Norfolk Boreas Offshore Wind Farm Land Plans (Onshore) · u t L i n e s h e e t A 1 5 6 C u t L i n...

14
Norfolk Boreas Offshore Wind Farm Land Plans (Onshore) Part 4 of 6 (Version 3) DCO Document 2.2 Applicant: Norfolk Boreas Limited Document Reference: 2.2 Deadline 9 Date: April 2020 Revision: Version 3 Author: Ardent Management Limited Photo: Ormonde Offshore Wind Farm

Transcript of Norfolk Boreas Offshore Wind Farm Land Plans (Onshore) · u t L i n e s h e e t A 1 5 6 C u t L i n...

  • Norfolk Boreas Offshore Wind Farm

    Land Plans (Onshore) Part 4 of 6 (Version 3)

    DCO Document 2.2

    Applicant: Norfolk Boreas Limited Document Reference: 2.2 Deadline 9

    Date: April 2020 Revision: Version 3 Author: Ardent Management Limited

    Photo: Ormonde Offshore Wind Farm

  • NORWICH

    13/11

    13/02

    13/09

    13/08

    13/05

    13/04

    13/0313/01

    13/06

    13/07

    13/13

    13/12

    13/10

    Cut Line sheet 12Cut Line sheet 13

    Cut Line sheet 13Cut Line sheet 14

    SewagePpg Sta

    Issues

    Track

    22.8m

    Def

    Path (um)

    DrainPlaying Field

    Track

    Owl Barn

    SpringMeadow

    The Beeches

    Drain

    MeadowHolly Brook

    ShallowBrook

    Corner

    Stavely

    Shangri La

    Oak

    Snowdrift

    Sunny

    SunnysideFarm

    26

    Drain

    FieldViewDrain

    NewHaven

    The OldPost Office

    Pond

    Pond

    Track

    FB

    Pond

    Cottages

    Drain

    MeadowCottage

    Drain

    Hall Farm

    4

    Drain

    Pond

    Hall Farm

    Drain19.2m

    23.3m

    Hall Farm

    ColbyTrack

    3

    StableCottage

    BrushPlantation

    Def

    Redbrook 2 Post OfficeCottages18.4m

    Track

    FB

    Lang WoodPond

    Drain

    MeadowCottages

    Pond

    Well

    Pink Cottage

    Well

    CottageRose Bank

    New Forge

    Littlea

    cre

    BRIGGS LOKE

    NakiskaTriways

    Pond

    CornerFlower

    Baker Briggs

    WheelersMeadow

    1

    Holly Cottage

    Highbury Farm

    TCB

    18.9m

    Brambles

    GP

    2

    Tanglewood

    Thistledome

    7

    622000

    622000

    330000

    330000

    331000

    331000

    © Vattenfall Wind Power Ltd 2018. Contains Ordnance Survey data© Crown copyright and database rights 2018 Ordnance Survey 0100031673

    ±

    0 0.1 0.2 km

    Type of Interest RequiredTemporary RightsAcquisition of Permanent New Rights, Access OnlyAcquisition of Permanent New Rights

    Scenario 1 and 2 Interests Differentiation HatchingType 1: Land not required under Scenario 1

    Title:

    Report:Development Consent OrderNorfolk BoreasOffshore Wind Farm

    Drawn: Scale:Checked:Date:Revision:

    Drawing No:

    Size:

    British National Grid

    Doc Ref:

    Co-ordinate system:

    Land Plans

    2.2 006_ARDG_Norfolk_B_LP_v1_Rev8

    27700EPSG:

    Project:

    1:2,50002 IM AP A1

    APFP Ref: 5(2)(i)

