ESPAK made its debut in the Kingdom of Saudi Arabia (KSA) by setting up a joint venture with the Ar-Riyadh NDevelopment Authority in 1978. The Company
established its Regional Office in Riyadh in 1982. Initially, NESPAK acquired in the energy sector in the KSA, but later the Company was awarded projects in the sectors related to the fields of Environmental & Public Health Engineering, Highways, Architecture & Planning, Water Resources and Dam Engineering, Oil & Gas, Industrial, Airports and Ports & Harbours.
NESPAK has been providing services for 28 projects in the Environmental & Public Health Engineering Sector, 27 projects in the Energy Sector, 22 projects in Highways Sector and 19 projects in the Architecture and Planning Sector.
NESPAK is associated with two Saudi companies in terms of business acquisition and the provision of consultancy services in the Kingdom of Saudi Arabia.
NESPAK joined hands with the Saudi Consulting Services (SAUDCONSULT) in 1986 by working on the project titled “Sedimentation Control Project for Jazan Dam Reservoir” as lead firm. The two companies carried out 34 projects together. NESPAK started working with the M.H. Aitah Consulting Engineers' Office in 1997 as local partner and both the companies jointly completed almost 40 projects.
To date, NESPAK has secured 115 projects worth US$ 21 billion out of which 22 projects are in operation. The ongoing projects are being handled by the NESPAK Regional Office and 22 site offices scattered all over the Kingdom. The total strength of NESPAK staff in the KSA stands at 179 including nationals from Pakistan, Saudi Arabia, Bangladesh, Syria, Egypt and Sudan.
Portfolios of the of some of the major projects for which NESPAK has rendered or is rendering consultancy services in the Kingdom of Saudi Arabia are given in the following pages.
This project comprised the construction of two new 110/13.8 kV Gas Insulated Switchgear (GIS) substations at Muna and Harat-ul-Bab in Makkah Al-Mukarramah. The project also included extension & modifications in seven existing 110 kV substations, eight km of 110 kV double circuit overhead transmission line, seven km of Cross-linked Polyethylene (XLPE) cables, readjustment of the protection system and installation of three 110 kV bays. The extension of the Makkah Load Despatch Centre including SCADA (Supervisory Control and Data Acquisition) and new telecommunication links was also part of this power project.
Makkah 110 kV SystemExtension andReinforcement Project
OVERSEAS PROFILE28
Project Status: Completed in 1993 Scope of Services: Detailed Design, Construction Supervision Project Cost: US$ 40 millionClient: Saudi Electricity Company--Western Operating Area, Saudi Arabia
110 kV Gas Insulated Switchgear atMuna substation -- MakkahSystem Extension &Reinforcement Project
A general view of the Jeddah Power Plant No. 3 Extension Project
Located in Jeddah City, this 480 MW expansion power plant comprised the engineering design, procurement & training on equipment, structures and civil works for four gas turbines.
The client issued a “Letter of Special Thanks and Appreciation” to NESPAK for completing the project ahead of the contractual schedule.
Jeddah Power PlantNo. 3 Extension Project
Project Status: Completed in 2006Scope of Services: Design review, Construction SupervisionProject Cost: US$ 252 millionClient: Saudi Electricity Company--Western Operating Area, Saudi Arabia
Aitah-NESPAK provided consultancy services for this project which comprised the construction of a 132 kV overhead power transmission line and two other transmission lines for the supply of electricity to the Shuqaiq Phase-II Water Transmission System in the Jazan Region. Two associated power substations were also constructed. The project was completed in one year.
This 120 MW power project was the extension of the main 5,980 MW Riyadh Power Plant. After the execution of this project in 2003, it became the largest crude oil-fired power plant in the world. The combined cycle plant comprised engineering design and procurement for all systems, structures and civil works for the gas turbines. The plant has been built over an area of 3.2 million sqm, located 54 km east of Riyadh City.
Power Supply toShuqaiq Phase-II WaterTransmission System
Riyadh Power PlantNo. 9, Blocks C & D
KINGDOMOF 29Saudi Arabia
Project Status: Completed in 2008Scope of Services: Feasibility Study, Detailed DesignProject Cost: US$ 713 millionClient: Saline Water Conservation Corporation, Riyadh, Saudi Arabia
Project Status: Completed in 2009Scope of Services: Design Review, Construction SupervisionProject Cost: US$ 689 millionClient: Saudi Consulting Services (SAUDCONSULT)
Fuel gas plant pressurereduction and water bathheaters skid of the RiyadhPower Plant No. 9 Block C
A view of GTG Units of Riyadh PowerPlant No. 9 Block C
OVERSEAS PROFILE30
GTG Units Nos. 9, 10 & 11 of the Tabouk Power Plant No. 2 Extension Project
Generator step-up transformer of the Tabouk Power Plant No. 2 Extension Project
NESPAK reviewed the design and undertook the supervision of this project which included the supply, installation and testing & commissioning of three simple cycle gas turbines of 60 MW each, state-of-the-art Mark VI gas turbine control system, fuel unloading station, two fuel storage tanks, fuel treatment plant and the extension of 132 kV GIS substation.
