13 19.30 202.26 - - 07/08/13 2.65 6.3 17710/01/13 19.37 202.19 - - 10/01/13 2.29 4.5 20501/22/14 19.30 202.26 - - 01/22/14 0.60 5.2 21501/28/15 21.24 200.32 - - 01/28/15 2.79 5.9 25705/14/15 19.00 202.56 - - 05/14/1509/16/15 20.88 200.68 - - 09/16/1502/04/16 19.52 202.04 - 1.0 02/04/16 2.68 6.2 17906/07/16 17.34 204.22 - - 06/07/1610/19/16 21.58 199.98 - - 10/19/1602/28/17 21.70 199.86 - 2.0 02/28/17 2.48 5.7 14706/08/17 18.95 202.61 - - 06/08/1710/18/17 19.43 202.13 - - 10/18/17
Monitoring Point Data Summary TableNorth Elmore Chevron MW-15
03/12/13 28.5 13.5 - 28.5 221.56
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L)
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SOIL ANALYTICAL SUMMARY (mg/Kg)
Offsite Indoor Air Inhalation SSTLs:
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
pHREDOX POTENTIAL
(mV)
NOT SAMPLED
NOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLED
NOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Monitoring Point Data Summary TableNorth Elmore Chevron MW-15
03/12/13 28.5 13.5 - 28.5 221.56
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SAMPLE DATE MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
04/01/13 <0.0010 <0.0010 <0.0010 0.0075 0.0397 0.0472 0.022304/23/1307/08/13 <0.0010 0.0028 <0.0010 0.0078 0.0010 0.0116 0.023510/01/13 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001001/22/14 <0.0010 0.0028 <0.0010 0.0077 0.0012 0.0117 0.160305/21/14
09/15/1401/28/15 <0.0010 0.0017 <0.0010 0.0019 <0.0010 0.0036 0.015905/14/1509/16/1502/04/16 <0.0010 <0.0010 <0.0050 0.0210 0.0677 0.0887 0.128006/07/1610/19/1602/28/17 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL 0.001306/08/1710/18/17
Inhalation SSTLs: 30,200 13.7 526 169 175 - 31
GROUNDWATER ANALYTICAL SUMMARY (mg/L)
NOT SAMPLEDNOT SAMPLED
CORRECTIVE ACTION STARTED: MEME EVENTS
NOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
SAMPLE ID SAMPLE DATE DEPTH (FT) MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
MW-16 03/12/13 7.5 - 12.5 <0.0056 <0.0056 <0.0056 <0.0056 <0.0056 BDL <0.0056MW-16 03/12/13 12.5 - 17.5 <0.0055 <0.0055 <0.0055 <0.0055 <0.0055 BDL <0.0055
5,150 4.39 352 152 186 138
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
04/01/13 18.96 202.03 - - 04/01/13 2.42 5.7 19707/08/13 19.33 201.66 - - 07/08/13 2.91 5.9 21210/01/13 19.33 201.66 - - 10/01/13 2.15 4.8 17001/22/14 19.36 201.63 - - 01/22/14 1.98 5.7 23801/28/15 21.46 199.53 - - 01/28/15 2.58 6.2 24305/14/15 18.90 202.09 - - 05/14/1509/16/15 20.85 200.14 - - 09/16/1502/04/16 19.79 201.20 - 1.0 02/04/16 2.40 5.8 19606/07/16 17.00 203.99 - 4.0 06/07/1610/19/16 21.77 199.22 - 2.0 10/19/1602/28/17 22.44 198.55 - 1.0 02/28/1706/08/17 19.09 201.90 - 3.0 06/08/1710/18/17 19.18 201.81 - 3.0 10/18/17 4.54 6.2 142
Monitoring Point Data Summary TableNorth Elmore Chevron MW-16
03/12/13 28.5 13.5 - 28.5 220.99
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L)
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SOIL ANALYTICAL SUMMARY (mg/Kg)
Offsite Indoor Air Inhalation SSTLs:
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
NOT SAMPLED
pHREDOX POTENTIAL
(mV)
NOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLEDNOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Monitoring Point Data Summary TableNorth Elmore Chevron MW-16
03/12/13 28.5 13.5 - 28.5 220.99
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SAMPLE DATE MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
04/01/13 0.0144 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001004/23/1307/08/13 0.1880 0.1069 0.0030 0.0071 0.0255 0.1425 0.030510/01/13 0.0371 0.0093 <0.0010 <0.0010 <0.0010 0.0093 0.003701/22/14 0.1124 0.2234 <0.004 0.0104 0.0049 0.2387 0.289205/21/1409/15/1401/28/15 0.1854 0.8105 0.0145 0.0136 <0.010 0.8386 0.191405/14/1509/16/1502/04/16 0.0157 0.1460 0.0068 0.0172 0.0077 0.1777 0.0859
06/07/16 0.0039 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001010/19/16 0.0378 0.5713 0.0067 0.0102 0.0050 0.5932 0.123602/28/17 0.0252 0.1501 0.0077 0.0100 0.0054 0.1732 0.082306/08/17 0.0095 0.0150 <0.0010 <0.0010 0.0070 0.0220 0.008210/18/17 0.0055 0.0336 <0.0010 <0.0010 <0.0010 0.0336 0.0207
Inhalation SSTLs: 30,200 13.7 526 169 175 - 31
NOT SAMPLED
GROUNDWATER ANALYTICAL SUMMARY (mg/L)
CORRECTIVE ACTION STARTED: MEME EVENTS
NOT SAMPLED