    Sheet 13

    24/04/2020

    Version 3 - April 2020

  • NORWICH

    14/14

    14/21

    14/05

    14/02

    14/26

    14/10

    14/09

    14/04

    14/01

    14/06

    14/08

    14/11

    14/16

    14/1514/19

    14/20

    14/23

    14/22

    14/24

    14/28

    14/27

    14/25

    14/03

    14/18

    14/13

    14/07

    14/12

    Cut Line sheet 13Cut Line sheet 14

    Cut Line sheet 14Cut Line sheet 15

    FB

    Def

    Old FarmHouse

    ErpinghamLodge Farm

    25.3m

    Def1.22m RH

    S Lake

    20.9m 18.3m

    Cottage

    Lake

    GPPond

    Aylsham Wood

    ErpinghamLodge FarmHouse

    BANNINGHAMROAD

    LittlewoodLodge

    HolidayCottage

    Def

    E Wood

    Track Church Farm

    PondTra

    ck

    B 1145

    20.4m

    Und

    AshTree FarmAbbot's Hall

    FB

    Hall FarmAbbot's

    Drain

    Moat

    FB

    Pond

    DrainDrain

    Butts Common

    Track

    Def

    Holly Farm

    15.6m Lay B

    y

    Drain

    1.22m RH

    CD

    1.22m

    RH

    Co Const,CP & ED Bdy

    Def1.22m RH

    Pond1.22m

    RH

    1.22m R

    H

    Def CR

    Und

    Drain

    Def

    The OldRectory

    GP 14

    The CoachHouse

    620000

    620000

    621000

    621000

    329000

    329000

    © Vattenfall Wind Power Ltd 2018. Contains Ordnance Survey data© Crown copyright and database rights 2018 Ordnance Survey 0100031673

    ±

    0 0.1 0.2 km

    Type of Interest RequiredTemporary RightsAcquisition of Permanent New Rights, Access OnlyAcquisition of Permanent New Rights

    Scenario 1 and 2 Interests Differentiation HatchingType 1: Land not required under Scenario 1

    Title:

    Report:Development Consent OrderNorfolk BoreasOffshore Wind Farm

    Drawn: Scale:Checked:Date:Revision:

    Drawing No:

    Size:

    British National Grid

    Doc Ref:

    Co-ordinate system:

    Land Plans

    2.2 006_ARDG_Norfolk_B_LP_v1_Rev8

    27700EPSG:

    Project:

    1:2,50002 IM AP A1

    APFP Ref: 5(2)(i)

    Sheet 14

    24/04/2020

    Version 3 - April 2020

  • NORWICH

    15/02

    15/13

    15/07

    15/11

    15/04

    15/03

    15/01

    15/06

    15/0815/09

    15/10

    15/12

    15/14

    15/15

    15/05

    Cut Line sheet 14Cut Line sheet 15

    Cut Line sheet 15Cut Line sheet 16

    Pond

    114.8m

    22a

    10a

    4

    13.6m

    10

    16.6m

    12

    14

    Tennis Court

    Track

    Drain

    Drain

    FB

    River

    Bure

    River Bure

    Drain

    Drain

    PondPlantation

    Drain

    4448

    86

    76

    11.6m

    DRABBLEGAT

    E

    Lodge

    Drain

    54

    Drain

    Drain

    Drain

    Drain

    Pond

    PondPond 15

    Pond

    PondDrain Pond

    Track

    Def

    Def

    SDDef

    1.22m RH

    Pond

    Pond

    Hill TopPlantation

    DrainCR

    Co Const,CP & ED Bdy

    Track

    Drain

    Drain

    Pond

    Pond

    Path (um)

    Pond

    Drain

    Pond

    Holly's Grove

    Pond

    CR

    Drain

    Lodge Farm

    Pond

    Drain

    College

    Drain

    Bridge

    Drain

    Drain CD

    Drain

    Cubitt's Carr

    Toll Bar

    DrainDrain

    14.0mGP

    LittleCubitt's

    GP Pond

    Drain

    Drain

    Squirrel'sCarr

    Drain

    Pond

    Drain

    DrainDrain

    Drain 5

    12.4mPonds LB

    Path

    Pond

    15.2m

    12.8m

    CottagePond

    13.7mBure Acre

    Pond Wood

    Drain

    DrainPond

    12.4m Def

    Def

    Def

    SD

    Drain

    Tennis Court

    FBSD Def CR

    SD

    Drain

    Abbot's Hall

    FB

    Hall FarmAbbot's

    Pond

    Drain

    Drain

    Moat

    FB

    11.6m

    DRABBL

    EGATE

    34

    90

    Pond

    DrainDrain

    2632

    Taniwha2220

    Und

    Keeper'sCottage20.9m

    MS

    Plantation

    23.2m

    26.6m

    619000

    619000

    620000

    620000

    328000

    328000

    329000

    329000

    © Vattenfall Wind Power Ltd 2018. Contains Ordnance Survey data© Crown copyright and database rights 2018 Ordnance Survey 0100031673