The client issued a “Letter of Special Thanks and Appreciation” to NESPAK for completing the project ahead of the contractual schedule.
Tabouk Power Plant No. 2Extension Project Units 9,10 & 11 (Stage V)
Project Status: Completed in 2009 Scope of Services: Design Review, Construction Supervision Project Cost: US$ 114 millionClient: Saudi Electricity Company-Western Operating Area, Saudi Arabia
The Riyadh Power Plant No.10 Project consists of 40 gas turbine generator units each 7EA Frame with 56 MW guaranteed output from General Electric, USA. The project covers an area of approximately 6 Sq km in the southeast of Riyadh City.
Detailed NESPAK scope of services includes the monitoring of engineering design, supervision of structures and civil works and training on equipment for all the 40 gas turbines.
This 120 MW power project consists of two gas turbines and related balance of plant equipment, gas treatment plant, plant management system, fire detection, alarm & protection system, plant safety & security system and communication system. The project is progressing well.
Riyadh Power Plant No. 10 Wadi Dawasir Power PlantExtension Project
KINGDOMOF 31Saudi Arabia
Project Status: Ongoing Scope of Services: Design Review, Construction SupervisionProject Cost: US$ 3 billionClient: Saudi Electricity Company--Central Operating Area, Saudi Arabia
Project Status: Ongoing Scope of Services: Construction Supervision Project Cost: US$ 165 millionClient: SAUDCONSULT
A view of the Wadi Dawasir Power Plant Extension Project
Turbine Blocks A1 & B1 and tank area of the Riyadh Power Plant No. 10
NESPAK-SAUDCONSULT joint venture was hired for the 1680 MW Rabigh Power Plant Extension Project which comprises the engineering design, procurement & training on equipment, systems, structures and civil works for 28 gas turbines for its Unit Nos 22-49. This two-phase project is aimed at meeting the growing electricity needs of Makkah Al-Mukarramah and Madinah Al-Munawwarah Regions.
Rabigh Power PlantExtension Project Unit Nos 22-49 (Stage V & VII)
OVERSEAS PROFILE32
Project Status: Ongoing Scope of Services: Design Review, Construction SupervisionProject Cost: US$ 1805 millionClient: Saudi Electricity Company-Western Operating Area, Saudi Arabia
Installation of GSU No. 1- AREVA Transformer for Units Nos. 38-39 at the Rabigh Power Plant Extension Project Units Nos., 22-49 - Stage VII
General view of Rabigh Power Plant Extension Project -- Stage V
KINGDOMOF 33Saudi Arabia
This project comprised the construction of a 53 km long 1524 mm dia steel pipe and a pump station including all civil, architectural, mechanical and electrical works.
The pipeline originated from the Jubail Desalination Plant located on the Coast of Arabian Gulf and was aimed at supplying 278,000 cu. m/day product water to the King Fahd International Airport and the towns of Rahima, Safwa, Sayhat and Qatif, all located in the Eastern Province of Saudi Arabia. The product water was
Project Status: Completed in 1995Scope of Services: Project Planning, Detailed Design, Tender Documents, Construction SupervisionProject Cost: US $ 209 million Client: Saline Water Conservation Corporation, Saudi Arabia
supplied from the product water header of the existing water storage tanks of the Jubail Desalination Plant. Earlier, blending stations of Rahima, Safwa, Sayhat and Qatif received product water from the Al-Khobar Desalination Plant through two feeders.
The pumping plant was located within the boundary of Jubail Desalination Plant and was planned to contain eight pumping units, four of which were installed under this project.
The NESPAK-SAUDCONSULT joint venture was hired for study and design to supply blended water to Al-Majmah and Al-Shaqrah storage tanks and to connect them with the Water Distribution Network. This project was aimed at providing 20,000 cu. m/day of water to Al-Majmah and 300,000 cu. m/day to Al-Shaqrah.
The project involved the construction of water storages, blending stations and pipelines for these two fast growing cities near Riyadh. Desalinated water was proposed to be blended with the groundwater, increasing the water supply to the two cities.
AI-Majmah & AI-ShaqrahWater Supply Project
Project Status: Completed in 1990Scope of Services: Feasibility Study, Detailed Design, Tender DocumentsProject Cost: US$ 95 millionClient: Water & Sewerage Board, Riyadh, Saudi Arabia
Eastern Province Water Supply System Phase I & II
This project study involved the review and updating of 1982 Master Plan for Madinah Al-Munawwarah City. The review was necessitated due to the expansion of the Holy City and the Prophet's (Peace be upon him) Mosque. The plan was prepared to meet water requirements up to the year 2039.
Storage/balancing reservoirs, booster pump stations and adequate pipe sizes (up to 2000 mm dia) were proposed after analysing the existing water supply network.
Madinah Al-MunawwarahWater Supply Master Plan
Project Status: Completed in 1995Scope of Services: Project PlanningProject Cost: US$ 1427 million Client: Madinah Al-Munawwarah Region, Water & Sanitary Drainage Authority, Saudi Arabia
OVERSEAS PROFILE34
NESPAK was engaged for studying and planning water supply systems comprising wells, booster pump stations, treatment plants, reservoirs and distribution networks in Buraidah and Unaizah cities.
