NickWorkman Portfolio
-
Upload
shivendu-shekhar-singh -
Category
Documents
-
view
216 -
download
0
Transcript of NickWorkman Portfolio
-
8/8/2019 NickWorkman Portfolio
1/16
B A C H E L O R O F U R B A N P L A N N I N G | U N I V E R S I T Y O F C I N C I N N A T I | C L A S S O F 2 0 1 2
2
2
-
8/8/2019 NickWorkman Portfolio
2/16
COVER LETTER
Thank you for the opportunity to apply for a cooperative education position with your firm. As a third year Urban P
University of Cincinnati, I am available for a position in the winter quarter/semester, beginning January 2011. My
design and planning policy research. Eventually, I would like to steer my career into this area. I am enrolled in
Architecture, Art, and Planning which has an accredited nationally recognized Planning program. My educatio
experience in several design programs used frequently by planner and architects, such as SketchUp, AutoCA
Illustrator, InDesign, Dreamweaver, and GIS.
My teammates and professors best describe me as a h ard-working, forward-thinking, and inclusive individual. Durin
college, I made the Deans List every quarter and currently maintain a 3.63 Grade Point Average. I am involved in
Organization and am an active member of the American Planning Association. In June 2009, I wo rked as an intern fo
Ohio, a suburb of Cleveland, in the Citys Department of Planning and Development. It was there that I was able to
skills as well as better understand the structure of the local go vernment. Additionally, I worked for the Hamilton Cou
Commission from December 2009 to August 2010. In my studio classes, our professors assign large group class
cooperation and collaborative creativity. This in turn has helped me to be a more open-minded person and learn
approach.
My experience in the field of urban planning and design combined with my academic record and participation
candidate for a cooperative education position at. If you need to contact me to possibly schedule an interview, I can
at [email protected] or on the phone at (513) 388-6249. Thanks for your consideration, and I look forward to s
Sincerely,
Nick Workman
-
8/8/2019 NickWorkman Portfolio
3/16
EDUCATION
U N I V E R S I T Y O F C I N C I N N A T I | C I N C I N N A T I , O H I O
College of Design, Architecture, Art, and Planning
Bachelor of Urban Planning, Class of 2012
GPA 3.63/4.0 (Deans List 8/8 Quarters)
U N I V E R S I T EI T V A N A M S T E R D A M | A M S T E R D A M , N E T H E R L A N D S
International School for Humanities and Social Sciences
Study Abroad in Urban and Regional Planning
September 2010-January 2011
M A D E I R A H I G H S C H O O L | C I N C I N N A T I , O H I O
GPA 3.6/4.0; Top 30% of Class
Involvement: Latin Club, Drama Club, Art Club, Thespian Society, Chorus, Select Vocal
Ensemble
ACTIVITIES/HONORS
Planning Student Organization (2007-Present)
American Planning Association (2007-Present)
Cincinnatus Century Scholarship (2007-Present)
Louis Taft Semple Scholarship (2007-2008)
EXPERIENCE
H A M I L T O N C O U N T Y R E G I O N A L P L A N N I N G C O M M I S S I O N
Assisted the planning director and assistant planning director with the c
for zone changes and worked on assembling materials for the Green To
update (December 2009-August 2010).
L A K E W O O D P L A N N I N G D E P A R T M E N T | I N T ER N
Responsible creating reports, generating maps, and performing other
Planning Department for the City of Lakewood, an inner-ring suburb o f
to August 2009).
