No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF...

68
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09.2017 To As per distribution list Sub: Agenda of 59 th meeting of Operation and Coordination Committee of MP. The Agenda of 59 th meeting of the Operation and Coordination Committee of MP scheduled on 12 th September 2017 at Conference Hall SLDC, MPPTCL, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded. (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur vkbZ ,l vks : 9001-2008 ISO: 9001-2008

Transcript of No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF...

Page 1: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in

No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09.2017

To

As per distribution list

Sub: Agenda of 59th meeting of Operation and Coordination Committee of MP.

The Agenda of 59th meeting of the Operation and Coordination Committee of MP

scheduled on 12th September 2017 at Conference Hall SLDC, MPPTCL, Jabalpur has been

uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded.

(R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur

vkbZ ,l vks : 9001-2008

ISO: 9001-2008

Page 2: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

Distribution List 1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, email-

[email protected], [email protected]. 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710

Email- [email protected] 3. The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur.

Email- [email protected]. 4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, Indore.Email-

[email protected] 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar,

Govindpura, Bhopal, email- [email protected]. 6. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email-

[email protected] 7. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908

Email – [email protected] 8. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-

2664749, Email- [email protected], Email- [email protected] 9. The Chief Engineer (O&M:Hydel), MP Power Generating Co. Ltd, Jabalpur, Fax No-0761-2664749. 10. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected]

[email protected] 11. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected]

[email protected]. 12. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co.Limited,

Jabalpur, Fax No- 0761-2668503, Email – [email protected]. 13. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co.

Limited, Bhopal, Fax No-0755-2580611,Email- [email protected]. 14. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited,

Near Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]. 15. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email –

[email protected]. 16. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email –

[email protected] 17. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755-

2423046, [email protected] 18. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills,

Bhopal – 462013., Fax No- 0755-4030130,Email – [email protected] 19. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical

Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected], [email protected], M-9752415312, Mr.Satyendra Kumar (Dy.CE), Mob.9752415301 (CEDE, WCR).

20. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) – 450 119, Fax No- 07323-284080, Email – [email protected]

21. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 554, FaxNo-07280-271703, Email- [email protected], [email protected], [email protected].

22. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551, Fax No. 07791-243667 / 243669, Email – [email protected]

23. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina- 470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected]

24. The Chief Executive Officer, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi, Distt. Hoshangabad, Email – [email protected]

25. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :[email protected]

26. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row, Email- [email protected], Indore – 452010, [email protected]

Page 3: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 58th meeting of Operation & Coordination Committee of MP held on 14TH July 2017 at Hotel Kalchuri, Civil Lines, Jabalpur were forwarded to the committee members vide No. 07-05/SG-9B-II/1833 Jabalpur dated 16.08.2017.

[OCC may confirm the minutes]

ITEM NO. 2 : REVIEW OF SYSTEM OPERATION DURING THE MONTHS JUNE 2017 TO JULY 2017. 2.1. Frequency Particulars: During June 2017 the system frequency was below 49.9 Hz for 5.81% of time against 6.56 % of time during July 2017. The system frequency was above 50.05 Hz for 18.69% of time during June 2017 against 17.29% of time during July 2017. The system frequency was within the IEGC range of 49.9-50.05 Hz for 75.50% of the time during June 2017 against 76.15% of time during July 2017. The average monthly frequency was 50.00 Hz during month of June 2017 and 49.99 Hz during month of July 2017. The system frequency did not touch 49.20 Hz during the above period.

The detailed frequency particulars for the month of June 2017 and July 2017 are enclosed at

Annexure-2.1. The brief detail of frequency profile is given here under:

Month Average frequency

Minimum Integrated frequency over an hour

Maximum integrated frequency over an hour

Instantaneous Minimum Frequency

Instantaneous Maximum Frequency

June 2017 50.00 Hz 49.85 Hz 50.15 Hz 49.72 Hz 50.26 Hz July 2017 49.99 Hz 49.82 Hz 50.09 Hz 49.69 Hz 50.26 Hz

[Committee may like to note]

2.2 Operational Matters 2.2.1 Operational Discipline : System operated in terms of frequency profile for the months June 2017

and July 2017 is as given below for discussion by the committee :

Month % of time Frequency Below 49.9 Hz

% of time Frequency above 50. 05 Hz

% of time frequency within the permissible range of 49.9-50.05 Hz.

Average monthly frequency

No. of times frequency dipped below 49.2 Hz

June 2017 5.81% 18.69% 75.50% 50.00 Hz 0 July 2017 6.56% 17.29% 76.15% 49.99 Hz 0

[Committee may like to note]

AGENDA FOR 59TH MEETING OF OPERATION & COORDINATION COMMITTEE OF MP TO BE HELD ON 12TH September 2017 AT 11:00 AM AT SLDC, MPPTCL, NAYAGAON,

JABALPUR

Agenda of 59th OCCM of MP 1

Page 4: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

2.2.2 Voltage Profile: During the months June 2017 and July 2017 the maximum and minimum voltage as recorded at following important 400 KV s/s in MP Grid:-

June 2016 July 2017 Max. Voltage Min. Voltage Max. Voltage Min. Voltage Name of observed Observed Observed Observed Sr. 400 KV

Voltage

Voltage KV

No. Substation Voltage Voltage

Date Date Date Date KV KV KV

1 Indore 419 26.06.17 391 05.06.17 425 24.07.17 402 07.07.17

2 Itarsi 415 28.06.17 385 05.06.17 419 04.07.17 397 07.07.17

3 Bina 418 28.06.17 406 12.06.17 419 25.07.17 415 25.07.17

4 Gwalior 421 07.06.17 385 20.06.17 417 20.07.17 383 02.07.17

5 Nagda 421 23.06.17 396 05.06.17 426 24.07.17 405 11.07.17

6 Satpura 424 28.06.17 411 12.06.17 426 04.07.17 410 21.07.17

7 Birsinghpur 426 28.06.17 410 12.06.17 429 04.07.17 413 02.07.17

8 ISP 426 08.06.17 406 12.06.17 432 24.07.17 406 21.07.17

9 Bhopal 423 05.06.17 397 04.06.17 422 04.07.17 401 07.07.17

10 Ashta 423 08.06.17 406 18.06.17 426 24.07.17 402 20.07.17

12 Pithampur 421 10.06.17 401 20.06.17 425 24.07.17 407 07.07.17

11 SSTPS 425 10.06.17 405 03.06.17 427 25.07.17 411 31.07.17 [Committee may please note & discuss]

2.2.3 Status of Capacitor Banks in sub-transmission system: The updated information of the status of capacitor banks in sub-transmission system as on 31st July 2017 as submitted by DISCOMs is detailed below:

[Action: DISCOMS]

DISC

OM

Capacitor bank installed in good condition (No)

Capacitor Banks healthy but not in service due to control ckt problem

Capacitor bank installed but defective & are repairable (No)

Requirement of repair against each unit (No)

Requirement against non-repairable capacitor banks

Capacitor banks already covered under ADB T-V

Balance capacitor banks to be covered in other schemes

600 KVAR

1200 KVAR

1500 KVAR

600 KVA

R

1200 KVA

R

1500 KVA

R

600 KVA

R

1200 KVAR

1500 KVAR

No of 100 KVAR Units

required

600 KVAR

1200 KVAR

600 KVAR

1200 KVAR

600 KVAR

1500 KVAR

EZ 410 143 36 20 12 1 18 04 0 25 - - - - - 77

CZ 5 687 686 0 0 0 0 0 0 0 0 0 0 588 0 0

WZ 624 541 596 17 14 01 22 20 87 181 2 10 - - - 6

Agenda of 59th OCCM of MP 2

Page 5: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

2.2.4 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: The updated information of the status of installed capacitor banks (in MVAR) in EHV transmission system as on 31.07.2017 as submitted by MPPTCL is given below:-

[Action: MPPTCL]

2.2.5 Status of completion of ongoing Transmission Schemes being executed by MPPTCL: The various ongoing Transmission Schemes completed during the financial year 2017-2018 (up to July 2017) and plan for completion of various ongoing Transmission Schemes for the Year 2017-2018 is enclosed as Annexure 2.2.5(i) and 2.2.5(ii) respectively.

[Action: Committee may like to note] 2.2.6 U/F and df/dt Relay Operation (i) U/F and df/dt Relay Operation: Frequency did not touch 49.20 Hz during June 2017 and July 2017.

There was no df/dt operation during the same period. [Action: MPPTCL]

(ii) Defective u/f, df/dt relays: MPPTCL has informed that all the df/dt relays are in operation, where the U/F

relays are not available, the numerical relays programmed for under frequency operation. df/dt relay installed at 220 KV Ujjain, 220 KV S/s Badnagar & 132 KV S/s Chapda is being replaced shortly, except this all U/F stages are in good/healthy working condition.

[Committee may like to note] 2.3 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group allocation to 33

KV feeders : (i) Details of DISCOM wise Power supply given to various domestic categories during the period June

2017 and July 2017 is enclosed at Annexure 2.3(i).

[Committee may like to note]

(iii) Group Allocation to Newly Commissioned existing EHV substations:- The region wise list of 33 KV feeders emanating from various newly commissioned/existing EHV substations for which groups have not been allocated is given in Annexure 2.3 (ii). The DISCOM wise details of pending group allocation to 33 KV feeders is given below:-

SN DISCOM Region No of 33 KV feeders for which groups to be allocated

01 EAST

Jabalpur 0 02 Sagar 0

Voltage Class

Capacitor bank installed as on

31.05.17(MVAR)

Capacity Added after Last OCC Meeting (MVAR)

Capacitor banks already covered under ADB T-V

TOTAL CAPACITY AS ON 31-07-17

(MVAR)

Capacitor Bank Installed but

defective & are not repairable (No &

MVAR) 220 KV 100.00 0.00 - 100.00 All in Service

132 KV 1238.00 0.00 - 1238.00 33 KV 4624.50 60.00 - 4684.50 Total 5962.50 60.00 - 6022.50

Agenda of 59th OCCM of MP 3

Page 6: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

03 Rewa 0 04 Total 0 05

WEST Indore 12

06 Ujjain 06 07 Total 18 08

CENTRAL Bhopal 08

09 Gwalior 08 10 Total 16

TOTAL Grand Total 34 Discoms are requested to furnish the details as per list enclosed at Annexure-2.3(ii) in the meeting.

[ACTION : DISCOMs]

ITEM NO. 3 : OPERATIONAL PLANNNING: 3.1 Generating Units under planned outage and proposed maintenance programme: The annual maintenance /outages of thermal generating units of MPPGCL during Sept 2017 to Oct 2017 are as given below.

Sr. No.

Station Unit No. Planned outage duration

Reason From date To date

1. STPS-IV 11 20.07.2017 09.11.2017 AOH & ESP work

2. SGTPS-I 1 09.09.2017 23.09.2017 AOH 3. SGTPS-II 3 15.08.2017 08.09.2017 AOH 4. SSTPS-I 2 01.08.2017 20.09.2017 AOH

[Committee May like to discuss]

3.2 Proposed shutdown programme of Transmission lines / Transformers: The proposed shutdown of transmission elements for the period 01.09.2017 to 31.10.2017 submitted by MPPTCL is enclosed as Annexure-3.2.

[Committee May like to discuss]

3.3 Long Outages of transmission elements and protections: The status submitted by MPPGCL /MPPTCL are given below:-

Sr. No

Line/Transformer/ etc under long Outage

Outage date Reason Response from Utility

1. 315 MVA, 400/220 KV X’mer II (TELK make) Main Breaker at 400 KV S/s Katni

03.11.2015

X’mer commissioned through bus coupler breaker since commissioning.

It has come to notice that the transformer-II has been connected through bus coupler breaker both side (400 KV & 220 KV) and there is no main breaker for this 315 MVA X’mer-II. In 58th OCCM MPPTCL informed the committee that 220 KV side Main CB is taken in service & 400 KV side Main CB work is in

Agenda of 59th OCCM of MP 4

Page 7: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

progress and CB expected to be commissioned by September-2017. Latest status for commissioning of 400 KV side CB may please be submitted by MPPTCL in the meeting.

2. 12.5 MVA, 132/66/33 KV X’mer, CGL make Sr. No. 23615 at 132 KV S/s Pichhore

19.05.2016 Transformer failed on

19.05.2016 as intimated by T&C, MPPTCL.

The load is manageable through (1x20 + 1x40) MVA X’mers in running condition at S/s Pichhore. Hence replacement of failed X’mer is not required as intimated by MPPTCL. In 52nd 53rd 54th & 55th OCCM, Chairman OCC requested MPPTCL, P&D to submit the letter for removal of transformer from Asset. In 56th , 57th & 58th OCC. Chairman OCC stated that T&C and P&D will perform load growth / load assessment study prior to decommissioning and intimate to SLDC. Further, Member Secretary OCC stated in 58th OCCM that the matter shall be taken up by P&D with Discom and thereafter it shall be discussed in this forum as it includes policy matter also. The latest status in the matter may please be submitted by MPPTCL (T&C/P&D) in the meeting.

3. 12.5MVA X mer, BBL Make (Sr. No.-1428/3) at 132 KV S/s Chapda.

Not intimated X’mer failed

The 12.5MVA BBL make Transformer Sl. No. 1428/3 failed and proposed to be withdrawn from system as intimated by MPPTCL. In 56th and 57th OCC representative from T&C informed the committee that correspondence is being done with P&D, MPPTCL for load growth study and decommissioning of the transformer. Further, Member Secretary OCC stated in 58th OCCM that the matter shall be taken up by P&D with Discom and thereafter it shall be discussed in this forum as it includes policy matter also. The latest status in the matter may please be submitted by MPPTCL (T&C/P&D) in the meeting.

4. 160 MVA, 220/132 KV Sr. No. 626452037050 BHEL X’mer at 220 KV S/s Jabalpur

30.09.2016 Tripped on Differential indication.

Transformer dismantled and sent to M/s BHEL for inspection / repairs as intimated by MPPTCL. Latest status may please be submitted by MPPTCL in the meeting.

5. 63 MVA Auto X’mer at ATPS Chachai.

14:30 Hrs/ 16.03.2017

Generation of Acetylene Gas in the DGA result was found beyond dangerous limit.

MPPGCL informed that over hauling work is under progress. MPPGCL is requested to submit the latest status in the meeting.

6. 50 MVA, 132/33 KV BHEL make X’mer, Sr. No. 2042474 at 132 KV S/s

28.05.2017 Tripped on differential indication.

Representative from MPPTCL informed the committee that X’mer failed within guarantee period and it

Agenda of 59th OCCM of MP 5

Page 8: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

Katni is being sent to M/s BHEL for inspection/ repair. MPPTCL is requested to submit latest status in the meeting.

7. 20 MVA, 132/33 KV EMCO make X’mer, Sr. No. HT-1223-11224 at 400 KV S/s, Katni

22.07.2017 Tripped on differential indication.

MPPTCL informed that the X’mer shall be replaced by October 2017. MPPTCL is requested to submit the latest status in the meeting.

8. 40 MVA, 132/33 KV CGL make X’mer, Sr. No. T-8362-3 at 220kv s/s Ujjain.

22.06.2017 Tripped on differential indication.

MPPTCL informed that the internal inspection of the X’mer is pending due to bad weather. MPPTCL is requested to submit the latest status in the meeting.

9. 20 MVA, 132/33 KV CGL make X’mer, Sr. No. T-8362-3 at 132kv s/s Sonkatch.

09.06.2017 Tripped on differential indication.

MPPTCL informed that the 33 KV bushings are defective and purchase order for procurement has been placed. MPPTCL is requested to submit the latest status in the meeting.

10. 20 MVA(16.5/6.6 KV), UAT-A, Unit No. 10, STPS, Sarni 27.05.2017 Due to oil leakage from

B-Phase LV bushing.

MPPGCL informed that procurement of new bushing is under progress. MPPGCL is requested to submit the latest status in the meeting.

11. 90 MVA (400/11.5/6.6KV) Station X’mer-2, SSTPP, Khandwa

14.09.2016 B Ph. HV side bushing failed

MPPGCL informed that repair work of station transformer is under progress at M/s BHEL, Jhansi. MPPGCL is requested to submit the latest status in the meeting.

12. 400 KV Generator Breaker of Unit # 9 of Satpura 01.09.2017 Faulty Declared as

intimated by MPPGCL

The utility may submit the latest status.

[Action:MPPGCL/MPPTCL]

ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF JUNE 2017 AND JULY 2017: The details of actual generation, Schedule from Central Sector, demand etc. are given in the following Annexures: Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of

MPPGCL & NHDC Hydel Units. Annex. 4.2 Power Supply Position. Annex. 4.3 Hourly Average of Availability and Demand. Annex. 4.4 Hourly average schedule Vs Drawal of DISCOMs.

[Committee may like to note] ITEM NO. 5 : SYSTEM DISTURBANCE IN MP DURING JUNE 2017 AND JULY 2017 : There was no major grid disturbance in MP during June 2017 and July 2017. Moreover, the Grid Disturbances and Grid Incidents in MP during these months are given in Annexure 5.

[Committee May like to discuss]

Agenda of 59th OCCM of MP 6

Page 9: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES:- 6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS / TRANSMISSION ELEMENTS:- The present status regarding schedule and commissioning of reactors / transmission elements is as below:-

S.No. 400 KV S/s Size MVAR

Implementing Agency

Expected Date of Commissioning as intimated in last OCC

1. Bus Reactor : ISP 125 MVAR NHDC

Representative from NHDC informed the committee that delivery of all equipment is expected by August 2017. Thereafter erection & commissioning work will be carried out. It is expected that the reactor will be in service by October 2017 as informed by NHDC.

2. Line Reactor on 400 kV Satpura–ISP line at STPS

50 MVAR MPPGCL

In 57th & 58th OCCM, MPPGCL informed the committee that procurement of line reactor is under tendering stage and expected to be commissioned by Oct, 2017.

3. Bus Reactor at SSTPS

125 MVAR MPPGCL

Work will be carried out under PSDF as intimated by MPPGCL. In 56th OCCM MPPGCL informed the committee that purchase tender will be opened on 31.03.2017. Representative from MPPGCL informed the committee in 57th & 58th OCCM that the price bid is to be opened and it is expected to be commissioned by January 2018.

The latest status may be submitted in the meeting.

[Action: MPPGCL/NHDC]

6.2 Provision of synchronization facility at EHV sub-stations of MPPTCL:- As per Grid Code, the

synchronization facility should be available at all the Power Stations, 400 KV Sub-stations and 220 KV Sub-

stations and 132 KV sub-stations in the path of black start. In last OCC meeting MPPTCL representative

informed the committee that order for 69 no. synchronization trolleys has been placed

The status of installation and commissioning of synchronization trolleys at different substations has not

been intimated by the MPPTCL till date. In last 58th OCCM MPPTCL intimated that synchronization trolley will

be commissioned by September 2017. MPPTCL is requested to submit the latest status along with time line in

the meeting. [Action: MPPTCL]

6.3 Ten Daily Reservoir operation table of MPPGCL HPS:- In the meeting held in Regional Office of MPPMCL at Bhopal on 24.09.2016 to discuss availability from Sardar Sarovar Project, ISP & OPS and State Hydel Plants for Rabi season, MPPGCL had agreed to obtain ten daily reservoir operation table from WRD and NVDA for their operation of their hydro generators. In last 54th to 58th, OCCMs, request has been made to MPPGCL for furnishing the same to SLDC.

MPPGCL has not submitted the ten Daily Reservoir Operation Table of all the power stations of

MPPGCL for the year 2017-18. It is requested that MPPGCL shall submit the Ten Daily Reservoir Table of all

Agenda of 59th OCCM of MP 7

Page 10: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

hydel power stations in coordination with NVDA and WRD for optimum utilisation of available water in the reservoirs during real time operation.

[Action: MPPGCL]

6.4 : MAPPING OF FEEDERS WIRED UNDER AUFLS TO SLDC SCADA :- In the 4th, 5th & 6th NPC meetings, mapping of the Feeders / Lines covered under AUFLS on SCADA systems of SLDC's/RLDC's was discussed. NPC have desired that monitoring of the feeders / loads under the AUFLS shall be done at SLDC's / RLDC's, so as to ascertain that the desired results are ensured during the events, frequency falling below the AUFLS frequency settings.

It has been decided to integrate the DFE make RTUs for mapping of AUFLS feeders for calculation of

load relief during the tripping of feeders. Accordingly Chief Engineer (Planning & Design) has requested M/s

Dongfang Electronic Co. Ltd, to make necessary arrangements in the DFE software to provide details

regarding load relief on activation of under frequency and DF/DT relays during tripping of feeders. The

interconnection between above relays and RTUs shall be done by MPPTCL.

In the above context, it is mentioned that a meeting was held on 26.07.2017 at MPSLDC, Jabalpur

regarding integration of RTUs for mapping of AUFLS feeders. Therein it has been decided that substation wise

requirement for integration of under frequency and df/dt relays ( requirement of spare port in Digital Input

(DI) module / DI module, wiring required / RTU configuration, CMR requirement etc.) shall be worked out by

Transco SCADA and T&C section and suitable action for integration of relays in RTU and Transco SCADA as

well as arrangement of software to provide details regarding load relief on activation of under frequency and

df/dt relays with GUI terminal at SLDC shall be initiated by MPPTCL. The present status of above work may

please be apprised.

[Action: MPPTCL]

6.5 MONITORING OF SCHEMES FUNDED FROM PSDF :- It was decided in the 6th meeting of NPC held on 19th December 2016 at Bengaluru, that all the RPCs in the monthly OCC meetings may follow up with the utilities to expedite the completion of schemes by giving due priority. The implementation of most of the schemes are based on the recommendation of the enquiry committee on grid disturbance of July 2012 headed by Chairperson, CEA. Therefore timely implementation of these schemes would enhance the grid security and reliability. Accordingly the details of grant sanctioned from PSDF for the schemes of MP is enclosed at Annexure- 6.5A. The status of implementation of above schemes (physical as well as financial progress) may please be reviewed and the entities are requested to expedite implementation of the schemes. The utilities were advised to furnish the information in the format enclosed at Annexure – 6.5B by first week of every month on regular basis to Member Convener, PSDF project monitoring group (AGM, NLDC, POSOCO) with a copy to NPC, WRPC division and SLDC . The status of the same is being monitored by WRPC in OCC meeting of WRPC every month. It is observed that MPPTCL and MPPGCL are not submitting the requisite information to SLDC in first week of every month for onward transmission to WRPC. It is therefore requested that concerned official may please instructed to submit the same regularly to SLDC within time. [Action: MPPGCL/MPPTCL]

Agenda of 59th OCCM of MP 8

Page 11: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

6.6 Delayed convey of information of tripping / disturbance of 400 KV DCDS Satpura-Astha line I & II to M/s Kalpataru Satpura Transmission Pvt. Ltd.-

M/s Kalpataru Satpura Transmission Pvt. Ltd., has intimated that 400 KV Satpura –Astha Ckt-I & II

were tripped at 4:31 hrs on 20.07.2017. The circuits were normalized at 08:26 hrs and 07:24 hrs on

20.07.2017 respectively, However tripping details were conveyed telephonically to M/s KSTPL representative

by 07:30 hrs on 20.07.2017 by Astha substation official delayed by about three hours. In this context M/s

KSTPL has requested that whenever such incidence takes place, they may be apprised of such incidences

immediately.

In view of the above, MP SLDC has already conveyed to CE, MPPGCL, STPS, Sarni / CE(T&C)

MPPTCL to ensure to inform invariably to the representative of M/s KSTPL about tripping / disturbance

occurrence on 400 KV Astha–Sarni, DCDS Circuit I & II within reasonable time, so that the concerned authority

may take suitable remedial measures immediately.

Further, kind attention of MPPGCL/ MPPTCL is also invited regarding recent and past trippings on 400

KV Sarni-Astha line I & II and indications conveyed. M/s KSTPL has raised question regarding relay indications

received and mentioned that line is not tripped on fault. However, as far as regarding tripping occurred on

20.07.2017, MPPGCL has clarified that this tripping was due to transient fault as such fluctuation observed in

DR file. Moreover, it is also mentioned that Sarni-Astha line again got tripped on 09.08.2017, when line was

being normalized after availing shutdown (for checking of auto reclosure logic). The line tripped from Astha

substation on DT received, however line was open from Sarni substation at the time of tripping and EE

(Testing), STPS, Sarni clarified that they have not closed the line, even though line tripped from Astha

substation on DT received. Considering the above incident, it is desired that relay protection may be got

verified and checked thoroughly at Sarni, STPS and Astha 400 KV substation as well in order to avoid

possibility of mal operation /mal function. MPPGCL/MPPTCL is requested to clarify the cause of tripping.

[Committee may like to discuss]

6.7 Procedure for availing outage on Interstate lines, 220 KC lines radiating from PGCIL S/s and 400 KV Transmission Elements -

As per standard procedure of WRPC, all proposed outages of interstate lines, 400 KV transmission

elements and 220 KV lines radiating from PGCIL sub-stations, proposed shutdowns for next month should be

got approved in the OCC meeting of WRPC in the current month. All the constituents of WR shall inform to

WRLDC for readiness for availing OCCM outage of transmission elements on D-3 basis i.e. 3 days before the

date of approved outage. Further in WRPC meeting it was also decided that post-OCCM outages should be

discouraged.

