NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei...

23
1 AGENDA TRAINING BANDUNG 2017 NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des ELECTRICAL, INSTRUMENTATION & CONTROL SYSTEM 1 ACDC ELECTRICAL MOTOR CONTROL 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14 2 ADVANCED & OPTIMAL PID CONTROLLER 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16 3 ADVANCED & OPTIMAL PROCESS CONTROL 5 9,500,000 09-13 06-10 20-24 17-21 30-03 05-09 10-14 01-05 12-16 03-07 14-18 05-09 4 ALARM & ANNUNCIATOR SYSTEM MANAGEMENT 4 8,500,000 11-14 07-10 01-04 10-13 17-20 07-10 05-08 23-26 11-14 04-07 06-09 06-09 5 BASIC ELECTRICAL 3 6,500,000 12-14 16-18 23-25 20-22 08-11 05-07 27-29 14-16 18-20 12-14 02-04 07-09 6 BASIC ELECTRICAL FOR NON ELECTRICIAN 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16 7 CONTROL AND CHOKE VALVES 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14 8 DISTRIBUTION SYSTEM PROTECTION 4 8,500,000 11-14 07-10 01-04 10-13 17-20 07-10 05-08 23-26 11-14 04-07 06-09 06-09 9 ELECTRIC INSTALATION IN HAZARDOUS AREA 4 8,500,000 17-20 15-18 07-10 19-22 15-18 07-10 12-15 21-24 06-09 23-26 22-25 18-21 10 ELECTRICAL CALIBRATION 3 8,500,000 23-25 09-11 16-18 17-19 18-20 08-10 24-26 21-23 18-20 12-14 27-29 11-13 11 ELECTRICAL EQUIPMENT SYSTEM AND MAINTENANCE 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16 12 ELECTRICAL POWER GENERATOR 5 9,500,000 23-27 20-24 14-18 18-22 29-02 13-17 18-22 22-26 25-29 24-28 07-11 19-23 13 ELECTRICAL POWER SYSTEM ANALYSIS AND PROTECTION 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

Transcript of NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei...

1

AGENDA TRAINING BANDUNG 2017

NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des

ELECTRICAL, INSTRUMENTATION & CONTROL SYSTEM

1 ACDC ELECTRICAL MOTOR CONTROL 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

2 ADVANCED & OPTIMAL PID CONTROLLER 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

3 ADVANCED & OPTIMAL PROCESS CONTROL 5 9,500,000 09-13 06-10 20-24 17-21 30-03 05-09 10-14 01-05 12-16 03-07 14-18 05-09

4 ALARM & ANNUNCIATOR SYSTEM MANAGEMENT 4 8,500,000 11-14 07-10 01-04 10-13 17-20 07-10 05-08 23-26 11-14 04-07 06-09 06-09

5 BASIC ELECTRICAL 3 6,500,000 12-14 16-18 23-25 20-22 08-11 05-07 27-29 14-16 18-20 12-14 02-04 07-09

6 BASIC ELECTRICAL FOR NON ELECTRICIAN 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

7 CONTROL AND CHOKE VALVES 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

8 DISTRIBUTION SYSTEM PROTECTION 4 8,500,000 11-14 07-10 01-04 10-13 17-20 07-10 05-08 23-26 11-14 04-07 06-09 06-09

9 ELECTRIC INSTALATION IN HAZARDOUS AREA 4 8,500,000 17-20 15-18 07-10 19-22 15-18 07-10 12-15 21-24 06-09 23-26 22-25 18-21

10 ELECTRICAL CALIBRATION 3 8,500,000 23-25 09-11 16-18 17-19 18-20 08-10 24-26 21-23 18-20 12-14 27-29 11-13

11 ELECTRICAL EQUIPMENT SYSTEM AND MAINTENANCE 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

12 ELECTRICAL POWER GENERATOR 5 9,500,000 23-27 20-24 14-18 18-22 29-02 13-17 18-22 22-26 25-29 24-28 07-11 19-23

13 ELECTRICAL POWER SYSTEM ANALYSIS AND PROTECTION 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

2

NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des

14 ELECTRICAL POWER SYSTEM ANALYSIS USING SOFTWARE

APPLICATION APPLICATION 4 8,500,000 23-26 21-24 22-25 26-29 02-05 14-17 19-22 28-31 27-30 25-28 27-30 13-16

15 ELECTRICAL POWER SYSTEM PROTECTION 4 8,500,000 16-19 13-16 20-23 03-06 02-05 12-15 17-20 21-24 25-28 23-26 18-21 04-07

16 ELECTRICAL TRANSFORMER TESTING AND MAINTENANCE 4 8,500,000 16-19 13-16 20-23 03-06 02-05 12-15 17-20 21-24 25-28 23-26 18-21 04-07

17 ELECTRONIC SHUTDOWN AND LOGIC SYSTEM 4 8,500,000 24-27 21-24 14-17 25-28 16-19 06-09 11-14 08-11 12-15 17-20 21-24 19-22

18 FUZZY LOGIC CONTROL 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

19 GRUNDING SYSTEM AND LIGHTNING PROTECTION 5 9,500,000 10-14 21-25 20-24 04-08 16-20 12-16 04-08 08-12 05-09 10-14 21-25 12-16

20 HUMAN MACHINE INTERFACE (HMI) 4 8,500,000 17-20 15-18 07-10 19-22 15-18 07-10 12-15 21-24 06-09 23-26 22-25 18-21

21 INSTRUMENTATION & PROCESS CONTROL 5 9,500,000 10-14 21-25 20-24 04-08 16-20 12-16 04-08 08-12 05-09 10-14 21-25 12-16

22 INSTRUMENTATION AND CONTROL SYSTEM 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

23 LV AND MV GENERATOR 4 8,500,000 09-12 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

24 LV SWITCHGEAR MAINTENANCE AND COORDINATION 4 8,500,000 16-19 13-16 20-23 03-06 02-05 12-15 17-20 21-24 25-28 23-26 18-21 04-07

25 PEMELIHARAAN INSTALASI LISTRIK 4 8,500,000 17-20 01-04 14-17 25-28 02-05 12-15 19-22 28-31 13-16 11-14 27-30 13-16

26 PEMELIHARAAN MOTOR LISTRIK 4 8,500,000 23-26 21-24 22-25 26-29 02-05 14-17 19-22 28-31 27-30 25-28 27-30 13-16

27 PENGENDALIAN MOTOR LISTRIK SECARA ELEKTRONIK 4 8,500,000 11-14 07-10 01-04 10-13 17-20 07-10 05-08 23-26 11-14 04-07 06-09 06-09

28 PERAWATAN PERALATAN LISTRIK 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

29 PIPING AND INSTRUMENT DIAGRAM (P&ID) 4 8,500,000 23-26 21-24 22-25 26-29 02-05 14-17 19-22 28-31 27-30 25-28 27-30 13-16

3

NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des

30 PLC FOR BEGINNER 4 8,500,000 09-12 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

31 POWER ELECTRICAL INSTALLATION SYSTEM 4 8,500,000 17-20 15-18 07-10 19-22 15-18 07-10 12-15 21-24 06-09 23-26 22-25 18-21

32 POWER ELECTRONIC CONVERTERS AND DESIGN 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

33 POWER TRANSFORMER OPERATION AND MAINTENANCE 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

34 PROGRAMMABLE LOGIC CONTROLLER 4 8,500,000 11-14 07-10 01-04 10-13 17-20 07-10 05-08 23-26 11-14 04-07 06-09 06-09

35 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 4 8,500,000 11-14 07-10 01-04 10-13 17-20 07-10 05-08 23-26 11-14 04-07 06-09 06-09

