Nihar's Material Management System Ports

download Nihar's Material Management System Ports

of 40

Transcript of Nihar's Material Management System Ports

  • 8/7/2019 Nihar's Material Management System Ports

    1/40

    PresentationPresentation

    ononNihars Material Management SystemNihars Material Management System

    for Portsfor Ports

    By

    NIHAR INFO GLOBAL LIMTED,PLOT NO 34, GANESH NAGAR,WEST MAREDPALLY,SECUNDERABAD 500026.

    www.niharinfo.com

  • 8/7/2019 Nihar's Material Management System Ports

    2/40

    Presentation on Material Management SystemBy

    Nihar Info Global Limited

    Introduction - NiharInfo Global Limited

    k Nihar Info Global Limited is an ISO 9001:2000 certifiedthirteen year-old public limited Company providing IT solutions

    with its development center located in Hyderabad, Indiak The company has legally owned outfit in Sunny vale, California.

  • 8/7/2019 Nihar's Material Management System Ports

    3/40

    Presentation on Material Management SystemBy

    Nihar Info Global Limited

    Profile Development center in located Hyderabad, India with more than 100 nodes connected with localservers on Windows and Linux platforms.

    Nihar has strong talent pool of Software Engineers with s

    ills in Web Technologies, Multimedia,

    ApplicationD

    evelopment,D

    atabase Administration and Networ

    ing Nihar has Co-located servers with leading ISP providers in India.

    Nihar has strong clients in Government, Defence and Private Sectors.

    Nihar is the IBM partner for ECM solutions

  • 8/7/2019 Nihar's Material Management System Ports

    4/40

    Presentation on Material Management SystemBy

    Nihar Info Global Limited

    Services

    k Web Technology Solutions

    k ECM Solutions with Filenet an IBM Productk E l Governance

    k E l Learning

    k E l Commercek Multimedia

    k .In Accredited Domain Registrar

  • 8/7/2019 Nihar's Material Management System Ports

    5/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    IntroductionIntroduction -- MMSMMSNiharhs Material Management System software is online multi

    user application which automates all the functions dealt by

    Material ManagementD

    epartment of any port w icincludes Indent Management

    Purchase Management

    Stores Management

    Issues Management Bills and Payments etc.

  • 8/7/2019 Nihar's Material Management System Ports

    6/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Main FeaturesMain Features Online Application Multi User

    User Specific Menus Secured with Authorization and Authentication

    functionalities Wide variety of Reports Scalable Can be integrated with any third party applications Independent of OS Customizable

  • 8/7/2019 Nihar's Material Management System Ports

    7/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Success StorySuccess StoryParadip Port TrustParadip Port Trust

    The Material Management is successfully implemented in ParadipPort Trust, MM Department.

    The application maintains total 29000 different materials

    The application maintains 8 departments and 36 divisions

    The solution provided is based on turn ey to provide networ ing,hardware, software, man power support for total 5 years.

    The stores and MM department are connected through fibre opticcable.

    The LAN supports 30 users.

    All the functionalities as described in this presentation areimplemented.

  • 8/7/2019 Nihar's Material Management System Ports

    8/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Organization of ApplicationOrganization of ApplicationThe application is organized into the following modules

    Masters Maintenance This module maintains the information pertaining to Materials, Suppliers,

    Departments, Divisions etc. Transactions

    This module deals with regular day to day transactions lie Indents, Purchase

    Requests, Quotations, POs, Material Receipts, Material Issues, Bills, Payments etc.

    Reports & Queries The software provides around 100+ various reports which includes Stoc Ledgers,

    Stoc Valuation, Daily Material Receipts and Issue Reports, Pending Indents,Pending Pos, Budget Wise Consumption Reports etc.

    Administration This module deals with User Administration li e User Creation, Deletion,

    Permissions etc.

  • 8/7/2019 Nihar's Material Management System Ports

    9/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Masters MaintenanceMasters MaintenanceThe System maintains the following masters information.

    1. Material Master It maintains the information regarding material code, group, Unit of

    Measurement, Unit Rate, Weighted Average Price, Last Issued Date, LastReceived Date, Last Purchase Date & Rate, Opening Qty, Balance Qty,Min. Qty, Max Qty etc.

    2. Supplier Master It maintains the details of supplier code, name, address, approved

    vendor status, list of materials supplied etc.3. Department Master

    4. Division Master

    5. User Master

  • 8/7/2019 Nihar's Material Management System Ports

    10/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Indent ManagementIndent Management The Indents will be accepted from different departments and divisions

    of the port approved by respective heads.