In the above context, it is further intimated that during 496th OCCM of WRPC which was held on Mumbai

on 13.06.2017, Member Secretary, WRPC has informed that not any post-OCCM shutdown shall be

entertained / approved on D-3 basis, except of emergency nature of shutdown. Therefore, it becomes

mandatory to get approval of all the shutdowns in OCCM. It may please be noted that WRPC is reluctant to

give consent of outage of transmission elements for planned maintenance / construction activities since long,

Agenda of 59th OCCM of MP 9

Page 12: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

except OCCM approved shutdown. Now, WRPC is not giving consent for outages which are not approved in

OCCM of WR.

In view of above, it is therefore requested to include invariably all proposed shutdown of 400 KV

elements, interstate lines and all 220 KV lines radiating from PGCIL sub –stations. In proposal of outages for

consideration of OCCM of WR as per practice in vogue so that maintenance / construction activities may not

be hampered and shutdown may be availed systematic pre-planned manner as desired by WRPC. Further, if approved shutdown has not been availed then reason for not availing such shutdown may also be

intimated positively to SLDC for onward communication to WRPC and WRLDC.

As sequel to above, during 497th meeting of Operation & Coordination Sub Committee of WRPC held

on 20.07.2017, the OCC approved outage and post OCC outage procedure for transmission lines / elements

was discussed. The gist of the discussions is narrated as under:-

A. OCC approved Planned outages:

1. OCC forum shall planned outages for transmission lines / elements which exist in WRLDC website

under list of important grid elements in Western Region which includes all 400 KV lines / 400/ 220 KV

ICT and 220 KV lines ( list of 220 KV lines is annexed).

2. The forum also decided that if deviation between outages finalized / planned in OCC forum and actual

outages availed during any month is more than 50%, then in that case the concerned agency shall

have to justify the deviation before the OCC Forum in next OCC meeting.

3. The existing procedure would continue for submitting the outage requests for discussion and decision

in OCC meeting of WRPC.

B. Post OCC outages:

1. It is decided that post-OCCM outage should be discouraged. However for any important outages

need to be availed by the agency under post OCCM approval procedure, the same shall be forwarded

by the Chief Engineer of concerned agency clearly indicating nature of urgency along with

contingency plan for availing shut down, indicating in single line diagram. This proposal has to be

forwarded prior to five working days i.e D-5 of proposed shut down to WRLDC /WRPC by respective

SLDC. Therefore, such urgent nature post-OCCM outage proposal should be forwarded to SLDC at

least prior to seven working days before the proposed outage date through respective / concerned

Chief Engineer along with all relevant information / contingency plan of outage indicating in single line

diagram.

2. For the outage of emergency nature viz. to attend hot points or any other emergency maintenance

work etc. concerned agency/authority shall approach for availing such outage as per prevailing

procedure in vogue. However the emergency should be well defined in the proposal.

Committee may like to discuss.

[MPPGCL/MPPTCL/NHDC/IPPs)

Agenda of 59th OCCM of MP 10

Page 13: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

6.8 Updation of Recovery Procedure for Western Regional ( WR ) Grid-2007:- WRLDC has informed that

the Grid Recovery Procedure for Western Region is being updated and the users of WR Grid, STUs and CTU

may kindly convey the relevant details for facilitating timely updation of this document.

In view of the above it has been requested vide letter no 07-05/RPC-38/1951 dated 25.08.2017 to

kindly submit the relevant details as on 31.08.2017 pertaining to respective entity to SLDC as mentioned in

WRLDC letter under reference to this office by 10th September 2017, so that consolidated information could be

forwarded to WRLDC within specified time limit, but no information has been received till date. It is therefore

again requested to kindly convey the relevant details as given below :-

a. Contacts Details (Mobile/Land Line Numbers/Email-Id) of the Nodal officers identified for crisis

management.’

b. List of New transmission elements and generation units commissioned in 2017.

c. Shunt Reactive resources (Line Reactors/ Bus Reactors) in STU system.

d. Traction Supply Details( As per format enclosed at Annexure-6.8)

e. Synchronization facilities at 132 KV/220 KV/400 KV.

f. List of Stations having black start capabilities.

g. Any other relevant information.

[MPPGCL/MPPTCL/NHDC]

6.9 Delay in conveying information of tripping / grid disturbance on 25.08.17 at STPS,Sarni- It is intimated that the following elements got tripped at 13:02 & 13:09 Hrs on 25.08.2017 at STPS,

Sarni, respectively -

(i) 220 KV Sarni-Sarni Interconnector No.2 (ii) 220 KV Handiya-Sarni Ckt.

Due to above trippings, 220 KV Sarni-Sarni Interconnector No.1 got over loaded as such 400/1 Amp CTs connected at Sarni (PH) end. Therefore contingency arrangements were made in order to reduce the loading on 220 KV Sarni- Sarni Interconnector No.1.

In the above context, it is worthwhile to mention that indications of aforesaid lines were conveyed to SLDC, Jabalpur considerably delayed by about 30 minutes, even after repeated pursuance and request by SLDC officials/officers. It is normally observed that whenever trippings/disturbances take place at Sarni Power House (STPS), the details of occurrences are not conveyed timely and delayed considerably, resulting in delay in process of normalization. Thus, outage of such affected lines / elements are increased unnecessarily.

It is, requested that concerned officials / authority may please be instructed suitably that whenever any tripping or disturbance occurred on EHV elements, the same should be conveyed /intimated with all relevant details to SLDC within reasonable time slot so that remedial action could be taken immediately and unnecessary delay in normalization could be avoided in the interest of safe operation of grid.

Agenda of 59th OCCM of MP 11

Page 14: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

Further, MPPGCL kind attention is also invited towards CT ratio of 400/1 A provided on 220 KV Sarni-Interconnector No.1, under N-1 condition the feeder gets over loaded. The reason of CT ratio provided, at low range i. e. 400/1 A, may please be intimated.

Committee may like to discuss.

[Action-MPPGCL/MPPTCL/NHDC/IPPs)

6.10 REPORTING OF FLASH REPORT, DR and EL FOR 400KV, Interstate Transmission Elements & Detailed Tripping Report:-

As per the provisions of Regulation 5.2 (r) of CERC (Indian Electricity Grid Code) Regulations 2010 and Regulation of 5(9) of CERC (Indian Electricity Grid Code) (First Amendment) Regulations, 2012 all the Regional Entities of the Region shall furnish the tripping details including DR & SEL output to RLDC with in 24 hrs of the event for analysis and identify the real time measures required in future to ensure secured grid operation. The flash report is also required to be furnished to SLDC within an hour of tripping. It is observed that FLASH REPORT, DR & EL of station is not made available after tripping of transmission grid element by the State Grid Entities and the flash report is also not being sent after repeated pursuation. It has been intimated by WRLDC wide letter no.- WRLDC/SO-II/1737/2017/1996-2014 dated-21.07.2017 that in case of tripping of Inter State & inter Regional lines of voltage class 220 KV & above level, a tripping report along with the DR/EL files shall be submitted to WRLDC. In the matter it is to mention that the detailed report along with DR/EL shall be submitted to WRLDC/WRPC. Several incidences / trippings which occurred during the month of June-2017 for which the details has not been submitted are as below:-

S.no.

Element Date of tripping

Time of tripping

Remark

1. 220 KV Malanpur - Auriya

14.06.2017 21:03 MPPTCL is requested to submit the detailed report along with DR/EL files, A/R details, etc. in the meeting.

2. 220 KV Malanpur - Auriya

21.06.2017 14:21 MPPTCL is requested to submit the detailed report along with DR/EL files, A/R details, etc. in the meeting.

3. 220 KV Badod Sakatpur

21.06.2017 15:23 MPPTCL is requested to submit the detailed report along with DR/EL files, A/R details, etc. in the meeting.

In view of the above MPPTCL is requested to kindly take up the matter with the field offices and submit the detailed tripping report to SLDC at the earliest for onward submission to WRLDC/WRPC. [Action: MPPTCL/MPPGCL/IPPs/NHDC/ISP/OSP]

6.11 PROTECTION ISSUE

a. On dtd. 03.069.2017 at 16.27 hrs 400kV S/s Ashta-Jetpura line tripped on transient fault in R-phase and auto reclose was successfully operated at Jetpura substation. However the auto reclosure was not operated at Astha Substation

Agenda of 59th OCCM of MP 12

Page 15: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

It is therefore required auto relosure relay may be tested / checked at Astha substation and the cause of non-operation may please apprised in the meeting.

b. On dtd 02.09.2017 at 21.30 hrs, 220kV Main Bus-I Y-Ø string failed at 220 KV s/s Rajgarh (Dhar) . The fault was cleared from remote end. It is observed that Bus-Bar protection had not been operated at Rajgarh Substation.

It is therefore desired that Non-operation of Bus Bar Scheme at 220kV S/s Rajgarh may please be investigated & the details report may be submitted in the meeting.

[Action: MPPTCL]

6.12 Inspection of Automatic Under Frequency Load Shedding : As Per MPEGC Clause 6.1.17 “all

Users shall provide automatic under-frequency load shedding in their respective premises, to arrest frequency

decline that could result in a collapse/disintegration of the grid, as per the plan separately finalised by the

concerned REB forum, and shall ensure its effective application to prevent cascade tripping of .generating

units in case of any contingency. All Users shall ensure that the under frequency load shedding/islanding

schemes are functional.. SLDC shall carry out periodic inspection of the under frequency relays and maintain

proper records of the inspection.

In 31st WRPC meeting and 478th OCC meeting of WRPC it is decided that SLDCs shall collect the

data of self certification by Discoms/STUs and inspection carried out by intra-circles of Discoms/STUs and

submit to WRPC. In the last meeting of OCC of WR, WRPC suggested to carry out the AUFLS inspection for

at least 10-20 % by WRPC Secretariat & others shall be self-certified by S/s in-charge.

SLDC vide letter no. 07-05/PM-57/1089 dtd. 08.06.2017 and 07-05/PM-57A/1837 dtd. 17.08.2017

requested MPPTCL to submit report regarding self-certification of healthiness the UFRs. The information is yet

to be received from MPPTCL. It is therefore once again requested to submit the same to SLDC for onward

transmission to WRPC. Further as per regulatory provisions, SLDC shall carry out periodic inspection of the

under frequency relays.

[Action- MPPTCL]

6.13 Formation of State Level Relay setting group- Review and Coordination of relay setting in state of MP :- As decided in 128th Protection Committee meeting of WRPC held on 06th & 07th Dec. 2016 , relay

review group for state of MP has been constituted vide this officer letter No.07-05/RPC-14/596 Jabalpur dtd

22.05.2017. In the above context all entities are requested to provide relay settings of all important nodes & all

other nodes where relay settings are required to be examined considering protection issues. As desired by

WRLDC important nodes like Indore PG, Bhopal etc. required to be examined first, which have huge effect on

reliability and security of Grid.

The first meeting of State Level Relay Setting Group convened on 18th August 2017 at SLDC for review the existing relay settings of critical state network and state network incidental to ISTS and to provide necessary interface between utilities/entities.

Agenda of 59th OCCM of MP 13

Page 16: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

All the members were requested to make arrangement to furnish details of relay settings of all important nodes,

so that same may be communicated to all members and existing setting of critical nodes could be reviewed &

corrective measures may be taken. Attention was also invited to members that SLDC have made multiple

correspondences in this regard, however except MPPGCL, no any other utility has provided the desired data. It

is accordingly desired that the data may please be provided immediately to SLDC.

During discussions, it was envisaged that relay setting of ISP, OSP nodes required to be examined first, as in

recent past, frequent undesirable trippings were observed due to probable mismatch of relay coordination issue.

Accordingly, ISP, OSP representatives were requested to provide relay setting of ISP, OSP nodes so that same

could be validated by the committee in the next meeting. The issue of relay settings were discussed in broader

prospect.. The date of next meeting shall be intimated separately after obtaining desired data.

6.14 Furnishing the Pending protection audit observation compliances :- As per Hon’ble CERC order

dated 21.02.2014 in petition No. 220/MP/2012 filed by Power Grid, SLDC has regularly submitted the quarterly

Protection Audit Report to the WRPC. WRPC vide letter under reference has intimated that the status of

Protection Audit Observations is being monitored in the PCM regularly. However, it is observed that the

compliances of many Protection Audit Observations is still pending.

The list of pending Protection Audit Observations as submitted by the Intrastate entities updated upto

June 2017 is enclosed as Annexure-6.14. It is therefore requested to take the pending Protection Audit

Observations with site officials and submit the timeline to resolve the pending Protection Audit Observation, to

SLDC so that same could be forwarded to WRPC/CERC. [Action- MPPTCL/MPPGCL/NHDC/ISP/OSP]

6.15 : High Voltage nodes in WR :- Voltage Deviation Index (VDI) of important nodes in WR is being

computed regularly by WRLDC on daily, weekly, monthly and yearly basis and these reports are being

published in WRLDC website. Based on VDI computed for the monthly of July’17 the high voltage nodes in MP

at 400 kV are given below :-

Voltage Deviation Index : 400 KV Sub stations

S.No Station Name

Voltage (in Volts) Voltage (in % of Time) Total No. of Hours

out of IEGC Band

Max Voltage

Min Voltage <380 KV 380 KV-

420 KV >420 KV

1 Damoh 426.34 384.48 0 74.31 25.69 191:06:00 2 Khandwa 429.66 404.9 0 84.7 15.3 113:49:00 3 Nagda 425.65 404.6 0 92.49 7.51 55:51:00

Above computation are based WRLDC SCADA.

[Committee may like to Discuss]

Agenda of 59th OCCM of MP 14

Page 17: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

6.16 Outage of Main circuit breaker of Generator transformer of Unit no 9 at STPS, Sarni

On dated 24.08.2017 at 21:05 hrs while synchronizing Unit#9 after AOH, generator X-mer tripped on

PRV/Differential/Buchholz indication. The LBB Protection was also operated, resulting tripping of multiple EHV

elements. 500MVA, 400/220KV ICT at Sarni was also tripped on Buchholz indication.

It is observed that Unit no 9 GT Xmer was charged through tie breaker at the instant of incident as

main circuit breaker was already under outage. It is learnt that the Main circuit breaker of unit no 9 has been

out since long but the outage of the same is not intimated to SLDC, which is violation of MPEGC/IEGC. As per

the provision of clause of IEGC section 5.2, whenever any EHV element goes on outage, it should invariably be

intimated to SLDC. It is therefore requested that reason of outage of circuit breaker and expected restoration

may please be intimated to SLDC immediately.

Further, it has come to the notice of SLDC that 220 KV transfer bus / breaker at 220 KV SGTPS was

also out since long and unavailable for charging of any transmission line / generator in case of outage in main

breaker. This outage is also not intimated to SLDC by MPPGCL. Such important outage of grid element is not

desirable for safe and secure grid operation.

MPPGCL is requested to furnish the detail of outages of the grid elements in all the hydel and thermal

power stations in the meeting. [Action- MPPGCL]

6.17 Low voltage profile at 132 KV Sheopur Kalan area in MP Madhya Kshetra :-

132 KV substation Sheopur Kalan is a remote end substation in the Gwalior region. Line length of 132

KV line feeding Sheopur Kalan from 220 KV substation Sabalgarh is about 90 KM. This long length of 132 KV

transmission line and high loading of Sheopur Kalan and Baroda substations causes poor voltage profile in the

area due to heavy reactive power demand of irrigational load.

To improve the voltage profile, when the irrigation demand is high, all the capacitor banks provided in

the Transmission / Distribution network are required to be taken into service. It is desired that all the

capacitors banks should be in healthy condition and fault if any should be rectified on priority. It is proposed

that SE (T&C), MPPTCL, Gwalior and SE (O&M), MPPMKVVCL, Sheopur Kalan jointly inspect all the capacitor

banks provided in the area and ensure round the clock availability of all the capacitor banks.

[Action- MPPTCL/Central Discom]

ITEM NO. 7: BLACK-START MOCK DRILL OF HYDEL POWER STATIONS : Black Start mock drill of Hydel stations of MPPGCL:- During 2017-18 the black start mock drill successfully carried out at Bargi and Pench Hydel power station on dtd 23.05.2017 and 06.06.2017 respectively. The Black Start Mock drill exercise at Gandhi Sagar Power station was also carried out on dtd 30.05.2017 but synchronization of islanded system with national grid was not successfully done due to problem in bus coupler breaker at Gandhi sagar Power Station. MPPGCL may apprise the same in the meeting.

Agenda of 59th OCCM of MP 15

Page 18: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

The black start mock drill exercise of other power stations shall be planned in the month of September 2017 and October 2017. The date of the same shall be finalized in the meeting. [Action : MPPGCL/NHDC]

ITEM NO. 8: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES:

8.1 Status of AMR system installed at SLDC:

In the month of July 2017, the complete data of 571 meters was received through AMR

system and data of 58 no meters (Monthly- 50 & Partial – 08) was not received through AMR system. M/s Secure Meters Ltd. have been advised to examine the reasons of 50 Nos. meters not read during the month. The status of data received through AMR system is invariably sent to all concerned offices including SE(T&C) offices through email for furnishing the missing data alongwith monthly JMR data latest by 4th of every month. The Committee may like to discuss the following as an action plan for receiving the complete data trough AMR system in in a time bound manner.

1. CE(T&C) office is requested to take up the matter with M/s Secure Meters Ltd for resolving

the site related issues of the 50 Nos meters could not read during the month of July 2017. Details are shown in enclosed Annexure-8.1(i).

2. Status of integration of 113 Nos. ABT meters installed at the interface points of newly

commissioned substation / Xmer’s / HT consumers / OACs.

i. Modem & SIM details received from field Offices – 76 Nos.

ii. Modem & SIM details not received from field offices – 37 Nos.

iii. ABT meters integrated successfully with AMR system -36 Nos. CE(T&C) office is requested to advice M/s Secure Meters Ltd. and field offices for integrating the balance ABT meters (41 Nos.) whose modem and SIM details are received. Further, CE(T&C) office is requested to furnish the details of modem and SIM of 37 Nos. ABT meters as per Annexure-8.1(ii).

3. T&C Circle’s office are not sending JMR data (ABC format) to SLDC except Jabalpur and Gwalior Circle. CE(T&C) office is requested to issue instructions to concerned circle offices for furnishing the JMR data to SLDC on email id- [email protected].

[Action: CE (T&C) MPPTCL]

8.2 AMR facility for the ABT meters installed at MPPGCL:

In compliance to state commission directives for computation of weekly transmission losses and Deviation charges, SLDC has requested the MPPGCL for providing the AMR facility on the meters installed at the interface points for data downloading through AMR System installed at SLDC. Accordingly MPPGCL has provided AMR facility on 107 Nos ABT meters installed at the interface points as intimated by CE(Thermal), O/o ED(O&M:Gen), MPPGCL vide letter No. 426 dated 01.03.2016. The status of July 2017 of ABT meter data (38 Nos) not received through AMR system of SLDC has been emailed to GCC, MPPGCL on 03rd August 2017. MPPGCL is requested to take up the matter with M/s Secure Meters Ltd. to resolve the problems related with non-readability of meters integrated successfully. MPPGCL is also requested to instruct the Power Station officials for

Agenda of 59th OCCM of MP 16

Page 19: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

considering the ABT meters with AMR facility as main meters and shall furnish the JMR data accordingly.

MPPGCL is requested to furnish the meter master of ABT meters installed at the interface

points as main, check and standby meters alongwith modem and SIM details as per Annexure-V. [Action: MPPGCL]

8.3 Non receipt of injection data (JMR) timely of Wind & Solar Power Project for issuance of

monthly State Energy Account :

The SE(O&M), Dewas & Sehore are not furnishing the wind & solar data timely i.e. by 3rd or 4th of every month for issuance of monthly State Energy Account. These SE(O&M) are furnishing the data on 6th (A.N) of every month after repeated pursuance. However, SE(O&M) Dewas is not furnishing the complete data by 7th of every month. Further, the concerned SE(O&M)’s do not furnish the monthly injection data of following newly commissioned Wind & Solar Power Project connected at 33KV level. However, SLDC is incorporating the injection data recorded in ABT meter in SEA, but, verification of data could not be done.

i) 15MW Dhar Renewable Pvt. Ltd. connected at 33KV Dashera Maidan substation. –

SE(O&M) Dhar. ii) 15MW Tripupati Dhar Renewable connected at 33KV Jaitpura substation. SE(O&M) Dhar. iii) 30MW Wind Power Project of M/s Sudheer Project Pvt. Ltd. connected at 132KV Maxi

Substation. – SE(O&M) Ujjain. iv) 30MW Wind Power Project of M/s Sudheer Project Pvt. Ltd. connected at 132KV Bercha

Substation. – SE(O&M) Shajapur v) 30MW Wind Power Project of M/s Kshema Power & Infra connected at 132KV Ghosla

substation. SE(O&M) Ujjain. vi) 30MW Wind Power Project of M/s Kshema Power & Infra connected at 132KV Behrugarh.

SE(O&M) Ujjain. vii) 15MW Solar Power Project of M/s Simcom Pvt. Ltd. Simcom (1MW), Eastman(4MW) &

Made Easy(10MW) connected at 220KV Ganjbasoda. –SE(O&M) Vidisha viii) 29.4MW Wind Power Project of M/s Suzlon Gujrat Wind Park Ltd. connected at 132KV

Khachrod substation. –SE(O&M) Ujjain. ix) 28 MW Wind Power Project of M/s Inox Betul (Giriraj) connected at 132KV Gudgaon

substation - SE(O&M) Betul.

DDC, Indore is requested to take up the matter with CE (Comml), MPPKVVCL for issuance of

directives to concerned SE(O&M)’s to furnish the wind & solar generation data by 3rd or 4th of every month.

Further, the JMR injection data of the following wind & solar generators connected at 132KV level and above is not furnished by the concerned EE(T), MPPTCL. SLDC consider the data received through AMR or through MRI by site official in monthly SEA, but verification of data could not be done.

i) 42MW Wind Power Project of M/s Suzlon Gujrat Wind Park Ltd. connected at 220KV Badnagar

substation through 132KV Ckt. ii) 21MW Wind Power Project of M/s Sarjan Realities Ltd. connected at 220KV Badnagar substation

through 132KV Ckt. iii) 200MW Wind Power Project of M/s Innox Wind Infra Structure Services (Lahori) connected at

220KV Shajapur through 220KV Ckt.

Agenda of 59th OCCM of MP 17

Page 20: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

iv) 11.5MW MSW Plant of M/s Essel Power Ltd., Marhotal, Jabalpur connected at 132KV Marhotal substation through 132KV Ckt.

v) 50 MW Kukru Wind Power Project connected at 132KV Gudgaon substation through 132KV Ckt. vi) 49.5 MW Betul Wind Power Project connected at 132KV Gudgaon substation through 132KV

Ckt.

CE(T&C) office is requested to issue necessary instructions to concerned offices for

furnishing the JMR data to SLDC by 3rd or 4th of every month. [Action : MPPKVVCL & MPPTCL] ITEM NO. 9: SCADA and E&T RELATED ISSUES: 9.1 ARRANGENEMENT OF TELEMETRY OF IMPORTANT 220KV SUB STATIONS & 132KV S/S HAVING INJECTION FROM RENEWABLES/CAPTIVE POWER PLANTS OR HAVING INTERDISCOM FEEDERS & HAVING TRACTION FEEDERS-

The telemetry of new 220KV S/s, important 132KV S/s having injection from renewable generating Stations, and Captive Power Plant, is to be provided through Dongfeng RTUS installed and commissioned under MPPTCL SCADA project. Total 50 Nos. Sub Stations has already been identified and forwarded to MPPTCL for arranging integration of telemetry. The integration of around Sixteen RTUs (132KV Biora,132KV Arniakala,132KV Kannod, 132KV Poliakala, 132KV Jeerapur ,132KV S/s Tarana, 132 KV Bankhedi S/s, 132 KV Khapaswami S/s, 132 KV Chanera S/s, 132KV Banmore S/s, 132KV Morena S/s, 132KV Mungaoli S/s, 132KV Shujalpur S/s, 132KV Meghnagar S/s, 132 KV Semri Harchand S/s & 132 KV Amla S/s) is required to be integrated with SLDC SCADA system. The telemetry of 132KV Kothiya Sub station is also required to be extended by MPPTCL.

In addition to the above telemetry of Birsingpur HPS and Zinna HPS are also not available

and same needs to be provided by MPPGCL.

Further, most of the RTUs commissioned recently is not working properly and functioning intermittently. The telemetry of 400 KV Satpura Extension, 220 KV Tikamgarh, 220 KV Morena, 220 KV Gwalior II, 220 KV Anuppur, 220 KV Sirmour, 220 KV Maihar, 132 KV Amarpatan, 132KV Khilchipur, 132 KV Ayodhya Nagar, 132 KV Harda, 220 KV Betul, 132 KV Betul, 132 KV Khategaon and 132 KV Balaghat, is commissioned but functioning intermittently.