The scope of work included study of the existing systems to update record, identify difficulties and deficiencies in the systems and prepare preliminary design for the improvement and extension of the systems. The project also included the preparation of O&M manual for different components of the existing system.
The NESPAK-SAUDCONSULT joint venture was engaged for the Jeddah Sanitary Drainage Master Plan project covering 105,000 hectares of land. The plan was necessitated to meet the increasing water requirements of the Jeddah City. The project involved the evaluation and upgradation proposals for the existing sewerage system, large diametre sewers and tunnels ranging from 400 mm to 2500 mm DI pipes. The project was implemented in phases according to the requirements of the city. Existing and proposed sewerage systems were developed on the GIS platform which facilitated the execution of various spatial analyses and queries.
Buraidah & UnaizahWater DistributionNetwork
Jeddah Sanitary DrainageMaster Plan
Project Status: Completed in 2001Scope of Services: Project Planning Project Cost: US$ 953 millionClient: Qaseem Region Water & Sanitary Drainage Authority, Saudi Arabia, SAUDCONSULT
Project Status: Completed in 2003Scope of Services: Master Planning, Detailed Design, Tender DocumentsProject Cost: US$ 4 billionClient: Makkah Al-Mukarramah Region Water & Sanitary Drainage Authority, SAUDCONSULT
Roads and sanitary network overlaid on Spin-2 image for Al-Andulus District for the Jeddah Sanitary Drainage Master Plan
This project comprised a study for the reuse of the treated wastewater and monitoring the application of treated effluent to agriculture, horticulture, groundwater recharge of the depleting aquifers and sand dunes stabilisation in arid zones. The project also involved the design of 1500 mm dia, 150 km long transmission pipeline to pump the treated effluent.
Dammam WastewaterReuse Project
Project Status: Completed in 1995Scope of Services: Master Planning, Detailed Design, Tender DocumentsProject Cost: US$ 37 millionClient: SAUDCONSULT
KINGDOMOF 35Saudi Arabia
The Buraida Feeder Line Project involved the laying of 1,100 mm dia, 13.5 km long steel pipeline to transmit desalinated water from two feeders of Riyadh-Qaeesm Water Transmission System to the Buraidah Treatment Plant with a capacity of 30 MGD. The project was aimed at
3supplying 100,000 m /day of water to Buraidah City from the Riyadh-Qaseem Water Transmission System.
Buraidah Water FeederLine Project
Project Status: Completed in 2005Scope of Services: Design Review, Construction SupervisionProject Cost: US$ 17 millionClient: Saline Water Conservation Corporation, Riyadh
Satellite image of project area overlaid with existing Sanitary Drainage Network for the Jeddah Sanitary Drainage Master Plan
Underground valve chamber at Buraidah Storage Terminal and laying of 44” diametre pipeline (Right) at the Buraidah Water Feeder Line Project
OVERSEAS PROFILE36
The objective of this 40 MGD capacity project was to transmit water from the AI-Khobar Desalination Plant to Jabal Abu Ghanimah near Hofuf City in the Al-Ahsa Region. The proposed structure involved a 1,422 mm dia, 136 km long steel pipeline, pump station, interconnection for Abqaiq city and interconnections with the existing facilities at the Hofuf Terminal.
Hofuf Pipeline System
Project Status: Completed in 2005Scope of Services: Detailed design, Tender Documents, Tender Evaluation, Design Review, Construction SupervisionProject Cost: US$ 153 millionClient: Saline Water Conservation Corporation, Riyadh, Saudi Arabia
Different views of the Hofuf Pipeline System
KINGDOMOF 37Saudi Arabia
Ductile Iron Pipeline DN 600 mm laid forthe Sabya Water Project
This project comprised the construction of 3four 14,000M groundwater tanks, main
pumping station, chlorination room, generator room, electrical and mechanical works, instrumentation control system for operation, laying of 26.6 km long DI/UPVC water distribution network ranging from DN 110 mm to DN 600 mm and house connections.
Sabya Potable WaterNetwork Project (Phase-I)
Project Status: Completed in 2008Scope of Services: ConstructionSupervisionProject Cost: US$ 4.43 millionClient: Ministry of Water & Electricity, Saudi Arabia
NESPAK in association with M.H. Aitah is handling this project aiming to supply 140,000 cu. m/day treated surface water from Khulais and Rabigh Dams to Jeddah and Makkah cities. The construction of the project has been planned in three phases. The first phase, which is being implemented, includes the construction of a 40,000 cu. m/day Water Treatment Plant along with other related structures at the Khulais Dam and the laying of 43 km long Ductile Iron (DI) water transmission main of DN 1200/700 mm up to the junction point on the Makkah-Madinah Road.
