Low-Power Verification, the WayFunctional + Physical Low-Power Silicon Verification
David Tester, Founder & CTO
26 February 2009
What are the Low-Power Verification Questions?How can you prove low-power silicon implementation of a system?
Disruptive products demand system-level optimizations
- Low-Power is no exception and requires …
- Example: airwave1 and low-power GPS optimization
- Today we will not discuss GPS or system verification!
Let‟s consider an alternative question:
“How did you prove (verify) the silicon implementation of
that low power architecture? What are the challenges?”
Q1. Lazy is OK. How do you know when you‟re done?
Q2. Did you survive (or avoid) the pain a PMK can offer?
Q3. How did you verify clock tree power consumption?
Q4. Multi-DVDD chips – Where EDA meets reality …
Q5. Is timing-optimized and power-optimized the same?
Here are five … not in order and not an exhaustive list …
… but first let‟s have an advert for
GPS 101Received Power is -130dBm (Maximum) … 20dB below Thermal Noise Floor!
Regional geo-stationary
augmentation satellites
WAASWide Area Augmentation System – USA
EGNOSEuropean Geostationary Navigation Overlay
System – Europe
Earth radius
6378 km
19100 km
20200 km
23222 km
GalileoOrbit 14 hours (approx)
13300 km/h
GPSOrbit 11 hours 58 minutes
13900 km/h
GLONASSOrbit 11 hours 15 mins
14200 km/h
MoonApprox. 400000 km
35786 km
Geo-stationary
GPS6 orbital planes; 55° to equator
Galileo3 orbital planes; 56° to equator
GLONASS3 orbital planes; 65° to equator
GPS with airwave1 silicon
David TesterCo-Founder & CTO
Stephen GrahamCo-Founder & VP Marketing
Staff
Employee #1 (20 years experience)
Employee #2 (20 years experience)
Contract
Contract #1 (15 years experience)
Contract #2 (15 years experience)
Staff
Employee #3 (20 years experience)
Employee #1 (20 years experience)
Staff
Employee #4 (10 years experience)
Employee #5 (15 years experience)
Employee #6 (15 years experience)
Contract
Contract #3 (20 years experience)
Contract #4 (20 years experience)
Contract #5 (20 years experience)
2x Synopsys IC layout contractors
Staff
Employee #7 (20 years experience)
Employee #8 (15 years experience)
Contract
Contract #8 (20 years experience)
Contract #9 (15 years experience)
RFIC Design System Design ASIC Design Software Design
ex-CEO Andromedia (acquired Macromedia ‘99)
ex-CEO Frictionless Commerce (acquired SAP ‘06)
Andy HeatonVP Operations & Development
ex-CEO PortalPlayer (NASDAQ: PLAY)
ex-CEO S3 (NASDAQ: SIII)
Kent Godfrey
Michael Gera
David Tester
Board of Directors
Gary Johnson
Pond Ventures
Independent
Pond Ventures
ex-CEO TapRootHugh Thomas
Hugh ThomasCEO
Support Staff
1x General Admin
1x Finance ManagerCTO
CEO
The A Development TeamAir Headcount: 23 people
10x Employee Development
9x Contract Development
4x Non-Development Staff
History – Design, Verification, Schedule conflict
Red Herring 100 Europe 2008
April „08
Series-A Termsheet
April „06
Prof Izzet Kale joins Technical Advisory Board
October „08
Demonstrate GPS technology
July „08
Recruit external CEO
May „08
Exit stealth mode
Announce 1st
product
January „08
Gary Johnson joins Board of Directors
2x NASDAQ CEO (PortalPlayer & S3)
May „07
A1225 RFIC (v1)
April „07
A1250 single die GPS receiver
January „09
A1225 RFIC (v2)
February „08
J F M A M J J A S O N D
J F M A M J J A S O N D
J F M A M J J A S O N D
J F M A M J J A S O N D
2006 2007
J F M A M J J A S O N D
J F M A M J J A S O N D
J F M A M J J A S O N D
J F M A M J J A S O N D
2008 2009
Air Inc + Ltd incorporated
May „06
Development starts!