The telemetry of these identified Sub Stations is urgently required for monitoring of grid. Hence the progress in the matter as well as further schedule of commissioning, including data channel, plan for arrangement of modems, and rectification of SOE issue may please be provided by T&C. [Action: - CE (T&C)/CE (T&P), MPPTCL]

Agenda of 59th OCCM of MP 18

Page 21: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

9.2 UPGRADATION OF EXISTING RTUS & DISCREPANCY IN TELEMETRERED VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS: The present status of telemetry discrepancy including upgradation requirement is enclosed herewith as Annexure-9.2. The list of important locations where RTU upgradation is required to accommodate renewable feeders/other feeders/transformers is detailed is also given hereunder:-

Sl No.

Name of Substation whose RTU is required to

be upgraded Name of feeders/transformers required to be

included in telemetry

01

220 KV Tons

Telemetered values of following feeders is wrong:- 1. 220 KV Tons-Sirmour 2. 220 KV Tons-Rewa 3. 220 KV Tons-Satna 4. 220 KV Tons-Kotar

Above discrepancy is pending since more than year. In Last OCCM it was ensured by MPPGCL that the same shall be rectified within a week but no action.

02 400 KV ISP

1.Telemetered values of 400 KV Indore-II MW & MVAR is 10 times of actual value. 2.Telemetry of all generators is non-current when the generators are taken out of service.

03 400 KV Chhegaon Breaker status of 400 KV Bus Reactor, 400 KV Julwania, 220 KV OSP. SOE to be verified

04 400 KV Katni Non availability of telemetry of 400 KV Bus Tie.

05 400 KV Birsingpur, TPS

1.Wrong telemetry of 400/220 KV Xmer CB status (Both Sides), Bus Coupler CB status, Station Xmer 3 & 4 CB status,400 KV Bus II Voltage. 2.Non availability of telemetry of 220/33 KV Xmer. These discrepancies are persisting since long time.

06 400 KV Satpura, TPS

1.Telemetered values of Generating Transformer 6 & 7 MW,MVAR 2.Wrong CB status of GT 6 ,GT 7 & 220 KV Transfer Bus Coupler.

07 220 KV ATPS Non availability of telemetry of Station Transformer 5A & 5B & 132/33 KV transformer.

08 220KV Birsingpur S/s

The telemetry of 220KV IC-1 & 4 feeder is not available since last ten months. The Value of 220/132KV TRF and 132KV Umariya feeder is wrong since long time and need to be rectified.

09 220 KV Rewa S/s Telemetry of 132 KV Rewa-Rewa Interconnector II, 132 KV Mangawan II, 132 KV JP Cement is not available.

Agenda of 59th OCCM of MP 19

Page 22: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

The commissioning of new SCADA/EMS system at SLDC is completed and for successful functioning of EMS system the availability of complete telemetry including CB status is a prerequisite. Hence the work regarding telemetry discrepancy mentioned in enclosed annexure is to be taken up on highest priority. MPERC vide Letter dated 09-08-2017 has directed to ensure proper functioning of RTUs. MPPGCL and MPPTCL may please provide completion schedule regarding rectification of telemetry discrepancy and upgradation of RTU’s.

[ACTION: (T&C, MPPTCL & O&M: GEN, MPPGCL)]

10 Pench HPS Telemetry not available since one month. Voltage & Frequency of 132 KV Bus-II not available. It is not available since long time.

11 220 KV Itarsi Telemetered value of 220 KV Pipariya-II feeder & 220 KV Bus II Voltage, frequency is wrong.

12 220 KV Bhopal Telemetered values of 220 KV Bus II frequency,132 KV Bagroda, 132 KV Bhel, 132 KV STDS and 132 KV Amrawat Khurd is not available.

13

132 KV Jaora S/s

33 KV Choksi wind 1,2 is not available

14 220KV Anuppur S/s 132KV Shahdol, 132KV Kotma 2, 132KV TRF 2 telemetry not available. Wrong CB status of 220 KV Amarkantak-II, 160 MVA Xmer II, 132 KV Kotma-I, 132 KV Kotma II, 132 KV Shahdol, 40 MVA Xmer.

15 132KV Kotma S/s 132KV Anuppur feeder II telemetry not available 16 220KV Pandurna S/s 220KV Pandurna-Sarni telemetry is not available &

the telemetered value of 132/33 KV 20 MVA Xmer II is wrong. Wrong CB status of 132 KV Railway Traction II.

17 220KV Ratlam Telemetry of 132/33KV 40 MVA Xmer-3 & 220 KV Bus voltage, frequency is not available. Wrong CB status of 132 KV Interconnector-II.

18

220Kv Indore SZ

Telemetry of 132 KV CAT II feeder is not available.

19 220 KV Narsingpur Telemetered value of 220 KV Bus Voltage is wrong. Wrong CB status of 132 KV Bus coupler & 63 MVA Xmer I.

20 220 KV Sukha Bus Tie CB, Bus Coupler CB, 220 KV Panagar I CB status.

21 220 KV Sirmour Bus Coupler CB status. 22 220 KV Seoni Non availability of telemetry of 132/33 Xmer II. 23 220 KV Dewas Non availability of telemetry of 132 KV Shankargarh

II 24 220 KV Hoshangabad Non availability of telemetry of 132 KV SPM, 132 KV

Shahganj & 132 KV Trident. 25 132 KV Seoni Bus Coupler CB status

Agenda of 59th OCCM of MP 20

Page 23: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

9.3 PRESENT STATUS OF PROCUREMENT OF RTUs BY MPPGCL:- The matter of procurement of RTU for Rajghat HPS and Bansgar III HPS was discussed in detail in last eighteen OCCM meetings as well as on two number special telemetry meetings, without any conclusive result. The Telemetry of Rajghat HPS is out since LAST THREE YEARS . In the last OCC meeting it was informed by MPPGCL that RTU has been delivered & cable dispatch is pending. The latest status in the matter along with commissioning schedule may please be provided by MPPGCL. MPERC vide Letter dated 09-08-2017 already directed to submit reason for so long outage for RTU at Rajghat Power Station.

In addition to the above telemetry of Birsingpur HPS and Zinna HPS are also not available and same needs to be provided by MPPGCL.

[Action: - ED (O&M: GEN: MPPGCL)]

9.4 Extension of RGMO/FGMO signal to SLDC/WRLDC :-

As per IEGC 5.2(f), RGMO/FGMO is mandatory for all thermal units above 200 MW and hydro units above 10 MW. Further considering the high penetration of renewable to grid and also the Government target to achieve 175 GW, it is essential to monitor operation of RGMO/FGMO at SLDC/RLDC for ensuring grid security and compliance of regulation. Subsequently SLDC vide letter no. 07-05/RPC-27/3739 dated 18-01-2017, letter No. SE/LD:E&T/693 dated 23-01-2017, letter No. SE/LD:E&T/34 dated 13-04-2017, letter No. SE/LD:E&T/143 dtd.26-05-17, , letter No. SE/LD:E&T/309 dtd.19-07-17 requested MPPGCL/NHDC for integration of telemetry of RGMO/FGMO in RTU installed at power station and forward the object address configured in RTU so that same may also be configured in SLDC SCADA and RGMO/FGMO status may be displayed in SCADA system. The matter was again taken up vide this office UO No.38 dated 21/08/2017. However, extension of RGMO/FGMO signal of following generating units is still to be extended to SLDC SCADA system:-

S.No. Name of Generating Station Unit.No.

1 Satpura ,TPS All Units 2 SGTPS 1,2,3,4 3 SSTPS 1,2 4 Bargi HPS 1,2 5 Pench HPS 1,2

[Action: - ED (O&M: GEN: MPPGCL), GM (ISP:NHDC), GM(OSP:NHDC)]

9.5 COMMISSIONING OF COMMUNICATION CHANNELS FOR DUAL REPORTING OF RTUS AS PER BACKUP SLDC REQUIREMENT:-

The commissioning of SCADA/EMS system at SLDC Jabalpur and backup SLDC Bhopal is already completed however the additional communication channel required for dual control center reporting as per backup SLDC requirement is yet to be commissioned by MPPTCL & MPPGCL .The RTU wise progress may please be provided by MPPTCL & MPPGCL.

The Strengthening of existing wideband communication node is also required to be

arranged so as to ensure reliable backbone communication network. The immediate requirement in the matter has already been submitted by SLDC to MPPTCL and MPPGCL. The present status of the same may please be provided.

Agenda of 59th OCCM of MP 21

Page 24: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

The wideband equipment installed and commissioned at SGTPS however, remains unutilized. The RTU data need to be transferred using wideband link. The scheme for the same is already prepared and forwarded to SGTPS around four months back. The present status may be intimated by MPPGCL. 9.6 MAINTENANCE OF OPGW

The 8 No. fibers had been installed on EHV line section between 220 KV Jabalpur to 220 KV Katni S/s under ULDC project in 2003. Presently three number fibres out of eight number of fibers is not serviceable/ ready to use due to problem in joint box placed at 20 KM distance from 220 KV S/s Jabalpur towards Katni. The SLDC vide letter No.SE/LD:E&T/707/826 dated 06/03/2017 already requested, SE (EHT: Maint), Jabalpur to arrange for replacement of the Joint box and ensure that all 8 fibers between 220 KV Jabalpur S/s to 220 KV Katni S/s being healthy and ready to use. However, replacement of joint box is still pending.

9.7 NON AVAILABLITY OF SOE AT SLDC SCADA SYSTEM

WRLDC vide letters dtd. 03.05.17 & 15.05.17 intimated that SOE of grid disturbance at 220 KV

S/s Mahalgaon & 400 KV S/s Indore is not received in Back-up LDC SCADA/Sub-LDC SCADA system respectively. SLDC is carrying out data validation of various substations periodically & it is observed that SOE from various substations like 220 KV S/s Damoh, 220 KV S/s Anuppur, 220 KV S/s Malanpur, 220 KV S/s Tikamgarh, 220 KV S/s Mahalgaon, 220 KV S/s Hoshangabad, 220 KV S/s Bhopal, 220 KV Shujalpur, 220 KV S/s Ujjain, 220 KV S/s Badod was not received at SLDC SCADA system. Subsequently SLDC vide letter SE/LD:E&T/200 dtd. 14-06-17 requested MPPTCL to arrange simulation testing for SOE of all RTUs.

Receiving of SOE is very essential for analysis & investigation of major trippings in the grid.

MPPTCL is thus requested to arrange simulation testing for SOE of all RTU’s in coordination with SLDC SCADA/Back UP SLDC/Sub LDC SCADA system & also issue necessary instructions to sort out the issues for ensuring proper receipt of SOE in SLDC SCADA system.

9.8 INTERMITTENT TELEMETRY DUE TO NOISE IN COMMUNICATION CHANNEL :-

It has been observed that the telemetry of 400KV Pithampur, Singaji Super Thermal Power Station, 220KV Sirmore, 220Kv Sidhi, 220KV Maiher, 220KV Tikamgarh, Bargi HPS, Pench HPS, 132 KV S/s Seoni, 220 KV Seoni, 132 KV Chhindwara, 220 KV Chhindwara, 220 KV Pandhurna, 132 KV Balaghat, 220 KV Dewas, 220 KV Indore SZ, 220 KV Barwaha, 132 KV Jaora, 132 KV Chapda,220 KV S/s Ujjain, 220 KV S/s Shajapur is intermittent due to heavy noise in the communication channel. Further these noisy channels interrupt the functioning of FEP at the SLDC/Back Up LDC/Sub LDC which leads to inconvenience in system operation & control.

MPPTCL is thus requested to arrange for alignment of PLCC Channel & identify/replace the outdoor equipments which inject the noise in the channel/system.

9.10 LONG OUTAGE OF RTUS, PROBLEM IN DATA AND VOICE CHANNELS The long outage of telemetry of following S/s is discussed in detail:-

Agenda of 59th OCCM of MP 22

Page 25: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

Sl No. Name of Sub Station Out from /Remark

01 Rajghat HPS Out from last three years 02

132KV Morwa S/s

More then one and half Year

04 132KV Waidhan S/s Out from one year. Channel problem between Anuppur to Jabalpur

05 132KV Beohari S/s Out from more than one year

06 132 KV Deolond S/s Out due to PLCC channel

07 220 KV Gwalior II & 220 KV Morena

Telemetry of either of the two sub stations i.e. 220 KV Morena or 220 KV Gwl-II is functioning.

08 Pench HPS Out from more than one month

09 132 KV Harda Out from more than 15 days.

10 132 KV Khategaon Out from more than 15 days.

11 Bansagar III HPS Out from more than 6 months.

12 220 KV Sirmour Intermittent

13 220 KV Maihar Intermittent

14 220 KV Anuppur Intermittent

MPERC vide Letter dated 09-08-2017 has directed to submit reason for long outage for RTU & also directed to ensure proper functioning of RTUs. MPPTCL, MPPGCL are requested to sort out rectification of above RTU/data channel on top most priority.

9.11 Telemetry of Railway TSS Sub Stations:- The telemetry of 36 Nos. railway Traction Sub Stations is required to be provided by railway for monitoring of drawal by each TSS and also monitoring of demand of railway in MP. In last OCC, the railway representative informed that the tender for the telemetry arrangement is yet to be floated by railway and railway is planning to float tender for providing telemetry of 20 Railway TSS and not for all 38 existing TSS. Further, MPPTCL representative informed that in addition to existing 38 Nos Railway TSS in MP, planning for establishment of around 25 new TSS is also under progress. Accordingly, Railway is requested to plan for arranging telemetry of all 38 existing TSS as well as for 25 upcoming TSS and expedite the matter. Further Railway officials are requested to provide current progress in the matter along with the timeline.

Agenda of 59th OCCM of MP 23

Page 26: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

ITEM No 10 : DATE AND VENUE OF NEXT OCC MEETING :

It is proposed to hold 60th Operation and Coordination Committee meeting of MP on 27-10-2017. The host and venue of the same shall be decided in the meeting.

***********

Agenda of 59th OCCM of MP 24

Page 27: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

S. No. Particulars

1

1.1 Maximum Frequency 50.15 Hz

Between 18.00 hrs & 19.00 Hrs on 19.06.17

50.09 HzBetween 07.00 hrs & 08.00 Hrs on 06.07.17

1.2 Minimum Frequency 49.85 Hz

Between 00.00 hrs & 01.00 Hrs on 04.06.17

49.82 HzBetween 19.00 hrs & 20.00 Hrs on 19.07.17

1.3 Average Frequency 50 Hz 49.99 Hz

2

2.1 Maximum Frequency 50.26 HzAT 18.46.20 HRS ON 19.06.17

50.26 Hz AT 08.00 HRS ON 06.07.17

2.2 Minimum Frequency 49.72 Hz AT 22.11 HRS ON 02.06.17 49.69 Hz AT 20.56. HRS

ON 07.07.17

3 Percentage of time when frequency was :-

%age of time when frequency was Jun-17 Jul-17

3.1 Below 48.5 Hz 0.00 0

3.2 Between 48.50 Hz and 48.8 Hz 0.00 0

3.3 Between 48.80 Hz and 49.2 Hz 0.00 0

3.4 Between 49.20 Hz and 49.5 Hz 0.00 0

3.5 Between 49.50 Hz and 49.7 Hz 0.00 0

3.6 Between 49.70 Hz and 49.9 Hz 5.81 6.56

3.7 Between 49.9 Hz and 50.05 Hz 75.50 76.15

3.8 Between 50.05 Hz AND 51.5 Hz 18.69 17.29

3.9 Above 51.5 Hz 0.00 0.00

4 No. of times frquency touched 48.80 Hz 0 0

4.1 No. of times frquency touched 48.60 Hz 0 0

4.2 No. of times frquency touched 51.0 Hz 0 0

FREQUENCY PARTICULARS

INTEGRATED OVER AN-HOUR

INSTANTANEOUS FREQUENCY

Jun-17 Jul-17

Agenda of 59th OCCM of MP 25

Page 28: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

I

S.

No. NAME OF THE TRANSMISSION LINE / (FINANCED

BY)

TYPE OF

CIR CUITS

ROUTE

LENGTH

CIRCUIT

KMS.

DATE OF

COMPL-

ETION

DATE OF

COMMI-

SSIONING

A. 400 KV TRANSMISSION LINES

NIL 0 0

B. 220 KV TRANSMISSION LINES

1

(a).220Kv DCDS line for inter-connection of 400Kv

S/s Betul with 220Kv S/s Betul (2x1.88) (ADB-III

Saving)

DCDS 1.88 3.76 July'2017charged on

21.07.2017

C. 132 KV TRANSMISSION LINES

1

132 kv DCDS Ujjain(220 kv) -Chandrawatiganj line

(2x33.191) (JICA) (Note: 18.40cktkm One ckt

charged by tapping arrangement on 30.03.2015)

DCDS 33.19 47.982 June'17comm.on

06.06.2017

22nd Ckt of 132 kv Badnagar - Gautampura line

(1x23.24)(JICA)2ND CKT 23.24 23.24 June'17

comm.on

30.06.2017

3132 kv DCSS line from220Kv S/s Chichli - 132Kv

Karapgaon (1x31.058)(PFC-II)DCSS 31.06 31.058 June'17

charded on

18.06.207

4

132Kv DCSS line from proposed 132Kv s/s Tamot

to Sagar Yarn plant of M/s Sagar Manufacturer (P)

Ltd.(1x3.1) (contributory work)

DCSS 3.10 3.1 June'17comm.on

30.06.2017

5

132Kv DCSS line from 220kV s/s Pithampur for

supply of 5MVA to M/s SRF Ltd.(1x2.421)

(contribution work)

DCSS 2.42 2.421 June'17comm.on

29.06.2017

62nd Ckt of 132 kv Pithampur - Betama line (1x14)

(JICA)

2nd

ckt.km.14.00 14 July'2017

comm.on

02.07.2017

II.

S.

No.

NAME OF SUBSTATION / (DISTRICT) /

(FINANCED BY)

VOLTAGE

RATIO

(KV)

No.OF

X-mer &

Cap.

(MVA)

EFFECTIVE

CAPACITY

MVA

DATE OF

COMPL-

ETION

DATE OF

COMMI-

SSIONING

A. 400 KV SUBSTATIONS

1 Nil 0.00

B. 220 KV SUBSTATIONS

a. 220 KV NEW SUBSTATIONS

1 Nil 0

C. 132 KV SUBSTATIONS

1 Nil 0

ANNEXURE -2.2.5.i

M.P POWER TRANSMISSION COMPANY LIMITED

TRANSMISSION WORKS COMPLETED DURING 2017-18 (UP TO 31.07.2017)

EHV TRANSMISSION LINES

EHV SUB - STATIONS

Agenda of 59th OCCM of MP 26

Page 29: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

S.

No.NAME OF THE TRANSMISSION LINE

CKT.

KMS.

PROGRES

S

IN %

Proposed

Target for

completion

A. 400 KV TRANSMISSION LINES

1400kV DCDS (Quad moose) line from Shri Singaji TPS (stage-

II) - Pithampur (2x69.968)140 6% 2018-19

2400kV DCDS (Quad moose) line from Pithampur - Badnawar

(2x70)140 3% 2018-19

3LILO of both ckt. Of 400kV Nagda to Rajgarh line at 400kV S/s

Badnawar (4x8.163)33 3% 2018-19

B. 220 KV TRANSMISSION LINES

1 2nd Ckt of 220kv Satna - Chhatarpur line (152) 160 8% 2017-18

2LILO of 2nd circuit of Damoh (MPPTCL) - Sagar 220KV line at

Damoh (PGCIL) 400 kV Sub-station Damoh (4x0.592)2.368 100%

Line to be

charged

3LILO of one circuit of Satna (MPPTCL) - Chhatarpur 220KV

line at Satna (PGCIL) 400 kV Sub-station (2x1.726)3.452 90% 2018-19

4LILO of 2nd ckt. Of Itarsi(MPPTCL) - Hoshangabad 220Kv line

at Itarsi(PGCIL) 400 KV S/s. (2X0.060)0.12 100%

To be

charged

5LILO of one Ckt of 220kv DCDS Ashta - Dewas line at 220kv

S/S Chapda (DCDS) (2x32.782)66 3%

6 220Kv DCDS line from Pithampur-Depalpur line (2X31) 62 37%

7220Kv FCFS line for LILO of both Ckt. Of Badnagar -Ratlam

D/C line at 400Kv S/s Badnawar (2x1+4x8)34 4% 2018-19

8 220Kv DCDS Julwaniya- Kukshi (2X58) 116 16%

9 220Kv DCSS Shujalpur- Narsinghgarh line (1X43.6) 44 15%

10LILO of both ckt of Badod-Kota/Modak 220kV line at 220Kv

S/s Suwasara (4x4.382)17 15% 2017-18

11LILO of 2nd ckt Nagda - Neemuch 220kV line at 220Kv S/s

Daloda (2x12.2)24.4 11% 2017-18

LILO of 220kV Sarni - Pandhurna at 220kV S/s Betul

(2x38.864)77.728 7% 2018-19

12

220Kv DCDS Morena(400KV S/s CWRTL Adani Group) -

Sabalgarh DCDS line & lilo of Morena 400KV S/s (Adani) to

Sabalgarh at Morena 220Kv s/s (2X92 + 2x0.5)

185 22% 2017-18

13LILO of one circuit of Malanpur - Mehgaon at 400Kv S/s

CWRTL (Adani) (2x6.031)12.062 36% 2017-18

14LILO of 2nd ckt. Of Birsinghpur - Amarkantak 220kV line at

Shahdol 220 KV S/s. (2X5.6)11.2 17% 2017-18

15LILO of 2nd ckt. Of Bansagar - Satna 220Kv line at Kotar 220

KV S/s. (2X5.693)11.386 52% 2017-18

16220kV DCDS line for LILO of one ckt of 220kV DCDS Indore -

Indore-II(Jaitpura) line at Mangliya (2x0.3)1 60% 2017-18

17

220Kv DCDS line from 220kV Pooling S/s RUMS at

Goojarkhedi, Suwasara (For interconnection of Solar PV Plant

of RUMS) (2X43.426)

86.852 29% 2017-18

18220kV DCDS Barsitadesh (220kV Pooling S/s) - 400kV Grid

S/s PGCIL line (2X0.917)1.834 14% 2017-18

19220kV DCDS Ramnagar (220kV Pooling S/s) - 400kV Grid S/s

PGCIL line (2X2.572)5.144 5% 2017-18

20220kV DCDS Badwar (220kV Pooling S/s) - 400kV Grid S/s

PGCIL line) (2X0.917)4.33 2% 2017-18

Annexure-2.2.5.ii

EHV TRANSMISSION WORKS UNDER PROGRESS AS ON 31.07.2017

Page 1 of 4

Agenda of 59th OCCM of MP 27

Page 30: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

C. 132 KV TRANSMISSION LINES

1 132 kv DCSS Dewas-Barotha line (1x23) 23 60% 2018-19

2 132 kv DCSS Ghatabillod-Betama line (1x18) 18 29% 2017-18

3 132kv DCSS Gautampur -Depalpur line (1x19) 19 20% 2017-18

4 132kv Nagda(220kv)- Kachrod-Jaora DCSS line (1x64) 64 18% 2018-19

5 132kv Mugaliya Chaap - Sehore DCSS line (1x24) 24 30% 2018-19

6132 kv DCSS line between 132Kv S/s Nasrullaganj & 220KV

Itarsi s/s(1x53.209)53.209 42%

7LILO of S/C ckt of 132 KV Seoni-Lakhnadon line at 220kv S/S

Seoni (2x20)40 17% 2018-19

8 132 kv DCSS Guna-Eshagarh line (1x72) 72 32%

9LILO of one circuit of 132 kv Neemuch220 - Ratangarh DCDS

line at 132 KV S/s Morwan (2x1)2 0%

10132 kv DCSS Line from 220Kv S/s Shivpuri-132Kv Bairad

(1x32.859)32.859 38% 2017-18

11132 kv DCSS from 220Kv S/s Datiya-132kv S/s Indergarh

(1x27.1)27.1 51% 2017-18

12132 kv DCSS line from 132Kv S/s Kymore-132Kv S/s Barhi

(1x35)35 95% 2017-18

13 132 kv Sirmour - Katra DCDS line (2x37.67) 75.34 18%

14 132 kv Sagar-Rahatgarh DCSS line (1x55) 55 96% 2017-18

15LILO of Both circuit of 132 kv DCDS Gwalior(Mahalgaon) -

Dabra/Karera line at 220 KV S/s Gwalior II) (2x2x7.87)55.09 36%

16132Kv DCSS line from 220Kv S/s Rajgarh to 132Kv S/s Jhabua

(1x67.749)67.749 99% 2017-18

17132Kv DCDS line for extension of 132Kv line from

Manliya(132) - Mangliya (220) (2x1)2 99%

Line to be

charged

18 132 kv DCSS Dewas-Agrod line (1x20.76) 20.76 28%

19 132 kv DCSS Khurai- Khimlasa line (1x20.937) 20.937 20%

20

LILO of 132Kv Mungaoli Traction feeder at 132Kv S/s

Mungaoli (4x7.8+2x0.7) Note: (4x7.8ckt.km line charged on

30.12.2015 by tapping )

32.6 96%

21LILO of 132Kv Vidisha- Bairasiya line at salamatpurr

(2x0.162)0.324 46%

22132 kv DCDS Line Chichli - Udaypura (2x47) (On 220Kv

Tower)94 51%

23 132 kv DCSS Panagar - Patan line (1x22.749) 22.749 7%

24 132 kv DCSS Badnagar - Chhayan Line (1x31) 31 34%

25 132 kv DCSS Dhar - Teesgaon line (1x15.35) 15.35 16%

26LILO of 132 kv Ratlam - Meghnagar line at 132Kv S/s

Petlawad (2x7.4)14.8 5%

27 132 kv DCDS Beragarh - Intkhedi (2x8.7+4x1.5) 23.4 81%

28 132 kv DCSS Udaipura - Silvani line (1x25.8) 25.8 38%

29 132 kv DCSS Narsinghpur - Devnagar (1x23) 23 18%

30 132 kv DCSS Karakbel - Belkheda (1x24.445) 24.445 11%

31 132 kv DCDS Narsinghpur - Karakbel line (2x23) 46 20%

32

LILO of 132KV Gwalior- Dabra/Karera line at Chinour (132KV

DCSS Dabra- Chinour line) (2X13.68) & LILO of 2ND CIRCUIT

OF 132KV Gwalior- pIChore at 132Kv S/s Dabra (2X0.108)

27.36 52% 2017-18

33 132KV DCSS Sabalgarh - Kelaras line (1x25) 25 93% 2017-18

34 132kv DCSS Chhegaon -Singot line (1x58) 58 12% 2017-18

35 132kv DCSS Chhanera -Khirkiya line (1x30.42) 30.42 54% 2017-18

36LILO of 132kv Nagda - Ratadiya line Unhel 132KV Sub-station

(2x2)4 20% 2017-18

37LILO of one ckt of 132kv Neemuch - Mandsore line at Budha

132KV Sub-station (2x22.077)44.154 17%

38LILO of both ckt of 132kv Gandhisagar - Suwasara/Garoth

line at Bhanpura 220KV S/s (4x14)56 1% 2018-19

39LILO of both ckt of 132kv Gandhisagar - Suwasara/Garoth

line at Suwasara 220KV S/s (2x3)6 9%

40 132kv DCSS Mugaliyachhap - Bilkishganj line (1x17.274) 17.274 14%

41132kv DCDS Rajgarh - Khujner/Sindaota line (2x26.499+

4x1.457)57 5%

42 132kv DCSS Betul-Bisnoor/Masod line (1x35.245) 35 6%

43 132kv DCDS line Guna-Bhonra (2x21.394) 21 3%

44 132kv DCSS line Bhonra - Kapasi (1x22.534) 23 16% 2017-18

45 2nd ckt. Stringing of 132kV Shivpuri - Kolaras line (35) 35 80% 2017-18

Page 2 of 4

Agenda of 59th OCCM of MP 28

Page 31: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

46 132kv DCSS line from Kolaras - Mada line (1x18.366) 18.366 55% 2017-18

47 132kv DCSS line Chhindwara-Saori line (1x31.60) 31.6 29% 2017-18

48 132kv DCSS Damoh-Patera line (1x38) 38 3%

49132kv Birsinghpur -Shahdol DCSS line (1x45) (Revised Estt.

