NIPPC’s IIBA Initiative Agenda
7 December 2007• Introduction – independent, integrated Balancing Authority (IIBA)• Overview
– Why?– What?– How?– When? – Who?
• Costs/Benefits– Tangible Assessment– Intangible Assessment
• Operations (user interface)• Optimal Generation Mix• Contractual Structure• Procedural Next Steps• Timeline
![Page 2: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/2.jpg)
2
Introduction• Pacific Northwest Independent Integrated Balancing Authority (IIBA)• Meeting Protocol• Project Participants:
– Project Lead: • CECD - Constellation Energy Control & Dispatch
– Technical, Operational and Policy Support• Energy Expert Services• NIPPC• Opatrny Consulting• The Energy Group• Versify Solutions
– Legal and Contracting Support• K&L Gates• Van Ness Feldman
– Generators• NIPPC generators• Potentially other generators
![Page 3: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/3.jpg)
3
OverviewWhy is the IIBA a good idea?
• It will enable generators to:– Get paid for what they provide now for free, e.g., frequency and voltage
support, reactive supply– Reduce operating expenses, e.g., operating reserves, generation
imbalance, integration charges• It will allow money-making opportunities and add value to
competitive markets:– Redispatch around transmission constraints– Support the integration of wind (indirectly or directly)– Pool transmission
• It will allow generators: – Greater autonomy – To play by market rules, not just BPA’s rules– New opportunities as well as new responsibilities– Last chance to operate as merchants
• These opportunities need to be prioritized and sequenced
![Page 4: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/4.jpg)
4
OverviewWhat is the IIBA?
• CECD sets-up/implements/certifies the BA– The BA is a reliability function– The BA function requires communications links and AGC
• The participating generators separately contract with CECD in order to:– Integrates resources– Maintains interchange-generation balance– Supports interconnection frequency– Manages transmission for these purposes
• As a BA, the participating generators will be enabled to:– Sell regulation to support the integration of wind– Participate in operating reserve sharing (through the NWPP)– Self-providing or contracting with third-parties for operating
reserves
![Page 5: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/5.jpg)
5
OverviewHow is a BA Established?
– Certification Decision• Prepare Questionnaire for NERC and WECC• On-site Visit
– Address Minimum Operating Reliability Criteria• Generation Control Performance• Transmission• Interchange• System Coordination• Emergency Operations• Operations Planning• Telecommunications• Operating Personnel and Training
– This Process Takes About Six Months; there is a Six Month Probation
![Page 6: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/6.jpg)
6
OverviewWhen does this make sense to do?• Why not now?• There is a recognize lack of business opportunities in the
region• There are no plans to aggregate BAs in the PNW• The region is hamstrung by hourly block markets• Transmission constraints are being operated through BPA
federal resource redispatch and curtailment• BPA is projecting significant wind integration through 2010
(i.e., 6,000 MW)• The region is now “capacity” constrained
– Light-load hours– Heavy-load hours
• There is a need for within hour regulation• Renewable portfolio standards are drivers
![Page 7: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/7.jpg)
7
OverviewWho could participate?
• Operating Resources– Calpine
• Hermiston, OR 630 MW gas CCCT– EPCOR
• Fredrickson/Tacoma, WA 125 MW gas CCCT– Mint Farm Energy Center LLC
• Longview, WA 286 MW gas CCCT– NESCO
• Sumas, WA N/A gas CCCT
– Sierra Pacific• Mt. Vernon, WA 28 MW biomass/cogen
– Suez Energy America• Chehalis, WA 520 MW gas CCCT
– TransAlta• Centralia, WA 1404 MW coal
248 MWgas CCCT
• Resources Under Construction– Grays Harbor Energy Center LLC 650 MW gas CCCT– NW Energy Partners (enXco) 125 MW wind
• Resources Permitted but Not Constructed– Horizon
• Ellensburg, WA 125 MW wind• Arlington, OR 125 MW wind
Source: Robert Kahn
![Page 8: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/8.jpg)
8
Costs/BenefitsWhat will this Arrangement Cost?
• Estimated Cost of Arrangement– Start-up/Implementation/Certification
• $175,000 first entrant• $35,000 for each additional
– Communications and hardware
– Balancing Authority Service Operations• $60,000/month first entrant• $12,000/month for each additional
• The CECD Balancing Authority Services Agreement is an instrument already in operation
![Page 9: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/9.jpg)
9
Cost/BenefitsExperience of Other BAs
• Value of Load-only or Gen-only BA– Greater control over future commodities
purchasing, risk and price management– Eliminate exposure to Generation Imbalance
charges– Become a front runner rather than a follower– Take active role in Business Management and
Regulatory and Compliance Issues– Actively involved in managing Transmission
![Page 10: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/10.jpg)
10
Cost/BenefitsWhat will this Arrangement Save?