Water Transmission Projectfrom Khulais and RabighDams to Jeddah
Project Status: Ongoing Scope of Services: Design Review, Construction SupervisionProject Cost: US$ 113 millionClient: Ministry of Water & Electricity, Saudi Arabia
Plant components constructed at theKhulais Dam for water transmission project
Ductile Iron Pipeline DN 1200 mm laid forthe Water Transmission Project from Khulais & Rabigh Dams to Jeddah
OVERSEAS PROFILE38 OVERSEAS PROFILE38
The 1,000 ha. study area, located in the Qaseem Province, is a closed catchment. A number of small hill torrents drained into Qusayba Depression from the catchment area, causing salinity which damaged the crop land. The main purpose of the project was to improve agriculture through the provision of proper drainage and checking of runoff into the Qusayba Depression. The feasibility report proposed a scheme for reducing the inflow into the Qusayba Depression through the construction of three water conservation structures, two pump stations, 8.75 km long flood channels and provision of 26.5 km long sub-surface and 17 km long surface drains for the removal of saline effluent..
Qusayba IrrigationDrainage Project
Project Status: Completed in 1987Scope of Services: Feasibility Study, Detailed Design, Tender Documents Project Cost: US $ 33 million Client: Ministry of Agriculture & Water, Saudi Arabia
The purpose of this project was to solve drainage problems for the project area located in the northern part of Najran City. The project involved the laying of 31 km long RCC pipes ranging from 500 mm to 1200 mm dia in the project area.
The project also comprised the construction of 375 RCC manholes, 590 RCC street catch basins, laying of 6.5 km uPVC pipeline of 300 mm dia for the interconnection of catch basins to manholes and three RCC outfall structures at Wadis.
Najran StormwaterDrainage Project
Project Status: Completed in 2009Scope of Services: Construction SupervisionProject Cost: US$ 6 millionClient: Ministry of Municipality & Rural Affairs, Saudi Arabia
RCC Pipeline DN 1200 mm laid for the NajranStormwater Drainage Project
Pre-cast Manhole used forNajran Drainage Project
KINGDOMOF 39Saudi Arabia
The 40m high Jazan Dam with a total storage capacity of 71 mcm was constructed in 1970 at the confluence of five tributaries in the Kingdom of Saudi Arabia and Yemen Arab Republic. Out of total catchment of 1233 sq km, about 58% is in Yemen. Over the time, sediments had accumulated in the reservoir, causing depletion of storage capacity.
The studies involved a comprehensive reservoir survey, soil classification of catchment in the Kingdom, appraisal of existing hydromet network and recommendations for improvement &
Sedimentation Control Project for Jazan Dam Reservoir
Project Status: Completed in 1987Scope of Services: Feasibility Study, Detailed Design, Tender Documents Project Cost: US$ 3 millionClient: Ministry of Agriculture & Water, Saudi Arabia
A beautiful view of the Jazan Dam
The Jazan Dam Reservoir
evaluation of instruments embedded in the body of dam, identification of locations and survey for sediment trap structures, watershed management, dredging of deposited sediment and raising of the dam.
The hydromet network was reviewed and recommendations made for the establishment of two more stations with rain recording gauges, upgrading of station at Aridah and the establishment of two stream gauging stations in Wadi Jazan and Wadi Mishrif.
OVERSEAS PROFILE40
This project comprised the construction of two link roads i.e., 101 km long Khyber Al-Hayet Road and 90 km long Al-Yatamah-Dhumariyah Road in the Madinah Al-Munawwarah Region.
These two-lane roads are located in a hard terrain between Khyber and Al-Hayet cities.
NESPAK was engaged for rendering consultancy services for the "Construction of Balghazi Road" in AI-Ga'a, Wadi Gussy, AI-Sharha, Mashereen, Reea areas and miscellaneous farm-to-market roads in the Jazan Region.
The project included a 200-metre long bridge and 276 km long link roads scattered around the Jazan Region.
Madinah AI-MunawwarahSecondary Roads Project
Balghazi Road Project,Jazan Region
Project Status: Completed in 2010Scope of Services: Detailed Design, Construction SupervisionProject Cost: US$ 59 millionClient: Ministry of Transport, Saudi Arabia
Project Status: Completed in 2010Scope of Services: Detailed Design, Construction SupervisionProject Cost: Rs. 54 millionClient: Ministry of Transport, Saudi Arabia
A view of a compIeted road for the Madinah AI-Munawwarah SecondaryRoads Project
A superb view of the Balghazi Road Project, Jazan Region
KINGDOMOF 41Saudi Arabia
This airport project included the construction of runway, taxiway, apron, CAT-l airfield lighting system and other airside infrastructure. In addition to the consultancy services, NESPAK provided specialist input regarding the special systems for this project. The airport is capable of handling Boeing 747-400 aircraft.
Madain Saleh AirportProject
Project Status: Completed in 2006Scope of Services: Master Planning, Detailed Design, Tender Documents Project Cost: US$ 41 millionClient: Zuhair Fayez Partnership, Jeddah, Saudi Arabia
Master Plan of the Madain Saleh Airport Project
OVERSEAS PROFILE42
In the early 90s, NESPAK was hired for rendering consultancy services for the project titled “Pension Directorate Building,” in Riyadh, Saudi Arabia. Located at the Zubaida Bin Jaffar Street off King Fahd Road in Al-Washm area, this five-storey building was constructed on a total ground area of 6,000 sqm. The covered area of the building comprising a basement, ground and five floors is 18,200 sqm. The Pension Directorate building is flanked by the buildings of
Pension Directorate Building, Riyadh
Project Status: Completed in 1995Scope of Services: Detailed Design, Tender Documents Project Cost: US$ 40 millionClient: Pension Directorate, Riyadh, Saudi Arabia
A view of the Pension Directorate Building, Riyadh
Another view of the PensionDirectorate Building
Technical Training Institute -- Training centre for Architects and King Abdul Aziz Historical Centre -- National Museum of Saudi Arabia.