SKILLS
M I C R O S O F T O F F I C E
Word, Excel, Powerpoint, Outlook
A D O B E C R E A T I V E S U I T E
Photoshop, Illustrator, InDesign, Dreamweaver
S K E T C H U P
A R C G I S
A U T O C A D
RESUME
-
8/8/2019 NickWorkman Portfolio
4/16
CONTENT
I
I II I I
COVER LETTER
RESUMECONTENT
01
04
0607
09
10
MADISONVILLE REGENERATION
CAR DEALERSHIP REDEVELOPMENT
GEOGRAPHIC INFORMATION SYSTEMS
GOLD COAST SIGNAGE
LUDLOW, K ENTUCKY
INTERSTATE 7 5 CO RRIDOR ANALYSIS
-
8/8/2019 NickWorkman Portfolio
5/16
EXISTING BUILDINGS PROPOSED BUILDINGS
M A S T E R P L A N
Madisonville, a neighborhood on the east side of Cincinnati, has struggled within the last decade from disinvestment and blight. For my freshman studio project, I focusproposing a master plan consisting of a series of infill projects along the business district. I then focused more specifically on the section of the business district between Raven
Avenue, and designed new mixed use developments.
-
8/8/2019 NickWorkman Portfolio
6/16
C O U R S E I N F O R M A T I O N
Quarter: Autumn 2007
Instructor: Kiril Stanilov02T H E G O A L
The goal of the project is to establish a gateway that would be welcoming and appropriate for the Madison
The existing strip mall on the north side of the street is fronted by a surface parking lot, which disconnects
the surrounding area and is unwelcoming to pedestrians. Across the street is a patchwork o f vacant build
mere relics of the neighborhoods past. The new development would be a hybrid of the old and the new,
traditional main street with modern architecture, resulting in a more cohesive neighborhood as a whol
EXISTING DEVELOPMENT PROPOSED DEVELOPMENT
-
8/8/2019 NickWorkman Portfolio
7/16
The existing strip mall between Ravenna Street and Whetsel Avenue would be replaced with a new mixed use development. The adjacent side of the street would also incl
development.
C O U R S E I N F O R M A T I O N
Quarter: Autumn 2007
Instructor: Kiril Stanilov03
ADDITIONAL VIEWS VIEW FROM MADISON ROAD AND RAVENNA STREET
-
8/8/2019 NickWorkman Portfolio
8/16
P R O P O S E D
DETROITAVENUE
RO
SEW
OOD
AVE
EV
AE
VO
RG
DR
AH
CR
O
BRO
CKLEYAV
E
PROPOSAL
In the wake of the fallout o f the Big Three automakers,
special attention was given to the car dealerships throughout
Lakewood, Ohio. It was then recommended that the sites be
redeveloped into mixed use developments in keeping with the
transit-oriented character of city. The presence of large
surface lots disrupts the dense fabric of the downtown area.
Rather than supporting a mix of uses, the dealerships are
serving a single use and appear to be out of place as
car-oriented developments in a dense and walkable
community. SITE PLAN
-
8/8/2019 NickWorkman Portfolio
9/16
05 D E T R O I T A N D O R C H A R D G R O V E
The southwest corner of Detroit and Orchard Grove is occupied by
a sales room that would be redeveloped for mixed uses with
improvements to the streetscape.
D E T R O I T N E A R R O S E W O O D P L A C E
Looking east on Detroit near Rosewood Place, the addition of
multiple story buildings would complement the surrounding
urban environment.
EXISTING CONDITIONS
PROPOSED CHANGES
-
8/8/2019 NickWorkman Portfolio
10/16
These are a few samples my work using Geographic Information Systems (GIS). The maps to the left is part of the maps generated during the Land Use Plan Update wi
community under the jurisdiction of the Hamilton County Regional Planning Commission. To the right is a project gi ven to me by the Lakewoo d Planning Department to rec
LAND USE PLAN UPDATE G R E E N T O W N S H I P , O H I O
ZONING MAP C I T Y O F L A K E W O O D , O H I O
06 GEOGRAPHIC INFORMATION SYSTE
-
8/8/2019 NickWorkman Portfolio
11/16
LakeshoreTowers
DowntownLakewood
EdgewaterPark
GC Lake ave
LAKEWOOD
GoldCoast
S T R E E T
S I G N
B A N N E
While working for Lakewood, Ohio, I came up design schematics for a signage and
wayfinding system in the Gold Coast, a high rise residential neighborhood on the
shore of Lake Erie. These designs were presented at a public input meeting
attended by residents, community leaders, and stakeholders.