    The indents are classified into Indent General and Indent Spares.

    Other type of Indents in the software are Consolidated Indent and SelfGenerated Indent(By MM Department with out Indentor).

    The Indent captures the information li e indentor name, date of indent,chargeable head(revenue/capital), Consumption Code, materialindented with quantity etc.

    The indent status can be trac ed through out the life cycle of theindent.

  • 8/7/2019 Nihar's Material Management System Ports

    11/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Stock CheckingStock CheckingThis functionality chec s the stoc for any indent in terms of

    Qty Available In Stores

    Qty That Can Be Issued Quantity To Be Procured Quantity On Order

    Other relevant details li e last issued date, last procured dateand rate etc. are displayed.

    If stoc is available then it will go to Issues else to PurchaseRequest

  • 8/7/2019 Nihar's Material Management System Ports

    12/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Purchase RequestsPurchase RequestsThe Software Creates Purchase Requests for any Indents with details of

    Type of Purchase Request, Value of Purchase, EMD, Opening Date,Closing Date, SupplierDetails, Terms and Conditions, Details of

    TenderDisplayed in different news papers etc.

    The Purchase Requests are classified into Enquiries, Short Tender CallNotice(STN) and Tender Call Notice(TCN). These are classified based onvalue of the Tender.

    The Purchase Requests extension and cancellation are also handled.

  • 8/7/2019 Nihar's Material Management System Ports

    13/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    QuotationsQuotationsThrough this functionality all the Quotes received from

    Supplier against the purchase request will be entered with

    the details of rate, taxes, validity, delivery period,discounts, EMD details, Received Date etc.

    The Comparative Statement will be generated by systemautomatically with Least Bidder details for selection.

  • 8/7/2019 Nihar's Material Management System Ports

    14/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Purchase OrdersPurchase OrdersThe Purchase Orders will be generated through system with

    the details of PO number, Supplier, Materials, Rate, Taxes,D

    uties,D

    iscounts,D

    eliveryD

    ate, EMD

    , SecurityD

    eposit,Advance Payments, Payment Terms, Penalty etc.

    The System will support PO Extension,PO Cancellation, POAmendment etc.

    The System will support Phase wise Delivery.

  • 8/7/2019 Nihar's Material Management System Ports

    15/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Incoming Material RegisterIncoming Material RegisterThrough this functionality the materials quantity details are

    captured by retrieving the details from Purchase order.

    Here the Qty as per supplier challan is captured.

    Three Types of Incoming Materials are supported namely Fresh Purchase Orders Purchase Returns Balance Materials

  • 8/7/2019 Nihar's Material Management System Ports

    16/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Stores Receipts BookStores Receipts BookThe inspection details will be entered in SRB for the

    materials received through ICR.

    After the inspection, the accepted Quantity detailswill be entered.The stoc will be updated accordingly.The rejected material will be treated as purchase

    returns.The Balance Materials will be treated as materials to

    be supplied.

  • 8/7/2019 Nihar's Material Management System Ports

    17/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Stores Issue BookStores Issue BookThrough this functionality the materials are issued to

    indentors if they are available in the stores for the

    requested quantity.

    The Issued Quantity will be updated to the stoc .

    The status of the Indent will be updated and the lifecycle will end here.

  • 8/7/2019 Nihar's Material Management System Ports

    18/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Bills & Payments Once details of material receipts in SRB are entered the

    corresponding bill will be automatically generated and

    saved in the database. Payment will be entered for each Bill with the details li e

    Ban Name, Branch, Amount, DD/Cheque No etc.

    Pending Bills, Pending Payments will be trac ed throughthese data.

    Separate forms are provided for entering the details ofEMD, Security Deposit, Ban Guarantee etc.

  • 8/7/2019 Nihar's Material Management System Ports

    19/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Rate Contracted Purchases The System supports rate contracted purchases.

    The rate contracted details are entered once in a year.

    Once the indents are received for the rate contractedmaterials direct purchase orders will be sent to thesuppliers.

    After PO the normal flow will be followed.

  • 8/7/2019 Nihar's Material Management System Ports

    20/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Cash Purchase The System supports cash purchases.

    Once the indents are received for the cash purchase, Direct

    SRBs, Issues, Bills and Payments will be entered.