NESPAK scope of work included architectural and engineering design, Bill of Quantities, engineer's cost estimate and contract documents. The Pension Directorate houses various offices to facilitate the retired Saudi nationals by handling their post-retirement problems.
KINGDOMOF 43Saudi Arabia
Under the Carrefour Hypermarket Chain of Stores in Riyadh & Jeddah Project, NESPAK was hired to provide consultancy for a superstore in Jeddah namely Jamjoom Centre. The project involved the electrical, mechanical and architectural works for the Jamjoom Centre.
Carrefour HypermarketProject
Project Status: Completed in 2007Scope of Services: Design Review, Construction Supervision Client: COWl International, Bahrain
A view of the Carrefour Hypermarket Project
a) Feasibility Study c) Detailed Design e) Construction Supervisionb) Project Planning d) Tender Documents f) Design Review/Evaluation
Dams in Southern Region Saudi Arabia Ministry of Water & Electricity e 105 01-04-2010
31-03-2013
Transmission of Water from Saudi Arabia Ministry of Water & Electricity e 63 01-08-2009
Khulais and Rabigh Dams to 31-07-2012
Jeddah (Phase-I) in Makkah
Al-Mukarramah Region
Tabouk Power Plant No. 2 Saudi Arabia Saudi Electricity Company - e f 219 01-01-2007
Extension Project Unit Nos. 9, Western Operating Area 31-12-2013
10 & 11
Water Transmission from Hail and Saudi Arabia Ministry of Water & Electricity e N.A 01-10-2009
Laith Dams to Shoaiba (Phase-I) in 31-03-2013
Makkah Al-Mukarramah Region
Rabigh Power Plant Extension Saudi Arabia Saudi Electricity Company - c e 869 01-11-2007
Project Unit Nos. 20 to 37 (Stage-V) Western Operating Area 30-09-2011
Rabigh Power Plant Extension Saudi Arabia Saudi Electricity Company - c e 946 01-08-2008
Unit No. 38 to 49 (Stage-VII) Western Operating Area 30-09-2011
Road Project in Shaqra Saudi Arabia Ministry of Municipalities & e 60 01-04-2010
Riyadh Province Rural Affairs 31-05-2012
Road Project in Majman Saudi Arabia Ministry of Municipalities & Rural e 60 01-04-2010
Region Affairs 31-03-2012
Riyadh/Najran Roads and Saudi Arabia Ministry of Transport e 65 31-03-2008
Secondary Roads in Najran Region 30-11-2011
Stormwater Drainage for Qilwa, Saudi Arabia Ministry of Municipalities & b c d N.A 01-08-2010
Al-Mukhwa, Biljurashi, Al-Mandaq, Rural Affairs 28-02-2012
Al-Aqiq Cities in Al-Baha Region
Road Project in Zulfi and Qat Saudi Arabia Ministry of Municipalities & Rural e 58 01-04-2010
Region Affairs 31-03-2012
Riyadh Power Plant No.10 Saudi Arabia Saudi Electricity Company - e f 2,460 01-06-2010
Central Operating Area 31-12-2011
OVERSEAS PROFILE44
List ofProjects
PROJECT LOCATION CLIENT SCOPE OFWORK
COSTUS$
Million
Start Date/Comp.Date
a) Feasibility Study c) Detailed Design e) Construction Supervisionb) Project Planning d) Tender Documents f) Design Review/Evaluation
Riyadh Power Plant PP-9 Saudi Arabia Saudi Consulting Services e f 1,427 15-10-1995
Extension (SAUDCONSULT) 31-12-2004
Balghazi Road Project - Jazan Saudi Arabia Ministry of Transport e 75 01-07-2005
Region 30-06-2008
Najran Stormwater Drainage Saudi Arabia Ministry of Municipalities & e 5 01-07-2006
Project Rural Affairs 31-12-2011
Buraidah Water Feeder Line Saudi Arabia Saline Water Conversion e f 17 15-03-2001
Project Corporation, Riyadh 31-12-2005
Eastern Province Water Saudi Arabia Saline Water Conversion b c d e 209 05-02-1987
Supply System Phase I & II Corporation, Riyadh 30-09-1995
Power Supply to Shuqaiq Phase-II Saudi Arabia Saline Water Conversion a c 713 01-05-2007
Water Transmission System Corporation, Riyadh 30-06-2008
Hofuf Water Transmission System Saudi Arabia Saline Water Conversion a b c d e f 148 08-04-2000
Corporation, Riyadh 31-10-2005
Roads in Hail Region Saudi Arabia Ministry of Transport e 59 01-05-2008
31-05-2011
Jeddah Power Plant No. 3 Saudi Arabia Saudi Electricity Company - e f 252 27-07-2003
