No-Dig World 2011

20
Bringing you the latest in trenchless technology & land–based utility pipeline engineering CONFERENCE PROGRAMME REGISTRATION DETAILS EXHIBITOR INFORMATION Trenchless Middle East Edition. October 2011 TRENCHLESS MIDDLE EAST 2011 INTERNATIONAL EXHIBITION AND CONFERENCE Jumeirah Beach Conference & Exhibition Centre, Dubai, UAE 10 -11 October 2011 Exhibition and Conference Preview KEEPING THE MIDDLE EAST MOVING 2011 CONFERENCE PROGRAMME REGISTRATION DETAILS EXHIBITOR INFORMATION ENTRANCE TO THE EXHIBITION IS FREE OF CHARGE REGISTER ONLINE: WWW.TRENCHLESSMIDDLEEAST.COM AND RECEIVE YOUR FREE GIFT ON ARRIVAL AT THE SHOW

Transcript of No-Dig World 2011

Page 1: No-Dig World 2011

Bringing you the latest in trenchless technology & land–based utility pipeline engineering

CONFERENCE PROGRAMMEREGISTRATION DETAILSEXHIBITOR INFORMATION

Trenchless Middle East Edition. October 2011

TRENCHLESS MIDDLE EAST 2011INTERNATIONAL EXHIBITION AND CONFERENCE Jumeirah Beach Conference & Exhibition Centre, Dubai, UAE10 -11 October 2011

Exhibition and Conference Preview

KEEPING THE MIDDLE EAST MOvING

2011

CONFERENCE PROGRAMMEREGISTRATION DETAILSEXHIBITOR INFORMATION

ENTRANCE TO THE EXHIBITION IS FREE OF CHARGEREGISTER ONLINE: WWW.TRENCHLESSMIDDLEEAST.COMAND RECEIvE YOUR FREE GIFT ON ARRIvAL AT THE SHOW

Page 2: No-Dig World 2011
Page 3: No-Dig World 2011

PublisherPaul HarwoodT + 44 (0) 845 094 8066E [email protected]

AdvertisingStuart HillyardGary KingT + 44 (0) 845 094 8066E [email protected]

design & ProductionTrevor DorrellT + 44 (0) 845 094 8066E [email protected]

The publishers accept no responsibility in respect of

advertisements appearing in the magazine and the

opinions expressed in editorial material or otherwise do

not necessarily represent the views of the publishers.

The publishers accept no responsibility for actions

taken on the basis of any information contained

within this magazine. The publishers cannot accept

liability for any loss arising from the late appearance

or non-publication of any advertisement for any reason

whatsoever.

ISSN 1479-0815

Welcome.....

I am very pleased to welcome you to the fourth issue of NO-DIG WORLD, a publication that doubles as the Show Guide to the upcoming TRENCHLESS MIDDLE EAST 2011 event being held at the Jumeirah Beach Conference & Exhibition Centre, Dubai, UAE on 10 - 11 October 2011, supported by The International Society for Trenchless Technology (ISTT) and the Institution of Civil Engineers (ICE).

Known also as No-Dig technology and as NDRC (Non Disruptive Road Crossing) in the Gulf region, Trenchless Technology embraces techniques from micro tunnelling and directional drilling to pipe bursting, lining and inspection systems, aimed at minimising or eliminating the need for disruptive excavations whilst providing a quick, efficient and economical solution to the construction and renovation of sewers, water mains, electricity cables and telecommunications networks.

This is a developing global Industry. Products and techniques are reviewed and improved on a regular basis. New innovations are proven to enhance performance. Major projects are completed every day somewhere around the world, proving that trenchless techniques provide economic solutions and reduced environmental impact. The social costs are reduced, benefiting communities, as well as the travelling public.

The two day exhibition will be complemented by a conference programme, assembled in collaboration with the International Society for Trenchless Technology (ISTT). The conference will include presentations by local and international speakers, thus providing an exciting platform for delegates to learn, debate, share knowledge, benchmark, and network with like minded industry colleagues.

We, here at Westrade, are specialist organisers of shows focused on promoting the latest equipment and techniques used in Trenchless Technology which is now becoming the preferred option for utility installation and repair, designed to keep traffic on the move.

If you haven’t yet planned your visit to Trenchless Middle East, don’t miss this opportunity to come and see this unique line-up of products on display from exhibitors worldwide, and talk to the experts who can provide solutions to the challenges ahead.

For all information on how to get here and where to stay, visit our website www.trenchlessmiddleeast.com I am sure you will find time invested here will be both profitable and enjoyable.

The success of Trenchless Middle East is of course dependant on the support of the industry. We offer our thanks to all exhibitors for their participation and professional displays and of course to our sponsors. Their commitment and support to the event is greatly appreciated.

Paul HarwoodSales and Marketing DirectorWestrade Group Ltd.

2011

eXhibition floor PlAn PAge 26

conference ProgrAmme And timetAble PAge 24 - 25

eXhibitor Profiles PAge 27

Product guide PAge 32

contents

WESTRADE GROUP LTD

trenchless middle eAst isorganised by

sponsors

organised by

International SocietyFor Trenchless Technology

Westrade group ltd, 112-114 high street, rickmansworth, herts, Wd3 1AQ uK tel: +44 (0) 845 094 8066 fax: +44 (0) 870 429 9275Web: www.westrade.co.uk

Page 4: No-Dig World 2011

their advice and assistance in compiling our Conference programme. We also welcome the support of The Institution of Civil Engineers (ICE) and we welcome their members to the event. Last but by no means least, we acknowledge the huge support from our sponsors and exhibitors.

See you at the show in Dubai, 10-11 October!

I am very pleased to welcome you to the fourth issue of NO-DIG WORLD, a publication that doubles as the Show Guide to the upcoming TRENCHLESS MIDDLE EAST 2011 Exhibition and Conference being held at the Jumeirah Beach Conference & Exhibition Centre in Dubai, UAE, on 10 -11 October 2011.

Known also as No-Dig and also as NDRC (Non Disruptive Road Crossing) in the Gulf region, Trenchless Technology embraces techniques from micro tunnelling and directional drilling, to pipe bursting, lining and inspection systems, aimed at minimising or eliminating the need for disruptive excavations whilst providing a quick, efficient and economical solution to the construction and renovation of sewers, water mains, electricity cables and telecommunications networks.

This is a developing global Industry.

Products and techniques are reviewed and improved on a regular basis. New innovations are proven to enhance performance. Major projects are completed every day somewhere around the world, proving that trenchless techniques provide economic solutions and reduced environmental impact. The social costs are minimised, benefitting communities, as well as the travelling public.

The two day exhibition will be complemented by a top quality conference programme, assembled in collaboration with the International Society for Trenchless Technology (ISTT). The conference will include presentations by local and international speakers, thus providing an exciting platform for delegates to learn, debate, share knowledge, benchmark, and network with like minded industry colleagues.

We, here at Westrade, are specialist

International Aramoon Corp (IAC), is the first TrenchlessTechnology specialized local contractor in Saudi Arabia. The CEO & President of IAC, Faiz Al-Elweet reports that IAC has recently completed a rehabilitation project inKSA for The Water Authority of Eastern Province. The client was facing severe problems in their gravity sewers (600mm and 700mm pipelines).

IAC were called upon to discuss the project and perform inspection & condition assessment for the gravity sewers, including providing services for pipeline rehabilitation works. The pipeline material was ductile iron with a total length of 2300m. The pipes were located at an average depth of 4m below the ground surface in Dammam City - KSA.

organisers of shows focused on promoting the latest equipment and techniques used in Trenchless Technology which is rapidly becoming the preferred option for utility installation and repair around the world.

If you haven’t yet planned your visit to TRENCHLESS MIDDLE EAST 2011, don’t miss this opportunity to come and see this unique line-up of products on display from exhibitors worldwide, and talk to the experts who can provide solutions to the challenges ahead.

For all information on how to get here and where to stay, visit our websitewww.trenchlessmiddleeast.com I am sure you will find time invested here will be both profitable and enjoyable.

The success of Trenchless Middle East is of course dependant on the support of the industry.

We offer our thanks to The International Society (ISTT) for their support, as well as

2011

www.trenchlessmiddleeast.com No-Dig World 2011 5 4 No-Dig World 2011 www.trenchlessmiddleeast.com

full house At trenchless middle eAst 2011, dubAi

rehAbilitAtion ProJect in Kingdom of sAudi ArAbiA

Extensive cleaning was made to facilitate the CCTV robotic inspection and as a result, several problems were identified in the pipelines, such as infiltration, wall incrustations, partial blockages, severe corrosion.

After evaluation and condition assessment, IAC recommended No-Dig pipe rehabilitation using CIPP-UV system for the gravity sewer pipelines in order to restorethe 100% hydraulic efficiency and structural strength of the pipelines.

BKP Berolina-Liner System, the CIPP-UV system supplier of equipment, liners and training, had made the structural calculation and liner design based on the information provided by IAC.

During the preparation and installation of CIPP-UV system IAC had given very careful attention for safety precautions especially when rehabilitating sewer infrastructure in heavy traffic areas.

The CIPP-UV system is designed for fast and efficient onsite installation that minimizes the economic, social and environmental impacts. IAC is well prepared to meet the demand in the Region and has the full capability to undertake such No-Dig repair & rehabilitation works of wastewater network for the clients. n

[email protected]

CCTV inspection work in progress

CCTV inspection during cleaning process

IAC employee prepares for working in confined space (Manhole)

IAC combined Jet-Vacuum Truck ready for cleaning works

Liner material installation

Site engineer operates & controls the UV curing system

eXhibitor neWs

Page 5: No-Dig World 2011

vermeer neW technology

eXhibitor neWs eXhibitor neWs

A new technology is entering the guided boring industry, primarily focused on gravity sewer installations. The AXIS™ Guided Boring System is capable of achieving pinpoint line and grade accuracy in a variety of ground conditions, and for many different

www.trenchlessmiddleeast.com No-Dig World 2011 7 6 No-Dig World 2011 www.trenchlessmiddleeast.com

pipe sizes and materials.A recent project was the successful

installation of a 153m section of 450mm HDPE pipe. The goal was to eliminate a pump station and convert the existing sewer from a forced main to gravity flow. The

topography in the area, which included very hilly terrain, a stream, and existing wet well elevations raised many concerns. The greatest challenge, however, wasn’t the topography. The line would be bored through layered shale and limestone rock.

A 343mm cutter was used for the pilot bore, and the AXIS system achieved an average production rate of 4.3m per hour. Though the pilot alone could have been considered a challenge, the real test was yet to come. Rock bores had been completed for smaller pipe installations, but prior to this project, the system had not been used to upsize in rock. In order to install the HDPE with an OD of 470mm, a larger hole would need to be cut, while still maintaining the perfect line and grade achieved on the pilot shot.

Requiring a minimum over-cut due to

bursting With roPe

The rope bursting system (RBS), from the ABS Trenchless GmbH company in Germany, uses an innovative clamping technology in order to complete relining jobs with long pulling distances exceeding 1,000 m. This is done in one run, using only one machine pit in certain soil conditions. The RBS-Burster line is available with pulling capacities between 40 and 190 tonnes.

With the use of return pulleys, this technology also makes it possible to overdrive larger doglegs and bent old

pipes. The single operator is able to control everything from a safe distance above the pulling unit, as the Burster is operated by radio remote control – an important safety feature to the machine.

In addition to the safe handling, the new rope pull technology makes the work much easier for the operator as there is no need for rods to be removed.

Along with pipe bursting, the pulling system can also be adapted for slip lining, relining and swagelining jobs, making the machine very versatile.

Roping in FranceABS Trenchless, with Entreprise de Travaux Publics GIROUD GARANPON, Isére, France, recently completed a project in Vorion, near Grenoble, France with the RBS helping to supply cleaner drinking water to the town.

For this project the team used a RBS 1,200 machine to burst through two sections of water pipelines. The old pipes, which had an OD 250 mm for a 420 m section and an OD 200 mm for a 210 m section were replaced with new HDPE OD 250 mm pipes. With a pulling force of 40

the gun barrel straight hole, a 490mm hole opener was selected, which allowed for a 20mm annulus. The cutter was built with standard roller cone cutters, and the pipe was installed successfully, averaging around 3m per hour.