  • 8/7/2019 Nihar's Material Management System Ports

    21/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Special Purchases(Ex:POL) The system supports special purchases where rate and

    quantity are not fixed. Only the suppliers are fixed.

    For example for continuous purchases ofPetrol/Oils/Lubricants this special case will apply.

    Here Issues doesnht need any Indent as in normal flow fromthe Indentor. Issues will be directly entered.

    Purchase Orders will generated directly without againstself generated indent.

  • 8/7/2019 Nihar's Material Management System Ports

    22/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    ReportsVarious Reports are classified into

    View Reports Once Data is entered in any form the view reports provide the complete

    view of entered data.

    Master Reports All the master data is presented in this report in a summary and detailed

    modes.

    Stoc Reports Important stoc

    reports li

    e stoc

    ledgers, stoc

    valuation etc are provided

    between dates.

    Queries The queries of type stoc

    enquiry, pending POs etc. are presented in thiscategory.

    General Reports Spot Reports

    All the pre-printed formats are presented in this category.

  • 8/7/2019 Nihar's Material Management System Ports

    23/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Reports Provided in the SoftwareMaster Reports Department master report D

    ivision master report Supplier master report Detail supplier report Material master reportThe Purchasing reports are Indent reports Enquiries reports P.O reports

  • 8/7/2019 Nihar's Material Management System Ports

    24/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Indents and Enquiries Reports

    Types of Indent reports

    Executed statement

    Pending indent PO wise Bill of quantity

    Division wise indent

    The Enquiry reports are

    Tender opening date during a wee Tenders not yet converted to PO

    Extended PR report

  • 8/7/2019 Nihar's Material Management System Ports

    25/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    PO Reports

    The PO Reports are

    List of PO during a period

    PO order placed

    List of PO firm wise

    List of PO Indent wise

    List of PO delivered Pending PO firm wise

  • 8/7/2019 Nihar's Material Management System Ports

    26/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    PO Reports contd..

    Reminder for delivery of goods

    Cancellation &Issue of fresh SD processing

    Pending with PPT PO wise and firm wise

    Follow up of PO considering and delivery date

  • 8/7/2019 Nihar's Material Management System Ports

    27/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Stores Reports

    Stoc Received Reports

    Stoc Issue Reports

    Stoc Ledger Reports ABC Analysis Reports

    FSN Analysis Reports

    ICR Reports

  • 8/7/2019 Nihar's Material Management System Ports

    28/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    SRB and SIB Reports

    The Stoc Received reports are

    ICR date wise

    Daily Material Receipt

    Stoc in store not ta en to A/C

    Rejection of Materials

    Material Receipt Journal-Monthly wise

    Material Receipt Intimation to Indents

    The Stoc issue reports are List of Transacted Items daily wise

    Issue register

    Gate pass

  • 8/7/2019 Nihar's Material Management System Ports

    29/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Stock Reports

    The Stoc ledger reports are

    Stoc ledger

    Stoc ledger for all items Stoc level information

    Stoc statement on particular date

  • 8/7/2019 Nihar's Material Management System Ports

    30/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Bills & Payments Reports

    The Bills & Payments Reports are

    Budget wise receipt & issue during a period

    Payment made during a period Advance payment for adjustment

    Material received but payment not yet made

    Bills pending in finance

    Bill pending for payment

  • 8/7/2019 Nihar's Material Management System Ports

    31/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Other Reports

    Item wise price trend

    Consumption report

    EMD pending with PPT report

    EMD details report

    Vendor performance report

  • 8/7/2019 Nihar's Material Management System Ports

    32/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Filenet (An IBM Product) ECM Solution for ProcurementProcess :

    The Filenet application provides Enterprise ContentManagement for the files created for procurement of materialsand automates the Entire Process involved through itsBusiness Process Management.

    Nihar is a valuenet partner for the Filenet, an IBM Company.

    Add On Applications

  • 8/7/2019 Nihar's Material Management System Ports

    33/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    The filenet solution is proposed to Paradip Port Trust, MaterialManagementDepartment for their procurement process.

    The main objective of filenet solution is for addressing the following

    issues of Material ManagementDepartment.1. To maintain the documents in the files for procurement process li e Indents,

    Purchase Requests, Quotations, Purchase Order etc.

    2. Each file ta es minimum 3 to 6 months for closing because of variousapprovals at various levels. Hence Business Process Manager(BPM) solutionof Filenet is required which eeps trac of file at various levels .

    Filenet Solution Contd..