NOT SAMPLEDNOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
SAMPLE ID SAMPLE DATE DEPTH (FT) MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
MW-17 03/12/13 7.5 - 12.5 <0.0058 <0.0058 <0.0058 <0.0058 <0.0058 BDL <0.0058MW-17 03/12/13 12.5 - 17.5 0.0179 0.0089 <0.0061 <0.0061 <0.0061 0.0089 <0.0061
5,150 4.39 352 152 186 - 138
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
04/01/13 19.94 201.68 - - 04/01/13 1.64 6.4 17607/08/13 20.40 201.22 - - 07/08/1310/01/13 19.97 201.65 - - 10/01/1301/22/14 20.14 201.48 - - 01/22/1401/28/15 21.92 199.70 - - 01/28/15 3.06 5.7 22405/14/15 19.61 202.01 - - 05/14/1509/16/15 21.42 200.20 - - 09/16/1502/04/16 20.39 201.23 - 1.0 02/04/16 2.91 5.9 23706/07/16 17.05 204.57 - 4.0 06/07/1610/19/16 22.27 199.35 - 2.0 10/19/1602/28/17 22.88 198.74 - 1.0 02/28/1706/08/17 19.76 201.86 - 3.0 06/08/1710/18/17 19.69 201.93 - 3.0 10/18/17 2.58 6.1 136
Monitoring Point Data Summary TableNorth Elmore Chevron MW-17
03/12/13 28.5 13.5 - 28.5 221.62
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L)
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SOIL ANALYTICAL SUMMARY (mg/Kg)
Offsite Indoor Air Inhalation SSTLs:
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
pHREDOX POTENTIAL
(mV)
NOT SAMPLEDNOT SAMPLED
NOT SAMPLED
NOT SAMPLEDNOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLED
NOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Monitoring Point Data Summary TableNorth Elmore Chevron MW-17
03/12/13 28.5 13.5 - 28.5 221.62
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SAMPLE DATE MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
04/01/13 0.0521 0.0881 0.0249 0.0072 0.0258 0.1460 0.011004/23/1307/08/13 0.0536 0.1238 0.0163 0.0057 0.0139 0.1597 0.012710/01/13 0.0213 0.0490 0.0016 0.0011 <0.0010 0.0517 0.002001/22/14 0.4045 1.3324 0.0401 0.0217 0.0155 1.4097 0.236305/21/1409/15/1401/28/15 0.2364 0.6626 0.0504 0.0186 0.0113 0.7429 0.054205/14/1509/16/1502/04/16 0.0170 0.0088 <0.0050 0.0015 <0.0010 0.0103 <0.0050
06/07/16 0.0031 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001010/19/16 0.1066 0.4263 0.0520 0.0339 0.0376 0.5498 0.089002/28/17 0.0466 0.3212 0.3767 0.0929 0.4535 1.2443 0.072806/08/17 0.0035 0.0062 0.0012 <0.0010 <0.0010 0.0074 0.003510/18/17 0.0014 0.0015 <0.0010 <0.0010 <0.0010 0.0015 <0.0010
Inhalation SSTLs: 30,200 13.7 526 169 175 - 31
NOT SAMPLED
CORRECTIVE ACTION STARTED: MEME EVENTS
GROUNDWATER ANALYTICAL SUMMARY (mg/L)
NOT SAMPLEDNOT SAMPLED
NOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
SAMPLE ID SAMPLE DATE DEPTH (FT) MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
MW-18 09/06/16 8 - 13 <0.0068 <0.0068 <0.0068 <0.0068 <0.0068 BDL <0.0068MW-18 09/06/16 13 - 18 <0.0066 <0.0066 <0.0066 <0.0066 <0.0066 BDL <0.0066
5,150 4.39 352 152 186 138
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
09/06/16 19.76 199.87 - - 09/06/1610/19/16 20.67 198.96 - 2.0 10/19/16 2.81 6.0 19202/28/17 21.31 198.32 - 1.0 02/28/17 2.87 5.9 15606/08/17 18.16 201.47 - 3.0 06/08/17 2.86 6.1 15510/18/17 18.29 201.34 - 3.0 10/18/17 3.69 6.4 151
Monitoring Point Data Summary TableNorth Elmore Chevron MW-18
09/06/16 27.2 12.2 - 27.2 219.63
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L)
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SOIL ANALYTICAL SUMMARY (mg/Kg)
Offsite Indoor Air Inhalation SSTLs:
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
NOT SAMPLED
pHREDOX POTENTIAL
(mV)
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Monitoring Point Data Summary TableNorth Elmore Chevron MW-18
09/06/16 27.2 12.2 - 27.2 219.63
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SAMPLE DATE MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
04/23/1310/19/16 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL 0.004902/28/17 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL 0.005106/08/17 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001010/18/17 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.0010
Inhalation SSTLs: 30,200 13.7 526 169 175 - 31
CORRECTIVE ACTION STARTED: MEME EVENTS
GROUNDWATER ANALYTICAL SUMMARY (mg/L)
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
SAMPLE ID SAMPLE DATE DEPTH (FT) MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