36 SAFETY SHUTDOWN SYSTEMS 5 9,500,000 23-27 20-24 14-18 18-22 29-02 13-17 18-22 22-26 25-29 24-28 07-11 19-23

37 SCADA SYSTEM 5 9,500,000 10-14 14-18 07-11 25-29 15-19 06-10 25-29 21-25 26-30 17-21 27-01 18-22

38 SUPERVISORY CONTROL AND DATA ACQUISITION

(SCADA) 5 9,500,000 10-14 21-25 20-24 04-08 16-20 12-16 04-08 08-12 05-09 10-14 21-25 12-16

39 TRANSMISSION AND DISTRIBUTION OPERATION AND

MAINTENANCE 4 8,500,000 23-26 21-24 22-25 26-29 02-05 14-17 19-22 28-31 27-30 25-28 27-30 13-16

40 UNINTERUPTIBLE POWER SUPLY OPERATION SUPLY

MAINTANCE 4 8,500,000 16-19 13-16 20-23 03-06 02-05 12-15 17-20 21-24 25-28 23-26 18-21 04-07

41 VARIABLE SPEED DRIVES 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

MECHANICAL, MAINTENANCE, OPERATION & TROUBLESHOOTING

42 ALAT PENUKAR KALOR (HEAT EXCHANGER): OPERASI DAN

PERAWATAN 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

4

NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des

43 ALIGNMENT AND VIBRATION INSPECTION SYSTEM 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

44 ALIGNMENT, LEVELLING AND ROTOR BALANCING 3 6,500,000 23-25 09-11 16-18 17-19 18-20 08-10 24-26 21-23 18-20 12-14 27-29 11-13

45 ANALISIS DAN PENGUKURAN GETARAN MEKANIK

(ANALYSIS AND MEASURING OF VIBRATION MACHINERY) 4 8,500,000 11-14 07-10 01-04 10-13 17-20 07-10 05-08 23-26 11-14 04-07 06-09 06-09

46 ASME PTC 4 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

47 AUTOMOTIVE (CARS) AIR CONDITIONING (AC) SYSTEM 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

48 BASIC GAS ENGINE 4 8,500,000 11-14 07-10 01-04 10-13 17-20 07-10 05-08 23-26 11-14 04-07 06-09 06-09

49 BEARING AND OIL LUBRICATION FOR MACHINERY 4 8,500,000 17-20 15-18 07-10 19-22 15-18 07-10 12-15 21-24 06-09 23-26 22-25 18-21

50 BELT CONVEYOR TECHNOLOGY - DESIGN &

TROUBLESHOOTING 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

51 BOILER (KETEL UAP) DAN TURBIN UAP OPERASI,

PERAWATAN DAN TROUBLESHOOTING 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

52 CALLIBRATION OF MEASURING TOOL 4 8,500,000 23-26 21-24 22-25 26-29 02-05 14-17 19-22 28-31 27-30 25-28 27-30 13-16

53 COATING SYSTEM AND PROTECTION CORROSION 4 8,500,000 16-19 13-16 20-23 03-06 02-05 12-15 17-20 21-24 25-28 23-26 18-21 04-07

54 CONDITIONS BASE INSPECTION AND MAINTENANCE 4 8,500,000 16-19 13-16 20-23 03-06 02-05 12-15 17-20 21-24 25-28 23-26 18-21 04-07

55 CONTROL VALVE OPERATION, MAINTENANCE, AND

TROUBLE SHOOTING 4 8,500,000 24-27 21-24 14-17 25-28 16-19 06-09 11-14 08-11 12-15 17-20 21-24 19-22

56 DYNAMIC OF MACHINE TOOLS 4 8,500,000 17-20 15-18 07-10 19-22 15-18 07-10 12-15 21-24 06-09 23-26 22-25 18-21

5

NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des

57 FINITE ELEMENT METHODS (FEM) 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

58 FISCAL AND CUSTODY METERING 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

59 FLOW MEASUREMENT AND CONTROL ELEMENT 4 8,500,000 09-12 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

60 FLUID FLOW–GAS METERING AND CUSTODY TRANSFER 5 9,500,000 10-14 21-25 20-24 04-08 16-20 12-16 04-08 08-12 05-09 10-14 21-25 12-16

61 GENSET TEKNOLOGI, PERAWATAN DAN OPERASI 4 8,500,000 16-19 13-16 20-23 03-06 02-05 12-15 17-20 21-24 25-28 23-26 18-21 04-07

62 HAND TOOL UTILIZATION 4 8,500,000 17-20 01-04 14-17 25-28 02-05 12-15 19-22 28-31 13-16 11-14 27-30 13-16

63 HEAVY DUTY EQUIPMENT 4 8,500,000 23-26 21-24 22-25 26-29 02-05 14-17 19-22 28-31 27-30 25-28 27-30 13-16

64 HYDRAULIC & PNEUMATIC 4 8,500,000 11-14 07-10 01-04 10-13 17-20 07-10 05-08 23-26 11-14 04-07 06-09 06-09

65 HYDRAULIC CONTROL SYSTEM 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

66 INDUSTRIAL METROLOGY 4 8,500,000 23-26 21-24 22-25 26-29 02-05 14-17 19-22 28-31 27-30 25-28 27-30 13-16

67 INSPEKSI DAN KOROSI 4 8,500,000 09-12 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

68 INSPECTION AND MAINTENANCE OF PRESSURE VESSEL 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

69 KINEMATIKA DAN DINAMIKA MESIN (KINEMATICS AND

DYNAMICS OF MACHINERIES) 4 8,500,000 17-20 15-18 07-10 19-22 15-18 07-10 12-15 21-24 06-09 23-26 22-25 18-21

70 MACHINERY CONDITION MONITORING 4 8,500,000 16-19 13-16 20-23 03-06 02-05 12-15 17-20 21-24 25-28 23-26 18-21 04-07

71 MACHINERY NOISE AND PROBLEM SOLVING 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

72 MAINTENANCE MANAGEMENT 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

6

NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des

73 MAINTENANCE MANAGEMENT (FOR MANUFACTURE

AND OIL & GAS COMPANY) 3 6,500,000 23-25 09-11 16-18 17-19 18-20 08-10 24-26 21-23 18-20 12-14 27-29 11-13

74 MAINTENANCE OF MACHINE COMPONENTS 4 8,500,000 11-14 07-10 01-04 10-13 17-20 07-10 05-08 23-26 11-14 04-07 06-09 06-09

75 MAINTENANCE OF PUMP AND COMPRESSOR 4 8,500,000 17-20 01-04 14-17 25-28 02-05 12-15 19-22 28-31 13-16 11-14 27-30 13-16

76 MAINTENANCE SYSTEM AND COST 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

77 MEASUREMENT SYSTEM ANALYSIS 4 8,500,000 23-26 21-24 22-25 26-29 02-05 14-17 19-22 28-31 27-30 25-28 27-30 13-16

78 MEASUREMENT TECHNIQUE FOR MAINTENANCE AND

OPERATION LATHE MACHINE 4 8,500,000 16-19 13-16 20-23 03-06 02-05 12-15 17-20 21-24 25-28 23-26 18-21 04-07

79 MECHANICAL MAINTENANCE 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

80 MECHANICAL POWER TRANSMISSION 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-13

81 MODERN MAINTENANCE MANAGEMENT 4 8,500,000 11-14 07-10 01-04 10-13 17-20 07-10 05-08 23-26 11-14 04-07 06-09 06-09

82 NON DESTRUCTIVE TEST 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

83 OIL TRANSPORTATION PIPING 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

84 OPERATION & MAINTENANCE OF BOILER 4 8,500,000 11-14 07-10 01-04 10-13 17-20 07-10 05-08 23-26 11-14 04-07 06-09 06-09

85 OPERATION AND MAINTANCE OF DIESEL ENGINE 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

86 OPERATION AND MAINTENANCE HEAVY DUTY

EQUIPMENT 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

87 OPERATION AND MAINTENANCE OF DIESEL GUNSET 4 8,500,000 11-14 07-10 01-04 10-13 17-20 07-10 05-08 23-26 11-14 04-07 06-09 06-09