  • 8/7/2019 Nihar's Material Management System Ports

    34/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    There are around 28 steps involved in processing a file at various levels in thePurchase Process

    In each step the file clearance time varies from 1 day to 1 month The File In and File Out process will be with around 10 officers li e Chairman,

    Deputy Chairman, FA&CAO, Material Manager, Deputy Manager, AssistantManager, Purchase Officer, Purchase Assistant, Stores Incharge etc.

    Hence the total life cycle of each file from Indent to Purchase Order variesfrom 3 months to 2 years.

    There will around 50 files created in the department every month. Each file will be maintaining 50 to 100 documents Hence the filenet solution with Document Management and Business Process

    Management is suitable for automating the procurement process in MMDepartment to increase efficiency and reduce the time of procurement.

    Filenet Solution Contd..

  • 8/7/2019 Nihar's Material Management System Ports

    35/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Hardware : Software :Server : Operating SystemProcessor - P IV Windows/LinuxRam - 512 MB Development Environment

    Hard Dis - 40 GB J2S DK 1.5Client : DatabaseProcessor - P III or P IV OracleRam - 256 MB Reporting ToolHard Dis - 40 GB Jasper Reports

    ClientInternet Explorer 5.0

    Web ServerApache Tomcat 5.5

    System Requirements

  • 8/7/2019 Nihar's Material Management System Ports

    36/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Our Clientele

    We have good clientele in the International Market and in Government,

    Defense and Private Sector. A Partial list clients:

    _ Defence Sector

    Military College of Electronics and Mechanical

    Engineers, Hyderabad(MCEME)

    ASC Center & College, Bangalore

    Commander Works Engineering (CWE), Hyderabad

    Faculty of Industrial Engineering (FIET), Hyderabad

    College of Defence

    Management (CD

    M), Hyderabad

    Electronics & Mechanical Engineering (EME) School,

    Baroda

  • 8/7/2019 Nihar's Material Management System Ports

    37/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Our Clientele

    Paradip Port Trust, Orissa

    Rajasthan Small Industries Development Corporation Ltd., Jaipur

    Andhra Pradesh Backward Classes Cooperative Finance Corporation (APBCCFC)

    Andhra Pradesh Cooperative Oilseeds Growers Federation (APOILFED)

    Andhra Pradesh Industrial Infrastructure Corporation (APIIC)

    Andhra Pradesh Forensic Science Laboratory (APFSL)

    Andhra Pradesh Handicrafts Development Corporation Limited(APHDCL)

    Leather Industries Development Corporation of Andhra Pradesh (LIDCAP)

    Andhra Pradesh Backward Classes Welfare Department (APBCWD)

    Andhra Pradesh Scheduled Castes Finance Corporation (APSCFC)

    District Rural Development Agency (DRDA)

    Vishakapatnam Export Processing Zone (VEPZ)

    Osmania University (OU)

    SCERT, Hyderabad

    District Primary Education Program, Hyderabad

    BOB Capital Markets Limited, Mumbai

    Society for Elimination of Rural Poverty (SERP - A World Bank Aided Project

    Government SectorGovernment Sector

  • 8/7/2019 Nihar's Material Management System Ports

    38/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Our Clientele

    Private Sector

    Film Nagar Cultural Club (FNCC), Hyderabad

    Pascal Vaccum Thermowave Private Limited

    Rasula InfoTech Limited

    Siri Cyber Tech Limited

    Growel Formulations Private Limited

    Sound Craft Industries Limited

    Krishna Shreya Constructions Limited

    Jagruthi Foundation Private Limited

    SDE Engineering Limited

    AyurMagic.com Private Limited

    Parke-Davis Ex-Employees Mutual Fund

    BreezeAdvertising Private Limited

    CVR Silks Private Limited

    Indian Association of Cardio Thoracic Surgeons (IACTS)

  • 8/7/2019 Nihar's Material Management System Ports

    39/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Thank You

    Question and Answers

  • 8/7/2019 Nihar's Material Management System Ports

    40/40

    Presentation on Material Management System

    ByNihar Info Global Limited

    Contact Us

    Nihar Info Global Limited

    Plot No. 34,Ganesh Nagar,

    West Marredpally,Secunderabad. India - 500 026

    e-mail: [email protected]

    Ph: 91-40- 27705389/90, 55641416

    Fax:91-40-27807267

    Massif Technologies ,Inc.

    341 Cobalt Way, Suite #202

    Sunnyvale, CA 94085, USA.