Expansion Project Lot No. 1 Western Operating Area 26-07-2006
Madinah Al-Munawwarah Saudi Arabia Ministry of Transport e 42 01-04-2007
Secondary Roads 31-12-2010
Dams in Western Part of Saudi Arabia Saudi Consulting Services e f 706 01-09-2005
Saudi Arabia (SAUDCONSULT) 30-09-2011
Roads in Madinah Al-Munawwarah Saudi Arabia Ministry of Transport c 25 01-03-2006
30-06-2007
Technical Services to Saudi Arabia Siemens, Jeddah e N.A 26-10-2002
Siemens, Jeddah 30-09-2011
KINGDOMOFSaudi Arabia 45
Saudi Arabia
PROJECT LOCATION CLIENT SCOPE OFWORK
COSTUS$
Million
Start Date/Comp.Date
a) Feasibility Study c) Detailed Design e) Construction Supervisionb) Project Planning d) Tender Documents f) Design Review/Evaluation
Tabouk-II Power Plant Saudi Arabia Saudi Electricity Company - e f 251 01-07-2003
Expansion Project Western Operating Area 31-12-2005
Five Colleges at King Faisal Saudi Arabia Zuhair Fayez Partnership, c N.A 01-04-2007
University at Al-Ahsa Jeddah 30-09-2008
Shoaiba Power Plant Project Saudi Arabia Saudi Electricity Company - e 1,175 01-04-2001
Western Operating Area 30-09-2011
Saudi German Hospital, Abha Saudi Arabia Saudi German Hospital, c f 56 18-06-1996
Jeddah 30-06-2007
Al-Baha Secondary Roads Saudi Arabia Ministry of Transport e 55 01-04-2007
31-12-2010
Fuel Gas Works at Power Saudi Arabia Saudi Electricity Company - e f 39 30-08-1999
Plant 7&8 Riyadh Central Operating Area 30-06-2003
Al-Hail Secondary Roads Saudi Arabia Ministry of Transport c e f 53 01-04-2007
30-04-2009
Substations, Overhead Saudi Arabia Saudi Electricity Company - f N.A 01-01-2004
Transmission Lines, Underground Western Operating Area 30-09-2011
Cables and SCADA Systems
Carrefour Hypermarket (French) Saudi Arabia COWI International e f 24 01-06-2007
Chain of Stores in Riyadh, Jeddah & 28-02-2008
Madinah Al-Munawwarah
Secondary Roads in Al-Jazan Saudi Arabia Ministry of Transport c 19 01-03-2005
Region 31-12-2006
Section Road in Eastern Saudi Arabia Ministry of Transport c 29 01-07-2004
Province 31-03-2005
Six Substations Project in Saudi Arabia Saudi Electricity Company - c e f 119 01-11-2002
Khulais, Taif and Jeddah Areas Western Operating Area 31-12-2007
Sabya Water Network Project Saudi Arabia Ministry of Municipalities & Rural e f 4 05-12-2001
(Phase-I) Affairs 30-09-2011
OVERSEAS PROFILE46
List ofProjects
PROJECT LOCATION CLIENT SCOPE OFWORK
COSTUS$
Million
Start Date/Comp.Date
a) Feasibility Study c) Detailed Design e) Construction Supervisionb) Project Planning d) Tender Documents f) Design Review/Evaluation
Najran Airport Project Saudi Arabia Zuhair Fayez Partnership c d N.A 01-12-2005
30-06-2008
Riyadh National Hospital Saudi Arabia Zuhair Fayez Partnership c N.A 01-04-2007
31-12-2008
Roads in Jouf, Tabouk and Saudi Arabia Ministry of Transport c N.A 01-04-2008
Northern Border Regions 31-12-2010
Medical College of Saudi Saudi Arabia M/s BGK Consulting GmbH c d 24 19-06-2003
German Hospital, Jeddah 30-12-2006
Secondary Roads in Najran Saudi Arabia Ministry of Transport c 64 01-04-2005
Region 30-09-2005
Wadi Dawasir Power Plant Saudi Arabia Saudi Consulting Services e 162 01-08-2010
31-08-2012
Sanitary Drainage Project for Saudi Arabia 1. Saudi Consulting Services a b c d 4,086 01-08-1999
Jeddah City 2. Water & Sanitary Drainage 31-12-2003
Authority, Makkah
Al Mukarramah Region
Jeddah Stormwater Saudi Arabia Jeddah Municipality a b c 191 01-06-2001
Drainage Phase-II 30-09-2004
Secondary Roads in Al-Baha Saudi Arabia Ministry of Transport c 44 01-03-2006
Area 31-10-2006
Services to Arabian BEMCO on Saudi Arabia Arabian BEMCO Contracting e f N.A 01-07-2003
Substation Projects in Company 30-06-2005
Western Region
Secondary Roads in Al-Jouf Saudi Arabia Ministry of Transport c d 126 01-04-2005
Region 30-09-2005
Services to AMCDE on Saudi Arabia Azmi Abdulhadi & Abdullah Al e 57 01-12-2002
Jeddah Substation Moaibed Consulting Engineering 31-03-2005