As the hole opener approached the softer rock, production increased and the last 85m section was completed in under 8 hours.

tonnes, the 420 m section was reached in only one drill string. Project Manager Marco Wulff said “This is the first time that a 420 m section was burst in only one string.”

Trenchless techniques were chosen for this job as the site was close to a nature reserve and for the preservation of trees.

In addition to this, due to the amount of water that was involved, it would have been impossible to do use the traditional open-cut method. Special tools were needed as the concrete pipes had curves and bends that are quite difficult to crack.

The advantage to using a rope is that it can be redirected with a pulley and can burst more of the diameter. Only taking two days to complete the bursting, the full project was done in just one week.

ABS Trenchless has introduced the rope bursting system – the world’s first large pipe bursting system with a rope as the pulling mechanism and a pulling force of more than 1,000 kN.

stoPPress

International Aramoon Corp. (IAC) is the pioneer and the first specialized local contractor in the Kingdom of Saudi Arabia with core specialty in the field of No-Dig Pipe Inspection, Condition Assessment and Rehabilitation.

The CEO & President of IAC, Eng. Faiz Al-Elweet says (IAC) is an engineering contractor which has been founded in Riyadh since 1990. IAC is specialized in Water Leak Detection, Test and Repair for Water and Sewer Networks without Excavation, by using Trenchless Technology.

Head Office of IAC is in Riyadh and it has branch offices in Dammam/ Al-Khobar, Ahsa, Tabuk, Madinah and Abha in KSA.

We have undertaken projects throughout Saudi Arabia and since last five years we have executed (& progressing) projects for Water

Leak Detection and Repair for about 15,000Km of pipelines for various diameters and 550,000 House Connections in the various cities in Saudi Arabia.

IAC had developed locally “WATCH LEAK” software, which is a Water Management System to monitor and quantify leaks in Water Supply Networks.

The traditional water audit collects the data manually during a single historic time, but “WATCHLEAK” collect real-time network information. This software is a GIS based web interface tool in order to help the Water Network Operation & Maintenance staff to identify District Meter Area (DMA) with higher water usage and to react before developing a visible and costly failure.

During the last five years, IAC has

successfully executed and ongoing projects for Sewer Networks are about (40,000m) including flow control & diversion (i.e. By-Pass, dewatering…etc), Hydro-Jet Cleaning, CCTV Robotic Inspection, Pipelines Condition Assessment, Pipelines Rehabilitation (MH-MH Internal Lining).

IAC introduces several Trenchless Techniques and cost effective solutions for No-Dig Pipes Rehabilitation such as Cured In Place Pipe System using Ultra Violet Rays (CIPP-UV) and Spiral Wounding System as well as Spot Lining Technique for sectional repair of all types of host pipes.

iAc sPeciAlized locAl contrActor At the time of going to press we have

learned that the ISTT (International Society for Trenchless Technology) are in the process of finalising the affiliated agreement for a UAE Society for Trenchless Technology. An official signing of the agreement will take place at Trenchless Middle East 2011. Further information about the Society will also be available.

International SocietyFor Trenchless Technology

Page 6: No-Dig World 2011

8 No-Dig World 2011 www.trenchlessmiddleeast.com

For thirty years, ConShield has engineered solutions to reinforce, seal and protect existing underground structures for both storm water and sanitary environments; from manholes to catch basins, wet wells and lift stations as well as CMP to RCP, because just one product cannot effectively overcome every problem in every system.

ConmicShield®, the liquid additive that prevents Microbiologically Induced Corrosion (MIC) in concrete sewer pipe and structures. It is dosed directly into the concrete mix that can be used in shotcrete, precast and ready mix, for both new structures and can be used to rehab existing structures. ConmicShield®, has proven performance since 1996 with several case studies from all over the country.

ConmicShield®, has a 100 year design life and offers full thickness protection for a fraction of the cost of plastic liners or polymer coatings. For case studies technical information and specifications go to www.conshield.com

PERMACAST® is our engineered mortar liner system for manholes. Specially formulated ultra-high strength mortar is centrifugally cast from our patented robotic applicator. It guarantees a consistently dense and uniform liner at whatever thickness (1/2” to 2”) is best suited for the condition, depth, diameter, traffic loading, and ground water pressure. The highest quality is guaranteed each and every time since application does not depend upon a person working inside cramped and hazardous conditions. Our formulations are high-strength, quick-setting and corrosion-resistant. www.permaform.net

CentriPipeTM Centrifugally Cast Concrete Pipe. is a cost-effective, NO DIG solution for structural lining of culverts using a spin caster and our specialty mortar, PL-8000.

The precisely placed and compacted concrete liner is applied at the best design thickness for the diameter and conditions.

It contains rust inhibitors to prevent corrosion of the old metal culvert and it is

conshield solutionshighly resistant to abrasion. This process also provides waterproofing, sealing, structural reinforcement and corrosion protection, www.centripipe.com

PERMAFORM® is the system for complete replacement of old manholes without digging or disrupting flows. This process pours a seamless and structurally independent “manhole within a manhole” for the best long-term solution to serious manhole problems.

When biogenic or chemical corrosion is the problem, a plastic liner is embedded into the structurally independent concrete wall and anchored securely with its interlocking tees or

studs. All inlet and outlet pipe connections are sealed directly to the inlet/outlet pipes so they cannot leak.

For severe corrosion, our COR+GARD® 100% solids epoxy is spun on to form a protective, composite barrier. In all cases, each material is applied safely and uniformly from above without entry into the manhole.

The I&I Barrier® is the best solution we have found for sealing the chimney when resetting frames and covers. COR+FLEX® works best when doing an internal chimney seal without digging.

Over the years ‘cured in place pipelining’ methods for sewer and drainage pipes becomes more and more a key role in the no-dig business.

iMPREG is currently manufacturing more

then 150 miles each year and distributing their products all over the world.

Cured by Steam or latest UV – Technology the iMPREG Liners are the benchmark for being the strongest, most cost effective and most environmentally friendly products in the market.

Made in Germany, the iMPREG Liner is manufactured fully quality controlled according DIN EN ISO 9001. Additionally the iMPREG Liner is certified by the DIBT (German Institute for construction techniques) and meets several industry standards.

Compared to conventional felt liners the iMPREG GRP Liners show five times more strength, 100% water tightness and provide minimum 50 years of Service.

The iMPREG Liners come already pre- impregnated with special resins and ready to use on the job side. Shelf lives up to six months and easy container shipment keeps your construction flexible abroad.

imPreg, cured in PlAce PiPelining

A pipe section can be rehabilitated in less then a day. An installation range of DIA 150mm – DIA 1300mm and even more can be installed in maximum lengths up to 300 meters each. In middle of 2012 iMPREG is planing to open the new part of the production plant and is than able to

manufacture liners up to DIA 1600!Additionally to the liner manufacture

iMPREG provides training on side as well as on their own training course. With two own lining equipments and a team of professionals iMPREG provides a world wide support.

www.trenchlessmiddleeast.com No-Dig World 2011 9

China-Burma oil & gas pipeline Project, contracted by PetroChina Daqing Oilfield Construction Group.

The launch ceremony of GD8000-LL HDD Machine for China-Burma oil & gas pipeline project was held in Goodeng machine’s production base – Jiangsu Goodeng Engineering Machinery Assembling Co., Ltd on Jan. 23rd , 2011. On this day, a colourful ball swayed to welcome every guest, and gun salutes declared the beginning of the ceremony.

Guests included the general manager of Daqing Oilfield Construction Group PipelineCrossing Company, Mr. Guan Lizhi, Dafeng people’s government mayor, Mr. Wang Hai, Jiangsu Goodeng Engineering Machinery Assembling Co., Ltd general manager, ChenFenggang, and other management leaders.

GD8000-LL HDD Machine was appointed by China National Petroleum Corporation Daqing oilfield Construction Group. After the successful completion of commissioning,

it was off the assembly line on 22nd of January and immediately loaded for shipment to be sent to “China-Burma oil & gas pipeline project” worksite in Burma on behalf of China Petroleum.

Except for the structural parts, the power, hydraulic, electrical, the appliance control are all imported from abroad. It uses split and double caterpillar. The maximum pull & push force is 8100KN, the maximum torque is 165000N.M, which was independently researched, developed, and manufactured by Goodeng machine. With advanced senses, excellent performance, top quality service, the large-scale machine produced by Goodeng machine has become the preferred product for China National Petroleum Corporation, China Petroleum & Chemical Corporation, and many other construction units.

The strategic meaning of China-Burma oil & gas pipeline project : with the China-Burma oil & gas pipeline project started, the strategic pattern of four oil and gas import

lAunch of the goodeng hdd mAchine - gd 8000-llchannel has taken shape, which are the northeast of China (China-Russia crude oil pipeline), Northwest (Central Asia Gas Pipeline), Southwest Land (China-Burma oil and gas pipelines) and marine (sea lanes through the Malacca Strait). It diversifies the oil transport channels and protects the energy supply security in China. It is the fourth energy import channel after the Sino-Kazakhstan oil pipeline, the Central Asian natural gas pipeline, oil pipeline between China and Russia; it relieves China’s dependence on the Malacca Strait and reduces the risk of importing crude oil at sea.

Goodeng Machine Model GD8000- LL Finishes the following project successfully: Jiangxi Province Main project.The first step of Jiangxi Province gas pipeline—Gan river HDD Project

On May 13th, 2011, the project in Fengcheng City Jiangxi province was

finished successfully. It was designed by Zhongyuan Petroleum Explore Bureau Projects Construction Main Company and constructed by Jiangsu Keyi Company using Goodeng Machine Model GD8000-LL.

The horizontal length of the project is 1887.52 meters and the real working length is 1890.34 meters (The width of the Gan river is 1363.82 m, the width of sand and riverbank is 526.52 m). The project pipe is 508×10L415 diameter arc welding steel pipe.

Which adopts strengthen three-coat PE anti-rotten.

The entry angle is 9°and out is 6°.The curvature radius is 762m (150 OD).The project crosses the Jiangxi Gan river.The geology of the river bed is very

complex because it contains a fault area, pebble stone area, gravel sand area and rough soft clay (including many stones). It is obvious that the project is complicated as it is also difficult to control the angle and azimuth.The HDD project is the biggest in scale, longest in length, most complex.

eXhibitor neWs eXhibitor neWs

Page 7: No-Dig World 2011

10 Global Focus Middle East 2009

comPAny neWs

The underground connection to the new “Czajka” wastewater treatment plant in Warsaw has been completed successfully and on time. Two Herrenknecht AVND micromachines handled the difficult drives with a total of 5,860 meters with bravura. Apart from pipe jacking with extraordinarily large diameters of 3 meters, the extreme winter conditions and a high groundwater level demanded top performance by everyone involved.

With performances of up to 36 meters a day, the Herrenknecht machines blazed the trail for an efficient new wastewater system in the Polish capital fast and efficiently.

Warsaw, Poland / Schwanau, Germany, 6. April 2011. Wastewater systems in many large cities have already reached their limits requiring modernization or expansion in order to avoid overflowing into nearby rivers. For this reason, the city of Warsaw is investing in the construction of a state-of-the-art wastewater treatment system. This will treat the wastewater produced by 80 percent of Warsaw’s inhabitants, thereby improving the quality of water and life along the

banks of the Vistula over the long term. Hydrobudowa 9 S.A., PRG Metro Sp.z.o.o. and KWG (PBG Group) have been commissioned to connect the plant with the underground wastewater network.

The Polish contractors selected the pipe jacking method for their tunnel project and relied on the two AVND2000AB (with Extension Kit, Ø 3,025mm) and AVND2400AB (Ø 3,025mm) hydroshields from Herrenknecht. This type of machine is worldwide in use in the construction of supply and disposal tunnels; they master tunnelling through groundwater and can penetrate a wide range of heterogeneous soils. In Warsaw, the machines tunnelled at depths of 10 to 14 meters reaching their final targets after boring through 5,860 meters of soil comprising coarse and fine sand, clay, loam, gravel and boulders.