    ±

    0 0.1 0.2 km

    Type of Interest RequiredTemporary RightsAcquisition of Permanent New Rights, Access OnlyAcquisition of Permanent New Rights

    Scenario 1 and 2 Interests Differentiation HatchingType 1: Land not required under Scenario 1

    Title:

    Report:Development Consent OrderNorfolk BoreasOffshore Wind Farm

    Drawn: Scale:Checked:Date:Revision:

    Drawing No:

    Size:

    British National Grid

    Doc Ref:

    Co-ordinate system:

    Land Plans

    2.2 006_ARDG_Norfolk_B_LP_v1_Rev8

    27700EPSG:

    Project:

    1:2,50002 IM AP A1

    APFP Ref: 5(2)(i)

    Sheet 15

    24/04/2020

    Version 3 - April 2020

  • NORWICH

    16/10

    16/12

    16/06

    16/01

    16/02

    16/03

    16/04

    16/05

    16/07

    16/11

    16/13

    16/14 16/08

    16/09

    Cut Line sheet 15Cut Line sheet 16

    Cut Line sheet 16Cut Line sheet 17

    Path (um

    ) TudorRoseBarnPond

    Pond Manor Farm

    Drain

    BLICK

    LING

    ROAD

    Little

    Camohill

    Rowangarth

    The DellCottage

    The Poplars

    Hedger

    ows

    HEYDON ROAD

    Greenw

    ays

    27.3m

    49

    30.5m

    The

    The Dell

    PondKeeper'sCottage

    DismantledRailway

    Track

    Workings

    3518

    Drain

    Silvergate

    31SILVE

    RGATE

    LANE

    36

    Well

    34

    22

    Well

    The Artworks

    30

    Drain

    2821

    20

    27.0m

    11

    17Well

    1233

    Drain

    Drain

    BlicklingPark

    31.2m

    39.5m

    GP37.2m

    Def

    Track 37.5m

    Abel Heath

    HEYDON ROAD

    33.0m

    GP

    35.8m

    Oak

    Tk

    Ppg Sta

    Drain

    31.6mWater

    Wheel Carr

    (disused)

    Icehouse

    Plantatio

    n

    Plantation

    TCB

    Drain

    Cemetery

    FB

    Path (um)

    28.9m

    Weavers Way

    34.4m

    Path (um)

    GreenhousePark

    25.6m

    GP

    MS

    30.0m

    32.1m

    618000

    618000

    328000

    328000

    © Vattenfall Wind Power Ltd 2018. Contains Ordnance Survey data© Crown copyright and database rights 2018 Ordnance Survey 0100031673

    ±

    0 0.1 0.2 km

    Type of Interest RequiredAcquisition of Permanent New Rights, Access OnlyAcquisition of Permanent New Rights

    Title:

    Report:Development Consent OrderNorfolk BoreasOffshore Wind Farm

    Drawn: Scale:Checked:Date:Revision:

    Drawing No:

    Size:

    British National Grid

    Doc Ref:

    Co-ordinate system:

    Land Plans

    2.2 006_ARDG_Norfolk_B_LP_v1_Rev8

    27700EPSG:

    Project:

    1:2,50002 IM AP A1

    APFP Ref: 5(2)(i)

    Sheet 16

    24/04/2020

    Version 3 - April 2020

  • NORWICH

    17/07

    17/01

    17/03

    17/05

    17/04

    17/02

    17/06

    Cut Line sheet 16Cut Line sheet 17

    Cut Line sheet 17Cut Line sheet 18

    37.9m

    Bennet

    'sGro

    ve

    Track

    (dis)