Company, Saudi Arabia
KINGDOMOF 21Saudi Arabia 47
Saudi Arabia
PROJECT LOCATION CLIENT SCOPE OFWORK
COSTUS$
Million
Start Date/Comp.Date
a) Feasibility Study c) Detailed Design e) Construction Supervisionb) Project Planning d) Tender Documents f) Design Review/Evaluation
Qusayba Irrigation and Saudi Arabia Ministry of Agriculture & Water a c d 33 19-04-1984
Drainage Project 30-09-1987
General Engineering Saudi Arabia Saudi-ARAMCO, Dahran c N.A 01-08-2001
Services for ARAMCO Projects 31-12-2005
Technical Services for Rabigh Saudi Arabia Saudi Electricity Company - e 443 01-03-1992
Steam Power Plant Ext. 1413 Western Operating Area 30-09-1995
Water Distribution Network Saudi Arabia 1. Qaseem Region Water & b 857 13-11-1993
and Ancillaries in Buraidah Sanitary Drainage Authority 31-12-2000
and Unaizah Cities 2. Saudi Consulting Services
Madain Saleh Airport Project Saudi Arabia Zuhair Fayez Partnership b c d 41 01-05-2004
31-05-2005
Qaseem-Hail Water Saudi Arabia Saline Water Conversion b c d 247 03-04-1991
Transmission System Corporation, Riyadh 31-10-1993
Water Supply Master Plan for Saudi Arabia Madinah Al-Munawwarah Region, b 1,388 01-09-1994
Madinah Al-Munawwarah Water & Sanitary Drainage Authority 30-09-1995
Gas Conversion Project PP-9 Saudi Arabia 1. Saudi Consulting Services e f 16 15-07-1999
2. Saudi Electricity Company - 30-06-2003
Central Operating Area
Dammam Wastewater Saudi Arabia Saudi Consulting Services b c d 37 01-06-1990
Reuse Project 30-06-1995
Qurayyat Airport Saudi Arabia Saudi Consulting Services b c N.A 01-03-2007
30-06-2009
Al-Shamiyah Development in Saudi Arabia Shamiyah Company, Saudi Arabia c N.A 01-07-2005
Makkah Al-Mukarramah 31-08-2006
i) Three Mosques for the King Saudi Arabia Ministry of Defence c f 469 18-09-1979
Khalid Military City; 31-12-1987
ii) Services for ADA's KKMC
Housing Project
OVERSEAS PROFILE48
List ofProjects
PROJECT LOCATION CLIENT SCOPE OFWORK
COSTUS$
Million
Start Date/Comp.Date
a) Feasibility Study c) Detailed Design e) Construction Supervisionb) Project Planning d) Tender Documents f) Design Review/Evaluation
Al-Khobar Al-Hofuf Water Saudi Arabia Saline Water Conversion b c d 236 27-10-1990
Transmission System Corporation, Riyadh 30-06-1993
Water & Sanitary Drainage Saudi Arabia 1. Riyadh Water & Sanitation a c d 89 13-11-1993
Systems for Al-Kharj Authority 31-12-1997
2. Saudi Consulting Services
Pension Directorate Building, Saudi Arabia Pension Directorate, Riyadh c d 40 14-07-1991
Riyadh 31-03-1995
Al-Khobar--Al-Hofuf Water Saudi Arabia Saline Water Conversion a c d 117 01-01-1996
Transmission System Corporation, Riyadh 30-06-1999
Al-Baha Area Road Saudi Arabia Ministry of Communications c d 16 01-05-2003
31-03-2004
Gold's Gym. of Saudi German Saudi Arabia M/s BGK Consulting GmbH c d N.A 24-10-2003
Hospital, Jeddah 31-12-2005
Makkah 110 kV System Extension Saudi Arabia Saudi Electricity Company - c e 40 05-09-1988
and Reinforcement Project Western Operating Area 30-09-1993
Control of Sediment Entering Saudi Arabia Ministry of Agriculture & Water a c d 3 11-11-1986
Jazan Dam Reservoir 30-10-1987
Gas Pipeline and Metering Station Saudi Arabia Saudi Electricity Company - c 51 01-01-2005
for Riyadh Power Plant No. 9 Central Operating Area 31-03-2010
Upgradation of Najran Airport Saudi Arabia Presidency of Civil Aviation b c d 22 01-04-2001
31-12-2004
PP-9 Extension Stage-II Saudi Arabia Saudi Consulting Services c d N.A 01-04-2003
(Phase-A) Project 30-04-2004
Oncology Centre of Saudi Saudi Arabia Saudi German Hospital, c f 6 25-12-1996
German Hospital, Jeddah Jeddah 31-12-1997
Technical Services for Riyadh Saudi Arabia Al-Malik Engineering Consulting e N.A 29-03-1992
Sewage Treatment Plant Centre 30-09-1995
KINGDOMOFSaudi Arabia 49
Saudi Arabia
PROJECT LOCATION CLIENT SCOPE OFWORK
COSTUS$
Million
Start Date/Comp.Date