7

NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des

88 OPERATION AND MAINTENANCE OF STEAM GENERATOR

AND TURBINE 4 8,500,000 17-20 15-18 07-10 19-22 15-18 07-10 12-15 21-24 06-09 23-26 22-25 18-21

89 OPERATION, MAINTENANCE, AND TROUBLESHOOTING

OF GAS TURBINE 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

90 OXY ACETYLENE WELDING 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-13

91 PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL

(OIL FENCE) SEBAGAI PENGUMPUL TUMPAHAN MINYAK 4 8,500,000 23-26 21-24 22-25 26-29 02-05 14-17 19-22 28-31 27-30 25-28 27-30 13-16

92 PEMELIHARAAN KENDARAAN 4 8,500,000 16-19 13-16 20-23 03-06 02-05 12-15 17-20 21-24 25-28 23-26 18-21 04-07

93 PERAWATAN BELT CONVEYOUR 3 6,500,000 12-14 16-18 23-25 20-22 08-11 05-07 27-29 14-16 18-20 12-14 02-04 07-09

94 PERENCANAAN DAN PENJADWALAN PERAWATAN

(MAINTENANCE PLANNING AND SCHEDULING) 4 8,500,000 24-27 21-24 14-17 25-28 16-19 06-09 11-14 08-11 12-15 17-20 21-24 19-22

95 PNEUMATIC CONTROL SYSTEM 4 8,500,000 17-20 15-18 07-10 19-22 15-18 07-10 12-15 21-24 06-09 23-26 22-25 18-21

96 POMPA DAN KOMPRESOR : OPERASI, PERAWATAN DAN

TROUBLESHOOTING 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

97 PREDICTIVE MAINTENANCE (PM) 4 8,500,000 09-12 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

98 PREVENTIVE MAINTENANCE (SHEDULE & PREDICTIVE

MAINTENANCE) 4 8,500,000 16-19 13-16 20-23 03-06 02-05 12-15 17-20 21-24 25-28 23-26 18-21 04-07

99 PUMP & COMPRESSOR 4 8,500,000 17-20 01-04 14-17 25-28 02-05 12-15 19-22 28-31 13-16 11-14 27-30 13-16

8

NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des

100 PUMP : OPERATION, MAINTENANCE AND

TROUBLESHOOTING 4 8,500,000 23-26 21-24 22-25 26-29 02-05 14-17 19-22 28-31 27-30 25-28 27-30 13-16

101 PUMPS LIFE CYCLE MANAGEMENT 4 8,500,000 09-12 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

102 PUMP OPERATION AND MAINTENANCE 4 8,500,000 11-14 07-10 01-04 10-13 17-20 07-10 05-08 23-26 11-14 04-07 06-09 06-09

103 RELIABILITY CENTERED MAINTENANCE (RCM) 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

104 ROOT CAUSE FAILURE ANALYSIS 4 8,500,000 17-20 01-04 14-17 25-28 02-05 12-15 19-22 28-31 13-16 11-14 27-30 13-16

105 SISTEM PEMIPAAN (PIPING) 4 8,500,000 23-26 21-24 22-25 26-29 02-05 14-17 19-22 28-31 27-30 25-28 27-30 13-16

106 TEKNIK KONSERVASI ENERGI MELALUI AUDIT ENERGI

PADA BANGUNAN GEDUNG 4 8,500,000 09-12 01-14 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

107 TEKNIK PERAWATAN MEKANIK 4 8,500,000 17-20 15-18 07-10 19-22 15-18 07-10 12-15 21-24 06-09 23-26 22-25 18-21

108 TEKNOLOGI PERAWATAN MESIN 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

109 TESTING OF MACHINE TOOLS 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

110 TOTAL PRODUCTIVE MAINTANCE (TPM) 4 8,500,000 16-19 13-16 20-23 03-06 02-05 12-15 17-20 21-24 25-28 23-26 18-21 04-07

111 TROUBLE SHOOTING, INSPECTION, AND MONITORING OF

MACHINERY 4 8,500,000 23-26 21-24 22-25 26-29 02-05 14-17 19-22 28-31 27-30 25-28 27-30 13-16

112 VALVE 4 8,500,000 11-14 07-10 01-04 10-13 17-20 07-10 05-08 23-26 11-14 04-07 06-09 06-09

STATISTICAL ENGINEERING, MANAGEMENT OPERATION & PRODUCTION

9

NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des

113 APPLIED TAGUCHI METHOD IN INDUSTRIES 5 9,500,000 10-14 14-18 07-11 25-29 15-19 06-10 25-29 21-25 26-30 17-21 27-01 18-22

114 EFFECTIVE LINE BALANCING 2 4,500,000 09-10 20-21 06-07 17-18 22-23 15-16 24-25 21-22 25-26 16-17 27-28 28-29

115 KESEIMBANGAN LINTAS PRODUKSI (LINE BALANCING) 2 4,500,000 10-11 27-28 07-08 04-05 22-23 19-20 11-12 28-29 25-26 23-24 27-28 05-06

116 LIFE CYCLE COSTING 2 4,500,000 24-25 07-08 14-15 11-12 29-30 06-07 18-19 01-02 05-06 30-31 07-08 12-13

117 MANAJEMEN OPERASI 2 4,500,000 30-31 14-15 21-22 18-19 09-10 13-14 25-26 15-16 12-13 03-04 14-15 19-20

118 MANAJEMEN OPERASI PRODUKSI 3 6,500,000 10-12 06-08 30-01 17-19 29-31 13-15 11-13 31-02 18-20 19-21 16-18 11-13

119 MANAJEMEN PRODUKSI 2 4,500,000 16-17 22-23 02-03 06-07 02-03 19-20 06-07 23-24 27-28 11-12 15-16 07-08

120 MANAJEMEN PRODUKSI DAN OPERASI 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

121 MANAJEMENT PERBENGKELAN 3 6,500,000 12-14 16-18 23-25 20-22 08-11 05-07 27-29 14-16 18-20 12-14 02-04 07-09

122 MANUFACTURING PROCESS TO USE CNC MACHINING 4 8,500,000 11-14 07-10 01-04 10-13 17-20 07-10 05-08 23-26 11-14 04-07 06-09 06-09

123 MANUFACTURING PROCESSES TO USE CASTING 4 8,500,000 17-20 15-18 07-10 19-22 15-18 07-10 12-15 21-24 06-09 23-26 22-25 18-21

124 MANUFACTURING PROCESSES TO USE METAL FORMING 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

125 OPTIMIZATION FOR PRODUCTION SYSTEM 4 8,500,000 23-26 21-24 22-25 26-29 02-05 14-17 19-22 28-31 27-30 25-28 27-30 13-16

126 PERANCANGAN TATA LETAK PABRIK (PLANT LAYOUT) 4 8,500,000 16-19 13-16 20-23 03-06 02-05 12-15 17-20 21-24 25-28 23-26 18-21 04-07

