NMCB Ops Officer Perspective - … Conference... · NMCB Ops Officer Perspective Iraq/Kuwait...

26
NMCB Ops Officer Perspective Iraq/Kuwait Deployment Brief to: SAME Mid-Atlantic Regional Conference 10 OCT 07

Transcript of NMCB Ops Officer Perspective - … Conference... · NMCB Ops Officer Perspective Iraq/Kuwait...

NMCB Ops Officer Perspective Iraq/Kuwait Deployment

Brief to: SAME Mid-Atlantic Regional Conference10 OCT 07

Overview

• Deployment Overview– Deployment Timeline– Mission– Organization– Locations

• Deployment Highlights

Deployment Summary:• Advanced Party Deploys: 26 Jul 05

• Iraq MEF Support: 15 Aug 05 to 25 Nov 05

• CFLCC Support: 18 Nov 05 to 28 Feb 06

• Delayed Party Re-deploys: 28 Feb 06

206162195217173195151184206

Feb-06Jan-06Dec-05Nov-05Oct-05Sep-05Aug-05Jul-05Jun-05

Timeline for Deployment

CSE Training Iraq MEF Support CFLCC Support

Mission

– On 26 July 05, NMCB THREE will deploy a responsive, flexible general engineering / construction force with Convoy Security Element (CSE) capabilities.

– Provide general engineering support to II MEF (FWD), ARCENT CFLCC, and JTF HOA.

COMMAND MASTER CHIEF STAFF

Safety Officer Military Advisor

CMAA

OPSLCDR Stasick

SUPPLYADMIN TRAINING COMM

OPS STAFF

S3C–

Ops Chief–S3E Engineering OffS3QC -

–Quality Control

S3A

Asst Ops

SPECIAL STAFFX1 - ChaplainX2 - DentalX3 - LegalX4 - Medical

CO

XO

CHARLIE COMPANY

INTEL / WEAPONSMLO

Organization

BRAVO COMPANYALFA COMPANYHQ COMPANY DETAILS MOBILITY COMPANY

Deployment Locations

Det PAPA

Gulfport

Det GTMO

Det Andros

Det Rota Det Souda Bay Kosovo IA Iraq Mainbody

CFLCC-Camp Arifjan (MB)-Camp Buehring-Camp Virginia-Ali Al Saleem-Kuwait Naval Base-K-Crossing-Navistar-Camp Victory-Ash Shuaybah

Det Bahrain

ABO/KAAOT OILPLAT

Qatar IA

Det Seychelles

Det Horn of Africa-Camp Lemonier, Djibouti-Adangalina, Djibouti-Tadjura, Djibouti-Nairobi, Kenya-Manda Bay Kenya-Harer, Ethiopia-Hurso, Ethiopia-Gode, Ethiopia

3

3

33

3 3

33

33

3

3

Iraq Deployment Highlights

• Camp Fallujah– MHG Camp Maintenance– Pump House O & M– Election Support

• Ramadi \ Taquaddum– Hardened Galley’s– SWA Hut Construction– Iraqi Security Force Camp– Timber Tower– Camp Maintenance

• Kalsu– Electrical Upgrades– Dust Abatement Motor– Force Protection Improvements– Super SWA Huts in the RDF– MHG Camp Maintenance

• Al Asad– Hardened Galley (CG)– Runway Joint Repair– ISF Camp Support– Coalition Forces FOB Construction

CENTCOM Laydown

3U n ite d S ta te s F lee t F o rc e sU n ite d S ta te s F lee t F o rc e s O p e ra tio n a l R ea d in e ss E ffe c tiv e n es s P rim a cyO p e ra tio n a l R ea d in e ss E ffe c tiv e n es s P rim a cy

Al AsadNMCB 3 DETNMCB 22

Al Taqaddum30 NCR DETNMCB 4 DET

NMCB 22 DET

Al Fallujah30 NCRNMCB 3 NMCB 22 DET

Korean VillageNMCB 22 DET

HOA (Djibouti)