June „06
Engage with TSMC for silicon
Sept „06
IET Start-Up of the Year 2008
November '08
Electra Start-Up of the Year 2008
November „08
RFIC + FGPA platform
May „08
Air tracks GPS satellites with RFIC
March „08
Air tracks GPS satellites with RFIC + FPGA
June „08
Air first PVT, confirms lab in Swindon
June „08
David TesterCo-Founder & CTO
Stephen GrahamCo-Founder & VP Marketing
Staff
Employee #1 (20 years experience)
Employee #2 (20 years experience)
Contract
Contract #1 (15 years experience)
Contract #2 (15 years experience)
Staff
Employee #3 (20 years experience)
Employee #1 (20 years experience)
Staff
Employee #4 (10 years experience)
Employee #5 (15 years experience)
Employee #6 (15 years experience)
Contract
Contract #3 (20 years experience)
Contract #4 (20 years experience)
Contract #5 (20 years experience)
2x Synopsys IC layout contractors
Staff
Employee #7 (20 years experience)
Employee #8 (15 years experience)
Contract
Contract #8 (20 years experience)
Contract #9 (15 years experience)
RFIC Design System Design ASIC Design Software Design
Andy HeatonVP Operations & Development
Hugh ThomasCEO
Optimize for Power Everywhere, But Earlier is BetterLow power algorithms more efficient (for hitting targets) than optimized circuits
Quick Review on Where that Power is ConsumedDynamic (switching) and static (leakage) power from DVDD to DVSS
Example circuit taken from:
http://www.dti.unimi.it/~liberali/papers/c63.pdf
When is “Low-Power” low enough? When to Stop?Products need to get to market … Stop when you‟ve verified it‟s good enough
Can you spot the conflict between the following two statements?
“I‟d like the lowest possible power consumption, please”
“I‟d also like to get that product to market on time, please”
Do you have a power budget? When should verification STOP ?
Track and predict power performance at all levels of abstraction:
- Architecture / Algorithm / System Partitioning
- Pre-Synthesis RTL and Post-Synthesis Gates
- Pre-Layout and Post-Layout
“… but verification is never really complete…”
True
… what is the milestone for sufficient
confidence that power meets budget?
Less Complexity + Less Transitions = Lowest Power Reduce depth of logic between flip-flops and switching activity to minimise power
How to verify switching
activity level on budget?
How to verify the original
complexity assumptions?
Routing Capacitance is the Enemy Parasitic capacitance (from routing) significantly alters switching power of logic
How can you verify post-layout parasitic routing capacitance is acceptable?
Power Management Kit ... Handle with Care!… rather like a chainsaw with all the safety features removed …
- Standard cell library assumes single DVDD supply voltage
- Power management library enables multiple voltage domains
- Voltage domain control cells – DVDD and DVSS switch
- P&R “optimisation” can pull cells from PMK library by mistake!
- Can simulation identify these problems?…
- Signal isolation cells (for crossing voltage domains)
- Must verify P&R didn‟t “optimise” these!
- PMK also adds more back-end DRC and LVS
verification issues simulation can‟t solve…
Multi-DVDD Silicon: Where EDA meets Reality …Circuit level functionality that needs to be verified at RTL level
- DVDD functionality in “HEAD” and “FOOT” cells
… but DVDD not represented in logic simulation!
- How, and when, are cells instanced in the design?
- Manually by logic designer or layout team?
- Automatically by EDA tool? Do you trust it?
- Yet another task to verify before tape-out !!!
- Control signal active sense depends on cell used:
- Active low for PMOS but active high for NMOS
- Are control signal wired correctly?
- How many cells for each domain?
- “Power Aware” design flows try to plug the hole!
Example:
airwave1: 44x digital, 8x analog voltage domains
“Custom” Cells rather than “Standard” Cells?„Optimized for Power‟ and „Optimized for Timing‟ are not always compatible
Example
- Custom flip-flop used in airwave1 datapath
- Relaxed timing enabled >40% power improvement!
- Knowledge of “use” offer options for power optimized gates
- Power optimized and timing optimized are not always the same
What‟s Your Methodology to Verify the Clock Tree?Not all clock tree‟s are low power …
- Power depends on conflicting constraints: skew, rise time, load, etc
- CTS tools build functional but over-designed, high-power clock trees
- Can‟t verify power until P&R started ... but is that too late for market?
- Clock tree can pass functional verification but fail power verification!
Example:
airwave1:
400+ clock domains
More a clock forest
than a clock tree ...
Post-Placement Optimization? Roll the Dice Again!Development on-schedule and on-budget? P&R “optimization” can solve that…
“Here‟s the final netlist,
it meets the power spec‟s
and just needs to go through P&R”
- Pre-Layout gate level power estimates are estimates
- Routing capacitance impacts both timing and power
- P&R optimization resizes gates to close timing
… almost certainly ignoring circuit power
… so power estimates on pre-P&R netlist
are exactly that - estimates
Verification Issue:
How to verify post-layout power still hits
the target specification …
… and hit your schedule
Validation of Software Power against Power BudgetAfter the HW / SW partitioning is done, does the software hit it‟s power budget?
How to Estimate Software Power ?... (… since hardware power is under control)
- CPU power consumed with vendor „example‟ code
- Actual power with real code in real environment?
Example Issues:
Cache RAM v Main RAM power executing code
Does any firmware exist yet that can be profiled?
“Blind Faith and Ignorance” or “Informed Decision”?Don‟t forget to be paranoid about power, if you care about power
Low-Power can be broken anywhere:
- Architecture
- Hardware (RTL) or Software
- Logic Synthesis
- P&R and CTS
- Cell library and macros choices
- Process technology
Each step demands differing levels of verification activity,
but verification of power needs more than just logic simulation
and must include power budgets, circuit simulation and
… application of brain power …