GOLD COAST SIGNAGE
W A Y F I N D I N G S I G N
-
8/8/2019 NickWorkman Portfolio
12/16
08I N S P I R A T I O NThe signage designs for the Gold Coast were inspired by the neighborhoods iconic high-rise developments
as well as its proximity to Lake Erie. The proposal includes a street sign, banner, and wayfinding sign
template as well as a gateway sign (below). The signage would be featured throughout the entire
neighborhood as as near the Lakewood/Cleveland border. LAKE AVENU
LakeAVENUE
Lake avenuthegold coast
ADDITIONAL SIGNAGE DESIGNS
C O N C E P T 1
C O N C E P T 2
C O N C E P T 3
-
8/8/2019 NickWorkman Portfolio
13/16
C O U R S E I N F O R M A T I O N
Quarter: Autumn 2008
Instructor: Mahyar Arefi
T H E P R O B L E M
The Elm Street business district (above), despite its proximity
to major economic centers such as downtown Cincinnati and
Covington, Kentucky, struggles with high vacancy rates and
underutilized public infrastructure. For this studio, I worked
with a team of four other students to propose a development on
the former site of an amusement park and would incorporate
office space, housing, and retail.
T H E P R O P O S A L
Utilizing the former site of an amusement park, our team proposed a mixed use development (above) cons
on the bottom floors and h ousing and office space on the upper floors. The project would provide amenitie
as well as draw in people from communities within the region.
LUDLOW, KENTUCKY09
DOWNTOWN LUDLOW PROPOSED COMMERCIAL/RESIDENTIAL DEVELOPMENT
-
8/8/2019 NickWorkman Portfolio
14/16
For the 2009 Niehoff Urban Design Studio, I collaborated with a team of planners, architects, and engineers to analyze the Interstate 75 corridor. With my fellow classmate J
the history of the corridor as it relates to the West End, an inner city neighborhood that was dramatically reshaped by urban renewal and highway construction.
H O U S I N G P R O J E C T S
The West End was home to some of Cincinnatis first housing projects, making it a
neighborhood.
C E N T R A L P A R K W A Y
Central Parkway ran along the Eastern border of the West End, serving as a ma
containing unused subway tunnels beneath it.
N E I G H B O R H O O D S T R E E T S
The West Ends streets were organized in a tight grid pattern, reflecting the dense ur
once defined the entire community.
R O W H O U S E S
Many of the West Ends tight blocks contained rowhouses, a reflection of the neighbo
character nearly a century ago.
I N D U S T R I A L U S E S
1948 Cincinnati Master plan called for industrial development in the West End, g
railways.
R A I L W A Y S
Extensive rail networks lined the western and southern borders of the West End, fe
Terminal rail station.
WEST END 1956
INTERSTATE 75 CORRIDOR ANALY10
-
8/8/2019 NickWorkman Portfolio
15/16
H O U S I N G P R O J E C T S
Large block housing projects expanded throughout the West End, which led to social
for the neighborhood.
C E N T R A L P A R K W A Y
Continued to serve as a major neighborhood level street through the 1960s and into
N E I G H B O R H O O D S T R E E T S
Many of the original streets were reconfigured into highway access roads. Other stre
where they intersected with I-75.
R O W H O U S E S
Most of West Ends single family housing stock was demolished. Examples of survivin
be seen today on Dayton Street.
I N D U S T R I A L U S E S
Proximity to the highway, like the rail yards, attracted industry to the West End,
objectives established by the 1948 plan.
H I G H W A Y S Y S T E M
By 1963 I-75 ran through the West End and connected to Northern Kentucky, dis
families in the neighborhood.
WEST END 1968
C O U R S E I N F O R M A T I O N
Quarter: Autumn 2009
Instructor: Frank Russell
1 1
-
8/8/2019 NickWorkman Portfolio
16/16
THANK YOU FOR YOUR T
C
W O R K M A N Z @ M