Sanc.no.0187dtd.05.09.2016)45 40% 2017-18

50 132 KV DCSS Kukshi - Jobat line (1x33.74) 33.74 95% 2017-18

51 132kV MACT (Bhopal) - Mugaliachhap line (2x30.368) 60.736 23% 2018-19

52132kV Julwaniya400 - Shahpura DCSS line (2nd ckt-28 +

1x46.866)74.866 3% 2018-19

53132Kv DCSS line from GWSTPP to upcoming Make up Water

Pump House river Narmada (Line-I)(1x24.192)24.192 89%

54132Kv DCSS line from GWSTPP to upcoming Make up Water

Pump House river Narmada (Line-II)(1x24.152)24.152 17%

55132Kv DCSS 2 phase 2wire line from 132Kv s/s Bankhedi for

PS to RTS Bankhedi (1x7.9)7.9 96%

56132Kv DCSS 2 phase 2wire line from proposed 220Kv s/s

Narsinghpur 5MVA PS to RTS Narsinghpur (1x7.253)7.253 19%

57132Kv DCSS line from 400Kv s/s Katni - RTS Patwara

(1x19.417)19.417 18%

58132Kv DCSS 2 phase 2wire line from 220Kv s/s Maihar for PS

to TSS Bhadanpur(1x13.1)13.1 70%

59132Kv DCSS 2 phase 2wire line from 220Kv s/s KOtar for PS

to RTS kaima1x26.938)26.938 34%

60132Kv DCSS 2 phase 2wire line from 132Kv s/s Majhgawan

for PS to TSS Majhgawan(1x0.19)0.19 89%

61132Kv DCSS 2 phase 2wire line from 132Kv s/s Rewa for PS

to TSS Rewa(1x0.4)0.4 74%

62132Kv DCDS 2 phase 4wire line from 220Kv s/s Ashoknagar

for PS to 132kV RTS Ashoknagar (2x4.474)8.948 30%

63132Kv DCSS 2 phase 2wire line from 132Kv s/s Umreth to

RTS Parasiya (1x13.623)13.623 99%

64 132kV DCSS Sirmore - RTS Dabhaura line (1x56.1) 56.1 11%

65

132Kv DCDS line from 132Kv s/s Morwa for Power supply of

21.6MVA in pfase manner on 132kV for RTS Singroli

(1x1.809)

1.809 32%

662nd ckt of 132Kv 2ph 2 wire line from 220Kv s/s Bina - RTSA

Mungaoli RVNL38 87%

67

132Kv DCSS line from 132Kv s/s Chhegaon - 50MW Soalar

Power Project of M/s Sky Power Solar South-East Asia-One

Pvt'Ltd At vill. Chhirbel/Khajuri, Khandwa (1x11.226)

11.226 99%

S.

No.NAME OF THE SUBSTATION

EFFECTIVE

CAPACITY

MVA

PROGRES

S

IN %

A. 400 KV SUBSTATIONS

Page 3 of 4

Agenda of 59th OCCM of MP 29

Page 32: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

1400 KV sub-station Balaghat/Kirnapur with 2x100MVA

400/220 kv x-MER+ 1X40 MVA X-mer (Distt.Balaghat)200 33% 2018-19

2400 KV sub-station Badnawar with 2x315MVA 400/220

KV X-mer (Distt. )630 37% 2018-19

3Bhopal (Sukhi Sewaniya) 400/220 kv s/s Addl. 315 MVA

X-mer (Distt.Bhopal)315 47% 2017-18

4Chhegaon 400/220 kv s/s Addl. 315 MVA X-mer

(Distt.Khandwa)315 80% 2017-18

B. a 220 KV SUBSTATIONS

1Upgradation of Chapda 132Kv S/s to 220kv with

1x160MVA (Distt. )160 2%

2Upgradation of Depalpur 132Kv S/s to 220kv with

1x160MVA(Distt. )160 9%

3 Adampur 220/33kv S/s 2x50MVA 100 8%

4

Upgradation of Kukshi 132Kv S/s to 220kv with

1x160MVA

(Distt. )

160 11%

5

Upgradation of Chhanera 132Kv S/s to 220kv with

2x160MVA +1x50MVA 132KV X-mer

(Distt. Khandwa )

320 16% 2018-19

6 220/132kV S/s Suwasara (2x160MVA + 1x50)

(Distt. Mandsore)320 10% 2017-18

7

Upgradation of Shahdol 132Kv S/s to 220kv with

1x160MVA 160 51% 2017-19

8220/132 KV S/s Mangliya with 1x160MVA+ 63MVA

132/33KV X-mer 160 44% 2017-18

9 33/220 Kv Pooling Sub-station at Barsitadesh

3x100MVA300 38% 2017-18

10 33/220kV Pooling Sub-station at Ramnagar 3x100 300 9% 2017-18

11 220/33Kv Pooling Sub-station at Suwasara (Gujarkhedi)

3x100300 90% 2017-18

C. 132 KV SUBSTATIONS

(a) NEW SUBSTATIONS

1 Barahi 132kv s/s (Distt. Katni) 40 22% 2017-18

2 Karapgaon 132kv s/s (Distt- Narsinghpur) 40 27% 2017-18

3 Biston 132kv s/s1x40 MVA 40 9%

4 Agrod 132kv s/s 1x40 MVA 40 59% 2018-19

5 Chhayan 132kv s/s1x40 MVA 40 78% 2018-19

6 Teesgaon 132kv s/s 1x40MVA 40 10%

7 Waraseoni 132kv s/s1x40 MVA (Dist- Balaghat) 40 3%

8 Devnagar 132kv s/s 1x40 MVA (Dist- Narsighpur) 40 35%

9 Belkheda 132kv s/s 1x40 MVA (Dist- Jabalpur) 40 4%

10 Khimlasa 132kv s/s 1x40 MVA 40 3%

11 Karakbel 132kv s/s1x40 MVA (Dist. Narsinghpur) 40 17%

12 Kelaras 132kv s/s with 1x63 MVA 63 90% 2017-18

13 Narsinghgarh 132kv s/s with 1x40 MVA 40 7%

14 Salamatpur 132kv s/s with 1x40 MVA 40 52% 2018-19

15 Intkhedi 132kv s/s 1x63 MVA 63 71% 2018-19

16 Silvani 132kv s/s with 1x40 MVA 40 12%

17 Udaipura 132kv s/s with 1x40 MVA 40 20% 2018-19

18 Singot 132kv s/s with 1x50 MVA 50 19% 2017-18

19 Unhel 132kv s/s with 1x50 MVA 50 27% 2017-18

20 Bilkishganj 132kv s/s with 1x50 MVA 50 16% 2018-19

21 Khajner/Sindaota 132kv s/s with 1x50 MVA 50 18% 2018-19

22 Bisnoor/Masod 132kv s/s with 1x50 MVA 50 5% 2018-19

23 Kapasi/Paranth 132kv s/s with 1x50 MVA 50 21% 2017-18

24 Mada 132kv s/s with 1x50 MVA 50 20% 2017-18

25 Rehli 132kv s/s with 1x50 MVA 50 13% 2018-19

26 Jobat 132kv s/s with 1x40 MVA 40 80% 2017-18

27 Shahpura 132kv s/s with 1x40 MVA (Barwani) 40 9% 2018-19

Page 4 of 4

Agenda of 59th OCCM of MP 30

Page 33: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

Annexure-2.3(i)

Jun-17 Jul-17 Jun-17 Jul-17

Commissinary HQ 23:47 23:46 23:35 23:34

District HQ 23:51 23:47 23:33 23:38

Tehsil HQ 23:43 23:42 23:18 23:28

Rural -Mixed 23:22 23:18 21:58 22:30

Rural -DLF 23:22 23:17 22:23 22:50

Rural -Irrigation 9:58 9:57 9:05 9:21

Jun-17 Jul-17 Jun-17 Jul-17

Commissinary HQ 23:46 23:43 23:42 23:40

District HQ 23:43 23:49 23:43 23:44

Tehsil HQ 23:36 23:41 23:33 23:37

Rural -3Phase 22:07 23:52 22:41 22:57

Rural -1Phase 23:10 23:24 23:00 23:10

Total Rural 9:30 10:05 9:31 9:47

Discoms wise Average Supply Hours

PARTICULARS

PARTICULARS

West Zone MP

East Zone Central Zone

Agenda of 59th OCCM of MP 31

Page 34: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

132KV Badgaon 33KV Khamni 29.11.2014 25.09.2015132KV Khandwa 33KV Amalpura 30.01.2011 19.08.2016132KV Moondi 33KV Chandel 31.01.2013 27.10.2016132KV Chhegaon- Makhan 33KV Khandwa Oil --- 18.11.2016 33KV Chamati 04.11.2016 20.11.2016132KV Pandhana 33KV Dhulkot 03.12.2016 03.12.2016132KV Kasrawad 33KV Ashok Spoon 07.11.2016 07.11.2016

132KV Anjad 33KV Shivai 29.12.2016 29.12.2016

132KV Depalpur 33KV Moorkhera 23.05.2017 25.05.2017132KV Rau 33KV Panther-I 14.03.2014 14.03.2016

33KV Silicon City 23.01.2017 02.02.2017

132KV Jamli 33KV PHE 13.08.2014 01.07.2015

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

220KV Barod 33KV Suzlon-I 15.07.2013 31.03.2017

132KV Susner 33KV Soyat-II(West Discom) 21.05.2014 23.03.2017

132KV Maksi 33KV Badoni Power-I 08.02.2017 29.03.2017

33KV Badoni Power-II 08.02.2017 29.03.2017

132KV Sonkatch 33KV AVP Power-I 29.03.2016 24.03.2017

33KV AVP Power-II 29.03.2016 24.03.2017

220KV

132KV

LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR (For which group to be allocated)

220KV

JABALPUR REGION

INDORE REGION

NIL

132KV

SAGAR REGION

132KV

220KV

REWA REGION

NIL

Annexure-2.3.(ii)

BHOPAL REGION

UJJAIN REGION

132KV

220KV

NIL

NIL

NIL

NIL

Agenda of 59th OCCM of MP 32

Page 35: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

Annexure-2.3.(ii)

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

220 KV Ganjbasoda 33 KV AKVN Kanjna Pathar 20.10.2016 --

33 KV Simcon Solar Power 18.11.2016 --

132 KV Bareli 33 KV Boras 19.02.2014 --132 KV Biora 33 KV Nagar Palika 09.03.2014 --132 KV Gopalpur 33 KV AE, PHE 27.02.2015 --132 KV Amrawad-Khurd 33 KV Katara Hills-II 01.06.2016 --

33 KV Goharganj 05.05.2016 31.01.201733 KV Obedullaganj 05.05.2016 02.02.2017

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

220 KV Sabalgarh 33 KV Mangrol 30.05.2014 --

132 KV Tamot

220KV

GWALIOR REGION

132 KV

220 KV

132 KV

Agenda of 59th OCCM of MP 33

Page 36: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

Annexure-3.2

From To

03-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work04-Oct-18 9:00 18:00 9:00 For post monsoon maintenance work05-Oct-19 9:00 18:00 9:00 For post monsoon maintenance work

2 400KV S/s Ashta 400KV BUS COUPLER - 06-Oct-17 9:00 18:00 9:00 For bay maintenance & testing work

3 400KV S/s Ashta 400KV BUS TIE - 07-Oct-17 9:00 18:00 9:00 For bay maintenance & testing work

09-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work10-Oct-17 9:00 18:00 9:00 For bay maintenance & testing work11-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work12-Oct-17 9:00 18:00 9:00 For bay maintenance & testing work23-Oct-17 9:00 18:00 9:00 For bay maintenance & testing work24-Oct-17 9:00 18:00 9:00 For line reactor maintenance and testing work25-Oct-17 9:00 18:00 9:00 For bay maintenance & testing work26-Oct-17 9:00 18:00 9:00 For line reactor maintenance and testing work

8 400KV S/s Ashta 400kV Bus Reactor (CGL) - 27-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

9 400KV S/s Ashta 400KV MAIN BUS NO.1 & CVT SET NO. 1 - 30-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

10 400KV S/s Ashta 400KV MAIN BUS NO.2 & CVT SET NO. 2 - 31-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

02-Sep-17 9:00 -

14-Sep-17 - 17:00

15-Sep-17 9:00 -

25-Sep-17 - 17:00

13 400KV S/s Bhopal 315MVA XMER -2 - 27-Sep-17 9:00 17:00 8:00 For post monsoon maintenance work

14 400KV S/s Bhopal 315MVA XMER -2 - 28-Sep-17 9:00 17:00 8:00 For post monsoon maintenance work

15 400KV S/s Bhopal 315MVA XMER -2 - 29-Sep-17 9:00 17:00 8:00 For post monsoon maintenance work

16 400KV S/s Bhopal 315MVA XMER -1 - 04-Oct-17 9:00 17:00 8:00 For post monsoon maintenance work

17 400KV S/s Bhopal 315MVA XMER -1 - 05-Oct-17 9:00 17:00 8:00 For post monsoon maintenance work

18 400KV S/s Bhopal 315MVA XMER -1 - 06-Oct-17 9:00 17:00 8:00 For post monsoon maintenance work

19 400KV S/s Bhopal 80MVAR REACTOR -1 - 26-Oct-17 9:00 17:00 8:00 For post monsoon maintenance work

20 400KV S/s Bhopal 80MVAR REACTOR -2 - 27-Oct-17 9:00 17:00 8:00 For post monsoon maintenance work14-Sep-17 9:00 17:00 8+8=32:00 For post monsoon maintenance work15-Sep-17

19-Sep-17 9:00 17:00 8+8=32:00 For post monsoon maintenance work20-Sep-17

04-Sep-17 9:00 17:00 8+8=32:00 For post monsoon maintenance work05-Sep-17

05-Sep-17 8:00 17:00 9:00 For post monsoon maintenance work

06-Sep-17 8:00 17:00 9:00 For post monsoon maintenance work

07-Sep-17 8:00 17:00 9:00 For post monsoon maintenance work

08-Sep-17 8:00 17:00 9:00 For post monsoon maintenance work

11-Sep-17 8:00 -

14-Sep-17 - 17:00

27 400KV S/s Bina 50 MVAR REACTOR -1 - 04-Oct-17 8:00 17:00 9:00 For post monsoon maintenance work

28 400KV S/s Bina 50 MVAR REACTOR -2 - 05-Oct-17 8:00 17:00 9:00 For post monsoon maintenance work

29 400KV S/s Bina 50 MVAR BUS REACTOR - 06-Oct-17 8:00 17:00 9:00 For post monsoon maintenance work

24-Oct-17 8:00 17:00 9:00 For post monsoon maintenance work

25-Oct-17 8:00 17:00 9:00 For post monsoon maintenance work

400KV S/s Ashta

315 MVA X-MER-III

315 MVA X-MER-I

400KV S/s Bina

400KV S/s Bina

-

-

-

I

400KV S/s Bina 315 MVA X-MER-II

30 400 KV BHOPAL-1

80:00 For routine testing and maintenance of equipments

400KV S/s Bina

For CB replacement and CT replacement work

For attending oil leakage from turret of HV and LV

bushing, inspection window

315MVA BHEL -

315MVA TELK -

125MVAR REACTER -

400KV S/s Bhopal

400KV S/s Bhopal

400KV S/s Katni

400KV S/s Katni

400KV S/s Katni

400kV Itarsi-1 Main CB 296:00

315MVA XMER -3 248:00

-

-

II400kV Satpura - Ashta CKT -2

315MVA X-MER - II (CGL) -

400kV Satpura - Ashta CKT -1 I

4

400KV MAIN BUS 1 & 2

Proposed shutdown program of Transmission Elements for the duration 01-09-17 to 31-10-17

PeriodS.N

oName of Sub Station Name of Equipment / Feeder / Line

Circuit

No.Date Duration Proposed Maintenance Work

315MVA X-MER - I (CGL) -

-400KV S/s Ashta

400KV S/s Ashta

400KV S/s Ashta

400KV S/s Ashta

23

24

25

26

A. 400KV Transformers/ Reactors / Bays / Feeders

1

5

6

7

11

12

21

22

Agenda of 59th OCCM of MP 34

Page 37: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

From To

PeriodS.N

oName of Sub Station Name of Equipment / Feeder / Line

Circuit

No.Date Duration Proposed Maintenance Work

26-Oct-17 8:00 17:00 9:00 For post monsoon maintenance work

27-Oct-17 8:00 17:00 9:00 For post monsoon maintenance work

32 400KV S/s Bina 400 KV BPSCL - 30-Oct-17 8:00 17:00 9:00 For post monsoon maintenance work

04-Sep-17 10:00 -

05-Sep-17 - 17:00

07-Sep-17 10:00 -

08-Sep-17 - 17:00

11-Sep-17 10:00 -

14-Sep-17 - 17:00

15-Sep-17 10:00 -

16-Sep-17 - 17:00

18-Sep-17 10:00 -

19-Sep-17 - 17:0021-Sep-17 9:00 17:00 8:0022-Sep-17 9:00 17:00 8:0026-Sep-17 9:00 17:00 8:0027-Sep-17 9:00 17:00 8:00

39 400KV S/s Pithampur 50 MVAR Reactor No. I - 04-Sep-17 9:00 17:00 8:00 For post monsoon maitnenacne work 40 400KV S/s Pithampur 50 MVAR Reactor No. II - 05-Sep-17 9:00 17:00 8:00 For post monsoon maitnenacne work

06-Sep-17 7:00 -

07-Sep-17 - 17:00

11-Sep-17 7:00 -

12-Sep-17 - 17:00

43 400KV S/s Pithampur 400KV SSTPH-I I 13-Sep-17 9:00 17:00 8:00 For post monsoon maitnenacne work 44 400KV S/s Pithampur 400KV SSTPH-II II 14-Sep-17 9:00 17:00 8:00 For post monsoon maitnenacne work 45 400KV S/s Pithampur 400KV PGCIL-I I 15-Sep-17 9:00 17:00 8:00 For post monsoon maitnenacne work 46 400KV S/s Pithampur 400KV PGCIL-II II 16-Sep-17 9:00 17:00 8:00 For post monsoon maitnenacne work

03-Oct-17 10:00 -

06-Oct-17 - 18:00

09-Oct-17 10:00 -

10-Oct-17 - 17:00

12-Oct-17 10:00 -

13-Oct-17 - 17:00

50 400KV S/s Indore 400 KV ISP-II II 23-Oct-1710.00

to18.00 hrsPost mansoon Maintenance work

25-Oct-17 10:00 -

26-Oct-17 - 17:00

03-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

04-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

53 400kV S/s Chhegaon 400kV, 50MVAR Reactor - 12-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

54 400kV S/s Julwaniya 400kV, 50MVAR Reactor - 16-Sep-17 9:00 18:00 9:00 For post monsoon maintenance work

55 400kV S/s Julwaniya 400kV Bus Tie - 20-Sep-17 9:00 18:00 9:00 For post monsoon maintenance work

56 400kV S/s Julwaniya 400kV Julwaniya-SSTPS - 22-Sep-17 9:00 18:00 9:00 For post monsoon maintenance work

57 400kV S/s Julwaniya 400kV Julwaniya-Chhegaon - 03-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

58 400kV S/s Julwaniya 400kV TBC - 05-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

09-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

10-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

12-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

13-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

04-Sep-17 9:00 -

15-Sep-17 - 17:00

06-Sep-17 9:00 -

07-Sep-17 - 17:00

14-Sep-17 8:00 -

15-Sep-17 - 17:00

18-Sep-17 9:00 -

29-Sep-17 - 17:00

20-Sep-17 9:00 -

21-Sep-17 - 17:00

25-Sep-17 8:00 -

26-Sep-17 - 17:00

28-Sep-17 8:00 -

29-Sep-17 - 17:00

04-Oct-17 8:00 -

06-Oct-17 - 17:00

10-Oct-17 8:00 -

11-Oct-17 - 17:00

70 400KV S/s Nagda400 KV S/S NAGDA 400KV NAGDA RAJGARH-

I LINEI 13-Oct-17 8:00 17:00 9:00 For post monsoon maintenance work

71 400KV S/s Nagda400 KV S/S NAGDA TIE BAY OF 400KV

NAGDA RAJGARH-I LINE & 400KV ICT-IV TIE 24-Oct-17 8:00 17:00 9:00 For post monsoon maintenance work

72 400KV S/s Nagda 400KV S/S 400KV 50MVAR BUS REACTOR -I - 26-Oct-17 8:00 17:00 9:00 For post monsoon maintenance work

73 400KV S/s Nagda400 KV S/S NAGDA 400KV NAGDA ISP LINE

WITH REACTOR- 30-Oct-17 8:00 17:00 9:00 For post monsoon maintenance work with reactor

400KV S/s Bina

400KV S/s Indore

400KV S/s Indore

400KV S/s Indore

400KV S/s Indore

For replacement of Main CB

For isolator and panel replacement work

For post monsoon maintenance work

400/220kV, 315MVA X-Mer (CGL)

31:00

31:00

400kV S/s Chhegaon

80:00

31:00

CT Replacement Work

400 KV Nagda 31:00. For replacement of 400KV CT

400 KV ISP I

For replacement of Main CB

-

-

-

400 KV S/S NAGDA MAIN CB OF ICT-III

400 KV S/S NAGDA 400KV NAGDA ISP LINE

272

32:00

400kV S/s Julwaniya

400kV S/s Julwaniya

400/220kV, 315MVA X-Mer-I(CGL)

400/220kV, 315MVA X-Mer-II(EMCO)

For isolator and CT replacement work

For bus routine maintenance work

For post monsoon maintenance work

For post monsoon maitnenance work and 220KLKV

Side panel replacement work

For post monsoon maintenance work

400KV S/s Nagda

400KV S/s Nagda

400KV S/s Nagda

400KV S/s Nagda

400KV S/s Nagda

57:00

33:00

400KV S/s Nagda

400KV S/s Nagda

400KV S/s Nagda

400KV S/s Nagda

33:00

272

32:00

33:00

33:00

400 KV S/S NAGDA 315MVA ICT-II

400/220/33400 KV S/S NAGDA 315MVA ICT-IV

400/220/33

-

II

-

-

-

-

400 KV S/S NAGDA 315MVA ICT-III

400/220/33

400 KV S/S NAGDA MAIN CB OF ICT-I

400 KV S/S NAGDA 400KV NAGDA RAJGARH-

II LINE

400KV MAIN BUS -I

400 KV S/S NAGDA 315MVA ICT-I

400/220/33

31:00. For replacement of 400KV CT

79:00 For CB replacement load will be Transfer on TBC

315 MVA 400 / 220 KV Xmer-IV31:00. X-mer will be OFF due to replacement of 400KV CB

315 MVA 400 / 220 KV Xmer-III 31:00. Replacement of 400KV CT

400KV S/s Indore

For post monsoon maitnenacne work

For post monsoon maitnenacne work

II

47

48

31 400 KV BHOPAL-2

-

I

-

-

-400KV S/s Indore

400KV S/s Indore

37

38

400KV S/s Indore

400KV S/s Indore

400KV S/s Pithampur

400KV S/s Pithampur

400KV S/s Indore 400 KV BUS COUPLER

400 KV BUS TRANSFER

315 MVA 400 / 220 kV Xmer-III

3x105 MVA 400 / 220 kV Xmer-II

315 MVA 400/220KV Xmer-IV

315 MVA 400/220KV Xmer-I

315 MVA ICT No.I

NIFS commissioning work &

Maintenance workNIFS commissioning work &

Maintenance work

CT Replacement Work

For post monsoon maitnenacne work

For post monsoon maitnenacne work

-

-

-

31:00.