Apart from the unusually large diameter of 3 meters for the pipe jacking method, another challenge was represented by a high groundwater level which in some places reached up to 8 meters above the top of the pipes. The site teams were therefore obliged to

dewater and seal the requisite construction shafts prior to tunnelling. The Herrenknecht AVND pipe jacking machines proved its worth during this tunnelling process. Where required, these machines secure the tunnel face using a support fluid (bentonite and water mixture) and an additional compressed air cushion in the split excavation chamber, allowing safe tunnelling under water pressure. The separation of solids of the excavated material from fluids was realized with the Herrenknecht Separation Plant HSP500, providing a capacity of 400 to 500 m3/h depending on the particle size distribution.

During the particularly cold winter months of 2010, the site team continued tunnelling work despite some extremely low temperatures and a lengthy period of frost.

The Herrenknecht micromachines completed a total of 16 drives, some with short distances starting at 80 meters, but also including long-distance sections of 800 meters and more. The longest individual drive was 930 meters. The hydroshields safely underpassed a six-lane highway without having any negative impact on the flow

WArsAW: mAJor PiPe JAcKing Process successfully comPleted

10 No-Dig World 2011 www.trenchlessmiddleeast.com

Clean water for the Vistula river

of traffic. Hydraulic intermediate jacking stations serve to reduce the friction forces prevailing in such long-distance tunnelling projects. Herrenknecht had already adapted these interjack stations exactly to the thin walls of the Hobas GRP pipes installed in Warsaw. The longest section revealed yet another particular feature: two underground curves with a radius of 450m and 900m had to be realized. Thanks to the Herrenknecht SLS RV navigation system the cutterhead is guided exactly with millimeter precision, the machine operators also mastered this task in a precise and safe manner.

December 14, 2010 saw completion of the last section representing a significant milestone for this wastewater project in Warsaw. During the construction project, the Herrenknecht equipment achieved impressive advance rates of up to 36 meters a day (double shift) and an average of 20 meters per day.

To complete the entire sewer system and connect it with “Czajka” wastewater treatment plant (WWTP), PRG Metro Sp.z.o.o. and Hydrobudowa 9 S.A. are additionally realizing the 1,300m long Vistula River Crossing tunnel with a Herrenknecht large diameter tunnel boring machine. The Mixshield S-642 with a diameter of 5.35m was successfully accepted in February 2011 in the Schwanau/Germany plant of Herrenknecht. Once this tunnel is completed the Czajka WWTP could go into operation. n

Project data

Wastewater tunnel in Warsaw, Poland Geology: 70% coarse and fine sand, 30% clay and loam, gravel, boulders Tunnel lengths: total of 5,860 m, 16 drives of 80 to 930 meters Particular features: high groundwater level, long-distance driving, curve drives

Machine data

Herrenknecht M-1083M, AVND2000AB with Extension Kit, excavation diameter 3,025mm Herrenknecht M-1363M, AVND2400AB, excavation diameter 3,025mm

Cutterhead: mixed-soil cutterheads fitted with disc cutters and cutting knives Max. torque: 780kNm, 1,200kNm

Tunnel lining: Pipe Jacking

comPAny neWs

Page 8: No-Dig World 2011

beton & rohrbAu highly customer-orientAted

12 No-Dig World 2011 www.trenchlessmiddleeast.com

beton & rohrbau is one of the leading companies in civil and construction engineering for the public sector.

Throughout Germany and abroad, clients in the public water and sewage sector provide beton & rohrbau with a high level of confidence. With nationwide branches beton & rohrbau is well equipped and highly customer-orientated.

Besides Germany projects are also executed through subsidiaries and holding companies in Bahrain, Bulgaria, Georgia, Kazakhstan, Mauritius, Nigeria, Romania, Russian Federation, Turkey and the United Kingdom. The employees

of beton & rohrbau have many years of experience in providing water and sewage services for the public sector and have been recruited from the regions where the projects take place. With the most up-to-date and innovative technology, the equipment and machinery of beton & rohrbau satisfy all current requirements. The technical and commercial capabilities have made it a consistent partner for the public water and sewage sector in Germany and Abroad. The scope of beton & rohrbau encompasses sewer pipes, portable water, pressurized pipes, sewage

treatment plants and pumping stations, micro-tunnelling and pipe jacking, the laying and sinking of pipes, caissons and storm water clarification plants and as well as turnkey civil engineering projects is one of the main reasons why it enjoys the confidence of its clients in the public sector.

With a workforce of some 500 members of staff the beton & rohrbau group meanwhile achieves an annual turnover of around 100 mi. Euros. At its various regional locations, beton & rohrbau is one of the most efficient and productive companies. n

comPAny neWs

Page 9: No-Dig World 2011

tt-middle eAst/tt-uK, successes in omAn, sAudi ArAbiA And the uAe

14 No-Dig World 2011 www.trenchlessmiddleeast.com

HDD drill rod rescue using Grundoram technology saved the company DCL significant financial implications such as the total cost of a lost drilled bore, contractual penalties, ongoing cost delays in commissioning the final pipelines and all associated costs involved in planning a new bore and the actual costs of duplicating all the undertakings of a new bore/installation, etc…

Due to the success of the HDD Drill Rod Rescue above, DCL went on to purchase a Prime Drilling PD 250/90 HDD System. n

TT-Middle East/TT-UK have been offering their range of Trenchless Technology (NDRC) products throughout the Middle East for many years with notable successes in Oman, Saudi Arabia and the UAE.

A 30” diameter x 110m long steel oil pipeline exchange project under a major highway between Damman and Riyadh was completed using a Grundoram Taurus.

Grundomat Soil Displacement Hammers and Grundodrill HDD rigs are now in daily use throughout the region laying fibre optic network systems; notable success has been achieved by Omani companies with Grundomats and a Grundodrill 15X.

Grundomat road crossing in Oman

Taurus Grundoram installing a 30” steel pipe under the Damman-Riyadh Highway

Grundodrill HDD working in Oman

HDD Drill Rod Rescue using Grundoram

Prime Drilling PD 250/90 System

comPAny neWs

Page 10: No-Dig World 2011

16 No-Dig World 2011 www.trenchlessmiddleeast.com

Though our Earth is made up of 2/3 water, only 1/100 of that water is drinkable. The rest is salt water or permanently frozen and we can’t drink it, wash with it, or use it to water plants. Water is a limited resource!

Therefore, it is important that we use our water wisely and do not waste it. For future generations we all must do our part to save water, particularly in industrial application.

Most of these efforts can be reached priceless and as a benefit you can save money by saving water - using innovative shaft sealing technologies for your slurry pumps. As a standard for slurry pumps in tunnelling packing glands and expeller units combined with packing rings are installed as state of the art shaft sealing technologies. Shaft seals of pumps which convey sludges and slurries containing solid particles require constant supply of sealing water in order to cool, lubricate and keep the seal clean. Furthermore a permanent dripping of sealing water is essential for a trouble free operation of packing glands. While boring the tunnel a constant sealing water supply to discharge and feed pumps must be assured.

After having been charged with particles it has to be

cleaned up before being disposed as waste water.This means you have to pay for supply, cleaning and

removing the sealing water every day of tunnelling. As alternative grease lubricated packing glands are used associated with reduced wear life of the gland and shaft sleeve.

Nevertheless a permanent greasing of the gland using a grease pump is necessary as well as periodic on-site refilling of the storage tank.

Our experienced team of engineers and technicians designed an innovative shaft sealing solution tailored to the task. Our experience which we have gained in a large number of applications is included in the development and design of our own mechanical seal type HGD which is available in single- acting and double-acting designs. In double acting design this seal is supplied with sealing water from an unpressurized storage tank. Continuous external sealing water distribution is therefore not essential. In single acting design no additional sealing water is required while pump operation.

For rough conditions in tunnelling we use application-optimized materials for the sliding and counter rings.

This ensures reliable operation in a large number of slurry pump applications in direct pipe, utility- and traffic-tunnelling today.

Save Water using innovative shaft sealing technologies for tunnelling pumps. n

See Arthur Habermann Gmbh & Co. Kg on stand 53.

sAve WAter, sAve money …Innovative shaft sealing technologies for tunnelling pumps – no additional sealing water required

comPAny neWs

Page 11: No-Dig World 2011

www.trenchlessmiddleeast.com No-Dig World 2011 19 18 No-Dig World 2011 www.trenchlessmiddleeast.com

Fluvius GmbH of Germany, in association with its Eastern European partner Sanikom in Slovenia, sells products primarily for the trenchless repair of wastewater pipe systems with the product focus being mainly on full-length and localised repair up to a pipe diameter of 800 mm.

The company’s range includes the full spectrum of consumables, such as resin systems, liners, fibreglass complexes, renovation packers and products for flow control and test technology as well as accessories, that are required for trenchless installations in wastewater systems, as well as specialist technical equipment that is designed either in-house to the highest quality standards or as products sourced from other renowned manufacturers. The various renovation methods offered carry a range of globally recognised industry approvals and certificates.

Fluvius can provide clients with solution proposals and entire systems for the renovation and maintenance of defective wastewater pipes. With experienced employees that have been active in this industry sector for many years, the company can

also offer support as a competent partners in all technical and commercial issues.

The technologies on offer from Fluvius include full lining systems for pipelines in diameters from 28 mm up to 800 mm using CIPP technology as well as lateral lining and lateral sealing systems that can negotiate bends up to 90o and diameter transitions in a single installation. Liners are also offered for localised repairs (‘patches’) where full length rehabilitation is not required in diameters from 100 mm up to 900 mm.

In larger man-entry diameters Fluvius also offers a range of Kevlar/EPDM manually installed pipe joint seals. For manhole rehabilitation the company has cementitious grout lining options offering structural repair and saltwater resistance, as well as localised manhole leak sealing systems.

Commenting on the event Sebastian Schmitz, Managing Director of Fluvius said:

“Trenchless Middle East 2011 will give us another springboard into areas of the world that require the sort of technology we have on offer. Our technical team will be at the event offering current and any potential new clientelle guidance through the Fluvius range of systems.” n

euroPeAn rehAbilitAtion technology goes globAl

Full length lining utilising an inversion drum installation technique

Manhole rehabilitation systems are included in the Fluvius range.

Fluvius offers ‘patch’ repair localised lining systems

comPAny neWs comPAny neWs

Page 12: No-Dig World 2011

horizontAl directionAl drilling techniQue for dn 900 PiPes

20 No-Dig World 2011 www.trenchlessmiddleeast.com

Horizontal directional drilling technique used for pipe-by-pipe pulling-in of DN 900 ductile iron pipes in Belgium

IntroductionConstantly spreading built-up areas, wide multi-laneroads or complicated routes are making itincreasingly difficult and expensive to replaceexisting pipeline systems, or lay new ones, bythe open trench technique. This is why trenchlessinstallation techniques have been underdevelopment and in use for some 30 years now.

The continuing development of the machineryused is going hand in hand with the modificationof a pipe material with a great tradition,namely ductile iron, and with changes in thetechnology of making restrained joints betweenpipes of this material. A successful example ofsuch new joints is the positive locking BLS®/VRS®-T push-in joint. This joint is flexible andenables pipes to be laid to tight radiuses by anangular deflection at the sockets. The weldingbead, which is applied to the spigot end in thefactory, and the metallic locking segments, whichare supported in the locking chamber cast intothe socket, enable very high longitudinal forcesto be transmitted.

The horizontal directional drilling technique using ductile iron pipesPipes having the positive locking BLS®/VRS®-Tpush-in joint (Fig. 1), combined with a cementmortar coating to EN 15542 [1] as an externalprotection able to withstand high mechanicalloads (Fig. 2), are available for the trenchlessinstallation of ductile iron pipes by the horizontaldirectional drilling (HDD) technique.

The BLS®/VRS®-T push-in joint is a restrainedsocket joint in which a welding bead is applied tothe spigot end in the factory. A locking chambercast into the socket receives the locks or lockingsegments which, once the spigot end has beenpushed into the socket, are inserted throughopenings in the end-face of the socket whichlead into the locking chamber. If axial tractiveforces are exerted on the joint, either by theinternal pressure or by the use of the pipes fora trenchless pulling-in technique, the weldingbead is supported against these locks or lockingsegments and in this way transmits a very highforce (Fig. 3).