MW-19 09/06/16 8 - 13 <0.0056 <0.0056 <0.0056 <0.0056 <0.0056 BDL <0.0056MW-19 09/06/16 13 - 18 <0.0064 <0.0064 <0.0064 <0.0064 <0.0064 BDL <0.0064
5,150 4.39 352 152 186 - 138
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
09/06/16 20.32 199.25 - - 09/06/1610/19/16 21.25 198.32 - 2.0 10/19/16 2.54 5.8 17702/28/17 22.05 197.52 - 1.0 02/28/1706/08/17 19.01 200.56 - 3.0 06/08/17 4.29 6.3 24010/18/17 18.54 201.03 - 3.0 10/18/17 3.46 6.2 153
Monitoring Point Data Summary TableNorth Elmore Chevron MW-19
09/06/16 27.4 12.4 - 27.4 219.57
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L)
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SOIL ANALYTICAL SUMMARY (mg/Kg)
Offsite Indoor Air Inhalation SSTLs:
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
pHREDOX POTENTIAL
(mV)
NOT SAMPLED
NOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Monitoring Point Data Summary TableNorth Elmore Chevron MW-19
09/06/16 27.4 12.4 - 27.4 219.57
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SAMPLE DATE MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
04/23/1310/19/16 0.0257 0.0097 <0.0010 <0.0010 <0.0010 0.0097 0.002302/28/17 0.0113 0.0016 <0.0010 <0.0010 <0.0010 0.0016 <0.001006/08/17 0.0054 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001010/18/17 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.0010
Inhalation SSTLs: 30,200 13.7 526 169 175 - 31
GROUNDWATER ANALYTICAL SUMMARY (mg/L)
CORRECTIVE ACTION STARTED: MEME EVENTS
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
SAMPLE ID SAMPLE DATE DEPTH (FT) MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
VW-1 01/24/12 7.5 - 12.5 <0.0060 <0.0060 <0.0060 <0.0060 <0.0060 BDL <0.0060VW-1 01/24/12 12.5 - 17.5 <0.0066 <0.0066 <0.0066 <0.0066 <0.0066 BDL <0.0066
9,680 28.7 352 152 186 - 138
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
01/30/12 37.48 186.36 - - 01/30/12 2.6 6.7 17205/08/12 34.20 189.64 - - 05/08/12 2.94 6.4 13708/16/12 35.45 188.39 - - 08/16/12 2.49 6.4 20011/05/12 36.96 186.88 - - 11/05/12 2.38 5.8 18804/01/13 32.84 191.00 - - 04/01/13 3.54 6.1 21607/08/13 36.59 187.25 - - 07/08/13 2.29 6.4 33610/01/13 32.33 191.51 - - 10/01/13 1.93 6.0 14701/22/14 32.90 190.94 - - 01/22/14 2.32 5.8 24005/21/14 26.56 197.28 - - 05/21/14 4.32 6.4 13009/15/14 31.28 192.56 - - 09/15/14 2.04 6.0 20701/28/15 34.54 189.30 - - 01/28/15 3.32 5.7 22505/14/15 32.41 191.43 - - 05/14/15 2.62 6.0 20009/16/15 34.06 189.78 - 4.0 09/16/15 - 5.6 19502/04/16 33.12 190.72 - 1.0 02/04/16 3.67 6.2 28206/07/16 29.41 194.43 - 5.0 06/07/16 3.21 6.4 15810/19/16 35.04 188.80 - 2.0 10/19/16 2.78 5.9 22402/28/17 34.79 189.05 - 2.0 02/28/17 2.91 6.1 15606/08/17 32.67 191.17 - 5.0 06/08/17 4.52 6.2 19010/18/17 31.81 192.03 - 3.0 10/18/17 3.82 5.9 174
Monitoring Point Data Summary TableNorth Elmore Chevron VW-1
01/24/12 42.5 40 - 42.5 223.84
pHREDOX POTENTIAL
(mV)
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SOIL ANALYTICAL SUMMARY (mg/Kg)
Onsite Indoor Air Inhalation SSTLs:
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L)
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 2
Monitoring Point Data Summary TableNorth Elmore Chevron VW-1
01/24/12 42.5 40 - 42.5 223.84
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SAMPLE DATE MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
01/30/12 <0.0010 <0.0010 0.0016 <0.0010 0.0025 0.0041 <0.001005/08/12 0.0028 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001008/16/12 0.0025 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001011/05/12 0.0019 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001004/01/13 0.0011 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001004/23/1307/08/13 0.0016 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001010/01/13 0.0018 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001001/22/14 0.0026 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001005/21/14 0.0045 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001009/15/14 0.0092 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001001/28/15 0.0078 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001005/14/15 0.0016 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001009/16/15 0.0015 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001002/04/16 0.0011 <0.0010 <0.0050 <0.0010 <0.0010 BDL <0.005006/07/16 0.0060 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001010/19/16 0.0032 <0.0010 <0.0010 <0.0010 0.0014 0.0014 0.006602/28/17 0.0013 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.001006/08/17 0.0020 <0.0010 0.0011 <0.0010 0.0016 0.0027 <0.001010/18/17 0.0033 <0.0010 <0.0010 <0.0010 <0.0010 BDL <0.0010