315 MVA ICT No.II 31:00.

-

-

-

-

33

34

35

36

41

42

52

68

69

49

51

59

60

61

62

63

64

65

66

67

-

-

-

Agenda of 59th OCCM of MP 35

Page 38: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

From To

PeriodS.N

oName of Sub Station Name of Equipment / Feeder / Line

Circuit

No.Date Duration Proposed Maintenance Work

18-Sep-17 10:00 17:00 7:0019-Sep-17 10:00 17:00 7:0009-Oct-17 10:00 17:00 7:0010-Oct-17 10:00 17:00 7:00

3 220KV S/s Pandhurna 220 KV Kalmeshwar - 04-Sep-17 9:00 -

4 220KV S/s Pandhurna 220 KV Kalmeshwar - 05-Sep-17 - 18:00

5 400KV S/s Bina 220KV PGCIL - 01-Sep-17 8:00 17:00 9:00 For post monsoon maintenance work

6 400KV S/s Bina 220KV SHIVPURI - 04-Sep-17 8:00 17:00 9:00 For post monsoon maintenance work

7 400KV S/s Bina 220KV BINA I/C-I I 19-Sep-17 8:00 17:00 9:00 For post monsoon maintenance work

8 400KV S/s Bina 220KV BINA I/C-II II 20-Sep-17 8:00 17:00 9:00 For post monsoon maintenance work

9 400KV S/s Bina 220KV BUS TIE - 22-Sep-17 8:00 17:00 9:00 For post monsoon maintenance work

10 400KV S/s Bina 220KV SAGAR -I I 23-Sep-17 8:00 17:00 9:00 For post monsoon maintenance work

11 400KV S/s Bina 220KV SAGAR -II II 25-Sep-17 8:00 17:00 9:00 For post monsoon maintenance work

12 400KV S/s Bina 220KV BORL-I I 26-Sep-17 8:00 17:00 9:00 For post monsoon maintenance work

13 400KV S/s Bina 220KV BORL-II II 27-Sep-17 8:00 17:00 9:00 For post monsoon maintenance work

14 400KV S/s Bina 220 KV GUNA - 09-Oct-17 8:00 17:00 9:00 For post monsoon maintenance work

15 400KV S/s Bina 220 KV ASHOKNAGAR - 10-Oct-17 8:00 17:00 9:00 For post monsoon maintenance work

16 400KV S/s Bina 220 KV GWALIOR - 11-Oct-17 8:00 17:00 9:00 For post monsoon maintenance work

17 400KV S/s Bina 220 KV DATIYA - 12-Oct-17 8:00 17:00 9:00 For post monsoon maintenance work18 220KV S/s Mahalgaon 220KV PGCIL-I I 14-Sep-17 9:00 17:00 8:00 For post monsoon maintenance work19 220KV S/s Mahalgaon 220KV PGCIL-II II 15-Sep-17 9:00 17:00 8:00 For post monsoon maintenance work20 220KV S/s Mahalgaon 220KV Bina - 20-Sep-17 9:00 17:00 8:00 For post monsoon maintenance work21 220KV S/s Mahalgaon 220KV Datia - 22-Sep-17 9:00 17:00 8:00 For post monsoon maintenance work22 220KV S/s Gwalior-II 220KV PGCIL-I I 12-Sep-17 9:00 17:00 8:00 For post monsoon maintenance work

23 220KV S/s Malanpur 220KV PGCIL-I I 11-Sep-17 9:00 17:00 8:00 For post monsoon maintenance work

24 220KV S/s Malanpur 220KV PGCIL-II II 12-Sep-17 9:00 17:00 8:00 For post monsoon maintenance work

25 220KV S/s Malanpur 160MVA X-mer-I At 220KV s/s Malanpur - 13-Sep-17 9:00 17:00 8:00 For post monsoon maintenance work

26 220KV S/s Malanpur 160MVA X-mer-I I At 220KV s/s Malanpur - 14-Sep-17 9:00 17:00 8:00 For post monsoon maintenance work

27 220KV S/s Malanpur 220KV Auraiya - 19-Sep-17 9:00 17:00 8:00 For post monsoon maintenance work

28 220KV S/s Malanpur 220KV Mehgaon - 15-Sep-17 9:00 17:00 8:00 For post monsoon maintenance work

29 220KV S/s Mehgaon 220KV Auraiya - 20-Sep-17 9:00 17:00 8:00 For post monsoon maintenance work

30 220KV S/s Mehgaon 160MVA X-mer-I At 220KV s/s Mehgaon - 21-Sep-17 9:00 17:00 8:00 For post monsoon maintenance work

31 220KV S/s Mehgaon 160MVA X-mer-II At 220KV s/s Mehgaon - 22-Sep-17 9:00 17:00 8:00 For post monsoon maintenance work

32 220KV S/s Datia 220KV Bina - 25-Sep-17 9:00 17:00 8:00 For post monsoon maintenance work

33 220KV S/s Datia 220KV Gwalior - 27-Sep-17 9:00 17:00 8:00 For post monsoon maintenance work34 220KV S/s Malanpur 220KV PGCIL-I I 04-Oct-17 9:00 17:00 8:00 For post monsoon maintenance work35 220KV S/s Malanpur 220KV PGCIL-II II 05-Oct-17 9:00 17:00 8:00 For post monsoon maintenance work

36 220KV S/s Malanpur 160MVA X-mer-I At 220KV s/s Malanpur - 10-Oct-17 9:00 17:00 8:00 For post monsoon maintenance work

37 220KV S/s Malanpur 160MVA X-mer-I I At 220KV s/s Malanpur - 11-Oct-17 9:00 17:00 8:00 For post monsoon maintenance work

38 220KV S/s Malanpur 220KV Auraiya - 13-Oct-17 9:00 17:00 8:00 For post monsoon maintenance work

39 220KV S/s Malanpur 220KV Mehgaon - 17-Oct-17 9:00 17:00 8:00 For post monsoon maintenance work

40 220KV S/s MEhgaon 220KV Auraiya - 18-Oct-17 9:00 17:00 8:00 For post monsoon maintenance work

41 220KV S/s MEhgaon 160MVA X-mer-I At 220KV s/s Mehgaon - 20-Oct-17 9:00 17:00 8:00 For post monsoon maintenance work

42 220KV S/s MEhgaon 160MVA X-mer-II At 220KV s/s Mehgaon - 24-Oct-17 9:00 17:00 8:00 For post monsoon maintenance work

43 220KV S/s Datia 220KV Bina - 25-Oct-17 9:00 17:00 8:00 For post monsoon maintenance work

44 220KV S/s Datia 220KV Gwalior - 26-Oct-17 9:00 17:00 8:00 For post monsoon maintenance work45 400KV S/s Pithampur 220 KV BADNAGAR - 18-Sep-17 9:00 17:00 8:00 For post monsoon maitnenacne work 46 400KV S/s Pithampur 220 KV PITHAMPUR SECTOR-I I 19-Sep-17 9:00 17:00 8:00 For post monsoon maitnenacne work 47 400KV S/s Pithampur 220 KV INTER CONNECTOR-I I 20-Sep-17 9:00 17:00 8:00 For post monsoon maitnenacne work

48 400KV S/s Pithampur 220 KV INTER CONNECTOR-II II 21-Sep-17 9:00 17:00 8:00 For post monsoon maitnenacne work

49 220kV S/s Nepanagar 220/132kV, 3x40MVA X-Mer - 05-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

50 400kV S/s Chhegaon 220/132kV, 160MVA X-Mer-I - 06-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

51 400kV S/s Chhegaon 220kV Khandwa-I (PGCIL) I 07-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

52 400kV S/s Chhegaon 220/132kV, 160MVA X-Mer-II - 09-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

53 220kV S/s Nepanagar 220/132kV, 160MVA X-Mer - 10-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

54 400kV S/s Chhegaon 220/132kV, 160MVA X-Mer-III - 11-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work55 220KV S/S TIKAMGARH 220 KV TIKAMGARH - PGCIL DAMOH - 11-Sep-17 9:00 18:00 9:00 For post monsoon maintenance work56 220KV S/S TIKAMGARH 220 KV TIKAMGARH - MPPTCL DAMOH - 13-Sep-17 9:00 18:00 9:00 For post monsoon maintenance work57 220KV S/S TIKAMGARH 160 MVA XMER - I (EMCO ) - 25-Sep-17 9:00 18:00 9:00 For post monsoon maintenance work58 220KV S/S TIKAMGARH 160 MVA XMER - II ( BBL) - 27-Sep-17 9:00 18:00 9:00 For post monsoon maintenance work59 220KV S/S CHHATARPUR 220 KV CHHATARPUR - SATNA - 08-Sep-17 9:00 18:00 9:00 For post monsoon maintenance work60 220KV S/S CHHATARPUR 160 MVA XMER - I (AREVA ) - 20-Sep-17 9:00 18:00 9:00 For post monsoon maintenance work61 220KV S/S CHHATARPUR 160 MVA XMER - II ( IMP ) - 22-Sep-17 9:00 18:00 9:00 For post monsoon maintenance work62 220KV S/S Sagar 220 KV SAGAR- BINA - I I 25-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work63 220KV S/S Sagar 220 KV SAGAR- BINA - II II 26-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work64 220KV S/S Sagar 220 KV SAGAR- TRACTION - I I 27-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work65 220KV S/S Sagar 220 KV SAGAR- TRACTION - II II 31-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work66 220KV S/S Sagar 220 KV SAGAR- DAMOH PGCIL - 30-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work67 220KV S/S Sagar 220 KV SAGAR- DAMOH MPPTCL - 28-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

68 220KV S/S Sagar 220/132 kv 160 MVA BHEL Xmer - 09-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

69 220KV S/S Sagar 220/132 kv 160 MVA AREVA Xmer - 10-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

70 220KV S/S Sagar 220/132 kv 100 MVA AREVA Xmer - 07-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work71 220KV S/S Damoh 220 KV DAMOH-PGCIL I I 12-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work72 220KV S/S Damoh 220 KV DAMOH-PGCIL II II 13-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work73 220KV S/S Damoh 220 KV DAMOH-KATNI - 11-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work74 220KV S/S Damoh 220 KV DAMOH-TIKAMGARH - 07-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work75 220KV S/S Damoh 220 KV DAMOH- TRACTION I I 09-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work76 220KV S/S Damoh 220 KV DAMOH-TRACTION II II 10-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

77 220KV S/S Damoh 160 MVA BHEL Xmer - 03-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

78 220KV S/S Damoh 160 MVA AREVA Xmer - 04-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

79 220KV S/S Damoh 125 MVA TELK Xmer - 05-Oct-17 9:00 18:00 9:00 For post monsoon maintenance work

33:00Shutdown required to connect jumper between New

Add.160 MVA X-mer isolator and 220 KV main bus .

220KV S/s Sukha

220KV ICT-I -

220 KV ICT-II -

1

2

B. 220KV Transformers/ Feeders / Bays

For Bay maintenance work

For Bay maintenance work

Agenda of 59th OCCM of MP 36

Page 39: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

A. ThermalStn. Name UNIT No. Capacity

MW June-17 July-173 120 0.00 0.004 120 0.00 0.00

PH II 240 0.00 0.005 210 103.73 152.19

PH III 210 103.73 152.19TOT 210 103.73 152.19

6 200 0.00 0.007 210 0.00 0.00

PH II 410 0.00 0.008 210 0.00 0.009 210 0.00 0.00

PH III 420 0.00 0.0010 250 146.93 170.1411 250 130.98 104.63

PH IV 500 277.91 274.76TOT 1330 277.91 274.76

1 210 89.73 106.672 210 56.42 44.29

PH I 420 146.15 150.963 210 76.00 50.364 210 71.83 85.89

PH II 420 147.83 136.255 500 268.01 0.00

PH III 500 268.01 0.00TOT 1340 561.99 287.21

1 600 57.81 184.622 600 0.00 0.00

PH1 1200 57.81 184.62

4080 1001.44 898.78

B. HydelCapacity

MW June-17 July-17115.0 12.82 18.43172.0 0.15 0.2899.0 1.98 4.99

386.0 14.94 23.69193.0 7.47 11.85160.0 6.35 9.35107.0 4.23 6.2390.0 18.35 13.24

315.0 51.03 83.6020.0 1.22 7.6060.0 20.19 9.4430.0 5.83 2.7645.0 0.00 0.0022.5 0.00 0.0020.0 4.74 2.1360.0 0.01 0.02

1186.0 122.65 151.83915.0 120.53 146.56917.5 113.07 136.87

CapacityMW June-17 July-17

Indira Sagar Hydel Project 1000 144.611 72.130Omkareshwar Hydel Project 520 77.456 41.308

Unitwise / Stationwise Genration in MUAnn 4.1

AM

AR

KA

NTA

KSA

TPU

RA

SAN

JAY

GA

ND

HI

MPPGCL THERMAL

SSTP

S

TONSBIRSINGHPUR

Station NameGANDHISAGARR.P.SAGARJ.SAGARCHAMBAL

C. NHDC (Ex-Bus)Station Name

B.SGR(DEOLONDH)B.SGR(SILPARA)RAJGHATM.P.RAJGHATB.SGR(JINHA)MADIKHEDA

Note : 1. Amarkantak Thermal Power Station-II Unit # 4 De-commissioned wef 01-May-2014. 2. Amarkantak Thermal Power Station-II Unit # 3 De-commissioned wef 13-Jan-2015.

TOTAL HYDELMPPGCL HydelMPSEB HYDEL Share

M.P.CHAMBALPENCHM.P.PENCHBARGI

Agenda of 59th OCCM of MP 37

Page 40: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

S No. Source Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Total30 31 30 31 0 0 0 0 0 0 0 0 122

A.1 Thermal 1034.52 1374.20 922.84 823.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4155.282 Hydel 138.81 65.34 111.66 135.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 450.943 Total 1173.34 1439.54 1034.51 958.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4606.21

B.1 Indira Sagar 129.51 156.20 150.63 68.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 505.052 Omkareshwar 65.48 77.85 77.46 41.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 262.093 MPPMCL Schedule from Central Sector of WR 1833.79 1792.95 1558.13 1599.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6783.934 MPPMCL Schedule from Central Sector ER 19.03 18.18 12.01 9.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 59.065 Total MPPMCL Schedule from Central Sector (WR+ER) 1852.82 1811.13 1570.14 1608.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6842.986 Deviation Energy of (WR+ER) -31.86 -26.91 -38.23 -6.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -103.997 Schedule From DVC ER 156.34 208.88 112.45 128.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 605.888 Schedule From Sugen 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.009 LANCO Amk 196.56 178.13 122.84 113.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 610.7710 SASAN 1014.14 899.33 838.39 965.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3717.1911 ESSAR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0012 J P Nigri 327.32 332.81 304.49 146.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1110.7613 MB Power 80.31 140.94 117.90 131.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 470.3514 JHABUA Power 9.94 23.88 6.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.6715 Other Open Access Schedule other than MPPMCL Incl. Seci -129.92 -138.00 -129.55 -81.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -478.5016 Himachal Pradesh HYDAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0017 BARH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0018 Schedule from Sardar Sarovar 67.97 59.81 151.66 12.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 292.1319 SCH to Railway from RGPPL_ebid 154.54 149.12 157.11 163.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 624.3020 Schedule from SEZ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0021 Schedule from Rihand+Matatila 6.47 9.44 10.06 12.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 37.97

22 Medium Term Power Purchase from CSPDCL through PTC agaisnt PPA CSPDCCL dtd. 18.09.2012 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

23 Medium Term Power Purchase from Balco through PTC agaisnt PPA Balco dtd. 18.09.2012 Including Short term purchase against MTOA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

24 Additional Power Purchase 0.22 7.22 7.97 10.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.6925 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0026 Banking of Energy -168.43 -7.60 -23.96 -235.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -435.9427 Sale of Power -321.90 -670.25 -592.09 -341.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -1926.0028 Total MP Schedule (Including Railway) 3246.37 3004.82 2654.27 2632.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11538.2529 Total MP Drawal (Including Railway) 3214.52 2977.92 2616.04 2625.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11434.2630 Wheeled Energy of Tawa HEG 0.00 0.00 0.00 0.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0431 Wheeled Energy of Wind Farm 8.61 7.99 6.45 10.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33.2032 Wheeled Energy of Solar Plant 27.57 29.46 24.81 31.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 112.9633 Wheeled Energy of Bio-Mass 0.00 0.00 0.00 1.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.8234 Wheeled Energy of Ascent Hydro 1.35 1.32 1.12 1.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.8735 Export to MSEB (Nepa-Dharni) 0.00 0.00 0.00 -2.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -2.8636 Deviation Energy of MPPGCL Thermal -11.71 -19.44 -25.21 -17.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -73.9037 Energy Purchased by MP from Wind Farm 505.01 525.74 530.63 682.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2243.7438 Energy Purchased by MP from Solar Plant 100.86 94.32 101.32 69.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 366.04

39 Firm / Infirm Energy of HEG Mandideep+Hindalco+HEG Tawa +Trimula Ind. purchase by MP +Wheeled enrgy of CPP / IPP 171.01 173.70 169.69 121.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 636.26

40Purchased from ASN Biomass Katni + RDM Care Ind. Biogas Pariyat + Pragya Energy Pvt. Ltd. Biogas Richhai+ Arya Energy Kotma + Orient Green Power Limited, Gadarawara Bio-Mass+Shaliwahna (CHH+Umariya) + JBP MSW

5.16 2.32 1.21 4.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.33

41 Deviation Energy of ISP 5.44 4.77 -6.02 3.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.6142 Schedule Energy of BLA Power against LTOA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0043 Schedule Energy of JP BINA Power against LTOA 55.54 73.35 45.22 19.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 193.4144 Import from bargi Left Bank Canal Power House + ISP NVDA 0.03 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0445 Chambal Complex Excess / less Overshare by MP -0.40 -1.77 3.92 4.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.6146 Rajghat Hydel Power Station Excess / Less Overshare by MP -0.03 -0.12 -0.03 -0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -0.2047 State Supply (Ex-Power st. Bus) 5451.30 5543.18 4731.74 4624.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20350.5748 AVERAGE DAILY (Ex-Bus) 181.71 178.81 157.72 149.17 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 166.8149 MINIMUM DAILY (MP Periphery) 162.70 149.61 138.02 1301.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 138.0250 MAXIMUM DAILY (MP Periphery) 182.74 179.81 170.82 160.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 182.7451 State Supply (Ex-Power st. Bus):- YEAR : 2016-17 5405.05 5099.95 4767.84 4213.94 4110.38 4736.12 5188.15 6416.59 6773.82 6418.79 5633.70 5519.39 19486.7852 Year ((17-18)-(16-17))*100/Year (16-17) 0.86 8.69 -0.76 9.74 -100.00 -100.00 -100.00 -100.00 -100.00 -100.00 -100.00 -100.00 4.4353 Unshedule L/S : Year-2017-18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0054 Frequency Correction 2.97 3.19 2.06 2.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.4855 Restricted Requirement : Year-2017-18 5454.27 5546.37 4733.79 4626.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20361.0556 Shedule L/S : Year-2017-18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0057 Un-Restricted Requirement : Year-2017-18 5454.27 5546.37 4733.79 4626.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20361.05

ENERGY BALANCE SHEETYear : 2017 - 18

All figures in Million Unit

M.P. Availability

Exchange with other States / Systems

Agenda of 59th OCCM of MP 38

Page 41: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

S.NO. Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Yr 16-17C.1 DEMAND MET 8328 8181 7075 6977 0 0 0 0 0 0 0 0 83282 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 03 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0D.1 DEMAND MET 8106 7936 7571 7372 0 0 0 0 0 0 0 0 81062 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 03 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0F. REGISTERED MAXIMUM 8349 8181 7659 7372 0 0 0 0 0 0 0 0 8349G. COMPUTED MAXIMUM DEMAND 8364 8181 7689 7412 0 0 0 0 0 0 0 0 8364H. UNRESTRICTED MAXIMUM DEMAND 8364 8181 7689 7412 0 0 0 0 0 0 0 0 8364I.1. Div. Head Quarters 23:49 23:41 23:42 23:40 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 23:432. District Head Quarters 23:51 23:45 23:43 23:44 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 23:463. Tahsil Head Quarters 23:44 23:38 23:33 23:37 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 23:384. Rural -Mixed 23:07 22:57 22:41 22:57 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 22:565. Rural -DLF 23:23 23:15 23:00 23:10 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 23:126. Rural -Irrigation 9:46 9:41 9:31 9:47 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 9:41J LOAD FACTOR % 90.68 91.07 85.81 84.31 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 87.97

S.N PARTICULARS Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Yr 16-17A. INTGRATED FREQUENCY

1 MAXIMUM 50.14 50.18 50.15 50.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.182 MINIMUM 49.83 49.78 49.85 49.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.78

B. INSTANTANEOUS FREQUENCY1 MAXIMUM 50.26 50.26 50.26 50.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.262 MINIMUM 49.66 49.64 49.72 49.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.64

C. AVG FREQUENCY 49.99 49.99 50.00 49.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.99D. % TIME WHEN FREQUENCY WAS

1 ABOVE 51.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.002 50.05 TO 51.5 Hz 16.45 19.46 18.69 17.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.983 49.9 TO 50.05 Hz 74.49 71.45 75.50 76.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 74.394 49.7 TO 49.9 Hz 9.06 9.09 5.81 6.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.635 49.5 TO 49.7 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.006 49.2 TO 49.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.007 48.8 TO 49.2 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.008 48.5 TO 48.8 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.009 BELOW 48.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

ENERGY BALANCE SHEET : Demand & Sypply HoursYear : 2017 - 18

MORNING PEAK (MAX)

EVENING PEAK (MAX)

Average Power Supply per day to

FREQUENCY ANALYSIS YEAR 2017-18

Agenda of 59th OCCM of MP 39

Page 42: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSP

Total IPPs

Injection

Total CPPs

Injection

Total CSS DVC ER Sugen Lanco Sasan Essar JP

NigriMB

Power

Jhabua

PowerSSP

SCH to

Railway

SEZ Banking Sale Pur

Total MTO

Aat

MP

STOA

Rihand+Matatila-Rajghat

Total SCHUN

SCH TOTAL

1:00 50.01 1445 1315 172 179 115 307 752 2840 2233 217 0 159 1127 8 408 202 17 251 215 0 -42 -778 0 0 -191 14 3841 6681 3780 -62 -6 6614 0 0 0 6616 6616

2:00 50.01 1449 1319 129 106 65 306 787 2712 2193 191 0 152 1134 8 407 197 15 258 215 0 -42 -760 0 0 -210 14 3771 6483 3734 -37 -5 6440 0 0 0 6442 6442

3:00 50.00 1430 1301 116 89 55 306 780 2646 2197 166 0 152 1144 5 402 173 12 160 215 0 -2 -776 0 0 -209 14 3652 6299 3728 75 -5 6369 0 0 0 6371 6371

4:00 50.01 1415 1288 111 95 54 292 761 2599 2156 160 0 152 1139 5 400 166 12 98 215 0 -10 -580 0 0 -234 14 3693 6292 3707 14 -5 6301 0 0 0 6304 6304

5:00 49.98 1376 1252 89 77 42 288 765 2512 2083 83 0 155 1136 5 389 105 10 78 215 0 -18 -201 7 0 -233 14 3826 6338 3748 -78 -5 6255 0 0 0 6259 6259