127 PRODUCTION AND OPERATION MANAGEMENT 4 8,500,000 24-27 21-24 14-17 25-28 16-19 06-09 11-14 08-11 12-15 17-20 21-24 19-22

128 PRODUCTION OF HELICAL GEAR 4 8,500,000 09-12 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

10

NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des

129 PROSES PEMESINAN (MACHINING) 4 8,500,000 16-19 13-16 20-23 03-06 02-05 12-15 17-20 21-24 25-28 23-26 18-21 04-07

130 SYSTEM AND COST PRODUCTION 4 8,500,000 17-20 15-18 07-10 19-22 15-18 07-10 12-15 21-24 06-09 23-26 22-25 18-21

ELECTRICAL & MECHANICAL DESIGN, IT AND SOFTWARE APPLICATION

131 ADVANCE EXCEL TRAINING 3 6,500,000 23-24 13-14 20-21 10-11 15-16 12-13 17-18 14-15 18-19 30-31 20-21 18-19

132 CAD BIDANG TEKNIK MESIN (CAD FOR MECHANICAL

AUTOCAD OR CATIA) 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

133 DISAIN ALAT BANTU CEKAM DAN PEGANG (DESIGN OF

JIGS AND FIXTURES) 4 8,500,000 11-14 07-10 01-04 10-13 17-20 07-10 05-08 23-26 11-14 04-07 06-09 06-09

134 DISAIN ALAT PENEKAN DAN PEMBENTUK (DESIGN OF

PRESS AND FORMING TOOL) 4 8,500,000 23-26 21-24 22-25 26-29 02-05 14-17 19-22 28-31 27-30 25-28 27-30 13-16

135

DISAIN KONSTRUKSI MESIN DAN PERALATAN INDUSTRI

(DESIGN OF MACHINE CONSTRUCTION AND INDUSTRIAL

EQUIPM

4 8,500,000 16-19 13-16 20-23 03-06 02-05 12-15 17-20 21-24 25-28 23-26 18-21 04-07

136 INFORMATION TECHNOLOGY INFRASTRUCTURE LIBRARY

(I T I L) VERSION 3.1 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

137 MASTERING MICROSOFT EXCEL 2 4,500,000 16-17 06-07 13-14 03-04 08-09 05-06 11-12 07-08 11-12 23-24 06-07 04-05

138 MICROSOFT PROJECT 2010 3 6,500,000 30-01 09-11 02-04 20-22 31-02 13-15 27-29 30-01 14-16 18-20 22-24 14-16

139 OPERATING SYSTEMS TECHNOLOGIES AND INSTALLATION

PROCEDURES 3 6,500,000 09-11 16-18 09-11 27-29 08-10 05-07 10-12 03-05 28-30 25-27 29-01 21-23

11

NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des

140 PROJECT MANAGEMENT (USING WIN QSB & MICROSOFT

PROJECT) 3 6,500,000 16-18 23-25 16-18 03-05 15-17 12-14 17-19 10-12 04-06 05-07 02-04 28-30

141 PROJECT MANAGEMENT(PM) WITH PRIMAVERA V6 3 6,500,000 23-25 27-01 23-25 10-12 22-24 06-08 24-26 24-26 11-13 12-14 09-11 04-06

142 SIMULASI PROSES TEKNIK KIMIA MENGGUNAKAN HYSYS 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

143 TEKNOLOGI CADCAM 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

MATERIAL KNOWLEDGE

144 GAS HANDLING, CONDITIONING, AND PROCESSING

FACILITIES 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

145 HANDLING OF DANGEROUS GOODS IN AIR TRANSPORT 3 6,500,000 23-25 09-11 16-18 17-19 18-20 08-10 24-26 21-23 18-20 12-14 27-29 11-13

146 HAZARDOUS MATERIAL HANDLING 4 8,500,000 23-26 21-24 22-25 26-29 02-05 14-17 19-22 28-31 27-30 25-28 27-30 13-16

147 HAZARDOUS MATERIAL HANDLING 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

148 MANAJEMEN MATERIAL 4 8,500,000 11-14 07-10 01-04 10-13 17-20 07-10 05-08 23-26 11-14 04-07 06-09 06-09

149 MATERIAL MANAGEMENT FOR PROJECT 4 8,500,000 17-20 15-18 07-10 19-22 15-18 07-10 12-15 21-24 06-09 23-26 22-25 18-21

150 NON DESTRUCTIVE TEST 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

151 OIL AND GAS HANDLING FACILITIES 4 8,500,000 23-26 21-24 22-25 26-29 02-05 14-17 19-22 28-31 27-30 25-28 27-30 13-16

152 PEMILIHAN MATERIAL KOMPONEN MESIN (MATERIAL

SELECTION) 4 8,500,000 16-19 13-16 20-23 03-06 02-05 12-15 17-20 21-24 25-28 23-26 18-21 04-07

12

NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des

153 PENGEMBANGAN TEKNOLOGI DAN STANDAR MATERIAL 4 8,500,000 24-27 21-24 14-17 25-28 16-19 06-09 11-14 08-11 12-15 17-20 21-24 19-22

154 PENGETAHUAN MATERIAL HANDLING & APLIKASI 4 8,500,000 09-12 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

155 PENGUJIAN MATERIAL BERSIFAT MERUSAK (DESTRUCTIVE

TEST) 4 8,500,000 16-19 13-16 20-23 03-06 02-05 12-15 17-20 21-24 25-28 23-26 18-21 04-07

156 PERLAKUAN PANAS LOGAM (HEAT TREATMENT FOR

METAL) 4 8,500,000 17-20 15-18 07-10 19-22 15-18 07-10 12-15 21-24 06-09 23-26 22-25 18-21

157 PRODUCTION HANDLING SEPARATION AND

MEASUREMENT 4 8,500,000 23-26 21-24 22-25 26-29 02-05 14-17 19-22 28-31 27-30 25-28 27-30 13-16

PURCHASING, LOGISTIC AND SUPPLY CHAIN

158 VENDOR EVALUATION 2 4,500,000 12-13 06-07 13-14 03-04 02-03 01-02 10-11 07-08 04-05 02-03 06-07 04-05

159 ADVANCE SAFETY PRINCIPLES IN WAREHOUSE 2 4,500,000 19-20 13-14 20-21 10-11 08-09 05-06 17-18 14-15 11-12 09-10 13-14 11-12

160 BASIC OF SUPPLY CHAIN MANAGEMENT (FOR BEGINNER) 2 4,500,000 26-27 20-21 06-07 17-18 15-16 12-13 24-25 21-22 18-19 16-17 20-21 18-19

161 BASIC OF VENDOR MANAGEMENT 2 4,500,000 10-11 27-28 07-08 04-05 22-23 19-20 11-12 28-29 25-26 23-24 27-28 05-06

162 BASIC PROCURENMENT AND PURCHASING 3 6,500,000 19-21 02-04 29-31 06-08 30-01 06-08 20-22 23-25 07-09 11-13 15-17 07-09

163 EFFECTIVE INVENTORY REDUCTION 2 4,500,000 24-25 07-08 14-15 11-12 29-30 06-07 18-19 01-02 05-06 30-31 07-08 12-13

164 FUNDAMENTAL OF SUPPLY CHAIN MANAGEMENT 2 4,500,000 30-31 14-15 21-22 18-19 09-10 13-14 25-26 15-16 12-13 03-04 14-15 19-20