GRP SSTLs: 0.818 0.204 40.9 28.6 175 - 0.818Inhalation SSTLs: 48,000 89.6 526 169 175 - 31
GROUNDWATER ANALYTICAL SUMMARY (mg/L)
CORRECTIVE ACTION STARTED: MEME EVENTS
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 4
SAMPLE ID SAMPLE DATE DEPTH (FT) MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
9,680 28.7 352 152 186 - 138
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
04/01/13 14.71 208.59 - - 04/01/1304/24/13 14.07 209.23 - - 04/24/1307/08/13 16.88 206.42 - - 07/08/1307/29/13 15.75 207.55 - - 07/29/1310/01/13 17.03 206.27 - - 10/01/1301/22/14 15.34 207.97 0.01 - 01/22/1406/05/14 13.33 209.97 - - 06/05/1407/01/14 14.17 209.13 - - 07/01/1408/06/14 15.34 207.96 - - 08/06/1410/08/14 18.35 204.95 - - 10/08/1411/06/14 18.80 204.50 - - 11/06/1401/28/15 17.63 205.67 - - 01/28/1505/14/15 15.95 207.35 - - 05/14/1509/16/15 18.85 204.45 - - 09/16/1502/04/16 14.79 208.51 - 4.0 02/04/1606/07/16 15.82 207.48 - - 06/07/1610/19/16 20.10 203.20 - - 10/19/1602/28/17 16.82 206.48 - 7.0 02/28/1706/08/17 15.07 208.23 - - 06/08/1710/18/17 17.31 205.99 - - 10/18/17
Monitoring Point Data Summary TableNorth Elmore Chevron RW-1
03/12/13 25 10 - 25 223.30
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L)
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SOIL ANALYTICAL SUMMARY (mg/Kg)
Onsite Indoor Air Inhalation SSTLs:
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
pHREDOX POTENTIAL
(mV)
NOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLED
FREE PRODUCT (0.01 FT)NOT SAMPLED
NOT SAMPLED
NOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLED
NOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 4
Monitoring Point Data Summary TableNorth Elmore Chevron RW-1
03/12/13 25 10 - 25 223.30
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SAMPLE DATE MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
04/01/13 0.2355 9.3951 26.3253 2.3008 12.4054 50.4266 0.662604/23/1307/08/13 1.6073 13.3250 37.2829 3.1334 17.1119 70.8532 0.724810/01/13 0.9636 7.7104 21.3794 1.5575 8.1966 38.8439 0.626601/22/14 0.3679 9.1194 28.3077 2.1109 12.1968 51.7348 1.876605/21/1409/15/1401/28/15 0.1166 2.2122 9.3740 0.3893 6.0692 18.0447 0.316905/14/1509/16/1502/04/16 0.2290 6.7800 21.6000 1.2500 12.8000 42.4300 0.616006/07/1610/19/1602/28/17 <0.0100 0.1349 0.1613 <0.0100 1.3876 1.6838 <0.010006/08/1710/18/17
GRP SSTLs: 0.818 0.204 40.9 28.6 175 - 0.818Inhalation SSTLs: 48,000 89.6 526 169 175 - 31
GROUNDWATER ANALYTICAL SUMMARY (mg/L)
NOT SAMPLED
CORRECTIVE ACTION STARTED: MEME EVENTS
NOT SAMPLED
NOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 4
SAMPLE ID SAMPLE DATE DEPTH (FT) MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
9,680 28.7 352 152 186 - 138
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
04/01/13 17.14 206.60 - - 04/01/1304/24/13 16.40 207.34 - - 04/24/1307/08/13 18.83 204.91 - - 07/08/1307/29/13 18.07 205.67 - - 07/29/1310/01/13 18.33 205.41 - - 10/01/1301/22/14 17.80 205.94 - - 01/22/1406/05/14 15.10 208.64 - - 06/05/1407/01/14 15.99 207.75 - - 07/01/1408/06/14 17.06 206.68 - - 08/06/1410/08/14 19.70 204.04 - - 10/08/1411/06/14 20.37 203.37 - - 11/06/1401/28/15 20.23 203.51 - - 01/28/1505/14/15 18.11 205.63 - - 05/14/1509/16/15 20.68 203.06 - - 09/16/1502/04/16 17.50 206.24 - 5.0 02/04/1606/07/16 17.56 206.18 - - 06/07/1610/19/16 26.70 197.04 - - 10/19/1602/28/17 19.25 204.49 - 8.0 02/28/1706/08/17 17.62 206.12 - - 06/08/1710/18/17 19.15 204.59 - - 10/18/17
Monitoring Point Data Summary TableNorth Elmore Chevron RW-2
03/11/13 27 12 - 27 223.74
NOT SAMPLED
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SOIL ANALYTICAL SUMMARY (mg/Kg)
Onsite Indoor Air Inhalation SSTLs:
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L) pH
REDOX POTENTIAL (mV)
NOT SAMPLEDNOT SAMPLEDNOT SAMPLED
NOT SAMPLED
NOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 4
Monitoring Point Data Summary TableNorth Elmore Chevron RW-2
03/11/13 27 12 - 27 223.74
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SAMPLE DATE MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
