Nipigon Stormwater Scoping Report Sample Site Conditions, Watershed Data, Roles and Responsibilities Dr. Robert Stewart Faculty of Science and Environmental Studies

description

Presentation by Dr. Rob Stewart of Lakehead University on the stormwater management scoping study being done in the Town of Nipigon

Transcript of Nipigon storm scoping oct 9 presentation to PAC

Page 1: Nipigon storm scoping oct 9 presentation to PAC

Nipigon Stormwater Scoping Report Sample Site Conditions, Watershed Data, Roles and Responsibilities Dr. Robert Stewart Faculty of Science and Environmental Studies

Page 2: Nipigon storm scoping oct 9 presentation to PAC

•  The purpose of a Stormwater Master Plan is to provide an integrated process to evaluate existing infrastructure and policies, identify drainage system deficiencies, and develop an implementation plan, including capital planning estimates and possible funding mechanisms for a long-term sustainable program, including policy to manage stormwater, within municipal boundaries

Context

Page 3: Nipigon storm scoping oct 9 presentation to PAC

•  A characterization of the existing environmental conditions for all watersheds within municipality.

•  An assessment of the effectiveness of existing stormwater management infrastructure at reducing the negative impacts of stormwater on the environment, including the consideration of the potential impacts of climate change on the effectiveness of existing infrastructure.

•  The identification of new stormwater measures, retrofit opportunities or improvements to existing infrastructure that could improve the level of water quality and flow capacity.

•  A determination of the framework for an Asset Management model that incorporates costs of capital, operations and maintenance, and replacement with a life-cycle approach.

•  An identification of recommended strategies for stormwater management in the municipality; and

•  A Recommended implementation plan

A Master Plan often includes:

Page 4: Nipigon storm scoping oct 9 presentation to PAC

•  The purpose of this scoping report is to determine the key priorities, issues and resources available for coordinated stormwater management efforts in the Township of Nipigon.

•  It is the first phase of a more comprehensive stormwater management assessment required in the development of a Stormwater Management Master Plan (SWMMP), and Watershed Restoration Plan (WRP) for Clearwater Creek.

Stormwater Scoping Report

Page 5: Nipigon storm scoping oct 9 presentation to PAC

Year 1 (2013-2014) Master Plan Scoping Study •  Develop suitable reference sites within the Town of Nipigon

watershed. These reference sites can be used for comparison to assess the level of impact tributaries exposed to urban municipal discharge

•  Examine tributaries within the city limits, identify the extent of ecosystem impairments, characterize contaminant sources, and provide inventory of physical characteristics to identify areas of concern (i.e. stormwater outfalls, severe erosion, impacted buffer, utility crossings, stream crossings, channel modification etc.)

•  Offer mitigation options and pollution prevention strategies to improve conditions within impaired tributaries

Page 6: Nipigon storm scoping oct 9 presentation to PAC
Page 7: Nipigon storm scoping oct 9 presentation to PAC
Page 8: Nipigon storm scoping oct 9 presentation to PAC
Page 9: Nipigon storm scoping oct 9 presentation to PAC
Page 10: Nipigon storm scoping oct 9 presentation to PAC
Page 11: Nipigon storm scoping oct 9 presentation to PAC
Page 12: Nipigon storm scoping oct 9 presentation to PAC
Page 13: Nipigon storm scoping oct 9 presentation to PAC

D D D

D  

(D

D

IMG_0033.JPG

Page 13 of 205

Site Notes:  Stage 2 enhancement measure for Clearwater Creek. Well established vegetation, however site has not been maintained.

Site: 1 St. Edwards School Retention Catchment

Stormwater

2013:09:04 11:36:54

Page 14: Nipigon storm scoping oct 9 presentation to PAC

D D

D

(D D

D

IMG_0035.JPG

Page 14 of 205

Site Notes:  Retention tank at Site 1

Site: 1 St. Edwards School Retention Catchment

Stormwater

2013:09:04 11:36:59

Page 15: Nipigon storm scoping oct 9 presentation to PAC

D D D

(D D

D

IMG_0037.JPG

Page 15 of 205

Site Notes:  Spillway from retention pond to Clearwater Creek - exposed cobble from path of drainage. (could be re-vegetated to improve retention and reduce erosion.