165 HPS (HARGA PERKIRAAN SENDIRI) 2 4,500,000 16-17 06-07 13-14 03-04 08-09 05-06 11-12 07-08 11-12 23-24 06-07 04-05

13

NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des

166 INFORMATION SYSTEMS AND INFORMATION

TECHNOLOGIES FOR SUPPLY CHAIN MANAGEMENT 3 6,500,000 12-14 22-24 22-24 26-28 18-20 12-14 13-15 09-11 27-29 04-06 08-10 27-29

167 INTEGRATED PROCUREMENT MANAGEMENT 2 4,500,000 11-12 21-22 01-02 05-06 16-17 07-08 05-06 22-23 19-20 10-11 21-22 06-07

168 INVENTORY MANAGEMENT AND COST INVESTMENT

RECOVERY 4 8,500,000 11-14 07-10 08-09 10-13 23-24 14-15 12-13 15-16 26-27 24-25 06-09 21-22

169 INVENTORY MANAGEMENT 2 4,500,000 18-19 01-02 15-16 12-13 30-31 14-15 12-13 29-30 26-27 17-18 28-29 13-14

170 KOMPUTERISASI PERGUDANGAN 2 4,500,000 25-26 08-09 22-23 19-20 04-05 08-09 19-20 02-03 06-07 24-25 01-02 20-21

171 KPI FOR WAREHOUSE 2 4,500,000 23-24 15-16 29-30 26-27 18-19 15-16 26-27 09-10 13-14 04-05 08-09 27-28

172 LOGISTIC AND SUPPLY CHAIN MANAGEMENT 4 8,500,000 23-26 21-24 22-25 26-29 02-05 14-17 19-22 28-31 18-19 27-30 18-21 13-16

173 LOGISTIC MANAGEMENT 2 4,500,000 16-17 22-23 02-03 06-07 02-03 19-20 06-07 23-24 27-28 11-12 15-16 07-08

174 LOGISTIC MANAGEMENT AND SUPPLY CHAIN

MANAGEMENT 3 6,500,000 18-20 08-10 08-10 05-07 17-19 08-10 19-21 29-31 06-08 17-19 28-30 13-15

175 MANAJEMEN LOGISTIK 3 6,500,000 25-27 15-17 15-17 19-21 04-06 15-17 26-28 02-04 13-15 24-26 01-03 20-22

176 MANAJEMEN PERGUDANGAN DAN PERSEDIAAN 2 4,500,000 23-24 13-14 20-21 10-11 15-16 12-13 17-18 14-15 18-19 30-31 20-21 18-19

177 MODERN WAREHOUSE DESIGN 2 4,500,000 09-10 02-03 09-10 21-22 02-03 06-07 13-14 30-31 07-08 18-19 22-23 14-15

178 NEGOTIATION SKILL FOR PURCHASING STAFF 3 6,500,000 24-26 21-23 21-23 18-20 16-18 14-16 25-27 08-10 12-14 03-05 14-16 19-21

179 PLANNING AND MANAGING INVENTORIES IN A SUPPLY

CHAIN 3 6,500,000 11-13 01-03 01-03 25-27 03-05 01-03 12-14 22-24 26-28 10-12 21-23 06-08

14

NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des

180 PRINCIPLES OF WAREHOUSE MANAGEMENT 2 4,500,000 16-17 09-10 16-17 27-28 29-30 07-08 20-21 03-04 14-15 25-26 29-30 21-22

181 RFID FOR WAREHOUSE 2 4,500,000 23-24 16-17 23-24 03-04 09-10 14-15 27-28 10-11 28-29 05-06 02-03 28-29

182 SUPPLY MARKET ANALYSIS 2 4,500,000 12-13 23-24 30-31 10-11 08-09 08-09 06-07 24-25 27-28 12-13 09-10 04-05

183 TRANSPORTATION AND FACILITY DECISIONS IN A SUPPLY

CHAIN 3 6,500,000 10-12 07-09 07-09 04-06 29-31 13-15 11-13 28-30 25-27 23-25 27-29 05-07

184 TRANSPORTATION MANAGEMENT 3 6,500,000 17-19 14-16 14-16 11-13 02-04 07-09 18-20 01-03 05-07 30-01 07-09 12-14

185 VENDOR MANAGEMENT 3 6,500,000 12-14 16-18 23-25 20-22 08-11 05-07 27-29 14-16 18-20 12-14 02-04 07-09

186 WAREHOUSE MANAGEMENT OPERATION AND CONTROL 2 4,500,000 24-25 13-14 20-21 18-19 15-16 13-14 18-19 28-29 25-26 20-21 16-17 27-28

187 WAREHOUSING & DISTRIBUTION MANAGEMENT 3 6,500,000 23-25 20-22 20-22 17-19 22-24 06-08 24-26 21-23 18-20 16-18 20-22 18-20

HEALTH, SAFETY AND ENVIRONMENT

188 AUDIT INTERNAL SMK3 PERMENAKER NO. 5 THN 1996 4 8,500,000 09-12 13-16 06-09 17-20 31-03 05-08 10-13 02-05 13-16 17-20 13-16 11-14

189 AUDIT K-3 DI KANTOR & FACTORY 2 4,500,000 12-13 06-07 13-14 03-04 02-03 01-02 10-11 07-08 04-05 02-03 06-07 04-05

190 CONSTRUCTION & MAINTENANCE SAFE 4 8,500,000 11-14 07-10 01-04 10-13 17-20 07-10 05-08 23-26 11-14 04-07 06-09 06-09

191 DETECTION,INVESTIGATION, AND INTTEROGATION 2 4,500,000 19-20 13-14 20-21 10-11 08-09 05-06 17-18 14-15 11-12 09-10 13-14 11-12

192 DISASTER MANAGEMENT 3 6,500,000 16-18 13-15 13-15 10-12 15-17 12-14 17-19 14-16 11-13 09-11 13-15 11-13

193 DRILLING SAFETY AND ENVIRONMENTAL 4 8,500,000 16-19 13-16 20-23 03-06 02-05 12-15 17-20 21-24 25-28 23-26 18-21 04-07

194 HAZARDOUS MATERIALS SAFE HANDLING 4 8,500,000 24-27 21-24 14-17 25-28 16-19 06-09 11-14 08-11 12-15 17-20 21-24 19-22

15

NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des

195 HUMAS & K3 2 4,500,000 26-27 20-21 06-07 17-18 15-16 12-13 24-25 21-22 18-19 16-17 20-21 18-19

196 INTRODUCTION OF BASIC SAFETY 3 6,500,000 09-11 06-08 06-08 03-05 08-10 05-07 10-12 07-09 04-06 02-04 06-08 04-06

197 LAND TRANSPORTATION SAFETY MANAGEMENT SYSTEM 4 8,500,000 17-20 15-18 07-10 19-22 15-18 07-10 12-15 21-24 06-09 23-26 22-25 18-21

198 MANAGING & SAFETY LEADERSHIP 2 4,500,000 09-10 02-03 09-10 21-22 02-03 06-07 13-14 30-31 07-08 18-19 22-23 14-15

199 OIL SPILL HANDLING IN ONSHORE AND OFFSHORE

OPERATIONS 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

200 BASIC HSE-SHE-K3LL 4 8,500,000 17-20 15-18 07-10 19-22 15-18 07-10 12-15 21-24 06-09 23-26 22-25 18-21

201 PELATIHAN CONFINED SPACE 2 4,500,000 30-31 14-15 21-22 18-19 09-10 13-14 25-26 15-16 12-13 03-04 14-15 19-20

202 JOB SAFETY ANALYSIS 2 4,500,000 16-17 06-07 13-14 03-04 08-09 05-06 11-12 07-08 11-12 23-24 06-07 04-05

203 PENCEGAHAN DAN PENANGGULANGAN KEBAKARAN 3 6,500,000 17-19 13-15 08-10 25-27 04-06 07-09 19-21 08-10 13-15 26-28 23-25 18-20