• The BA will result in direct savings– Generation Imbalance Charges – Integration Charges ($3.10 – $4.80/MWh)– Operating Reserves (BPA’s rate is $7.93/MWh)
• The BA will enable intangible benefits– Provide needed in-hour services – Enhance redispatch opportunities
• Reliability• Planning
– Pool transmission– Avoid/reduce regulatory interface costs– Improve output profile (wind farm diversity)– Enhance Renewable Portfolio Standard Opportunities
![Page 11: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/11.jpg)
11
Costs/BenefitsHow can benefits be analyzed?
• Evaluate BPA Tariff– Generation Imbalance– Avoid Generation Imbalance (BPA)
• Band 1: +2 MW or +1.5% of scheduled energy– No charge if returned– Charged, if not returned, at diurnally-differentiated incremental cost
• Band 2: Greater than +2 MW or +1.5% of scheduled energy– Charged 110% incremental cost– Credited 90% of incremental cost
• Band 3: Greater than +10 MW or +7.5% of scheduled energy– Charged 125% incremental cost; – Credited 75% of incremental cost
– Operating Reserves (quantity and price)– Integration Charge (if applicable)
• Intangible Benefits– Identify which benefits need further evaluation
• Case-by-case, e.g., pooled transmission• Generic analysis using existing data sets
![Page 12: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/12.jpg)
TMTM Company Overview
• Headquartered in Chadds Ford, PA (Philadelphia)
• Focused on software applications and tools in two areas of the power
industry
– Generation asset performance management (V-PerformanceTM)
– Trading – LMP and market data analysis (V-TraderTM)
• Advanced web-based software architecture with robust and secure data
management capabilities and unique user interface
• 15 customers and growing
• Partnership with Constellation Energy Control and Dispatch
![Page 13: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/13.jpg)
TMTM Sample Tariff
![Page 14: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/14.jpg)
TMTM Versify Product Overview
V-Enterprise
q LMP Price Analysisq DA/RT ISO Pricingq ISO Footprint –
Load, Outageq Chart Analysisq FTR Analysisq Lookback -
Forecasting
V-Trader
Trading Mgmt - Accounting
q Outage Planningq Generator Forecastq Unit Attributesq Contact Mgmt.
V-Planner
Planning
q Dispatch Logq Unit Statusq Day Ahead Energy Schedulingq Portfolio Statusq Alerts
q Wind Availabilityq Manages Outage and Deratingq Wind Schedulingq Combined Energy Scheduling –
Wind, Reserves, AGC
Dispatch - Operations
V-Dispatch V-Renew
q Dash Boards (MW, Avail, Accounting)
q Real-Time Monitoringq Unit Performanceq Operational Reportingq Energy Accountingq Workflow
V-Performance
![Page 15: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/15.jpg)
TMTM Key Functionality
• Real time monitoring and full range of asset performance dashboard reports
– Operational and performance dashboards
– Unit performance reports
– Daily operational reports
• Key functionality enabled through web-based architecture
– Integrates data from CECD PI, dispatch and other systems
• Complete visualization of asset performance
• Common view of operational status
– Summary/graphical reporting with drill down capability
– Simplifies data intensive collection and analysis
– Security manager allows user-based report access
![Page 16: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/16.jpg)
TMTM V-Enterprise
textV-Dispatch V-PlannerVersifyDatabase
Versify Integration Services
PIISO
PricingISO
FootprintUnit
CharacteristicsContractTerms
Others
Data Sources and Inputs
Generation ForecastPlan Generator Outage
Supply Availability
Performance ReportingGeneration or Dispatch Events
Settlement/Shadow Invoice
Versify Reports and Tools (Numerous)
V-Trader
Versify Hosted Facilities
API
Web Serv I ces
DataExport
Fuels System
ISOPortals
ETRM
Users
Planners
Back OfficeAccountants
Senior Management
Dispatchers
Plant Personnel
Traders
Internet
DataWarehouse
EMS
Excel
Nerc eGads
![Page 17: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/17.jpg)
TMTM Applications
• Dashboard Reports
• Unit Status
• Event Log
• Real-Time Monitor
• SCADA Query Tool
• Daily Reports
• Unit Performance
Full range of software applications to analyze, monitor and report on plant operations
![Page 18: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/18.jpg)
TMTM Dashboards
The Operations Dashboard summarizes weather, energy, emissions data and reports KPI type data, such as availability and capacity factor.