NMCB 3 DET BahrainNMCB 3 DET

Ar RamadiNMCB 3 DETNMCB 22 DET

Al QaimNMCB 22 DET

RawahNMCB 3 DET

NMCB 22 DET

CorregidorNMCB 3 DET

II MEF

CJSOTFCJSOTF

HOA HOA

NAVCENTNAVCENT

30 NCR DETNMCB 3 DET

NMCB 21 DET

HadithaNMCB 22 DET

Command Element

Kuwait22NCR FWD

NMCB 3NMCB 21 DET

HOA (Ethiopia)

NMCB 3 DET

HOA (Kenya)NMCB 3 DET

KalsuNMCB 3 DET

Hardened DFAC

Drainage Improvements

Water Well, Camp Rawah

MEF Construction

Electrical UpgradesRunway Repairs, Al Asad

Bridge Repair, Habbiniyah

Timber Tower, Ar Ramadi

SWAHut, TQ Comm Tower, Al Asad

ISF Base Camp

Convoy Security Teams

Camp Maintenance / Force Protection

KUWAIT

IT CAN’T GET ANY BETTER THAN THIS!

Mission in Kuwait

• Setup Mainbody Site at Camp Arifjan

• Setup two Detail Camps– Camp Virginia– Camp Buehring

• Completed 58 projects and over 22,596 mandays of construction at 11 different locations

• 19 Projects partially completed and turned over to NMCB SEVEN

• Active/Reserve integration

• Joint operations

Camp Virginia-Manholes For Fiber Optic Cables-Construct Base Roads-PEB Sunshades

KCIA / APOD-Bus and Convoy Route Upgrade

Ali Al Salem/Camp Moreell/Army LSA-ECP Sun Shade-USO Tent Improvements-ATOC Briefing Room

Arifjan-POL Fuel Transfer Yard PEB-Concrete Loading Ramp-Drainage Improvements-Construct Secure Room-TNOSC Pad Expansion

Camp Victory-PX Construction

SPOD-Construct Height Check Arch-Redeployment Yard ICODE Prep

Navistar-Southbound Lane Improvements-South Immigration Lot Improvements

Camp Buehring-ASP Site Prep-ASR Dallas Improvements-Erect 4 LAMS-Erect 5 Sunshade PEBs

KNB-Staging Yard improvements-Concrete Loading Ramp

K Crossing

UNCLASSIFIED

UNCLASSIFIED

Udairi Range-South Road Repairs-Road Maintenance

Kuwait Project Locations

Camp Arifjan

Ali Al Salem ECP Sunshade

Camp Virginia Utility Projects

Camp Virginia ECP Drainage/Road Repair

Camp Buehring LAMS

K-Crossing

• 2KM long border crossing• Over 3,000 manday project• 70,000 metric tons of asphalt• 1,800 cubic meters of concrete• Completed 38% of project

Det HOA

• Completed over 8,200 mandays of work at 8 different det sites stretched across three countries

• Drilled three water wells and repaired another

• Rapid response to Nairobi building collapse

• Completed a design/build boat ramp in Kenya

Ea r t hwor k 14 %

FOB S uppor t2 %M i nor P r oj e c t s

8 %For c e P r ot e c t i on

2 %

Ca mp S e t - up15 %

Ca mp M a i nt e na nc e

17 %

P l umbi ng3 %

Wa t e r We l l s3 %

I nt e r i or Fi ni sh7 %

El e c t r i c a l1%

Fa br i c S t r uc t ur e s1%

M a sonr y S t r uc t ur e s

5 %

Conc r e t e & P a v i ng

5 %

Wood S t r uc t ur e s12 %

M e t a l S t r uc t ur e s5 %

Work Breakdown

Deployment Summary

• 112 Projects Completed• 64,218 MD’s Completed• Personnel Deployed to Iraq and Kuwait

– 570 Personnel in Iraq– 877 Personnel in Kuwait (NMCB 21 and 63rd CSE) – 6 CSEs completing over 26,000 miles and 200

missions in Iraq