04/01/13 0.1065 1.0907 2.9268 0.2601 1.7110 5.9886 0.160604/23/1307/08/13 0.4706 1.6940 4.4095 0.2872 1.6381 8.0288 0.133810/01/13 0.3468 2.0885 5.6212 0.3757 1.9478 10.0332 0.110001/22/14 0.1653 1.6244 4.0786 0.2729 1.4924 7.4683 0.100305/21/1409/15/1401/28/15 0.0754 1.0124 3.9630 0.2866 1.4807 6.7427 0.091805/14/1509/16/1502/04/16 0.0222 0.8100 5.0100 0.4130 2.1400 8.3730 0.145006/07/1610/19/1602/28/17 <0.0100 0.2372 0.6418 0.0767 0.5200 1.4757 0.029406/08/1710/18/17
GRP SSTLs: 0.818 0.204 40.9 28.6 175 - 0.818Inhalation SSTLs: 48,000 89.6 526 169 175 - 31
NOT SAMPLEDNOT SAMPLED
GROUNDWATER ANALYTICAL SUMMARY (mg/L)
CORRECTIVE ACTION STARTED: MEME EVENTS
NOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 4
SAMPLE ID SAMPLE DATE DEPTH (FT) MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
9,680 28.7 352 152 186 - 138
DEPTH TO WATER ELEVATION(FT BTOC) (FT ABOVE MSL)
04/01/13 15.24 207.99 - - 04/01/1304/24/13 14.58 208.65 - - 04/24/1307/08/13 17.44 205.79 - - 07/08/1307/29/13 16.40 206.83 - - 07/29/1310/01/13 17.52 205.71 - - 10/01/1301/22/14 15.92 207.31 - - 01/22/1406/05/14 13.79 209.44 - - 06/05/1407/01/14 14.67 208.56 - - 07/01/1408/06/14 15.80 207.43 - - 08/06/1410/08/14 18.87 204.36 - - 10/08/1411/06/14 19.08 204.15 - - 11/06/1401/28/15 18.34 204.89 - - 01/28/1505/14/15 16.46 206.77 - - 05/14/1509/16/15 19.17 204.06 - - 09/16/1502/04/16 15.53 207.70 - - 02/04/1606/07/16 16.26 206.97 - - 06/07/1610/19/16 20.26 202.97 - - 10/19/1602/28/17 17.42 205.81 - 10.0 02/28/1706/08/17 15.85 207.38 - - 06/08/1710/18/17 17.93 205.30 - - 10/18/17
Monitoring Point Data Summary TableNorth Elmore Chevron RW-3
03/11/13 28 13 - 28 223.23
NOT SAMPLED
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SOIL ANALYTICAL SUMMARY (mg/Kg)
Onsite Indoor Air Inhalation SSTLs:
POTENTIOMETRIC ELEVATION SUMMARY INTRINSIC GROUNDWATER DATA SUMMARY
MEASUREMENT DATE
FREE PRODUCT THICKNESS (FT)
PCW GALLONS CONTAINERIZED SAMPLE DATE
DISSOLVED OXYGEN (mg/L) pH
REDOX POTENTIAL (mV)
NOT SAMPLEDNOT SAMPLEDNOT SAMPLED
NOT SAMPLED
NOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLEDNOT SAMPLEDNOT SAMPLED
SITE NAME: UST NUMBER: 11-06-10 WELL ID:
INSTALLATION WELL DEPTH SCREEN CASING ELEV WELL TYPE: IIDATE: (FT BTOC): INTERVAL (FT): (FT ABOVE MSL): DIAMETER (IN): 4
Monitoring Point Data Summary TableNorth Elmore Chevron RW-3
03/11/13 28 13 - 28 223.23
Notes: BTOC (Below Top of Casing); MSL (Mean Sea Level); BDL (Below Detection Limit); NS (Not Sampled)
SAMPLE DATE MTBE BENZENE TOLUENE ETHYLBENZENE TOTAL XYLENES TOTAL BTEX NAPHTHALENE
04/01/13 <0.0040 <0.0040 <0.0040 0.0569 1.0859 1.1428 0.252104/23/1307/08/13 <0.0040 <0.0040 <0.0040 0.0309 0.8690 0.8999 0.441710/01/13 <0.0040 <0.0040 <0.0040 0.0461 0.9621 1.0082 0.243901/22/14 <0.0050 <0.0050 <0.0050 0.0252 0.6527 0.6779 0.612105/21/1409/15/1401/28/15 <0.0050 <0.0050 <0.0050 0.0368 0.9292 0.9660 0.284405/14/1509/16/1502/04/16 <0.0010 <0.0010 <0.0050 0.0450 0.8160 0.8610 0.209006/07/1610/19/1602/28/17 <0.0050 <0.0050 <0.0050 0.0253 0.5575 0.5828 0.132606/08/1710/18/17
GRP SSTLs: 0.818 0.204 40.9 28.6 175 - 0.818Inhalation SSTLs: 48,000 89.6 526 169 175 - 31
NOT SAMPLEDNOT SAMPLED
GROUNDWATER ANALYTICAL SUMMARY (mg/L)
CORRECTIVE ACTION STARTED: MEME EVENTS
NOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLED
NOT SAMPLEDNOT SAMPLED
Copyright:© 2013 National Geographic Society, i-cubed, Source: Esri,DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA,USGS, AeroGRID, IGN, and the GIS User Community
0 2,000 4,000Feet
Site
§Site Location USGS Topographic Map
North Elmore Chevron1200 Alabama Highway 143Elmore, Elmore County, AL
www.cdge.com
Property Line
Gas Line
Overhead Electric Cable
Buried Telephone Cable
Buried Fiber Optic Cable
Water Line
Type II Monitoring Well
Type III Monitoring Well
Recovery Well
LEGEND
www.cdge.com
0
Approximate Scale in Feet
60 120
Site Map with Utility and Well Locations
Elmore, Elmore County, AL
1200 Alabama Highway 143
North Elmore Chevron
Gas StationStora
ge
Ala
ba
ma H
wy 1
43
100' ROW
Fitzpatrick Road
40' R
OW
Ala
ba
ma H
wy 1
43
MW 8
MW 7
Diesel Pump
Tank Pit
Telephone Booth
Sign
�1.19 AcresNorth Elmore Chevron
Lot 1, Block A, Of R.I.Perkins SubdivisionParcel #29-15-01-12-1-004-017.000
Interstate Oil Company Inc.