![Page 19: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/19.jpg)
TMTM SCADA Query Tool
Ad hoc charting and reporting of SCADA/historical data to assist back office and settlement activities.
![Page 20: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/20.jpg)
20
Optimal Generation Mix
• Define Optimal Mix of Generators– Diversity in Fuel Mix
• Anchor tenant resources• Sequencing additional resources
– Diversity among same Fuel type, e.g., wind– Geographic Diversity in terms of Resource Location– Geographic Diversity in terms of Location of Loads– Various Renewable Portfolio Standards– Transmission Access
• Constraints can further enable redispatch• Opportunities (e.g., counter-flows)
![Page 21: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/21.jpg)
21
IIBA Transmission Area
![Page 22: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/22.jpg)
22
Natural GasCT/CCCT
Wind Energy System
IIBA Participants
Goodnoe Hills125 MW
Horizon 125 MW
Calpine Hermiston630 MW
Mint Farm286 MW
Suez Chehalis520 MW
TransAlta1404 MW Coal248 MW CCCT
EPCOR 125 MW
Sierra Pacific28 MW Biomass
Grays Harbor650 MW
Baseload Coal
![Page 23: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/23.jpg)
23
Load Centers - Interties
Puget Sound EnergySnohomish PUDSeattle City Light
Tacoma Power5,000 MW est.
AvistaSpokane, WA
PacifiCorpPGE
Portland, OR
John Day (PACI)Big Eddy (PDCI)
BC Hydro
IdahoPowerNWE
PacifiCorpWalla Walla,
WA
BPA Public PowerCustomers
![Page 24: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/24.jpg)
24
Wind Energy Systems
Hydroelectric Projects
BC Hydro
ThermalPowerplants
Constrained Flowgates
![Page 25: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/25.jpg)
25
Proposed Wind Project Interconnections
![Page 26: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/26.jpg)
26
Wind + CCCT
CCCT Generation Schedule
0
50
100
150
200
250
300
350
400
450
500
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hour
Ou
tpu
t
![Page 27: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/27.jpg)
27
Wind Ramp
![Page 28: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/28.jpg)
28
Wind Ramp + CCCT shaping
![Page 29: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/29.jpg)
29
BPA Creation of Flat Block Product
![Page 30: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/30.jpg)
30
Operational Configuration
![Page 31: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/31.jpg)
31
Who are the Anchor Tenants?
• Any resource can be the anchor tenant– Needed to initiate the BA certification process– Realize cost savings
• Fossil fuel resource can support wind integration– In-hour shaping– Between hour shaping– Back-off generation during off-peak hours
• Wind can provide other opportunities– Enable RPS opportunities– Further cost savings through avoidance of integration charges– Potential wind farm diversity to improve capacity factor
![Page 32: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/32.jpg)
32
Contractual Structure
• Contractual Arrangement– The Balancing Authority
• Execute BA Services Agreement• The BA will not engage in commercial transactions• The BA will offer services to enhance the value of member generators• The BA generators can be “interconnected” through transmission and
dynamic schedules– The Generators
• Execute the BA Services Agreement (cross contracts)• The Generators will sell to end-users• The Generators will address pooling opportunities• Advise was to not limit participants
– No “Anti-trust” issues identified• The purpose is to facilitate commerce – enhance competition• A bid structure will need to be designed for services• Information sharing as long as such doesn’t impact competition
![Page 33: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/33.jpg)
33
Procedural Next Steps
• Simple Start– Stage this Concept– Arrange Policy Representation (NIPPC)– Allow for full Expansion
• NERC certification– Process requirements
• WECC recognition– Process requirements
![Page 34: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/34.jpg)
34
Procedural Next Steps
• The IIBA would need to– Become a member of the WECC– Become a member of the PNSC– Become a member of the NWPP
• Reserve Sharing Group
– Consider signing the Western Interconnection Agreement (release of liability)
– Consider joining ACE Diversity Interchange
![Page 35: NIPPC’s IIBA Initiative Agenda 7 December 2007](https://reader036.fdocuments.us/reader036/viewer/2022062803/56814650550346895db362bd/html5/thumbnails/35.jpg)
35
Timeline
• Other questions? • Define policy/PR needs for this effort.• Execute Balancing Services Agreement
(December 2007)• Initiate certification process
(January 2008)• Engage in BPA’s wind integration pilot
(Q1 or Q2 2008)• Other “next steps”?