    353638 Well37

    Drain

    33.0m

    RH

    Drain

    DismantledRailway

    Oulton Belt

    Track

    Track

    Track

    Def

    Fir Grove

    41.1m

    FirgroveCottage

    HEYDON ROAD

    38.5m

    Track

    Pond

    Wood Farm

    IssuesTrack

    Belt

    AYLSH

    AM RO

    AD

    Track

    Track

    Track

    Und

    1.22m RH

    616000

    616000

    617000

    617000

    327000

    327000

    © Vattenfall Wind Power Ltd 2018. Contains Ordnance Survey data© Crown copyright and database rights 2018 Ordnance Survey 0100031673

    ±

    0 0.1 0.2 km

    Type of Interest RequiredAcquisition of Permanent New Rights, AccessAcquisition of Permanent New Rights

    Title:

    Report:Development Consent OrderNorfolk BoreasOffshore Wind Farm

    Drawn: Scale:Checked:Date:Revision:

    Drawing No:

    Size:

    British National Grid

    Doc Ref:

    Co-ordinate system:

    Land Plans

    2.2 006_ARDG_Norfolk_B_LP_v1_Rev8

    27700EPSG:

    Project:

    1:2,50002 IM AP A1

    APFP Ref: 5(2)(i)

    Sheet 17

    24/04/2020

    Version 3 - April 2020

  • NORWICH

    18/05

    18/0818/13

    18/0318/06

    18/02

    18/09

    18/01

    18/04

    18/07

    18/10

    18/1118/12

    18/14

    18/1518/16

    Cut Line sheet 17Cut Line sheet 18

    Cut Line sheet 18Cut Line sheet 19

    Pond

    Def

    Drain

    1.22m TB

    Track

    DrainDrain

    LarchPlantation

    Def

    Pond

    Docking FarmCottage TrackDocking FarmDocking HouseMonitoringStation

    Drain

    HighPlantation

    Pond

    1.22m Tk H

    Middleton'sDole

    615000

    615000

    616000

    616000

    326000

    326000

    © Vattenfall Wind Power Ltd 2018. Contains Ordnance Survey data© Crown copyright and database rights 2018 Ordnance Survey 0100031673

    ±

    0 0.1 0.2 km

    Type of Interest RequiredTemporary RightsAcquisition of Permanent New Rights, AccessAcquisition of Permanent New Rights

    Scenario 1 and 2 Interests Differentiation HatchingType 1: Land not required under Scenario 1

    Title:

    Report:Development Consent OrderNorfolk BoreasOffshore Wind Farm

    Drawn: Scale:Checked:Date:Revision:

    Drawing No:

    Size:

    British National Grid

    Doc Ref:

    Co-ordinate system:

    Land Plans

    2.2 006_ARDG_Norfolk_B_LP_v1_Rev8

    27700EPSG:

    Project:

    1:2,50002 IM AP A1

    APFP Ref: 5(2)(i)

    Sheet 18

    24/04/2020

    Version 3 - April 2020

  • NORWICH

    19/04

    19/02

    19/08

    19/07

    19/05

    19/01

    19/03

    19/06

    19/09

    Cut Line sheet 18Cut Line sheet 19

    Cut Line sheet 19

    Cut Line sheet 20

    TrackPond

    BluestonePlantation

    1.22m TB

    1.22m T

    BPond

    Boat House

    Reservoir

    DockingPlantation

    40.7m

    MS

    Cottage

    Well

    BluestoneLodge

    BluestonePlantation

    43.6m

    41.4m

    43.9m

    Track

    B 114947.2m

    BeerhouseFarm

    41.1m

    BeerhouseCottages

    38.9m

    Pond Drain

    WellPond

    Sovereign Cottage

    GP

    Track

    B 1149

    MonitoringStation

    41.9m

    Track

    B 1149

    Dix's

    614000

    614000

    615000

    615000

    325000

    325000

    326000

    326000

    © Vattenfall Wind Power Ltd 2018. Contains Ordnance Survey data© Crown copyright and database rights 2018 Ordnance Survey 0100031673