6:00 50.00 1331 1211 111 108 60 288 734 2511 2032 65 0 157 1126 5 388 72 6 60 215 0 -20 -129 16 0 -233 14 3774 6285 3724 -50 -5 6230 0 0 0 6233 6233

7:00 50.02 1320 1202 138 117 64 288 779 2587 1949 41 0 157 1095 5 374 80 6 153 215 0 -20 -163 16 0 -224 14 3700 6287 3669 -31 -5 6251 0 0 0 6252 6252

8:00 50.06 1285 1169 123 86 54 287 953 2673 1869 41 0 157 1111 5 388 80 0 157 215 0 -20 -141 16 0 -245 14 3647 6320 3495 -152 -5 6163 0 0 0 6164 6164

9:00 50.02 1298 1181 106 100 48 285 1076 2796 1771 52 0 157 1101 5 393 78 0 167 215 0 -20 -204 16 0 -266 14 3479 6275 3305 -174 -5 6095 0 0 0 6096 6096

10:00 50.01 1349 1228 139 136 66 287 1107 2963 1934 100 0 157 1106 5 394 83 4 180 215 0 -20 -725 7 0 -289 14 3163 6126 3136 -28 -5 6093 0 0 0 6094 6094

11:00 50.00 1385 1260 128 161 91 297 1096 3033 2108 150 0 157 1138 5 397 139 8 140 210 0 -27 -1063 0 0 -306 14 3069 6102 3012 -57 -5 6040 0 0 0 6041 6041

12:00 49.98 1416 1288 155 218 112 298 1041 3111 2123 163 0 157 1138 5 404 143 12 76 215 0 -27 -1215 0 0 -316 14 2893 6004 2919 26 -5 6025 0 0 0 6030 6030

13:00 50.00 1409 1282 157 234 112 298 974 3057 2086 172 0 157 1108 6 411 145 12 69 209 0 -34 -1058 0 0 -312 14 2986 6042 3104 118 -5 6156 0 0 0 6160 6160

14:00 50.00 1396 1271 154 261 131 302 930 3050 2137 180 0 148 1105 6 412 163 12 68 210 0 -34 -1033 0 0 -305 14 3081 6131 3116 35 -5 6161 0 0 0 6164 6164

15:00 49.98 1416 1288 145 271 141 305 893 3043 2173 194 0 148 1099 6 412 188 12 64 213 0 -74 -976 0 0 -296 14 3177 6219 3151 -25 -5 6189 0 0 0 6195 6195

16:00 50.01 1408 1281 144 255 139 303 862 2983 2176 204 0 148 1101 6 415 198 12 75 212 0 -68 -1036 0 0 -281 14 3175 6158 3092 -83 -5 6070 0 0 0 6072 6072

17:00 50.01 1339 1219 143 273 136 286 789 2847 2055 173 0 148 1093 3 415 166 9 144 212 0 -74 -1027 0 0 -259 14 3071 5918 3067 -4 -5 5909 0 0 0 5910 5910

18:00 50.01 1318 1199 171 246 134 289 704 2743 1681 50 0 157 1072 0 417 85 4 239 212 0 -34 -570 0 0 -233 14 3095 5838 3041 -54 -5 5779 0 0 0 5781 5781

19:00 50.00 1356 1234 296 346 172 291 642 2981 1951 175 0 157 1109 5 420 122 3 444 214 0 -20 -1388 0 0 -209 14 2997 5978 3027 30 -5 6003 0 0 0 6006 6006

20:00 49.96 1431 1303 335 443 222 316 626 3245 2229 270 0 258 1121 16 423 249 11 502 211 0 -11 -1800 0 0 -49 14 3443 6689 3548 104 -6 6787 0 0 0 6795 6795

21:00 49.98 1454 1323 318 436 233 322 594 3227 2256 243 0 218 1119 18 426 247 12 449 211 0 -43 -1596 0 0 -16 14 3557 6784 3574 17 -6 6795 0 0 0 6801 6801

22:00 50.01 1432 1303 240 306 152 320 585 2907 2232 231 0 171 1104 18 428 238 12 395 208 0 -42 -1185 0 0 -3 14 3820 6727 3856 36 -6 6757 0 0 0 6760 6760

23:00 50.01 1435 1306 226 284 143 319 644 2922 2256 223 0 166 1114 18 429 230 8 384 195 0 -40 -946 0 0 -7 14 4043 6965 3982 -61 -6 6899 0 0 0 6901 6901

24:00 50.00 1442 1312 194 231 130 297 698 2862 2250 206 0 166 1118 15 407 204 8 237 209 0 -53 -866 0 0 18 14 3931 6793 3896 -36 -5 6752 0 0 0 6755 6755

Avg. 50.00 1389 1264 168 211 111 299 815 2869 2089 156 0 163 1115 8 407 156 9 202 212 0 -33 -842 3 0 -204 14 3454 6322 3434 -20 -5 6297 0 0 0 6300 6300

00 TO 06 HRS.

50.00 1408 1281 121 109 65 298 763 2637 2149 147 0 154 1134 6 399 153 12 151 215 0 -22 -537 4 0 -218 14 3760 6396 3737 -23 -5 6368 0 0 0 6371 6371

06 TO 12 HRS.

50.02 1342 1221 131 136 72 290 1009 2860 1959 91 0 157 1115 5 392 100 5 145 214 0 -22 -585 9 0 -274 14 3325 6186 3256 -69 -5 6111 0 0 0 6113 6113

12 TO 18 HRS.

50.00 1381 1257 152 257 132 297 859 2954 2051 162 0 151 1096 4 414 157 10 110 211 0 -53 -950 0 0 -281 14 3097 6051 3095 -2 -5 6044 0 0 0 6047 6047

06TO 18 HRS.

50.01 1362 1239 142 197 102 294 934 2907 2005 127 0 154 1106 5 403 129 8 128 213 0 -38 -768 5 0 -278 14 3211 6118 3176 -36 -5 6078 0 0 0 6080 6080

18 TO 24 HRS.

49.99 1425 1297 268 341 176 311 631 3024 2196 225 0 189 1114 15 422 215 9 402 208 0 -35 -1297 0 0 -44 14 3632 6656 3647 15 -5 6666 0 0 0 6670 6670

REST. DEMAN

D

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- June 2017

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

TotAvl.

Act.Drl Deviation

Intra State STO

A

DEMAND MET

Load Shedding

Agenda of 59th OCCM of MP 40

Page 43: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSP

Total IPPs

Injection

Total CPPs

Injection

Total CSS DVC ER Sugen Lanco Sasan Essar JP

NigriMB

Power

Jhabua

PowerSSP

SCH to

Railway

SEZ Banking Sale Pur

Total MTO

Aat

MP

STOA

Rihand+Matatila-Rajghat

Total SCHUN

SCH TOTAL

1:00 49.99 1220 1110 185 68 39 185 858 2444 2226 254 0 150 1245 4 197 268 0 14 216 0 -464 -236 0 0 -107 16 3783 6228 3769 -14 -5 6208 0 0 0 6211 6211

2:00 50.01 1194 1087 167 42 22 183 892 2393 2214 214 0 138 1246 4 197 235 0 13 216 0 -463 -199 0 0 -108 16 3724 6117 3697 -27 -5 6085 0 0 0 6086 6086

3:00 50.00 1182 1075 165 26 15 181 895 2356 2158 185 0 138 1255 1 192 181 0 13 216 0 -409 -195 10 0 -106 16 3655 6012 3654 -1 -5 6006 0 0 0 6008 6008

4:00 50.01 1179 1073 173 16 15 178 876 2330 2165 141 0 138 1254 1 192 146 0 13 215 0 -411 -215 16 0 -104 16 3566 5896 3602 36 -3 5928 0 0 0 5930 5930

5:00 49.98 1188 1081 179 36 24 179 862 2362 2139 134 0 138 1270 0 194 131 0 13 216 0 -478 -229 19 0 -103 16 3462 5823 3526 64 -3 5884 0 0 0 5889 5889

6:00 49.97 1190 1083 188 76 35 181 844 2408 2042 107 0 138 1269 0 192 115 0 14 216 0 -291 -97 19 0 -104 16 3638 6045 3634 -4 -3 6038 0 0 0 6044 6044

7:00 50.01 1200 1092 216 125 56 184 856 2528 2113 173 0 138 1285 0 184 165 0 14 216 0 -296 -401 19 0 -107 16 3522 6050 3600 78 -3 6124 0 0 0 6127 6127

8:00 50.05 1211 1102 203 82 50 183 975 2595 2142 183 0 138 1301 0 184 177 0 14 216 0 -296 -423 19 0 -123 16 3550 6145 3465 -85 -4 6056 0 0 0 6056 6056

9:00 50.02 1195 1087 188 63 39 184 1068 2629 2102 160 0 138 1289 0 183 142 0 15 216 0 -302 -294 19 0 -133 16 3552 6181 3366 -186 -4 5991 0 0 0 5992 5992

10:00 50.03 1172 1066 172 63 41 185 1151 2679 2074 162 0 138 1273 0 184 146 0 15 216 0 -302 -462 19 0 -148 16 3331 6010 3199 -132 -4 5874 0 0 0 5875 5875

11:00 50.02 1182 1076 166 67 43 187 1193 2731 2037 156 0 138 1264 3 185 174 0 16 214 0 -326 -712 13 0 -165 16 3011 5741 2954 -56 -4 5682 0 0 0 5683 5683

12:00 50.00 1188 1081 177 51 37 187 1222 2754 2033 132 0 138 1256 3 186 148 0 15 215 0 -327 -775 13 0 -172 16 2880 5635 2736 -145 -4 5486 0 0 0 5489 5489

13:00 50.01 1183 1076 154 56 37 185 1235 2744 1961 114 0 138 1227 3 186 108 0 15 206 0 -326 -765 10 0 -166 16 2727 5471 2711 -16 -4 5451 0 0 0 5453 5453

14:00 49.99 1174 1068 155 56 35 184 1247 2746 1904 100 0 138 1203 3 186 99 0 15 210 0 -335 -653 10 0 -160 16 2737 5483 2693 -44 -4 5435 0 0 0 5438 5438

15:00 49.99 1177 1071 164 79 45 184 1207 2750 1900 104 0 138 1188 4 185 108 0 15 216 0 -383 -708 10 0 -153 16 2640 5390 2686 45 -3 5432 0 0 0 5436 5436

16:00 50.00 1170 1065 173 79 45 183 1144 2689 1950 118 0 138 1184 4 185 113 0 16 216 0 -376 -682 0 0 -142 16 2740 5428 2796 57 -3 5482 0 0 0 5483 5483

17:00 50.00 1151 1048 160 99 58 182 1040 2586 1937 96 0 138 1186 3 184 99 0 18 216 0 -374 -533 0 0 -128 16 2857 5443 2913 57 -3 5497 0 0 0 5499 5499

18:00 49.99 1154 1050 163 109 65 182 915 2484 1812 63 0 138 1190 2 190 68 0 21 216 0 -304 -247 0 0 -114 16 3050 5534 3127 77 -3 5608 0 0 0 5611 5611

19:00 49.99 1231 1121 270 171 91 190 802 2645 1972 174 0 138 1284 5 195 105 0 24 216 0 -25 -610 0 0 -105 16 3388 6033 3408 20 -3 6049 0 0 0 6054 6054

20:00 49.94 1322 1203 323 282 144 230 753 2935 2247 273 0 245 1247 22 195 244 0 24 216 0 -201 -715 0 0 -10 16 3803 6738 3778 -25 -4 6708 0 0 0 6720 6720

21:00 49.97 1324 1205 285 224 131 232 768 2845 2256 271 0 172 1260 22 195 280 0 24 212 0 -196 -683 0 0 -9 16 3818 6663 3787 -31 -6 6626 0 0 0 6633 6633

22:00 50.00 1292 1175 241 173 113 232 789 2723 2226 257 0 145 1251 22 197 272 0 22 211 0 -193 -582 0 0 -9 16 3834 6557 3815 -19 -6 6533 0 0 0 6536 6536

23:00 50.00 1279 1164 220 151 93 203 811 2642 2210 261 0 145 1243 21 198 264 0 20 207 0 -178 -411 0 0 -21 16 3973 6616 3914 -59 -6 6551 0 0 0 6554 6554

24:00 50.02 1257 1144 204 135 90 187 826 2587 2246 260 0 145 1244 11 191 270 0 18 204 0 -451 -243 0 0 -92 16 3819 6406 3764 -55 -5 6346 0 0 0 6346 6346

Avg. 50.00 1209 1100 195 97 57 190 968 2608 2086 171 0 145 1246 6 190 169 0 17 214 0 -321 -461 8 0 -108 16 3377 5985 3358 -19 -4 5962 0 0 0 5965 5965

00 TO 06 HRS.

50.00 1192 1085 176 44 25 181 871 2382 2157 173 0 140 1257 2 194 179 0 14 216 0 -419 -195 11 0 -105 16 3638 6020 3647 9 -4 6025 0 0 0 6028 6028

06 TO 12 HRS.

50.02 1191 1084 187 75 45 185 1077 2653 2083 161 0 138 1278 1 184 159 0 15 216 0 -308 -511 17 0 -141 16 3308 5960 3220 -88 -4 5869 0 0 0 5870 5870

12 TO 18 HRS.

50.00 1168 1063 161 80 47 183 1131 2666 1910 99 0 138 1196 3 186 99 0 17 213 0 -350 -598 5 0 -144 16 2792 5458 2821 29 -3 5484 0 0 0 5487 5487

06TO 18 HRS.

50.01 1180 1074 174 77 46 184 1104 2660 1997 130 0 138 1237 2 185 129 0 16 214 0 -329 -555 11 0 -143 16 3050 5709 3020 -29 -3 5676 0 0 0 5679 5679

18 TO 24 HRS.

49.99 1284 1169 257 189 110 212 792 2729 2193 249 0 165 1255 17 195 239 0 22 211 0 -208 -541 0 0 -41 16 3773 6502 3744 -28 -5 6469 0 0 0 6474 6474

REST. DEMAN

D

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- July 2017

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

TotAvl.

Act.Drl Deviation

Intra State STO

A

DEMAND MET

Load Shedding

Agenda of 59th OCCM of MP 41

Page 44: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandTotal Sch Total

Drawal

1:00 50.01 2204 2263 59 0 0 2264 2264 2155 2193 38 0 0 2194 2194 2163 1937 -226 0 0 1937 1937 98 220

2:00 50.01 2166 2196 30 0 0 2197 2197 2103 2133 31 0 0 2134 2134 2095 1888 -207 0 0 1889 1889 98 223

3:00 50.00 2094 2156 62 0 0 2157 2157 2040 2087 47 0 0 2088 2088 2052 1903 -149 0 0 1904 1904 98 222

4:00 50.01 2071 2145 74 0 0 2146 2146 2022 2056 34 0 0 2056 2056 2044 1885 -160 0 0 1885 1885 95 216

5:00 49.98 2042 2111 69 0 0 2113 2113 1990 2039 49 0 0 2041 2041 2021 1889 -133 0 0 1890 1890 95 216

6:00 50.00 1982 1953 -29 0 0 1953 1953 1996 2070 74 0 0 2071 2071 2127 1986 -140 0 0 1987 1987 95 221

7:00 50.02 1886 1871 -15 0 0 1871 1871 1970 2034 64 0 0 2035 2035 2226 2112 -115 0 0 2112 2112 95 234

8:00 50.06 1875 1807 -68 0 0 1807 1807 2029 2049 21 0 0 2049 2049 2285 2081 -205 0 0 2081 2081 95 226

9:00 50.02 1819 1782 -37 0 0 1783 1783 1994 1984 -10 0 0 1985 1985 2312 2102 -210 0 0 2102 2102 95 226

10:00 50.01 1780 1804 24 0 0 1805 1805 1918 1985 67 0 0 1986 1986 2231 2070 -161 0 0 2070 2070 94 233

11:00 50.00 1824 1865 41 0 0 1866 1866 1922 1979 57 0 0 1980 1980 2211 1985 -226 0 0 1985 1985 94 210

12:00 49.98 1833 1875 42 0 0 1877 1877 1897 1940 43 0 0 1942 1942 2193 1990 -203 0 0 1991 1991 94 220

13:00 50.00 1857 1933 76 0 0 1934 1934 1890 1980 90 0 0 1981 1981 2208 2033 -175 0 0 2035 2035 94 209

14:00 50.00 1851 1883 32 0 0 1884 1884 1922 1985 64 0 0 1987 1987 2261 2084 -177 0 0 2086 2086 94 208

15:00 49.98 1840 1869 29 0 0 1871 1871 1923 1987 64 0 0 1989 1989 2283 2116 -166 0 0 2118 2118 94 217

16:00 50.01 1838 1812 -26 0 0 1812 1812 1951 1973 22 0 0 1974 1974 2293 2070 -223 0 0 2071 2071 94 215

17:00 50.01 1760 1724 -36 0 0 1724 1724 1884 1941 57 0 0 1941 1941 2210 2024 -186 0 0 2025 2025 94 220

18:00 50.01 1702 1668 -34 0 0 1669 1669 1875 1936 61 0 0 1937 1937 2148 1954 -194 0 0 1955 1955 94 221

19:00 50.00 1758 1788 30 0 0 1789 1789 1856 1961 105 0 0 1962 1962 2131 2023 -107 0 0 2024 2024 93 231

20:00 49.96 2112 2187 75 0 0 2190 2190 2122 2277 155 0 0 2280 2280 2275 2107 -168 0 0 2110 2110 93 216

21:00 49.98 2211 2246 35 0 0 2248 2248 2211 2324 113 0 0 2326 2326 2215 2012 -203 0 0 2014 2014 94 212

22:00 50.01 2196 2242 46 0 0 2242 2242 2172 2300 129 0 0 2301 2301 2211 2010 -201 0 0 2010 2010 94 206

23:00 50.01 2276 2303 28 0 0 2304 2304 2261 2331 70 0 0 2332 2332 2298 2076 -222 0 0 2076 2076 95 189

24:00 50.00 2228 2282 55 0 0 2283 2283 2210 2263 53 0 0 2264 2264 2211 2003 -208 0 0 2004 2004 95 204

Avg. 50.00 1967 1990 23 0 0 1991 1991 2013 2075 62 0 0 2076 2076 2196 2014 -182 0 0 2015 2015 95 217

00 TO 06 HRS. 50.00 2093 2137 44 0 0 2138 2138 2051 2096 45 0 0 2097 2097 2084 1915 -169 0 0 1915 1915 97 220

06 TO 12 HRS. 50.02 1836 1834 -2 0 0 1835 1835 1955 1995 40 0 0 1996 1996 2243 2056 -187 0 0 2057 2057 95 225

12 TO 18 HRS. 50.00 1808 1815 7 0 0 1816 1816 1908 1967 60 0 0 1968 1968 2234 2047 -187 0 0 2048 2048 94 215

06TO 18 HRS. 50.01 1822 1824 2 0 0 1825 1825 1931 1981 50 0 0 1982 1982 2239 2052 -187 0 0 2053 2053 95 220

18 TO 24 HRS. 49.99 2130 2175 45 0 0 2176 2176 2139 2243 104 0 0 2244 2244 2223 2038 -185 0 0 2040 2040 94 210

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- June 2017

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE Railway

Agenda of 59th OCCM of MP 42

Page 45: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandTotal Sch Total

Drawal

1:00 49.99 1984 2002 18 0 0 2003 2003 2161 2313 153 0 0 2315 2315 1956 1673 -283 0 0 1674 1674 31 219

2:00 50.01 1930 1960 30 0 0 1960 1960 2114 2262 147 0 0 2262 2262 1917 1634 -284 0 0 1634 1634 31 230

3:00 50.00 1922 1936 14 0 0 1936 1936 2092 2217 125 0 0 2218 2218 1904 1629 -275 0 0 1629 1629 31 225

4:00 50.01 1884 1919 36 0 0 1920 1920 2054 2181 127 0 0 2182 2182 1860 1614 -246 0 0 1615 1615 31 213

5:00 49.98 1842 1887 45 0 0 1888 1888 2010 2151 142 0 0 2153 2153 1852 1631 -221 0 0 1632 1632 32 215

6:00 49.97 1793 1786 -7 0 0 1788 1788 2019 2187 167 0 0 2189 2189 1973 1846 -127 0 0 1848 1848 32 219

7:00 50.01 1697 1734 37 0 0 1734 1734 2012 2210 198 0 0 2211 2211 2044 1957 -87 0 0 1958 1958 32 224

8:00 50.05 1706 1675 -31 0 0 1675 1675 2077 2221 144 0 0 2221 2221 2091 1932 -159 0 0 1932 1932 32 228

9:00 50.02 1719 1640 -79 0 0 1641 1641 2115 2186 72 0 0 2187 2187 2137 1945 -192 0 0 1945 1945 32 220

10:00 50.03 1686 1621 -65 0 0 1621 1621 2057 2159 101 0 0 2159 2159 2051 1871 -181 0 0 1871 1871 32 224

11:00 50.02 1640 1629 -11 0 0 1629 1629 1955 2096 140 0 0 2096 2096 1931 1745 -186 0 0 1745 1745 33 212

12:00 50.00 1634 1589 -45 0 0 1590 1590 1913 2002 89 0 0 2003 2003 1898 1674 -224 0 0 1675 1675 33 221

13:00 50.01 1613 1598 -15 0 0 1598 1598 1849 1984 136 0 0 1985 1985 1855 1670 -185 0 0 1671 1671 33 199

14:00 49.99 1581 1557 -24 0 0 1558 1558 1847 1985 139 0 0 1987 1987 1864 1686 -178 0 0 1687 1687 33 206

15:00 49.99 1550 1566 16 0 0 1567 1567 1812 1962 150 0 0 1963 1963 1854 1683 -171 0 0 1684 1684 33 221

16:00 50.00 1556 1582 25 0 0 1582 1582 1818 1985 168 0 0 1986 1986 1866 1695 -171 0 0 1696 1696 33 220

17:00 50.00 1535 1548 13 0 0 1549 1549 1814 1980 166 0 0 1980 1980 1876 1745 -131 0 0 1746 1746 33 224

18:00 49.99 1551 1581 30 0 0 1582 1582 1833 2019 186 0 0 2021 2021 1908 1789 -119 0 0 1790 1790 30 219

19:00 49.99 1728 1787 59 0 0 1789 1789 1914 2046 132 0 0 2048 2048 2028 1991 -37 0 0 1993 1993 29 224

20:00 49.94 2078 2155 77 0 0 2159 2159 2187 2368 181 0 0 2372 2372 2180 1966 -214 0 0 1970 1970 29 219

21:00 49.97 2109 2171 62 0 0 2173 2173 2248 2407 159 0 0 2410 2410 2089 1840 -249 0 0 1842 1842 30 208

22:00 50.00 2082 2125 42 0 0 2126 2126 2237 2394 157 0 0 2395 2395 2061 1807 -254 0 0 1808 1808 30 207

23:00 50.00 2090 2119 29 0 0 2120 2120 2308 2469 161 0 0 2470 2470 2067 1761 -306 0 0 1762 1762 30 202

24:00 50.02 2009 2063 54 0 0 2063 2063 2247 2391 144 0 0 2391 2391 1984 1693 -292 0 0 1693 1693 30 199

Avg. 50.00 1788 1801 13 0 0 1802 1802 2029 2174 145 0 0 2175 2175 1969 1770 -199 0 0 1771 1771 31 217

00 TO 06 HRS. 50.00 1892 1915 22 0 0 1916 1916 2075 2219 143 0 0 2220 2220 1910 1671 -239 0 0 1672 1672 31 220

06 TO 12 HRS. 50.02 1680 1648 -32 0 0 1648 1648 2021 2146 124 0 0 2146 2146 2025 1854 -172 0 0 1854 1854 32 221

12 TO 18 HRS. 50.00 1564 1572 7 0 0 1573 1573 1829 1986 157 0 0 1987 1987 1870 1711 -159 0 0 1712 1712 32 215

06TO 18 HRS. 50.01 1622 1610 -12 0 0 1610 1610 1925 2066 141 0 0 2066 2066 1948 1783 -165 0 0 1783 1783 32 218

18 TO 24 HRS. 49.99 2016 2070 54 0 0 2072 2072 2190 2346 156 0 0 2348 2348 2068 1843 -225 0 0 1844 1844 30 210

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- July 2017

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE Railway

Agenda of 59th OCCM of MP 43

Page 46: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

Annexure-5 System Disturbance / System Incidence

1. System Disturbance on 05.06.2017 at 220 KV S/s Shivpuri: On dated 05.06.2017 at

around 15:30 Hrs. M.P system was normal and frequency of National Grid was 49.89 Hz. Prior to fault 132 KV Shivpuri – Motijheel Ckt & 132 KV Motijheel - Jora was kept open for load management. At around 15:32 Hrs., on 05.06.2017, 220 KV Bina(MPPTCL) – Shivpuri Ckt & 220 KV Bina (PGCIL) – Shivpuri Ckt tripped due to heavy rain & storm in Bina region. Consequently 132 KV Shivpuri – Pichhore Ckt tripped due to overloading and interruption occurred at 220 KV Shivpuri, 132 KV S/s Shivpuri, 220 KV S/s Shivpuri, 132 KV S/s Sheopur, 132 KV S/s Vijaypur, 132 KV S/s Baroda, 132 KV S/s Kolaras, 132 KV S/s Mohna and 132 KV S/s Jora . Due to above tripping there was load loss of about 183.76 MW. There was no generation loss and System was normalized in due course of time.