Lot 2, Block A, Of R.I.Perkins SubdivisionParcel #29-15-01-12-1-004-016.000
Interstate Oil Company Inc.
Block A, Of R.I.Perkins SubdivisionParcel #29-15-01-12-1-004-015.000
Kenneth Cole L & Rebecca Cole
Parcel #29-15-01-12-2-001-018.000Federal National Mortgage Association
Canopy
MW 9
MW 3
MW 4 VW 1
MW 11
MW 10
MW 6
MW 5
MW 2
MW 1
MW 12
MW 13
MW 14
RW 1
RW 2
RW 3
MW 15
MW 16
MW 17
MW 18
MW 19
Property Line
Type II Monitoring Well
Type III Monitoring Well
Recovery Well
LEGEND
Proposed Recovery Well
Proposed Recovery Well Trenching
Benzene Contour (June 8, 2017)
Proposed Recovery Wells
Radius of Influence for
www.cdge.com
0
Approximate Scale in Feet
60 120
Elmore, Elmore County, AL
1200 Alabama Highway 143
North Elmore Chevron
Proposed Remediation System
Proposed System Layout Map
Proposed Discharge Piping
Gas Station
Stora
ge
Ala
ba
ma H
wy 1
43
100' ROW
Fitzpatrick Road
40' R
OW
Ala
ba
ma H
wy 1
43
MW 8
MW 7
Tank Pit
Telephone Booth
Sign
Parcel #29-15-01-12-2-001-018.000Federal National Mortgage Association
Canopy
MW 9
MW 3
VW 1
MW 11
MW 10
MW 6
MW 5
MW 2
MW 1
MW 12
MW 13
MW 14
RW 1
RW 2
RW 3
MW 15
MW 16
MW 17
MW 18
MW 19
1.19 AcresNorth Elmore Chevron
0.1
0.01
0.1
MW 4
0.01
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/AirbusDS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
0 100 200Feet
Store
§System Discharge Point Location Map
North Elmore Chevron1200 Alabama Highway 143Elmore, Elmore County, AL
www.cdge.com
LegendDischarge Point
Proposed Discharge Piping
www.cdge.com
Remediation Compound Layout
Elmore, Elmore County, AL
1200 Alabama Highway 143
North Elmore Chevron
www.cdge.com
Not to Scale
Piping Cross Section and Manifold Detail
Elmore, Elmore County, AL
1200 Alabama Highway 143
North Elmore Chevron
2" PVC Ball
Valve (Typ)
2" Tee Reduced
to 1/4" NPT (Typ)
Capsuhelic Pressure
Gauge (Typ)
Clear PVC Site Tube
(Typical Each Leg)
To 3" F
PT Influent
From
RW-2
From
RW-1
From
RW-5
Manifold Detail
From
RW-4
From
Piping Cross Section
6"
2" PVC SCH 40
Pipe (Typ)
Ground Surface
Pea Gravel
RW-1
RW-2
Front View
Manifold Detail
Side View
Schedule 40
PVC (Typ)
2"
2" PVC Ball
Valve (Typ)
2" Tee Reduced
to 1/4" NPT (Typ)
Capsuhelic Pressure
Gauge (Typ)
Clear PVC Site Tube
(Typical Each Leg)
From Recovery Well
Schedule 40
PVC (Typ)
2"
From
Natural Soil2'-
0"
4"
RW-6 RW-7
PVC (Typ)
3" Schedule 40
PVC (Typ)
3" Schedule 40
RW-4
RW-5
RW-6
RW-7
24" - 4
8"
To Remedial System
Concrete
Pea Gravel
1.5" Sch. 40 PVC Pipe
Locking Manhole Cover
Rated For Heavy Traffic
2'x2'x2' Prefabricated
Locking Manhole
Grout
4" Diameter PVC Casing
1" Spiralite PVC Vacuum Hose
(Droptube)
Static Water Table
4" X 1-1/2" PVC Bushing
3'-0" Long w/ ASTM Threads
Barb
Droptube Perforations forMulti-Phase Extraction
2' Bentonite Seal
Sand Pack
4" Diameter PVC Screen
Min.