a) Feasibility Study c) Detailed Design e) Construction Supervisionb) Project Planning d) Tender Documents f) Design Review/Evaluation
Regional Load Despatch Saudi Arabia 1. Electricite de France b c d e 213 01-02-1993
Centre and Telecom Master 2. Saudi Electricity Company - 31-12-1997
Plan for SCECO (West) Western Operating Area
Area Control Centres Saudi Arabia Zuhair Fayez Partnership c f N.A 01-01-2005
at Jeddah and Riyadh 31-07-2006
Water Storage Tanks at Al-Ghat Saudi Arabia Ministry of Municipalities & Rural b c d 86 11-06-1995
Affairs 10-06-1996
SCADA System Project, Tabouk Saudi Arabia Tabouk Electricity Company e f 11 10-08-1988
30-09-1992
Stormwater Drainage System Saudi Arabia Saudi Consulting Services c 4 18-02-2003
for Madinah Al-Munawwarah 31-12-2004
Al-Jouf Irrigation and Saudi Arabia Ministry of Agriculture & Water e 14 05-06-1982
Drainage Project 20-02-1985
Al-Dhoha Al-Rimaya Road Saudi Arabia Al-Qwaidah Mohammad & c N.A 01-02-2006
in Jazan area Rasheed Contracting Company 31-08-2006
Assistance to Kara Establishment Saudi Arabia Riyadh Water & Sanitation e 52 01-12-1991
for the Execution/Supervision of Authority 30-06-1992
Riyadh Sewage Treatment Plant
Motor Vehicle Inspection Centres Saudi Arabia Omar Ali Esayi & Co. c d 2 04-06-1985
30-08-1985
25 MW KAMC Power Plant Saudi Arabia Habib Rafiq (Pvt.) Ltd., Lahore f N.A 23-04-2002
Extension in Tabouk 30-06-2004
Makkah Al-Mukarramah Saudi Arabia 1. Dar-al-Riyadh Consultants c 20 01-06-1993
Interchange Bridge 2. TURKPAK International 31-12-1993
Al-Russ Wastewater Saudi Arabia FURAT Environmental d N.A 01-09-2003
Treatment Plant Engineering Consultants 30-09-2004
Al-Nakheel Project Saudi Arabia Diyar Najed Establishment for f N.A 01-06-2001
Antiquities & Culture 31-01-2002
OVERSEAS PROFILE50
List ofProjects
PROJECT LOCATION CLIENT SCOPE OFWORK
COSTUS$
Million
Start Date/Comp.Date
a) Feasibility Study c) Detailed Design e) Construction Supervisionb) Project Planning d) Tender Documents f) Design Review/Evaluation
Pakistan Chancery, Riyadh Saudi Arabia M/s Engineering Consultancy, e 3 26-05-1984
London 31-12-1985
Al-Majma and Shaqrah Water Saudi Arabia Water and Sewerage Directorate a b c e 95 27-08-1988
Supply Schemes 30-09-1990
Engineering Services for Saudi Arabia Saudi Consulting Services Technical N.A 06-11-1995
Saudi ARAMCO Project Assistance 31-05-1996
Sewage Treatment Plant at Saudi Arabia 1. Qaseem Region Water & a d 3 09-05-1994
Haii Al-Naqaa in Buraidah Sanitary Drainage Authority 31-12-1994
2. Saudi Consulting Services
Technical Assistance to Royal Saudi Arabia Royal Commission b c N.A 01-10-1991
Commission Architecture/Urban 30-09-1993
Planning Project
Access Road to Saudi Grey Cement Saudi Arabia Riyadh Cement Company c N.A 01-01-2005
Factory Muzahmiah, Riyadh 31-07-2005
The Postal Centre Buildings Saudi Arabia M/s Al-Askar Engineering Riyadh c d 12 06-06-1984
at Sakaka and Buraidah of 31-12-1985
the Ministry of PT&T
Construction Supervision of Saudi Arabia Ministry of Water & Agriculture e N.A 17-11-1983
Potable Water Project Group-1 30-05-1985
Technical Assistance to Rashid Saudi Arabia Rashid Geotechnical & Miscellaneous N.A 15-07-1984
Engineering (Geotechnical Division) Material Engineers 31-12-1986
Sewerage System for 100 Saudi Arabia M/s Emar Arabia b c d 3 01-10-2001
Hectares of an area in Jeddah 31-08-2003
Khalidiya and Najran East Saudi Arabia Saudi Electricity Company - e 25 01-10-1996
Substations Western Operating Area 31-12-1997
Survey Assistance for K.A. Saudi Arabia 1. Rashid Geotechnical & Survey 1 01-02-1992
Airbase Al-Yamam Material Engineers 30-05-1992
2. Saudi Royal Airbase
Makkah Al-Mukarramah - Saudi Arabia Rashid Geotechnical & Material f N.A 04-03-1985
Taif Desalination Plant Engineers 31-12-1985
KINGDOMOF 21Saudi Arabia 51
Saudi Arabia
PROJECT LOCATION CLIENT SCOPE OFWORK
COSTUS$
Million
Start Date/Comp.Date