2. System Disturbance on 07.07.2017 at SGTPS: On dated 07.07.2017 at around 18:30 Hrs. M.P system was normal and frequency of National Grid was 49.98 Hz. Prior to fault 400/220 KV, 500 MVA ICT at SGTPS was under shut down since 11:32 Hrs., 04.07.2017 for retrofitting of Bus Bar Protection. At around 18:39 Hrs. while charging & synchronizing 400/220 KV, 500 MVA ICT at SGTPS from 400 KV side, ICT tripped on differential protection, subsequently SGTPS Unit # 1 differential protection operated but the Generator Circuit Breaker of Unit # 1 did not trip, resulting in operation of LBB protection. Consequently following feeders & transformers tripped as detailed here under:- 220 KV SGTPS – Rewa Ckt. 220 KV Birsinghpur Interconnector – 2nd 220 KV Bus Coupler. Due to above tripping there was no load loss. There was generation loss of about 190 MW and System was normalized in due course of time.

Agenda of 59th OCCM of MP 44

Page 47: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

Annexure-6.5A

Schemes of Western Region funded under PSDF

State I UT Sr. No.

Details of the Scheme Nos. of Schemes

Grant Sanctioned (in Rs Crores)

Date of Sanction

Funds released (in Rs Crores) as on 30.11.2016

%age of fund Disbursed against Grant sanctioned

Madhya Pradesh

1. Implementation of Integrated system for availability based tariff.

2 3.6 17/03/2016 0 0%

2. Renovation and Upgradation of protection system of substations of MPPTCL

92.7 17/03/2016 0 0%

Madhya Pradesh

3. Renovation and Upgradation of protection system of substations MPPGCL

2 47.11 5/9/2016 0 0%

4. Installation of 125MVARBus Reactor at SSTPP Khandwaand 50MVARLine Reactor at SGSTPS Birsinghpur substation of MPPGCL.

5.59 0 0%

Chhattisgarh 5. Renovation and Upgradation of protection system of substations

1 61.67 5/9/2016 0 0%

Gujarat 6. Automatic Demand Management Scheme

3 1.50 11105/2015 17/03/2015

1.35 89.82%

7. Load Forecasting Scheme

3.70 04/08/2015 0 0%

8. Wind generation forecasting project for State of Gujarat.

1.62 17/03/2015 0 0%

TOTAL 8 217.49

Agenda of 59th OCCM of MP 45

Page 48: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

Annexure-6.5B

1. Name of the Scheme

1.1 Name of the substation and its Location

1.2 Executing Agency

1.3 State/Region

2. Date of Sanction Order

2.1 Date of Agreement of Entity with State Govt. / NLDC

2.2 Total Approved Cost of Scheme

2.3 Approved Grant by Monitoring Committee (Rs. In Lakhs)

2.4 Date of Requisition by the Entity

2.4 a) Date and Reference of LOA

2.4 b) Amount of LOA

2.5 Date of Disbursement and amount

2.5.1 Ist Installment

2.5.2 IInd Installment

2.5.3 IIIrd Installment

2.6 Date of Scheduled completion of work

2.7 Date of Handling over of Site to entity ( In case of Turn key project)

Sch. Act.1 Item Details (As per Annexure-II)

1.1

1.2

Erection Discriptionworks as per

LOAProgress During Month

Balance

2 Work Details

2.1

2.2

3 Others

Signature With Seal of The Nodal Officer

No.

Report for the Month of JANUARY 2017

CUMMULATIVE PROGRESS till date

Reporting Format to the PSDF Project Monitoring Group

CUMMULATIVE PROGRESS till date

RemarkBalance

Quantity Received during

MonthQty. AS PER

LOASupply Discription

Agenda of 59th OCCM of MP 46

Page 49: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

Agenda of 59th OCCM of MP 47

Page 50: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

Yes NoPA

conducted on date

If not done Taget

Yes No TotalCatergory

ACatergory

BTotal

Catergory A

Catergory B

TotalCatergory

ACatergory

B

1 400KV S/s Bhopal 400KV Yes 17.01.13 5 5 0 5 4 0 4 1 0 12 220KV S/s Bhopal 220KV Yes 22.04.13 4 4 0 4 3 0 3 1 0 13 400KV S/s Katni 400KV Yes 17.01.13 8 8 6 2 7 6 1 1 0 14 220KV S/s Gwalior 220KV Yes 27.04.13 5 5 2 3 3 2 1 2 0 25 220KV S/s Malanpur 220KV Yes 01.05.13 8 8 6 2 6 6 0 2 0 26 220KV S/s Mehgaon 220KV Yes 30.04.13 6 6 5 1 5 5 0 1 0 1

7220KV S/s South Zone Indore

220KV Yes 23.04.13 5 5 3 2 4 3 1 1 0 1

8 220KV S/s Jabalpur 220KV Yes 24.04.13 4 4 3 1 3 3 0 1 0 19 220KV S/s Rewa 220KV Yes 29.04.13 8 8 6 2 6 6 0 2 0 2

10 220KV S/s Satna 220KV Yes 01.05.13 6 6 3 3 3 3 0 3 0 311 220KV S/s Sagar 220KV Yes 09.05.13 4 4 2 2 2 2 0 2 0 212 220KV S/s Chichli 220KV Yes 13.03.15 3 3 1 2 2 1 1 1 0 113 220KV S/s Narsinghpur 220KV Yes 13.03.15 3 3 2 1 2 2 0 1 0 114 220KV S/s Pipariya 220KV Yes 16.03.15 8 8 7 1 7 6 1 1 1 015 220KV S/s Guna 220KV Yes 13.03.15 10 10 4 6 8 4 4 2 0 216 220KV S/s Shivpur 220KV Yes 15.03.15 7 7 2 5 5 2 3 2 0 217 220KV S/s Sabalgarh 220KV Yes 17.03.15 7 7 5 2 6 5 1 1 0 118 220KV S/s Nagda 220KV Yes 16.04.15 6 6 5 1 5 5 0 1 0 119 220KV S/s Tikamgarh 220KV Yes 13.03.15 11 11 8 3 10 8 2 1 0 120 220KV S/s Seoni 220KV Yes 11.03.15 5 5 3 2 4 3 1 1 0 121 220KV S/s Chhatarpur 220KV Yes 13.03.15 8 8 5 3 7 5 2 1 0 122 220KV S/s Sarni 220KV Yes 14.03.15 3 3 2 1 2 2 0 1 0 1

Annexure-6.14

No. of Defeciencies No. of Defeciency attendedNo. of Defeciencies not yet

attended

Protection Audit Report Of MPPTCL

Name of Entity - MPPTCL Name of State - Madhya Pradesh FY : 2017-18

Sr. No.

Name of the S/s KV

Weather identified

of PAIf identified for PA

Deficiency observed

for the period April-17 to June- 17

Agenda of 59th OCCM of MP 48

Page 51: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

Yes NoPA

conducted on date

If not done Taget

Yes No TotalCatergory

ACatergory

BTotal

Catergory A

Catergory B

TotalCatergory

ACatergory

B

No. of Defeciencies No. of Defeciency attendedNo. of Defeciencies not yet

attended

Protection Audit Report Of MPPTCL

Name of Entity - MPPTCL Name of State - Madhya Pradesh FY : 2017-18

Sr. No.

Name of the S/s KV

Weather identified

of PAIf identified for PA

Deficiency observed

for the period April-17 to June- 17

23 220KV S/s Pandurna 220KV Yes 13.03.15 4 4 0 4 2 0 2 2 0 224 220KV S/s Chhindwara 220KV Yes 12.03.15 3 3 0 3 0 0 0 3 0 325 220KV S/s Betul 220KV Yes 15.03.15 3 3 1 2 1 1 0 2 0 226 220KV S/s Daloda 220KV Yes 15.04.15 6 6 5 1 5 5 0 1 0 127 220KV S/s Anuppur 220KV Yes 17.03.15 25 25 19 6 18 17 1 7 2 528 220KV S/s Indore Eas 220KV Yes 12.03.15 10 10 7 3 8 6 2 2 1 129 220KV S/s Dhar 220KV Yes 07.04.15 11 11 9 2 10 9 1 1 0 130 220KV S/s Neemuch 220KV Yes 16.04.15 8 8 6 2 7 6 1 1 0 131 220KV S/s Vidisha 220KV Yes 07.04.15 6 6 4 2 5 4 1 1 0 1

32 220KV S/s Rajgarh Baiora 220KV Yes 08.04.15 8 8 6 2 6 6 0 2 0 2

33 220KV S/s katni 220KV Yes 08.04.15 8 8 6 2 7 6 1 1 0 134 220KV S/s Nepanagar 220KV Yes 08.04.15 11 11 5 6 6 5 1 5 0 535 220KV S/s Sidhi 220KV Yes 09.04.15 6 6 3 3 2 2 0 4 1 336 220KV S/s Maihar 220KV Yes 07.04.15 5 5 3 2 2 2 0 3 1 237 220KV S/s Bairagarh 220KV Yes 06.04.15 6 6 5 1 5 5 0 1 0 138 220KV S/s Dewas 220KV Yes 08.04.15 5 5 4 1 4 4 0 1 0 139 220KV S/s Handiya 220KV Yes 09.04.15 7 7 3 4 5 3 2 2 0 240 220KV S/s Kotar 220KV Yes 08.04.15 8 8 5 3 5 5 0 3 0 341 220KV S/s Rajgarh 220KV Yes 13.03.15 12 12 10 2 11 10 1 1 0 1

42220KV S/s Birsinghpur Pali

220KV Yes 16.03.15 23 23 15 8 12 11 1 11 4 7

Agenda of 59th OCCM of MP 49

Page 52: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

Annexure-6.14

Name of the entity :- MPPGCL State- Madhya Pradesh

1 220 YES11.02.13 &

12.02.13 YES 11 3 8 7 3 4 4 0 4

2 220 YES13.02.13 &

14.02.13 YES 17 11 6 12 11 1 5 0 5

3 400 YES13.02.13 &

14.02.13 YES 15 10 5 10 10 0 5 0 5

4 220 YES12.03.13 &

13.03.13 YES 18 6 12 6 6 0 12 0 12

5 400 YES12.03.13 &

13.03.13 YES 16 9 7 6 6 0 10 3 7

6 220 YES11.02.13 &

12.02.13 YES 31 7 24 11 6 5 20 1 19

7 400 YES06.04.15 &

07.04.15 YES 4 4 0 3 3 0 1 1 0

8 132 YES22.04.13 &

23.04.13YES 12 4 8 5 4 1 7 0 7

9 132 YES22.04.13 &

23.04.13YES 13 5 8 6 5 1 7 0 7GANDHISAGAR

Category BCategory B Total Category A Category B Total Category A

STPS

TONS

SSTPS

BARGI

Total Category A

ATPS

Quarterly Report for the period of APRIL 2017 to JUNE 2017MPPGCL

FY: 2017-18

S.No. Name of the S/s KV

Whether identified for PA If identified for PA Deficiencies

Observed No.of Deficiencies No.of Deficiencies attended No.of Deficiencies not yet attended

Yes No

SGTPS

SGTPS

STPS

NoPA conducted on date

if not done, Target

Yes

Agenda of 59th OCCM of MP 50

Page 53: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

Agenda of 59th OCCM of MP 51

Page 54: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

Report Generated On: 04/08/2017

Annexure-8.1.i

SNO Meter No Location Feeder Name T & C Circle T & C Division Data Not Available Dates

1 MPE53482 132KV S/S ARON 40MVA,EMCO 400KV BINA Testing Division Guna 01/07/2017 to 31/07/2017

2 MPE51924 132KV S/S ASHOKNAGAR 40MVA,BBL-II 400KV BINA Testing Division Guna 01/07/2017 to 31/07/2017

3 XB577480 220KV S/S GUNA 63MVA BBL SN 5442/10 400KV BINA Testing Division Guna 01/07/2017 to 31/07/2017

4 MPE51793 132KV S/S PITHAMPUR MVA 132/33KV X'MER-I BHEL S.NO. 20097 400KV Indore Testing Division - II Indore 01/07/2017 to 31/07/2017

5 MPC74039 220KV S/S PITHAMPUR 63MVA SEZ_II 400KV Indore Testing Division - II Indore 03/07/2017 to 31/07/2017

6 MPP28453 220KV S/S S/Z, INDORE 132KV PITHAMPUR (FOR STI) 400KV Indore 440 KV Testing Division, Indore 01/07/2017 to 31/07/2017

7 MSP44327 132KV S/S GOPALPUR 40MVA TRANSFORMER PC0100096 T&R BHOPAL Testing Division -II Bhopal 01/07/2017 to 31/07/2017

8 MSP44373 220KV S/S BHOPAL 132KV STDS BHOPAL BHOPAL 400 KV Testing Division Bhopal 01/07/2017 to 31/07/2017

9 MPE51977 220KV S/S ITARSI 20MVA MAKE AMCO SN 1313/11538 BHOPAL Testing Division Itarsi 01/07/2017 to 31/07/2017

10 MPE51763 132KV S/S SARANGPUR SCOM_33KV SALSALAI FEEDER (CZ TO W CZ-WZ Testing Division -I Bhopal-S/s DN Beora 01/07/2017 to 31/07/2017

11 MPP28723 220KV S/S BINA ISCOM_33KV VIDISHA FEEDER ( EZ TO C EZ-CZ 400 KV Testing Division Bina 01/07/2017 to 31/07/2017

12 MPE51934 132KV S/S DABRA 40 MVA MAKE BBL SN 1239/11296 GWALIOR Testing Division -II Gwalior 01/07/2017 to 31/07/2017

13 MPE53513 132KV S/S DATIA 40 MVA MAKE EMCO SN HT-12510 GWALIOR Testing Division -II Gwalior 01/07/2017 to 31/07/2017

14 MPE51941 132KV S/S LAHAR 40 MVA MAKE BBL SN 4910/2 GWALIOR Testing Division -II Gwalior 01/07/2017 to 31/07/2017

15 Y0221297 132KV S/S MORENA 40 MVA MAKE BBL SN 4910/7 GWALIOR Testing Division -I Gwalior, S/S DN Morena 01/07/2017 to 31/07/2017

16 MPE53503 132KV S/S PICHORE 12.5MVA,CGL GWALIOR Testing Division Guna-S/S Dn Shivpuri 01/07/2017 to 31/07/2017

17 MPE51936 132KV S/S SEONDHA 12.5 MVA MAKE BHEL SN 6002787 GWALIOR Testing Division -II Gwalior 01/07/2017 to 31/07/2017

18 MPE51937 132KV S/S SEONDHA 20MVA MAKE HEL SN 6000197 GWALIOR Testing Division -II Gwalior 01/07/2017 to 31/07/2017

19 MPE51917 132KV S/S SHEOPUR 40MVA-I BBL SN 4733/8 GWALIOR Testing Division Guna-S/S Dn Shivpuri 01/07/2017 to 31/07/2017

20 MPC59861 132KV S/S ALIRAJPUR 20MVA XMER BBL S.NO.1991/3 INDORE Testing Division - Rajgarh 01/07/2017 to 31/07/2017

21 GEC08964 132KV S/S BAHADARPUR 63 MVA,ABB SN 12018-005 INDORE Testing Division - Khandwa 01/07/2017 to 31/07/2017

22 MPE51805 132KV S/S CHHANERA 20MVA MAKE CGL SN 24641 INDORE Testing Division - Khandwa 01/07/2017 to 31/07/2017

23 MPE51906 132KV S/S SANWER 16 MVA EMCO 1045/10878 INDORE Testing Division - I Indore 01/07/2017 to 31/07/2017

24 MPP28667 132KV S/S SANWER 20 MVA NGEF 280004-6059 INDORE Testing Division - I Indore 03/07/2017 to 31/07/2017

25 MPC75135 220KV S/S DHAR 132 KV VACMAT UJJAINI INDORE Testing Division - DHAR 01/07/2017 to 31/07/2017

26 MPU04759 220KV S/S INDORE-II(JETPURA) 63MVA XMER INDORE Testing Division - I Indore 01/07/2017 to 31/07/2017

27 MPP28690 220KV S/S NIMARANI 16 MVA BBL 1992/1 INDORE Testing Division - I Indore 01/07/2017 to 31/07/2017

28 XB577435 132KV S/S KATNI 50MVA MAKE BHEL JABALPUR Testing Division -Katni 01/07/2017 to 31/07/2017

29 MPP28587 132KV S/S NARSINGPUR 40MVA BHEL SN6004697 JABALPUR Testing Division -II Jabalpur 01/07/2017 to 31/07/2017

30 XB577373 220KV S/S JABALPUR 63MVA MAKE BBL JABALPUR Testing Division -I Jabalpur 01/07/2017 to 31/07/2017

31 MPP28793 220KV S/S BHOPAL Tr.132 KV TRACT SUKHI SEW RAILWAY 400 KV Testing Division Bhopal 01/07/2017 to 31/07/2017

32 MPP28789 220KV S/S ITARSI Tr.220KV TRACT KALA AKHAR RAILWAY Testing Division Itarsi 01/07/2017 to 31/07/2017

33 Y0221158 132KV S/S BIJAWAR 12.5 MVA MAKE HEL SN 6000597 SAGAR Testing Division -II Sagar 01/07/2017 to 31/07/2017

34 Y0221275 132KV S/S BEOHARI 50 MVA X-mer SN 204292 SATNA Testing Division - Satna- S/S DN Shahdol 01/07/2017 to 31/07/2017

35 MPE51749 220KV S/S REWA 40MVA XMER EMCO SATNA Testing Division - Rewa 01/07/2017 to 31/07/2017

36 MPP28427 132KV S/S CHOURAI 40MVA BBL, sn.3072/6 SEONI Testing Division -II Chindwara 02/07/2017 to 31/07/2017

37 MPE51871 132KV S/S CHAPDA 12.5MVA MAKE BBL SN 1428/3 UJJAIN Testing Division - Dewas 01/07/2017 to 31/07/2017

38 Y0221354 132KV S/S KANNOD 16MVA MAKE BBL SN 1992/5 UJJAIN Testing Division - Dewas 01/07/2017 to 31/07/2017

39 MPE51866 132KV S/S KHATEGAON 40MVA BBL Xmer S.No-5076/15 UJJAIN Testing Division - Dewas 01/07/2017 to 31/07/2017

40 MPE51860 132KV S/S MOMIN BADODIA 20MVA NGEF UJJAIN Testing Division - Dewas - S/S Dn Shujalpur 01/07/2017 to 31/07/2017

41 MPC58858 132KV S/S MSP DEWAS 63MVA MAKE EMCO SN 4882 UJJAIN Testing Division - Dewas 01/07/2017 to 31/07/2017

42 MPE51822 132KV S/S MSP DEWAS 63MVA MAKE BBL SN 4909/4 UJJAIN Testing Division - Dewas 01/07/2017 to 31/07/2017

43 MPE51869 132KV S/S MSP DEWAS 40MVA MAKE GEC SN B-25820 UJJAIN Testing Division - Dewas 01/07/2017 to 31/07/2017

44 MPC58835 132KV S/S POLAIKALAN 20 MVA EMCO UJJAIN Testing Division - Shujalpur 01/07/2017 to 31/07/2017

45 Y0221211 132KV S/S SHAJAPUR 40MVA MAKE ECE SN S-86020 UJJAIN Testing Division - Dewas 01/07/2017 to 31/07/2017

46 Y0221549 132KV S/S SHAJAPUR 40MVA MAKE BHEL SN 2012385 UJJAIN Testing Division - Dewas 01/07/2017 to 31/07/2017

47 MPP28623 220KV S/S RATLAM 40MVA MAKE BHEL SN 2014006 UJJAIN Testing Division - Ratlam 01/07/2017 to 31/07/2017

48 Y0221427 220KV S/S UJJAIN 40MVA MAKE CROMPTON SN T-8362/3 UJJAIN Testing Division - Ujjain 01/07/2017 to 31/07/2017

49 Y0221446 220KV S/S UJJAIN 63MVA MAKE BHEL SN 2014010 UJJAIN Testing Division - Ujjain 01/07/2017 to 31/07/2017

50 Y0221526 220KV S/S UJJAIN 63MVA MAKE BBL SN 5442/9 UJJAIN Testing Division - Ujjain 01/07/2017 to 31/07/2017

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE (SLDC), Jabalpur, MP

EOP : ABT SEM Data DriverMonthly Data Non-Availability Report (Main Meter) from 01/07/2017 to 31/07/2017

Agenda of 59th OCCM of MP 52

Page 55: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

Annexure-8.1.ii

Sr. No Make SIM No.SIM Data No.

IMSI No.Service Activated GPRS/ GSM

1 MPC57145 132KV S/S DHAR 40MVA BHEL 400KV Indore Testing Division - II Indore2 NA 132KV S/S ICHHAWAR 40MVA BBL SN 1448/3 BHOPAL Testing Division - I Bhopal

3 MPC74042 132KV TAMOT 40MVA MAKE CGL SN 24788 BHOPAL Testing Division -II Bhopal

4 XB577758 132KV S/S ESAGARH_NEW 40MVA MAKE BHEL 400KV BINA Testing Division Guna5 XB583343 132KV PRATAPURA 40MVA GWALIOR Testing Division -II Gwalior6 XC559777 220KV MORENA 63MVA GWALIOR Testing Division Morena7 MPC59861 132KV S/S ALIRAJPUR 20MVA BBL 1991/3 INDORE Testing Division - Rajgarh

8 MPC58407 220KV S/S JULWANIYA 40MVA BHEL SN 2037620 INDORE Testing Division - II Barwaha

9 NA 132KV JHABUA 40 MVA MAKE NGEF INDORE Testing Division - II Indore10 NA 132KV S/S KASRAWAD 20MVA INDORE Testing Division - I Indore11 NA 132KV S/S TALAKPURA 40 MVA INDORE Testing Division - Barwaha12 MPC73877 132KV S/S SINGHANA 40 MVA IMP INDORE Testing Division - II Indore13 XB552537 132KV S/S Kishangarh 40 MVA IMP INDORE Testing Division - Dewas14 MPC58410 132KV S/S BICHHUA 40MVA BHEL XMER JABALPUR Testing Division -II Chindwara15 MPP28518 220KV S/S CHHINDWARA 50MVA XMER JABALPUR Testing Division -II Chindwara16 NA 132KV BENEGAON 12.5MVA JABALPUR Testing Division -II Chindwara17 XB577474 132KV AMARWARA 50MVA BHEL JABALPUR Testing Division -Chhindwara18 XB577435 132KV S/S KATNI 50MVA MAKE BHEL JABALPUR Testing Division - Katni19 XB577453 220KV S/S SEONI 50MVA BHEL JABALPUR Testing Division - Seoni

20 XB577412 132KV S/S NARSINGPUR 50MVA BHEL SN2042481 JABALPUR Testing Division -II Jabalpur

21 Y0221147 220KV S/S CHICHLI 50MVA XMER MAKE BHEL SR. 2042480 JABALPUR Testing Division -II Jabalpur

22 Y0062910 132KV S/S GADARWARA 132KV TC_NTPC JABALPUR Testing Division -II Jabalpur

23 XB577425 132KV S/S SLEEMANABAD 12.5MVA NGEF SN2800022226

JABALPUR Testing Division -Katni

24 XC530817 132KV S/S LALBARRA 40MVA IMP JABALPUR Testing Division -II Chindwara25 XC548595 132KV S/S UMRETH 40MVA BBL XMER JABALPUR Testing Division -II Chindwara

26 XB577374 132KV S/S BOREGAON 50MVA BHEL SN.2042482 JABALPUR Testing Division -II Chindwara

27 MP924832 132KV S/S RAMPUR NAIKIN 40 MVA X-mer (33 kv side) SATNA Testing Division - Satna

28 KA907077 220KV S/S ANUPUR 132KV MOSERBEAR SATNA Testing Division - Satna- S/S DN Shahdol29 MPC58838 220KV S/S SIDHI 220KV S/S SIDHI SATNA Testing Division - Rewa30 KA904800 220KV S/S ANUPUR 132KV OPM SATNA Testing Division - Satna- S/S DN Shahdol

31 MPP28396 132KV S/S KATRA 50MVA BHEL MAKE XMER SATNA Testing Division - Rewa

32 MPP28606 132KV S/S RATLAM 50MVA X-mer BBL SN 5406/10

UJJAIN Testing Division - Ratlam

33 XC573290 132KV S/S TAL 40MVA MAKE IMP UJJAIN Testing Division - Ratlam

34 XB577371 220KV BHANPURA 50MVA BHEL SN 2042485 UJJAIN Testing Division - Neemuch

35 NA 132KV S/S SATWAS 20MVA NGEF SN 280002-2214 UJJAIN Testing Division - Dewas

36 Y0221471 220KV S/S NEEMUCH 50MVA BHEL UJJAIN Testing Division - Neemuch37 NA 132KV BAGRODA 40MVA BHOPAL Testing Division -I Bhopal