204 PENGENALAN SMK3LL 3 6,500,000 24-26 20-22 15-17 05-07 18-20 14-16 26-28 22-24 27-29 02-04 30-01 05-07

205 PRODUCTION SAFETY SYSTEM 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

206 PRODUCTION SAFETY SYSTEMS AND HAZARDOUS AREA

CLASSIFICATION 5 9,500,000 10-14 21-25 20-24 04-08 16-20 12-16 04-08 08-12 05-09 10-14 21-25 12-16

207 SAFETY AUDIT & SITE INSPECTION 5 9,500,000 23-27 20-24 14-18 18-22 29-02 13-17 18-22 22-26 25-29 24-28 07-11 19-23

208 SAFETY LEADERSHIP 2 4,500,000 11-12 21-22 01-02 05-06 16-17 07-08 05-06 22-23 19-20 10-11 21-22 06-07

209 SISTEM MANAJEMEN K3 2 4,500,000 18-19 01-02 15-16 12-13 30-31 14-15 12-13 29-30 26-27 17-18 28-29 13-14

16

NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des

210 SMK3 PERMENAKER NO. 5 THN1996 & PP NO.50 THN

2012 4 8,500,000 23-26 21-24 22-25 26-29 02-05 14-17 19-22 28-31 27-30 25-28 27-30 13-16

211 HAZOPS 4 8,500,000 09-12 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

212 ISO 9001,ISO 14001 & OHSAS 18001 4 8,500,000 16-19 13-16 20-23 03-06 02-05 12-15 17-20 21-24 25-28 23-26 18-21 04-07

213 TRANSPORTATION SAFETY MANAGEMENT SYSTEM 4 8,500,000 23-26 21-24 22-25 26-29 02-05 14-17 19-22 28-31 27-30 25-28 27-30 13-16

214 WATER TREATING AND CHEMICALS 4 8,500,000 11-14 07-10 01-04 10-13 17-20 07-10 05-08 23-26 11-14 04-07 06-09 06-09

MANAGEMENT, FINANCIAL, BUDGETING, ACCOUNTING, EXPORT-IMPORT

215 ACCOUNT RECEIVABLE MANAGEMENT 2 4,500,000 19-20 13-14 20-21 10-11 08-09 05-06 17-18 14-15 11-12 09-10 13-14 11-12

216 ACCOUNTING INFORMATION SYSTEMS 3 6,500,000 19-21 02-04 29-31 06-08 30-01 06-08 20-22 23-25 07-09 11-13 15-17 07-09

217 ASSET MANAGEMENT 3 6,500,000 30-01 09-11 02-04 20-22 31-02 13-15 27-29 30-01 14-16 18-20 22-24 14-16

218 ASSET MANAGEMENT BERBASIS ICT 3 6,500,000 09-11 16-18 09-11 27-29 08-10 05-07 10-12 03-05 28-30 25-27 29-01 21-23

219 BASIC ACCOUNTING 3 6,500,000 16-18 23-25 16-18 03-05 15-17 12-14 17-19 10-12 04-06 05-07 02-04 28-30

220 BUDGET : PLANNING, CONTROLLING & ANALYSING 3 6,500,000 23-25 27-01 23-25 10-12 22-24 06-08 24-26 24-26 11-13 12-14 09-11 04-06

221 BUDGETING AND PROJECT COST CONTROL 3 6,500,000 10-12 06-08 30-01 17-19 29-31 13-15 11-13 31-02 18-20 19-21 16-18 11-13

222 CASH MANAGEMENT 2 4,500,000 25-26 08-09 22-23 19-20 04-05 08-09 19-20 02-03 06-07 24-25 01-02 20-21

223 CUSTOM FACILITY, SHIPPING DOCUMENTS & EXPORT

IMPORT PROCEDURE 3 6,500,000 18-20 08-10 08-10 05-07 17-19 08-10 19-21 29-31 06-08 17-19 28-30 13-15

17

NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des

224 EXPORT IMPORT 3 6,500,000 25-27 15-17 15-17 19-21 04-06 15-17 26-28 02-04 13-15 24-26 01-03 20-22

225 STUDI KELAYAKAN INVESTASI MENGGUNAKAN APLIKASI

MICROSOFT EXCEL 3 6,500,000 12-14 22-24 22-24 26-28 18-20 12-14 13-15 09-11 27-29 04-06 08-10 27-29

MANAGEMENT, HR MANAGEMENT

226 CUSTOMER RELATION MANAGEMENT 3 6,500,000 11-13 01-03 01-03 25-27 03-05 01-03 12-14 22-24 26-28 10-12 21-23 06-08

227 ANALISIS BEBAN KERJA 2 4,500,000 23-24 13-14 20-21 10-11 15-16 12-13 17-18 14-15 18-19 30-31 20-21 18-19

228 BALANCED SCORECARD (BSC) CONCEPT AND

IMPLEMENTATION 3 6,500,000 24-26 21-23 21-23 18-20 16-18 14-16 25-27 08-10 12-14 03-05 14-16 19-21

229 BUDAYA ORGANISASI DAN MANAJEMEN PERUBAHAN 2 4,500,000 19-20 13-14 20-21 10-11 08-09 05-06 17-18 14-15 11-12 09-10 13-14 11-12

230 CERTIFIED HUMAN RESOURCE PROFESSIONAL 2 4,500,000 26-27 20-21 06-07 17-18 15-16 12-13 24-25 21-22 18-19 16-17 20-21 18-19

231 CHANGE & CONFLICT MANAGEMENT AND DEALING WITH

DIFFICULT PEOPLE 2 4,500,000 10-11 27-28 07-08 04-05 22-23 19-20 11-12 28-29 25-26 23-24 27-28 05-06

232 COMPETENCY BASED TRAINING EVALUATION 2 4,500,000 24-25 07-08 14-15 11-12 29-30 06-07 18-19 01-02 05-06 30-31 07-08 12-13

233 CORPORATE SOCIAL RESPONSIBILITY 2 4,500,000 30-31 14-15 21-22 18-19 09-10 13-14 25-26 15-16 12-13 03-04 14-15 19-20

234 EFFECTIVE PUBLIC SPEAKING AND BUSINESS

PRESENTATION 2 4,500,000 09-10 02-03 09-10 21-22 02-03 06-07 13-14 30-31 07-08 18-19 22-23 14-15

235 ETHICS & ATTITUDE AT THE OFFICE 2 4,500,000 16-17 09-10 16-17 27-28 29-30 07-08 20-21 03-04 14-15 25-26 29-30 21-22

236 GENERAL AFFAIR MANAGEMENT 3 6,500,000 17-19 14-16 14-16 11-13 02-04 07-09 18-20 01-03 05-07 30-01 07-09 12-14

18

NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des

237 GOOD CORPORATE GOVERNANCE 4 8,500,000 23-26 21-24 22-25 26-29 02-05 14-17 19-22 28-31 27-30 25-28 27-30 13-16

238 HOLISTIC CSR AND SUSTAINABLE COMMUNITY

DEVELOPMENT 2 4,500,000 16-17 22-23 02-03 06-07 02-03 19-20 06-07 23-24 27-28 11-12 15-16 07-08

239 HOUR OF CHANGE MANAGEMENT 3 6,500,000 23-25 20-22 20-22 17-19 22-24 06-08 24-26 21-23 18-20 16-18 20-22 18-20

240 HOW TO IMPROVE BUSINESS PERFORMANCE 3 6,500,000 10-12 07-09 07-09 04-06 29-31 13-15 11-13 28-30 25-27 23-25 27-29 05-07