    ±

    0 0.1 0.2 km

    Type of Interest RequiredAcquisition of Permanent New Rights, Access OnlyAcquisition of Permanent New Rights

    Title:

    Report:Development Consent OrderNorfolk BoreasOffshore Wind Farm

    Drawn: Scale:Checked:Date:Revision:

    Drawing No:

    Size:

    British National Grid

    Doc Ref:

    Co-ordinate system:

    Land Plans

    2.2 006_ARDG_Norfolk_B_LP_v1_Rev8

    27700EPSG:

    Project:

    1:2,50002 IM AP A1

    APFP Ref: 5(2)(i)

    Sheet 19

    24/04/2020

    Version 3 - April 2020

  • NORWICH

    20/10

    20/0720/09

    20/06 20/02

    20/0320/01

    20/04

    20/08

    20/11

    20/18

    20/17

    20/20

    20/05

    20/21

    20/19

    Cut Line sheet 19

    Cut Line sheet 20

    Cut Line sheet 20Cut Line sheet 21

    The Belt

    14a

    2323 42

    17b

    Cawston

    12 131

    5

    14

    20 18

    12

    211

    17

    27

    6

    154

    PYE1

    39

    2c

    142

    3

    17 1826

    Orchard

    18

    2420

    2a

    5End

    12b

    Rose

    25

    BulwersTerrace 14

    37

    37

    25

    12

    31Forge

    49a

    10 31

    16

    45 4930TheHide Away

    CawstonWesleyanReform Chapel

    34.9m

    Pond

    MP.25

    Track

    FB

    Drain

    2

    Playing Field

    Track

    Track

    Nursing

    Play Area

    6

    44.7m

    41.2m

    40

    c

    a

    107

    79

    461

    PAUL WAY2

    16

    8

    3

    11

    8

    35

    55

    Loke

    GP45.9m

    Hall

    Track

    B 1145 53b

    53a 26

    14

    40.8mB 1145

    Nursery

    7

    59

    33

    24

    49b51c 51b51DOaks View 22

    37.8mCawston Cottage

    The OldPlough

    Mill Cottage

    Sygate

    Cottage

    Sygate

    Cottag

    eCHA

    PEL ST

    REET

    Clumps

    34

    House

    61

    MARRIOTT'S

    WAY

    1

    Pp

    Little

    Kosi Bungalow

    The BungalowGP

    544.9m

    Dukes

    LBWell

    69

    Rose Cottage

    Westland

    GlebeCrescent

    Montrose

    21

    Cottage

    Pond

    Station House

    ElSta8

    Works

    2

    914

    10

    SygateSunny

    CottagesBIRDS LANE

    Roadside

    Sygate

    21

    The

    FRED DRIVE

    Cottage

    Tanks

    Marriott'sWay (Path)

    Twinmills

    Pond

    36

    Track

    The Common

    TrackCOCS

    Tanks

    Track

    Track

    Gas Gov

    Distribution

    Station

    Drain42.2m

    Alder Carr

    ETL

    Drain

    Drain

    ETL

    5

    COMMON

    SIDE

    13

    COCS

    37.1m

    Drain

    Sall Bridge

    Drain

    Sub

    28.7m

    DrainDrain

    Drain29.2m

    FarmPark

    613000

    613000

    324000

    324000

    325000

    325000

    © Vattenfall Wind Power Ltd 2018. Contains Ordnance Survey data© Crown copyright and database rights 2018 Ordnance Survey 0100031673

    ±

    0 0.1 0.2 km

    Type of Interest RequiredTemporary RightsAcquisition of Permanent New Rights, AccessAcquisition of Permanent New Rights

    Scenario 1 and 2 Interests Differentiation HatchingType 1: Land not required under Scenario 1

    Title:

    Report:Development Consent OrderNorfolk BoreasOffshore Wind Farm

    Drawn: Scale:Checked:Date:Revision:

    Drawing No:

    Size:

    British National Grid

    Doc Ref:

