Balancing Authority Area Transmission Service Cost Estimates
25 MW Generator Location
Cost (in Millions of
dollars)
South of Great Falls
$0See footnote 1
on the next page
North of Great Falls $8.75
East of Billings $25
Bozeman-Billings $12.5
Missoula-Butte $0
WAPA Unknown
WAPA
![Page 2: No GF](https://reader030.fdocuments.us/reader030/viewer/2022032805/5681331e550346895d99eba5/html5/thumbnails/2.jpg)
Transmission Cost AttributableTo 25 MW Project
25 MW Generator Location
Full/Share (Full-CREP Triggers upgrade,
Share-CREP shares in cost for upgrade)
Cost (in Millions of
dollars)
Total Potential Cost (in Millions
of dollars) Comments
South of Great Falls Full $0 - $14.25 $01
No known congestion at this time with the current TSR queue. If needed, CREP will reconductor the line they are connected to in the SOGF area.
North of Great Falls Full $8.75 $8.75
If needed, CREP will reconductor the line they are connected to in the NOGF area.
East of Billings Full $10 - $25 $25
If needed, CREP will reconductor the line in the Billings area.
Bozeman-Billings Full $10 - $12.5 $12.50
If needed, CREP will reconductor the line in the Bozeman - Billings area.
Missoula-Butte N/A $0 $0
At this time, no transmission congestion has been identified and it is assumed that there is capacity on the lines to accommodate 25 MW.
WAPA NE MT Full N/A Unknown
WAPA interconnection, balancing and regulation reserves, and transmission service costs are unknown.
1. Assumes the project is injecting its power a the Great Falls 230 Switch Yare. Should a project connect on one of 100 kV lines in the south of Great Falls transmission system, there is a likelihood that the 100 kV would need to be reconductored.