Research Data Management: the UK national change programme (Nordbib)
Nordbib, Copenhagen 12 th June, 2012 Andrew Dorward.
-
Upload
gabriella-walton -
Category
Documents
-
view
214 -
download
1
Transcript of Nordbib, Copenhagen 12 th June, 2012 Andrew Dorward.
![Page 1: Nordbib, Copenhagen 12 th June, 2012 Andrew Dorward.](https://reader035.fdocuments.us/reader035/viewer/2022062618/55149e63550346b2598b59c2/html5/thumbnails/1.jpg)
Nordbib, Copenhagen12th June, 2012
Andrew Dorward
![Page 2: Nordbib, Copenhagen 12 th June, 2012 Andrew Dorward.](https://reader035.fdocuments.us/reader035/viewer/2022062618/55149e63550346b2598b59c2/html5/thumbnails/2.jpg)
2
What is RepNet ?•a socio-technical infrastructure supporting deposit, curation & exposure of Open Access research literature.
What’s its aim ?•The aim is to increase the cost effectiveness of repositories of such literature.
How will it do this?•offering a sustained and well-used suite of services for repositorieshttp://www.repositorynet.ac.uk/
UK RepositoryNet+ (RepNet)
![Page 3: Nordbib, Copenhagen 12 th June, 2012 Andrew Dorward.](https://reader035.fdocuments.us/reader035/viewer/2022062618/55149e63550346b2598b59c2/html5/thumbnails/3.jpg)
3
Web Site/Production Environment
www.repositorynet.ac.uk
![Page 4: Nordbib, Copenhagen 12 th June, 2012 Andrew Dorward.](https://reader035.fdocuments.us/reader035/viewer/2022062618/55149e63550346b2598b59c2/html5/thumbnails/4.jpg)
4
•Wave One Service components selected•Contracts drawn up with service providers•Wave 2 components identified for selection•Launch of service at OR12 – July 10th •Functional areas covered by platform include:
• Aggregation, search• Benchmarking, statistics, reporting• Registry of Repositories• Deposit tools• Enhancing metadata• Curation and preservation
Where we’re at (June 2012)
![Page 5: Nordbib, Copenhagen 12 th June, 2012 Andrew Dorward.](https://reader035.fdocuments.us/reader035/viewer/2022062618/55149e63550346b2598b59c2/html5/thumbnails/5.jpg)
5
Roadmap with functional areas
![Page 6: Nordbib, Copenhagen 12 th June, 2012 Andrew Dorward.](https://reader035.fdocuments.us/reader035/viewer/2022062618/55149e63550346b2598b59c2/html5/thumbnails/6.jpg)
6
Timelines
Date Milestone Description
31st March 2012 Initial Production Environment operational
31st May 2012 Subset of Wave 1 components in the Initial Production Environment (IRUS, SHERPA ROMEO, JULIET, RepUK).
9th July 2012 RepNet launch at OR2012 Conference
30th September 2012 Wave 2 components chosen
31st October 2012 Phase 2 Production Environment ready
31st January 2013 Wave 2 components in Phase 2 Production Environment(includes hosting of SHERPA ROMEO and JULIET
31st March 2013 Project finishes.