Site: 1

2013:09:04 11:37:09

Page 16: Nipigon storm scoping oct 9 presentation to PAC

D D (D

D

D

D

210 IMG_0041.JPG

Page 16 of 205

Site Notes:  Clearwater Creek looking upriver. High turbitity from erosion. Sediment contribution from upstream east side of creek major outfall from First Street (Site 4); Harkness Street runoff into St Edwards lot and down by platform.

Site: 1

2013:09:04 11:38:46

Page 17: Nipigon storm scoping oct 9 presentation to PAC
Page 18: Nipigon storm scoping oct 9 presentation to PAC

D

D

D

D

D

D

D

D

D

(D

D

D

D

D D

200

IMG_0047.JPG

Page 18 of 205

Site Notes:  From CN line North of tracks down to ravine. Remediated site using boulders. View is a well vegetated and established section.

Site: 3 Drainage Outfall from Nipigon Cafe

2013:09:04 11:54:29

Page 19: Nipigon storm scoping oct 9 presentation to PAC

D

D

D

D

D

D

D

D

D

(D

D

D

D

D D

200

IMG_0049.JPG

Page 19 of 205

Site Notes:  Top of Ravine looking back toward Nipigon Cafe. Vegetation established. No overland drainage problems reported.

Site: 3 Drainage Outfall from Nipigon Cafe

2013:09:04 11:54:34

Page 20: Nipigon storm scoping oct 9 presentation to PAC

D

D

D

D D

D

D

D

D (D

200

IMG_0067.JPG

Page 20 of 205

Site Notes:  Drainage pipe from Nipigon Cafe. Newly replaced with rip rap rock to prevent further erosion. However no soil or vegetation cover. Also need to ensure boulders are sealed with fine material for vegetation to establish. Temporary fix.

Site: 3 Drainage Outfall from Nipigon Cafe

2013:09:04 12:00:55

Page 21: Nipigon storm scoping oct 9 presentation to PAC

D

D  

 D D

D D D D

D

(D

IMG_0071.JPG

Page 21 of 205

Site Notes:  Left of half pipe shows where rip rap fills in previous erosion.

Site: 3 Drainage Outfall from Nipigon Cafe

2013:09:04 12:04:31

Page 22: Nipigon storm scoping oct 9 presentation to PAC

D

D

D

D D

D

D

D

D (D

200

IMG_0073.JPG

Page 22 of 205

Site Notes:

Fish passage and erosion control / enhancement works in creek below half pipe. No seal of fine materials established for vegetation and erosion reduction. Need to monitor vegetation growth. Area also has noticable floodplain. Need to assess hazard potential and mitigation of fish passage measures. Need to ensure pool/riffle sequence. Potentially clear culvert for fish passage

Site: 3 Drainage Outfall from Nipigon Cafe

2013:09:04 12:07:24

Page 23: Nipigon storm scoping oct 9 presentation to PAC

D D

D

D D

D

D

D D

(D

D

D D

200

200

IMG_2296.JPG

Page 23 of 205

Site Notes:

Site: 3 Initial Trip by Rob Stewart - 08/27/2013

2013:08:27 14:44:42

Page 24: Nipigon storm scoping oct 9 presentation to PAC

D (D    

D

D

D

D

D

D

D

D

D D

D

D

D D

200

IMG_0056.JPG

Page 24 of 205

Site Notes:

Site: 3 Drainage Outfall from Nipigon Cafe

2013:09:04 11:56:09

Page 25: Nipigon storm scoping oct 9 presentation to PAC

D D

D

D D

D

D

D

(D

D

D

D D

D

D

D

200

IMG_2286.JPG

Page 25 of 205

Site Notes:

Site: 3 Initial Trip by Rob Stewart - 08/27/2013

2013:08:27 14:32:18

Page 26: Nipigon storm scoping oct 9 presentation to PAC

D

D

D

D

D

D

D D

D

D

(D

D

D

D

D

D

200

IMG_2289.JPG

Page 26 of 205

Site Notes:

Site: 3 Initial Trip by Rob Stewart - 08/27/2013

2013:08:27 14:36:08

Page 27: Nipigon storm scoping oct 9 presentation to PAC

D

D

D

D

D

D

D D

D

D

(D

D

D

D

D

D

200

IMG_2290.JPG

Page 27 of 205

Site Notes:

Site: 3 Initial Trip by Rob Stewart - 08/27/2013

2013:08:27 14:36:31

Page 28: Nipigon storm scoping oct 9 presentation to PAC

D

D

D

D

D

D

D D

D

D

D

(D

D

D

D

D

200

IMG_2291.JPG

Page 28 of 205

Site Notes:

Site: 3 Initial Trip by Rob Stewart - 08/27/2013

2013:08:27 14:37:07

Page 29: Nipigon storm scoping oct 9 presentation to PAC

D D

D

D D

D

D

D

(D

D

D

D D

D

D

D

200

IMG_2287.JPG

Page 29 of 205

Site Notes:

Site: 3 Initial Trip by Rob Stewart - 08/27/2013

2013:08:27 14:32:31

Page 30: Nipigon storm scoping oct 9 presentation to PAC

D

D

D

D

D

D D  

Site: 3 Initial Trip by Rob Stewart - 08/27/2013

D

(D

D

D

D

D

D

D

200

IMG_2288.JPG

Page 30 of 205

Site Notes:

2013:08:27 14:35:09

Page 31: Nipigon storm scoping oct 9 presentation to PAC

D D

D

D D

D

D

D D

D  

Site: 3 Initial Trip by Rob Stewart - 08/27/2013

(D

D D 200

200

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.

IMG_2300.JPG

Page 31 of 205

Site Notes:

2013:08:27 14:46:45

Page 32: Nipigon storm scoping oct 9 presentation to PAC

D

D

D

D D

D

D

D

D (D

200

IMG_2303.JPG

Page 32 of 205

Site Notes:

Site: 3 Initial Trip by Rob Stewart - 08/27/2013

2013:08:27 14:50:37

Page 33: Nipigon storm scoping oct 9 presentation to PAC

D

D

D

D D

D

D

D

D (D

200

IMG_2304.JPG

Page 33 of 205

Site Notes:

Site: 3 Initial Trip by Rob Stewart - 08/27/2013

2013:08:27 14:50:39

Page 34: Nipigon storm scoping oct 9 presentation to PAC

D

D  

 D D

D D D D

D

(D

IMG_2305.JPG

Page 34 of 205

Site Notes:

Site: 3 Initial Trip by Rob Stewart - 08/27/2013

2013:08:27 14:51:41

Page 35: Nipigon storm scoping oct 9 presentation to PAC
Page 36: Nipigon storm scoping oct 9 presentation to PAC

(D

210 IMG_0075.JPG

Page 36 of 205

Site Notes:

Site: 4

2013:09:04 12:19:14

Page 37: Nipigon storm scoping oct 9 presentation to PAC

(D

210

220

IMG_0082.JPG

Page 37 of 205

Site Notes:  Grassy swale by hospital. Water obscured by vegetation.

Site: 5

2013:09:04 12:26:31

Page 38: Nipigon storm scoping oct 9 presentation to PAC

(D D

D

IMG_0094.JPG

Page 38 of 205

Site Notes:

Site: 6

2013:09:04 12:32:07

Page 39: Nipigon storm scoping oct 9 presentation to PAC

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.

D

(D

D

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.