Ductile iron pipes can be trenchlessly installedby the HDD technique both as a fully assembledpipe string and by pipe-by-pipe connection. Thepossible length of pipeline which can be pulled in is determined by the permitted tractive forceon the restrained push-in joint. Details can befound in DVGW-Arbeitsblatt GW 321 [2] andin the manual entitled “Trenchless Installationof Ductile Cast Iron Pipes” [3]. Because ofthe results of externally monitored type tests(internal pressure tests under product standardEN 545 [4]), the values of permitted tractiveforce specified in the latter are in some caseshigher than those specified in DVGW-ArbeitsblattGW 321 [2] (Table 1).

Installation of a drinking water pipelineusing DN 900 ductile iron pipesPidpa is one of the largest Flemish water suppliers and supplies fresh drinking water to more than a million people. The company distributes its drinking water by means of a 12,581 km long pipeline network. The municipality of Grobbendonk (a small town with just over 10,000 inhabitants), is situated right next to the Albert Canal, an artificial waterway 129.5 km long which connects the two Belgian towns of Liège and Antwerp. The existing pipeline needed to be relaid due to the construction of a new bridge.

In part of the area, the new pipeline runs directly along the Albert Canal. If open trenches had been used, the water would have had to be predrained from them, an expensive undertaking. This was avoided by the trenchless installation of ductile iron pipes by the horizontal directional drilling technique with the pipes pulled in pipe-by-pipe.

It was possible to make use in this case of the experience gained on a project involving DN 600 nominal size pipes which was completed in 2008 in the town of Ghent [5], also in Belgium.

A 1000 kN drilling rig (Fig. 4) was used for the drilling and the subsequent pulling-in of the ductile iron pipes. The pilot bore having been made, it was widened step by step by special upsizing heads (Fig. 5). The pipes were connected on one by one on a special connecting ramp. The first pipe was connected (Fig. 6) to the traction string and the barrel reamer by means of a BLS®/VRS®-T traction head withbuilt-in force-measuring equipment.

To make the connection, the segments for locking the

DN 900 BLS®/VRS®-T push-in joint are inserted, once the spigot end of the pipe has been inserted in the next socket, in the locking chamber (Fig. 8) through the opening leading into the socket (Fig. 7) and are distributed around the circumference of the pipe alternately to the left and the right.

In a trenchless installation technique, the segments are then secured with a steel fixing clip.

This ensures that the locking segments are at alltimes firmly in abutment as the pipe is pulled in.

Once the locking segments have been inserted, the socket joints are protected by a shrink-on sleeve. The sheet-metal cone (Fig. 9) which is slid on prevents any possible

damage from being done to the shrink-on sleeve in the boreas the pipeline is subsequently being pulled in.

To sum upDuctile iron pipes with restrained BLS®/VRS®-Tpush-in joints are very well suited to trenchlessinstallation and have already shown this to be the case on a large number of completed projects.

The possibility of particularly high forces being transmitted from pipe to pipe allows economical and cost-saving installation and enables very long runs of pipe to be pulled in when using trenchless installation techniques. n

Project data• HDD installation of individually connected• DN 900 BLS® pipes• Pipe external protection: cement mortar• coating to EN 15542 [1]• Length of pipeline: 342 m• Drilling rig: 1,000 kN• Permitted tractive force for DN 900 BLS®

• pipes: 1,845 kN• Max. tractive force which occurred: 500 kN

See Duktus Pipe Systems Fzco on stand 13.

References[1] EN 15542, Ductile iron pipes, fittings and accessories - External cement mortar coating for pipes – requirements and test methods 2008[2] DVGW-Arbeitsblatt GW 321, Horizontal directional drilling for gas and water pipelines – requirements, quality assurance and testing 2003-10[3] Buderus Manual - Trenchless Installation of Ductile Cast Iron Pipes 2009-07[4] EN 545, Ductile iron pipes, fittings, accessories andtheir joints for water pipelines - requirements and test methods 2006[5] Ertelt, S.: Einzelrohreinzug ductiler Gussrohrebeim HDD-Verfahren – Fortsetzung einer Erfolgsgeschichte [Pipe-by-pipe pulling-in of ductile iron pipes by the HDD technique – a continuing success story] GUSSROHR-TECHNIK 43 (2009), p. 72 ff

Fig 1. The BLS®/VRS®-T push-in joint

Fig 2. The cement mortar coating to EN 15542

Fig 3. Construction of the DN 900 BLS®/VRS®-T push-in joint with fixing clip for trenchless pipeline installation

Fig 4. 1000 kN drilling rig

Fig. 5: Upsizing heads

Fig. 6: Pipes being connected on a connecting ramp

Fig. 7, left : Opening leading into socket on DN 600 to DN 1000 size BLS®/VRS®-T push-in joints

Fig. 8, right : Insertion of locking segments

Fig. 9: Pulling-in of the pipes; the push-in joint is protected by shrink-on material and a sheet-metal cone slid over the top

comPAny neWs comPAny neWs

Page 13: No-Dig World 2011

Dr Sam Ariaratnam

Dr Dec Downey

www.trenchlessmiddleeast.com No-Dig World 2011 23 22 No-Dig World 2011 www.trenchlessmiddleeast.com

Dear Trenchless Colleagues

I am hoping to see many of you at the Jumeirah Beach Hotel for this year’s eighth Trenchless Middle East. Once again we have an excellent technical programme covering new construction replacement and rehabilitation of underground utilities with some outstanding local speakers to bring you specific experience from the region. This is supported by an exhibition which grows from strength to strength featuring the leading system providers from around the world demonstrating improved equipment and process options.

Our exhibitors turned out in force in recent months for International No-Dig Conferences and Exhibitions in Singapore and Berlin and the Dubai event promises to bring the best available to the region this year. It is going to be a show to remember, the challenge for me is to develop a keynote address to match the rest of the event highlights. The last year has seen real developments in construction and renovation, we live in challenging times and our industry has once again raised the bar – see you in Dubai.

Best regardsDec Downey Conference Programme Director ISTT immediate past Chairman

conference PrevieW

trenchless middle eAst dubAi 2011 conference 10 - 11 october 2011This Conference is a must for utility engineers and related professionals looking for detailed information on the latest techniques for the non disruptive installation and rehabilitation of pipelines and pipe networks.

VIP guests will include ISTT Chairman Professor Sam Ariaratnam, passing through Dubai en route from No-Dig Down Under. We can be sure that Dr Sam will make a lively contribution to the conference proceedings.

Conference Registration FeeUS$900/AED 3,300

The delegate registration fee includes:

• Attendance at all conference sessions• Coffees, refreshments & buffet lunch

10 & 11 October• Conference papers• Free entrance to exhibition• Certificate of attendance

Register online atwww.trenchlessmiddleeast.comOr simply turn up on the day

2011mts Perforator Slurry Systems successfully at work in Qatar and Australia

Why Large Diameters!Large diameter pipe jacking has become common feature in most new urban drainage and sewage schemes. Large size sewage and storm water drainage collectors are the sustainable solution to complement modern sewage strategies, allow long term planning and dealing with high urban growth rates. Large diameter pipe jacking is also used for the creation of intake and outlet pipelines into the sea for desalination plants.

Challenges overcome by German technology. Large diameter pipelines are commonly designed to be stretching over long distances. To achieve this safely the tunneling equipment must fulfill the highest standards for quality, reliability and flexibility. Mts Perforator machines Type “mts2000L” have proven to be a most suitable and also economical choice for meeting such challenges.

In all our projects worldwide mts Perforator After Sales and Service Staff support the progress locally and from

lArge diAmeter tunnelling in urbAn AreAs

Germany, so that clients can finish their projects in time. n

Melbourne, Australia: ID2400mm, OD3040mm, Stormwater pipelineThree drives ranging from 450m – 650m single drive length, Clay soil with groundwater, successfully crossing main highway with less than 2m overburden Adaptation of mts Mixed Ground Cutting Disc under ground Elaborate set up for Slurry water recycling, including use of Decanter systemwww.melbournewater.com.au

Doha, Qatar, Expressway Qatar, Salwa Road Project ID2400mm ID3040mm, Concrete Sewage Collector pipe.6 drives ranging from 470m-550m single drive length. Weathered limestone with localized seepage or ground water Mts Perforator Mixed Ground Cutting DiscMinimal machine wear and high jacking progress rates

comPAny neWs

Page 14: No-Dig World 2011

2011trenchless middle eAst international exhibition and conferenceconference ProgrAmme conference ProgrAmme

The organisers reserve the right to amend the programme or substitute speakers without notice if circumstances should dictate The organisers reserve the right to amend the programme or substitute speakers without notice if circumstances should dictate

10 - 11 october 2011

day 2 - tuesday 11 october - rehabilitation

conference registration and exhibition open

session 1

Welcome – Dr Sam Ariaratnam, chairman International Society for Trenchless Technology (ISTT), UK

1.1 steP - A sustainable solution for Abu dhabiA review of the development of the tunnel solution for delivery of a world class sewerage service for Abu Dhabi. The presentation will highlight the challenges that have been faced and how they have been addressed. It will also update delegates on the current progress of the programme and how it is impacting on the company and the city. Alan Thomson, Managing Director, ADSCC, UAE

1.2 new milestone in guided auger boring with front steer technologyWith the development of a novel steering technology, Bohrtec have for the first time overcome the application restrictions and enabled applications in very dense strata. The presentation will demonstrate the capabilities of this guided auger boring system that excavates the ground as it advances.Dr.- Ing. Hans-Peter Uffmann, Bohrtec, GmbH, Germany

1.3 recent innovations in hdPe butt fusion.This presentation will highlight the recent developments in the handling and fusion welding process and how these can help with a variety of trenchless operations.Keith Mole, International Business Manager, McElroy Manufacturing Inc, UK

buffet lunch and exhibition viewing

session 2

2.1 horizontal directional drilling (hdd) and burstlining - exception becomes routine: installation with ductile iron pipesThis paper will clearly present the possibilities, advantages and requirements related to the installation of ductile cast iron pipes on the basis of projects completed in the field of new pipe installation using the controlled horizontal directional drilling method (HDD) and pipe replacement using pipe bursting. Steffen Ertelt, Duktus Rohrsysteme Wetzlar GmbH, Germany

day 1 - monday 10 october 2011 - new construction

2.2 4.1 m diameter pipe jacking of intake and outfall tunnelsThis case study will feature a project involving the construction of four 300m intake and outfall tunnels serving a coal-fired plant under construction at the shoreline of the North Sea in northern Germany. Due to time constraints, two slurry pipe jacking machines with a diameter of 4.1 m are being used simultaneously. The presenter will share the challenges and experience during the construction stages.Dr. Klaus Rieker, Wayss & Freytag, Germany

coffee break and exhibition viewing

session 3

3.1 small diameter on-grade microtunnelling in rock and highly compacted soils.One of the newest technologies capable of boring small diameter on-grade gravity sewer is the recently introduced AXIST Guided Boring System. The system design was originally targeted at bores averaging 90m length, with diameters of 250-350mm and in soft soil conditions. Those boundaries have been stretched to include longer bores, larger diameters, and much harder ground conditions. This paper will present project case studies that have been in high blow count compacted soils, fractured rock, and solid rock conditions. John Milligan, Business Manager, Vermeer USA

3.2 the development of high stress crack resistance polyethelene for use in trenchless technologyThis paper will outline the develoment of polyethylene materials used in the production of pipes and fittings. It will also describe how the extensive use of polethylene in trenchless technology applications has driven the latest developments in the material, namely pipe grades that have high stress crack resistance, so allowing the extension of underground infrastructuer service lifetime by up to 100 years.Andrew Wedgner, Kang Peck Tze and David Walton, Borouge, UAE and Singapore

close of day 1

Cocktail reception in Exhibition

exhibition close

10.30

11.00

12.45

14.15

15.15

16.00

17.00

18.30

exhibition open

session 4

4.1 Keynote Address – trenchless pipeline rehabilitation methodsAn insight into the methods for rehabilitating water and wastewater pipelines, diameter and length considerations, choice of materials and methodologies.Dr Dec Downey, past chairman International Society for Trenchless Technology (ISTT), UK

4.2 experiences with uv light-curing ciPP in large pipe dimensionsThis presentation will discuss the development of light curing CIPP methods which are now successful in dimension ranges which were in the past dominated by conventional warm-curing liner technologies. These experiences will be underlined by case studies of several successful large dimension rehabilitation projects. Benedikt Stentrup, Managing director of RELINEEUROPE Liner GmbH & Co KG, Germany.