    Co-ordinate system:

    Land Plans

    2.2 006_ARDG_Norfolk_B_LP_v1_Rev8

    27700EPSG:

    Project:

    1:2,50002 IM AP A1

    APFP Ref: 5(2)(i)

    Sheet 20

    24/04/2020

    Version 3 - April 2020

  • NORWICH

    21/1421/12

    21/02

    21/08

    21/01

    21/04

    21/05

    21/07

    21/09

    21/11

    21/1021/13

    21/17

    21/16

    21/03

    21/15

    21/06

    Cut Line sheet 20Cut Line sheet 21

    Cut Line sheet 21Cut Line sheet 22

    New BungalowManor Farm PondDrain

    Track

    Drain

    (disused)

    38.5m

    Estate LB

    Pond ReephamCottages

    Yard Stone

    Drain

    Garden House

    Ward Bdy

    42.3m

    42.7m

    Pond

    B 1145

    Def

    CR

    DrainDrain

    FB

    Drain DrainDrain

    Ward B

    dy

    CD

    ETL

    44.2m

    Ward B

    dy

    Moor Farm

    CS

    CH

    PathMarriott'sWay

    Drain

    Pit(disused) Lodge

    BathPlantation

    CS

    Salle Park

    Salle Hall

    Drain

    39.2m41.9m

    SandpitsHouse

    Drain

    CD

    Drain

    FB

    Pond

    Drain MP.75

    MARRIOTT'SWAY (Track)

    CFWard Bdy

    The Common

    DrainDrain

    Track

    Drain

    CS

    Tk S

    COCS

    B 1145

    5

    COMMON

    SIDE

    13

    FarmPark

    611000

    611000

    612000

    612000

    324000

    324000

    © Vattenfall Wind Power Ltd 2018. Contains Ordnance Survey data© Crown copyright and database rights 2018 Ordnance Survey 0100031673

    ±

    0 0.1 0.2 km

    Type of Interest RequiredTemporary RightsAcquisition of Permanent New Rights, Access OnlyAcquisition of Permanent New Rights

    Scenario 1 and 2 Interests Differentiation HatchingType 1: Land not required under Scenario 1

    Title:

    Report:Development Consent OrderNorfolk BoreasOffshore Wind Farm

    Drawn: Scale:Checked:Date:Revision:

    Drawing No:

    Size:

    British National Grid

    Doc Ref:

    Co-ordinate system:

    Land Plans

    2.2 006_ARDG_Norfolk_B_LP_v1_Rev8

    27700EPSG:

    Project:

    1:2,50002 IM AP A1

    APFP Ref: 5(2)(i)

    Sheet 21

    24/04/2020

    Version 3 - April 2020

  • NORWICH

    22/1422/15

    22/12

    22/0422/06

    22/02

    22/13

    22/07

    22/10

    22/01

    22/08

    22/09

    22/1122/16

    22/05 22/03

    Cut Line sheet 21Cut Line sheet 22

    Cut Line sheet 22Cut Line sheet 23

    11 to 1

    5

    1

    47

    Track

    Hall

    10The

    1a

    45

    27

    90

    47

    63

    68

    3a

    84

    CROWN

    62

    92STATION

    58

    Marriott'sWay

    27

    78

    50

    49

    Crown RICHMOND

    87 60

    11

    10a

    80

    14a

    5a 2

    15

    26

    75

    38

    15

    El

    1

    Sta

    25

    52TCB

    STONY LANE

    LBPLAIN

    Terrace

    LANE6a

    111

    54

    Hillrise

    5

    37

    El Sub S

    ta

    Warehouse

    1

    71

    21

    56

    9

    69

    12

    814

    29

    20

    16

    33

    Wren ParkFarm

    1 67 68

    OAK

    95

    ASH16

    1

    3430

    10 GPCAWST

    ON ROAD

    17a

    33

    WOOD

    DALLIN

    GROA

    D

    Garage Corner

    2828a

    COLLER

    S WAY

    13

    17

    1511

    LABURNUM GROVE

    35

    47

    19

    41

    1

    27

    39

    53

    12

    42

    3

    10

    Sub 1 2

    15

    4036

    WAY

    11

    6

    22

    FB

    AllotmentGardens

    Wilkinsons

    Games Court

    Stimpson's(Playing Field)