IMG_2309.JPG

Page 39 of 205

Site Notes:

Site: 6

2013:09:04 12:32:22

Page 40: Nipigon storm scoping oct 9 presentation to PAC

(D

IMG_2310.JPG

Page 40 of 205

Site Notes:

Site: 6

2013:09:04 12:56:44

Page 41: Nipigon storm scoping oct 9 presentation to PAC
Page 42: Nipigon storm scoping oct 9 presentation to PAC

D (D

IMG_0101.JPG

Page 42 of 205

Site Notes:

Site: 7

2013:09:04 12:44:50

Page 43: Nipigon storm scoping oct 9 presentation to PAC

(D D

IMG_0105.JPG

Page 43 of 205

Site Notes:

Site: 7

2013:09:04 12:45:41

Page 44: Nipigon storm scoping oct 9 presentation to PAC

D (D

IMG_0107.JPG

Page 44 of 205

Site Notes:

Site: 7

2013:09:04 12:45:53

Page 45: Nipigon storm scoping oct 9 presentation to PAC

D

D

D

(D

D

260

IMG_0115.JPG

Page 45 of 205

Site Notes:

Site: 9

2013:09:04 12:52:54

Page 46: Nipigon storm scoping oct 9 presentation to PAC

D D

(D

D

D

IMG_0121.JPG

Page 46 of 205

Site Notes:

Site: 9

2013:09:04 12:53:52

Page 47: Nipigon storm scoping oct 9 presentation to PAC

D D

D

(D

D IMG_0123.JPG

Page 47 of 205

Site Notes:

Site: 9

2013:09:04 12:54:19

Page 48: Nipigon storm scoping oct 9 presentation to PAC

D D

D

(D

D IMG_0125.JPG

Page 48 of 205

Site Notes:

Site: 9

2013:09:04 12:54:25

Page 49: Nipigon storm scoping oct 9 presentation to PAC
Page 50: Nipigon storm scoping oct 9 presentation to PAC

D (D    

D D

D

D 190

200

210

220

IMG_0167 - Copy.JPG

Page 50 of 205

Site Notes:

Site: 11

2013:09:04 13:23:11

Page 51: Nipigon storm scoping oct 9 presentation to PAC

D D

D D

D

(D

220

IMG_0169.JPG

Page 51 of 205

Site Notes:

Site: 11

2013:09:04 13:23:18

Page 52: Nipigon storm scoping oct 9 presentation to PAC

D (D    

D D

D

D 190

200

210

220

IMG_0171.JPG

Page 52 of 205

Site Notes:

Site: 11

2013:09:04 13:23:33

Page 53: Nipigon storm scoping oct 9 presentation to PAC

D D

(D

D

D

D

IMG_0180.JPG

Page 53 of 205

Site Notes:

Site: 11

2013:09:04 13:24:46

Page 54: Nipigon storm scoping oct 9 presentation to PAC

D D

(D

D

D

D

IMG_0182.JPG

Page 54 of 205

Site Notes:

Site: 11

2013:09:04 13:25:03

Page 55: Nipigon storm scoping oct 9 presentation to PAC

D D

D D

D

(D

220

IMG_0194.JPG

Page 55 of 205

Site Notes:

Site: 11

2013:09:04 13:27:11

Page 56: Nipigon storm scoping oct 9 presentation to PAC
Page 57: Nipigon storm scoping oct 9 presentation to PAC

D

D  

D (D

IMG_0204.JPG

Page 57 of 205

Site Notes:

Site: 12

2013:09:04 13:34:20

Page 58: Nipigon storm scoping oct 9 presentation to PAC

D (D

D

D

IMG_0206.JPG

Page 58 of 205

Site Notes:

Site: 12

2013:09:04 13:34:42

Page 59: Nipigon storm scoping oct 9 presentation to PAC

(D

D    

D D

IMG_2321.JPG

Page 59 of 205

Site Notes:

Site: 12

2013:09:04 13:35:26

Page 60: Nipigon storm scoping oct 9 presentation to PAC

Infosuperior.com