4.3 biogenic corrosion – ‘microbiological induced corrosion’ - in concrete sewerage systems. the impact and solutionsThe industry often incorrectly refers to the deterioration of concrete sewerage systems as a gas problem. But the real culprit for concrete is Biogenic corrosion (often called MIC) a process by which sulfuric acid is produced in sewer systems when hydrogen sulfide gas and Thiobacillus bacteria interact. This paper will discuss the process of concrete MIC, laboratory and field tests and case studies of the long term effectiveness of the anti-bacterial additive, ConmicShield®. Moosa Damerchie, B.Eng. M.ASCE, International Managing Director, ConShield Technologies, Inc, USA, William E. Shook President, AP/M PERMAFORM, USA and Ibrahim Almajaida, Liwa Contracting, UAE

buffet lunch and exhibition viewing

session 5

5.1 no-dig technologies –innovative solutions for efficient and fast pipe rehabilitationThe presenter will give an overview on the technologies for pipe inspection, cleaning and pipe rehabilitation utilising trenchless technology Various technologies will be illustrated giving delegates comprehensive overview of the alternatives available.Mrs. Ulrike Rabmer-Koller – General Manager of Rabmer Group, Austria

5.2 lining of pipes, sewers and tunnels with the spiral wound sPr renovation technique. This paper will highlight the rehabilitation of circular and special profiles of sewer pipes, pipes or tunnels by using spiral wound technology. The material is a manufactured endless plastic strip, that is as PVC or HDPE-Liner of high ring stiffness as static load-bearing system and lightweight spiral wound directly through the existing shaft structure into the damaged pipe. Hans Jürgen König, General Manager KMG Pipe Rehabilitation Emirates LLC, Abu Dhabi

5.3 techniques to seal infiltration within waste water networks to meet ini targetsInfiltration into a closed sewer system is one of the network owners major problems. This paper discusses the trenchless techniques available to repair and contain the infiltration, covering traditional and new innovations in network sealing.Ian Ramsay, Managing Director Fluvius, UK

coffee break and exhibition viewing

session 6

6.1 Pipe inspection and rehabilitation by ciPP-uvThis presentation will describe various projects focussing on pipe inspection and the applications and advantages of using CIPP-UV.Faiz Al-Elweet, President and CEO, International Aramoon Corp, Saudi Arabia

conference close

exhibition close

10.30

11.00

12.30

14.00

15.30

16.15

17.30

18.00

Page 15: No-Dig World 2011

3 9 11 13 14

27 25 23 21 19

4 6 8 10 1221 15

22 20 18

43 45 47

26 24

37

28

33

16

48

50

40 42 44 46

59 57 55 53

34

56 54 5264 60

65

30

31

29

floor PlAn & eXhibitor list

www.trenchlessmiddleeast.com No-Dig World 2011 27

ABS TRENCHLESS GMBH Stand No: 21Wintersohler Straße 5, Drolshagen, 57462, GermanyT +49 2761 50730F +49 2761 507359E [email protected] www.abs-trenchless.comABS Trenchless has been a member of the Bauer group since 2009 and specialises in the manufacture of equipment and accessories for trenchless installation and replacement of many types of pipelines. We produce Auger Boring Systens (ABS), Rope Bursting Systems (RBS) and tools for HDD-Drilling. Our guided Auger Boring System (ABS) is used for the installation of pipes with dimensions from 150 mm up to 1800 mm and a force of up to 600 tones. If an existing line is to be renovated or rehabilitated, we can offer you our Rope Bursting System (RBS).

ABU DHABI SEWERAGE SERVICES COMPANY (ADSSC) Stand No: 57PO Box 108801, Abu Dhabi, United Arab EmiratesT +971 2 694 3333 F +971 2 694 3773W www.adssc.ae Abu Dhabi Sewerage Services Company was formed in 2005 and is licensed to operate the collection, treatment and disposal of waste water for the Emirate of Abu Dhabi. We employ five hundred people and have a large investment program including four new treatment plants and our landmark Strategic Tunnel Enhancement Program (STEP).

AL NABOODAH SPECIALIST SERVICES (LLC) Stand No: 45PO Box 11193, Dubai, United Arab EmiratesT +971 4 3390020F +971 4 3393573E [email protected] www.alnaboodah.comAl Naboodah Specialist Services (ANSS) Microtunelling and Directional Division was established in 2001. We have installed over 100km of pipelines with a fleet of 11 microtunnelling machines and 4 HDD rigs, pipe diameters from 100mm to 3m ID upto lengths of 1000m.

AL-WATANI FACTORY FOR FIBERGLASS COMPANY Stand No: 52Block 10, Street 1, 13130, KuwaitT +96 524764400F +96 524765930E [email protected] W www.watanigrp.com Watani Polycon Pipes has furnished a number of projects in the USA, Australia & GCC Countries. For any enquiries, please call us on +965 247664400 or fax to +965 24765930 or e-mail [email protected]

AMERICAN AUGERS Stand No: 30135 State Route 42, West Salem, Ohio, OH 44287, USAT +1 419 869 7107F + 419 869 7425E [email protected] www.americanaugers.comSince 1970, customers worldwide have come to know American Augers as a dedicated manufacturer of rugged and unsurpassed underground technology equipment. The product line includes state-of-the-art horizontal directional drills, earth boring machines, mud pump and cleaning systems, oil and gas drill rigs as well as industry-leading product tooling or accessories.

ANABEEB - PIPE MANUFACTURING FACTORIES Stand No: 48Al Mafraq Industrial Area, P.O.Box 46231, Abu Dhabi, 46231, United Arab EmiratesT +971 2 582 6288F +971 2 582 6239E [email protected] www.hobas.comANABEEB Factory manufactures GRP Pipes by the centrifugal casting process (CC-GRP) for a wide range of applications and installations including trenchless applications, microtunneling, opencut, for all the environments for stormwater and sewer systems, raw water and irrigation, waste water and sea water.

APS HOLDINGS Stand No: 50PO Box 8091, Dubai, United Arab EmiratesT +971 4 337 2877F +971 4 337 7389E [email protected] www.channelineinternational.comChanneline International Ltd has its roots firmly in the history of investigation, design and engineering of structural liner solutions for the large diameter pipeline industry. Channeline has been involved in the provision of specialist GRP structural lining elements for over 25 years accumulating an unrivalled degree of experience relative to the rehabilitation of circular and non-circular large diameter buried pipeline structures worldwide. We are committed to serve our existing and future customers in the water and wastewater industries.

ARTHUR HABERMANN GMBH & CO. KG Stand No: 53Goethestaße 12, Witten, D-58453, GermanyT +49 23 02 66 06-0F +49 23 02 69 05 64E [email protected] www.habermann-gmbh.deFor more than 80 years ARTHUR HABERMANN GmbH & Co. KG has been an experienced and innovative partner wherever a reliable solution in slurry pumping is required. We offer a wide range of charge and discharge slurry pumps for traffic tunnelling, microtunnelling and civil engineering.

BAROID INDUSTRIAL DRILLING PRODUCTS Stand No: 22PO Box 1675, Houston, TX 77251, USAT +1 800 735 6075F +1 281 871 4621E [email protected] www.baroididp.comBaroid Industrial Drilling Products is a worldwide network of service engineers, laboratory scientists, and support personnel dedicated to servicing the industrial drilling industries. The comprehensive product line, with the concept of Engineered Fluid Solutions for every drilling situation, guarantees improved drilling performance and superior expertise in well site service.

BENTOFRANCE SAS SUD-CHEMIE Stand No: 47Bldg 6EB, Office# 143, Dubai Airport Free Zone, Dubai, 293871, UAET +971 4 7017713/14F +971 4 7017715E [email protected] www.sud-chemie.comSupply of Drilling Fluid Products for HDD, tunneling and microtunneling-pipe jacking works. High Yield Bentonites: BENTONIL CF/ BENTONIL GTC4 Polymer Additives: SC MUD P/L, GSTP, SC LUB, SC FOAM, BENTOCRYL 86

eXhibitor Profiles2011

ABS TRENCHLESS GMBH 21

ABU DHABI SEWARAGE SERVICES COMPANY (ADSSC) 57

AL MAZROUI MEDICAL & CHEMICAL SUPPLIES 56

AL NABOODAH SPECIALIST SERVICES (LLC) 45

AL-WATANI FACTORY FOR FIBERGLASS COMPANY 52

AMERICAN AUGERS 30

ANABEEB PIPE MANUFACTURING FACTORIES 48

APS HOLDINGS 50

ARTHUR HABERMANN GMBH & CO KG 53

BAROID INDUSTRIAL DRILLING PRODUCTS 22

BENTOFRANCE SAS SUD-CHEMIE 47

BETON & ROHRBAU C.-F. THYMIAN GMBH & CO. KG 8

BKP BEROLINA POLYESTER GMBH & CO KG 23

BOROUGE PTE LTD 60

BRAWOLINER KARL OTTO BRAUN GMBH & CO 42

CHANNELINE INTERNATIONAL LTD 50

COLLI DRILL SPA 26

COLLI EQUIPMENT SRL 26

CONSHIELD TECHNOLOGIES INC 56

DIGITAL CONTROL INCORPORATED 37

DOWN2EARTH BVBA 15

DRILLTO TRENCHLESS CO LTD 9

DUKTUS PIPE SYSTEMS FZCO 13

DW/TXS CONSTRUCTION EQUIPMENT (BEIJING) CO.,LTD 55

FLUVIUS GMBH 59

FRISCH & FAUST TIEFBAU GMBH 6

GERMAN SOCIETY FOR TRENCHLESS TECHNOLOGY (GSTT) 2

HARD METALS AUSTRALIA PTY LTD 28

HELIMANN GENERAL MAINTENANCE 24

HERRENKNECHT AG 29 & 33

IMPREG GMBH 10

INTERNATIONAL ARAMOON CORPORATION 64

INTERNATIONAL DRILLING SERVICES LTD 43

JACKCONTROL AG 65

JOSEPH GALLAGHER LTD 16

KAYSON 31

KEM-TRON TECHNOLOGIES INC. 40

KMG PIPE REHABILITATION - EMIRATES LLC 1

KURTEC PIPELINE SERVICES LLC 18

MCALLISTER BROS 16

MTS PERFORATOR GMBH 25

PALMIERI SPA 46

PMPS LINER TECHNOLOGY 20

PRIME DRILLING GMBH 3

PURE TECHNOLOGIES LTD. 64

QATAR GERMAN PIPES COMPANY WLL 54

RABMER ROHRSANIERUNGS GMBH 19

RABMER ROHRTECHNIK GMBH 19

RASA CORPORATION 44

RASA INDUSTRIES CO LTD 44

RELINEEUROPE AG 6

R.TEC GMBH 19

SANIKOM 59

SCHAUENBURG MAB GMBH 12

SEKISUI NORDITUBE TECHNOLOGIES BELGIUM 1

SEKISUI RIB LOC AUSTRALIA 1

SHANGHAI GOODENG CONSTRUCTION MACHINERY

MANUFACTURING CO LTD 14

SWP SYSTEMS GMBH 4

TARGET UNDERGROUND 16

TRELLEBORG PIPE SEALS 11

TRINITY PUMPS 3

TT GROUP – TT-UK/MIDDLE EAST & PRIME DRILLING 3

VERMEER MIDDLE EAST 34

VMT GMBH 65

WIEDEMANN ENVIRONMENT SERVICES 27

WIEDEMANN & REICHARDT MASCHINEN &

FAHRZEUGBAU GMBH 27

WES L.L.C. DUBAI 27

exhibitor Profiles10 -11 October 2011 Jumeirah Beach Conference & Exhibition Centre, Dubai, UAE

Page 16: No-Dig World 2011

28 No-Dig World 2011 www.trenchlessmiddleeast.com

eXhibitor Profiles

www.trenchlessmiddleeast.com No-Dig World 2011 29

BETON & ROHRBAU C.-F. THYMIAN GMBH & CO. KG Stand No: 8Westhafenstraße 1, 13353, GermanyT +49 30 3973410F +49 30 39734124E [email protected] www.beton-rohrbau.debeton & rohrbau is one of the leading companies in civil and construction engineering for the public sector and for water/sewage systems. Branches and holding companies have also been set up in the Middle East and Eastern Europe. An annual turnover of about €80m emphasizes its productivity and efficiency.