24"
4" Sanitary Well Seal
Compacted
Vacuum Port
Vacuum Measuring Port
Existing Ground Surface
Well Depth
www.cdge.com
Recovery Well Construction Detail
Elmore, Elmore County, AL
1200 Alabama Highway 143
North Elmore Chevron Not to Scale
UST RELEASE FACT SHEET
GENERAL INFORMATION:
SITE NAME: North Elmore Chevron ADDRESS: 1200 Alabama Highway 143 Elmore, Elmore County, Alabama FACILITY I.D. NO.: 12530-051-004599 UST INCIDENT NO.: 11-06-10
RESULTS OF EXPOSURE ASSESSMENT:
How many private drinking water wells are located within 1,000 ft. of site? 0
How many public water supply wells are located within 1 mile of the site? 0
Have any drinking water supply wells been impacted by contamination from this release? No
Is there an imminent threat of contamination to any drinking water wells? { } Yes { x} No
Have vapors or contaminated groundwater posed a threat to the public? { } Yes { x} No
Are any underground utilities impacted or imminently threatened by the release? { } Yes { x} No
Have surface waters been impacted by the release? { } Yes { x} No
Is there an imminent threat of contamination to surface waters? { } Yes { x } No
What is the type of surrounding population? Residential
CONTAMINATION DESCRIPTION:
Type of contamination at site: {X } Gasoline, { X } Diesel, { } Waste Oil { } Kerosene, { } Other ______________ Free product present in wells? { X } Yes { } No Maximum thickness measured: 1.41 feet in MW-4 on 06/05/14 Maximum TPH concentrations measured in soil: 50 ppm on 01/26/12 Maximum BTEX or PAH concentrations measured in groundwater: 384.911 ppm BTEX in MW-4 on 08/16/12 ADEM UST Form - 001 (04/22/93)
ADEM GROUNDWATER BRANCH UST SITE CLASSIFICATION SYSTEM
CHECKLIST
Please read all of the following statements and mark either yes or no if the statement applies to your site. If you have conducted a Preliminary or Secondary Investigation, all questions should be answered. Closure site assessment reports may not provide you with all the necessary information, but answer the statements with the knowledge obtained during the closure site assessment. SITE NAME: North Elmore Chevron SITE ADDRESS: 1200 Alabama Highway 143 Elmore, Elmore County, Alabama FACILITY I.D. NO.: 12530-051-004599 UST INCIDENT NO.: UST 11-06-10 OWNER NAME: Interstate Oil Company, Inc. OWNER ADDRESS: P.O. Box 967 Montgomery, Alabama 36101 NAME & ADDRESS OF PERSON COMPLETING THIS FORM:
CDG Engineers and Associates Inc.
Anna Brunson, Project Manager P.O. Box 278, Andalusia, Alabama 36420
CLASSIFICATION DESCRIPTION YES NO CLASS A IMMEDIATE THREAT TO HUMAN HEALTH, HUMAN SAFETY OR
SENSITIVE ENVIRONMENTAL RECEPTOR
A.1 Vapor concentrations at or approaching explosive levels that could cause health effects, are present in a residence or building.
A.2 Vapor concentrations at or approaching explosive levels are present
in subsurface utility system(s), but no buildings or residences are impacted.
CLASS B IMMEDIATE THREAT TO HUMAN HEALTH, HUMAN SAFETY OR SENSITIVE ENVIRONMENTAL RECEPTOR
B.1 An active public water supply well, public water supply line or public surface water intake is impacted or immediately threatened.
B.2 An active domestic water supply well, domestic water supply line or
domestic surface water intake is impacted or immediately threatened.
B.3 The release is located within a designated Wellhead Protection Area
I.
CLASS C IMMEDIATE THREAT TO HUMAN HEALTH, HUMAN SAFETY OR SENSITIVE ENVIRONMENTAL RECEPTOR
C.1 Ambient vapor/particulate concentrations exceed concentrations of concern from an acute exposure, or safety viewpoint.
C.2 Free product is present on the groundwater, at ground surface, on
surface water bodies, in utilities other than water supply lines, or in surface water runoff.
CLASSIFICATION DESCRIPTION YES NO
CLASS D SHORT TERM THREAT TO HUMAN HEALTH, SAFETY, OR SENSITIVE
ENVIRONMENTAL RECEPTORS
D.1 There is a potential for explosive levels, or concentrations of vapors that could cause acute effects, to accumulate in a residence or other building.
D.2 A non-potable water supply well is impacted or immediately
threatened.
D.3 Shallow contaminated surface soils are open to public access, and
dwellings, parks, playgrounds, day care centers, schools or similar use facilities are within 500 feet of those soils.
CLASS E SHORT TERM THREAT TO HUMAN HEALTH, SAFETY, OR SENSITIVE ENVIRONMENTAL RECEPTORS
E.1 A sensitive habitat or sensitive resources (sport fish, economically important species, threatened and endangered species, etc.) are impacted and affected.
CLASS F SHORT TERM THREAT TO HUMAN HEALTH, SAFETY, OR SENSITIVE ENVIRONMENTAL RECEPTORS
F.1 Groundwater is impacted and a public well is located within 1 mile of the site.
F.2 Groundwater is impacted and a domestic well is located within 1,000
feet of the site.
F.3 Contaminated soils and/or groundwater are located within
designated Wellhead Protection Areas (Areas II or III).
CLASS G SHORT TERM THREAT TO HUMAN HEALTH, SAFETY, OR SENSITIVE ENVIRONMENTAL RECEPTORS
G.1 Contaminated soils and/or groundwater are located within areas vulnerable to contamination from surface sources.
GLASS H SHORT TERM THREAT TO HUMAN HEALTH, SAFETY, OR SENSITIVE ENVIRONMENTAL RECEPTORS
H.1 Impacted surface water, storm water or groundwater discharges within 500 feet of a surface water body used for human drinking water, whole body water-contact sports, or habitat to a protected or listed endangered plant and animal species.
CLASS I LONG TERM THREAT TO HUMAN HEALTH, SAFETY, OR SENSITIVE ENVIRONMENTAL RECEPTORS
I.1. Site has contaminated soils and/or groundwater but does not meet any of the above mentioned criteria.