Modem & SIM details required of the newly commissioned transformers / HT Consumers

SNO Meter No Location Feeder Name T & C Circle T & C Division

Modem & SIM detailModem SIM

Agenda of 59th OCCM of MP 53

Page 56: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

Annexure-9.2DATA OUT FROM LONG TIME

1 MORWA 132 KV S/S2 BEOHARI 132 KV S/S3 REWA132 KV S/S

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 ALL T.M. DATA CB ,MW,MVAR N/A2 132/33 KV(50MVA) XMER CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED

1 132 KV MANGAWAN 2 CB /MW/MVAR N/A PROCESSES CONNECTION REQUIRED2 132 KV REWA 2(INTERCONNECTOR) CB /MW/MVAR N/A PROCESSES CONNECTION REQUIRED3 132 KV RAMPUR NIKEN CB FAULTY CLOSE4 220/132 XMER 2 SEC CB FAULTY CLOSE

1 220 KV INTERCONNECTOR 1 & 4 MW/MVAR N/C 115/152 132 KV UMRIYA MW/MVAR 21/2 26/51 220/132 KV XMER MW/MVAR 22/7 36/10

1 132 KV KOTMA CB N/A2 220/132 KV TR 2 (160 MVA) PRI & SEC CB N/A CLOSE3 220 KV BUS VOLTAGE & FREQUENCY N/A3 132 KV SHAHDOL CB ,MW,MVAR N/A4 132 KV KOTMA 2 CB ,MW,MVAR N/A5 132 /33 KV TR 2 CB ,MW,MVAR N/A

1 132 KV ANUPPUR 2 CB /MW/MVAR FAULTY PROCESSES CONNECTION REQUIRED

1 132/33 KV XMER 1 MW/MVAR 10/5 20/102 132/33 KV XMER 1 MW/MVAR 5/2 10/5

1 132/33 KV XMER 20MVA CB /MW/MVAR N/A PROCESSES CONNECTION REQUIREDUMARIYA 132 KV S/S

MAIHAR 132 KV S/S

KOTMA 132 KV S/S

BEOHARI 132KV S/S

REWA 220 KV S/S

SATNA CIRCLE

BIRSINGHPUR 220 KV S/S

ANUPPUR 220 KV S/S

PROCESSES CONNECTION REQUIRED

Agenda of 59th OCCM of MP 54

Page 57: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

Sr.no. DESCRIPTION Status telemetry value at SLDC actual value at site

1 132/33 KV XMER 2 CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED

1 220 KV SARNI CB /MW/MVAR N/C PROCESSES CONNECTION REQUIRED2 132 KV RLY TRACTION 2 CB FAULTY CLOSE

1 132 KV BUS COUPLER CB FAULTY OPEN

1 132KV B/C CB FAULTY OPEN

2 132 KV BUS FREQUENCY N/A

1 400 KV BUS TIE CB /MW/MVAR N/A PROCESSES CONNECTION REQUIRED

1 132 KV BUS COUPLER CB FAULTY OPENSEONI 132 KV S/S

KATNI 400 KV S/S

JABALPUR CIRCLE

SEONI 220 KV S/S

PANDURNA 220 KV S/S

KYMORE 132 KV S/S

BHANEGAON 132 KV S/S

CHINDWARA 132 KV S/S

Agenda of 59th OCCM of MP 55

Page 58: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

1 220 KV BUS TIE CB FAULTY CLOSE2 220/132 KV 160 MVA XMER-1 HV CB FAULTY CLOSE3 220/132 KV 160 MVA XMER-2 LV CB NON CURRENT CLOSE4 132 KV BUS COUPLER CB FAULTY OPEN5 132/33 KV 40 MVA-1 TR CB FAULTY

1 220 KV BINA BINA PG MW/MVAR2 220 KV GWALIOR MW/MVAR3 220 KV GUNA MW/MVAR4 220 KV DATIA MW/MVAR5 220 KV SHIVPURI MW/MVAR6 400/220 KV XMER 2 &3 MW/MVAR

BINA 400 KV S/S

FREQUNTLY DATA NON CURRENT

GUNA 220 KV S/S

BINA CIRCLE

Agenda of 59th OCCM of MP 56

Page 59: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

1 220 KV BUS TIE CB FAULTY CLOSE2 400 KV BUS TIE CB FAULTY CLOSE3 400 KV ISP-1 CB FAULTY CLOSE4 400/220 TRF-1 OLTC NOT COMING5 400/220 TRF-3 OLTC NOT COMING

1 220/132 TRF-2(Sec) Side MW,MVAR Direction need to be reversed from field.

1 220 KV BUSCOUPLER CB FAULTY CLOSE

1 132/33 TRF-2 P MW,MVAR NOT COMING2 132/33 TRF-2 S MW,MVAR NOT COMING3 33KV DHAR CB FAULTY OPEN

1 220 KV MAHESHWAR 2 CB FAULTY OPEN2 220/132 TR3 SEC SIDE MW,MVAR, OLTC N/C3 132/33 TR3 CB FAULTY CLOSE4 220/132 TR2 PRI SIDE MW 19.6 64

1 220/132kV 160MVA TRF-1(SEC SIDE) CB FAULTY CLOSE

1 220/132 TR1, TR2,TR3 & TR4 OLTC N/C2 220/132 TR4(SECONDARY SIDE) CB FAULTY3 132KV BUS COUPLER CB FAULTY CLOSE4 220 KV MAIN BUS HZ NOT COMING

3 132KV BUS COUPLER CB FAULTY CLOSE

2 220/132 TR2(SECONDARY SIDE) MW,MVAR 141,13 0,0

1 132KV RAILWAY TRAC 1&2 MW NOT COMING2 132KV RAILWAY TRAC 1&2 MVAR NOT COMING3 132KV RAILWAY TRAC 1 CB FAULTY CLOSE4 33/11 KV TRF 1 & 2 MW,MVAR,CB,SOE NOT COMING

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

1 220/132 TR2 160MVA OLTC N/A2 220/132 TR 1 4*40 MVA OLTC N/A3 132 KV CHOTI KHARGONE MVAR N/A4 220/132 TR1(SECONDARY SIDE) CB FAULTY

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

1 400 KV REACTOR CB FAULTY CLOSE2 400 KV BUS COUPLER CB FAULTY OPEN3 400 KVJULWANIYA CB FAULTY OPEN4 220 kV BUS I & II FREQ NOT SHOWING IN DECIMAL POINT5 220 KV BUS COUPLER CB FAULTY OPEN6 220 KV OMKARESHWER CB FAULTY OPEN7 400 kV BUS II VOLTAGE,FREQ NOT COMING8 132 KV INTCC-1 CB FAULTY CLOSE9 220/132 TRF-2 Sec Side CB FAULTY CLOSE

10 33KV CHIRAGPUR CB FAULTY CLOSE11 33KV DONGGAON CB FAULTY CLOSE12 33KV BHOJAKHEDI CB FAULTY CLOSE

1 132KV BHIKANGAON CB FAULTY CLOSE2 132/33 TRF 2 SEC MW,MVAR NOT COMING3 132/33 TRF 2 SEC CB FAULTY CLOSE4 33/11 KV TRF 1 & 2 MW,MVAR,CB,SOE NOT COMING5 33KV MALWA 1&2 MW,MVAR,CB,SOE NOT COMING6 33/11 KV TRF 1 & 2 MW,MVAR,CB,SOE NOT COMING

132 KV S/S CHHEGAON

NEPANAGAR 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S BAHADURPUR

BARWAHA 220 KV S/S

CHHEGAON 400 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

PITAMPUR 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

PITAMPUR 220 KV S/S-II

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDINDORE SZ 220KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

INDORE 400 KV S/S

INDORE NZ (JETPURA) 220KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDINDORE EAST 220 KV S/S

INDORE CHAMBAL 132 KV S/S

Agenda of 59th OCCM of MP 57

Page 60: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

1 220 KV BUS -1 KV,HZ N/A2 132/33 KV TR 2 SEC CB FAULTY CLOSE4 33KV CAP BANK CB FAULTY CLOSE

1 132KV BUS KV2 132KV BUS HZ3 33KV BUS KV4 33KV BUS HZ

1 132 KV BUSCOUPLER CB FAULTY2 400KV BUS 2 KV N/C3 400KV BUS 2 HZ N/C4 132/33 KV 40 MVA TR CB FAULTY5 400/220KV TRF-2PRI CB OPEN CLOSE

2 132/33 KV TR 2 CB/OLTC FAULTY3 132/33 KV TR II OLTC N/A4 132 KV NIMRANI I CB FAULTY CLOSE5 132/33 KV 20 MVA TR CB/MW/MVAR NOT COMING

2 220/132 TR 1 & 2 OLTC N/A3 132/33 63MVA TR-2 CB/OLTC N/A

33 SIDE Telemetry not available

RAJGRAH (DHAR) 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED220 KV S/S DHAR

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

NOT COMINGNOT COMINGNOT COMINGNOT COMING

CB's of 33 SIDE feeders are coming faulty from field.

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

JULWANIA 400 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

JULWANIA 220 KV S/S

NIMRANI 220 KV S/S

Agenda of 59th OCCM of MP 58

Page 61: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

1 132KV ALIRAJPUR CB FAULTY CLOSE2 132KV BUS COUPLER CB FAULTY CLOSE

3 33KV CAP BANK MW,MVARNOT

COMING

1 132KV BUS KVNOT

COMING

2 132KV JICA 1 MW,MVARNOT

COMING

3 132KV JICA 2 MW,MVARNOT

COMING4 132KV NAGDA CB OPEN CLOSE5 132/33 KV TRF 2 PRI CB FAULTY CLOSE5 132/33 KV TRF 2 SEC CB FAULTY CLOSE5 33 KV GRASIM CB FAULTY CLOSE

1 220KV SOUMIL POWERMW,MVAR,CB,

SOENOT

COMING

1 220/132KV TRF2 CB FAULTY CLOSE

1 132KV DALODA CB FAULTY CLOSE

2 132/33KV TRF1 MW,MVARNOT

COMING3 132/33 TRF2(sec side) CB OPEN CLOSE

4 33KV CHOUKSEY ENERGY 1 CB,MW,MVARNOT

COMING5 33KV CHOUKSEY ENERGY 2 CB,MW,MVAR

6 33/11KV TRF1 MW,MVAR,CB,

SOENOT

COMING7 33/11KV TRF2 CB FAULTY

1 132KV BUS COUPLER CB FAULTY CLOSE2 132KV BUS -2 FREQ3 33KV SUZLON 4 CB OPEN CLOSE4 33KV SUZLON 5 CB OPEN CLOSE5 33KV CAP BANK-II CB FAULTY OPEN6 33KV BUS COUPLER CB FAULTY CLOSE7 132/33 TRF2(sec side) CB FAULTY OPEN

1 132/33 XMER CB FAULTY CLOSE2 132KV SARJAN CB FAULTY CLOSE

3 132KV KSHEMA POWERMW,MVAR,CB,

SOE

1 33KV CAP BANK CB FAULTY CLOSE2 33KV DELIGENTIA-1 CB FAULTY CLOSE3 132KV BUS COUPLER CB OPEN CLOSE4 132/33 KV TRF-2 CB FAULTY OPEN

1 33KV DEEPAKHEDA CB OPEN CLOSE2 132/33KV TRF CB OPEN CLOSE

1 220 KV NAGDA I CB OPEN CLOSE2 220/132 TR1 OLTC N/C3 220/132 TR2 OLTC N/C4 220/132 TR3 OLTC N/C

132 KV S/S KACHROD

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED220 KV S/S DALODA

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED220 KV S/S RATLAM

132 KV S/S KUKSHI

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED220 KV S/S BADNAGAR

NOT COMINGSOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S JAORA

NOT COMING

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S SAILANA

N/C

132 KV S/S RATANGARH

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S SITAMAU

UJJAIN 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

Agenda of 59th OCCM of MP 59

Page 62: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

1 220/132 KV TR (160 MVA) 1 PRIMARY CB FAULTY OPEN2 220/132 KV TR (160 MVA) 1 SECONDARY CB FAULTY OPEN3 220/132 KV TR (160 MVA) 2 SECONDARY CB FAULTY CLOSE4 132 KV BUS COUPLER CB FAULTY CLOSE5 33kV BAPCHA CB FAULTY CLOSE6 33kV SUZLON-2 CB FAULTY CLOSE7 33KV TODAY ENERGY-1 MW,MVAR N/C8 33KV TODAY ENERGY-2 MW,MVAR N/C9 33KV TODAY ENERGY-1 CB FAULTY CLOSE

10 33kV BUS CP CB FAULTY CLOSE11 33kV SUZLON-2 MW,MVAR N/C12 33kV MB-1 MW,MVAR N/C13 33kV MB-1 MW,MVAR N/C

1 132KV BUS COUPLER CB FAULTY CLOSE2 33KV BUS COUPLER CB FAULTY CLOSE3 33 KV CAP BANK CB FAULTY CLOSE4 33KV DISCOM CB FAULTY CLOSE

1 132KV UJJAIN CB FAULTY CLOSE2 CAP BANK MVAR N/C 10.663 132KV BUS COUPLER CB FAULTY CLOSE

1 132 KV CHAPDA 1 CB FAULTY CLOSE2 132 KV CHAPDA 2 CB FAULTY CLOSE3 132 KV SHANKARGARH 2 CB/MW/MVAR N/A PROCESSES CONNECTION REQUIRED3 220/132 KV 160MVA TR3 CB FAULTY CLOSE4 132 KV GAMESHA FATANPUR 2 CB FAULTY CLOSE5 33KV CAP BANK CB FAULTY CLOSE6 33KV JOHNDEER 2 CB FAULTY CLOSE7 33KV TONK KALAN CB FAULTY CLOSE8 33KV DEWAS PRADHIKARAN CB FAULTY CLOSE9 33KV NEW BAY CB FAULTY CLOSE

10 33KVGAMESHA JAMBODARANI-1 CB FAULTY CLOSE11 33KVGAMESHA JAMBODARANI-2 CB FAULTY CLOSE

1 33KV IND NO-4 CB FAULTY CLOSE2 33KV DRP CB FAULTY CLOSE3 33KV DEWAS BNP-2 CB FAULTY CLOSE4 33KV SIYA CB FAULTY CLOSE

1 132/33 20MVA TRF-1 CB FAULTY OPEN2 33KV BUSCOUPLER CB FAULTY CLOSE3 33KV DEWAS BNP-2 CB FAULTY CLOSE4 33KV SIYA CB FAULTY CLOSE

1 132/33 KV 12.5MVA TR CB,MW,MVAR N/C2 132/33 KV 20MVA TR CB,MW,MVAR N/C3 33KV DEVGARH CB FAULTY CLOSE3 33KV BAGLI CB FAULTY CLOSE3 33KV KARNAWAD CB FAULTY CLOSE2 132/33 KV 20MVA TR-4 CB FAULTY CLOSE

1 220KV ILFS-1 CB FAULTY CLOSE2 132 KV SIDTUBE CB /MW/MVAR N/A

1 33KV BADONI-1 CB FAULTY CLOSE2 33KV BADONI-2 CB FAULTY CLOSE

1 33KV BUS FREQ N/C3 33KV CAP BANK CB FAULTY CLOSE

BADOD 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S AGAR

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDGHOSLA 132 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDDEWAS 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDDEWAS BNP 132 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDSONKATCH 132 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S CHAPDA

SHAJAPUR 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDMAKSI 132 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/SUWASRA

Agenda of 59th OCCM of MP 60

Page 63: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

4 132/33KV TRF1 CB OPEN CLOSE5 33KV RAWTI CB FAULTY CLOSE

1 132KV BUS COUPLER CB FAULTY CLOSE2 132KV GAUTAM CB FAULTY CLOSE

2 132KV GAUTAM MW,MVARNOT

COMING3 33KV CAP BANK CB FAULTY CLOSE4 132/33 TRF-2 SEC SIDE CB,MW,MVAR NOT COMING5 33/11 KV TR2 CB FAULTY CLOSE6 33KV BUS COUPLER CB FAULTY CLOSE

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

DEPALPUR 132 KV S/S

Agenda of 59th OCCM of MP 61

Page 64: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

1 400KV TIE BREAKER SHUJALPUR-1 & DEHGAM-1 CB FAULTY CLOSE2 220KV BUS COUPLER CB FAULTY CLOSE3 220KV BUS TIE CB FAULTY CLOSE4 400/220 TRF-4 CB FAULTY CLOSE5 400/220 TRF-3 TIE BREAKER CB FAULTY CLOSE

1 132 KV BUS COUPLER CB FAULTY CLOSE2 33KV CAP BANK CB FAULTY CLOSE3 33KV BUS COUPLER CB FAULTY CLOSE4 33KV BUS TIE CB FAULTY CLOSE5 220/132 100MVA CB FAULTY CLOSE6 220KV BUS COUPLER CB FAULTY CLOSE7 132KV INTCC CB FAULTY CLOSE

1 132KV BUS COUPLER CB FAULTY CLOSE2 220/132 TR-2 CB OPEN CLOSE3 132 KV CAP BANK-1 CB FAULTY OPEN4 33KV DHNERAKALAN CB FAULTY CLOSE5 132/33 TRF-2 CB OPEN CLOSE6 132/33 TRF-3 50 MVA MW 7 MW 22 MW

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

NAGDA 400 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDNAGDA 220 KV S/S

NEEMUCH 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

Agenda of 59th OCCM of MP 62

Page 65: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 220/132 KV 160 MVA XMER CB FAULTY CLOSE

1 132 KV KHIRKIYA PROCESSES CONNECTION REQUIRED2 132 KV KHIRKIYA TRACTION-2 MW/MVAR NON CURRENT3 132 KV KHIRKIYA TRACTION-2 CB FAULTY4 132 KV KHIRKIYA TRACTION-1 CB FAULTY5 132 KV HANDIA-2 MW/MVAR NON CURRENT

1 220 KV BUS-2 VOLTAGE WRONG VALUES2 220 KV PIPARIYA-2 MW/MVAR WRONG VALUES

1 132 KV GUDGAON-1 MW/MVAR WRONG VALUES

1 132 KV ASTHA-2 MW/MVAR WRONG VALUES2 132 KV ASHTA-2 CB FAULTY CLOSE3 132/33 KV 40 MVA CB OPEN CLOSE4 132 KV BUS FREQUENCY NON CURRENT

1 400 KV & 220 KV BUS FREQUENCY WRONG VALUES2 400 KV BUS COUPLER CB FAULTY

1 220 KV BHOPAL-1 CB OPEN CLOSE2 132 KV SHYAMPUR-2 CB NON CURRENT CLOSE

1 220 KV BUS VOLTAGE WRONG VALUES2 132 KV S.P.M PROCESSES CONNECTION REQUIRED3 132 KV SHAHGANJ PROCESSES CONNECTION REQUIRED4 132 KV TRIDENT PROCESSES CONNECTION REQUIRED

.

1 132 KV SEHORE CB FAULTY2 132/33KV 20 MVA XMER CB NON CURRENT

1 132/33KV 20 MVA XMER CB NA CLOSE

1 SOE DATA PROCESSES CONNECTION REQUIRED

14-08-2017SARNI 220 KV S/S

HARDA 132 KV S/S

ITARSI 220 KV S/S

BETUL 220 KV S/S

ALL CB STATUS ARE NON-CURRENT

KHILCHIPUR 132 KV S/S

SARANGPUR 132 KV S/S

ASHTA 132 KV S/S

ASHTA 400 KV S/S

SOE DATA NOT RECEIVED

BAIRAGRAH 220 KV S/S

HOSHANGABAD 220 KV S/S

ICHAWAR 132 KV S/S

Agenda of 59th OCCM of MP 63

Page 66: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 400 KV ITARSI-2 MVAR WRONG VALUES2 400 KV DAMOH-1&2 (LINE REACTOR) MVAR WRONG VALUES

1 220KV BUS COUPLER MW/MVAR NON CURRENT2 132 KV TRACTION-2 MW NON CURRENT3 132KV BUS COUPLER MW/MVAR NON CURRENT4 132 KV BINA CB FAULTY

1 220 KV BHOPAL MW/MVAR NON CURRENT2 220KV BUS VOLTAGE WRONG VALUES3 220KV BUS COUPLER MW/MVAR PROCESSES CONNECTION REQUIRED4 132 KV SANCHI R.-TRACT.-1 CB NON CURRENT5 132KV BUS COUPLER MW/MVAR PROCESSES CONNECTION REQUIRED6 220/132 KV 160 MVA XMER-2(LV) CB FAULTY CLOSE

1 132KV BUS COUPLER CB FAULTY

100 mva MW/MVAR wrong values1 220 KV HOSHANGABAD MVAR NON CURRENT2 220 KV BUS COUPLER CB FAULTY3 132 KV AMRAWAT KHURD MW/MVAR NON CURRENT4 132 KV BAGRODA MW/MVAR NON CURRENT5 132 KV BHEL MW/MVAR NON CURRENT6 132 KV STDS MW/MVAR NON CURRENT7 132 KV BUS COUPLER MW/MVAR NON CURRENT

1 220 KB BUS COUPLER CB FAULTY CLOSE2 220 KV TRANSFER BREAKER CB FAULTY OPEN3 220/132 KV 160 MVA XMR-2 CB FAULTY CLOSE

BERASIA 132 KV S/S

BHOPAL 220 KV S/S

MANDIDEEP 220 KV S/S

14-08-2017BHOPAL 400 KV S/S

GANJBASODA 220 KV S/S

VIDISHA 220 KV S/S

MANDIDEEP 132 KV S/SALL CB STATUS ARE NON CURRENT

Agenda of 59th OCCM of MP 64

Page 67: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 220 KV BUS COUPLER-2 CB FAULTY

2 220 KV BUS COUPLER-1MW/MVA

R NON CURRENT3 220 KV MORENA-1 CB FAULTY4 132 KV BUS COUPLER-1 CB FAULTY

1 220 KV BUS COUPLER CB FAULTY

2 132 KV BUS COUPLERMW/MVA

R NON CURRENT3 132 KV KOLARAS CB FAULTY CLOSE4 132 KV INTERCONNECTOR-1 CB FAULTY CLOSE

1 132 KV SABALGARH-1MW/MVA

R SIGN REVERSAL

2 132 KV BARODAMW/MVA

R WRONG VALUES

3 132/33 KV 63 MVA XMER-1MW/MVA

R WRONG VALUES

1 132 KV BUS COUPLER CB FAULTY OPEN2 132/33 KV 63 MVA XMER-2 CB FAULTY CLOSE

1 220 KV BUS COUPLER CB FAULTY CLOSE2 220 KV BUS TIE CB FAULTY

3 132 KV DABRAMW/MVA

R/CBPROCESSES CONNECTION

REQUIRED

1 132/33 KV 40 MVA TR CB NON CURRENT CLOSE

SOE DATA NOT RECEIVED

GWALIOR-2_220 KV S/S SOE DATA NOT RECEIVED

VIJAYPUR 132 KV S/S

16-08-2017

MALANPUR 220 KV S/S

SHIVPURI 220 KV S/S

SHOEPURKALAN 132 KV S/S

MEHGAON 220 KV S/S

DATIA 220 KV S/S

Agenda of 59th OCCM of MP 65

Page 68: No.07-05/SG-9B-II/2074 Jabalpur, dated:05.09 of 59th OCCM of MP.pdfITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 5th meeting of Operation & Coordination8 Committee of MP held on

Name at SLDC end at site end

1 GEN 6 GT MW/MVAR 0 155 /102 GEN 7 GT MW/MVAR 0 160/103 GEN 6 GT CB FAULTY OPEN4 GEN 7 GT CB FAULTY OPEN5 220 KV TRB CB FAULTY CLOSE

1 UNIT 5 GT MW N/A 1902 STATION XMER 5A & 5B CB N/A3 132/33 AUTO XMER CB N/A

1 400/220 KV TR 1 & 2 (315MVA ) OLTC N/C

1 400/220 KV ICT CB FAULTY CLOSE2 400 KV BUS TIE CB NA CLOSE3 400 KV STN TRANSFORMER A & B CB NA CLOSE5 STN TR 1 ,2 (220 KV ) CB NA CLOSE

6 220 KV BUS TIE CB NA CLOSE

7 220 /33 KV TR CB/MW/MVAR NA8 400 KV BUS 1 FREQ 49.79 49.989 220 KV BUS 2 VOLTAGE 197 230

1 220 KV SIRMORE MVAR 494 52 220 KV SIRMORE MVAR 685 53 220 KV SATNA MW 23 274 220 KV KOTAR MW 49 54

RAJGHAT H P S RTU OUT PENCH H P S RTU OUT

SATPURA T P S

AMARKANTAK TPS

SINGHA JI S T P S

S G T P S

TONS H P S

DEOLOAN H P S Telemetry N/C

Agenda of 59th OCCM of MP 66