BKP BEROLINA POLYESTER GMBH & CO. KG Stand No: 23Heidering 28, Velten, 16727, GermanyT +49 3304 20 88 100F +49 3304 20 88 110E [email protected] www.bkp-berollina.deBerolina-Liner-System (DN 150 – 1000 mm) is a UV-light curing, glass-fibre reinforced relining system for the trenchless renovation of pipes. Flexible pipe relining (CIPP) with UV-light is efficient, energy-saving and cost effective. BKP also offers the full range of equipment and service to install the liner.

BOROUGE PTE LTD Stand No: 60Sheikh Khalifa Energy Complex, Borouge Tower, Entrance 2Corniche Road, PO Box 6951, Abu Dhabi, 6951, United Arab EmiratesT +971 2 6070888F +971 2 6070889E [email protected] www.borouge.comBorouge is a leading provider of innovative, value creating plastics solutions. A joint-venture between ADNOC, one of the world’s major oil and gas companies, and Austria based Borealis, a leading provider of chemical and innovative plastics solutions; Borouge has its headquarters in the United Arab Emirates and Singapore.

BRAWOLINER KARL OTTO BRAUN GMBH & CO Stand No: 42Lauterstr. 50, Wolfstein, 67752, GermanyT +49 6304 74554F +49 6304 74476E [email protected] www.brawoliner.deBrawoliner® is a leading manufacture of liners and equipment for the rehabilitation of defective service laterals. Specialized on pipes from 50 mm to 250 mm the seamless Brawoliner®s are capable of making up to 90 degree bends with nearly no folds and can handle up to two diameter changes.

CHANNELINE INTERNATIONAL LTD Stand No: 50PO BOX 8091, Dubai, United Arab EmiratesT +971 4 3372877F +971 4 3377389E mail: [email protected] www.channelineinternational.comChanneline International Ltd has its roots firmly in the history of investigation, design and engineering of structural liner solutions for the large diameter pipeline industry. Channeline has been involved in the provision of specialist GRP structural lining elements for over 25 years accumulating an unrivalled degree of experience relative to the rehabilitation of circular and non-circular large diameter buried pipeline structures worldwide. We are committed to serve our existing and future customers in the water and wastewater industries.

COLLI DRILL SPA Stand No: 26Via Traversa del Grillo,11, Capena (Roma) 00060, ItalyT +39 06 9085000F +39 06 9085301E [email protected] W www.collidrill.itColli Drill, located in Rome, is a producer of forged friction welded drill rods and forged one piece drill rods for the HDD market. The whole process production has ISO quality certification, and the tool joint, tube and weld has API certification.Colli equipment is a producer and designer of any kind of reamers, fly cutters, rock and barrel reamers for small, medium and large diameter. We are designers of mud pump and recycling equipment for any customer requirements.

COLLI EQUIPMENT SRL Stand No: 26Via G.di Vittorio,39- 40056 Crespellano (BO), ItalyT + 39 051969454F +39 051 969459E [email protected] www.colliequipment.com Colli Equipment is located in Bologna, we design and manufacture reamers, fly cutter, rock reamers, barrel reamers for small, medium and large diameter. We are designers of mud pump and recycling equipment for any customer requirements.

CONSHIELD TECHNOLOGIES INC Stand No: 56541 Tenth Street NW#233, 30318-5713, USAT +1 289 426 1690F +1 404 420 2160E [email protected] www.conshield.comConshield Technologies Inc. is a USA based chemical company which provides high tech additives for the prevention of concrete corrosion in sanitary sewers. ConmicShield® additive prevents growth of the acid-producing bacteria and thereby prevents corrosion of the concrete. It is not a coating; and therefore, it cannot chip, peel, or delaminate.

DIGITAL CONTROL INC. Stand No: 37DCI India, JA1023, DLF Tower A, Jasola District Center, Jasola, 110025, IndiaT +91 11 4507 0444F +91 11 4507 0440E [email protected] www.digitrak.com; www.digital-control.comWe are leading manufacturers of “tracking equipments” for the HDD industry with our flagship brand “Digitrak”. Our popular “walkover tracking systems” are F5, F2 & SE. We also specialize in magnetic guidance system(SST), cable locating system, pullback force & fluid pressure monitoring system (fluid pressure transmitter & TensiTrak).

DOWN2EARTH BVB Stand No: 15Research Campus Hasselt RCH1, Kempische Steenweg 301/9, Hasselt, 3500, BelgiumT +32 11 281 666F + 32 11 281 667E [email protected] www.down2earth.netDown2Earth, a full-service provider, aims to be a preferred partner for consultancy, services and supply of equipment to the No-Dig industry, especially for tunneling. Driven by experience, Down2Earth and its partners, combine decades of know-how, easy accessible for its clients. Down2Earth clients are authorities, designers, contractors and equipment suppliers.

DRILLTO TRENCHLESS CO LTD Stand No: 9F Block, D Zone, Buchong, Industrial Estate (1 Industrial Road), Shajing Baoan District, Shenzhen 518103, ChinaT +86 186 76651581F + 86 0755 29546072E [email protected] www.drillto.netDrillto Trenchless Co., Ltd is China’s biggest professional HDD machine manufacturer with a wide international influence. Superior service and excellent products enabled Drillto to become the fastest growing HDD machine manufacturer in the world. It has successfully exported products to more than 20 countries.

DUKTUS PIPE SYSTEMS FZCO Stand No: 13South Jebel Ali Free Zone, View 18 / Office No. 909, P.0.Box. 262446, United Arab EmiratesT +971 0 48865680F +971 0 48865640E [email protected] www.duktus.comThe Duktus Group develops, produces and markets high-grade ductile iron systems for transporting water and for laying deep foundations for buildings and other structures.

DW/TXS CONSTRUCTION EQUIPMENT (BEIJING) CO. LTD Stand No: 55NO. 6, Huo Xing Fifth Street, Huo County Development Area Tongzhou District, Beijing, 101109, ChinaT +86 10 8058 2365F +86 10 8058 2515E [email protected] www.dwtxs.comDW/TXS Construction Equipment (Beijing) Co.,Ltd was established in December 23, 2008. It is a joint venture between US-based The Charles Machine Works, Inc. and Tu Xing Sun No-Dig Tech (Beijing) Co.,Ltd. Our main products include 10T to 600T drilling rig, mud mixing systems, pilot hole tooling and accessories.

FLUVIUS GMBH Stand No: 59Fluvius GmbH, Schiessstraße 56, Dusseldorf, , 40549, GermanyT +49 (0)211 69168231F +49 (0)211 69168219E [email protected] www.fluvius.deFluvius GmbH established 4 years ago as suppliers of No-dig products to the pipe rehabilitation industry. Partners in the Fluvius group are Ecocanal, supplying mortars for the repair of manholes and chambers, and Sanikom who, alongside the Fluvius and Ecocanal range, produce carbon fibre technology and pipe testing equipment.

FRISCH & FAUST TIEFBAU GMBH Stand No: 6Civil Engineering Branch Bahrain: Office 63, Building 240, Road 3306, Area 333, Manama, BahrainT +97 334126912E [email protected] www.frisch-faust.deFrisch & Faust Engineering has more than 110 qualified and experienced employees. We have amassed an almost inexhaustible amount of know-how which provides valuable advantages for every customer. Controlled pipe-feed driving, open conduit building, conduit remediation and piping construction are our main points of focus in civil engineering work.

GERMAN SOCIETY FOR TRENCHLESS TECHNOLOGY (GSTT) Stand No: 2Messedamm 22, Berlin, 14055, GermanyT +49 30 3038 2143F +49 30 3038 2079E [email protected] www.gstt.deWelcome to the German Pavilion within TRENCHLESS MIDDLE EAST 2011. On behalf of all German exhibitors, the Federal Ministry of Economics and Technology (BMWi), the Association of the German Trade Fair Industry (AUMA) and the GSTT cordially invite you to visit the Official German presentation at TRENCHLESS MIDDLE EAST 2011.

HARD METALS AUSTRALIA PTY LTD Stand No: 282/35 King Road, Hornsby, NSW 2077, AustraliaT +61 2 9476 6333F +61 2 9476 5033E [email protected] www.hardmetals.comHard Metals is an Australian based manufacturer of tungsten carbide and diamond tooling for mining, drilling and infrastructure industries. Our business was founded in 1982 and we have built a reputation on innovation and manufacture of specialised tooling for difficult applications.At Trenchless Middle East we will be exhibiting our new range of high flow sonde housings, rock heads and a world first with field seviceable PDC Rock Reamers. The PDC Rock Reamers have been designed specifically to be serviced on site with simple tools.

HELIMANN GENERAL MAINTENANCE Stand No: 24P.O.Box 37438, Khalidiya, Zayed First Street, Abu Dhabi, UAET +971 2 666 5226F +971 2 666 5229E [email protected]

HERRENKNECHT AG Stand No: 29 / 33Schlehenweg 2, Schwanau, 77963, GermanyT +49 7824 3020F +49 7824 3403E [email protected] www.herrenknecht.comHerrenknecht is a technology and market leader in the area of mechanized tunnelling systems. As the only company worldwide, Herrenknecht delivers cutting-edge tunnel boring machines for all ground conditions and in all diameters – ranging from 0.10 to 19 meters.The Herrenknecht Group employs around 3,300 members of staff worldwide. With 68 subsidiaries and associated companies working in related fields in Germany and abroad, Herrenknecht is able to provide a comprehensive range of services close to the project site and the customer, quickly and in a targeted way.

IMPREG GMBH Stand No: 10Eisenbahnstraße 32, D-72119, Ammerbuch, GermanyT +49 7073 300 31-0F +49 7073 300 31-19E [email protected] www.impreg.deiMPREG is the leader manufacture of GRP Liners cured by Steam or latest UV – Light technology. Made in Germany, iMPREG Liners are the strongest, most environmentally friendly and easy to install CIPP liners in the market. Our clients install more than 150 miles of iMPREG liners each year ranging from DIA 150 to 1300 in diameter (in 2012 up to DIA 1600).

eXhibitor Profiles

Page 17: No-Dig World 2011

www.trenchlessmiddleeast.com No-Dig World 2011 31 30 No-Dig World 2011 www.trenchlessmiddleeast.com

INTERNATIONAL ARAMOON CORPORATION Stand No: 64P.O. Box 5685, Riyadh 11432, Saudi ArabiaT +966 1 2886769F +966 1 2886786E [email protected] www.aramoon.comInternational Aramoon Corporation is a specialized contractor and offers services for flow measurement, pressure recording, water audit, GIS survey & Watch Leak software to monitor and quantify leaks. The head office of IAC is in Riyadh and has branch offices in Dammam/ Al-Khobar, Ahsa, Tabuk, Madinah and Abha in KSA.

INTERNATIONAL DRILLING SERVICES LTD Stand No: 43Carrwood Road, Chesterfield Trading Estate, Sheepbridge, Chesterfield, Derbyshire, S41 9QB, United KingdomT +44 1246 269911F +44 1246 269922E [email protected] www.idsuk.comIDS is an industry leader in the design, manufacture and supply of in-hole tools and associated products for exploration/utility drilling and subcontract precision and general engineering.

JACKCONTROL AG Stand No: 65Buchholzstrasse 50, Glarus, 8750, SwitzerlandT +41 55 6502020F +41 55 6502030E [email protected] www.jackcontrol.comWith the development of the hydraulic joint and an accompanying real-time monitoring system, Jackcontrol has opened up new horizons in trenchless construction using pipe jacking and microtunneling. Spectacular curved pipe jacking projects with demanding alignments in almost every type of soil formation have become possible.

KAYSON Stand No: 31Iranzamin bldg 2288 Iranzamin Ave. Shahrak Qods, Tehran 14656, Iran T +9821 88072501 9F +9821 88072500E [email protected] W www.kayson-ir.comKayson is a privately held engineering and construction company providing world-class design, management, procurement and construction services to develop, engineer & build projects for customers both in Iran and overseas. Overseas Branches:Belarus, Oman, India, Bolivarian Republic of Venezuela, Iraq.