ADDITIONAL COMMENTS: Complete the classification evaluation questions listed above. Upon completion, determine the highest rank of the site (A.1 is the highest rank) based on the statements answered with a yes. Enter the determined classification ranking:
C.2
ADEM GROUNDWATER BRANCH SITE CLASSIFICATION CHECKLIST (5/8/95)
InvoiceDate
1/27/2014
Invoice #
21583
Bill To
CDG Engineers & AssociatesPO Box 278Andalusia, AL 36420
Ship To
Atlanta Highway Food Mart5440 Atlanta HwyMontgomery, ALAttn: April Harrelson 334-222-9431
PO #
Atlanta Highway Food ...
Terms
Net 30
Rep
JG
Ship
1/22/2014
Via
Common Carrier
F.O.B.
Factory
Ref
MK 213133B
Thank you for your business.Total
Please remit payment to:319 N Weber Road, PMB# 370Bolingbrook, IL 60490630-920-1104 Phone630-920-8013 Fax
Item Code DescriptionQuantity Price Each Amount
Liquid Ring 40.0 HP single stage oil sealed liquid ring blower1 32,603.00 32,603.00T
AWS1 200 200 gallon Air/water separator with conductivity probe levelswitches
1 0.00 0.00T
Transfer Pump 1.5 hp transfer pump, 3450 rpm, TEFC motor2 0.00 0.00T
SA20 MKE Model SA20HE Stripperator NEW high efficiencyStripperator- 800 CFM20 GPM capacity Oil/Water Separator and air strippertreatment system
1 15,437.00 15,437.00T
Pulse Meter Groundwater flow totalizer with pulse output for remotetotalization
1 0.00 0.00T
Control Panel NEMA 3R Master Control Panel System1 13,108.00 13,108.00T
Telemetry Telemetry system model 5701 0.00 0.00T
Transducer Vacuum transducer integrated into telemetry system for realtime monitoring, 4-20mA
1 0.00 0.00T
Building 8.5'W X 12'L X 9.5'H system building, fully insulated withremovable sliding wall panels for ease of maintenance
1 23,559.00 23,559.00T
Heater 12,000 BTU XP heater with XP thermostat1 0.00 0.00T
Electrical Equipment electrical installation, wiring of components, XPseal offs and liquid tight flexible connections.
1 0.00 0.00T
Mechanical Mechanical installation including mounting, interconnectingfittings and hoses.
1 0.00 0.00T
Page 1
InvoiceDate
1/27/2014
Invoice #
21583
Bill To
CDG Engineers & AssociatesPO Box 278Andalusia, AL 36420
Ship To
Atlanta Highway Food Mart5440 Atlanta HwyMontgomery, ALAttn: April Harrelson 334-222-9431
PO #
Atlanta Highway Food ...
Terms
Net 30
Rep
JG
Ship
1/22/2014
Via
Common Carrier
F.O.B.
Factory
Ref
MK 213133B
Thank you for your business.Total
Please remit payment to:319 N Weber Road, PMB# 370Bolingbrook, IL 60490630-920-1104 Phone630-920-8013 Fax
Item Code DescriptionQuantity Price Each Amount
Vessel Vapor Phase Carbon Vessels (for dual phase offgastreatment)VF-1000 vessels1,000 lb initial load each
2 5,425.00 10,850.00T
AWS3 AWS3 knock out tank prior to oxidizer to minimizecondensed liquids from entering burner or vapor phasecarbon bed
1 0.00 0.00T
NRTL Third Party MET Certification (required for the city limits ofMontgomery)The entire remediation building to be third party certified atMK Environmental factory.National Recognized Testing Lab (NRL)
1 0.00 0.00T
manifold 7-Point dual phase inlet manifold inside system buildingincluding4" main x (7) 2" branches, each branch includes;2" throttling valve, vacuum gauge, 6" section of clear pvc sitetube with quick rubber coupling100' of bulk 2" clear tiger flex hose for stub up connection byothers
1 2,625.00 2,625.00T
Disconnect 200 Amp Fused Main DisconnectWeatherhead with extension pole and bracket supportElectric meter socket base installed
1 2,257.00 2,257.00T
Vessel Vapor Phase Carbon Drums (Air Stripper off gas treatment)400 lb initial load each6" in and out plain pipe connections
2 2,290.00 4,580.00T
Start up Training Start up and training1 1,750.00 1,750.00
Page 2
Task Completed by Personnel/Title:Griffin
Gatschet, PG/PM
Alan Barck, PG/PE/PM
Anna Brunson, Project
Manager
Kyle Marshall, Staff Scientist
Ray Hollinghead,
Drafter
Kim Ballard, Admin
Patricia Horwath,
Admin
Project Management X
Work Plan Preparation/Review X X
Cost Proposal Preparation/Review X X X X X
Field Work
Data Interpretation/Tabulations X X
Drafting X
Report Preparation/Review X X X X
Payment Request Preparation/Review X X X X
Notes:DO=Drilling OversightBL=Boring Log Description/Soil ClassificationWG=Well GaugingGSC=Groundwater Sample CollectionMEME=MEME OversightPM=Project ManagementO&M=Routine Operation & MaintenanceHRS=High Resolution StudyVM=Vapor MonitoringFC=Fan Check
TASK PERFORMANCE SUMMARYModified CAP Report, CP-25
Elmore, Elmore County, Alabama1200 AL Hwy 143
North Elmore Chevron