241 HR MANAGEMENT 2 4,500,000 16-17 09-10 16-17 27-28 29-30 07-08 20-21 03-04 14-15 25-26 29-30 21-22

242 HR MANAGEMENT OF CHANGE 3 6,250,000 16-18 13-15 13-15 10-12 15-17 12-14 17-19 14-16 11-13 09-11 13-15 11-13

243 HUB INDUSTRIAL KEPEGAWAIAN 2 4,500,000 11-12 21-22 01-02 05-06 16-17 07-08 05-06 22-23 19-20 10-11 21-22 06-07

244 HUMAN RESOUCES MANAGEMENT 2 4,500,000 18-19 01-02 15-16 12-13 30-31 14-15 12-13 29-30 26-27 17-18 28-29 13-14

245 INTERPRETING FOR ISO 9001 2 4,500,000 25-26 08-09 22-23 19-20 04-05 08-09 19-20 02-03 06-07 24-25 01-02 20-21

246 KEIMIGRASIAN 2 4,500,000 23-24 15-16 29-30 26-27 18-19 15-16 26-27 09-10 13-14 04-05 08-09 27-28

247 MAN POWER PLANNING 3 6,500,000 09-11 06-08 06-08 03-05 08-10 05-07 10-12 07-09 04-06 02-04 06-08 04-06

248 MANAGEMENT INFORMATION SYSTEM 3 6,500,000 24-26 20-22 15-17 05-07 18-20 14-16 26-28 22-24 27-29 02-04 30-01 05-07

249 MANAGEMENT PROJECT : STRATEGI DAN IMPLEMENTASI 4 8,500,000 16-19 13-16 20-23 03-06 02-05 12-15 17-20 21-24 25-28 23-26 18-21 04-07

250 MANAJEMEN KOMPENSASI BERBASIS KINERJA 2 4,500,000 11-12 21-22 01-02 05-06 16-17 07-08 05-06 22-23 19-20 10-11 21-22 06-07

251 MANAJEMEN PENGEMBANGAN PRODUK 2 4,500,000 18-19 01-02 15-16 12-13 30-31 14-15 12-13 29-30 26-27 17-18 28-29 13-14

252 MANAJEMEN PROYEK 3 6,500,000 17-19 13-15 08-10 25-27 04-06 07-09 19-21 08-10 13-15 26-28 23-25 18-20

19

NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des

253 MANAJEMEN RESIKO 2 4,500,000 23-24 15-16 29-30 26-27 18-19 15-16 26-27 09-10 13-14 04-05 08-09 27-28

254 METODE PENGAMBILAN KEPUTUSAN (ANALYTICAL

HIERARCHY PROCESS) 2 4,500,000 16-17 22-23 02-03 06-07 02-03 19-20 06-07 23-24 27-28 11-12 15-16 07-08

255 PERFORMANCE MANAGEMENT 3 6,500,000 23-25 27-01 23-25 10-12 22-24 06-08 24-26 24-26 11-13 12-14 09-11 04-06

256 PLAN LAY OUT OFFICE 3 6,500,000 10-12 06-08 30-01 17-19 29-31 13-15 11-13 31-02 18-20 19-21 16-18 11-13

257 PROJECT MANAGEMENT 3 6,500,000 12-14 16-18 23-25 20-22 08-11 05-07 27-29 14-16 18-20 12-14 02-04 07-09

258 SECURITY MANAGEMENT SYSTEM 3 6,500,000 16-18 23-25 16-18 03-05 15-17 12-14 17-19 10-12 04-06 05-07 02-04 28-30

259 SIX SIGMA CHAMPIONS 4 8,500,000 10-14 21-25 20-24 04-08 16-20 12-16 04-08 08-12 05-09 10-14 21-25 12-16

260 STRATEGI MEMBANGUN IMAGE CORPORATE 2 4,500,000 25-26 08-09 22-23 19-20 04-05 08-09 19-20 02-03 06-07 24-25 01-02 20-21

261 STRATEGI SISTEM INFORMASI KESEHATAN DI RUMAH

SAKIT 3 6,250,000 09-11 16-18 09-11 27-29 08-10 05-07 10-12 03-05 28-30 25-27 29-01 21-23

262 STUDI KELAYAKAN PROYEK 2 4,500,000 23-24 13-14 20-21 10-11 15-16 12-13 17-18 14-15 18-19 30-31 20-21 18-19

263 THE BEGINNER FOR HRD & GA MANAGEMENT 2 4,500,000 18-19 01-02 15-16 12-13 30-31 14-15 12-13 29-30 26-27 17-18 28-29 13-14

264 WORKLOAD ANALYSIS 2 4,500,000 12-13 06-07 13-14 03-04 02-03 01-02 10-11 07-08 04-05 02-03 06-07 04-05

SECRETARY, PR, PERSONAL DEVELOPMENT

265 ACHIEVMENT MOTIVATION (4 hari) 4 8,500,000 09-12 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

266 ACHIEVMENT MOTIVATION 3 6,500,000 30-01 09-11 02-04 20-22 31-02 13-15 27-29 30-01 14-16 18-20 22-24 14-16

20

NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des

267 ADVANCE SECURITY VULNERABILITY ASSESSMENT 2 4,500,000 09-10 20-21 06-07 17-18 22-23 15-16 24-25 21-22 25-26 16-17 27-28 28-29

268 ALIGNING PERFORMANCE SUCCESS 2 4,500,000 24-25 13-14 20-21 18-19 15-16 13-14 18-19 28-29 25-26 20-21 16-17 27-28

269 BAHAGIA DAN PRODUKTIF SAAT PURNA BAKTI 5 9,500,000 10-14 21-25 20-24 04-08 16-20 12-16 04-08 08-12 05-09 10-14 21-25 12-16

270 BASIC LEADERSHIP 2 4,500,000 16-17 09-10 16-17 27-28 29-30 07-08 20-21 03-04 14-15 25-26 29-30 21-22

271 COACHING AND CONSELING 3 6,500,000 19-21 02-04 29-31 06-08 30-01 06-08 20-22 23-25 07-09 11-13 15-17 07-09

272 COMMUNICATION SKILLS 2 4,500,000 18-19 01-02 15-16 12-13 30-31 14-15 12-13 29-30 26-27 17-18 28-29 13-14

273 COMMUNICATION, ASSERTIVENESS AND CONFLICT

MANAGEMENT 2 4,500,000 25-26 08-09 22-23 19-20 04-05 08-09 19-20 02-03 06-07 24-25 01-02 20-21

274 CORPORATE BUILIDNG DALAM MEMBANGUN KULTUR

DAN ETIKA INTERNAL ORGANISASI 4 8,500,000 16-19 13-16 20-23 03-06 02-05 12-15 17-20 21-24 25-28 23-26 18-21 04-07

275 CUSTOMER SERVICE EXCELLENCE 4 8,500,000 23-26 21-24 22-25 26-29 02-05 14-17 19-22 28-31 27-30 25-28 27-30 13-16

276 DEPLOVING HIGH PERFORMANCE TEAMS 2 4,500,000 23-24 15-16 29-30 26-27 18-19 15-16 26-27 09-10 13-14 04-05 08-09 27-28

277 DOCUMENT CONTROL (VERIFICATION AND

CLASSIFICATION) 4 8,500,000 11-14 07-10 01-04 10-13 17-20 07-10 05-08 23-26 11-14 04-07 06-09 06-09

278 DOCUMENT MANAGEMENT SYSTEM AND ELECTRONIC

FILLING 4 8,500,000 24-27 21-24 14-17 25-28 16-19 06-09 11-14 08-11 12-15 17-20 21-24 19-22

279 DYNAMIC INTERPERSONAL & COMMUNICATION SKILLS 2 4,500,000 23-24 13-14 20-21 10-11 15-16 12-13 17-18 14-15 18-19 30-31 20-21 18-19