KEM-TRON TECHNOLOGIES INC. Stand No: 4010550 Cash Road, Stafford, TX, 77477, USAT +1 888 536 2766F +1 281 499 4080E [email protected] www.kemtron.comSince 1990, KEM-TRON Technologies has been providing quality waste management and solids control systems to customers around the world. Specific products include linear motion shale shakers, decanter centrifuges, packaged mud recycling systems, shale shaker screens, mud mixing systems, performance polymers and centrifugal pumps.

KMG PIPE REHABILITATION - EMIRATES LLC Stand No: 1P.O. Box 43815, Abu Dhabi, United Arab EmiratesT +971 2 6766004F +971 2 6766335E [email protected] www.kmg-emirates.aeKPRE provides trenchless pipe rehabilitation including Spiral wound Rib LOC, SPR, CIPP lining NordiTube, cleaning, CCTV and Patch repair. Japanese Sekisui Chemical Corp., one of the leading industrial concerns in Osaka, was founded in 1947, become majority shareholder of SEKISUI SPREe GmbH. KPRE is a division of Sekisui SPR Europe.

KURTEC PIPELINE SERVICES LLC Stand No: 18P.O. Box 127867, Abu Dhabi, United Arab EmiratesT +971 2 554 8390F +971 2 554 8183E [email protected] www.kurtecme.comKurtec Pipeline Services LLC provide a total pipeline rehabilitation service for gravity and pressure systems, including CCTV inspection, asset assessment/monitoring, leak detection, cured in place pipe, polyethylene and sprayed linings plus localized/joint repair. KPS is a UAE company and serves the Gulf region through their representative offices.

MTS PERFORATOR GMBH Stand No: 25Am Heisterbusch 18a, 19246, GermanyT +49 388513270F +49 3885132710E [email protected] www.mts-p.commts Perforator is a german manufacturer of tunnelling systems. Providing technology for all diameters from small microtunnelling systems to large diameter TBMs, and for all ground conditions, like auger boring machines, slurry, EPB and hard rock systems.

PALMIERI SPA Stand No: 46Via dell’Industria 58, Silla - Gaggio Montano, (Bologna), Italy, 40041T +39 0534 32511F +39 0534 32501E [email protected] www.palmierigroup.comWith over 35 years experience, Palmieri Group is a specialised leader in the global tunnelling and drilling spares and componentry industry. The newest development is the production of the most advanced microtunnelling system and all related accessories.

PMPS LINER TECHNOLOGY (S) PTE LTD Stand No: 2048 Toh Guan East Road, Enterprise Hub #06-100, 608586, SingaporeT +65 64653008F +65 64653009E [email protected] www.pmpsliner.comPMPS is a company which brings to the market the core business of pipeline rehabilitation management in the form of a business to business approach. We offer one of the broadest portfolios of cost-effective solutions for rehabilitation aging or deteriorating pipelines.

QATAR GERMAN PIPES COMPANY WLL Stand No: 54Zone No. 81, P.O. Box: 8588, New Industrial Area, Doha, QatarT +974 444 34 990F +974 444 34 603E [email protected] www.pipegreen.comQatar German Pipes Company manufactures polymer concrete drainage pipes which is made up of resin, filler, aggregates and chemicals. The pipes are environmentally friendly and no iron, cement or water is used in it’s production. It uses microtunneling jacking technology and has an assumed lifespan of at least 50 years.

RABMER ROHRSANIERUNGS GMBH Stand No: 19Elsenheimerstr. 59, 80687 München, 80687, GermanyT +43 7230 7213 752F +43 7230 8093 731E [email protected] www.rabmer.atRabmer, an international company, has specialised now for more than 20 years on no-dig technologies for pipe rehabilitation. r.tec GmbH, a daughter company of Rabmer, distributes Rabmer’s technologies for trenchless rehabilitation of underground pipelines worldwide. The company serves specialized contractors in underground utilities with delivery of equipment and material.

RASA INDUSTRIES CO LTD Stand No: 441-1-1, Kyobashi, Chuo-ku, Tokyo, 104-0031, JapanT +81 3 3278 3830F +81 3 3281 6699E [email protected] www.rasa.co.jpJapan-based Rasa Industries Ltd is a manufacturer of pipe jacking and microtunneling equipment in the field of civil engineering as well as trenchless construction industries.

RELINEEUROPE LINER GMBH & CO. KG Stand No: 6Große Ahlmühle 31, Rohrbach, , 76865, GermanyT +49 (0)6349 93934 220F +49 (0)6349 93934 101E [email protected] www.relineeurope.comRELINEEUROPE is a corporate group founded in 2009 with the purpose of establishing a systems supplier for companies in the pipe rehabilitation industry. The company is based on the years of experience of the involved engineers and managers in the development, production and application of trenchless pipe rehabilitation technologies.

SCHAUENBURG MAB GMBH Stand No: 12Weseler Straße 35, Mülheim an der Ruhr, , 45478, GermanyT +49 208 9991 0F +49 208 592409E [email protected] www.schauenburg-mab.comFor more than 50 years SCHAUENBURG MAB has been building separation plants. MAB’s plants are operating successfully in tunneling and other underground engineering projects worldwide. Our range of standardized equipment is supplemented by solutions designed and executed to customer specifications.

SHANGHAI GOODENG CONSTRUCTION MACHINERY MANUFACTURING CO LTD Stand No: 14No. 1088, Fulian Road, Gucun Industry Garden, Baoshan, District, Shanghai, 201906, ChinaT +86 2136 040215F +86 2136 041373E [email protected] www.goodeng.com.cnGoodeng Machine is a high-tech company specialising in construction machinery established in 2002. Our main products are GD series of trenchless horizontal directional drilling machines, ranging from 18 Ton to 800 Ton. For big rigs, we take about 80% market share in China.

SWP SYSTEMS GMBH Stand No: 4Grüner Weg 4, 33397 Rietberg, GermanyT +49 5244 404700F +49 5244 404748E [email protected] www.swp-systems.deSWP pipe system is used for the rehabilitation of sewer lines and conduits restoring the efficiency, reliability and structural integrity for existing pipelines by the insertion of a machine-made strip of PVC-HI wound into the existing pipeline using a winding machine which remains stationary in the manhole.

TARGET UNDERGROUND Stand No: 16HQ Unit 1 Bldg 2748, Road 3649, Al Seef District, Kingdom of Bahrain OMAN Branch: Villa 1931 Way 9307, Al Hail North, Muscat, Oman, 23873T +973 1363 4933F +973 1363 4934E [email protected] www.targethdd.comTarget Underground is the Middle East’s premiere thrustboring and tunnelling contractor boasting the largest horizontal directional drilling and tunneling fleet of its kind in the region - Saudi Arabia, Qatar, Kuwait, Bahrain and Oman. Their services include HDD tunnelling and thrustboring as well as microtunnelling shaftsinking sewer rehabilitation CCTV CIPP Re-lining.

TRELLEBORG PIPE SEALS Stand No: 11Dr.-Alfred-Herrhausen-Alle 36, Duisburg, 47228, GermanyT +49 20659990F +49 2065999111E [email protected] www.trelleborg.com/eprosTrelleborg Pipe Seals Duisburg is among the leading specialists in engineered systems for pipe and sewer infrastructure. The brand name epros®DrainSystems stands for almost 20 years of experience, continuous research and further development of technical solutions for the trenchless rehabilitation of pipelines in sewer systems, buildings and industries.

TT GROUP – TT-UK/MIDDLE EAST & PRIME DRILLING Stand No: 3Windsor Road, Bedford, MK42 9SU, United KingdomT +44 1234 342566F +44 1234 352184E [email protected] www.tt-uk.comTT-UK/TT-Middle East manufacture and supply Grundomat hammers 45-180mm dia; Grundoram steel pipe hammers for pipes 200mm-4m dia; Grundocrack/Grundoburst pneumatic/hydraulic online replacement systems for 100-1000mm pipes/mains; Grundopit/Grundodrill/Grundobore auger /directional boring systems installing pipes to 600mm dia; Burstform Tight-in-Pipe renewal; Grundowinch 2-40 tonne; Prime Drilling Maxi HDD Rigs 30-600 tonnes, TT-UK/RSP Suction Excavators.

eXhibitor Profiles eXhibitor Profiles

Page 18: No-Dig World 2011

Product guide

32 No-Dig World 2011 www.trenchlessmiddleeast.com

BORE HOLE LOGGINGTARGET UNDERGROUND

VERMEER MIDDLE EAST

CABLE AVOIDANCE TOOLSVERMEER MIDDLE EAST

CCTVINTERNATIONAL ARAMOON CORP.

TARGET UNDERGROUND

CIPP MATERIALSBKP BEROLINA POLYESTER GMBH & CO. KG

FLUVIUS GMBH

IMPREG GMBH

INTERNATIONAL ARAMOON CORP.

PMPS LINER TECHNOLOGY

RABMER ROHRSANIERUNGS GMBH

RELINEEUROPE LINER GMBH & CO. KG

COATINGS CONSHIELD TECHNOLOGIES INC

TRELLEBORG PIPE SEALS

COIL TRAILERS PRIME DRILLING

TARGET UNDERGROUND

TT GROUP – TT-UK/MIDDLE EAST

CONSULTING SERVICES

DOWN2EARTH BVBA

FLUVIUS GMBH

IMPREG GMBH

PMPS LINER TECHNOLOGY

RELINEEUROPE LINER GMBH & CO. KG

CURVED MICROTUNNELLING JACKCONTROL AG

CUTTERSBRAWOLINER KARL OTTO BRAUN GMBH & CO

INTERNATIONAL DRILLING SERVICES LTD

PALMIERI SPA

RABMER ROHRSANIERUNGS GMBH

RELINEEUROPE LINER GMBH & CO. KG

TRELLEBORG PIPE SEALS

DETECTION EQUIPMENT DIGITAL CONTROL INC.

INTERNATIONAL ARAMOON CORP.

VERMEER MIDDLE EAST

DIGITAL MAPPING RABMER ROHRSANIERUNGS GMBH

DIRECTIONAL DRILLING ACCESSORIES ABS TRENCHLESS GMBH

AMERICAN AUGERS

COLLI DRILL SPA

COLLI EQUIPMENT SRL

DIGITAL CONTROL INC.

DW/TXS CONSTRUCTION EQUIPMENT

(BEIJING) CO. LTD

HARD METALS AUSTRALIA PTY LTD

INTERNATIONAL DRILLING SERVICES LTD

KEM-TRON TECHNOLOGIES INC.

PALMIERI SPA

PRIME DRILLING

SCHAUENBURG MAB GMBH

SHANGHAI GOODENG CONSTRUCTION

MACHINERY MANUFACTURING CO LTD

TT GROUP – TT-UK/MIDDLE EAST

VERMEER MIDDLE EAST

DIRECTIONAL DRILLING FLUIDS

BENTOFRANCE SAS SUD-CHEMIE

INTERNATIONAL DRILLING SERVICES LTD

VERMEER MIDDLE EAST

DIRECTIONAL DRILLING RIGS

AMERICAN AUGERS

DOWN2EARTH BVBA

DRILLTO TRENCHLESS CO LTD

DW/TXS CONSTRUCTION EQUIPMENT

(BEIJING) CO. LTD

INTERNATIONAL DRILLING SERVICES LTD

PRIME DRILLING

SHANGHAI GOODENG CONSTRUCTION

MACHINERY MANUFACTURING CO LTD

TT GROUP – TT-UK/MIDDLE EAST

VERMEER MIDDLE EAST

DRAIN CLEANING EQUIPMENT

WIEDEMANN & REICHHARDT MASCHINEN

UND FAHRZEUGBAU GMBH

DRAINAGE SYSTEMS

AL-WATANI FACTORY FOR FIBERGLASS COMPANY

INTERNATIONAL ARAMOON CORP.