    Car Park

    PathsCasu Park

    KERDISTONROAD

    34.2m

    STONY LANE

    BungalowThe

    TrackPath (um)

    FB

    Ponds

    PondC Baulk

    Def

    DrainBottom

    FB

    Salle Moor

    Moat

    Pond

    Hall

    Pond

    Def 1.22m RH

    AllotmentGardensSalle House

    44.2m

    RH

    Ward B

    dy

    DefDefRH

    Ward

    Bdy

    3

    Path (um)

    47.8m

    Path (um)

    47.2m

    47.7m

    Path (u

    m)

    Drain

    WalkgateTrac

    k

    1.22m RH

    Track

    Silo

    Paths

    Marriott'sWay

    Crowden

    Well Pond

    1.22m RH

    Def

    610000

    610000

    324000

    324000

    © Vattenfall Wind Power Ltd 2018. Contains Ordnance Survey data© Crown copyright and database rights 2018 Ordnance Survey 0100031673

    ±

    0 0.1 0.2 km

    Type of Interest RequiredAcquisition of Permanent New Rights, Access OnlyAcquisition of Permanent New Rights

    Title:

    Report:Development Consent OrderNorfolk BoreasOffshore Wind Farm

    Drawn: Scale:Checked:Date:Revision:

    Drawing No:

    Size:

    British National Grid

    Doc Ref:

    Co-ordinate system:

    Land Plans

    2.2 006_ARDG_Norfolk_B_LP_v1_Rev8

    27700EPSG:

    Project:

    1:2,50002 IM AP A1

    APFP Ref: 5(2)(i)

    Sheet 22

    24/04/2020

    Version 3 - April 2020

  • NORWICH

    23/04

    23/01

    23/03

    23/12

    23/07

    23/13

    23/02

    23/05

    23/11

    23/14

    23/10

    23/0623/09

    23/08

    Cut Line sheet 22Cut Line sheet 23

    Cut Line sheet 23Cut Line sheet 24

    Drain

    FB FB

    Casu Park

    Drain

    (Track)

    PathsPond

    Pond

    Pond

    Marriott'sWay

    RookeryThe

    Track

    FB

    Track

    KERDIS

    TON

    ROAD

    Pond

    Kerdiston

    Pond

    Pond

    1.22m RH

    Track

    Pond Old Hall Farm

    PondSluice Drain

    GP

    Pond

    40.9mIssues

    Orchard

    IssuesMoat

    Pond

    Well 46.6m44.4m

    Gable

    Kerdiston

    KERDISTONROAD

    Well

    45.0m

    45.7m

    1 4

    New House

    FB

    Track

    Drain

    Pond

    Grove

    Post

    Marriott'sWayPost

    NewPlantation

    New Plantation

    Drain

    Ash Cottage

    Drains

    Loke CottageValleyCottage

    609000

    609000

    324000

    324000

    © Vattenfall Wind Power Ltd 2018. Contains Ordnance Survey data© Crown copyright and database rights 2018 Ordnance Survey 0100031673

    ±

    0 0.1 0.2 km

    Type of Interest RequiredTemporary RightsAcquisition of Permanent New Rights, AccessAcquisition of Permanent New Rights

    Scenario 1 and 2 Interests Differentiation HatchingType 1: Land not required under Scenario 1

    Title:

    Report:Development Consent OrderNorfolk BoreasOffshore Wind Farm

    Drawn: Scale:Checked:Date:Revision:

    Drawing No:

    Size:

    British National Grid

    Doc Ref:

    Co-ordinate system:

    Land Plans

    2.2 006_ARDG_Norfolk_B_LP_v1_Rev8

    27700EPSG:

    Project:

    1:2,50002 IM AP A1

    APFP Ref: 5(2)(i)