280 EFECTIVE COMUNICATION SKILL 3 6,500,000 18-20 08-10 08-10 05-07 17-19 08-10 19-21 29-31 06-08 17-19 28-30 13-15

21

NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des

281 EFFECTIVE COMPETENCY MODELLING AND REPORTING 3 6,500,000 25-27 15-17 15-17 19-21 04-06 15-17 26-28 02-04 13-15 24-26 01-03 20-22

282 EFFECTIVE CONTRACT WRITING 2 4,500,000 25-26 08-09 22-23 19-20 04-05 08-09 19-20 02-03 06-07 24-25 01-02 20-21

283 EFFECTIVE EXECUTIVE SECRETARY 2 4,500,000 23-24 15-16 29-30 26-27 18-19 15-16 26-27 09-10 13-14 04-05 08-09 27-28

284 EFFECTIVE PRESENTATION & NEGOTIATION SKILLS 2 4,500,000 16-17 22-23 02-03 06-07 02-03 19-20 06-07 23-24 27-28 11-12 15-16 07-08

285 EFFECTIVE PRESENTATION SKILLS 3 6,500,000 12-14 22-24 22-24 26-28 18-20 12-14 13-15 09-11 27-29 04-06 08-10 27-29

286 ELECTRONIC FILLING AND DOCUMENT MANAGEMENT

SYSTEM 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

287 EMOTIONAL QUETIENTS 3 6,500,000 17-19 14-16 14-16 11-13 02-04 07-09 18-20 01-03 05-07 30-01 07-09 12-14

288 EXCELLENT COMMUNICATION AT WORK 3 6,500,000 25-27 15-17 15-17 19-21 04-06 15-17 26-28 02-04 13-15 24-26 01-03 20-22

289

FILING MANAGEMENT FOR SECRETARY AND

ADMINISTRATION STAFF (USING MICROSOFT WORD,

MICROSOFT EXCEL)

3 6,500,000 24-26 21-23 21-23 18-20 16-18 14-16 25-27 08-10 12-14 03-05 14-16 19-21

290 ICE BREAKING AND ENERGIZERS 3 6,500,000 11-13 01-03 01-03 25-27 03-05 01-03 12-14 22-24 26-28 10-12 21-23 06-08

291 INTELLIGENT AND INVESTIGATION SKILLS 2 4,500,000 16-17 06-07 13-14 03-04 08-09 05-06 11-12 07-08 11-12 23-24 06-07 04-05

292 INTERPERSONAL COMMUNICATION SKILL 2 4,500,000 11-12 21-22 01-02 05-06 16-17 07-08 05-06 22-23 19-20 10-11 21-22 06-07

293 INTERVIWEWING AND HIRING SKILLS 2 4,500,000 18-19 01-02 15-16 12-13 30-31 14-15 12-13 29-30 26-27 17-18 28-29 13-14

294 KEMADYAN 4 8,500,000 17-20 15-18 07-10 19-22 15-18 07-10 12-15 21-24 06-09 23-26 22-25 18-21

295 LOBBYING AND SCHEDULLING 2 4,500,000 23-24 15-16 29-30 26-27 18-19 15-16 26-27 09-10 13-14 04-05 08-09 27-28

22

NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des

296 MANAGEMENT OF DOCUMENT CONTROL & MODERN

LIBRARY 4 8,500,000 16-19 13-16 20-23 03-06 02-05 12-15 17-20 21-24 25-28 23-26 18-21 04-07

297 MENINGKATAKAN EFEKTIVITAS FUNGSI SUPERVISOR 2 4,500,000 24-25 07-08 14-15 11-12 29-30 06-07 18-19 01-02 05-06 30-31 07-08 12-13

298 NEGOTIATION SKILLS 2 4,500,000 30-31 14-15 21-22 18-19 09-10 13-14 25-26 15-16 12-13 03-04 14-15 19-20

299 OFFICE MANAGEMENT AND ELECTRONICS FILING SYSTEM 4 8,500,000 11-14 07-10 01-04 10-13 17-20 07-10 05-08 23-26 11-14 04-07 06-09 06-09

300 OFFICE MODERN FILING MANAGEMENT 4 8,500,000 24-27 01-04 01-04 10-13 03-06 06-09 03-06 09-12 04-07 11-14 01-04 13-16

301 PRESENTATION SKILL FOR BEGINNER 3 6,500,000 10-12 07-09 07-09 04-06 29-31 13-15 11-13 28-30 25-27 23-25 27-29 05-07

302 PRESENTATION SKILL FOR PUBLIC RELATIONS &

MARKETING STAFF (USING MICROSOFT POWER POINT) 2 4,500,000 12-13 23-24 30-31 10-11 08-09 08-09 06-07 24-25 27-28 12-13 09-10 04-05

303 PROBLEM SOLVING 2 4,500,000 24-25 13-14 20-21 18-19 15-16 13-14 18-19 28-29 25-26 20-21 16-17 27-28

304 PROFESSIONAL SECRETARY SKILLS 3 6,500,000 09-11 06-08 06-08 03-05 08-10 05-07 10-12 07-09 04-06 02-04 06-08 04-06

305 SERVICE EXCELENT 3 6,500,000 23-25 20-22 20-22 17-19 22-24 06-08 24-26 21-23 18-20 16-18 20-22 18-20

306 SUPERVISORY LEADERSHIP AND DECISION MAKING 3 6,500,000 16-18 13-15 13-15 10-12 15-17 12-14 17-19 14-16 11-13 09-11 13-15 11-13

307 SUPERVISORY SKILLS MANAGEMENT 2 4,500,000 23-24 13-14 20-21 10-11 15-16 12-13 17-18 14-15 18-19 30-31 20-21 18-19

308 TEKNIK DIPLOMASI 2 4,500,000 09-10 02-03 09-10 21-22 02-03 06-07 13-14 30-31 07-08 18-19 22-23 14-15

309 TEKNIK PENULISAN LAPORAN 2 4,500,000 16-17 09-10 16-17 27-28 29-30 07-08 20-21 03-04 14-15 25-26 29-30 21-22

310 TRAINING DEVELOPMENT MANAGEMENT 2 4,500,000 23-24 16-17 23-24 03-04 09-10 14-15 27-28 10-11 28-29 05-06 02-03 28-29

23

NO TOPIC TRAINING DUR FEE (IDR) Jan Feb Mar Apr Mei Jun Jul Aug Sep Oct Nov Des

311 TRAINING OF TRAINER 3 6,500,000 23-25 20-22 20-22 17-19 22-24 06-08 24-26 21-23 18-20 16-18 20-22 18-20

312 TRANSFORMATION LEADERSHIP 2 4,500,000 09-10 20-21 06-07 17-18 22-23 15-16 24-25 21-22 25-26 16-17 27-28 28-29

Keterangan :

RUNNING MINIMAL 3 PESERTA

Harga Training sewaktu-waktu dapat berubah tanpa pemberitahuan sebelumnya Untk mendapatkan silabus training dapat menghubungi marketing kami di telp 022 8200 2557 - 8200 3519