QATAR GERMAN PIPES COMPANY WLLQATAR

GERMAN PIPES COMPANY WLL

TRELLEBORG PIPE SEALS

DRILL PIPE DRILLTO TRENCHLESS CO LTD

DW/TXS CONSTRUCTION EQUIPMENT

(BEIJING) CO. LTD

INTERNATIONAL DRILLING SERVICES LTD

VERMEER MIDDLE EAST

DRILL RODS

COLLI DRILL

DRILLTO TRENCHLESS CO LTD

DW/TXS CONSTRUCTION EQUIPMENT

(BEIJING) CO. LTD

INTERNATIONAL DRILLING SERVICES LTD

PRIME DRILLING

TT GROUP – TT-UK/MIDDLE EAST

VERMEER MIDDLE EAST

EXCAVATORS HERRENKNECHT AG

GAS MONITORINGTARGET UNDERGROUND

GEOTECHNICAL SERVICES

INTERNATIONAL DRILLING SERVICES LTD

GROUND PENETRATING RADARVERMEER MIDDLE EAST

GROUTING

BAROID INDUSTRIAL DRILLING PRODUCTS

HDD - ACCESSORIES

ABS TRENCHLESS GMBH

AMERICAN AUGERS

BAROID INDUSTRIAL DRILLING PRODUCTS

COLLI DRILL

DIGITAL CONTROL INC.

DRILLTO TRENCHLESS CO LTD

DW/TXS CONSTRUCTION EQUIPMENT

(BEIJING) CO. LTD

HARD METALS AUSTRALIA PTY LTD

INTERNATIONAL DRILLING SERVICES LTD

KEM-TRON TECHNOLOGIES INC.

PRIME DRILLING

SCHAUENBURG MAB GMBH

TARGET UNDERGROUND

TT GROUP – TT-UK/MIDDLE EAST

VERMEER MIDDLE EAST

HDD – DRILLING FLUIDSCOLLI EQUIPMENT SRL

HDD - RIGS

AMERICAN AUGERS

DRILLTO TRENCHLESS CO LTD

DW/TXS CONSTRUCTION EQUIPMENT

(BEIJING) CO. LTD

HERRENKNECHT AG

INTERNATIONAL DRILLING SERVICES LTD

PRIME DRILLING

TARGET UNDERGROUND

TT GROUP – TT-UK/MIDDLE EAST

VERMEER MIDDLE EAST

HIGH PRESSURE CLEANERS/JETTING FRISCH & FAUST TIEFBAU GMBH

RABMER ROHRSANIERUNGS GMBH

WIEDEMANN & REICHHARDT MASCHINEN

UND FAHRZEUGBAU GMBH

INSPECTION SYSTEMS

BRAWOLINER KARL OTTO BRAUN GMBH & CO

INTERNATIONAL ARAMOON CORP.

RABMER ROHRSANIERUNGS GMBH

WIEDEMANN & REICHHARDT MASCHINEN

UND FAHRZEUGBAU GMBH

JOINT REPAIR EQUIPMENT FLUVIUS GMBH

INTERNATIONAL ARAMOON CORP.

RABMER ROHRSANIERUNGS GMBH

RELINEEUROPE LINER GMBH & CO. KG

LATERAL REHABILITATION

BRAWOLINER KARL OTTO BRAUN GMBH & CO

FLUVIUS GMBH

FRISCH & FAUST TIEFBAU GMBH

INTERNATIONAL ARAMOON CORP.

RABMER ROHRSANIERUNGS GMBH

TRELLEBORG PIPE SEALS

LEAK DETECTION

BRAWOLINER KARL OTTO BRAUN GMBH & CO

FLUVIUS GMBH

RABMER ROHRSANIERUNGS GMBH

CONTRACTORS/ SERVICE SUPPLIERS

CLEANINGFRISCH & FAUST TIEFBAU GMBH

INTERNATIONAL ARAMOON CORP.

KMG PIPE REHABILITATION - EMIRATES LLC

KURTEC PIPELINE SERVICES LLC

PMPS LINER TECHNOLOGY

RABMER ROHRSANIERUNGS GMBH

TARGET UNDERGROUND

VERMEER MIDDLE EAST

WIEDEMANN & REICHHARDT MASCHINEN

UND FAHRZEUGBAU GMBH

HDD AL NABOODAH SPECIALIST SERVICES (LLC)

BAROID INDUSTRIAL DRILLING PRODUCTS

BENTOFRANCE SAS SUD-CHEMIE

INTERNATIONAL DRILLING SERVICES LTD

KEM-TRON TECHNOLOGIES INC.

TARGET UNDERGROUND

LOCALISED REPAIRS

ARTHUR HABERMANN GMBH & CO KG

KMG PIPE REHABILITATION - EMIRATES LLC

KURTEC PIPELINE SERVICES LLC

PMPS LINER TECHNOLOGY

TARGET UNDERGROUND

TRELLEBORG PIPE SEALS

WIEDEMANN & REICHHARDT MASCHINEN

UND FAHRZEUGBAU GMBH

LOCATION, DETECTION, INSPECTION

INTERNATIONAL ARAMOON CORP.

KURTEC PIPELINE SERVICES LLC

PMPS LINER TECHNOLOGY

RABMER ROHRSANIERUNGS GMBH

TARGET UNDERGROUND

VERMEER MIDDLE EAST

WIEDEMANN & REICHHARDT MASCHINEN

UND FAHRZEUGBAU GMBH

NEW INSTALLATIONS AL NABOODAH SPECIALIST SERVICES (LLC)

AL-WATANI FACTORY FOR FIBERGLASS COMPANY

FRISCH & FAUST TIEFBAU GMBH

JACKCONTROL AG

TARGET UNDERGROUND

VERMEER MIDDLE EAST

PIPELINE RENOVATION/LININGS

ABS TRENCHLESS GMBH

AL-WATANI FACTORY FOR FIBERGLASS COMPANY

BETON & ROHRBAU

BKP BEROLINA POLYESTER GMBH & CO. KG

BRAWOLINER KARL OTTO BRAUN GMBH & CO

CONSHIELD TECHNOLOGIES INC

FLUVIUS GMBH

IMPREG GMBH

INTERNATIONAL ARAMOON CORP.

KMG PIPE REHABILITATION - EMIRATES LLC

KURTEC PIPELINE SERVICES LLC

PMPS LINER TECHNOLOGY

RABMER ROHRSANIERUNGS GMBH

SWP SYSTEMS GMBH

TARGET UNDERGROUND

TRELLEBORG PIPE SEALS

VERMEER MIDDLE EAST

WIEDEMANN & REICHHARDT MASCHINEN

UND FAHRZEUGBAU GMBH

SURVEYS KMG PIPE REHABILITATION - EMIRATES LLC

KURTEC PIPELINE SERVICES LLC

PMPS LINER TECHNOLOGY

MANUFACTURERS/EQUIPMENT SUPPLIERS

ASSET MANAGEMENT

INTERNATIONAL ARAMOON CORP.

PMPS LINER TECHNOLOGY

RABMER ROHRSANIERUNGS GMBH

VERMEER MIDDLE EAST FZCO Stand No: 34 and Outside 101PO Box 261452, FZS1 AE02 Jebel Ali Free Zone (South), Dubai, United Arab EmiratesT +971 4 886 1178F +971 4 886 1179E [email protected] www.vermeer-middleeast.aeVermeer Middle East FZCO based in Jebel Ali Free Zone handles the sales, after sales and training on all Vermeer Products, including Track Trenchers, HDD Systems, brush chippers, compost turners, mini skid steers. For a more in depth look on Vermeer products please visit www.vermeer-middleeast.ae or call us at +971 4 886 1178.

eXhibitor Profiles

Product guide

LINER END SEALSTRELLEBORG PIPE SEALS

LININGS ANABEEB - PIPE MANUFACTURING FACTORIES

BKP BEROLINA POLYESTER GMBH & CO. KG

BRAWOLINER KARL OTTO BRAUN GMBH & CO

CONSHIELD TECHNOLOGIES INC

FLUVIUS GMBH

FRISCH & FAUST TIEFBAU GMBH

INTERNATIONAL ARAMOON CORP.

PMPS LINER TECHNOLOGY

RABMER ROHRSANIERUNGS GMBH

RELINEEUROPE LINER GMBH & CO. KG

TARGET UNDERGROUND

TRELLEBORG PIPE SEALS

MAINS INSERTION EQUIPMENT

PRIME DRILLING

TT GROUP – TT-UK/MIDDLE EAST

MANHOLE REHABILITATION

AL-WATANI FACTORY FOR FIBERGLASS COMPANY

ANABEEB - PIPE MANUFACTURING FACTORIES

CONSHIELD TECHNOLOGIES INC

FLUVIUS GMBH

FRISCH & FAUST TIEFBAU GMBH

INTERNATIONAL ARAMOON CORP.

PMPS LINER TECHNOLOGY

RABMER ROHRSANIERUNGS GMBH

TRELLEBORG PIPE SEALS

WIEDEMANN & REICHHARDT MASCHINEN

UND FAHRZEUGBAU GMBH

MANHOLE SEALSTRELLEBORG PIPE SEALS

MICROTUNNELLING

AL NABOODAH SPECIALIST SERVICES (LLC)

TARGET UNDERGROUND

MICROTUNNELLING EQUIPMENT

DOWN2EARTH BVBA

HERRENKNECHT AG

MTS PERFORATOR GMBH

PALMIERI SPA

RASA INDUSTRIES CO LTD

SCHAUENBURG MAB GMBH

TARGET UNDERGROUND

MONITORING MICROTUNNELING

JACKCONTROL AG

MOLING EQUIPMENT PRIME DRILLING

TT GROUP – TT-UK/MIDDLE EAST

VERMEER MIDDLE EAST

MUD PUMPS

AMERICAN AUGERS

COLLI EQUIPMENT SRL

DOWN2EARTH BVBA

DRILLTO TRENCHLESS CO LTD

KEM-TRON TECHNOLOGIES INC.

SCHAUENBURG MAB GMBH

VERMEER MIDDLE EAST

MUD RECYCLING EQUIPMENT

AMERICAN AUGERS

COLLI EQUIPMENT SRL

DOWN2EARTH BVBA

KEM-TRON TECHNOLOGIES INC.

SCHAUENBURG MAB GMBH

VERMEER MIDDLE EAST

MUD SEPARATION EQUIPMENTSCHAUENBURG MAB GMBH

MUD SUPPLIES

BAROID INDUSTRIAL DRILLING PRODUCTS

VERMEER MIDDLE EAST

PERFORMANCE POLYMER SUPPLIERKEM-TRON TECHNOLOGIES INC.

PIPES

AL-WATANI FACTORY FOR FIBERGLASS COMPANY

ANABEEB - PIPE MANUFACTURING FACTORIES

BOROUGE PTE LTD

DUKTUS PIPE SYSTEMS FZCO

DW/TXS CONSTRUCTION EQUIPMENT

(BEIJING) CO. LTD

QATAR GERMAN PIPES COMPANY WLLQATAR

GERMAN PIPES COMPANY WLL

PIPE BURSTING EQUIPMENT ABS TRENCHLESS GMBH

INTERNATIONAL DRILLING SERVICES LTD

MTS PERFORATOR GMBH

PRIME DRILLING

RABMER ROHRSANIERUNGS GMBH

TT GROUP – TT-UK/MIDDLE EAST

VERMEER MIDDLE EAST

PIPE AND CABLE PLOWSPRIME DRILLING

TT GROUP – TT-UK/MIDDLE EAST

PIPE CLEANING EQUIPMENT

INTERNATIONAL ARAMOON CORP.

RABMER ROHRSANIERUNGS GMBH

TRELLEBORG PIPE SEALS

WIEDEMANN & REICHHARDT MASCHINEN

UND FAHRZEUGBAU GMBH

PIPE COATINGS

FLUVIUS GMBH

TRELLEBORG PIPE SEALS

www.trenchlessmiddleeast.com No-Dig World 2011 33

WIEDEMANN & REICHHARDT MASCHINEN UND FAHRZEUGBAU GMBH Stand No: 27Freiweg 4, 86450 Altenmuenster, 86450, GermanyT +49 8295 96930F +49 8295 969330E [email protected] www.wiedemann-reichhardt.deWiedemann Germany is in joint venture with Wiedemann Environment Services / Wes L.L.C. Dubai. The company Wiedemann & Reichhardt, Germany, was founded in 1976. The company is worldwide leading in the technology of water recycling used inside sewer cleaning vehicles. Advantages include saving fresh-water, more effective cleaning & prepared for CCTV.

Page 19: No-Dig World 2011
Page 20: No-Dig World 2011