    Sheet 23

    24/04/2020

    Version 3 - April 2020

  • NORWICH24/01

    24/0524/03

    24/06

    24/08

    24/10

    24/11

    24/14

    24/16

    24/02

    24/09

    24/12

    24/13

    24/15

    24/1924/18

    24/17

    24/0424/07

    Cut Line sheet 23Cut Line sheet 24

    Cut Line sheet 24Cut Line sheet 25

    Pens

    ETL

    45.5m

    LBPettywellCorner

    38.2m

    39.9mGP 39.9m

    Sewell's BarnBrown's Farm

    The Wolery

    Vale Farm

    Marriott'sWay

    Post

    Pond

    Pond

    Drain

    Track

    Track

    FB FB

    Pond

    25.8m Cottage

    B 1145

    Drain

    Harefen

    Grange

    RuinPond

    Post

    Track

    Pond

    PettywellFarm

    White House

    Pettywell

    Pettywell

    PettywellBarn

    Track Pond

    Sub Sta

    1

    Hall Lodge

    48.9m

    Hackford Hall

    Pond

    Drain

    OLDLANE

    46.9m

    41.1m

    Marriott'sWay

    45.9m

    48.3mPond

    GP

    45.7mPond

    TrackLoke Cottage

    House

    608000

    608000

    609000

    609000

    322000

    322000

    323000

    323000

    © Vattenfall Wind Power Ltd 2018. Contains Ordnance Survey data© Crown copyright and database rights 2018 Ordnance Survey 0100031673

    ±

    0 0.1 0.2 km

    Type of Interest RequiredTemporary RightsAcquisition of Permanent New Rights, Access OnlyAcquisition of Permanent New Rights

    Scenario 1 and 2 Interests Differentiation HatchingType 1: Land not required under Scenario 1

    Title:

    Report:Development Consent OrderNorfolk BoreasOffshore Wind Farm

    Drawn: Scale:Checked:Date:Revision:

    Drawing No:

    Size:

    British National Grid

    Doc Ref:

    Co-ordinate system:

    Land Plans

    2.2 006_ARDG_Norfolk_B_LP_v1_Rev8

    27700EPSG:

    Project:

    1:2,50002 IM AP A1

    APFP Ref: 5(2)(i)

    Sheet 24

    24/04/2020

    Version 3 - April 2020

  • NORWICH

    25/06

    25/02

    25/04

    25/01

    25/03

    25/05

    25/07

    Cut Line sheet 24Cut Line sheet 25

    Cut Line sheet 25Cut Line sheet 26

    SiloPoultry House

    Pightle Farm

    Track

    Pond

    Pond

    Sub Sta

    LodgeFarmCottages1

    Hall Lodge

    48.9m

    Pond Hackford Hall

    Pond

    Pond

    Drain

    45.7m

    53.2m

    JordanGreen Farm

    Track

    Slurry Pit

    52.6m

    ROMAN ROAD

    The LodgeThe Laurels

    Orchard House

    Pond

    38.2m

    31.4m

    Pond

    Pond

    Well

    Jordan Green

    Folkards Farm

    JORDAN LANE

    Jordans

    PondJordan House

    Jordans

    Wood

    Pond

    50.6m

    607000

    607000

    608000

    608000

    321000

    321000

    322000

    322000

    © Vattenfall Wind Power Ltd 2018. Contains Ordnance Survey data© Crown copyright and database rights 2018 Ordnance Survey 0100031673

    ±

    0 0.1 0.2 km

    Type of Interest RequiredAcquisition of Permanent New Rights, Access OnlyAcquisition of Permanent New Rights

    Title:

    Report:Development Consent OrderNorfolk BoreasOffshore Wind Farm

    Drawn: Scale:Checked:Date:Revision:

    Drawing No:

    Size:

    British National Grid

    Doc Ref:

    Co-ordinate system:

    Land Plans

    2.2 006_ARDG_Norfolk_B_LP_v1_Rev8

    27700EPSG:

    Project:

    1:2,50002 IM AP A1

    APFP Ref: 5(2)(i)

    Sheet 25

    24/04/2020

    Version 3 - April 2020